TOWER-B Flat no 609 S.NO FROM TO 1 DB SB1 3.8 3.8 3.8 2 SB2 L1 2.5 2.5 3 L2 4.1 4.1 4 L3 5.6 5.6 5 L4 7.3 7.3 6 FB 12.35 12.35 7 EP4 6.3 6.3 6.3 P2 EP4 10.3 10.3 10.3 9 P 3 P 2, 1 0.25 0.25 0.25 10 SB1 P3 0.6 0.6 0.6 11 L1 2.35 2.35 12 L2 5.3 5.3 13 BUZZER 14 P1 SB3 22.65 22.65 22.65 15 SB3 FB 4.2 4.2 16 L1 6.3 6.3 17 L2 7.2 7.2 18 BUZZER BELL 15.9 15.9 19 DB PP 1 8.9 8.9 8.9 20 DB SB4 10.35 10.35 10.35 21 SB4 FBK 3.6 3.6 22 L1 6.1 6.1 4 Sq mm (PHASE) 4 Sq mm (NEUTRAL) 2.5 Sq mm (GROUND) 2.5 Sq mm (PHASE) 2.5 Sq mm (NEUTRAL) 1.5 Sq mm (GROUND) 1.0 Sq mm (PHASE) 1.0 Sq mm (NEUTRAL) Name: Signature: Date: Name: Signature: Date: Name: Signature:

Upload: ajay-medikonda

Post on 04-Feb-2016

218 views

Category:

Documents


0 download

DESCRIPTION

a new format for wiring

TRANSCRIPT

Page 1: Wiring Measurement d

PHASE 1 TOWER-B Flat no 609 WIRING MESURMENTS

S.NO FROM TO

1 DB SB1 3.8 3.8 3.82

SB2

L1 2.5 2.5 2.53 L2 4.1 4.1 4.14 L3 5.6 5.6 5.65 L4 7.3 7.3 7.36 FB 12.35 12.35 12.357 EP4 6.3 6.3 6.3

P2 EP4 10.3 10.3 10.39 P 3 P 2, 1 0.25 0.25 0.25

10

SB1

P3 0.6 0.6 0.611 L1 2.35 2.35 2.3512 L2 5.3 5.3 5.313 BUZZER14 P1 SB3 22.65 22.65 22.6515

SB3FB 4.2 4.2 4.2

16 L1 6.3 6.3 6.317 L2 7.2 7.2 7.218 BUZZER BELL 15.9 15.9 15.919 DB PP 1 8.9 8.9 8.920 DB SB4 10.35 10.35 10.3521

SB4FBK 3.6 3.6 3.6

22 L1 6.1 6.1 6.1

4 Sq mm (PHASE)

4 Sq mm (NEUTRAL)

2.5 Sq mm (GROUND)

2.5 Sq mm (PHASE)

2.5 Sq mm (NEUTRAL)

1.5 Sq mm (GROUND)

1.0 Sq mm (PHASE)

1.0 Sq mm (NEUTRAL)

1.0 Sq mm (GROUND)

MAAC INFRASPACE PVT LTD Name: Signature: Date:

PACIFICA: Name: Signature: Date:

CBRE: Name: Signature: Date:

Page 2: Wiring Measurement d

PHASE 1 TOWER-B Flat no 209 WIRING MESURMENTS

23

SB 4

L2 8.8 8.8 8.824 L3 10.2 10.2 10.225 P6 7.1 7.1 7.126 P 8 9.5 9.5 9.527 P728 SB5 1.4 1.4 1.429

P 7EP 9

30 PP 431

SB5

L132 PP533 P1034 P 1135 P11 L236 DB PP 237 PP2 PP338 DB PP539 DB SB640

SB64142 SB743

SB7

FB44 L145 L246 P 1547 L348

SB6P12,13

49

SB7 (2 WAY

CONTROL FOR LP)

SB7 (2 WAY

CONTROL FOR FB3)

MAAC INFRASPACE PVT LTD Name: Signature: Date:

PACIFICA: Name: Signature: Date:

CBRE: Name: Signature: Date:

Page 3: Wiring Measurement d

PHASE 1 TOWER-B Flat no 209 WIRING MESURMENTS

50SB8

L151 P 17,P1652 FB53

SB 9

L254 L355 FB56 P 1957 DB SB858

SB 85960 SB961 SB 1062 P 21 L263

SB 10L1

64 P 2165 P 2067 DB PP668 DB PP769 DB PP8

TOTAL

MAAC INFRASPACE PVT LTD Name: Signature: Date:

PACIFICA: Name: Signature: Date:

CBRE: Name: Signature: Date:

SB9 (2 WAY

CONTROL FOR LP)

SB9 (2 WAY

CONTROL FOR FB3)

MAAC INFRASPACE PVT LTD Name: Signature: Date:

PACIFICA: Name: Signature: Date:

CBRE: Name: Signature: Date:

Page 4: Wiring Measurement d

PHASE 1 TOWER-D Flat no 108 WIRING MESURMENTS

S.NO FROM TO

1 DB SB2 12 12 122

SB2

L1 7.5 3.8 3.83 L2 6.7 3 34 L3 9.7 6 65 FB 4.7 4.7 4.76 EP4 8.5 8.5 8.57 SB1 7.3 7.3 7.38 P3,P2, P1 1.2 1.2 1.29

SB1L1 1.8 1.8 1.8

10 L2 3 3 311 BUZZER 1.1 1.1 1.112 DB PP1 14 14 1415 DB SB5 19.5 19.5 19.516

SB5

L1 3.6 3.6 3.617 EXF 9.5 6 618 P11 0.6 0.6 0.619 L2 3.3 3.3 3.320 SB3 7.3 7.3 7.321

SB3FB 4 4 4

22 L1 5.2 2.5 2.523 L2 6 4 4

4 Sq mm (PHASE)

4 Sq mm (NEUTRAL)

2.5 Sq mm (GROUND)

2.5 Sq mm (PHASE)

2.5 Sq mm (NEUTRAL)

1.5 Sq mm (GROUND)

1.0 Sq mm (PHASE)

1.0 Sq mm (NEUTRAL)

1.0 Sq mm (GROUND)

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA: Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date:

Page 5: Wiring Measurement d

PHASE 1 TOWER-D Flat no 108 WIRING MESURMENTS

24 DB SB4 24.8 24.8 24.825

SB4

L1 1.1 1.1 1.126 L2 5.6 3.5 3.527 L3 5.8 3 328 FB 4.4 4.4 4.429 P7,P8 2 2 230 P6 5.2 5.2 5.231 EP9 4.8 4.8 4.832 PP4 8.3 8.3 8.333 DB PP2 25 25 2534 PP2 PP3 6 6 635 DB PP5 21.2 21.2 21.236 DB SB6 13.4 13.4 13.437

SB6

L1 1.3 1.3 1.338 SB7 6.5 6.5 6.539 SB7(2 1340 SB7(2 1341 P12 3 3 342 P14,P15 5.2 5.2 5.243 SB7 L1 6.7 4 444 SB7 FB 4.3 4.3 4.345 SB7 L2 1.9 1.9 1.946 DB PP6 14.3 14.3 14.347 DB PP7 11 11 1148 DB SB8 9.2 9.2 9.249

SB8

SB9 10.2 10.2 10.250 SB9(2 20.451 SB9(2 20.452 L1 1.2 1.2 1.253 L2 2.7 2.7 2.7

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA: Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date:

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA: Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date:

Page 6: Wiring Measurement d

PHASE 1 TOWER-D Flat no 108 WIRING MESURMENTS

50SB9

L1 7.7 3.5 3.551 FB 5.3 5.3 5.352 P19 7 7 753 SB8 SB10 12.3 12.3 12.354

SB10

L1 3.2 3.2 3.255 EXF 3.5 3.5 3.556 P21 0.5 0.5 0.557 L2 2.2 2.2 2.258 DB PP8 13.2 13.2 13.259 BUZZER BELL 7.7 7.7

TOTAL 104.7 104.7 104.7 169.9 169.9 169.9 176 98.5 90.8

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA: Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date:

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA: Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date:

Page 7: Wiring Measurement d

PHASE 1 TOWER-D Flat no 506 WIRING MESURMENTS

S.NO FROM TO

1 DB SB1 5.35 5.35 5.352

SB1

L1 1.9 1.9 1.93 L2 2.9 2.9 2.94 BUZZER 2.1 2.1 2.15 SB2 9.9 9.9 9.96

SB2

L1 4 4 47 L2 2.4 2.4 2.48 L3 7.2 1.5 1.59 L4 3.3 3.3 3.3

10 FB 5.7 5.7 5.711 EP1 4.4 4.4 4.412 SB3 10.8 10.8 10.813 P3,P2, P1 0.8 0.8 0.814

SB3L1 6.7 2.8 2.8

15 L2 2.05 2.05 2.0516 FB 3.9 3.9 3.917 DB PP1 6.85 6.85 6.8518 DB SB4 11.45 11.45 11.4519

SB4

L1 6 6 620 L2 6 6 621 L3 13.8 13.8 13.822 EF 13.2 13.2 13.223 FB 3.7 3.7 3.724 SB4 21.5 21.5 21.525 P7 7.1 7.1 7.1

4 Sq mm (PHASE)

4 Sq mm (NEUTRAL)

2.5 Sq mm (GROUND)

2.5 Sq mm (PHASE)

2.5 Sq mm (NEUTRAL)

1.5 Sq mm (GROUND)

1.0 Sq mm (PHASE)

1.0 Sq mm (NEUTRAL)

1.0 Sq mm (GROUND)

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA: Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date:

Page 8: Wiring Measurement d

PHASE 1 TOWER-D Flat no 506 WIRING MESURMENTS

26 P6 PP4 0.6 0.6 0.627

SB5

L1 3.2 3.2 3.228 EXF 4.6 2.5 2.529 P11 0.65 0.65 0.6530 L2 2.1 2.1 2.131 SB3 7.3 7.3 7.332 DB PP3 11.45 11.45 11.4533 PP3 PP2 6 6 634 DB PP5 11.55 11.55 11.5535 DB SB6 11.85 11.85 11.8536

SB6

SB7(2 9.637 SB7(2 9.638 SB7 4.8 4.8 4.839 P12 0.8 0.8 0.840 SB8 0.5 0.5 0.541

SB7

FB 4.8 4.8 4.842 L1 7 2.8 2.843 L2 1.8 1.8 1.844 P15 9.5 9.5 9.545 L3 8.4 3.6 3.646

SB8

L1 2.2 2.2 2.247 L2 7.25 5.05 5.0548 EXF 8.7 1.45 1.4549 P17 0.6 0.6 0.650 DB PP6 12.85 12.85 12.8551 DB PP7 18.45 18.45 18.4552 DB SB9 12.45 12.45 12.45

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date:

Page 9: Wiring Measurement d

PHASE 1 TOWER-D Flat no 506 WIRING MESURMENTS

53

SB9

P18 1.3 1.3 1.354 SB10 8.4 8.4 8.455 SB10(2 16.856 SB10(2 16.857

SB10

FB 4.7 4.7 4.758 L1 7 2.3 2.359 L2 2 2 260 L3 10.1 5.4 5.461 P20 9.5 9.5 9.562 DB PP8 13.65 13.65 13.6563 BUZZER BELL 13 13

TOTAL 80.8 80.8 80.8 141.65 141.65 141.65 222.4 130.05 117.05

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date:

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date:

Page 10: Wiring Measurement d

S.NO FROM TO

1 DB SB1 37.19 37.19 37.192 SB1 L1 6 6 63 1SB1 2SB1 3.6 3.6 3.64 DB ESB1 36.19 36.19 36.195 ESB1 EL1 5.3 5.3 5.36 1ESB1 2ESB1 3.6 3.6 3.67 DB SB2 20.59 20.59 20.598

SB2L1 10.9 10.9 10.9

9 L2 7.3 7.3 7.310 1SB2 2SB2 3.6 3.6 3.6 7.211 DB ESB2 19.59 19.59 19.5912

ESB2EL1 4.6 4.6 4.6

13 EL2 18.5 18.5 18.514 1ESB2 2ESB2 3.6 3.6 3.6 7.215 DB SB3 37.59 37.59 37.5916 SB3 L1 4.6 4.6 4.617 1SB3 2SB3 3.6 3.6 3.618 DB ESB3 27.56 27.56 27.5619 ESB3 EL1 4.6 4.6 4.620 1ESB3 2ESB3 3.6 3.6 3.621 DB SB4 10.19 10.19 10.1922

SB4L1 7.9 4.3 4.3

23 L2 3.6 3.6 3.624 L3 7.4 3.8 3.825 1SB4 2SB4 3.6 3.6 3.6 7.2

PHASE 1 TOWER-D LOBBY 1 ST FLOOR WIRING MESURMENTS

2.5 Sq mm (PHASE)

2.5 Sq mm (NEUTRAL)

1.5 Sq mm (GROUND)

1.5 Sq mm (PHASE)

1.5 Sq mm (NEUTRAL)

1.0 Sq mm (GROUND)

2.5 Sq mm (PHASE)

2.5 Sq mm (NEUTRAL)

1.5 Sq mm (GROUND)

1.5 Sq mm (PHASE)

1.5 Sq mm (NEUTRAL)

1.0 Sq mm (GROUND)

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA: Name: BASKARAN.D Signature: Date:

CBRE: Name: Signature: Date:

Page 11: Wiring Measurement d

PHASE 1 TOWER-D LOBBY 1ST FLOOR WIRING MESURMENTS

26 DB ESB4 10.59 10.59 10.5927

ESB4EL1 6.3 6.3 6.3

28 EL2 4.4 4.4 4.429 1ESB4 2ESB4 3.6 3.6 3.6 7.230 DB SB5 19.89 19.89 19.8931 SB5 L1 8.3 8.3 8.332 1SB5 2SB5 3.6 3.6 3.633 DB ESB5 25.09 25.09 25.0934 ESB5 L1 5.6 5.6 5.6

TOTAL 143.45 143.45 143.45 70.4 48.8 48.8 133.42 133.42 133.42 63.7 49.3 49.3

MAAC INFRASPACE PVT LTD Name: RAM KUMAR.V Signature: Date:

PACIFICA Name: BASKARAN Signature: Date:

CBRE: Name: Signature: Date: