withholding payment under jct and nec contracts january 2011... · withholding payment under jct...

2
JCT and NEC compared There are significant differences in the timescales for withholding in JCT and NEC Contracts. To help understand some of these differences we have prepared flow charts for the following: x JCT 2005 SBC/Q Revision 2 2009 x SBC Sub/A and SBC Sub/C Revision 2 2009 x NEC3 Subcontract These are on the reverse side of this Newsletter. You must be careful to check for any amendments to the Standard Forms which have been used as a basis for this illustration. The new Construction Contracts Bill or to give it its full name “The Local Democracy, Economic Development and Construction Bill”, an updated version of the HGCR Act (1996), is likely to come into force this year. What’s new in the new Bill? – amongst other things... x The Act will now apply to contracts agreed in writing or orally x Adjudication Costs—any attempt to allocate the costs of Adjudication between the parties will be invalid x Conditional payment—ban “pay when certified” clauses x The payment provisions specifically relating to withholding will be fundamentally changed. A practical guide to defending withholding notices: Provided that a party to a contract issues a compliant withholding notice setting out the ground or grounds and the sums attributable to each ground then the party may legitimately withhold. So what can you do to defend that position? Technical Challenge: x Are the provisions of the contract compliant with the HGCR Act? x Is the notice to withhold compliant with the contractual requirements? x Is the notice to withhold compliant with the timing requirements? x Is the notice to withhold compliant with the means of issue? (e.g. recorded delivery post?) Contractual Entitlement Challenge: x What is the cause (breach) of the contract giving entitlement to withhold? x Is there a loss naturally flowing from that breach? Quantum Challenge: x Is the valuation of the withholding prepared correctly and/or in accordance with the contract? x Is the evidential material fully auditable and relevant? x Do the costs claimed/presented naturally relate and flow from the alleged breach? x Have the quantities been properly calculated? x Are the rates and prices fair and reasonable? x Are the reference points correct? Withholding Notices - what level of information is required The law is clear in that a party cannot withhold a payment of a sum due after the final date for payment, unless it has issued an effective notice of intention to withhold, as provided by s111 of the HGCR Act 1996. The extent of the guidance provided by the Act as to the level of detail required in an effective withholding notice is provided at s111 (2). This simply states that the notice must specify— (a) the amount proposed to be withheld and the ground for withholding payment; or (b) if there is more than one ground, each ground and the amount attributable to it. Neither the Act, nor any decisions in the courts provide specific guidance or clarity as to what will constitute an effective withholding notice and how it should be drafted. The courts have “stressed the need for clarity” when withholding money against interim payments, in order to promote confidence in cash flow, as intended by s111 of the Act. An example of the approach of the courts can be found in Aedas Architects Ltd v Skanska Construction UK Ltd. The Judge in this case stated that “The contract demands attribution to each ground. It does not ask for any apportionments and in my view it is a competent way to proceed by debiting all sums. The Statute speaking of “each ground” says attribution “to it” must take place. In my view that also is what the counter notice has done. All the grounds which can be calculated have so been and a global figure debited. In my view that is compliance. ” Here the Judge distinguishes between attribution and apportionment. So... the Act requires attribution to each ground but does not require apportionment. It follows on this view that a “global” sum could be attributed to all grounds in the withholding notice without being apportioned. In conclusion, when drafting a withholding notice, as a safeguard it is important to set out the grounds and the amount attributable to each ground. To avoid the possibility of a withholding notice being challenged on this basis, it would be prudent to apportion and attribute where necessary. The position with such notices will change (probably this year) with the new Construction Contracts Bill (see above). WITHHOLDING PAYMENT UNDER JCT AND NEC CONTRACTS Sheffield : 0114 230 1329 Belper : 01773 599 299 www.ramskillmartin.co.uk NEWSLETTER - JANUARY 2011

Upload: lycong

Post on 06-Mar-2018

245 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: WITHHOLDING PAYMENT UNDER JCT AND NEC CONTRACTS January 2011... · WITHHOLDING PAYMENT UNDER JCT AND NEC CONTRACTS . JCT Standard Building Contract with Quantities 2005 (SBC/Q) –

JCT and NEC compared There are significant differences in the timescales for withholding in JCT and NEC Contracts. To help understand some of these differences we have prepared flow charts for the following:

JCT 2005 SBC/Q Revision 2 2009 SBC Sub/A and SBC Sub/C Revision 2 2009 NEC3 Subcontract

These are on the reverse side of this Newsletter. You must be careful to check for any amendments to the Standard Forms which have been used as a basis for this illustration.

The new Construction Contracts Bill or to give it its full name “The Local Democracy, Economic Development and Construction Bill”, an updated version of the HGCR Act (1996), is likely to come into force this year.

What’s new in the new Bill? – amongst other things...

The Act will now apply to contracts agreed in writing or orally

Adjudication Costs—any attempt to allocate the costs of Adjudication between the parties will be invalid

Conditional payment—ban “pay when certified” clauses

The payment provisions specifically relating to withholding will be fundamentally changed.

A practical guide to defending withholding notices: Provided that a party to a contract issues a compliant withholding notice setting out the ground or grounds and the sums attributable to each ground then the party may legitimately withhold.

So what can you do to defend that position?

Technical Challenge:

Are the provisions of the contract compliant with the HGCR Act?

Is the notice to withhold compliant with the contractual requirements?

Is the notice to withhold compliant with the timing requirements?

Is the notice to withhold compliant with the means of issue? (e.g. recorded delivery post?)

Contractual Entitlement Challenge:

What is the cause (breach) of the contract giving entitlement to withhold?

Is there a loss naturally flowing from that breach? Quantum Challenge:

Is the valuation of the withholding prepared correctly and/or in accordance with the contract?

Is the evidential material fully auditable and relevant?

Do the costs claimed/presented naturally relate and flow from the alleged breach?

Have the quantities been properly calculated?

Are the rates and prices fair and reasonable? Are the reference points correct?

Withholding Notices - what level of information is required The law is clear in that a party cannot withhold a payment of a sum due after the final date for payment, unless it has issued an effective notice of intention to withhold, as provided by s111 of the HGCR Act 1996. The extent of the guidance provided by the Act as to the level of detail required in an effective withholding notice is provided at s111 (2). This simply states that the notice must specify— (a) the amount proposed to be withheld and the ground for withholding payment; or (b) if there is more than one ground, each ground and the amount attributable to it.

Neither the Act, nor any decisions in the courts provide specific guidance or clarity as to what will constitute an effective withholding notice and how it should be drafted. The courts have “stressed the need for clarity” when withholding money against interim payments, in order to promote confidence in cash flow, as intended by s111 of the Act. An example of the approach of the courts can be found in Aedas Architects Ltd v Skanska Construction UK Ltd. The Judge in this case stated that “The contract demands attribution to each ground. It does not ask for any apportionments and in my view it is a competent way to proceed by debiting all sums. The Statute speaking of “each ground” says attribution “to it” must take place. In my view that also is what the counter notice has done. All the grounds which can be calculated have so been and a global figure debited. In my view that is compliance.” Here the Judge distinguishes between attribution and apportionment. So... the Act requires attribution to each ground but does not require apportionment. It follows on this view that a “global” sum could be attributed to all grounds in the withholding notice without being apportioned.

In conclusion, when drafting a withholding notice, as a safeguard it is important to set out the grounds and the amount attributable to each ground. To avoid the possibility of a withholding notice being challenged on this basis, it would be prudent to apportion and attribute where necessary. The position with such notices will change (probably this year) with the new Construction Contracts Bill (see above).

WITHHOLDING PAYMENT UNDER JCT AND NEC CONTRACTS

Sheffield : 0114 230 1329

Belper : 01773 599 299

www.ramskillmartin.co.uk

NEWSLETTER - JANUARY 2011

Page 2: WITHHOLDING PAYMENT UNDER JCT AND NEC CONTRACTS January 2011... · WITHHOLDING PAYMENT UNDER JCT AND NEC CONTRACTS . JCT Standard Building Contract with Quantities 2005 (SBC/Q) –

WITHHOLD

INGPA

YMEN

TUNDER

JCTANDNEC

CONTR

ACT

S.

JCTStan

dard

BuildingCo

ntractwithQuan

tities

2005

(SBC/Q)–

Interim

Paym

entTimeLine

(upto

andinclud

ingPracticalCom

pletion)

7DAYS

JCTStan

dard

BuildingSu

bCo

ntract20

05(SBCsub/Aan

dSB

CSub/C)

–Interim

Paym

entTimeLine

(upto

andinclud

ingPracticalCom

pletion)

NEC

3Subcon

tractCo

ntractorto

SubcontractorPa

ymen

tTimeline

SubCo

ntractor’sCo

mmen

cemen

ton

site.(Clause

4.9.1)

FinalD

ateforpaym

ent(Clause4.9.3)

Due

date.(Clause

4.9.1and4.9.2)

Due

date.Dateforissueof

interim

certificate

unde

rmain

contractor

nolaterthan

one

mon

th. (Clause

4.9.1and4.9.2)

NOTLA

TERTH

AN

5DAYS

As4.9.1or

nolaterthan

onemon

th

NOTLA

TERTH

AN5DAYS

ContractorsGrossValuation

.(Clause4.13

)Co

ntractor

shallgivewritten

notice

toSubCo

ntractor

specifyingthe

amou

ntof

paym

entprop

osed

tobe

made.(Clause4.10

.2)

Contractor

may

give

written

notice

toSub

Contractor

specifyingtheam

ount

prop

osed

tobe

withh

eld.(Clause4.10

.3)

SubCo

ntractor

may

subm

itpaym

ent

application.

Contractor

certifies

amou

ntof

paym

ent

Contractor

assesses

amou

ntdu

e.(Clause50

.2)

Ifno

programmeisaccepted

then

25%

ofam

ount

dueisretained

.(Clause

50.3)

Contractor

makes

paym

entof

amou

ntdu

e.(Clause51

.2)

Themetho

dof

assessmen

tof

theam

ount

dueisde

pend

enton

which

MainOptioncontractapplies.

OptionA:A

mou

ntdu

eisPrices

from

completed

activitysche

dule.

OptionC:

Priceforworkdo

neto

date

isactualbase

costof

workdo

necalculated

usingtheSche

duleof

CostCo

mpo

nentsplus

theapprop

riatefees.

2WEEKS

21DAYS

Employer’swritten

notice

toCo

ntractor

ofprop

osed

paym

ent.(Clause4.9)

App

licationby

Contractor

mon

thly

orothe

rwise.(Clause4.12

)Architect/Adm

inistrator

toissueInterim

Certificatesto

Contractor

statingthe

amou

ntdu

e(asstated

intheParticularsbu

tno

texceed

ingon

emon

th).(Clause4.9)

Employer

may

give

written

notice

tothe

Contractor

specifyingtheam

ount

prop

osed

tobe

withh

eld.(Clause4.13

.4)

14da

ysfrom

theda

teof

issueof

that

Interim

Certificate

Employer’swritten

notice

toCo

ntractor

ofprop

osed

paym

ent.(Clause4.9)

NOTLA

TERTH

AN5DAYS

NOTLA

TERTH

AN5DAYS

Contractor

may

subm

itInterim

App

licationno

tlaterthan

7days

before

theissueof

theInterim

Certificate. (Clause

4.12

)

7DAYS

FinalD

ateforpaym

ent

(Clause4.13

.1)

Due

Date.

(ClauseY(UK)2.2)

Assessm

entDateas

perCo

ntract

DataPartOne

andno

tgreater

than

5weeks

apart.

2WEEKS

Contractor

may

give

written

notice

toSub

Contractor

specifyingtheam

ount

prop

osed

tobe

withh

eld.(ClauseY(UK)2.3)

NOTLA

TERTH

AN7DAYS S

heff

ield

:0114 2

30 1

329

Belp

er

:01773 5

99 2

99

ww

w.r

am

skillm

art

in.c

o.u

k

WiT

hh

oL

diN

g p

AY

mE

NT

UN

dE

R J

cT

AN

d N

Ec

co

NT

RA

cT

S