Our journey towards the future 09:00 London to Luton Boarding Platform 7 New trains We’ve introduced a fleet of 115 new trains, which are longer, more spacious and more energy efficient. These trains have more luggage space and improved accessibillity for buggies and wheelchair users. There’s also air conditioning and real-time displays to help you find empty seats or a toilet. Brighter ideas Bigger trains Better stations Welcome Better stations We’ve transformed north-south travel through London to meet the huge rise in demand from passengers. With better stations, new trains and improved connections we’ve upgraded one of the busiest and most congested parts of the rail network. The new bigger, better London Bridge station provides around 55 million passengers each year with more space, easier connections, more lifts and escalators plus a wide range of shops.

Upload: others

Post on 03-Nov-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WM031566 Thameslink Benefits 6pp DL concertina HR.pdf 1 24

Our jou

rney

toward

s the

futu

re

09:00 Lo

ndon to

Luton

Boarding

Platform

7 New trainsWe’ve introduced a fleet of 115 new trains, which are longer, more spacious and more energy efficient.

These trains have more luggage space and improved accessibillity for buggies and wheelchair users. There’s also air conditioning and real-time displays to help you find empty seats or a toilet.

Brighter ideasBigger trainsBetter stations

Welcome

Better stations

We’ve transformed north-south travel through London to meet the huge rise in demand from passengers. With better stations, new trains and improved connections we’ve upgradedone of the busiest and most congested parts of the rail network.

The new bigger, better London Bridge stationprovides around 55 million passengers each year with more space, easier connections, more lifts and escalators plus a wide range of shops.

WM031566 Thameslink Benefits 6pp DL concertina HR.pdf 1 24/07/2019 12:10

Page 2: WM031566 Thameslink Benefits 6pp DL concertina HR.pdf 1 24

Cambr

idge

Luton

Rainham

Orpington

Horsh

am

Brighton

Gatwick

Pete

rbor

ough

More reliable journeysWe’ve added new tracks and modern trains so journeys are now more reliable. On the approach to London Bridge station, we’ve also untangled the tracks, cutting delays and reducing the time trains waitfor platforms to clear.

ImprovedconnectionsTo relieve congestion, we’ve increased the capacity and frequency of trains, meaning that on average 24 trains will run per hour during peak times between Blackfriars and St Pancras International.

New technologyBy updating the railway network with the latest technology, we’ve been able to run more frequent trains on existing track. Future development of a digital traffic management system will mean further improvements in performance and reliability.

With over 40km of new track, 147 new switches and crossings, 128 major track changes and 9 major resignalling changes we’ve been able to reduce congestion and increase capacity.

New infrastructure