~~~wlfu ~ ~ 0ti western regional power committee …3 400 kv sujalpur-kota(i r by rtcl) dec – 2015...

56
I Bffil mq)f{ qopernment of India ~~~ Central Electricity Authority ~~~Wlfu Western Regional Power Committee 1J;Cfl-3,1:J;l1~~, '*ffi(~),~ - 400093 F-3, MIDe Area, Andheri (East), Mumbai - 400 093 ~ Phone: 022- 28221681; 28200194; 28200195; 28200196 ~ Fax: 022 - 28370193 Website: WWW.Wlipc.gov.in E-mail: [email protected] . ~ r J "ff: qCillq~/gqr./gm:r-Ch"1OHi-q1l2015-16j,_ ,~ I ~ ~ 0TI g 9001-2008 ISO: 9001-2008 : 06.10.2015 -- ~:- ~"qlf ~ ~ Bfi'rfu, ~ cBT r;rqwr;:r ~ (=IJiyq<:j Bfi'rfu cBT ~ 14.10.2015 c€r APL Tiroda if ~ CffiTIT476 eft ~ cBT ChI4~-qr\1~ ~~ q \3Wl cBT Chl4ell iI cfi ITrm: ~ ~ I ~r:[jc/IG: I ~, ~-~ (cITcfi~) ~~ ~ (9ill~'i)

Upload: others

Post on 02-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

I Bffil mq)fqopernment of India~~~

Central Electricity Authority~~~Wlfu

Western Regional Power Committee1JCfl-31Jl1~~ ffi (~)~ - 400093

F-3 MIDe Area Andheri (East) Mumbai - 400 093~ Phone 022- 28221681 28200194 28200195 28200196 ~ Fax 022 - 28370193

Website WWWWlipcgovin E-mail opc-wrpcnicin

~ r Jff qCillq~gqrgmr-Ch1OHi-q1l2015-16j_ ~

I

~ ~ 0TI g 9001-2008ISO 9001-2008

06102015

--

~-

~qlf ~ ~ Bfirfu ~ cBT rrqwrr ~ (=IJiyqltj Bfirfu cBT ~14102015 ceuror APL Tiroda if ~ CffiTIT476 eft ~ cBT ChI4~-qr1~~~ q 3Wl cBT Chl4elliI cfi ITrm ~ ~ I

~r[jcIG I

~

~-~

(cITcfi~)~~ ~ (9ill~i)

476th OCC Agenda

AGENDA NOTES FOR 476th MEETING OF OPERATION amp COORDINATIONSUB-COMMITTEE OF WRPC

TO BE HELD ON 14th OCTOBER 2015 AT ADANI POWER LIMITED TIRODA

ITEM No 1 CONFIRMATION OF THE MINUTES

Minutes of 475th meeting of Operation amp Coordination Sub-Committee of WRPC held on

10th September 2015 at Mumbai were forwarded vide letter No WRPCOPNOCC-

Minutes2015-167955 dated 22092015

No comment has been received Sub-Committee may confirm the same

ITEM NO2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OFSEPTEMBER 2015

21 Frequency Particulars

The average frequency during the month of September 2015 was 4995 Hz The

maximum instantaneous frequency was 5033 Hz at 1606 hrs on 20th September-15

while minimum instantaneous frequency was 4952 Hz at 1913 hrs on 03 September -

15 The frequency profile during September 2015 was as under

01st September 2015 to 30th September 2015 time

IEGC band (499 lt f lt 5005 Hz) 5983

lt 499 Hz 2939

gt 5005 Hz 1078

The frequency particulars is enclosed at Annex-21

The Sub-Committee may like to note

22 INTER-REGIONAL EXCHANGES

There was a net inter-regional export of 550400 MUs by WR against net export

schedule of 516500 MUs

The Sub-Committee may like to discuss23 Voltage Profile

Voltage profile at some of 765400 kV sub-stations during the month of September

2015 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee may like to discuss

2

476th OCC Agenda

24 UF Relay OperationsAs per WRLDC records during September 2015 the system frequency didnrsquot touch 492

Hz and no UFR operation has been reported by WRLDC However Gujarat intimated

there were 8 occasions UFR operation in Gujarat system

Gujarat may explain the same

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during September 2015 as furnished by

the state utilities are given in Annex 25

The Sub-Committee may note

26 Details of Generating Units under Forced outages

Details of generating units under forced outages during September 2015 are given inAnnex-26

The Sub-Committee may discuss

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during September 2015 aregiven in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING

31Proposed Planned maintenance programme of generating units

The maintenance programme of generating units for the months October 2015 ampNovember 2015 is given in Annex 31

The Sub-Committee may discuss and finalize the outage schedule of generatingunits for the above period

32 OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS

Maintenance programme for transmission lines during the months October 2015 ampNovember 2015 is given in Annex 32

The Sub-Committee may discuss and finalize the maintenance programmeproposed above

3

476th OCC Agenda

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash OCTOBER2015 amp NOEMBER - 2015

Details of anticipated restricted amp un-restricted demands for the months of October 2015

amp November 2015 are given in Annex 33

Constituents may furnish the anticipated station wise Availability amp Energy for the months

of October 2015 amp November 2015

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF SEPTEMBER 2015

The details of actual generation demand drawl of power from grid exchanges etc

are given in the following Annexures

Annex 41 - Actual Generation and Requirement for September 2015

Annex 42 - Peak Demand Schedule Vs Actual for September 2015

Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

for September 2015

Annex 47 ndash Details of level of Major Reservoirs in Western Region for September

2015

The Sub-Committee may like to note

ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGIONThere was no major grid disturbance in the Western Region during the month of

September 2015 However the details of minor incidences during the month received

from WRLDC are enclosed at Annexure-5The Sub-Committee may like to notediscuss

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems onthe dates below

Sl No Name ofconstituents

Date of Receipt

1 PGCILWRTS-I 041020152 PGCILWRTS-II 061020153 MPPTCL 100920154 NTPC 031020155 CSPTCL 031020156 GETCO 061020157 MSETCL 10092015

The sub-Committee may like to note

4

476th OCC Agenda

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINES ANDGENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors in2015-16

As per the approval of 33rd amp 36TH standing committee of WR and subsequentlydiscussion in 28TH WRPC meeting the following reactors have to be installed at thevarious occasions in WRAccordingly the information regarding the commissioning schedule is as below

SNo

400 kVSubstn

Size(MVAR)

Implementingagency

Expected commissioningdate

1 Nanded 125 MVAR MSETCL June ndash 2016

2 Sholapur 125 MVAR MSETCL June ndash 2016

3 Kolhapur 125 MVAR MSETCL June ndash 2016

4 Akola 125 MVAR MSETCL June ndash 2016

5 Nagda 125 MVAR MPPTCL December ndash 2015

6 Bhopal 80 MVAR MPPTCL Commissioned on 27th

August7 ISP 125 MVAR NHDC December 2015

8 Line reactorat Nagda-ISPline at Nagdaend

50MVAR MPPTCL March 2016

11 Satpura 50 MVAR MPPGCL April-2016

12 Sasan Busreactor

240 MVAR RELIANCE Commissioned on 23rd May-2015

50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor aftercommissioning of 125 MVAr reactor at Nagda

Utilities are requested to ensure that reactors are installed and commissionedaccording to the schedule agreed as above Utilities may give update on thestatus of implementation

5

476th OCC Agenda

72 Status of completion of 765400 kV and above ongoing Transmission Schemesbeing executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2015-16 asper the current information available is as follows -

SNo

Name of the Line TargetCompletionDate

Remarks

POWERGRID1 400 kV Navsari ndash Kudus DC Line Oct -15 ROW problem2 765 kV Gwalior - Jaipur line -I

765 kV Gwalior - Jaipur line -I ICommissioned on 130815Commissioned on 110815

3 765 kV Dharamjaygarh - JabalpurPooling Station DC line

Oct -15

4 765 kV Wardha ndashNizamabad-Hyderabad DC

March-16

5 765 kV Narendra-Kolhapur DC Dec-156 400 kV Aurangabad - Boisar line DC

lineNov -2015

7 765 kV Aurangabad (PG) - Padghe(PG) DC

Oct -2015

8 800kV Champa ndash Kurukshetra Bipole Dec- 20159 765 kV Aurangabad- Solapur DC

lineOct- 2015

10 LILO of both circuits of Aurangabad ndashPune 400 kV Dc line at Pune765400 kV GIS

Oct -15

11 400 kV Parli-Pune(Sikarapur) LILO atSikarapur

Commissioned on24022015

12 765 kV Raipur ndash Champa765 kV Raigarh - Champa

Commissioned on 28052015Commissioned on 29052015

13 765 kV Indore-Vadodara Commissioned on05062015

14 400 kV Vadodara-Asoj Commissioned on27062015

15 400 kV Vadodara-Pirana Commissioned on27062015

16 765kV Dharmjaigad-Rachi-II Sept-201517 400 KV Solapur(NTPC)-Solapur(PG)

ckt-ICommissioned on10072015

CHHATTISHGARH1 400 kV Korba west- Marwa

400 kV Marwa- KhedamaraCommissioned on13062015

2 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

Mar- 2016

3 220 kV DCDS lines Chhuri to Mopka(Bilaspur) (DCDS)

Nov ndash 2015

4 LILO of 220 kV Raigarh-Budipadar at400 kV PGCIL Ss Raigarh

Oct -2015

6

476th OCC Agenda

5 LILO of 220 Korba (E)- Bishrampurline at 220 kV Churri Ss

Commissioned on01052015

GUJARAT1 400 kV DC Mundra-Zerda line No 1 Dec -20152 400 kV DC Mundra-Zerda line No 2 Dec -20153 400 kV DC Vadinar-Amreli line Dec -20154 400kV APL-Hadala LILO to Halvad Dec -20155 400 kV DC Amreli-Kasor line(Part-1) Dec -20156 400 kV Charanka- Veloda Dec -2015MADHYA PRADESH1 Satpura TPH-Ashta 400KV DCDS

Line1st ckt commissioned on30th March 20152nd ckt ndash expected by July2015

MAHARASHTRA(STU)1 400KV DC line from Koradi-(II) to

Wardha SS(PG) DCDec ndash 2015

2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

3 2x1500 MVA 765400 kV ICTs atEktuni Dec -15

4 400 kV Bableshwar-Kudus DC(Quad) August -16

5 765 kV Akola(II)-Ektuni -2 (charge at400kV at Tapthithanda)

Charge at 400kV atTapthithanda on20052015

6 400kV IEPL-Warora October-2015

GUJARAT (IPTC route) by WRTransmission (Guj) Pvt Ltd1 400 kV Rajgarh(PG)-Karamsad

(GETCO) DC Dec- 2015

STERLITE (JTCL)1 765 kV Dhramjaygarh - Jabalpur (JTCL)

DC lineOct -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc Charged on 30th June2015

3 400 kV Sujalpur-Kota(IR by RTCL) Dec ndash 2015STERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) SC Charged on 12th June

20152 765 kV Bhopal- Jabalpur Charged on 8th June 20153 765kV Bhopal - Jabalpur Charged on 8th June 2015

The Sub-Committee may discuss and update the status

7

476th OCC Agenda

73 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16

The status regarding Generating units commissioned expected to be commissionedduring the year 2015-16 according the available information is as below

Name of the Power Projects Unit No Capacity(MW)

Date of CommissioningSchedule Date

GUJARATSIKKA TPS EXT 1 250 Oct -15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARHMarwa 1 500 Dec 2015

2 500 Dec 2015MAHARASHTRACHANDRAPUR 9 500 Feb- 2016KORADI 9 660 Nov- 2015KORADI 10 660 March -2016PARLI 8 250 Jan- 2016MADHYA PRADESHMs Jhabua Power Seoni 1 600 December ndash 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 Oct -2015CENTRAL SECTORIPPVINDYACHAL 13 500 OCT -2015KSK 3 600 March ndash 2016KSK 4 600 June ndash 2016SASAN 6 600 COD on 27032015

ACBIL(Maruti) 1 300Commissioned on17042015

RKM 1 360 Oct -2015RKM 2 360 Dec 2015RKM 3 360 Dec 2015

RKM 4 360 MARCH 2016BALCO 1 300 COD on 11072015

The WR utilities may intimate the current status on above

8

476th OCC Agenda

ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (June 2015 to September 2015) for the year 2015-16

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (June 2015

to September 2015) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 83 READINESS OF SLDC AT GOA OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADAEMS SYSTEM

During 29th WRPC meeting it was decided that the status of progress of SLDCrsquos amp

Back-up SLDCrsquos of WR constituents WRLDC would be regularly monitored in monthly

OCC meeting The present status of progress of SLDCrsquos amp Back-up SLDCrsquos of WR

constituents WRLDC attached at Annexure ndash 83All the constituents are requested to give an update in attached format

ITEM NO 84 GENERATION TARGETLGBR PREPARATION FOR THE YEAR2016-17 IN WESTERN REGION

A Electricity Generation Target for the year 2016-17Chief Engineer(OPM) CEA New Delhi intimated vide letter dated 29092015(copy

enclosed at annexure-84A) that generation target for the year 2016-17 to be fixed up by

MoP in consultation with CEA The exercise is already stated by CEA Therefore all the

utilities are requested to send the necessary informationdata in attached format latest

by 31st October 2015 via mail targetopmceagmailcom kiranmeenanicin amp also

send the copy of the same to WRPC(email operationwrpcgmailcom )

All the constituents are requested to furnish the same in attached format

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 2: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

476th OCC Agenda

AGENDA NOTES FOR 476th MEETING OF OPERATION amp COORDINATIONSUB-COMMITTEE OF WRPC

TO BE HELD ON 14th OCTOBER 2015 AT ADANI POWER LIMITED TIRODA

ITEM No 1 CONFIRMATION OF THE MINUTES

Minutes of 475th meeting of Operation amp Coordination Sub-Committee of WRPC held on

10th September 2015 at Mumbai were forwarded vide letter No WRPCOPNOCC-

Minutes2015-167955 dated 22092015

No comment has been received Sub-Committee may confirm the same

ITEM NO2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OFSEPTEMBER 2015

21 Frequency Particulars

The average frequency during the month of September 2015 was 4995 Hz The

maximum instantaneous frequency was 5033 Hz at 1606 hrs on 20th September-15

while minimum instantaneous frequency was 4952 Hz at 1913 hrs on 03 September -

15 The frequency profile during September 2015 was as under

01st September 2015 to 30th September 2015 time

IEGC band (499 lt f lt 5005 Hz) 5983

lt 499 Hz 2939

gt 5005 Hz 1078

The frequency particulars is enclosed at Annex-21

The Sub-Committee may like to note

22 INTER-REGIONAL EXCHANGES

There was a net inter-regional export of 550400 MUs by WR against net export

schedule of 516500 MUs

The Sub-Committee may like to discuss23 Voltage Profile

Voltage profile at some of 765400 kV sub-stations during the month of September

2015 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee may like to discuss

2

476th OCC Agenda

24 UF Relay OperationsAs per WRLDC records during September 2015 the system frequency didnrsquot touch 492

Hz and no UFR operation has been reported by WRLDC However Gujarat intimated

there were 8 occasions UFR operation in Gujarat system

Gujarat may explain the same

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during September 2015 as furnished by

the state utilities are given in Annex 25

The Sub-Committee may note

26 Details of Generating Units under Forced outages

Details of generating units under forced outages during September 2015 are given inAnnex-26

The Sub-Committee may discuss

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during September 2015 aregiven in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING

31Proposed Planned maintenance programme of generating units

The maintenance programme of generating units for the months October 2015 ampNovember 2015 is given in Annex 31

The Sub-Committee may discuss and finalize the outage schedule of generatingunits for the above period

32 OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS

Maintenance programme for transmission lines during the months October 2015 ampNovember 2015 is given in Annex 32

The Sub-Committee may discuss and finalize the maintenance programmeproposed above

3

476th OCC Agenda

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash OCTOBER2015 amp NOEMBER - 2015

Details of anticipated restricted amp un-restricted demands for the months of October 2015

amp November 2015 are given in Annex 33

Constituents may furnish the anticipated station wise Availability amp Energy for the months

of October 2015 amp November 2015

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF SEPTEMBER 2015

The details of actual generation demand drawl of power from grid exchanges etc

are given in the following Annexures

Annex 41 - Actual Generation and Requirement for September 2015

Annex 42 - Peak Demand Schedule Vs Actual for September 2015

Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

for September 2015

Annex 47 ndash Details of level of Major Reservoirs in Western Region for September

2015

The Sub-Committee may like to note

ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGIONThere was no major grid disturbance in the Western Region during the month of

September 2015 However the details of minor incidences during the month received

from WRLDC are enclosed at Annexure-5The Sub-Committee may like to notediscuss

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems onthe dates below

Sl No Name ofconstituents

Date of Receipt

1 PGCILWRTS-I 041020152 PGCILWRTS-II 061020153 MPPTCL 100920154 NTPC 031020155 CSPTCL 031020156 GETCO 061020157 MSETCL 10092015

The sub-Committee may like to note

4

476th OCC Agenda

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINES ANDGENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors in2015-16

As per the approval of 33rd amp 36TH standing committee of WR and subsequentlydiscussion in 28TH WRPC meeting the following reactors have to be installed at thevarious occasions in WRAccordingly the information regarding the commissioning schedule is as below

SNo

400 kVSubstn

Size(MVAR)

Implementingagency

Expected commissioningdate

1 Nanded 125 MVAR MSETCL June ndash 2016

2 Sholapur 125 MVAR MSETCL June ndash 2016

3 Kolhapur 125 MVAR MSETCL June ndash 2016

4 Akola 125 MVAR MSETCL June ndash 2016

5 Nagda 125 MVAR MPPTCL December ndash 2015

6 Bhopal 80 MVAR MPPTCL Commissioned on 27th

August7 ISP 125 MVAR NHDC December 2015

8 Line reactorat Nagda-ISPline at Nagdaend

50MVAR MPPTCL March 2016

11 Satpura 50 MVAR MPPGCL April-2016

12 Sasan Busreactor

240 MVAR RELIANCE Commissioned on 23rd May-2015

50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor aftercommissioning of 125 MVAr reactor at Nagda

Utilities are requested to ensure that reactors are installed and commissionedaccording to the schedule agreed as above Utilities may give update on thestatus of implementation

5

476th OCC Agenda

72 Status of completion of 765400 kV and above ongoing Transmission Schemesbeing executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2015-16 asper the current information available is as follows -

SNo

Name of the Line TargetCompletionDate

Remarks

POWERGRID1 400 kV Navsari ndash Kudus DC Line Oct -15 ROW problem2 765 kV Gwalior - Jaipur line -I

765 kV Gwalior - Jaipur line -I ICommissioned on 130815Commissioned on 110815

3 765 kV Dharamjaygarh - JabalpurPooling Station DC line

Oct -15

4 765 kV Wardha ndashNizamabad-Hyderabad DC

March-16

5 765 kV Narendra-Kolhapur DC Dec-156 400 kV Aurangabad - Boisar line DC

lineNov -2015

7 765 kV Aurangabad (PG) - Padghe(PG) DC

Oct -2015

8 800kV Champa ndash Kurukshetra Bipole Dec- 20159 765 kV Aurangabad- Solapur DC

lineOct- 2015

10 LILO of both circuits of Aurangabad ndashPune 400 kV Dc line at Pune765400 kV GIS

Oct -15

11 400 kV Parli-Pune(Sikarapur) LILO atSikarapur

Commissioned on24022015

12 765 kV Raipur ndash Champa765 kV Raigarh - Champa

Commissioned on 28052015Commissioned on 29052015

13 765 kV Indore-Vadodara Commissioned on05062015

14 400 kV Vadodara-Asoj Commissioned on27062015

15 400 kV Vadodara-Pirana Commissioned on27062015

16 765kV Dharmjaigad-Rachi-II Sept-201517 400 KV Solapur(NTPC)-Solapur(PG)

ckt-ICommissioned on10072015

CHHATTISHGARH1 400 kV Korba west- Marwa

400 kV Marwa- KhedamaraCommissioned on13062015

2 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

Mar- 2016

3 220 kV DCDS lines Chhuri to Mopka(Bilaspur) (DCDS)

Nov ndash 2015

4 LILO of 220 kV Raigarh-Budipadar at400 kV PGCIL Ss Raigarh

Oct -2015

6

476th OCC Agenda

5 LILO of 220 Korba (E)- Bishrampurline at 220 kV Churri Ss

Commissioned on01052015

GUJARAT1 400 kV DC Mundra-Zerda line No 1 Dec -20152 400 kV DC Mundra-Zerda line No 2 Dec -20153 400 kV DC Vadinar-Amreli line Dec -20154 400kV APL-Hadala LILO to Halvad Dec -20155 400 kV DC Amreli-Kasor line(Part-1) Dec -20156 400 kV Charanka- Veloda Dec -2015MADHYA PRADESH1 Satpura TPH-Ashta 400KV DCDS

Line1st ckt commissioned on30th March 20152nd ckt ndash expected by July2015

MAHARASHTRA(STU)1 400KV DC line from Koradi-(II) to

Wardha SS(PG) DCDec ndash 2015

2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

3 2x1500 MVA 765400 kV ICTs atEktuni Dec -15

4 400 kV Bableshwar-Kudus DC(Quad) August -16

5 765 kV Akola(II)-Ektuni -2 (charge at400kV at Tapthithanda)

Charge at 400kV atTapthithanda on20052015

6 400kV IEPL-Warora October-2015

GUJARAT (IPTC route) by WRTransmission (Guj) Pvt Ltd1 400 kV Rajgarh(PG)-Karamsad

(GETCO) DC Dec- 2015

STERLITE (JTCL)1 765 kV Dhramjaygarh - Jabalpur (JTCL)

DC lineOct -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc Charged on 30th June2015

3 400 kV Sujalpur-Kota(IR by RTCL) Dec ndash 2015STERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) SC Charged on 12th June

20152 765 kV Bhopal- Jabalpur Charged on 8th June 20153 765kV Bhopal - Jabalpur Charged on 8th June 2015

The Sub-Committee may discuss and update the status

7

476th OCC Agenda

73 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16

The status regarding Generating units commissioned expected to be commissionedduring the year 2015-16 according the available information is as below

Name of the Power Projects Unit No Capacity(MW)

Date of CommissioningSchedule Date

GUJARATSIKKA TPS EXT 1 250 Oct -15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARHMarwa 1 500 Dec 2015

2 500 Dec 2015MAHARASHTRACHANDRAPUR 9 500 Feb- 2016KORADI 9 660 Nov- 2015KORADI 10 660 March -2016PARLI 8 250 Jan- 2016MADHYA PRADESHMs Jhabua Power Seoni 1 600 December ndash 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 Oct -2015CENTRAL SECTORIPPVINDYACHAL 13 500 OCT -2015KSK 3 600 March ndash 2016KSK 4 600 June ndash 2016SASAN 6 600 COD on 27032015

ACBIL(Maruti) 1 300Commissioned on17042015

RKM 1 360 Oct -2015RKM 2 360 Dec 2015RKM 3 360 Dec 2015

RKM 4 360 MARCH 2016BALCO 1 300 COD on 11072015

The WR utilities may intimate the current status on above

8

476th OCC Agenda

ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (June 2015 to September 2015) for the year 2015-16

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (June 2015

to September 2015) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 83 READINESS OF SLDC AT GOA OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADAEMS SYSTEM

During 29th WRPC meeting it was decided that the status of progress of SLDCrsquos amp

Back-up SLDCrsquos of WR constituents WRLDC would be regularly monitored in monthly

OCC meeting The present status of progress of SLDCrsquos amp Back-up SLDCrsquos of WR

constituents WRLDC attached at Annexure ndash 83All the constituents are requested to give an update in attached format

ITEM NO 84 GENERATION TARGETLGBR PREPARATION FOR THE YEAR2016-17 IN WESTERN REGION

A Electricity Generation Target for the year 2016-17Chief Engineer(OPM) CEA New Delhi intimated vide letter dated 29092015(copy

enclosed at annexure-84A) that generation target for the year 2016-17 to be fixed up by

MoP in consultation with CEA The exercise is already stated by CEA Therefore all the

utilities are requested to send the necessary informationdata in attached format latest

by 31st October 2015 via mail targetopmceagmailcom kiranmeenanicin amp also

send the copy of the same to WRPC(email operationwrpcgmailcom )

All the constituents are requested to furnish the same in attached format

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 3: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

2

476th OCC Agenda

24 UF Relay OperationsAs per WRLDC records during September 2015 the system frequency didnrsquot touch 492

Hz and no UFR operation has been reported by WRLDC However Gujarat intimated

there were 8 occasions UFR operation in Gujarat system

Gujarat may explain the same

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during September 2015 as furnished by

the state utilities are given in Annex 25

The Sub-Committee may note

26 Details of Generating Units under Forced outages

Details of generating units under forced outages during September 2015 are given inAnnex-26

The Sub-Committee may discuss

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during September 2015 aregiven in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING

31Proposed Planned maintenance programme of generating units

The maintenance programme of generating units for the months October 2015 ampNovember 2015 is given in Annex 31

The Sub-Committee may discuss and finalize the outage schedule of generatingunits for the above period

32 OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS

Maintenance programme for transmission lines during the months October 2015 ampNovember 2015 is given in Annex 32

The Sub-Committee may discuss and finalize the maintenance programmeproposed above

3

476th OCC Agenda

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash OCTOBER2015 amp NOEMBER - 2015

Details of anticipated restricted amp un-restricted demands for the months of October 2015

amp November 2015 are given in Annex 33

Constituents may furnish the anticipated station wise Availability amp Energy for the months

of October 2015 amp November 2015

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF SEPTEMBER 2015

The details of actual generation demand drawl of power from grid exchanges etc

are given in the following Annexures

Annex 41 - Actual Generation and Requirement for September 2015

Annex 42 - Peak Demand Schedule Vs Actual for September 2015

Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

for September 2015

Annex 47 ndash Details of level of Major Reservoirs in Western Region for September

2015

The Sub-Committee may like to note

ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGIONThere was no major grid disturbance in the Western Region during the month of

September 2015 However the details of minor incidences during the month received

from WRLDC are enclosed at Annexure-5The Sub-Committee may like to notediscuss

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems onthe dates below

Sl No Name ofconstituents

Date of Receipt

1 PGCILWRTS-I 041020152 PGCILWRTS-II 061020153 MPPTCL 100920154 NTPC 031020155 CSPTCL 031020156 GETCO 061020157 MSETCL 10092015

The sub-Committee may like to note

4

476th OCC Agenda

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINES ANDGENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors in2015-16

As per the approval of 33rd amp 36TH standing committee of WR and subsequentlydiscussion in 28TH WRPC meeting the following reactors have to be installed at thevarious occasions in WRAccordingly the information regarding the commissioning schedule is as below

SNo

400 kVSubstn

Size(MVAR)

Implementingagency

Expected commissioningdate

1 Nanded 125 MVAR MSETCL June ndash 2016

2 Sholapur 125 MVAR MSETCL June ndash 2016

3 Kolhapur 125 MVAR MSETCL June ndash 2016

4 Akola 125 MVAR MSETCL June ndash 2016

5 Nagda 125 MVAR MPPTCL December ndash 2015

6 Bhopal 80 MVAR MPPTCL Commissioned on 27th

August7 ISP 125 MVAR NHDC December 2015

8 Line reactorat Nagda-ISPline at Nagdaend

50MVAR MPPTCL March 2016

11 Satpura 50 MVAR MPPGCL April-2016

12 Sasan Busreactor

240 MVAR RELIANCE Commissioned on 23rd May-2015

50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor aftercommissioning of 125 MVAr reactor at Nagda

Utilities are requested to ensure that reactors are installed and commissionedaccording to the schedule agreed as above Utilities may give update on thestatus of implementation

5

476th OCC Agenda

72 Status of completion of 765400 kV and above ongoing Transmission Schemesbeing executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2015-16 asper the current information available is as follows -

SNo

Name of the Line TargetCompletionDate

Remarks

POWERGRID1 400 kV Navsari ndash Kudus DC Line Oct -15 ROW problem2 765 kV Gwalior - Jaipur line -I

765 kV Gwalior - Jaipur line -I ICommissioned on 130815Commissioned on 110815

3 765 kV Dharamjaygarh - JabalpurPooling Station DC line

Oct -15

4 765 kV Wardha ndashNizamabad-Hyderabad DC

March-16

5 765 kV Narendra-Kolhapur DC Dec-156 400 kV Aurangabad - Boisar line DC

lineNov -2015

7 765 kV Aurangabad (PG) - Padghe(PG) DC

Oct -2015

8 800kV Champa ndash Kurukshetra Bipole Dec- 20159 765 kV Aurangabad- Solapur DC

lineOct- 2015

10 LILO of both circuits of Aurangabad ndashPune 400 kV Dc line at Pune765400 kV GIS

Oct -15

11 400 kV Parli-Pune(Sikarapur) LILO atSikarapur

Commissioned on24022015

12 765 kV Raipur ndash Champa765 kV Raigarh - Champa

Commissioned on 28052015Commissioned on 29052015

13 765 kV Indore-Vadodara Commissioned on05062015

14 400 kV Vadodara-Asoj Commissioned on27062015

15 400 kV Vadodara-Pirana Commissioned on27062015

16 765kV Dharmjaigad-Rachi-II Sept-201517 400 KV Solapur(NTPC)-Solapur(PG)

ckt-ICommissioned on10072015

CHHATTISHGARH1 400 kV Korba west- Marwa

400 kV Marwa- KhedamaraCommissioned on13062015

2 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

Mar- 2016

3 220 kV DCDS lines Chhuri to Mopka(Bilaspur) (DCDS)

Nov ndash 2015

4 LILO of 220 kV Raigarh-Budipadar at400 kV PGCIL Ss Raigarh

Oct -2015

6

476th OCC Agenda

5 LILO of 220 Korba (E)- Bishrampurline at 220 kV Churri Ss

Commissioned on01052015

GUJARAT1 400 kV DC Mundra-Zerda line No 1 Dec -20152 400 kV DC Mundra-Zerda line No 2 Dec -20153 400 kV DC Vadinar-Amreli line Dec -20154 400kV APL-Hadala LILO to Halvad Dec -20155 400 kV DC Amreli-Kasor line(Part-1) Dec -20156 400 kV Charanka- Veloda Dec -2015MADHYA PRADESH1 Satpura TPH-Ashta 400KV DCDS

Line1st ckt commissioned on30th March 20152nd ckt ndash expected by July2015

MAHARASHTRA(STU)1 400KV DC line from Koradi-(II) to

Wardha SS(PG) DCDec ndash 2015

2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

3 2x1500 MVA 765400 kV ICTs atEktuni Dec -15

4 400 kV Bableshwar-Kudus DC(Quad) August -16

5 765 kV Akola(II)-Ektuni -2 (charge at400kV at Tapthithanda)

Charge at 400kV atTapthithanda on20052015

6 400kV IEPL-Warora October-2015

GUJARAT (IPTC route) by WRTransmission (Guj) Pvt Ltd1 400 kV Rajgarh(PG)-Karamsad

(GETCO) DC Dec- 2015

STERLITE (JTCL)1 765 kV Dhramjaygarh - Jabalpur (JTCL)

DC lineOct -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc Charged on 30th June2015

3 400 kV Sujalpur-Kota(IR by RTCL) Dec ndash 2015STERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) SC Charged on 12th June

20152 765 kV Bhopal- Jabalpur Charged on 8th June 20153 765kV Bhopal - Jabalpur Charged on 8th June 2015

The Sub-Committee may discuss and update the status

7

476th OCC Agenda

73 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16

The status regarding Generating units commissioned expected to be commissionedduring the year 2015-16 according the available information is as below

Name of the Power Projects Unit No Capacity(MW)

Date of CommissioningSchedule Date

GUJARATSIKKA TPS EXT 1 250 Oct -15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARHMarwa 1 500 Dec 2015

2 500 Dec 2015MAHARASHTRACHANDRAPUR 9 500 Feb- 2016KORADI 9 660 Nov- 2015KORADI 10 660 March -2016PARLI 8 250 Jan- 2016MADHYA PRADESHMs Jhabua Power Seoni 1 600 December ndash 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 Oct -2015CENTRAL SECTORIPPVINDYACHAL 13 500 OCT -2015KSK 3 600 March ndash 2016KSK 4 600 June ndash 2016SASAN 6 600 COD on 27032015

ACBIL(Maruti) 1 300Commissioned on17042015

RKM 1 360 Oct -2015RKM 2 360 Dec 2015RKM 3 360 Dec 2015

RKM 4 360 MARCH 2016BALCO 1 300 COD on 11072015

The WR utilities may intimate the current status on above

8

476th OCC Agenda

ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (June 2015 to September 2015) for the year 2015-16

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (June 2015

to September 2015) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 83 READINESS OF SLDC AT GOA OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADAEMS SYSTEM

During 29th WRPC meeting it was decided that the status of progress of SLDCrsquos amp

Back-up SLDCrsquos of WR constituents WRLDC would be regularly monitored in monthly

OCC meeting The present status of progress of SLDCrsquos amp Back-up SLDCrsquos of WR

constituents WRLDC attached at Annexure ndash 83All the constituents are requested to give an update in attached format

ITEM NO 84 GENERATION TARGETLGBR PREPARATION FOR THE YEAR2016-17 IN WESTERN REGION

A Electricity Generation Target for the year 2016-17Chief Engineer(OPM) CEA New Delhi intimated vide letter dated 29092015(copy

enclosed at annexure-84A) that generation target for the year 2016-17 to be fixed up by

MoP in consultation with CEA The exercise is already stated by CEA Therefore all the

utilities are requested to send the necessary informationdata in attached format latest

by 31st October 2015 via mail targetopmceagmailcom kiranmeenanicin amp also

send the copy of the same to WRPC(email operationwrpcgmailcom )

All the constituents are requested to furnish the same in attached format

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 4: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

3

476th OCC Agenda

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash OCTOBER2015 amp NOEMBER - 2015

Details of anticipated restricted amp un-restricted demands for the months of October 2015

amp November 2015 are given in Annex 33

Constituents may furnish the anticipated station wise Availability amp Energy for the months

of October 2015 amp November 2015

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF SEPTEMBER 2015

The details of actual generation demand drawl of power from grid exchanges etc

are given in the following Annexures

Annex 41 - Actual Generation and Requirement for September 2015

Annex 42 - Peak Demand Schedule Vs Actual for September 2015

Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

for September 2015

Annex 47 ndash Details of level of Major Reservoirs in Western Region for September

2015

The Sub-Committee may like to note

ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGIONThere was no major grid disturbance in the Western Region during the month of

September 2015 However the details of minor incidences during the month received

from WRLDC are enclosed at Annexure-5The Sub-Committee may like to notediscuss

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems onthe dates below

Sl No Name ofconstituents

Date of Receipt

1 PGCILWRTS-I 041020152 PGCILWRTS-II 061020153 MPPTCL 100920154 NTPC 031020155 CSPTCL 031020156 GETCO 061020157 MSETCL 10092015

The sub-Committee may like to note

4

476th OCC Agenda

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINES ANDGENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors in2015-16

As per the approval of 33rd amp 36TH standing committee of WR and subsequentlydiscussion in 28TH WRPC meeting the following reactors have to be installed at thevarious occasions in WRAccordingly the information regarding the commissioning schedule is as below

SNo

400 kVSubstn

Size(MVAR)

Implementingagency

Expected commissioningdate

1 Nanded 125 MVAR MSETCL June ndash 2016

2 Sholapur 125 MVAR MSETCL June ndash 2016

3 Kolhapur 125 MVAR MSETCL June ndash 2016

4 Akola 125 MVAR MSETCL June ndash 2016

5 Nagda 125 MVAR MPPTCL December ndash 2015

6 Bhopal 80 MVAR MPPTCL Commissioned on 27th

August7 ISP 125 MVAR NHDC December 2015

8 Line reactorat Nagda-ISPline at Nagdaend

50MVAR MPPTCL March 2016

11 Satpura 50 MVAR MPPGCL April-2016

12 Sasan Busreactor

240 MVAR RELIANCE Commissioned on 23rd May-2015

50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor aftercommissioning of 125 MVAr reactor at Nagda

Utilities are requested to ensure that reactors are installed and commissionedaccording to the schedule agreed as above Utilities may give update on thestatus of implementation

5

476th OCC Agenda

72 Status of completion of 765400 kV and above ongoing Transmission Schemesbeing executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2015-16 asper the current information available is as follows -

SNo

Name of the Line TargetCompletionDate

Remarks

POWERGRID1 400 kV Navsari ndash Kudus DC Line Oct -15 ROW problem2 765 kV Gwalior - Jaipur line -I

765 kV Gwalior - Jaipur line -I ICommissioned on 130815Commissioned on 110815

3 765 kV Dharamjaygarh - JabalpurPooling Station DC line

Oct -15

4 765 kV Wardha ndashNizamabad-Hyderabad DC

March-16

5 765 kV Narendra-Kolhapur DC Dec-156 400 kV Aurangabad - Boisar line DC

lineNov -2015

7 765 kV Aurangabad (PG) - Padghe(PG) DC

Oct -2015

8 800kV Champa ndash Kurukshetra Bipole Dec- 20159 765 kV Aurangabad- Solapur DC

lineOct- 2015

10 LILO of both circuits of Aurangabad ndashPune 400 kV Dc line at Pune765400 kV GIS

Oct -15

11 400 kV Parli-Pune(Sikarapur) LILO atSikarapur

Commissioned on24022015

12 765 kV Raipur ndash Champa765 kV Raigarh - Champa

Commissioned on 28052015Commissioned on 29052015

13 765 kV Indore-Vadodara Commissioned on05062015

14 400 kV Vadodara-Asoj Commissioned on27062015

15 400 kV Vadodara-Pirana Commissioned on27062015

16 765kV Dharmjaigad-Rachi-II Sept-201517 400 KV Solapur(NTPC)-Solapur(PG)

ckt-ICommissioned on10072015

CHHATTISHGARH1 400 kV Korba west- Marwa

400 kV Marwa- KhedamaraCommissioned on13062015

2 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

Mar- 2016

3 220 kV DCDS lines Chhuri to Mopka(Bilaspur) (DCDS)

Nov ndash 2015

4 LILO of 220 kV Raigarh-Budipadar at400 kV PGCIL Ss Raigarh

Oct -2015

6

476th OCC Agenda

5 LILO of 220 Korba (E)- Bishrampurline at 220 kV Churri Ss

Commissioned on01052015

GUJARAT1 400 kV DC Mundra-Zerda line No 1 Dec -20152 400 kV DC Mundra-Zerda line No 2 Dec -20153 400 kV DC Vadinar-Amreli line Dec -20154 400kV APL-Hadala LILO to Halvad Dec -20155 400 kV DC Amreli-Kasor line(Part-1) Dec -20156 400 kV Charanka- Veloda Dec -2015MADHYA PRADESH1 Satpura TPH-Ashta 400KV DCDS

Line1st ckt commissioned on30th March 20152nd ckt ndash expected by July2015

MAHARASHTRA(STU)1 400KV DC line from Koradi-(II) to

Wardha SS(PG) DCDec ndash 2015

2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

3 2x1500 MVA 765400 kV ICTs atEktuni Dec -15

4 400 kV Bableshwar-Kudus DC(Quad) August -16

5 765 kV Akola(II)-Ektuni -2 (charge at400kV at Tapthithanda)

Charge at 400kV atTapthithanda on20052015

6 400kV IEPL-Warora October-2015

GUJARAT (IPTC route) by WRTransmission (Guj) Pvt Ltd1 400 kV Rajgarh(PG)-Karamsad

(GETCO) DC Dec- 2015

STERLITE (JTCL)1 765 kV Dhramjaygarh - Jabalpur (JTCL)

DC lineOct -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc Charged on 30th June2015

3 400 kV Sujalpur-Kota(IR by RTCL) Dec ndash 2015STERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) SC Charged on 12th June

20152 765 kV Bhopal- Jabalpur Charged on 8th June 20153 765kV Bhopal - Jabalpur Charged on 8th June 2015

The Sub-Committee may discuss and update the status

7

476th OCC Agenda

73 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16

The status regarding Generating units commissioned expected to be commissionedduring the year 2015-16 according the available information is as below

Name of the Power Projects Unit No Capacity(MW)

Date of CommissioningSchedule Date

GUJARATSIKKA TPS EXT 1 250 Oct -15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARHMarwa 1 500 Dec 2015

2 500 Dec 2015MAHARASHTRACHANDRAPUR 9 500 Feb- 2016KORADI 9 660 Nov- 2015KORADI 10 660 March -2016PARLI 8 250 Jan- 2016MADHYA PRADESHMs Jhabua Power Seoni 1 600 December ndash 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 Oct -2015CENTRAL SECTORIPPVINDYACHAL 13 500 OCT -2015KSK 3 600 March ndash 2016KSK 4 600 June ndash 2016SASAN 6 600 COD on 27032015

ACBIL(Maruti) 1 300Commissioned on17042015

RKM 1 360 Oct -2015RKM 2 360 Dec 2015RKM 3 360 Dec 2015

RKM 4 360 MARCH 2016BALCO 1 300 COD on 11072015

The WR utilities may intimate the current status on above

8

476th OCC Agenda

ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (June 2015 to September 2015) for the year 2015-16

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (June 2015

to September 2015) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 83 READINESS OF SLDC AT GOA OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADAEMS SYSTEM

During 29th WRPC meeting it was decided that the status of progress of SLDCrsquos amp

Back-up SLDCrsquos of WR constituents WRLDC would be regularly monitored in monthly

OCC meeting The present status of progress of SLDCrsquos amp Back-up SLDCrsquos of WR

constituents WRLDC attached at Annexure ndash 83All the constituents are requested to give an update in attached format

ITEM NO 84 GENERATION TARGETLGBR PREPARATION FOR THE YEAR2016-17 IN WESTERN REGION

A Electricity Generation Target for the year 2016-17Chief Engineer(OPM) CEA New Delhi intimated vide letter dated 29092015(copy

enclosed at annexure-84A) that generation target for the year 2016-17 to be fixed up by

MoP in consultation with CEA The exercise is already stated by CEA Therefore all the

utilities are requested to send the necessary informationdata in attached format latest

by 31st October 2015 via mail targetopmceagmailcom kiranmeenanicin amp also

send the copy of the same to WRPC(email operationwrpcgmailcom )

All the constituents are requested to furnish the same in attached format

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 5: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

4

476th OCC Agenda

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINES ANDGENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors in2015-16

As per the approval of 33rd amp 36TH standing committee of WR and subsequentlydiscussion in 28TH WRPC meeting the following reactors have to be installed at thevarious occasions in WRAccordingly the information regarding the commissioning schedule is as below

SNo

400 kVSubstn

Size(MVAR)

Implementingagency

Expected commissioningdate

1 Nanded 125 MVAR MSETCL June ndash 2016

2 Sholapur 125 MVAR MSETCL June ndash 2016

3 Kolhapur 125 MVAR MSETCL June ndash 2016

4 Akola 125 MVAR MSETCL June ndash 2016

5 Nagda 125 MVAR MPPTCL December ndash 2015

6 Bhopal 80 MVAR MPPTCL Commissioned on 27th

August7 ISP 125 MVAR NHDC December 2015

8 Line reactorat Nagda-ISPline at Nagdaend

50MVAR MPPTCL March 2016

11 Satpura 50 MVAR MPPGCL April-2016

12 Sasan Busreactor

240 MVAR RELIANCE Commissioned on 23rd May-2015

50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor aftercommissioning of 125 MVAr reactor at Nagda

Utilities are requested to ensure that reactors are installed and commissionedaccording to the schedule agreed as above Utilities may give update on thestatus of implementation

5

476th OCC Agenda

72 Status of completion of 765400 kV and above ongoing Transmission Schemesbeing executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2015-16 asper the current information available is as follows -

SNo

Name of the Line TargetCompletionDate

Remarks

POWERGRID1 400 kV Navsari ndash Kudus DC Line Oct -15 ROW problem2 765 kV Gwalior - Jaipur line -I

765 kV Gwalior - Jaipur line -I ICommissioned on 130815Commissioned on 110815

3 765 kV Dharamjaygarh - JabalpurPooling Station DC line

Oct -15

4 765 kV Wardha ndashNizamabad-Hyderabad DC

March-16

5 765 kV Narendra-Kolhapur DC Dec-156 400 kV Aurangabad - Boisar line DC

lineNov -2015

7 765 kV Aurangabad (PG) - Padghe(PG) DC

Oct -2015

8 800kV Champa ndash Kurukshetra Bipole Dec- 20159 765 kV Aurangabad- Solapur DC

lineOct- 2015

10 LILO of both circuits of Aurangabad ndashPune 400 kV Dc line at Pune765400 kV GIS

Oct -15

11 400 kV Parli-Pune(Sikarapur) LILO atSikarapur

Commissioned on24022015

12 765 kV Raipur ndash Champa765 kV Raigarh - Champa

Commissioned on 28052015Commissioned on 29052015

13 765 kV Indore-Vadodara Commissioned on05062015

14 400 kV Vadodara-Asoj Commissioned on27062015

15 400 kV Vadodara-Pirana Commissioned on27062015

16 765kV Dharmjaigad-Rachi-II Sept-201517 400 KV Solapur(NTPC)-Solapur(PG)

ckt-ICommissioned on10072015

CHHATTISHGARH1 400 kV Korba west- Marwa

400 kV Marwa- KhedamaraCommissioned on13062015

2 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

Mar- 2016

3 220 kV DCDS lines Chhuri to Mopka(Bilaspur) (DCDS)

Nov ndash 2015

4 LILO of 220 kV Raigarh-Budipadar at400 kV PGCIL Ss Raigarh

Oct -2015

6

476th OCC Agenda

5 LILO of 220 Korba (E)- Bishrampurline at 220 kV Churri Ss

Commissioned on01052015

GUJARAT1 400 kV DC Mundra-Zerda line No 1 Dec -20152 400 kV DC Mundra-Zerda line No 2 Dec -20153 400 kV DC Vadinar-Amreli line Dec -20154 400kV APL-Hadala LILO to Halvad Dec -20155 400 kV DC Amreli-Kasor line(Part-1) Dec -20156 400 kV Charanka- Veloda Dec -2015MADHYA PRADESH1 Satpura TPH-Ashta 400KV DCDS

Line1st ckt commissioned on30th March 20152nd ckt ndash expected by July2015

MAHARASHTRA(STU)1 400KV DC line from Koradi-(II) to

Wardha SS(PG) DCDec ndash 2015

2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

3 2x1500 MVA 765400 kV ICTs atEktuni Dec -15

4 400 kV Bableshwar-Kudus DC(Quad) August -16

5 765 kV Akola(II)-Ektuni -2 (charge at400kV at Tapthithanda)

Charge at 400kV atTapthithanda on20052015

6 400kV IEPL-Warora October-2015

GUJARAT (IPTC route) by WRTransmission (Guj) Pvt Ltd1 400 kV Rajgarh(PG)-Karamsad

(GETCO) DC Dec- 2015

STERLITE (JTCL)1 765 kV Dhramjaygarh - Jabalpur (JTCL)

DC lineOct -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc Charged on 30th June2015

3 400 kV Sujalpur-Kota(IR by RTCL) Dec ndash 2015STERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) SC Charged on 12th June

20152 765 kV Bhopal- Jabalpur Charged on 8th June 20153 765kV Bhopal - Jabalpur Charged on 8th June 2015

The Sub-Committee may discuss and update the status

7

476th OCC Agenda

73 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16

The status regarding Generating units commissioned expected to be commissionedduring the year 2015-16 according the available information is as below

Name of the Power Projects Unit No Capacity(MW)

Date of CommissioningSchedule Date

GUJARATSIKKA TPS EXT 1 250 Oct -15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARHMarwa 1 500 Dec 2015

2 500 Dec 2015MAHARASHTRACHANDRAPUR 9 500 Feb- 2016KORADI 9 660 Nov- 2015KORADI 10 660 March -2016PARLI 8 250 Jan- 2016MADHYA PRADESHMs Jhabua Power Seoni 1 600 December ndash 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 Oct -2015CENTRAL SECTORIPPVINDYACHAL 13 500 OCT -2015KSK 3 600 March ndash 2016KSK 4 600 June ndash 2016SASAN 6 600 COD on 27032015

ACBIL(Maruti) 1 300Commissioned on17042015

RKM 1 360 Oct -2015RKM 2 360 Dec 2015RKM 3 360 Dec 2015

RKM 4 360 MARCH 2016BALCO 1 300 COD on 11072015

The WR utilities may intimate the current status on above

8

476th OCC Agenda

ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (June 2015 to September 2015) for the year 2015-16

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (June 2015

to September 2015) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 83 READINESS OF SLDC AT GOA OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADAEMS SYSTEM

During 29th WRPC meeting it was decided that the status of progress of SLDCrsquos amp

Back-up SLDCrsquos of WR constituents WRLDC would be regularly monitored in monthly

OCC meeting The present status of progress of SLDCrsquos amp Back-up SLDCrsquos of WR

constituents WRLDC attached at Annexure ndash 83All the constituents are requested to give an update in attached format

ITEM NO 84 GENERATION TARGETLGBR PREPARATION FOR THE YEAR2016-17 IN WESTERN REGION

A Electricity Generation Target for the year 2016-17Chief Engineer(OPM) CEA New Delhi intimated vide letter dated 29092015(copy

enclosed at annexure-84A) that generation target for the year 2016-17 to be fixed up by

MoP in consultation with CEA The exercise is already stated by CEA Therefore all the

utilities are requested to send the necessary informationdata in attached format latest

by 31st October 2015 via mail targetopmceagmailcom kiranmeenanicin amp also

send the copy of the same to WRPC(email operationwrpcgmailcom )

All the constituents are requested to furnish the same in attached format

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 6: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

5

476th OCC Agenda

72 Status of completion of 765400 kV and above ongoing Transmission Schemesbeing executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2015-16 asper the current information available is as follows -

SNo

Name of the Line TargetCompletionDate

Remarks

POWERGRID1 400 kV Navsari ndash Kudus DC Line Oct -15 ROW problem2 765 kV Gwalior - Jaipur line -I

765 kV Gwalior - Jaipur line -I ICommissioned on 130815Commissioned on 110815

3 765 kV Dharamjaygarh - JabalpurPooling Station DC line

Oct -15

4 765 kV Wardha ndashNizamabad-Hyderabad DC

March-16

5 765 kV Narendra-Kolhapur DC Dec-156 400 kV Aurangabad - Boisar line DC

lineNov -2015

7 765 kV Aurangabad (PG) - Padghe(PG) DC

Oct -2015

8 800kV Champa ndash Kurukshetra Bipole Dec- 20159 765 kV Aurangabad- Solapur DC

lineOct- 2015

10 LILO of both circuits of Aurangabad ndashPune 400 kV Dc line at Pune765400 kV GIS

Oct -15

11 400 kV Parli-Pune(Sikarapur) LILO atSikarapur

Commissioned on24022015

12 765 kV Raipur ndash Champa765 kV Raigarh - Champa

Commissioned on 28052015Commissioned on 29052015

13 765 kV Indore-Vadodara Commissioned on05062015

14 400 kV Vadodara-Asoj Commissioned on27062015

15 400 kV Vadodara-Pirana Commissioned on27062015

16 765kV Dharmjaigad-Rachi-II Sept-201517 400 KV Solapur(NTPC)-Solapur(PG)

ckt-ICommissioned on10072015

CHHATTISHGARH1 400 kV Korba west- Marwa

400 kV Marwa- KhedamaraCommissioned on13062015

2 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

Mar- 2016

3 220 kV DCDS lines Chhuri to Mopka(Bilaspur) (DCDS)

Nov ndash 2015

4 LILO of 220 kV Raigarh-Budipadar at400 kV PGCIL Ss Raigarh

Oct -2015

6

476th OCC Agenda

5 LILO of 220 Korba (E)- Bishrampurline at 220 kV Churri Ss

Commissioned on01052015

GUJARAT1 400 kV DC Mundra-Zerda line No 1 Dec -20152 400 kV DC Mundra-Zerda line No 2 Dec -20153 400 kV DC Vadinar-Amreli line Dec -20154 400kV APL-Hadala LILO to Halvad Dec -20155 400 kV DC Amreli-Kasor line(Part-1) Dec -20156 400 kV Charanka- Veloda Dec -2015MADHYA PRADESH1 Satpura TPH-Ashta 400KV DCDS

Line1st ckt commissioned on30th March 20152nd ckt ndash expected by July2015

MAHARASHTRA(STU)1 400KV DC line from Koradi-(II) to

Wardha SS(PG) DCDec ndash 2015

2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

3 2x1500 MVA 765400 kV ICTs atEktuni Dec -15

4 400 kV Bableshwar-Kudus DC(Quad) August -16

5 765 kV Akola(II)-Ektuni -2 (charge at400kV at Tapthithanda)

Charge at 400kV atTapthithanda on20052015

6 400kV IEPL-Warora October-2015

GUJARAT (IPTC route) by WRTransmission (Guj) Pvt Ltd1 400 kV Rajgarh(PG)-Karamsad

(GETCO) DC Dec- 2015

STERLITE (JTCL)1 765 kV Dhramjaygarh - Jabalpur (JTCL)

DC lineOct -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc Charged on 30th June2015

3 400 kV Sujalpur-Kota(IR by RTCL) Dec ndash 2015STERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) SC Charged on 12th June

20152 765 kV Bhopal- Jabalpur Charged on 8th June 20153 765kV Bhopal - Jabalpur Charged on 8th June 2015

The Sub-Committee may discuss and update the status

7

476th OCC Agenda

73 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16

The status regarding Generating units commissioned expected to be commissionedduring the year 2015-16 according the available information is as below

Name of the Power Projects Unit No Capacity(MW)

Date of CommissioningSchedule Date

GUJARATSIKKA TPS EXT 1 250 Oct -15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARHMarwa 1 500 Dec 2015

2 500 Dec 2015MAHARASHTRACHANDRAPUR 9 500 Feb- 2016KORADI 9 660 Nov- 2015KORADI 10 660 March -2016PARLI 8 250 Jan- 2016MADHYA PRADESHMs Jhabua Power Seoni 1 600 December ndash 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 Oct -2015CENTRAL SECTORIPPVINDYACHAL 13 500 OCT -2015KSK 3 600 March ndash 2016KSK 4 600 June ndash 2016SASAN 6 600 COD on 27032015

ACBIL(Maruti) 1 300Commissioned on17042015

RKM 1 360 Oct -2015RKM 2 360 Dec 2015RKM 3 360 Dec 2015

RKM 4 360 MARCH 2016BALCO 1 300 COD on 11072015

The WR utilities may intimate the current status on above

8

476th OCC Agenda

ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (June 2015 to September 2015) for the year 2015-16

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (June 2015

to September 2015) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 83 READINESS OF SLDC AT GOA OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADAEMS SYSTEM

During 29th WRPC meeting it was decided that the status of progress of SLDCrsquos amp

Back-up SLDCrsquos of WR constituents WRLDC would be regularly monitored in monthly

OCC meeting The present status of progress of SLDCrsquos amp Back-up SLDCrsquos of WR

constituents WRLDC attached at Annexure ndash 83All the constituents are requested to give an update in attached format

ITEM NO 84 GENERATION TARGETLGBR PREPARATION FOR THE YEAR2016-17 IN WESTERN REGION

A Electricity Generation Target for the year 2016-17Chief Engineer(OPM) CEA New Delhi intimated vide letter dated 29092015(copy

enclosed at annexure-84A) that generation target for the year 2016-17 to be fixed up by

MoP in consultation with CEA The exercise is already stated by CEA Therefore all the

utilities are requested to send the necessary informationdata in attached format latest

by 31st October 2015 via mail targetopmceagmailcom kiranmeenanicin amp also

send the copy of the same to WRPC(email operationwrpcgmailcom )

All the constituents are requested to furnish the same in attached format

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 7: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

6

476th OCC Agenda

5 LILO of 220 Korba (E)- Bishrampurline at 220 kV Churri Ss

Commissioned on01052015

GUJARAT1 400 kV DC Mundra-Zerda line No 1 Dec -20152 400 kV DC Mundra-Zerda line No 2 Dec -20153 400 kV DC Vadinar-Amreli line Dec -20154 400kV APL-Hadala LILO to Halvad Dec -20155 400 kV DC Amreli-Kasor line(Part-1) Dec -20156 400 kV Charanka- Veloda Dec -2015MADHYA PRADESH1 Satpura TPH-Ashta 400KV DCDS

Line1st ckt commissioned on30th March 20152nd ckt ndash expected by July2015

MAHARASHTRA(STU)1 400KV DC line from Koradi-(II) to

Wardha SS(PG) DCDec ndash 2015

2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

3 2x1500 MVA 765400 kV ICTs atEktuni Dec -15

4 400 kV Bableshwar-Kudus DC(Quad) August -16

5 765 kV Akola(II)-Ektuni -2 (charge at400kV at Tapthithanda)

Charge at 400kV atTapthithanda on20052015

6 400kV IEPL-Warora October-2015

GUJARAT (IPTC route) by WRTransmission (Guj) Pvt Ltd1 400 kV Rajgarh(PG)-Karamsad

(GETCO) DC Dec- 2015

STERLITE (JTCL)1 765 kV Dhramjaygarh - Jabalpur (JTCL)

DC lineOct -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc Charged on 30th June2015

3 400 kV Sujalpur-Kota(IR by RTCL) Dec ndash 2015STERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) SC Charged on 12th June

20152 765 kV Bhopal- Jabalpur Charged on 8th June 20153 765kV Bhopal - Jabalpur Charged on 8th June 2015

The Sub-Committee may discuss and update the status

7

476th OCC Agenda

73 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16

The status regarding Generating units commissioned expected to be commissionedduring the year 2015-16 according the available information is as below

Name of the Power Projects Unit No Capacity(MW)

Date of CommissioningSchedule Date

GUJARATSIKKA TPS EXT 1 250 Oct -15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARHMarwa 1 500 Dec 2015

2 500 Dec 2015MAHARASHTRACHANDRAPUR 9 500 Feb- 2016KORADI 9 660 Nov- 2015KORADI 10 660 March -2016PARLI 8 250 Jan- 2016MADHYA PRADESHMs Jhabua Power Seoni 1 600 December ndash 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 Oct -2015CENTRAL SECTORIPPVINDYACHAL 13 500 OCT -2015KSK 3 600 March ndash 2016KSK 4 600 June ndash 2016SASAN 6 600 COD on 27032015

ACBIL(Maruti) 1 300Commissioned on17042015

RKM 1 360 Oct -2015RKM 2 360 Dec 2015RKM 3 360 Dec 2015

RKM 4 360 MARCH 2016BALCO 1 300 COD on 11072015

The WR utilities may intimate the current status on above

8

476th OCC Agenda

ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (June 2015 to September 2015) for the year 2015-16

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (June 2015

to September 2015) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 83 READINESS OF SLDC AT GOA OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADAEMS SYSTEM

During 29th WRPC meeting it was decided that the status of progress of SLDCrsquos amp

Back-up SLDCrsquos of WR constituents WRLDC would be regularly monitored in monthly

OCC meeting The present status of progress of SLDCrsquos amp Back-up SLDCrsquos of WR

constituents WRLDC attached at Annexure ndash 83All the constituents are requested to give an update in attached format

ITEM NO 84 GENERATION TARGETLGBR PREPARATION FOR THE YEAR2016-17 IN WESTERN REGION

A Electricity Generation Target for the year 2016-17Chief Engineer(OPM) CEA New Delhi intimated vide letter dated 29092015(copy

enclosed at annexure-84A) that generation target for the year 2016-17 to be fixed up by

MoP in consultation with CEA The exercise is already stated by CEA Therefore all the

utilities are requested to send the necessary informationdata in attached format latest

by 31st October 2015 via mail targetopmceagmailcom kiranmeenanicin amp also

send the copy of the same to WRPC(email operationwrpcgmailcom )

All the constituents are requested to furnish the same in attached format

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 8: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

7

476th OCC Agenda

73 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16

The status regarding Generating units commissioned expected to be commissionedduring the year 2015-16 according the available information is as below

Name of the Power Projects Unit No Capacity(MW)

Date of CommissioningSchedule Date

GUJARATSIKKA TPS EXT 1 250 Oct -15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARHMarwa 1 500 Dec 2015

2 500 Dec 2015MAHARASHTRACHANDRAPUR 9 500 Feb- 2016KORADI 9 660 Nov- 2015KORADI 10 660 March -2016PARLI 8 250 Jan- 2016MADHYA PRADESHMs Jhabua Power Seoni 1 600 December ndash 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 Oct -2015CENTRAL SECTORIPPVINDYACHAL 13 500 OCT -2015KSK 3 600 March ndash 2016KSK 4 600 June ndash 2016SASAN 6 600 COD on 27032015

ACBIL(Maruti) 1 300Commissioned on17042015

RKM 1 360 Oct -2015RKM 2 360 Dec 2015RKM 3 360 Dec 2015

RKM 4 360 MARCH 2016BALCO 1 300 COD on 11072015

The WR utilities may intimate the current status on above

8

476th OCC Agenda

ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (June 2015 to September 2015) for the year 2015-16

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (June 2015

to September 2015) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 83 READINESS OF SLDC AT GOA OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADAEMS SYSTEM

During 29th WRPC meeting it was decided that the status of progress of SLDCrsquos amp

Back-up SLDCrsquos of WR constituents WRLDC would be regularly monitored in monthly

OCC meeting The present status of progress of SLDCrsquos amp Back-up SLDCrsquos of WR

constituents WRLDC attached at Annexure ndash 83All the constituents are requested to give an update in attached format

ITEM NO 84 GENERATION TARGETLGBR PREPARATION FOR THE YEAR2016-17 IN WESTERN REGION

A Electricity Generation Target for the year 2016-17Chief Engineer(OPM) CEA New Delhi intimated vide letter dated 29092015(copy

enclosed at annexure-84A) that generation target for the year 2016-17 to be fixed up by

MoP in consultation with CEA The exercise is already stated by CEA Therefore all the

utilities are requested to send the necessary informationdata in attached format latest

by 31st October 2015 via mail targetopmceagmailcom kiranmeenanicin amp also

send the copy of the same to WRPC(email operationwrpcgmailcom )

All the constituents are requested to furnish the same in attached format

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 9: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

8

476th OCC Agenda

ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS

ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (June 2015 to September 2015) for the year 2015-16

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (June 2015

to September 2015) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above

ITEM NO 83 READINESS OF SLDC AT GOA OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADAEMS SYSTEM

During 29th WRPC meeting it was decided that the status of progress of SLDCrsquos amp

Back-up SLDCrsquos of WR constituents WRLDC would be regularly monitored in monthly

OCC meeting The present status of progress of SLDCrsquos amp Back-up SLDCrsquos of WR

constituents WRLDC attached at Annexure ndash 83All the constituents are requested to give an update in attached format

ITEM NO 84 GENERATION TARGETLGBR PREPARATION FOR THE YEAR2016-17 IN WESTERN REGION

A Electricity Generation Target for the year 2016-17Chief Engineer(OPM) CEA New Delhi intimated vide letter dated 29092015(copy

enclosed at annexure-84A) that generation target for the year 2016-17 to be fixed up by

MoP in consultation with CEA The exercise is already stated by CEA Therefore all the

utilities are requested to send the necessary informationdata in attached format latest

by 31st October 2015 via mail targetopmceagmailcom kiranmeenanicin amp also

send the copy of the same to WRPC(email operationwrpcgmailcom )

All the constituents are requested to furnish the same in attached format

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 10: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

9

476th OCC Agenda

B LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERN REGION

As per the Regulation 574 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations 2011(reproduced below forreference)Quoteldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards This will be done after carryingout necessary system studies and if necessary the outage programmes shall berescheduled Adequate balance between generation and load requirement shall beensured while finalizing outage programme The same shall be uploaded by theRPCs on their websiterdquo

Unquote

Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

17 in respect of Western Region A meeting is proposed to be held on during last

week of November-15 at WRPC wherein constituents are requested to attend the

same with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2016- March 2017

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2016- March 2017

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH) for the year April 2016- March 2017

4 Monthwise minimum requirement of power (MW) for the year April 2016-

March 2017

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units during the year April 2015-

March 2015

7 Expected dates of commissioning of new generating units likely to be

commissioned during the year April 2016- March 2017

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 11: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

10

476th OCC Agenda

8 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

9 Expected RES energy(MUs) amp corresponding demand(MW) for the year April

2016- March 2017

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus

ITEM NO 85 LILO OF 220 KV RAIGARH-BUDIPADAR LINE AT LOCATION NO 9TO 400220 KV PGCIL SUBSTATION-CE SLDC Chhattisgarh informed that as per the Study Committee of WRs

recommendation the LILO of 220 KV Raigarh-Budhipadar line at 400220 KV PGCIL

Substation Kotra has been completed 02 months back and to save theft incidence the

LILO portion from PGCIL ss to point of LILO has been idle charged from 11082015

Vide this office letter no951 dated 24082015 GM (WRLDC) has been requested to

take up this matter with ERLDC and Orissa State The letter of DGM Raigarh PGCIL

regarding their readiness for charging of LILO of above line has also been received

which is enclosed Since the matter of charging of above line is pending since 2

months it is requested by WRLDC to obtain the readiness of ERLDC amp Orissa state so

that the arrangement for final charging may be done WRLDC may inform the position

in OCC

The Sub Committee may like to discuss

ITEM NO 86 SUPPLY OF COMMUNICATION EQUIPMENTS FOR BACK UP SLDCAT KHEDAMARA BHILAI-CE SLDC Chhattisgarh informed that in the 16th PRM of EMSSCADA upgrade of

western region at WRLDC on 06072015 the issue of supply of communication

equipment and DCPS for Back up SLDC at Bhilai was discussed The representative

of PGCIL has promised to explore the possibility of diverting the equipments from any

other project but till date SLDC Raipur has not received any suitable reply from Ms

PGCIL authorities despite many telephonic persuasions The work in the scope of

CSPTCL is likely to be completed by the end of October 2015 but due to non-

availability of communication equipments and DCPS the commissioning of Back up

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 12: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

11

476th OCC Agenda

SLDC will be delayed PGCIL is requested to look into the matter and arrange to

provide the equipments on top most priority so that the commissioning of Back up

SLDC at BHILAI is not delayed

The Sub Committee may like to discuss

ITEM NO 87 SWITCHING OPERATION PERFORMED AT 765 KV VADODARA(PG) SUBSTATION WITHOUT INTIMATION TO SLDC GUJARAT

CE SLDC Gujarat informed that recently on 290915 Hrs 765 KV bus - 1 and 765

KV SC Vadodara (PG) - Dhule line tripped Subsequently 765 KV Bus - 1 outage was

availed but WRLDC did not convey the information regarding event and concurrence

of emergency outage to SLDC-Gujarat Similarly an emergency outage of 765 KV SC

Vadodara (PG) ndash Dhule line has been facilitated on 03102015 for whole day without

informing SLDC-Gujarat

It is utmost necessary that the information of such important outage should be

communicated to respective SLDCs prior to permitting the code for switching

operation for secure and reliable grid operation Also outage availing entity shall give

information of such outage to respective State SLDC and also arrange to convey the

operation code (issued by WRLDC) throughto respective SLDCs

The Sub Committee may like to discuss the same

ITEM NO 9 WRLDC ITEMS

1 N-1 ADEQUACY OF 765400 KV ICT AT 765 KV AKOLA (2) AND 765 KVTIRODA

WRLDC informed that as per CEA Manual on Transmission Planning criteria and

IEGC 35 (a) ISTS shall be capable of withstanding and be secured against outage of

single interconnecting transformer Currently there is only one 1500 MVA 765400 kV

ICT at 765 kV Akola2 and 765 kV Tiroda substations in Maharashtra system Thus

the system is N-1 non-compliant at 765 kV Tiroda and 765 kV Akola2

SLDC Kalwa MSETCL may oversee and expedite commissioning of additional ICTs

at Tiroda and Akola2 to ensure N-1 compliance

SLDC MSETCL may update the status

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 13: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

12

476th OCC Agenda

2 ADEQUACY OF SHUNT CAPACITIVE COMPENSATION AT INDOREUJJAINAREA

WRLDC informed that in 465th OCCM held in Nov 2014 SLDC Madhya Pradesh

reported that low voltages in the range of 395 kV are observed at Indore (MP)

substation in morning hours (500-1000 Hrs) due to agricultural loads Accordingly

measures were initiated by WRLDC to switch off bus reactors at 765400 kV Indore

(PG) and 400 kV Itarsi substations during morning hours

The load in Madhya Pradesh is anticipated to be at its peak during the Rabi season

Hence in order to maintain good voltage profile at Indore and nearby areas SLDC

Madhya Pradesh may ensure adequacy and healthiness of capacitor banks nearby

Indore area As per the WRLDC records capacitor banks nearby Indore area is as

follows-

Substation (Having Capacitors) MVAR Capacity

132 kV Indore South Zone 1x10

132 kV Nagda 1x10

132 kV Shujalpur 1x50

132 kV Indore STG2 1x10

220 kV Indore 2x25

Total 130

Preparedness on this front is necessary well in advance before the forthcomingUjjain Kumbh mela in April 16SLDC Madhya Pradesh may appraise the OCC regarding the available shuntcapacitive compensation and its healthiness nearby Indore area

3 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION

WRLDC informed that the need for UVLS for system security was recognized and

discussed during last several OCC meetings In the 475th OCC meeting WRLDC had

suggested that as per the CEA Planning Criteria the emergency rating for minimum

voltage is 119 kV for 132 kV system 194 kV for 220 kV system and 372 kV for 400 kV

system SLDC Maharashtra stated that in Maharashtra the under voltage relay was

being set at 365 kV with 5 sec delay for 400 kV SS Similarly Gujarat SLDC stated

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 14: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

13

476th OCC Agenda

that in Gujarat the under voltage relay was being set at 185 kV with 5 sec delay for

220kV Ss

SLDC Maharashtra Gujarat and Madhya Pradesh may inform progress of the UVLS

implementation in the respective States

SLDCs may appraise the current status

4 CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL MAHAGENCO STATIONS

WRLDC informed that non-availability of telemetry from large number of EHV stations

of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in

the OCC forum since December 2013 (22 Months) In last OCC meeting MSETCL

informed that data from six substations (two 400 kV and four 220 kV substations) are

expected to be integrated by 30th Sept 2015 However the present status of telemetry

in Maharashtra is tabulated below

Number ofstationswhose

telemetryshould be

available atWRLDC

Number ofstationswhose

telemetryis not

integratedin WR-SCADA

Number ofstationswhose

telemetry isintermittent unreliable

observabilityof stations

underjurisdiction ofMaharashtraSTUSLDCat WRLDC

A B C (A ndash (B+ C)AGenerating Stations 32 0 4 875765400 kVTransmissionSubstations

17 4 4 5294

220 kVTransmissionsubstations

178 19 49 617

Total 227 23 57 6475

It may be seen that there are 23 stations like 400 kV Warora Chandrapur2 Lonikhand

and Taptithanda where the integration of database is pending even several months

after commissioning of the substations and there are nearly 57 stations where

database integration is completed but telemetry from these station is highly

intermittent due to continuous failure of communication link The telemetry status is

also being submitted to CERC and uploaded on our website as per the directions of

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 15: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

14

476th OCC Agenda

the Honrsquoble CERC in the petition number 194MP2011 amp IA 442012 In the absence

of telemetry from these stations severe constraints are being experienced by WRLDC

control room personnel in real-time supervision and operation of the grid

MSETCL to expedite the pending activities to ensure telemetry from MSETCLand MahaGenco stations to WRLDC

5 MOCK BLACK START EXERCISE IN WESTERN REGION

WRLDC informed that as mandated by IEGC the Black start capable units need to

conduct mock black start exercises once in every 6 months Western Region has 29generating stations with black start capability As per the information available with

WRLDC only 5 Black Start stations have completed the Mock exercise in the year

2015

SlNo Generating station

Date of mock drillexercisecompleted in 1st

six months

Date of mock drillexercise completed

in 2nd six months

1 Kadana Gujarat 19th Feb 2015 -

2 CLPIPL Gujarat 6th March 2015 -

3Hasdeo BangoChhatisgarh

17th May 2015-

4Khopoli HydroMaharashtra

23rd August 2015

NCA and SLDC Gujarat had intimated that the mockdrill of RBPH units was beingplanned in October A meeting of all stakeholders was scheduled on 30th September2015 to finalize the procedureAs per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows

PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSTATIONS OF MADHYAPRADESH

Sl No Name of Power Station Date of Mock Drill1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Bargi 12th Oct 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 16: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

15

476th OCC Agenda

4 Pench 6th Nov 20155 Tons 6th Oct 20156 Rajghat Governor Problem7 Madhikheda Governor Problem8 Gandhi Sagar 27th Nov 2015

SLDC Gujarat NCA and SLDC MP may update the status

Other constituentsregional entities are requested to plan the Mock exercise of theirblack start units and submit their plan for compliance of IEGC regulation 58(b)

The Sub-Committee may like to discuss6 LOAD FORECASTING IN WESTERN REGION

During the 475th OCC meeting it was decided that all the SLDCs would forward theday ahead load forecast to WRLDC along with the day-ahead requisition sheetsubmitted at 1500 hrs everyday Load forecasts are being received at WRLDC fromSLDC Gujarat Maharashtra and Madhya Pradesh SLDC Chhattisgarh Goa DDDNH and ESIL shall coordinate to submit the day-ahead load forecasts to WRLDC ondaily basis

SLDC Chhattisgarh Goa DD DNH and ESIL may appraise the status

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING475th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 As per roster 477th OCC meeting will be hosted by NTPC Sipat The tentative

proposed date is 09112015 NTPC Sipat may confirmed the same

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 17: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Anaulagnak 21

maah isatmbar 2015

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5013 Hz BETWEEN 1500 Hrs amp 1600 Hrs Hrs ON 20092015

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4972 Hz BETWEEN 0000 Hrs amp 0100 Hrs Hrs ON 05092015

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5033 Hz AT 160600 Hrs ON 20092015

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4952 Hz AT 191300 hrs Hrs ON 03092015

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2015 AUGUST 2015 JULY 2015

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 065 031 021 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2874 1472 1043 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5983 7000 7029

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1078 1497 1907

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2015

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 18: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Voltage Profile during the month of Sep 2015Annex-I

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 414 398 411 398 433 405 431 400 417 402 417 408 420 409 401 3802 413 397 410 397 431 408 431 396 416 397 416 404 418 411 402 3773 410 393 408 394 430 404 427 391 413 397 416 404 416 408 404 3824 414 400 411 399 429 402 427 398 416 403 415 406 414 407 406 3875 413 399 412 397 429 402 432 400 416 403 416 406 415 405 409 3906 416 400 413 398 433 407 429 391 417 405 417 408 418 407 406 3917 413 397 410 396 430 409 429 396 416 402 416 408 414 407 402 3868 417 400 413 401 429 415 429 404 416 403 416 408 417 409 400 3779 414 398 410 396 435 412 428 409 414 400 415 405 415 407 400 383

10 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38811 414 401 413 399 434 416 433 404 414 403 416 407 415 408 400 38812 419 404 415 403 434 406 434 407 417 404 416 407 416 409 407 38913 418 406 415 404 436 417 434 403 417 405 421 408 417 409 407 39014 419 402 414 400 436 414 430 400 417 403 418 407 414 407 407 39615 417 400 414 402 437 416 433 403 417 402 417 406 417 410 404 39216 417 403 415 404 436 414 433 409 416 402 417 405 417 411 406 38917 420 410 420 407 438 424 423 423 415 406 412 407 424 416 405 38818 421 411 420 407 440 419 423 418 417 405 417 407 422 413 409 39219 424 409 419 407 438 414 431 411 421 406 419 409 420 412 411 40020 423 411 420 408 438 415 423 418 420 409 418 409 422 414 414 40121 424 404 421 405 437 417 423 423 423 404 419 407 422 412 414 40022 423 400 418 407 439 400 423 400 423 400 419 400 421 400 413 39923 421 404 415 403 434 412 423 423 421 405 417 407 415 407 411 40024 421 404 416 403 430 405 432 407 420 405 416 407 415 404 408 40025 421 404 417 404 431 408 432 404 420 404 417 408 416 408 408 39626 420 400 416 402 431 404 432 402 419 403 416 405 415 405 407 39527 419 407 418 404 434 410 432 403 418 408 417 409 415 407 407 39628 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39129 418 402 415 402 430 405 428 400 419 402 417 404 414 406 407 39130 419 399 419 400 431 407 430 395 417 399 417 406 414 405 406 388

424 393 421 394 440 400 434 391 423 397 421 400 424 400 414 377

2015Annex-23

इदौर इटारसी कराड धल असोज कासोर जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 19: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Date

Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 413 404 405 398 418 402 426 409 770 755 785 764 786 761 783 7602 413 403 402 392 416 400 424 406 766 754 780 762 776 762 781 7643 410 402 403 390 414 396 421 402 762 751 777 758 780 755 778 7634 412 401 403 388 411 403 423 409 765 754 779 765 782 756 783 7615 412 402 407 390 416 402 419 419 763 753 777 762 790 759 783 7646 415 403 406 387 420 402 419 419 767 754 786 763 787 758 788 7637 412 401 404 388 418 399 423 410 762 753 780 761 783 755 780 7588 413 402 409 393 421 402 424 411 768 755 781 765 783 762 785 7649 412 402 406 389 417 399 422 406 763 750 780 764 778 754 780 761

10 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76611 411 403 406 392 417 403 424 409 768 754 784 765 780 757 780 76612 405 403 411 397 420 405 426 411 767 758 788 772 791 764 780 76613 410 401 412 390 420 407 427 413 768 757 787 769 788 760 785 76014 414 402 405 383 420 403 424 410 765 753 781 768 783 750 783 75215 413 402 411 396 421 404 428 412 766 756 783 770 790 765 784 76216 414 406 412 389 420 406 429 416 767 757 788 772 790 761 787 77117 414 406 412 389 421 411 430 419 774 761 788 772 790 761 787 77118 418 408 408 396 423 412 430 419 770 758 785 774 789 770 790 77319 417 408 408 396 424 410 431 419 770 758 785 770 791 767 790 77520 419 410 412 397 423 410 430 417 775 761 796 775 797 773 796 77721 421 406 410 393 424 406 431 417 774 758 792 767 794 760 798 76922 417 411 411 399 423 400 430 415 773 762 790 775 795 773 796 78023 420 409 412 395 421 405 427 413 772 760 786 775 798 773 796 77624 421 405 411 393 422 405 427 412 769 754 786 760 796 761 779 77025 418 404 411 394 421 404 428 412 771 758 789 770 796 763 797 77126 415 403 410 393 420 402 427 411 771 755 789 769 792 763 790 76527 418 404 410 396 421 410 428 412 771 758 787 773 793 769 797 77128 414 405 405 393 420 402 424 409 767 758 782 768 783 762 788 76929 415 402 405 393 420 402 424 409 767 758 785 765 784 763 788 76730 418 402 407 391 423 403 430 409 771 755 794 768 789 758 795 766

421 401 412 383 424 396 431 402 775 750 796 758 798 750 798 752

Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

नागदा खडवा

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 20: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

No ofOccasions

Max Load Reliefat 492 Hz

1 01-Sep-15 0 0 0 0 0 0 0 02 02-Sep-15 0 0 0 0 0 0 0 03 03-Sep-15 0 0 0 0 0 0 0 04 04-Sep-15 0 0 0 0 0 0 0 05 05-Sep-15 0 0 0 0 0 0 0 06 06-Sep-15 0 0 0 0 0 0 0 07 07-Sep-15 0 0 0 0 0 0 0 08 08-Sep-15 0 0 0 0 0 0 0 09 09-Sep-15 2 34 0 0 0 0 0 0

10 10-Sep-15 0 0 0 0 0 0 0 011 11-Sep-15 0 0 0 0 0 0 0 012 12-Sep-15 0 0 0 0 0 0 0 013 13-Sep-15 3 187 0 0 0 0 0 014 14-Sep-15 0 0 0 0 0 0 0 015 15-Sep-15 2 3933 0 0 0 0 0 016 16-Sep-15 0 0 0 0 0 0 017 17-Sep-15 0 0 NIL NIL NIL 018 18-Sep-15 0 0 0 0 0 0 0 019 19-Sep-15 0 0 0 0 0 0 0 020 20-Sep-15 0 0 0 0 0 0 0 021 21-Sep-15 0 0 0 0 0 0 0 022 22-Sep-15 0 0 0 0 0 0 0 023 23-Sep-15 0 0 0 0 0 0 0 024 24-Sep-15 0 0 0 0 0 0 0 025 25-Sep-15 1 68 0 0 0 0 0 026 26-Sep-15 0 0 0 0 0 0 0 027 27-Sep-15 0 0 0 0 0 0 0 028 28-Sep-15 0 0 0 0 0 0 0 029 29-Sep-15 0 0 0 0 0 0 0 030 30-Sep-15 0 0 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER - 2015

Recommonded Load relief at492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 21: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

ANNEXURE 25

Power CutRestrictions in Western Region for the month of September-2015

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectors

a) Only 10 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phasesupply during rest of 14 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01092015 30092015 2338 2247 2320

21 Three-PhaseSupply(Irrigation)

01092015 30092015 0952 0917 0945

21 Three-PhaseSupply(Mixed)

01092015 30092015 2334 2226 2310

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 22: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092015 30092015 2354 2336 234532 District Head Qtrs 01092015 30092015 2357 2327 234933 Tehsil Head Qtrs 01092015 30092015 2347 2315 2335

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010915 to 300915

SaUnya Nil

17-554 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

11 MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01092015 30092015 1000 0800 0900

22 Single-Phase Supply 01092015 30092015 1800 1800 18003 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 23: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 8487 MW(Av) For 20653 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

0576

-

3 HT Industries 7374 (Av) For 23930 Hrs0527

Total Energy Cutday 1103( b) Any other information1Weekly Offstaggering ofpower supply

1day (In a week as perconsumerrsquos option) 50MW(Av) - - 0039

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092015 to 30092015 600Hrs (Power cut)

1800

22 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 24: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Annex-26

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of forced unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Date1 ESSAR-2 GSECL 172 1212 22-02-2013 Still out Still out SHORTAGE OF GAS

2 GTPS-2 GSECL 120 2020 22-10-2014 Still out Still out RSD

3 GTPS-1 GSECL 120 536 22-10-2014 Still out Still out RSD

4 UKAI-2 GSECL 120 1502 10-11-2014 Still out Still out RSD

5 SUGEN-2 GSECL 382 1146 31-01-2015 Still out Still out RSD

6 HAZIRA EXT-1 GSECL 351 037 25-03-2015 Still out Still outRESTORATIONUNCERTAIN

7 PIPAVAV 2 GSECL 350 0250 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

8 UKAI 6 GSECL 500 0102 26-07-2015 0028 03-09-2015 RSD

9 UKAI 1 GSECL 120 1930 27-07-2015 2126 12-09-2015 RSD

10 UTRAN STG II 1 GSECL 375 1823 08-08-2015 0118 11-09-2015 CONTROL PROBLEM

11 GPEC 1 GSECL 218 0009 11-08-2015 1859 09-09-2015 RSD

12 SLPP 3 GSECL 125 2143 17-08-2015 Still out Still out TURBINE TRIP

13 DGBP 2 GSECL 112 2257 01-09-2015 1543 10-09-2015 RSD

14 GPEC 3 GSECL 218 2028 04-09-2015 1647 09-09-2015 RSD

15 ALTPS 1 GSECL 125 1532 05-09-2015 0816 10-09-2015 BTL

16 GPEC 1 GSECL 218 0902 10-09-2015 1845 28-09-2015 RSD

17 GPEC 3 GSECL 218 2355 10-09-2015 1830 28-09-2015 RSD

18 DGBP 2 GSECL 112 0744 11-09-2015 1150 06102015COSTLYGENERATION

19 GIPCL STG 2 GSECL 165 1700 12-09-2015 0700 06102015 RSD

20 DGBP 1 GSECL 107 1840 12-09-2015 0555 24092015 RSD

21 GPEC 2 GSECL 218 2352 12-09-2015 0607 24092015COSTLYGENERATION RSD

22 GTPS 4 GSECL 210 1055 15-09-2015 Still out Still out RSD

23 UKAI 1 GSECL 120 0615 17-09-2015 0800 20-09-2015 BTL

24 OPGS 1 GSECL 150 2359 17-09-2015 0530 22-09-2015 ANNUAL INSPECTION

25 WANAKBORI 6 GSECL 210 2015 18-09-2015 Still out Still out RSD

26 WANAKBORI 5 GSECL 210 2314 18-09-2015 0740 02102015 RSD

27 STPS 1 GSECL 120 1100 19-09-2015 Still out Still out RSD

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 25: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

28 WANAKBORI 4 GSECL 210 1120 19-09-2015 0610 01102015 RSD

29 UKAI 4 GSECL 200 1215 19-09-2015 1829 28092015 RSD

30 UKAI 1 GSECL 120 0800 20-09-2015 Still out Still out RSD

31 WANAKBORI 1 GSECL 210 1144 21-09-2015 2021 28-09-2015 RSD

32 ALTPS 2 GSECL 125 0828 23-09-2015 1217 26-09-2015 BTL

33 DGBP 1 GSECL 107 2157 24-09-2015 1033 28-09-2015 RSD

34 TORRENTPOWER- E

GSECL 120 2145 27-09-2015 Still out Still out MAIN FUEL TRIP

35 GPEC 2 GSECL 218 1159 28-09-2015 Still out Still outCOSTLYGENERATION(LOADMANAGEMENT)

36 GPEC 1 GSECL 218 2011 28-09-2015 Still out Still out RSD

37 GPEC 3 GSECL 218 2003 29-09-2015 Still out Still out RSD

38 CHANDRAPUR-1 MAHAGENCO 210 715 28-08-2014 Still out Still outBTL ECONOMICSHUTDOWN

39 PARLI 6 MAHAGENCO 250 1507 25-06-2015 Still out Still outFURNACE PRESSUREHIGHWATERSHORTAGE

40 BHUSAWAL-2 MAHAGENCO 210 1243 07-09-2014 Still out Still outFLAMEFAILUREECONOMYSHUTDOWN

41 KORADI-6 MAHAGENCO 210 0102 20-03-2015 Still out Still outECONOMICSHUTDOWN

42 URAN-6 MAHAGENCO 108 1635 01-04-2015 0102 14-09-2015CLEAN DRAIN TANKLEVEL HIGH

43 URAN-7 MAHAGENCO 108 0007 17042015 Still out Still outGAS TURBINEPROBLEM

44 PARLI-3 MAHAGENCO 210 1252 14062015 Still out Still out COAL SHORTAGE

45 WPCL 2 MAHAGENCO 135 0000 15-06-2015 Still out Still out LESS SCHEDULE

46 PARLI 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out WATER SHORTAGE

47 PARLI 5 MAHAGENCO 510 145500 06-07-2015 Still out Still out WATER SHORTAGE

48 PARLI 7 MAHAGENCO 250 120700 08-07-2015 Still out Still out WATER SHORTAGE

49 KORADI 8 MAHAGENCO 660 0950 20-08-2015 0432 05102015 ESP PROBLEM

50 CHANDRAPURUNIT-8

MAHAGENCO 500 2135 23-08-2015 1836 05092015COOLING WATERPUMP TRIPPED

51 WPCL 1 MAHAGENCO 135 1918 25-08-2015 Still out Still out ESP

52 KHAPARKHEDA 1 MAHAGENCO 210 2226 03-09-2015 1930 08-09-2015 BTL

53 KORADI 7 MAHAGENCO 210 2244 08-09-2015 1525 11-09-2015BOILER VALIDITYEXTENSION WORKS

54 URAN 8 MAHAGENCO 108 1308 12-09-2015 1818 15-09-2015 GAS SHORTAGE

55 URAN B0 1 MAHAGENCO 120 1308 12-09-2015 2317 15-09-2015 GAS SHORTAGE

56 BHUSAWAL 5 MAHAGENCO 500 0220 20-09-2015 2001 23092015 BTL

57 NASIK3 MAHAGENCO 210 1504 21-09-2015 1600 24-09-2015 BTL

58 CHANDRAPUR 2 MAHAGENCO 210 1741 24-09-2015 0445 28-09-2015BOILER PRESSUREVALVE PROBLEM

59 KORADI 5 MAHAGENCO 200 2156 25-09-2015 0154 01102015ID FAN VIBRATIONPROBLEM

60 CHANDRAPUR 5 MAHAGENCO 500 2143 25-09-2015 2202 28-09-2015 BTL

61 BHUSAWAL 4 MAHAGENCO 500 2122 26-09-2015 1949 29-09-2015 BTL

62 PARAS 3 MAHAGENCO 250 0048 27-09-2015 1100 29-09-2015FURNISH PRESSUREHIGH

63 URAN B0 1 MSETCL 120 2306 28-09-2015 Still out Still out GAS SHORTAGE

64 URAN 8 MSETCL 108 2311 28-09-2015 Still out Still out GAS SHORTAGE

65 CHANDRAPUR 5 MSETCL 500 1734 30-09-2015 0508 05-10-2015 BTL

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 26: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

66 TROMBAY 6 TPC 500 1708 15-07-2015 Still out Still outECONOMYSHUTDOWN

67 AMRAVATITPP(INDIABULL)-5

RATTANPOWER INDIA

LTD270 1422 03-04-2015 Still out Still out

TURBINE SHAFTVIBRATIONS

68 AMRAVATITPP(INDIABULL)-4

RATTANPOWER INDIA

LTD270 0237 14-09-2015 0252 17-09-2015

TURBINE SHAFTVIBRATION HIGH

69 UNOSUGEN 1TORRENT

POWER382 2354 31-07-2015 0616 02102015 LESS SCHEDULE

70 APML TIRODA 5ADANI

POWERTIRODA660 1303 06-09-2015 2327 19-09-2015

BOTTOM ASHREFECTORYPROBLEM

71 APML TIRODA 4ADANI

POWERTIRODA660 2049 11-09-2015 Still out Still out

ABNORMAL SOUNDIN GENERATOR

72 APL MUNDRA 3ADANIPOWER

330 1558 21-09-2015 0406 25-09-2015 RSD

73 APL MUNDRA 6ADANIPOWER 660 0853 22-09-2015 0050 26-09-2015

APH ndashB GUIDEBEARING ABNORMALSOUND

74 APL MUNDRA 7ADANIPOWER

660 0658 19-09-2015 0547 25092015FEED WATER LINELEAKAGE

75 MCCPL 1 ACBIL 300 1407 06-09-2015 1145 23092015LEAKAGE INTURBINE LUBE OIL

76 MCCPL 1 ACBIL 300 1113 30-09-2015 Still out Still outTURBINE BEARINGVIBRATION HIGH

77 ESSAR MAHAN-1ESSARPOWER

660 1716 171014 Still out Still out LESS SCHEDULE

78 EPGL 2ESSARPOWER

600 0052 26-07-2015 1034 10082015 RSD

79 EPGL 2 ESSAR 600 1342 01-09-2015 2220 14-09-2015NON AVAILABILITYOF COOLING WATER

80 EPGL 2 ESSAR 600 1403 21-09-2015 0542 29-09-2015 RSD

81 DB POWER I DBPOWER 600 0626 07-09-2015 1230 13-09-2015ECONOMISERCIRCUIT PROBLEM

82 ESSAR IPP 1ESSARPOWER

170 1230 11-08-2015 Still out Still out SPARKING ON GT

83 RGPPL-1B RGPPL 320 2300 31-03-2014 Still out Still out DRY PRESERVATION

84 RGPPL-1A RGPPL 320 1330 8-07-2014 Still out Still out LESS REQUISITION

85 RGPPL-2A RGPPL 332 1200 21-07-2014 Still out Still out CW PUMP PROBLEM

86 RGPPL-2B RGPPL 332 1330 1-09-2014 Still out Still out LESS REQUISITION

87 RGPPL-3B RGPPL 332 1809 30052015 Still out Still out NO SCHEDULE

88 RGPPL-3A RGPPL 332 1950 01-06-2015 Still out Still out NO SCHEDULE

89 AMARKANTAK-4 MPGCL 120 1113 30-04-2014 Still out Still out TURBINE VIBRATION

90 AMARKANTAK-3 MPGCL 120 025 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

91 SATPURA-III-9 MPPGCL 210 1330 23052015 Still out Still out FIRE IN GT

92 SATPURA IV 11MPPGCL

250 0120 25-07-2015 Still out Still out FIRE IN GT

93 SANJAY GANDHITPS 3

MPPGCL210 0043 17-09-2015 1803 21-09-2015 ELECTRICAL FAULT

94 MB POWER 1MPPGCL

600 1850 17-09-2015 1248 25092015TURBINE CONTROLVALVE PROBLEM

95 SINGAJI 2MPPGCL

600 2326 17-09-2015 1221 24092015 LESS SCHEDULE

96 JP BINA-1MPPGCL

250 0008 19-09-2015 0001 05102015 LESSNO SCHEDULE

97 SATPURA II 6MPPGCL

200 2226 23-09-2015 2100 27-09-2015 BTL

98 VANDANA -1 VANDANA 135 1500 9-01-2015 Still out Still out BTL

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 27: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

99 DHARIWAL-2 DHARIWAL 300 000 22-12-2014 Still out Still out NOLESS SCHEDULE

100 DHARIWAL-1 DHARIWAL 300 0227 28052015 Still out Still outHIGH VIBRATIONPROBLEM

101 LANCO-2 LANCO 300 1220 21-08-2013 Still out Still out COAL SHORTAGE

102 JPL STG-II-3 JINDAL POWER 600 1500 15012015 0108 15-09-2015 NO SCHEDULE

103 JPL STG-I- 2 JINDAL POWER 600 1729 10-07-2015 0709 06-09-2015 NOLESS SCHEDULE

104 JPL STG-II 2 JINDAL POWER 600 2358 31-07-2015 0610 09-09-2015 LOW SCHEDULE

105 JPL STG-II 3 JINDAL POWER 600 1300 16-09-2015 1547 16-09-2015 ELECTRICAL FAULT

106 JPL STG-I 3 JINDAL POWER 250 1505 16-09-2015 2027 29092015APH-B ABNORMALSOUND

107 JPL STG-II 3 JINDAL POWER 250 0000 19-09-2015 0257 06102015ASH EVACUATIONPROBLEM

108 JPL STG-II 1 JINDAL POWER 600 0007 16-09-2015 0931 23-09-2015ASH HANDLINGSYSTEM FAILURE

109 JPL Stg-II 2 JPL 250 1700 23-09-2015 0059 05102015 RSD

110 JP BINA 1 MPPGCL 250 1042 01-09-2015 0516 06-09-2015 NO SCHEDULE

111 JP BINA 2 MPPGCL 250 1817 01-09-2015 2245 09-09-2015GT DIFFERENTIALPROTECTIONOPERATED

112 SG TPS 1 MPPGCL 210 2215 04-09-2015 0905 08-09-2015 HYDRAULIC TESTING

113 MB POWER 1 MPPGCL 600 1304 11-09-2015 1538 17-09-2015FD FAN BLADE PITCHDAMAGED

114 SATPURA IV 10 MPPGCL 250 1942 13-09-2015 2315 13-09-2015FURNACE PRESSURELOW

115 JP BINA 2 MPPGCL 250 1824 17-09-2015 Still out Still out RSD

116 JP NIGRIE 1 JAYPEE 660 1712 27-09-2015 2134 27-09-2015

GENERATORDIFFERENTIALPROTECTIONOPERATED

117 DGEN-53 TPGL 400 2138 07-08-2015 1150 05-09-2015 LESS SCHEDULE

118 DGEN-52 TPGL 400 2142 03-09-2015 0600 05102015 LESS SCHEDULE

119 DGEN-53 TPGL 400 214500 25-09-2015 064100 29-09-2015 AS PER SCHEDULE

120 KWPCL 1 KWPCL 600 0528 15-08-2015 2231 08-09-2015 LOW SCHEDULE

121 KSK 1 KSK 600 1149 21-08-2015 0303 29092015TURBINE SIDEPROBLEM

122 SASAN 3 SASAN 660 2222 01-09-2015 0433 06-09-2015APH BELLOWDAMAGE

123 SASAN 4 SASAN 660 2213 03-09-2015 1606 07-09-2015 PA FAN PROBLEM

124 SASAN 6 SASAN 660 0146 27-09-2015 0156 27092015 FD FAN TRIPPED

125 BALCO- 1 BALCO 300 0002 06-09-2015 0837 09-09-2015t BTL

126 KAPS 2 NPCL 220 1409 01-07-2015 Still out Still outFEED WATER SIDEPROBLEM

127 TAPS 2 NPCIL 160 1255 10-09-2015 Still out Still outREFUELLINGOUTAGE

128 KAWAS 2B NTPC 164 2340 14-08-2015 0555 01102015 RSD

129 KAWAS 2A NTPC 164 1121 17-08-2015 1200 01102015 RSD

130 GANDHAR GT 2 NTPC 219 1958 28-08-2015 Still out Still out RSD

131 GANDHAR GT 1 NTPC 219 1853 04-09-2015 0528 07-09-2015 RSD

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 28: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

132 VSTPS 5 NTPC 210 0019 10-09-2015 1634 29092015 OVERHAULING

133 GANDHAR GT 3 NTPC 219 0011 15-09-2015 1404 23092015 RSD

134 SIPAT II 5 NTPC 500 0059 15-09-2015 0215 18-09-2015HYDROGENLEAKAGE

135 KAWAS 1A NTPC 164 0239 15-09-2015 Still out Still out RSD

136 MOUDA 1 NTPC 500 0253 17-09-2015 2112 27092015 RSD

137 GANDHAR GT 1 NTPC 219 1215 19-09-2015 0252 02102015 RSD

138 VSTPS 3 NTPC 210 1248 19-09-2015 0338 25092015 RSD

139 MOUDA 2 NTPC 500 1430 19-09-2015 0628 23-09-2015 RSD

Note Units out for more than 72 hrs are only included

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 29: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Annex-27

( )

Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

Western Regional Load Despatch CentreMumbai

2015Details of planned unit outages during the month of Sep 2015

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date1 CGPL 10 CGPLUMPP 830 0118 12-07-2015 1751 15-09-2015 AOH

2 SLPP 2 GSECL 125 0014 16-08-2015 1815 08-09-2015 AOH

3 STPS 1 GSECL 120 0000 19-08-2015 1700 12-09-2015 AOH

4 CHANDRAPUR 4 MAHAGENCO 210 2355 29-08-2015 1418 27092015 AOH

5 KOYNA STG-IV-II MAHAGENCO 250 0900 20-08-2015 1518 24092015

REALIGHINING OFT-G ROTOR ampADJUSTING THEBEARINGCLEARANCES(40DAYS)

6 LANCO 1 LANCO 300 0001 25-08-2015 2210 10-09-2015 AOH

7 NSPCL 2 NSPCL 250 0106 21-08-2015 0145 23092015 AOH

8 VSTPS 10 NTPC 500 0005 12-08-2015 1205 18092015 AOH 35 DAYS

9 SIPAT I 3 NTPC 660 0146 21-09-2015 Still out Still out AOH

10 KAWAS 1B NTPC 164 0945 21-09-2015 0619 25-09-2015 LESS SCHEDULE

11 KAWAS 1B NTPC 164 1630 25-09-2015 0627 29-09-2015 LESS SCHEDULE

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 30: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

(MW) From To1 GUVNL11 AKRIMOTA 2 125 1-Nov-15 30-Nov-15 AOH12 TORRENT POWER D 120 22-Nov-15 6-Dec-15 AOH13 TORRENT POWER F 121 11-Nov-15 20-Nov-15 AOH

2

NIL

3 CSPGCL

31 KORBA EST 4 50 151115 301115 AOH

4NIL

5 Central Sector51 CPL 20 800 081015 210915 AOH52 MAUDA 2 500 021015 211015 AOH

Annexure- 31

MSPGCL

MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2015 AND NOEMBER 2015

Capacity Outage as per AnnualMaintenance Plan

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 31: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

1 220 220 KV ANOOPUR - KOTMIKALA CKT - II 19Oct15 1000 19Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R2 765 765kV Jabalpur 03 main bay (724) at Korba PS 19-Oct-15 1130 19-Oct-15 1300 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R3 765 765kV Jabalpur 03 main bay (723) at Korba PS 19-Oct-15 1000 19-Oct-15 1115 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R4 765 765kV Jabalpur 04 main bay (727) at Korba PS 19-Oct-15 1500 19-Oct-15 1600 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R5 765 765kV Jabalpur 04 tie bay (726) at Korba PS 19-Oct-15 1615 19-Oct-15 1730 Daily CT OIL SAMPLING WRTS-ICG POWERGRID R6 400 Bableshwar-Dhule DC 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL7 400 Bableshwar-Aurangabad 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL8 400 Talegaon(PG)-Padghe 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL9 400 Talegaon(PG)-Kalwa 20-Oct-15 800 19-Nov-15 1700 Daily OPGW work-AR bypass MSETCL MSETCL

10 400 NKOYNA-KARAD -CKT 1 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL11 400 WARORA-ADANI (TIRODA) 2 20-Oct-15 1000 20-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL

12 400 Akola-Nandgaonpeth Line 20-Oct-15 1000 20-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Nandgaonpeth line shall becarried out under supervision of Hot line unit Akola at RailwayCrossing Loc No 374-374A 481-482

MSETCL MSETCL

13 400 Pune(GIS)-Pune 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C14 400 Solapur-Parli 1amp 2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C15 765 Seoni-Wardha 1 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

16 400 Bhadrawati-Parli-1 amp Bhadrawati - Dhariwal-Parli

20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

17 400 Solapur-Kolhapur-1amp2 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTML WRTS-I C18 765 Seoni-Bina 20-Oct-15 600 19-Nov-15 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R

Outage Planning of Transmission elements during the Duration 20102015 to 19112015

19 765 Wardha - Aurangabad 1 20-Oct-15 900 21-Oct-15 1800 Daily Modification of LA jumpers Commissioning of Spare Reactorat Aurangabad amp NGR replacement work at Wardha WRTS-I WRTS-I R

20 765 Bus-2 at Aurangabad 20-Oct-15 900 21-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I R21 400 Tie bay of Parli-2 amp Emco -1 at Bhadrawati 20-Oct-15 900 20-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

22 400 Bhadrawati-Chandrapur 3 amp 4 20-Oct-15 700 19-Nov-15 1800 DailyAuto reclose kept in non Auto mode for for OPGW stringingof Bhadrawati-Parli line as this line is crossing underneath theBhadrawati-Parli line in between Locs 4 - 5

WRTS-I WRTS-I R

23 765400 ICT-2 at Pune (GIS) 20-Oct-15 900 20-Oct-15 1800 Daily To take out spare transformer and take main unit in service WRTS-I WRTS-I R

24 400 Talegaon- Kalwa Line 20-Oct-15 800 20-Oct-15 1800 Daily Changing of OPGW Wire work will be carried out byPOWERGRID Telecom

MSETCL WRTS-I R

25 400 400kV Bus-1 at solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 404 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I R

26 220 220KV Bus-1 at Solapur ss 20-Oct-15 900 21-Oct-15 1800 Daily For Isolator Erection of 211 Bay for commissioning of 400KVICT-3

WRTS-I WRTS-I c

27 765 765 KV ICT 2 at Wardha 20-Oct-15 900 20-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R28 400 Wardha-Parli 2 20-Oct-15 900 20-Oct-15 1800 Daily Jumper tightning work WRTS-I WRTS-I R

29 220 KAWAS-HAL1 20-Oct-15 800 20-Oct-15 1800 Daily ATTENDING HOT SPOT amp ISOLATOR ALIGNMENT ampBREAKER TESTING NTPC NTPC

30 765 AT Bank 1 at Tamnar PS 20-Oct-15 1000 20-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R31 765 Bus Reactor at Kotra PS 20-Oct-15 1000 20-Oct-15 1400 Daily AMP Works WRTS-ICG POWERGRID R32 765 765kv DC Champa -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R33 765 765kv DC Raigarh -medesara line 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R34 400 Raipur-Raigarh Ckt-I amp II TL 20-Oct-15 800 19-Nov-15 1700 hrsDaily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R35 400 Raipur-Wardha-1amp2 TL 20-Oct-15 800 15-Nov-15 000 Daily AR non auto mode for Additional Earthing work on lines WRTS-ICG POWERGRID R36 400 Raipur - Wardha- 2 Line at Raipur SS 20-Oct-15 800 20-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

37 400 Akola-Bhusawal Line 21-Oct-15 1000 21-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Akola - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 558-559

MSETCL MSETCL

38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R38 400 Parli-2 Main bay (424) at Bhadrawati 21-Oct-15 900 21-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R39 400 400KV Mapusa Bus -I 21-Oct-15 900 21-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R40 765 Bus Reactor (Main bay 713) at Seoni 21-Oct-15 800 21-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R41 765 Aurangabad 1 Main Bay (716) at Wardha 21-Oct-15 900 21-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 32: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

42 400 400kV DGEN MAIN BUS-1 21-Oct-15 800 21-Oct-15 1800 Continuous40589A ISOLATOR R PHASE FEMALE CONTACT TOPFINGER IS OBSERVED IN BEND CONDITIOION PM ofIsolator 89-A

TEL TEL R

43 220 KAWAS-HAL2 21-Oct-15 800 21-Oct-15 1800 Daily 220KV CIRCUIT BREAKER TESTING amp PM JOB NTPC NTPC44 765 AT Bank 2 of Tamnar PS 21-Oct-15 1000 21-Oct-15 1400 Continuous AMP Works WRTS-ICG POWERGRID R45 400 BUS-1 (Raigarh ss) 21-Oct-15 1000 21-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R46 765 765 KV SC Sipat-Bilaspur-I TL 21-Oct-15 800 22-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R47 400 NEW KOYNA- JAIGADCKT 2 22-Oct-15 1000 22-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL

48 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

22-Oct-15 800 22-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

49 220 Bus Coupler bay 201 at Wardha 22-Oct-15 900 22-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

50 400 400 kV Koradi -Bhusawal Line 23-Oct-15 1000 23-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automode PID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 373-373A 474-475

MSETCL MSETCL

51 400 BABHALESHWAR - PADGHE 2 23-Oct-15 1000 23-Oct-15 1700 Daily Half Yearly maint Work MSETCL MSETCL52 400 400 kV Kolhapur-Mapusa ckt I 23-Oct-15 900 23-Oct-15 1800 Daily Replacement of CVT-Y phase at Mapusa WRTS-I WRTS-I R53 400 Boisar-2 Line Reactor at Aurangabad 23-Oct-15 900 23-Oct-15 1800 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C54 765 Bus-1 along with Bus Reactor at Aurangabad 23-Oct-15 900 24-Oct-15 1800 Daily for providing of spacers WRTS-I WRTS-I C

55 400 Kolhapur-Mapusa 1amp 2 DC 23-Oct-15 800 25-Oct-15 1800 Conti Commissioning of LILO line to GIS Kolhapur and GISKolhapur SS

WRTS-I WRTS-I C

56 400 Bus Reactor future Tie Bay (414) at Mapusa 23-Oct-15 900 23-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

57 400 Parli-Pune(GIS)1 amp 2Talegaon-Pune(GIS) 1amp2

23-Oct-15 800 23-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

58 400 Aurangabad 1 (409) Main Bay at Pune(Talegoan)

23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R59 765 765400 KV AT-2 (Main bay 715) at Seoni 23-Oct-15 800 24-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R60 400 400kV Bus-2 at Solapur 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 406 Bay amp Bus stability WRTS-I WRTS-I R61 220 220KV Bus-2 at Solapur ss 23-Oct-15 900 24-Oct-15 1800 Daily For Isolator Erection of 211 Bay amp Bus stability WRTS-I WRTS-I R62 400 Mauda 1 Main 434 Bay at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R63 220 Wardha line Bay 206 at Wardha 23-Oct-15 900 23-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R64 400 CGPL Jetpur Line-1 with Reactor 23-Oct-15 600 23-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL65 765 Durg Circuit1 Line Reactor at Kotra PS(LR-1) 23-Oct-15 1000 24-Oct-15 1800 Daily AMP of Line Reactor1 amp its CB(718R) WRTS-ICG POWERGRID R66 400 BUS-2 (Raigarh ss) 23-Oct-15 1000 23-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R67 765 765 KV SC Sipat-Bilaspur-II TL 23-Oct-15 800 24-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R

68 400 400 kV Koradi -Bhusawal Line 24-Oct-15 1000 24-Oct-15 1800 Daily

PID testing of insulator strings AR shall be kept in non automodePID of 400kV Koradi - Bhusawal Line shall be carriedout under supervision of Hot line unit Akola at RailwayCrossing Loc No 551-552

MSETCL MSETCL

69 765400 ICT-1 at Aurangabad 24-Oct-15 800 24-Oct-15 1800 Daily for normalisation of B-ph unit after repairs WRTS-I WRTS-I R70 400 50 MVAR Bus Reactor at Mapusa 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R

71 400 Parli-Pune(GIS) 1amp2 24-Oct-15 800 24-Oct-15 1800 Daily Overhead crossing by LILO of 400 KV Dc Aurangabad-Puneline and jumper tighening work at Pune (GIS) end

WRTS-I WRTS-I R

72 400 BUS 2 at Pune (Talegoan) 24-Oct-15 900 24-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R73 765 Bus Reactor 2 712 Bay at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R74 220 Badnera line Bay 208 at Wardha 24-Oct-15 900 24-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R75 400 CGPL Jetpur Line-1 with Reactor 24-Oct-15 600 24-Oct-15 1800 Daily Modification in Line 422 89L Isolator PGCIL CGPL76 400 Raipur- Bhadrawati 1 Line at Raipur SS 24-Oct-15 800 24-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R77 400 Jhanor- Dehgam2 25-Oct-15 800 27-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC78 765 765 KV SC Bilaspur-Korba TL 25-Oct-15 800 27-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R79 400 BABHALESHWAR - DHULE-I 26-Oct-15 1000 28-Oct-15 1700 Continuous Main 2 distance protection relay replacement work MSETCL MSETCL80 765400 ICT-2 at Aurangabad 26-Oct-15 800 26-Oct-15 1800 Daily for Commossioning of CSD at Aurangabad WRTS-I WRTS-I C

81 765 Wardha - Aurangabad 1 26-Oct-15 900 26-Oct-15 1300 Dailyto take out spare reactor into service to facilitate forcommissioning stability tests along with other circuit reactorbanks at Aurangabad

WRTS-I WRTS-I C

82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R82 400 400kV Chandrapur-1 main bay (406 bay) atBhadrawati

26-Oct-15 900 26-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

83 400 Bhadrawati-Parli-1 26-Oct-15 900 27-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossings Auto recloser kept in non auto mode forBhadrawati-Dhariwal-Parli 2

WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 33: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

84 220 220KV Mapusa Bus -I at Mapusa 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works WRTS-I WRTS-I R85 765 Seoni- Wardha-I (Tie bay 720) at Seoni 26-Oct-15 800 28-Oct-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

86 400 410 Bay (Main bay of 400kv ICT-1 ) at Solapur ss 26-Oct-15 900 26-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

87 765 Bus Reactor 2 711 Tie Bay at Wardha 26-Oct-15 900 26-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R88 765 Wardha - Aurangabad 4 26-Oct-15 900 26-Oct-15 1800 Daily CSD commissioning work at Wardha WRTS-I WRTS-I R

89 400 315 MVA ICT at 400 KV Khedamara Ss 26-Oct-15 900 27-Oct-15 1700 Continuousbasis

Replacement of 220 KV CTs

90 400 Main Bay 402 only of 40022033kV 315 MVA ICT -AKOLA 26-Oct-15 900 28-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICT willbe in service through its tie bay 403Said work will be carriedout by Agency

MSETCL MSETCL

91 400 Chandrapur Parali Circuit - III 26-Oct-15 800 26-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

92 400 400 KV INDORE- NAGDA CkT 26-Oct-15 600 31Oct15 1600 daily ON DAILY BASIS FOR LINE MAINTENANCE WORK MPPTCL MPPTCL R93 220 220 KV DAMOH PG - SAGAR CKT 26Oct15 900 26Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R94 220 KAWAS-Navsari 2 with Bus2 26-Oct-15 800 26-Oct-15 1800 Daily For Attending Hot Spot NTPC NTPC95 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 26-Oct-15 1000 26-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R96 765 Durg Circuit2 Line Reactor at Kotra PS(LR-2) 26-Oct-15 1000 27-Oct-15 1800 Daily AMP of Line Reactor2 amp its CB(713R) WRTS-ICG POWERGRID R97 400 ACBIL Tie Bay-414 at Bilaspur Ss 26-Oct-15 800 26-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R98 765 765 KV SC Bilaspur-Seoni-II TL 26-Oct-15 800 27-Oct-15 1800 Daily Fixing of open qurd Spacer Damper WRTS-ICG POWERGRID R99 000 406- ICT- II Main Bay at Bhatapara SS 26-Oct-15 900 26-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

100 765 Wardha - Aurangabad 2 27-Oct-15 900 28-Oct-15 1800 Daily Modification of LA jumpers Bay AMP works and Stability testalong with Spare Reactor at Aurangabad

WRTS-I WRTS-I C

101 400 400kvBVT Raipur-3 main bay (413) at Bhadrawati 27-Oct-15 900 27-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

102 765 Durg PS -Wardha 1 amp 2 27-Oct-15 600 28-Oct-15 1800 Daily Line rectification work WRTS-I WRTS-I R

103 400 Babhleshwar-Padghe SC 27-Oct-15 600 28-Oct-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

104 400 400kV Bus-1 at solapur ss 27-Oct-15 900 28-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R105 765 Seoni 1 Main 705 Bay at Wardha 27-Oct-15 900 27-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R106 400 400kV DGEN TRANSFER BUS 27-Oct-15 900 27-Oct-15 1200 Continuous Fixing of Display Board on gantry Tower TEL TEL R

107 400 Chandrapur Parali Circuit - II 27-Oct-15 800 27-Oct-15 1800 DailyFixing and replacement of broken Spacer cum vibrationdampersChandrapur Parali Circuit - I amp III will be inserviceSaid work will be carried out by Agency

MSETCL MSETCL

108 400 400 kv BHOPAL - BINA - CKT-I 27Oct15 900 27Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R109 765 Kotra 1 amp AT2 (705) Tie Bay at Tamnar PS 27-Oct-15 1000 27-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R110 400 Raipur-Durg PS-2 TL 27-Oct-15 800 27-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R111 765 765 KV SC Bilaspur-Seoni-I TL 27-Oct-15 800 29-Oct-15 1800 Daily Fixing of open qurd Spacer Damper and Fixing of Jumper nut and BoltWRTS-ICG POWERGRID R112 765 765kV Jharsuguda(Sundergarh) -Korba(Dharamjaygarh) Ckt-01 TL27-Oct-15 800 28-Oct-15 1800 Daily AMP+Pending SAS works WRTS-ICG POWERGRID R113 220 ICT 3 Bay at Raipur SS bay 209 27-Oct-15 800 27-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R114 400 KARAD JAIGAD CKT 2 28-Oct-15 1000 28-Oct-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL115 400 400kv EMCO-1 main bay (422) at Bhadrawati 28-Oct-15 900 28-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R116 400 Wardha-I Main Bay (401) at Parli 28-Oct-15 1000 28-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

117 400 Lonikand Line (413) Main Bay at Pune (Talegoan) 28-Oct-15 1000 28-Oct-15 1800 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R

118 765 765 KV ICT 2 Main Bay 706 at Wardha 28-Oct-15 900 28-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R119 765 765kV Bus Reactor 2 at Wardha 28-Oct-15 900 29-Oct-15 1800 Daily Balance construction works WRTS-I WRTS-I C120 400 400 kv Khedamara -Korba Ext ckt-1 28-Oct-15 900 28-Oct-15 1700 Daily Annual Maintenance Program

121 400 Chandrapur Parali Circuit - III 28-Oct-15 800 28-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

122 400 400KV SS INDORE -315 MVA X-MER - II 28Oct15 800 29Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R123 400 400 kv BHOPAL - BINA - CKT-II 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R124 220 220 KV MALANPUR - GWL( PG) CKT - I 28Oct15 900 28Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R125 400 Jhanor- Dehgam1 28-Oct-15 800 30-Oct-15 1800 Continuous Annual Bay maintenance NTPC NTPC126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R126 400 400KV SUGEN JHANOR LINE with Transfer Bus 28-Oct-15 900 28-Oct-15 1800 Daily Alignment work of 406-89T Pantograph Isolator TPL-SUGEN TPL-SUGEN R127 765 Bus Reactor (707) Main Bay at Tamnar PS 28-Oct-15 1000 28-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R128 765 Tamnar Circuit2 Main Bay(Bay no704) at Kotra PS 28-Oct-15 1000 29-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R129 765 765 KV Side ICT2 Tie bay(720 Bay) at Bilaspur ss 28-Oct-15 800 28-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 34: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

130 400 Raipur-Durg PS-1 TL 28-Oct-15 800 28-Oct-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R131 400 400 KV DC Sipat-Ranchi-I amp II TL 28-Oct-15 800 29-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R132 400 Wardha-2 Tie at Raipur ss (BAY 428) 28-Oct-15 800 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R133 000 407- Bus Reactor Main Bay at Bhatapara 28-Oct-15 900 28-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R134 765 Bus Reactor Main Bay 701 at Aurangabad 29-Oct-15 900 29-Oct-15 1800 Daily for AMP works WRTS_I WRTS_I R135 400 400kv EMCO-2 main bay (427) at Bhadrawati 29-Oct-15 900 29-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

136 400 Bhadrawati-Dhariwal 29-Oct-15 900 30-Oct-15 1800 DailyReplacement of Porcelain Insulators with Glass in NHHVDCCrossingsAuto recloser kept in non auto mode forBhadrawati-Parli 1

WRTS-I WRTS-I R

137 400 Kolhapur-1 Main Bay (412) at Mapusa 29-Oct-15 900 3-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R138 400 Wardha-II Main Bay (402) at Parli 29-Oct-15 1000 29-Oct-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R139 400 Talegaon-Pune(GIS) 1amp2 29-Oct-15 800 29-Oct-15 1800 Daily Removal of swapping arrangement WRTS-I WRTS-I R140 400 ICT 3 (418) Main Bay at Pune (Talegoan) 29-Oct-15 1000 29-Oct-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R141 400 Seoni - Khandwa-I Line 29-Oct-15 800 29-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R142 400 400kV Bus-2 at Solapur 29-Oct-15 900 30-Oct-15 1800 Daily Bus Bar testing and Bay Stability for 400KV ICT-3 WRTS-I WRTS-I R143 400 Aurangabad 2 Main 713 Bay at Wardha 29-Oct-15 900 29-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

144 400 400kV DGEN TRANSFER BUS 29-Oct-15 800 29-Oct-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel(FOR BAY 402)

TEL TEL R

145 400 Chandrapur Parali Circuit - II 29-Oct-15 800 29-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

146 400 Tie Bay 403 only between 400220 kV 315 MVAICT AKOLA and Aurangabad Ckt - 01(At Akola ss) 29-Oct-15 900 31-Oct-15 1800 Continuous

Servicing and Overhauling of Areva make 400kV CB ICTand Abad Ckt 01 will be in service through their respectiveMain Bays

MSETCL MSETCL

147 220 220 KV MALANPUR - GWL( PG) CKT - II 29Oct15 900 29Oct15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R148 220 220 KV PANDHURNA - KALMESHWAR CKT 29Oct15 900 29Oct15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R149 220 220 KV SUGEN-Kim LINE-1 with Bus-B 29-Oct-15 900 29-Oct-15 1800 Daily Alignment of Bus side Earth Switdh 213-89BE TPL-SUGEN TPL-SUGEN R150 765 Bus Reactor (707) Main Bay at Tamnar PS 29-Oct-15 1000 29-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R151 400 Wardha-2 Main at Raipur ss (BAY 430) 29-Oct-15 800 29-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R152 400 BABHALESHWAR - PADGHE 1 30-Oct-15 800 30-Oct-15 1800 Daily QM work and RelayCB testing work MSETCL MSETCL153 400 Waluj Aurangabad(PG) I 30-Oct-15 1000 30-Oct-15 1700 Daily QM work MSETCL MSETCL

154 400 Akola-Aurangabad 2 30-Oct-15 900 30-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

155 HVDC HVDC Filter 23 Pole-2 West 30-Oct-15 900 30-Oct-15 1800 Conti Removal of PIR WRTS-I WRTS-I R

156 400 Seoni - Khandwa-II Line 30-Oct-15 800 30-Oct-15 1800 Daily Commissioning of CSD at Seoni WRTS-II WRTS-I R

157 400 Aurangabad 1 Main 716 Bay at Wardha 30-Oct-15 900 30-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

158 400 CGPL Mansar Line amp Reactor (limdi-2) 30-Oct-15 600 30-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL159 400 400 kv Khedamara -Marwa (Old Korba Ext-2) 30-Oct-15 900 30-Oct-15 1700 Daily Annual Maintenance Program

160 400 Chandrapur Parali Circuit - III 30-Oct-15 800 30-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II

MSETCL MSETCL

161 400 400KV SS INDORE -315 MVA X-MER - III 30Oct15 800 31Oct15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R162 400 400KV Pirana (TPL) ndash SUGEN 30-Oct-15 800 30-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R163 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 30-Oct-15 1000 30-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R164 765 AT4 Main Bay(Bay no706) at Kotra PS 30-Oct-15 1000 31-Oct-15 1800 Daily AMP Works WRTS-ICG POWERGRID R165 765 Seoni1 Line Reactor at Bilaspur Ss 30-Oct-15 800 30-Oct-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R166 400 400 KV Sc Korba-Bhatapara TL 30-Oct-15 800 31-Oct-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R167 400 400 KV SC Sipat-Korba TL 30-Oct-15 800 30-Oct-15 1800 Daily Insulator hoisting due to Insulator broken WRTS-ICG POWERGRID R168 765 Bus Reactor 02 at Korba PS 30-Oct-15 800 30-Oct-15 1800 Daily TO ATTEND PUNCH POINTS WRTS-ICG POWERGRID R169 000 408- BusReactor Tie Bay at Bhatapara 30-Oct-15 900 30-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R170 400 BABHALESHWAR - DHULE-2 31-Oct-15 1000 31-Oct-15 1700 Daily QM work and RelayCB testing work MSETCL MSETCL

171 400 Akola-Aurangabad 1 31-Oct-15 900 31-Oct-15 1800 Daily Commissioning of LReactor at Aurangabad and Bays AMPworks

WRTS-I WRTS-I R

172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R172 HVDC HVDC Filter 24 Pole-2 West 31-Oct-15 900 31-Oct-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R173 765 Seoni- Wardha-II (Main bay 724) at Seoni 31-Oct-15 800 31-Oct-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

174 765 411 Bay (Tie bay of 400kv ICT-1 amp Karad line ) atSolapur ss

31-Oct-15 900 31-Oct-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

175 765 Durg PS 1 Main 718 Bay at Wardha 31-Oct-15 900 31-Oct-15 1800 Daily AMP work WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 35: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

176 400 CGPL Mansar Line amp Reactor (limdi-2) 31-Oct-15 600 31-Oct-15 1800 Daily Modification in Line 413 89L Isolator PGCIL CGPL

177 400 Chandrapur Parali Circuit - II 31-Oct-15 800 31-Oct-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

178 400 400KV Pirana (TPL) ndash SUGEN 31-Oct-15 800 31-Oct-15 1800 Daily For Insulator Replacement Work TPL TPGL R179 765 Bus Reactor amp AT3 (708) Tie Bay at Tamnar PS 31-Oct-15 1000 31-Oct-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R180 000 201- Transfer Bay Coupler at Bhatapara 31-Oct-15 1700 31-Oct-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

181 400 400kV DGEN-Navsari(PGCIL) line-2 1-Nov-15 900 1-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

182 400 Chandrapur Parali Circuit - III 1-Nov-15 800 1-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

183 400 400KV Pirana (TPL) ndash UNOSUGEN 1-Nov-15 800 1-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R184 400 400 KV DC Sipat-Raipur-IampII TL 01-Nov-15 800 02-Nov-15 1800 Daily Non Auto Mode For additional earthing work WRTS-ICG POWERGRID R185 000 402- ICT- I amp Korba Tie Bay at Bhatapara 01-Nov-15 900 01-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

186 765 Wardha - Aurangabad 3 2-Nov-15 900 2-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad amp CTOil Sample at Wardha

WRTS-I WRTS-I R

187 220 Trasnfer Bus at Pune (Talegoan) 2-Nov-15 930 2-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R188 765 Seoni- Bilaspur -II (Main bay 716) at Seoni 2-Nov-15 800 3-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R

189 765 716 Bay (Main bay of Raichur-1 line ) at Solapursubstation

2-Nov-15 900 2-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

190 765 Durg PS 2 Main 718 Bay at Wardha 2-Nov-15 900 2-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R191 400 Wardha-Raipur 1 2-Nov-15 900 2-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C192 400 400kV Bus 2 at Wardha 2-Nov-15 900 3-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C193 400 400 kv Khedamara -Raita Ckt-1 2-Nov-15 900 2-Nov-15 1700 Daily Annual Maintenance Program

194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL194 400 Chandrapur Parali Circuit - II 2-Nov-15 800 2-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

195 400 Main Bay 410 only of 400kV Akola Bhusawal Line atAkola

2-Nov-15 900 4-Nov-15 1800 Continuous Servicing and Overhauling of Areva make 400kV CBLine willbe in service through its Tie Bay 409

MSETCL MSETCL

196 400 400KV SS INDORE -315 MVA X-MER - IV 2Nov15 800 3Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R197 400 400 kv ITARSI(PG) - BHOPAL - CKT-I 2Nov15 900 2Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R198 400 Jhanor-GPEC 2-Nov-15 800 3-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC199 400 400KV Pirana (TPL) ndash UNOSUGEN 2-Nov-15 800 2-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R200 400 Bus-I at Tamnar PS 02-Nov-15 1000 02-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R201 765 AT2 amp 765kV Durg Circuit1 Tie Bay(Bay no719) at Kotra PS02-Nov-15 1000 03-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R202 400 RAIGARH-RKM LINE BAY 419 L at Raigarh SS 02-Nov-15 1000 02-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R203 765 765kv Seoni-1 Line-Reactor at Bilaspur Ss 02-Nov-15 800 02-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R204 400 Durg 1 Tie Bay at Raipur ss (BAY444) 02-Nov-15 800 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R205 000 Bay 401 - ICT- I Main Bay at Bhatapara 02-Nov-15 900 02-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R206 765 Bus Reactor Tie Bay 702 at Aurangabad 3-Nov-15 900 3-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

207 HVDC HVDC Pole-1 at Bhadrawati 3-Nov-15 900 4-Nov-15 1800 Conti Pole-1 South R phase conservator tank replacement work ontrial basis amp yearly AMP

WRTS-I WRTS-I R

208 400 Bhadrawati-Chandrapur 4 3-Nov-15 900 4-Nov-15 1800 DailyReplacement of Porcelain Insulators with CLR Polymer inHVDC line crossingsAuto recloser kept in non auto mode forBhadrawati-Chandrapur 3

WRTS-I WRTS-I R

209 400 Pune-II Main Bay (406) at Parli 3-Nov-15 1000 3-Nov-15 1800 Daily For AMP of Bay WRTS-1 WRTS-I R

210 765 Pune (GIS)-Sholapur Line with line reactor 3-Nov-15 800 3-Nov-15 1800 Daily To take spare into service with LR and jumpers to be madetwin from quad at Pune (GIS)

WRTS-I WRTS-I R

211 765400 ICT-1 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R212 765400 ICT-2 at Pune (GIS) 3-Nov-15 900 3-Nov-15 1400 Daily Implementation of master follower from RTCC WRTS-I WRTS-I R213 220 Bus 2 at Pune (Talegoan) 3-Nov-15 930 3-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R214 765 705 Bay (Tie Bay of Ict-2) at Solapur ss 3-Nov-15 900 3-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R215 400 Wardha-Raipur 2 3-Nov-15 900 3-Nov-15 1800 Daily Commissioning of CSD work at Wardha WRTS-I WRTS-I C

216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL216 400 Chandrapur Parali Circuit - III 3-Nov-15 800 3-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

217 400 400 kv ITARSI(PG) - BHOPAL - CKT-II 3Nov15 900 3Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

218 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 3Nov15 900 3Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 36: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

219 220 220 KV DAMOH PG - TIKAMGARH CKT 3Nov15 900 3Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R220 400 400KV Pirana (TPL) ndash SUGEN 3-Nov-15 800 3-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R221 400 Bus-I at Tamnar PS 03-Nov-15 1000 03-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R222 400 Raigarh - Sterlite line bay416L at Raigarh SS 03-Nov-15 1000 03-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R223 400 Raipur - Sipat 3 at Raipur SS 03-Nov-15 800 03-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R224 765 Wardha - Aurangabad 4 4-Nov-15 900 4-Nov-15 1800 Daily Stability test along with Spare Reactor at Aurangabad WRTS-I WRTS-I R225 400 Kolhapur-2 Main Bay (407) at Mapusa 4-Nov-15 900 9-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R

226 400 Wardha- Parli 2 4-Nov-15 1000 4-Nov-15 1800 Daily For commissioning of CSD at Parli amp Stringing work of brokenearth wire between span 387 to 390 near Wardha

WRTS-1 WRTS-I R

227 220 Bus 1 at Pune (Talegoan) 4-Nov-15 930 4-Nov-15 1700 Daily AMP Works at Pune (Talegoan) WRTS-I WRTS-I R228 765 Seoni- Wardha-II (Tie bay 723) at Seoni 4-Nov-15 800 5-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R229 765 706 Bay (Main Bay of Ict-2) at Solapur ss 4-Nov-15 900 4-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R230 400 400kV Bus 1 at Wardha 4-Nov-15 900 5-Nov-15 1800 Daily Constn works in 400kV Abad bay Extn WRTS-I WRTS-I C

231 765 Tiroda - Koradi Line - 1 4-Nov-15 900 6-Nov-15 900 Continuous Removal of Line reactor of Tiroda Koradi line at Tiroda endfor repairing purpose

MEGPTCL MEGPTCL R

232 765 ICT - 1 at Akola substation 4-Nov-15 900 4-Nov-15 1800 Daily Removal of Faulty ICT phase for repairing purpose MEGPTCL MEGPTCL R233 400 400 kv Khedamara -Raita Ckt -2 4-Nov-15 900 4-Nov-15 1700 Daily Annual Maintenance Program

234 400 400kV DGEN TRANSFER BUS 4-Nov-15 800 4-Nov-15 1800 Continuous Preventive maintenance of CB Isolator C amp Isolator D LACTEMVT and CRP Panel( FOR BAY 403)

TEL TEL R

235 400 Chandrapur Parali Circuit - II 4-Nov-15 800 4-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III will be in service MSETCL MSETCL

236 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 4Nov15 900 4Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

237 220 220 KV MALANPUR - AURAIYA CKT 4Nov15 900 4Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R238 400 Jhanor- SUGEN 4-Nov-15 800 9-Nov-15 1800 Continuous Annual Bay maintenance NTPC NTPC239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R239 400 400KV Pirana (TPL) ndash UNOSUGEN 4-Nov-15 800 4-Nov-15 1800 Daily For Insulator Replacement Work TPL TPGL R240 400 Bus-I at Tamnar PS 04-Nov-15 1000 04-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R241 765 AT3 at Kotra PS 04-Nov-15 1000 04-Nov-15 1400 Daily Tan-delta measurement at sweep frequency WRTS-ICG POWERGRID R242 400 Raigarh - KWPCL main bay-407 at Raigarh SS 04-Nov-15 1000 04-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R243 765 Bus Reactor at Bilaspur Ss 04-Nov-15 800 04-Nov-15 1800 Daily For gasket replacement work WRTS-ICG POWERGRID R244 400 Sipat-Raipur-1 TL 04-Nov-15 800 04-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R245 765 ICT-1 Main Bay 703 at Aurangabad 5-Nov-15 900 5-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R246 765 Durg PS -Wardha 1 amp 2 5-Nov-15 600 6-Nov-15 1800 Daily Line rectification work WRTS-I WRTS-I R

247 400 Wardha- Parli 1 5-Nov-15 1000 5-Nov-15 1800 Daily For commissioning of CSD at Parli amp Jumper tightning work WRTS-1 WRTS-I R

248 220 Urshe-1 Bay at Pune (Talegoan) 5-Nov-15 930 5-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R249 765 Pune Switchable Line reactor at solapur ss 5-Nov-15 900 5-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R250 765 Aurangabad 2 Tie 714 Bay at Wardha 5-Nov-15 900 5-Nov-15 1800 Daily AMP work WRTS-I WRTS-I R

251 400 Chandrapur Parali Circuit - III 5-Nov-15 800 5-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

252 400 400KV SS BINA -315MVA X-MER- I 5Nov15 900 5Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R253 220 220 KV MEHGAON - AURAIYA CKT 5Nov15 900 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R254 220 220 KV ANOOPUR - KOTMIKALA CKT - I 5Nov15 1000 5Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R255 400 Bus-I at Tamnar PS 05-Nov-15 1000 05-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R256 400 Raigarh - KWPCL amp ICT-2 tie bay 408 at Raigarh SS 05-Nov-15 1000 05-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R257 400 Sipat-Raipur-2 TL 05-Nov-15 800 05-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R

258 400 Aurangabad(PG)- Aurangabad(MSETCL) I 6-Nov-15 800 7-Nov-15 1800 Conti Replacement of HCB isolator Clamps connectors AlPipeand jumpers under up gradation work at MSETCL Waluj SS WRTS-I WRTS-I C

259 400 Aurangabad-Pune 1 6-Nov-15 800 7-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

260 HVDC CWD DIA20 Q50 Bay at Bhadrawati 6-Nov-15 900 6-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

261 400 Parli-Pune(GIS)-I Line 6-Nov-15 1000 6-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R262 220 Urshe-2 Bay at Pune (Talegoan) 6-Nov-15 930 6-Nov-15 1700 Daily AMP Works at Pune (Talegoan) MSETCL WRTS-I R263 765 Seoni- Bilaspur -I (Main bay 710) at Seoni 6-Nov-15 800 7-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R264 765 Raichur-1 Switchable Line reactor at Soalpur ss 6-Nov-15 900 6-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R265 400 CGPL 400 KV Bus-2 Outage 6-Nov-15 600 6-Nov-15 1800 Daily Modification in Line 401 89A Isolator PGCIL CGPL

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 37: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

266 400 400 kv Khedamara -Raita Ckt-3 6-Nov-15 900 6-Nov-15 1700 Daily Annual Maintenance Program

267 400 Chandrapur Parali Circuit - II 6-Nov-15 800 6-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp III

MSETCL MSETCL

268 400 400KV SS BINA -315MVA X-MER- II 6Nov15 900 6Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

269 400 400 kv RAJGARH (PGCIL )- SSPCKT I 6Nov15 900 6Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

270 765 Bus-I at Tamnar PS 06-Nov-15 1000 06-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R271 400 Raigarh- ICT-2 main bay- 409 at Raigarh SS 06-Nov-15 1000 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R272 765 765kv Seoni-2 Line-Reactor at Bilaspur Ss 06-Nov-15 800 06-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R273 000 403 - Korba Main Bay at Bhatapara 06-Nov-15 900 06-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R274 400 KHADKA- DEEPNAGAR CKT 1 7-Nov-15 1000 7-Nov-15 1700 Daily QM work MSETCL MSETCL275 220 Nasik Navsari II 7-Nov-15 1000 7-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL276 HVDC CWD DIA 20 Q51 Bay at Bhadrawati 7-Nov-15 900 7-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R

277 400 Parli-Pune(GIS)-2 Line 7-Nov-15 1000 7-Nov-15 1800 Daily For commissioning of CSD at Parli WRTMPL MSETCL

WRTS-I R

278 400 CGPL 400 KV Bus-2 Outage 7-Nov-15 600 7-Nov-15 1800 Daily Modification in Line 407 89A Isolator PGCIL CGPL

279 400 Chandrapur Parali Circuit - III 7-Nov-15 800 7-Nov-15 1800 Daily Fixing and replacement of broken Spacer cum vibrationdampers Chandrapur Parali Circuit - I amp II will be in service MSETCL MSETCL

280 400 400KV SS BINA -315MVA X-MER- III 7Nov15 900 7Nov15 1700 daily POST MAINTENANCE WORK ampTESTING WORK MPPTCL MPPTCL R

281 400 400 kv RAJGARH (PGCIL )- SSPCKT II 7Nov15 900 7Nov15 1600 daily MAINTENANCE WORK PGCILMPPTCL

WR - II R

282 765 Bus-I at Tamnar PS 07-Nov-15 1000 07-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R283 400 Raigarh -Raipur ckt -1 tie bay - 411 at Raigarh SS 07-Nov-15 1000 07-Nov-15 1800 Daily AMP Works WRTS-ICG POWERGRID R284 000 404 - Bhailai Main bay at Bhatapara ss 07-Nov-15 900 07-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R285 400 PADGHE - KALWA 2 8-Nov-15 1000 8-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R286 400 KARAD JAIGAD CKT 1 9-Nov-15 1000 9-Nov-15 1700 Daily Cold line Insulator disc washing MSETCL MSETCL287 765 Dhule Main Bay 704 at Aurangabad 9-Nov-15 900 9-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R288 400 Bhilai-Bhadrawati 9-Nov-15 800 13-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R

289 220 Seoni-Chhindwara- II(Main bay - 209) at Seoni 9-Nov-15 800 9-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

290 765 Raichur-2 Switchable Line reactor at Soalpur ss 9-Nov-15 900 9-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

291 765 Wardha-Aurangabad 3 line reactor at Aurangabad 9-Nov-15 900 9-Nov-15 1300 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

292 765 Wardha-Aurangabad 4 line reactor at Aurangabad 9-Nov-15 1400 9-Nov-15 1800 Daily DGA of bushing oil line outage is also required WRTS-I WRTS-I R

293 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

9-Nov-15 600 9-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

294 400 400 KV ISP- NAGDA CkT 9Nov15 900 9Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R295 000 405- Bhailai - ICT- II Tie Bay at Bhatapara SS 09-Nov-15 900 09-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R296 765 ICT-2 Tie Bay 705 at Aurangabad 10-Nov-15 900 10-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R297 400 Kolhapur-1 - ICT 1 Tie Bay (411) at Mapusa 10-Nov-15 900 15-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R298 765 765KV Bus reactor at Solapur ss 10-Nov-15 900 10-Nov-15 1800 Daily AMP works and MOG gasket replacing work WRTS-I WRTS-I R

299 400 CGPL Mundra-Bhimasar-Vadavi Line-1 WithReactor

10-Nov-15 600 10-Nov-15 1800 Daily Modification in Line 428 89L Isolator PGCIL CGPL

300 765 ICT-2 Main Bay 706 at Aurangabad 11-Nov-15 900 11-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

301 400 422 Bay (Main bay 0f 765400KV ICT-1) at Soalpurss

11-Nov-15 900 11-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

302 765 Wardha-Aurangabad 3 switchable line reactor atWardha

11-Nov-15 900 11-Nov-15 1300 Daily DGA of bushing oil WRTS-I WRTS-I R

303 765 Wardha-Aurangabad 4 switchable line reactor atWardha

11-Nov-15 1400 11-Nov-15 1800 Daily DGA of bushing oil WRTS-I WRTS-I R

304 765 Padghe-2 Main Bay 707 at Aurangabad 12-Nov-15 900 12-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

305 400 423 Bay (Tie Bay of 765400kv ICT-1) at Solapur ss 12-Nov-15 900 12-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

306 220 220 KV ANOOPUR - KOTMIKALA CKT - I 12Nov15 1000 12Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R

307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C307 400 Aurangabad(PG)- Aurangabad(MSETCL) 2 13-Nov-15 800 14-Nov-15 1800 ContiReplacement of HCB isolator CTs Clamps connectorsAlPipe and jumpers under up gradation work at MSETCLWaluj SS

WRTS-I WRTS-I C

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 38: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

308 400 Aurangabad-Pune 2 13-Nov-15 800 14-Nov-15 1800 Conti Attending problem of TBC isolator changing of clamps ampconnectors and AMP works at MSETCL Waluj SS

WRTMPL MSETCL

WRTS-I R

309 220 Seoni-Chhindwara- I(Main bay - 208) at Seoni 13-Nov-15 800 13-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

310 220 Seoni-Seoni- I(Main bay - 204) at Seoni 14-Nov-15 800 14-Nov-15 1800 Daily AMP works (DCRM test) Line will be in service throughTransfer bay

WRTS-I WRTS-I R

311 765 Wardha - Aurangabad 2 14-Nov-15 900 14-Nov-15 1800 Daily Balance rectification work at SS amp Line Commissioning ofLVCC CSD

WRTS-I WRTS-I R

312 400 Raipur - Tamnar Line 1 -433 L at Raipur SS 14-Nov-15 800 14-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

313 400KV 400kV DGEN-Navsari(PGCIL) line-1 15-Nov-15 900 15-Nov-15 1500 Continuous For cloth cleaning of Porcelain Insulators at 140MTransmission Tower at Narmada River Crossing

TEL-D TEL-D R

314 400 KORADI-KHAPERKHEDA I 16-Nov-15 1000 16-Nov-15 1700 Daily QM work MSETCL MSETCL315 400220 ICT-1 at Aurangabad 16-Nov-15 900 16-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R316 HVDC CWD DIA 20 Q52 Bay at Bhadrawati 16-Nov-15 900 16-Nov-15 1800 Daily Yearly Amp works WRTS-I WRTS-I R317 400 Raipur-Bhadrawati 1 16-Nov-15 800 19-Nov-15 1800 Daily AR in Non auto mode for conducting PID WRTS-I WRTS-I R318 400 Kolhapur-2 - ICT 2 Tie Bay (412) at Mapusa 16-Nov-15 900 21-Nov-15 1800 Conti CB Overhauling works WRTS-I WRTS-I R319 765 Seoni- Bilaspur -I (Main bay 711) at Seoni 16-Nov-15 800 17-Nov-15 1800 Daily AMP works (DCRM amp Timing test of CB) WRTS-II WRTS-I R320 765 707 Bay (Main Bay of Aurangbad-1 Line) 16-Nov-15 900 16-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

321 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

16-Nov-15 600 16-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

322 220 220 KV ANOOPUR - KOTMIKALA CKT - II 16Nov15 1000 16Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R323 400132 MOUDA ICT-1 16-Nov-15 800 18-Nov-15 1800 Continous Annual PM NTPC NTPC324 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar PS 16-Nov-15 800 16-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R325 765 Seoni1 Line Reactor at Bilaspur Ss 16-Nov-15 800 16-Nov-15 000 Daily For gasket replacement work WRTS-ICG POWERGRID R326 400 Raipur-Wardha-1 TL 16-Nov-15 800 16-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R327 400 Bhilai - Koradi Line 16-Nov-15 800 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL328 000 202- Suhela Ckt - 3 at Bhatapara 16-Nov-15 900 16-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R329 400 WARORA - CHANDRAPUR ll CKT 1 17-Nov-15 1000 17-Nov-15 1700 Daily Half Yearly maint Work MSETCL MSETCL330 400220 ICT-2 at Aurangabad 17-Nov-15 900 17-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

331 400 Babhleshwar-Padghe line -2 17-Nov-15 600 18-Nov-15 1800 Conti Crossing of up-coming 765kv Aurangabad-Padghe DC line MSETCL WRTS-I C

332 765 708 Bay (Tie Bay of Aurangbad-1 Line) 17-Nov-15 900 17-Oct-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

333 400 CGPL Mundra-Bhimasar-Vadavi Line-2 WithReactor

17-Nov-15 600 17-Nov-15 1800 Daily Modification in Line 425 89L Isolator PGCIL CGPL

334 400 Main Bay 413 only of 400kV Akola - NandgaonLine(At akola)

17-Nov-15 1000 17-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Tie Bay 412

MSETCL MSETCL

335 220 220 KV BINA( PG )- SHIVNPURI CKT 17Nov15 900 17Nov15 1700 daily MAINTENANCE WORK MPPTCL MPPTCL R336 220 220 KV DAMOH PG - DAMOH - IC- II 17Nov15 900 17Nov15 1800 daily MAINTENANCE WORK MPPTCL MPPTCL R337 220 220 KV BADOD - KOTA CKT 17Nov15 900 17Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R338 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar PS 17-Nov-15 800 17-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R339 400 Raipur-Wardha-2 TL 17-Nov-15 800 17-Nov-15 1800 Daily Line outage required for attending AMP amp shutdown works WRTS-ICG POWERGRID R340 400 Raipur - Sipat 3 at Raipur SS 17-Nov-15 800 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R341 000 204- Bus Coupler Bay at Bhatapara 17-Nov-15 900 17-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R342 400 KARAD-SOLAPUR (PGCIL) 18-Nov-15 1000 18-Nov-15 1700 Daily Half Yearly maint work MSETCL MSETCL343 400 Wardha-2 LReactor at Aurangabad 18-Nov-15 900 18-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R344 765 765400 KV AT-2 (Tie bay 714) at Seoni 18-Nov-15 800 19-Nov-15 1800 conti AMP works (DCRM amp Timing test of CB) WRTS-I WRTS-I R345 765 710 Bay (Main Bay of Aurangbad-2 Line) 18-Nov-15 900 18-Nov-15 1800 Daily CT oil Sampling for DGA at Solapur WRTS-I WRTS-I R

346 400 Khandwa-Dhule 1 18-Nov-15 900 18-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

347 400 80 MVAR Karad line reactor at Solapur 18-Nov-15 1000 18-Nov-15 1400 Daily DGA of bushing oil WRTS-I WRTS-I R348 400 CGPL Limdi Line-1 with Reactor 18-Nov-15 600 18-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL349 220 220 KV BADOD - MODAK CKT 18Nov15 900 18Nov15 1600 daily MAINTENANCE WORK MPPTCL MPPTCL R350 400 AT2 (412) Main Bay at Tamnar PS 18-Nov-15 800 18-Nov-15 2000 Continuous AMP Works WRTS-ICG POWERGRID R351 400 Raigarh - Sundergarh -2 line bay 413 L at Raigarh SS18-Nov-15 1000 18-Nov-15 1400 Daily AMP Works WRTS-ICG POWERGRID R352 400 Raipur - Khedamara Line 18-Nov-15 800 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R353 000 206- Suhela Ckt -1 at Bhatapara 18-Nov-15 900 18-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R354 765 Solapur-2 (Padghe-1) Main Bay 710 at Aurangabad 19-Nov-15 900 19-Nov-15 1800 Daily for AMP works WRTS-I WRTS-I R

355 400 428 Bay (Main bay 0f 765400KV ICT-2) at Soalpurss

19-Nov-15 900 19-Nov-15 1800 Daily AMP Works at Solapur WRTS-I WRTS-I R

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 39: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SN KV Line From To Basis Reason System Agency TypeOutage Planning of Transmission elements during the Duration 20102015 to 19112015

356 765 765 KV Bus 2 at Wardha 19-Nov-15 900 20-Nov-15 1800 Daily Bus Extension Work for Raipur Ckt 3amp4 WRTS-I WRTS-I C

357 400 Khandwa-Dhule 2 19-Nov-15 900 19-Nov-15 1800 Daily for Rectification of CB Air leakages and bay eqpt AMP worksat Dhule SS

MSETCL WRTS-I R

358 400 CGPL Limdi Line-1 with Reactor 19-Nov-15 600 19-Nov-15 1800 Daily Modification in Line 416 89L Isolator PGCIL CGPL

359 400 Tie Bay 412 only of 400kV Akola - Nandgaon Line(akola)

19-Nov-15 1000 19-Nov-15 1700 Daily Routine Maintenance and Testing worksLine will be inservice through its Main Bay 413

MSETCL MSETCL

360 765 Bus-II at Tamnar PS 19-Nov-15 1000 19-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R361 400 Raipur - Wardha- 1 Line at Raipur SS 19-Nov-15 800 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R362 000 207- Suhela Ckt - II at Bhatapara 19-Nov-15 900 19-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R363 400 125 MVAR Bus reactor at Seoni 20-Nov-15 800 20-Nov-15 1800 Daily Commissioning of fire fighting system WRTS-I WRTS-I R364 400 MOUDA 400kv Bus reactor 20-Nov-15 800 21-Nov-15 1800 Continous Annual PM NTPC NTPC365 765 Bus-II at Tamnar PS 20-Nov-15 1000 20-Nov-15 1800 Continuous AMP Works WRTS-ICG POWERGRID R366 000 210- ICT - II Bay at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R367 000 208-ICT-I at Bhatapara 20-Nov-15 900 20-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R

368 220 TAPS-Bhilad 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

GETCO NPCIL

369 220 TAPS1 amp2-TAPS 3amp4 tie line 21-Nov-15 800 26-Nov-15 1900 Continuous Zone-I Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

370 400132 MOUDA ICT-2 24-Nov-15 800 26-Nov-15 1800 Continous Annual PM NTPC NTPC371 400 Bhilai - Korba 1 Line at Khedamara SS 26-Nov-15 800 26-Nov-15 1700 Daily AMP Works WRTS-ICG POWERGRID R372 +-500kV Mundra-Mohindergarh HVDC Pole -1 27-Nov-15 700 30-Nov-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

373 220 TAPS 1amp2 ndash TAPS 3amp4 TIE LINE 28-Nov-15 700 29-Nov-15 1800 Daily Zone-III Switchyard main bus isolators amp insulatorsreplacement

MSETCL NPCIL

374 +-500kV Mundra-Mohindergarh HVDC Pole -2 1-Dec-15 700 4-Dec-15 1900 Daily Insulator replacment work in HVDC line ATIL ATIL R

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 40: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Anaulagnak 33

ATUbar 2015 AaOr navambar 2015 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2015 AND NOVEMBER 2015

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATUbar 2015 navambar 2015 ATUbar 2015 navambar 2015

OCTOBER 2015 NOVEMBER 2015 OCTOBER 2015 NOVEMBER 2015

1 gaujarat

saIimat 14500 14550 9300 9500

AsaIimat 14550 14600 9310 9550

2 maQya p`doSa

saIimat 8500 8700 4850 4690

AsaIimat 8500 8700 4850 4690

3 CltaIsagaZ

saIimat 3900 3450 2029 1796

AsaIimat 4010 3560 2051 1803

4 maharaYT

saIimat 20000 21200 12100 12250

AsaIimat 20100 21300 12150 12300

5 gaaovaa

saIimat 470 465 315 325

AsaIimat 470 465 315 325

6 dmana dIva

saIimat 330 335 205 210

AsaIimat 330 335 205 210

7 DI ena eca

saIimat 680 700 480 490

AsaIimat 680 700 480 490

8 piScama xao~

saIimat 47500 48000 28700 29000

AsaIimat 45800 48500 28800 29200

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 41: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

maah isatmbar 2015 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 633 75

]k[- Ukai - 2 1060 75]k[- Ukai - 3 746 75]k[- Ukai - 4 557 75]k[- Ukai (Total) 42 150 2995 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 176 3]k[- ela baI saI eca Ukai LBCH - 2 000 0]k[- ela baI saI eca Ukai LBCH (Total) 2 3 176 4 0022

3 kDanaa Kadana - 1 925 61 0000kDanaa Kadana - 2 1569 60 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 978 63 0049kDanaa Kadana (Total) 16 120 3471 60 0049

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 407 10 0028 6 kula jalaIya TOTAL(H) 60 273 7050 225 0341

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 000 0 00002 TaoronT pavar ilaimaToD yauinaT DI 85 120 6690 124 62123 TaoronT pavar ilaimaToD yauinaT [- 0 0 6532 123 59314 TaoronT pavar ilaimaToD yauinaT ef 74 121 6987 123 65235 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 116911 Qauvarna tapIya Dhuvaran - GT 2 000 0 053212 Qauvarna tapIya Dhuvaran - STG 2041 9813 ]ka[- yauinaT 1 Ukai -1 70 100 751 83 128714 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 011915 ]ka[- yauinaT 3 Ukai -3 36 200 11921 203 1038416 ]ka[- yauinaT 4 Ukai -4 140 200 8502 203 830217 ]ka[- yauinaT 5 Ukai -5 19 50 12657 212 1134318 ]ka[- yauinaT 6 Ukai -6 24378 505 1537319 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008320 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 004721 gaaMQaInagar 3 Gandhinagar - 3 136 210 10999 212 1128522 gaaMQaInagar 4 Gandhinagar - 4 145 210 5955 212 681923 gaaMQaInagar 5 Gandhinagar - 5 37 210 13130 212 1292924 vaNakbaaorI 1 Wanakbori - 1 0 0 9010 205 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 12077 20826 vaaNakbaaOrI 3 Wanakbori - 3 145 210 12173 19727 vaaNakbaaOrI 4 Wanakbori - 4 89 150 7022 21228 vaaNakbaaOrI 5 Wanakbori - 5 145 210 7522 21129 vaaNakbaaOrI 6 Wanakbori - 6 145 210 7471 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 12047 21231 ]trna Utran GT 1 0 0 000 0 018632 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 10463 225 3596

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 6528 144 0000

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 1384 109 194438 isaka Sikka - 2 70 110 13154 250 1529239 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4568 72 882240 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4194 7141 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4945 7642 kcC ilagnaa[-T Kutch Lignite - 4 0 0 000 0 036043 saUrt ilagnaa[-T Surat Lignite - 1 7214 128 7573

0

Actual vaastivak

173 240

0

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2015

Schedule yaaojanaa

Actual vaastivakSchedule yaaojanaa

0

Anaulagnak 41

0

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 42: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

44 saUrt ilagnaa[-T Surat Lignite - 2 5317 130 596345 saUrt ilagnaa[-T Surat Lignite - 3 000 0 035346 saUrt ilagnaa[-T Surat Lignite - 4 7450 129 778947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5519 107 882248 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5450 9849 jaI Aa[- pI saI ela GIPCL GT - 1 183 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 2120 3351 jaI Aa[- pI saI ela GIPCL GT - 3 1827 3252 jaI Aa[- pI saI ela GIPCL ST - 1 2225 3453 jaI Aa[- pI saI ela GIPCL GT - 4 404 97 000054 jaI Aa[- pI saI ela GIPCL ST - 2 227 5155 [- esa esa e Aar ESSAR GT - 1 000 0 019356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 152 146 088560 jaI pI [- saI GPEC GT - 2 3467 151 019261 jaI pI [- saI GPEC GT - 3 586 147 042762 jaI pI [- saI GPEC STG 1839 15163 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 442 4765 jaI esa [- jaI GSEG STG 217 2366 Sugen (GT 1 + GT 2) 0 0 20526 338 969567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 351688 4885

kula tapIya Total (T) 5277 7992 660292 14096 469889kula jalaIya+tapIya Total (H+T) 6130 9359 667342 14314 470230ivaMD [najaI- Wind Energy 46492kula jalaIya+tapIya+hvaa Total (H+T+Wind) 713834 15029ivainamaya Exchanges (+) 193425 saIimat jaa- maaMga Restricted Energy Req 9000 907259

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 3052 13611 gaaMQaI saagar Gandhi Sagar 000 0 009012 raNaa p`tap sagar RPSagar 3608 172 004013 javaahr sagar Jawahar Sagar 2496 99 0020

2 ponca Pench 40 75 6099 164 00603 baargaI Bargi 50 90 2259 92 00504 baargaI Bargi (LBCH) 179 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 4337 310 02906 banasaagar Bansagar-2 (Deolondh) 0 0 2712 607 banasaagar Bansagar-3 (Silpara) 30 60 392 15 00308 banasaagar Bansagar-4 (Zinaha) 0 0 593 10 00309 maoDIKoDa Medikheda 30 60 1403 63

10 ibarisaMGapur Birsingpur 15 20 375 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 000 0 004013 Omkareshwar 210 360 5992 432 039414 [Midra saagar Indira Sagar 610 990 11700 1009 0692

kula jalaIya TOTAL(H) MPPGCL 1185 2114 32994 2465 1059

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 146102 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 0 0 14906 214 04 satpura I Satpura-I(60Share) 50 67 000 0 00005 satpura II Satpura-II Unit 6 10736 190 204306 satpura II Satpura-II Unit 7 12264 1907 satpura II Satpura-II Unit 8 11862 199 112908 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 13394 270 14260

10 satpura III Satpura-III Unit 11 9556 176 2007011 esajaITIpIesa 1 SGTPS Unit - 1 9556 176 2007012 esajaITIpIesa 2 SGTPS Unit - 2 10844 20313 esajaITIpIesa 3 SGTPS Unit - 3 3756 176 1885014 esajaITIpIesa 4 SGTPS Unit - 4 11510 19515 esajaITIpIesa 5 SGTPS Unit - 5 291 390 32474 51216 SSTPS 51780 1128 31960

kula tapIya Total (T) 1057 1409 131302 3142 148980

100

95

430

140

95 140

Schedule yaaojanaa Actual vaastivak

173 240

60

350 480

61 82

128 163

191

194144

163122

142

90 150

600

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 43: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

kula jalaIya+tapIya Total (H+T) 2572 4036 164296 5746 150039Injection from WIND 26181 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 190477 5746ivainamaya Exchanges (+) 145832 saIimat jaa- maaMga Rest En Req 4800 336309

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 6277 120 00802 Gangrel 6 19 316 10 00403 Mini Micro KWB 182 7

kula jalaIya TOTAL(H) CSEB 61 139 6775 137 0130tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 87102 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 454 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 465 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 131106 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23400

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 15261 253 1223012 KORBA(EB) Extn - 2 149 250 17066 253 13410

kula tapIya Total (T) 119992 1747 10695013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 911 1780 119992 1747kula jalaIya+tapIya Total (H+T) 966 1900 126767 1884 107080ivainamaya Exchanges (+) 101329 0saIimat jaa- maaMga Rest En Req 1890 228096 1884

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 9500 560 19992 kaoyanaa III Koyna III 49 150 3944 3203 kaoyanaa IV Koyna IV 165 600 6807 10084 kaoyanaa DIpIeca Koyna DPH 10 20 976 375 TaTa jalaIya TATA Hydro 120 444 5082 481 26926 vaOtrNaa Vaitarna 3 60 031 617 eladarI Eldari 5 10 000 128 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 577 49 pOzana Paithan 0 0 162 56

10 itlaarI Tillari 0 0 011 5811 BaIra Tola rosa Bhira Tail Race 9 80 498 8112 GaTGar Ghatghar 37 250 2887 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 -1009 0

kula jalaIya TOTAL(H) 506 1966 32832 1425 4691

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11236 2004 naaisak 4 Nasik Unit -4 85 115 11811 2055 naaisak 5 Nasik Unit -5 133 180 13026 2056 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 31950 4958 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17132 253

10 Tambao 7A gaOsa Trombay -7A (Gas) 7246 127 252311 Tambao 7ba Trombay -7B (WHR) 3537 7112 kaoraDI 5 Koradi Unit -5 65 85 8257 16013 kaoraDI 6 Koradi Unit -6 75 100 000 014 kaoraDI 7 Koradi Unit -7 75 100 9570 18015 Bausaavala 2 Bhusawal Unit -2 110 150 000 016 Bausaavala 3 Bhusawal Unit -3 100 135 12140 18017 Bausaavala 4 Bhusawal Unit -4 250 335 27422 50018 Bausaavala 4 Bhusawal Unit -5 0 0 22718 51019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 000 021 parlaI 5 Parli Unit -5 0 0 000 022 parlaI 6 Parli Unit -6 155 210 000 023 parlaI 7 Parli Unit -7 40 55 000 0

0 0

Schedule yaaojanaa Actual vaastivak

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 44: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

24 KaprKoDa 1 Khaperkheda Unit -1 80 110 8182 18025 KaprKoDa 2 Khaperkheda Unit -2 100 135 10120 18026 KaprKoDa 3 Khaperkheda Unit -3 350 470 10651 18727 KaprKoDa 4 Khaperkheda Unit -4 10586 18128 KaprKoDa 5 Khaperkheda Unit -5 135 180 24971 48030 parsa Paras-3 135 180 13651 23131 parsa Paras-4 200 430 14536 25732 ]rna Uran (Gas) 200 430 14738 56833 ]rna Uran (WHR) 100 220 8414 0 545534 caMd`pur 1 Chandrapur Unit -1 100 135 000 15435 caMd`pur 2 Chandrapur Unit -2 100 135 8272 20836 caMd`pur 3 Chandrapur Unit -3 90 120 11910 20037 caMd`pur 4 Chandrapur Unit - 4 70 95 1245 42538 caMd`pur 5 Chandrapur Unit -5 80 110 22369 46139 caMd`pur 6 Chandrapur Unit -6 190 255 25567 43240 caMd`pur 7 Chandrapur Unit -7 150 200 25129 041 DhaNaU 1 Dahanu Unit-1 17399 250 1543542 DhaNaU 2 Dahanu Unit-2 17336 250 1543543 CPP 000 000 339995 47221544 RGPPL Share 200 300 000 0

kula tapIya Total (T) 6290 9090 761115 10664 309413MAH Wind + Solar Generation 39419 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 833366 12746 352952

TOTAivainamaya Exchanges (+) 332429saIimat jaa- maaMga Rest En Req 12000 1165795

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1878 26ivainamaya Exchanges 40236saIimat jaa- maaMga Rest En Req 290 460 42114 435

C (F) dmana AaOr dIva DAMAN amp DIU 19969 307ja (G) dadra nagar hvaolaI DNH 50083 728

kula DD ampDNH (T) 133 242 70052 1035

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 9415 160 1033012 tara`pur 2 TAPS Unit -2 80 160 2455 16013 tara`pur 3 TAPS Unit -3 300 480 38163 533 7016014 tara`pur 4 TAPS Unit -4 300 480 38089 53815 kakrapr 1 KAPS Unit -1 125 200 15823 533 1841516 kakrapr 2 KAPS Unit -2 125 200 000 538

kula ena pI saI NPC Total 1010 1680 103945 24622 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14231 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14687 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 15165 209 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 33979 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35292 50626 kaorbaa esaTIpIesa 6 KSTPS Unit-6 35639 50927 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33942 510

kula kaorbaa KSTPS Total 1510 2600 182934 2550 9977027 ivanQa esaTIpIesa 1 VSTPS Unit-1 14559 21028 ivanQa esaTIpIesa 2 VSTPS Unit-2 13976 21229 ivanQa esaTIpIesa 3 VSTPS Unit-3 11038 210

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14180 210211 ivanQa esaTIpIesa 5 VSTPS Unit-5 5064 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13825 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 29991 502214 ivanQa esaTIpIesa 8 VSTPS Unit-8 26932 505215 ivanQa esaTIpIesa 9 VSTPS Unit-9 35261 510216 ivanQa esaTIpIesa 10 VSTPS Unit-10 14010 509217 ivanQa esaTIpIesa 11 VSTPS Unit-11 33754 510

kula ivanQayaacala VSTPS Total 2294 4260 246238 REF 17711 31 saIpt -1 -SIPAT-1 42843 66100 32 saIpt -2 -SIPAT-2 40545 66200 33 saIpt -3 -SIPAT-3 31137 66000 34 saIpt -4 -SIPAT-4 35479 51000 35 saIpt -5 SIPAT-5 32155 51200

kula saIpt -SIPAT TOTAL 182159 243000 1012941 kvaasa gaOsa 1e Kawas GT-1A 2770 112

Schedule yaaojanaa Actual vaastivak

372 500

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 45: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

42 kvaasa gaOsa 1baI Kawas GT-1B 4425 11043 kvaasa esaTI 1saI Kawas ST-1C 4052 10844 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 193 630 11247 305 358751 gaMQaar gaOsa 1 Gandhar GT-1 4114 12552 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 4914 14054 gaMQaar esaTI 4 Gandhar ST-4 4815 150

kula gaMQaar GGPS Total 80 630 13843 310 466561 maaOda 1 Mauda -1 17803 503 000062 maaOda 2 Mauda -2 24911 504 0000

kula maaOda MAUDA Total 186 500 42714 995 2478061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 540 750 000 31 000071 esa esa pI SSP RBPH - 1 2172 20272 esa esa pI SSP RBPH - 2 1830 20073 esa esa pI SSP RBPH - 3 1651 19874 esa esa pI SSP RBPH - 4 2948 20175 esa esa pI SSP RBPH - 5 2325 20376 esa esa pI SSP RBPH - 6 1724 19777 esa esa pI SSP CHPH - 1 2798 4178 esa esa pI SSP CHPH - 2 1654 3979 esa esa pI SSP CHPH - 3 826 41710 esa esa pI SSP CHPH - 4 2005 41711 esa esa pI SSP CHPH - 5 354 40

kula esa esa pI SSP Total 580 900 20287 1403 202981 kula poMca Pench Total 40 75 6099 164 006082 Jindal Injection 34547 083 Amarkantak Lanco 12443 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2722778

(J) ]plabQata Availability 2628723 naoT ivainamaya Net Exchanges (+) -428932 ]plabQa jaa- Energy Availability 28500 2199791

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 46: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

maah isatmbar 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2015 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 14982 - - - 14982 090915 1400 4991

saIimat Restricted 14750

AsaIimat Unrestricted 14800 14982 0 4719 0 15029 090915 1400 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8184 8184 210915 0300 5002

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8751 - - - 8751 080915 2300 5007

saIimat Restricted 7200

AsaIimat Unrestricted 7200 8751 0 -18 0 8733 080915 2300 5007

nyaUnatma pMjaIkRt maaMga Min Registered Demand 5367 5367 170915 1700

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3837 3837 300915 2000 4992

saIimat Restricted 3553

AsaIimat Unrestricted 3590 3702 362 21 0 4085 290915 1900 4984

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1910 1910 170915 1300 4991

maharaYT MAHARASHTRApMjaIkRt Registered 19473 - - - 19473 290915 1200 4992

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19473 208 55 0 19736 290915 1200 4992

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11088 11088 180915 0400 4992

gaaovaa GOApMjaIkRt Registered 460 435 - - 435 070915 2000 4981

AsaIimat Unrestricted 460 413 40 304 - 456 260915 1900 4979

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 463 - - 463 250915 2400 4996

AsaIimat Unrestricted 463 0 0 - 463 250915 2400 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 304 - - 304 160915 1500 4982

AsaIimat Unrestricted 304 0 2 - 306 160915 1500 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 140 140 190915 0800

dadra va na hvoalaI DNHpMjaIkRt Registered 723 - - 723 100915 1200 4989

AsaIimat Unrestricted 723 2 3 - 728 100915 1200 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 616 616 220915

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45447 - - - 45447 290915 1500 4985

saIimat Restricted 47000

AsaIimat Unrestricted 47200 45298 485 285 0 46068 070915 1200 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 31485 31485 210915 0300 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 47: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

ANNEXURE 432015

Sep-15अन समातर

PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR) NA

2 HVDC back-to back link(WR-SR) NAटाई लाईन TIE LINE

1 765 -I 765kV Soni to Wardha 6971500

2 765 -II 765kV Seoni to Wardha 6054600

3 765 -I 765kV Seoni to Bilaspur-I 7200000

4 765 -II 765kV Seoni to Bilaspur-II 7200000

5 765 -I 765kV Durg to Wardha I 7200000

6 765 -II 765kV Durg to Wardha II 7200000

7 400 400kV Bhilai to Koradi 7115600

8 400 400kV Bhilai to Bhadravati 7192600

9 400 -I 400kV Raipur to Bhadravati-I 7175500

10 400 ndashII 400kV Raipur to Bhadravati-II 7200000

11 400 ndashIII 400kV Raipur to Bhadravati-III 7083800

12 400 कवी सातपरा स कोराडी 400kV Satpura to Koradi 7165000

13 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7163400

14 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 6041700

15 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7200000

16 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 6183400

17 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7200000

18 400 -I 400kV Kolhapur-Mapusa-I 5115800

19 400 -II 400kV Kolhapur-Mapusa-II 4980400

20 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7184600

21 400 कवी रायगढ़ स आयबीईयएल 400kV Raigarh to IBEUL 7200000

22 400 400kV Raigarh to Sterlight 7200000

23 400 कवी रायगढ़ स राऊरकला 400kV Raigarh to Rouerkela 7025700

24 400 कवी रायगढ़ स झरसगड़ा 400kV Raigarh to Jharsuguda 7103100

25 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 7200000

26 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7200000

27 400 ndashI 400kV Raipur to Wardha-I 7190400

28 400 ndashII 400kV Raipur to Wardha-II 7172600

29 400 ndashI 400kV Wardha to Mouda-II 7200000

30 400 ndashII 400kV Wardha to Mouda-II 7143600

31 220 -III 220kV K(E) to Budhipadar-III 7000000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 48: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Anaulagnak 47Annex-47

maah isatmbar 2015 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particulars gau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2015

10231

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39720 65837

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39926

]ka[- Ukai

65245

10362

26078

26147

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 49: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SrNo

Details of incident (Elements Generation Tripped) Owner Utility Date Time Effect (Loss of generation Load) if anyCategory as per CEA

Grid Standards

1

Tripping of1 400220 kV 315 MVA ICT 32 400220 kV 315 MVA ICT 43 220 kV Indore-Indore South Zone 24 220 kV Indore-Indre-East Zone5 220 kV Indore- Vadnagar6 220 kV Indore-Jaitpra 27 220 kV Indore-Barwaha 28 220 kV Bus Coupler due to 220 kV Bus 2 Bus Bar protection operated at 400220 kVIndore Sub-station due to LBB operation of 220 kV Indore-Jaitpura 2 circuit This leadto tripping of all elements connected to 220 kV Bus 2 of Indore

MPPTCL 2-Sep-15 1525 Load Loss NIL Gen Loss NIL GI-1

2

Tripping of220 kV Mahalgaon-Bina(MP) 1220 kV Mahalgaon-Bina(Mp) 2220 kV Mahalgaon-Gwalior(PG) 1220 kV Mahalgaon-Gwalior(PG) 2220132 kV 160 MVA Mahalgaon ICT 1220132 kV 160 MVA Mahalgaon ICT 2Due to broken B phase jumper of 220 kV Bus 2 at Mahalgaon Bus fault occurredDuring the event all elements from 220132 kV Mahalgaon ss tripped causingblackout at the station

MPPTCL 3-Sep-15 2037 Load Loss 312 Gen Loss NIL GD-1

3Tripping of 765 kV Solapur-Raichur 1 amp 2 Due to relay mal-function during fault both765 kV Solapur -Raichur circuit tripped and isolated the grid

PGCIL 4-Sep-15 1925 Load Loss NIL Gen Loss NIL GI-2

4

Tripping of1400220 kv Indore 315 MVA ICT 22400220 kv Indore 315 MVA ICT 33400220 kv Indore 315 MVA ICT 44220 kV BUS Coupler5220 kV Indore-Indore South Zone 16220 kV Indore-Indore South Zone 27220 kV Indore-JETPURA 18220 kV Indore-JETPURA 29220 kV Indore-DEWAS10220 kV Indore-INDORE EAST11220 kV Indore-PITHAMPUR (on TBC)12220 kV Indore-BADNAGAR13220 kV Indore-BARWAHA 114220 kV Indore-BARWAHA 115132 KV Indore South ZOne-BALWADA16220 KV Dewas-INDORE EASTWhile Charging 220 kV Indore-Pithampura ckt which was on TBC its isolator earthswitch were in close position creating a bus fault on 220 System Bus bar protectionhas not operated resulting in tripping of all 220 kV elements on backup protectionThsi caused zero supply at 220 kV bus of 400220 kv Indore SS 220 kV East zone gotblackout during the event

MPPTCL 9-Sep-15 1310 Load Loss 54 MW Gen Loss NIL GD-1

5

Tripping of1 CHANDRAPUR 400220 kV ICT-22 400 kV CHANDRAPUR-CHANDRAPUR(2)-II3 400 kV CHANDRAPUR-PADGHE IC-II4 400 kV CHANDRAPUR-PARLI-III5 400 kVBHADRAWATI-CHANDRAPUR-IV6 400 kV BHADRAWATI-CHANDRAPUR-II7 Chandrapur Unit 28 Chandrapur Unit 6Chandrapur Unit 6 LBB has initiated which has caused 400 kV Bus Bar protection of400 kV Bus 2 This led to tripping of all elements connected to 400 kV Bus 2

MSETCLMSEGCL 16-Sep-15 2032 Load Loss NIL Gen Loss 470 MW GI-2

6 Tripping of 220 kV Vapi-Karadphada -I amp II POWERGRIDDNH 29-Sep-15 1846 Load Loss 380 MW Gen Loss NIL MW GD-17 Multiple line trippings at Sukha (Jabalpur) due to Isolator of ICT-I Burst on 220 kV Side MPPTCL 30-Sep-15 1055 Load Loss NIL Gen Loss NIL GI-28 Hand tripping of Ambewadi-Ponda-1 amp 2 Ckts due to Loss of supply to Ambewadi Goa 30-Sep-15 1041 Load Loss 70 MW Gen Loss NIL GD-I

List of Grid Disturbances and Grid incidents (GDGI) in September-2015 Western RegionANNEXURE 5

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 50: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SNo State Status of Main CC

0 WRLDC

Installation Complete SAVT started from1492015 Progress (Mumbai)

1 GujaratInstallation Complete SAT completed(Vadodara)

2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)2 ChattisgarhInstallation Complete SAVT in Progress(Raipur)

3MadhyaPradesh

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur)

4 GOABuilding to be ready by 15th October2015 (Madgaon)

5 DD Installation complete SAT completed

6 DNH Building Ready Installation in progress

ANNEXURE- 83Status Of Backup CC

Installation Complete SAVT started from1492015 Progress (Mumbai)

Installation Complete SAT scheduled from20102015 Progress (Delhi)

Installation Complete SAT completed(Vadodara)

Installation Complete SAT proposed on 15th Oct2015 (Gandhinagar)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAVT in Progress(Raipur)

Building Ready Installation to start from 20th Oct2015 (Bhilai)

Installation Complete SAT proposed on15th Oct 2015 (Jabalpur) Installation in Progress (Bhopal)

Building to be ready by 15th October2015 (Madgaon) Building Ready Installation started (Cuncolim)

Installation complete SAT completed NA

Building Ready Installation in progress NA

Status as on 07102015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 51: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

भारत सरकार

Government of India

कनzwjदरीय विदयत पराधिकरण

Central Electricity Authority

परचालन ननषzwjपादन परबोिन परभाग

Operation Performance Division

छठी मजिल सिा भिन आरकपरम नई ददलzwjली-110066

6th Floor SewaBhawan RK Puram New Delhi ndash 110066 [ISO 9001-2008]

No-CEAGOampDOPMPPI512015-16 Dated 11092015

To

As per list

Sub Electricity Generation Targets for the year 2016-17

Sir

Annual exercise of assessment and finalization of the generation targets and the planned

maintenance schedules of the generating units for the year 2016-17 is being initiated by CEA Although the

generation performance of the various stations and their planned amp unscheduled outages are regularly

monitored in CEA but it is felt that a more realistic projection of month-wise generation in the coming year

could be made by the respective Station Authorities

While monitoring the generation performance during the current financial year it has been observed

that power utilities are facing the problem of loss of generation due to no low schedules and losses

accounted on other technical and commercial egresses Accordingly it is requested that the following inputs

may kindly be submitted for thermal generating units of your organization in the enclosed annexure

i) (Annex- I (point no 1 to 5)) The unit-wise proposed generation during 2016-17 (monthly and

yearly) along with anticipated generation during 2015-16 the anticipated loss of generation on

account of various constraints (eg Grid Constraints Low schedules Reserve shut down high fuel

cost) may be accounted and furnish with necessary details The details of units like boiler turbine

make date of commissioning etc may also be furnished

ii) (Annex ndashI (point no 6)) Utilities who have their Power Purchase Agreement (PPA) with various

Discoms Trader states etc and the details may be furnished in MW for Long and Medium term

Agreement for assessing the expected generation for next year

iii) (Annex- I (point no 7 (a) and (b)) The details of coal linkages from coal agencies and availability

of gas liquid fuel

iv) (Annex ndash I (point no 8)) Unit wise cost of generation and rate of sale of power

v) (Annex- II) Detailed unit-wise schedule of Planned Maintenance (approved by the respective

Regional Power Committees) and RampM to be carried out during 2016-17 may also be furnished

ANNEXURE- 84A

Tel No011- 2610502626732633 Fax No 011-2610741626732662 Email-targetopmceagmailcom

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 52: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

It may please be ensured that above detailsinformation may be sent to this office on or before 31st

October 2015

For your convenience the input formats are also being made available at our website

httpwwwceanicin in Whats New Flash News

The information may please be furnished electronically at the email address

targetopmceagmailcom kiranmeenanicin For any inconvenience in submission of data you may

contact Mrs Kiran Meena Assistant Director 011-26732684 Mob08588831051 or write to the undersigned

at the following address

Chief Engineer (OPM Division)

Room No604 (N) Central Electricity Authority

Sewa Bhawan RK Puram New Delhi-110066

Ph 011-26105026 (Telefax)

Yours faithfully

(Chandra Shekhar)

Chief Engineer (OPM)

Tel 011-26732633

Fax 011-26105026

Mob 9650807150

Shekhar_ceanicin

Shekhar_ceayahoocoin

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 53: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Annex-I(1 of 2)

Address District1 Units existing on 31032015

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation(if

any)

Expected Target

Generation (MU)

Reason for

variation in target

2 Units Commissioned likely to be commisioned during 2015-16

Remarks

Target Actual till last

month

PLF till last

month

Availability till

last month

Total Anticipated

during the year

Reason for low

generation

Expected Target

Generation (MU)

Reason for

variation in target

3 Units likely to be commisioned during 2016-17

Remarks

4 Details of Units commissioned likely to be commissioned

Unit

WISE

DETAILS

Unit no Capacity Date of

commissioning

Date of

commercial

Operation

Stablisation

Boiler make

Country

Turbine Make

Country

Boiler Effeciency

(design)

Turbine Heat Rate

(design)

Unit Design

Heat Rate

Type of cooling

Tower

Type of BFP (motor

Turbine)Driven

Type of FGD

1

2

3Formats may be modified as per CCGT Nucler Power Plant

Anticipated

Period of

constraint

Anticipated loss

of generation

(MU)

Transmission Constraints power evacuation problems low schedulehigh fuel cost

S NoDetails of the

Constraint

during 2015-16

Organisation

Note Please furnish the month-wise break-up of yearly generation in a separate Sheet keeping the similar format

2016-17 generation details (MU)

Capacity Date of

commissioning

Unit wise yearly generation target for the year 2016-17

2015-16 generation details (MU) 2016-17 generation details (MU)

2015-16 generation details (MU) 2016-17 generation details (MU)

Station

name

Unit No

Station

name

Unit No Capacity Actual expected

date of

commissioning

Station

name

Unit No Capacity Expected date of

commissioning

5 Loss of Generation due to Grid Constraints Low schedules high fuel cost during 2015-16

Expected Target Generation (MU)

Loss so far (Apr15-Sep15)

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 54: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

6 PPA details Annex-I(2 of 2)

Quantum (MW) bb PPA with

Discom

( name of

Discom)

7(a)Coal Linkage for coal based plants 7(b)Gas availibility for gas based stationsUnit No Domestic

linkage (MT)

Source PLF from this coal

linkage during the

year

Varoius sourcesFigures in

MMSCMD

PLF from this gas

availibility during

the year

8 Cost of Generation Unit No Cost of Gen

(Paisekwh)

Rate of Sale

of Power

(Paisekwh)

Capacity

(MW) With DISCOM

Duration of bb PPA

(Years)

State of

Discom

Quantum

(MW)

Duration (Yrs) Quantum

(MW)

bb PPA with

Discom ( name of

Discom)

Duration of bb

PPA (Years)

With PTC other trading cos

Untied (MW)

With State Trading Cos

quantum of bb

PPA in MW

quantum of bb

PPA in MW

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 55: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

Annex-II

A)

Station

nameUnit No

Capacity

(MW)

From date To date

B)

Station

nameUnit No

Capacity

(MW)

From date To date

C)

Station

nameUnit No

Capacity

(MW)

From date To date

D)

Station

nameUnit No

Capacity

(MW)Reason

From date To date

Planned maintenance Schedules including RampM activities

Other maintenance if not included above such as PG tests (new

units) and Boiler inspection

COH Schedule

Schedule

RampM of Units likely to be completed during 2015-16 amp 2016-17

RampM Schedule

Annual Overhaul Boiler overhaul

AOH Schedule

Capital Overhaul

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf
Page 56: ~~~Wlfu ~ ~ 0TI Western Regional Power Committee …3 400 kV Sujalpur-Kota(I R by RTCL) Dec – 2015 STERLITE (B DTCL) 1 765 kV Vadodara - Dhule (B DTCL) S/C Charged on 12th June 2015

SR NO UTILITIES OCC NO MONTH STATUS REMARK1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314AT MUMBAI BY NTPCMUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514AT MUMBAI BY WRPCAT RELIANCE

7 WRTS-I 460 Jun-14HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714AT RAIPUR BYKWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-14 Hosted on 13102014 at Varanasi

12 WRPC 465 Nov-1411112014 at WRPCMumbai

13 MADHYA PRADESH 466 Dec-14 Hosted on 09122014 at Jabalpur

14 WRPC 467 Jan-15held on 16012015 atWRPC Mumbai

15 ESSAR TRANSMISSION 468 Feb-15 held on 16022015 at Mumbai

16 BDTCLJBTCL 469 Mar-15 held on 10th March 2015 at Nagpur

17 NTPC VINDHYACHAL 470 Apr-15 held on 13th April 2015 AT LUCKNOW

18 WRPC 471 May-15

HELD ON13052015AT WRPCMUMBAI

19 TORRENT POWER 472 Jun-15HELD ON 10062015 AT AHMEDABADHOSTED BY TORRENT POWER LTD

20 TATA POWER 473 Jul-15HELD ON 14072015 BY TATA POWERIN MUMBAI

21 WRPC 474 Aug-15 HELD ON 13082015 at WRPC MUMBAI

22 WRPC 475 Sep-15 HELD ON 10092015 AT WRPC MUMBAI23 ADANI POWER(TIRODA) 476 Oct-15 TO BE HELD ON 14102015 AT APML TIRODA24 NTPC SIPAT CG 477 Nov-1525 TAPS-3amp4 478 Dec-1526 CGPL 479 Jan-1627 NTPC Mouda 480 Feb-1628 KSK 481 Mar-1629 RELIANCE TRANSMISSION 482 Apr-1630 APL 483 May-1631 DNH 484 Jun-1632 NCA 485 Jul-1633 RATTAN INDIA POWER LTD 486 Aug-1634 KAPS 487 Sep-1635 RKM POWER GEN 488 Oct-1636 NHDC 489 Nov-1637 NTPC Mumbai 490 Dec-1638 ADANI TRANSMISSION 491 Jan-1739 WRTS-II 492 Feb-1740 SUGEN (TPL) 493 Mar-1741 NTPC KORBA 494 Apr-1742 GOA 495 May-1743 JPL 496 Jun-17

ANNEXURE 10

  • cov letterpdf
  • textpdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84apdf
  • 10pdf