US Army Corps of EngineersBUILDING STRONG®
WISSAHICKON CREEKFeasibility Study
U.S. Army Corps of Engineers, Philadelphia District
January 14, 2010
Co-sponsor:
Philadelphia Water Department
with
Biohabitats, Inc.
Friends of the Wissahickon
![Page 2: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/2.jpg)
BUILDING STRONG®
Purpose of public meeting
Describe USACE feasibility process & the Wissahickon Creek Feasibility Study
Introduce proposed restoration sites & possible alternatives
Share information & get feedback from you!
![Page 3: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/3.jpg)
BUILDING STRONG®
Agenda/OverviewProject backgroundIntroduction to NEPAOverview of Feasibility Process
ID Problems and OpportunitiesInventory and Forecast ConditionsFormulate Alternative PlansEvaluate and Compare Alternatives
Breakout groups based on project sites
![Page 4: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/4.jpg)
BUILDING STRONG®
Project Sponsors & PartnersArmy Corps of Engineers, Philadelphia DistrictConsultants: Biohabitats, Inc. & VersarAgency Partner: Philadelphia Water Department(non-federal sponsor)Additional Stakeholders► Friends of the Wissahickon► City of Philadelphia Department of Recreation
(formerly FPC)► Neighborhood/community groups► Watershed organizations
![Page 5: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/5.jpg)
BUILDING STRONG®
Project Description & HistoryUSACE received authority to conduct a Schuylkill River Basin Reconnaissance Study in 1988 (completed in 2002)Focused on flood control, water supply, recreation, water quality, and other water and land related resource problemsIdentified primary problems in the Wissahickon: streamflow variability, poor quality aquatic habitat and impaired biological communities, flooding and overall ecosystem imbalancePWD initiated the Wissahickon Creek Feasibility Study in 2004
![Page 6: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/6.jpg)
BUILDING STRONG®
Project Setting & Location64 square mile watershedPhiladelphia portion of watershed is 10.6 sq. mi.Study includes river corridor and selected tributaries between the Schuylkill River and Montgomery Co. / City line~ 8 miles of mainstem and selected tributariesHeavily impacted by urban developmentLong-term history of human disturbance
![Page 7: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/7.jpg)
BUILDING STRONG®
Project Purpose
ID Problems and Opportunities within the study area
Investigate and evaluate ecological restoration solutions toward improving impairments in the ecosystem
Focus toward improvement in aquatic and riparian habitat
![Page 8: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/8.jpg)
BUILDING STRONG®
Introduction to NEPA
National Environmental Policy Act of 1969National charter on protection of the environmentProcess applies to Federal agencies and the programs they fund
![Page 9: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/9.jpg)
BUILDING STRONG®
NEPA: Human EnvironmentPreserve and protect the human environmentEcologyWater and air qualityEndangered speciesSocioeconomicArcheologyCultureAestheticsRecreation
![Page 10: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/10.jpg)
BUILDING STRONG®
NEPA: Interagency Coordination
Coordination with agencies that have legal jurisdiction or expertise in the project area
![Page 11: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/11.jpg)
BUILDING STRONG®
NEPA: Public InvolvementPublic notices
Public meetings
Comments on documents
Surveys
![Page 12: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/12.jpg)
BUILDING STRONG®
USACE Feasibility Process
Six Planning Steps
►Step 1: Identify Problems & Opportunities►Step 2: Inventory & Forecast Conditions►Step 3: Formulate Alternative Plans►Step 4: Evaluate Alternative Plans►Step 5: Compare Alternative Plans►Step 6: Select a Recommended Plan
![Page 13: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/13.jpg)
BUILDING STRONG®
Water Quality and Habitat ImpairmentsState 303(d) listings:
Elevated NutrientsSiltationLow Dissolved OxygenOil & GreasePathogensWater/flow VariabilityHabitat Alteration
Non-Native and Invasive Riparian SpeciesImpediments to Resident Fish Passage
Step 1: Identify Problems & Opportunities
![Page 14: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/14.jpg)
BUILDING STRONG®
Step 1: Identify Problems & Opportunities
Promote fish passage
Reduce sedimentation
Improve aquatic habitat
Restore natural stream channel characteristics
Create or enhance riparian wetlands
![Page 15: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/15.jpg)
BUILDING STRONG®
Step 2: Inventory & Forecast Conditions
Site DescriptionSite Conditions:
aquatic resources and wetlands, vegetation, wildlife resources, finfish and invertebrates, and cultural resourcesHow can changes in the environment over time
impact the current problems and opportunities?Forecasted without any “project action” over 50
years
![Page 16: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/16.jpg)
BUILDING STRONG®
Step 3: Formulate Alternative Plan
Project Site Selection
Restoration Approaches
Alternative Development
![Page 17: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/17.jpg)
BUILDING STRONG®
Project Site Selection
Selected based on prior studies by USACE and PWD10 sites selected► 5 dams along
mainstem► 5 tributaries
![Page 18: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/18.jpg)
BUILDING STRONG®
10 Identified Restoration Sites
Big Ridge Ave. DamLittle Ridge Ave. DamMonoshone CreekCarpenters WoodsGorgas RunLivezey DamCresheim Creek DamMagarge DamCathedral RunThomas Mill Dam
![Page 19: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/19.jpg)
BUILDING STRONG®
Restoration Approaches
No action alternativeAction alternatives►Tributaries
• Bank and bed stabilization• Floodplain reconnection• Wetland enhancement/creation
►Dams• Full or partial removal• Addition of fish ladder or rock ramp
![Page 20: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/20.jpg)
BUILDING STRONG®
Big Ridge Avenue DamDownstream-most site20-ft high Wissahickon damPiers upstream support SEPTA rail lineEncased sewer line
![Page 21: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/21.jpg)
BUILDING STRONG®
Big Ridge Avenue Dam (WSBR)Restoration Alternatives
Alternative 1: No actionAlternative 2: Dam removalAlternative 3: Partial dam removal &
addition of rock rampAlternative 4: Partial dam removal &
addition of fish ladder
![Page 22: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/22.jpg)
BUILDING STRONG®
Little Ridge Avenue Dam8-ft high Wissahickon damPiers downstream support SEPTA rail lineEncased sewer line
![Page 23: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/23.jpg)
BUILDING STRONG®
Little Ridge Avenue Dam (WSLR)Restoration Alternatives
Alternative 1: No actionAlternative 2: Dam removalAlternative 3: Partial dam removal &
addition of rock rampAlternative 4: Bypass channel construction
![Page 24: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/24.jpg)
BUILDING STRONG®
Monoshone CreekTributary to WissahickonFlows along Historic RittenhouseTownExtensive rock walls and weirs
![Page 25: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/25.jpg)
BUILDING STRONG®
Monoshone Creek (WSMC)Restoration Alternatives
Alternative 1: No actionAlternative 2: Channel naturalization &
wetland constructionAlternative 3: Stream restoration at higher
invert & wetland constructionAlternative 4: Preserve existing structures
& wetland construction
![Page 26: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/26.jpg)
BUILDING STRONG®
Carpenters WoodsTributary to WissahickonWooded corridorPast repairs at upstream end
![Page 27: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/27.jpg)
BUILDING STRONG®
Carpenters Woods (WSCW)Restoration Alternatives
Alternative 1: No actionAlternative 2: Stream restoration at higher
invert & wetland constructionAlternative 3: Stabilization of eroding
banks & wetland constructionAlternative 4: Stream restoration at higher
invert, wetland construction & riparian enhancement
![Page 28: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/28.jpg)
BUILDING STRONG®
Gorgas RunBegins at stormwater outfallSteep, coarse tributaryExisting boulders along bank to protect water main
![Page 29: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/29.jpg)
BUILDING STRONG®
Gorgas Run (WSGR)Restoration Alternatives
Alternative 1: No actionAlternative 2: Full stream restoration with
additional treatmentsAlternative 3: Local stream restoration &
bank stabilization with additional treatments
Alternative 4: Wetland creation
![Page 30: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/30.jpg)
BUILDING STRONG®
Livezey DamRock dam on WissahickonPartially breached
![Page 31: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/31.jpg)
BUILDING STRONG®
Livezey Dam (WSLD)Restoration Alternatives
Alternative 1: No actionAlternative 2: Dam removalAlternative 3: Partial dam removal at breachAlternative 4: Installation of rock ramp over
existing dam breach
![Page 32: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/32.jpg)
BUILDING STRONG®
Cresheim Dam & CreekTributary to WissahickonRock damChannel erosion downstream of dam
![Page 33: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/33.jpg)
BUILDING STRONG®
Cresheim Dam & Creek (WSCD)Restoration Alternatives
Alternative 1: No actionAlternative 2: Dam removal and channel
stabilizationAlternative 3: Dam retrofit and channel
stabilizationAlternative 4: Stream restoration at higher
invert
![Page 34: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/34.jpg)
BUILDING STRONG®
Magarge DamRock dam on WissahickonPartially breached
![Page 35: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/35.jpg)
BUILDING STRONG®
Magarge Dam (WSMD)Restoration Alternatives
Alternative 1: No actionAlternative 2: Dam removalAlternative 3: Partial dam removal &
addition of rock rampAlternative 4: Addition of naturalized
passageway
![Page 36: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/36.jpg)
BUILDING STRONG®
Cathedral RunSteepest tributaryCoarse bed materialMost severe bank erosionBedrock outcropsPWD wetland/drainage basin creation in the headwaters
![Page 37: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/37.jpg)
BUILDING STRONG®
Cathedral Run (WSCR)Restoration Alternatives
Alternative 1: No actionAlternative 2: Full stream restoration using
step-poolsAlternative 3: Bank stabilization & grade
controlAlternative 4: Stream restoration at higher
invert
![Page 38: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/38.jpg)
BUILDING STRONG®
Thomas Mill DamRock dam on WissahickonHistoric covered bridgeAdjacent mill racePartially breached
![Page 39: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/39.jpg)
BUILDING STRONG®
Thomas Mill Dam (WSTM)Restoration Alternatives
Alternative 1: No actionAlternative 2: Dam removalAlternative 3: Naturalized passageway
along existing breachAlternative 4: Bypass channel through mill
race
![Page 40: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/40.jpg)
BUILDING STRONG®
Steps 4 and 5: Overview of the Alternative Evaluation and
Comparison Process Two Inputs:►Costs—construction cost estimates►Benefits—FWS Habitat Evaluation Procedure
(HEP)
Corps Cost-Effectiveness/Incremental Cost Analysis (CE/ICA): the foundation for project and alternative selection
![Page 41: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/41.jpg)
BUILDING STRONG®
Environmental Benefit
USFWS’s Habitat Evaluation Procedure (HEP)►Species-specific approach, based on habitat
improvements relating to food, cover, reproduction, and basic needs for survival
►Models exist for a number of mammals, birds, reptiles, amphibians, fish, and invertebrates
►We used Brown Trout, Common Shiner, and Blacknosed Dace
![Page 42: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/42.jpg)
BUILDING STRONG®
Percent pools (V2)
Food-Cover (Cf-c)
Cf-c = (V1+V2+V3+V4)/4
Or, if any value ≤ 0.4, Cf-c = V1, V2, V3, or V4, whichever is lowest.
Suitability Graph
![Page 43: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/43.jpg)
BUILDING STRONG®
Approach to Using HEP to Estimate Environmental Benefits of RestorationModify the individual suitability index scores based on projected results of each alternative on each habitat variable
![Page 44: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/44.jpg)
BUILDING STRONG®
Approach to Using HEP to Estimate Environmental Benefits of Restoration
Repeat for all variables (Blacknosed Dace has 15 variables, Common Shiner has 9 variables, and the Brown Trout has 14 variables)Conduct this for all 10 project sites and for each of four alternatives
![Page 45: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/45.jpg)
BUILDING STRONG®
Approach to Using HEP to Estimate Environmental Benefits of RestorationRun the revised scores through the model to generate the post-restoration and forecasted no-action habitat score
Model Element
Habitat Variable
Tributary Reference WSPC017
Alternative 1 (Project Area: 10000ft long by 15ft wide, 150000ft2, 3.44 ac)
Alternative 2 (Project Area: 150000ft2, 3.44 ac)
Food Cover
v2 Percent pools
21.0 0.76 16.0 0.65 Assume site will have a 5% reduction in pools from channel erosion and deposition and homogenization of channel form
50.0 1.00 Estimated based on step-pool restoration, ½ pool, ¼ riffle, ¼ runs or glides
![Page 46: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/46.jpg)
BUILDING STRONG®
Step 6: Select a Recommended Plan
Preferred alternatives will be based on an incremental analysisCost versus the ecological benefitsAnalysis looks for best benefit within proposed alternatives
![Page 47: WISSAHICKON CREEK Feasibility Study](https://reader030.vdocument.in/reader030/viewer/2022012607/619b397d88a3af013b286d84/html5/thumbnails/47.jpg)
BUILDING STRONG®
Time for Break-out Sessions!