MINISTRY OF PUBLIC WORK AND PUBLIC HOUSING

DIRECTORATE GENERAL OF HOUSING PROVISION

FEBRUARY 2016

KEMAYORAN

ATHLETE VILLAGES

TOWARDS ASIAN GAMES 2018

GBK

Athlete

Village

A. Kemayoran Athlete Villages

ZONE D10Tower : 7 (24 & 32 lt)

Unit : 5.594

Spacious : 333.700 m2

Capacity : 11.188 persons

Build by : PUPR

ZONE C2Tower : 3 (18 & 24 lt)

Unit : 1.930

Spacious : 135.000 m2

Capacity : 3.860 persons

Build by : PUPR

PROGRESS• Procurement method: Design and Build

• Pre Qualification bidding Announcement January 12th 2016

• The entire contract is expected to be completed on March 9th 2016

• Construction will be completed by October 2017

ZONE C3Tower : 5 (22 & 24 lt)

Unit : 3.969 (T.36)

Spacious : 80.200 m2

Capacity : 7.938 persons

Build by : Perumnas

TOTALTower : 15

Unit : 11.493

Spacious : 611.612 m2

Capacity : 22.986 persons

Build by : PUPR and Perumnas

• The development of Athlete Village

consists of the buldings,

surrounding infrstructure and

utilities

A. Wisma Atlet Kemayoran

BLOK D10Tower : 7 (24 & 32 lt)

Unit : 5.594

Luas : 333.700 m2

Penghuni : 11.188

Pelaksana : PUPR

BLOK C2Tower : 3 (18 & 24 lt)

Unit : 1.930

Luas : 135.000 m2

Penghuni : 3.860

Pelaksana : PUPR

PROGRES PERSIAPAN

PEMBANGUNAN• Sistem pengadaan Design and Build

• Pengumuman pra-kualifikasi lelang

tanggal 12 Januari 2016.

• Rencana kontrak tanggal 9 Maret 2016

• Rencana selesai konstruksi ≤ Oktober 2017

• Bangunan Wisma Atlet akan

dilaksanakan termasuk dengan penataan

lingkungannya.

BLOK C3Tower : 5 (22 & 24 lt)

Unit : 3.969 (T.36)

Luas : 80.200 m2

Penghuni : 7.938

Pelaksana : Perumnas

TOTALTower : 15

Unit : 11.493

Luas : 611.612 m2

Penghuni : 22.986

Pelaksana : PUPR dan

Perumnas

Zone Costructed By Total Building

Area

Quantity of

Tower

Quantity of

Unit

Quantity of

Accupants

C2Ministry of Public Work and Public

Housing 135.000 3 1.930 3.860

C3 PERUMNAS 80.200 5 3.969 7.938

D10Ministry of Public

Work and Public

Housing

333.700 7 5.594 11.188

Total 15 11.493 22.986

CAPACITY OF KEMAYORAN ATHLETE VILLAGE

5

*) note: 1 (one) unit occupied by 2 (two) persons

ZonaDibangun

olehLuas Total Bangunan

JumlahTower

TotalUnit

Total JmlhPenghuni*

Blok C2 PUPR 135.000 3 1.930 3.860

Blok C3 PERUMNAS 80.200 5 3.969 7.938

Blok D10 PUPR 333.700 7 5.594 11.188

Total 15 11.493 22.986

DAYA TAMPUNG RUMAH SUSUN KEMAYORAN

SESUAI PERENCANAAN

6

*) catatan: 1 (satu) unit sarusun dihuni oleh 2 (dua) orang

JIExpo

Kemayoran

Media Village

Block C2

Athletes Village

Block D10

Athletes Village

Media Village

Block C2 & C3

Media Village

Block D10

Athletes Village

JIExpo

Block C2 & C3

Media Village

Block D10

Athletes Village

JIExpo

C2C3D10

Athletes VillageMedia Village

ZONE

C21st TOWER

18 Floors

522 Units @36 m2, 2BR

2nd TOWER24 Floors

886 Units @36 m2, 2BR

3rd TOWER18 Floors

522 Units @36 m2, 2BR

ZONE C2

ZONED10

Tower 1ST

24 floor

Tower 2ND

32 floorTower 3RD

24 floor

Tower 4TH

32 floor

Tower 5th

32 floor

Tower 6th

24 floor

Tower 7th

32 floor

Tower : 7TH tower

Unit : 5.594

Spacious : 333.700 m2

Capacity : 11.188 person

TRANSPORTATION

ZONE

FLAG PLAZA

HOSPITAL

RESIDENTIAL

ZONE

Recreation Park

Residential

Access

Residential

Access

Residential

Access

Vehicles

Access

Vehicles

Access

Vehicles

Access

Vehicles

Access

Vehicles

Access

ATHLETES VILLAGE – Accessibility

TRANSPORTATION

ZONE

FLAG PLAZA

HOSPITAL

RESIDENTIAL

ZONE

Recreation Park

INTERNATIONAL ZONE1st floor & 2nd floor Podium Block

(total 16 meeting rooms @ 100m2)

ATHLETES VILLAGE – D10

4 Meeting Rooms

@ 100 m2

4 Meeting Rooms

@ 100 m2

4 Meeting Rooms

@ 100 m2

4 Meeting Rooms

@ 100 m2

ATHLETES VILLAGE – D10

TRANSPORTATION

ZONE

FLAG PLAZA

HOSPITAL

RESIDENTIAL

ZONE

Recreation Park

750 seats

750 seats

750 seats

750 seats

DINNING HALL

On 3rd floor Open Space

(total 1500 seats)

750 seats

750 seats

Service

Access

Service

Access

Service

Access

DINNING HALLOn 3rd floor Open

Space(total 3000 seats)

TRANSPORT

ZONE

FLAGS PLAZA RESIDENTIAL

ZONE

Rumah Sakit

(eksisting)

Sekolah Jubilee

(eksisting)

International / Transportation ZoneMeminjam sebagian lahan Rumah Sakit sbg Transport Zone

Halte

Busway

Angkot

LRT

+2.00

+2.00

+1.00

±0.00+2.00

+1.00

MESJID

LOKASI WTP

-4.00

TK & SD

SEKOLAH

RS MITRA KEMAYORAN(eksisting)

SEKOLAH JUBILEE(eksisting)

+4.00

+5.00

+6.00

+8.00

+3.00±0.00

-1.00

-2.00

-3.00

POS DAMKAR

KELURAHAN

4.0

0

P L A Z A

±0.00

STASIUN LRT

+0.50

RAK SEPEDA

SHOWERS

GROUND TANK

LOBBY±0.00

TOKO / WARUNG±0.00

TOKO / WARUNG±0.00

LIFT LOBBY±0.00

TOKO / WARUNG±0.00

SERVICE DOCK-0.15

RAK SEPEDA-0.15

SHOWERS-0.05

TAMAN-0.15

PARKIR SEPEDA-0.15

AREA DUDUK-0.30

AREA DUDUK

PARKIR SEPEDA MOTOR-0.15

PARKIR MOBIL+1.50

SERVICE DOCK

-0.15

SERVICE DOCK-0.15

PARKIR MOBIL+1.50

PARKIR SEPEDA MOTOR-0.15

TOKO / WARUNG±0.00

PARKIR SEPEDA-0.15

TOKO / WARUNG±0.00

TOKO / WARUNG±0.00

TAMAN-0.15

AREA DUDUK-0.30

AREA DUDUK

LOBBY±0.00

-0.15

DROP-OFF

SERVICE DOCK-0.15

SERVICE DOCK-0.15

RAK SEPEDA-0.15

RAK SEPEDA-0.15

SHOWERS-0.05

SHOWERS-0.05

LOBBY±0.00

-0.15

DROP-OFF

PLAZA INTERNAL

PARKIR MOBIL+1.50

PARKIR SEPEDA MOTOR-0.15

TOKO / WARUNG

±0.00

TOKO / WARUNG±0.00

TOKO / WARUNG±0.00

LIFT LOBBY±0.00

LIFT LOBBY±0.00

MEP

Kotak Surat

MEP

Kotak Surat

MEP

Kotak Surat

TOKO / WARUNG±0.00

TOKO / WARUNG±0.00

TOKO / WARUNG±0.00

PARKIR SEPEDA-0.15

PARKIR SEPEDA-0.15

SERVICE DOCK-0.15

SERVICE DOCK-0.15

PARKIR MOBIL+1.50

PARKIR SEPEDA MOTOR-0.15

LOBBY±0.00

-0.15

DROP-OFF

LIFT LOBBY±0.00

MEP

Kotak Surat

TAMAN-0.15

PLAZA INTERNAL

TOKO / WARUNG

±0.00

TOKO / WARUNG±0.00

TOKO / WARUNG±0.00

TOKO / WARUNG±0.00

TOKO / WARUNG±0.00

TOKO / WARUNG±0.00

PARKIR SEPEDA-0.15

PARKIR SEPEDA-0.15

TAMAN-0.15

TAMAN-0.15

LOBBY±0.00

-0.15

DROP-OFF

SERVICE DOCK-0.15

RAK SEPEDA-0.15

SHOWERS-0.05

RAK SEPEDA-0.15

LOBBY±0.00

-0.15

DROP-OFF

SERVICE DOCK-0.15

SERVICE DOCK-0.15

SERVICE DOCK-0.15

LIFT LOBBY±0.00

MEP

Kotak Surat

LIFT LOBBY±0.00

MEP

Kotak Surat

PARKIR MOBIL+1.50

PARKIR SEPEDA MOTOR-0.15

PARKIR SEPEDA MOTOR-0.15

PARKIR MOBIL+1.50

LAGOON

KOLAM HIAS

R. PLN

TRAFO

PDTR

PDTM

CAP BANK

R. PLN

TRAFO

PDTR

PDTM

CAP BANK

R. PLN

TRAFO

PDTR

PDTM

CAP BANK

TRAFO

PDTR

PDTM

CAP BANK

R.PANEL Tower 1 & 2

R.PANEL Tower 3 & 4

R.PANEL Tower 5 & 6

R.PANEL Tower 7

R.KONTROL±0.00

FCC±0.00

FCC±0.00

FCC±0.00

FCC±0.00

FCC±0.00

FCC±0.00

FCC

±0.00

-0.15

DROP-OFF

TRANSPORT

ZONE

ACCESSIBILITY

Motorized Access

Service Access

Pedestrian Access

FLAGS PLAZA – International Zone

FLAGS PLAZA

VIEW MAIN LOBBY (COMMUNITY CENTER) GROUND FLOOR

PUBLIC SPACE PODIUM

12TH and 16th floor

2.75

3.1

0

2.00

2.1

0

3.0

0

2.75

.95

2.7

01

.60

2.00

1.95

KITCHEN

LIVING

BEDBED

BATH

WASH/

DRYING

CORRIDOR

RESIDENTIAL UNIT

Living Room

Type of unit is 36 meter square full-furnished, consists of 1 bedroom (twin bed),

1 bathroom, and kitchen (open space)

LAMPIRAN

APR-DES

1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12

PROCUREMENT

a Pre Qualification Announcement

b Pre Qualification Evaluation

c Procurement

d Procurement selected

e Signing contract

CONSTRUCTION

a 18 Floor Building

b 24 Floor Building

c 32 Floor Building

20172016

ACTIVITIESNOMARETFEBRUARIJANUARI

SCHEDULE

• Pre Qualification Announcement : January 12th 2016

Signing contract : March 9th 2016

Ground Breaking : March 15th 2016

PHO 18 floor,

MAY 2017

PHO 24 floor,

JULY 2017

PHO 32 floor,

OCT 2017

• Construction goals18 Floor Building : May 2017 (14th month)

24 Floor Building : July 2017 (16th month)

32 Floor Building : October 2017 (18 month)

NO ACTIVITIES 2016

1 2 3 4 5 6 7 8 9 10 11 12

PROCUREMENT

a Procurement Process

b Signing Contract

CONSTRUCTION

5 floor Building

A. Kemayoran

B. Jakabaring

• 3 (three) tower already built on 2015

• Procurement process of 2 (two) remaining

tower on 2016

• Signing contract : February 11th 2016

• Construction time (8 month) : October 2016

APR-DES

1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12

PELELANGAN

a Pengumuman PQ

b Evaluasi PQ dan Penetapan

c Pemilihan

d Penetapan Pemenang

e Penandatanganan Kontrak

PELAKSANAAN KONSTRUKSI

a Bangunan Rusun (Wisma Atlet) 18 lantai

b Bangunan Rusun (Wisma Atlet) 24 lantai

c Bangunan Rusun (Wisma Atlet) 32 lantai

20172016

KEGIATANNOMARETFEBRUARIJANUARI

JADWAL PELAKSANAAN

• Pengumuman Pra-Kualifikasi (PQ) : 12 Januari 2016

Penandatanganan Kontrak : 9 Maret 2016

Ground Breaking : 15 Maret 2016

PHO 18 lantai,

MEI 2017

PHO 24 lantai,

JULI 2017

PHO 32 lantai,

OKT 2017

• Target PenyelesaianBangunan 18 lantai : Mei 2017 (14 bulan)

Bangunan 24 lantai : Juli 2017 (16 bulan)

Bangunan 32 lantai : Oktober 2017 (18bulan)

A. Kemayoran

B. Jakabaring

• Rusun Wisma Atlet telah terbangun:

3 (tiga) tower TA. 2015

• Proses Lelang 2 (dua) tower TA. 2016

Jan-Feb 2016

• Tandatangan Kontrak): 11 Februari 2016

• Konstruksi (8 bulan) : Oktober 2016

NO KEGIATAN 2016

1 2 3 4 5 6 7 8 9 10 11 12

PELELANGAN (2 tower) TA.2016

a Proses Pelelangan

b Penandatanganan Kontrak

PELAKSANAAN KONSTRUKSI

Bangunan Rusun (Wisma Atlet) 5 lantai