PROJECT MANAGEMENT

WITH REFERENCE TO THE CAPITAL

ACQUISITION PROCESSCopyright C. R. Cushing

2011

Page 3: Wmu Malmo 2011 Power Pt

3

Charles R. Cushing, Ph.D., P.E.30 Vesey Street, 7th Floor

New York, NY 10007Tel. (212) 964-1180Fax (212) 285-1334

E-mail [email protected]

Page 4: Wmu Malmo 2011 Power Pt

4

Page 5: Wmu Malmo 2011 Power Pt

5

Typical Ship PricesShip Type $, MillionsContainer Ship, 12,600 TEU 165

Tanker, Capesize 95

Tanker, VLCC 115

Container – Reefer, 7450 TEU / 3400 Reefer 143

Container Ship 70

Bulk Carrier, 92,500 DWT 70

Bulk Carrier, 34,000 DWT 37

Tanker, Chemical 4,300 DWT 20

Ore Carrier, VLOC 350,000 DWT 135

Cruise Ship, 6,400 Passenger 1,240

Log Carrier, 35,000 DWT 30

Multi-Purpose Cargo, 5,670 DWT 14

Bulk Carrier, 92,500 DWT 70

Page 6: Wmu Malmo 2011 Power Pt

6

World Population of Merchant Ships, December

2010Commercial Ships: No.(%) GRT x 1,000(%)

General Cargo 18,178(23.4) 63,525(6.8)

Container Ships 4,869(6.3) 158,112(16.9)

Ro Ro Ships 1,556(2.0) 41,704(4.5)

Bulk Carriers 8,920(11.5) 292,906(31.4)

Oil and Chem Tankers 12,014(15.4) 260,735(27.9)

Gas Tankers 1,552(2.0) 48,159(5.2)

Passenger Vessels 6,382(8.2) 34,100(3.7)

Offshore Vessels 6,283(8.1) 19,248(2.1)

Tugs 3,757(17.7) 3,879(0.4)

Other 4,257 (5.4) 10567(1.1)

Total 77,768(100) 932,935(100)

Page 7: Wmu Malmo 2011 Power Pt

7

Ships on Order (December 2009)

No. 9,226*GRT 300,500,000CGT 152,000,000* Of which 7,282 are cargo vessels

Source: Lloyds Fairplay Dec. 2009

Page 8: Wmu Malmo 2011 Power Pt

8

Process Applies To:

Ships Ports Cranes Factories Refineries Other Capital Projects

Page 9: Wmu Malmo 2011 Power Pt

9

Capacity Acqusition Alternatives

New Construction Conversion Purchase Second-hand Vessel Bareboat Charter Time Charter Contract of Affreightment Freight Service Agreement Consecutive Voyage Charter Spot Charter Vessel Pooling Slot Charter

Page 10: Wmu Malmo 2011 Power Pt

10

History of Project Management

Dates back to early civilization

Creative architects and engineers

Page 11: Wmu Malmo 2011 Power Pt

11

Capital Projects

Egyptian Pyramids

Page 12: Wmu Malmo 2011 Power Pt

12

Capital Projects

Great Wall of China

Page 13: Wmu Malmo 2011 Power Pt

13

History of Project Management Imhotep – Pyramids (2630 BC) Qin Shi Huang – Great Wall (221

BC) Vitrvius – Roman Aqueducts (100

BC) Christopher Wren – St. Paul’s

Cathedral (1632 – 1723 AD) Thomas Telford – Bridges & Canals

(1754 – 1834 AD) Isambard K. Brunel – Great

Western Railway (1806 – 1859)

Page 14: Wmu Malmo 2011 Power Pt

14

Recent Developments in Project Management

Fredrick Wilson Taylor – Pioneer in theories of scientific management (WBS)

Henry Gantt – Father of planning and control techniques – (Gantt Chart)

Dupont / Remington Rand – Critical Path Method (CPM)

Booz – Allen & Hamilton – Program Evaluation and Review Technique (PERT)

Page 15: Wmu Malmo 2011 Power Pt

15

Capital Projects Ships Ports

Page 16: Wmu Malmo 2011 Power Pt

16

Project Management

Planning Organizing Managing Resources to Achieve

Specific Goals

Page 17: Wmu Malmo 2011 Power Pt

17

Project

Temporary Endeavor Defined Beginning Defined End Unique Goals and

Objectives

Page 18: Wmu Malmo 2011 Power Pt

18

Traditional Project Management

Initiation Planning Design Execution

Commercial Production

Completion

Page 19: Wmu Malmo 2011 Power Pt

19

Page 20: Wmu Malmo 2011 Power Pt

20

Page 21: Wmu Malmo 2011 Power Pt

21

Project Management Process Traditional PM Critical Chain PM Extreme PM Agile PM Event Chain PM Event Chain Methodology Prince2 (Prompt + Prince) Process-Based Management

Page 22: Wmu Malmo 2011 Power Pt

22

Planning Design Commercial Production

The Process Consists Of:

Page 23: Wmu Malmo 2011 Power Pt

23

“Now here’s an advanced organism. You’ll note the nucleus and cytoplasm development, along with what appears to be the first draft of a strategicplan.”

Page 24: Wmu Malmo 2011 Power Pt

24

Page 25: Wmu Malmo 2011 Power Pt

25

Page 26: Wmu Malmo 2011 Power Pt

26

Page 27: Wmu Malmo 2011 Power Pt

27

Page 28: Wmu Malmo 2011 Power Pt

28

Origins of Strategic Planning

473 BC Sun Tzu’s The Art of War 1645 Miayamoto Mushashi’s A

Book of Rings

1800 Napoleon 1850’s Industrial Revolution 1860’s Policies and Procedures 1900 Work Norms and

Standings

Page 29: Wmu Malmo 2011 Power Pt

29

Origins of Strategic Planning (Cont’d.)

1916 WWI Battle Strategy 1920’s Financial Planning and Control 1930’s Management by Objectives 1940’s WWII O.S.S./C.I.A. 1950’s Strategic Planning 1970’s-80’s Global Spread of

Strategic Planning 1990’s Strategic Management

Page 30: Wmu Malmo 2011 Power Pt

30

Development of Planning

Page 31: Wmu Malmo 2011 Power Pt

31

Factors that Make Strategic Planning Essential in the Marine Industry

Cyclical market conditions Fluctuating currency exchange rates Uncertainty in fuel costs Uncertainty in interest rates Emergence of trading partners and trading

alliances Over tonnaging due (partially) to overly

generous subsidies Regulatory and governmental restraints Fast paced technology (leading to

premature technological obsolescence) More rapid response by Safety and

Environmental Regulatory Bodies to disasters

Page 32: Wmu Malmo 2011 Power Pt

32

Benefits of Using this Process

Opportunity to optimize vessel characteristics

Improved delivery time Better use of lead time Better financing and currency terms Better guarantees Control of extra costs and changes Improved quality Chance to introduce innovation Product is more “obsolescence – proof” Fewer disputes or litigation

Page 33: Wmu Malmo 2011 Power Pt

33

Strategic Planning Asks Four Questions

How did organization get to its present position?

Where does organization want to go?

How will it get there? How will it function successfully

when it gets there?

Page 34: Wmu Malmo 2011 Power Pt

34

Strategic Planning ProcessAppraisals

External Internal

Create Strategies

Evaluate and Choose Strategy

Implement Strategy

Page 35: Wmu Malmo 2011 Power Pt

34a

Strategic Planning Process (Cont’d)

Page 36: Wmu Malmo 2011 Power Pt

Strategic Planning Process

34b

Page 37: Wmu Malmo 2011 Power Pt

37

The Company Environment

The Industry The Company The Market The Competitors

Page 38: Wmu Malmo 2011 Power Pt

38

Other Aspects of the Company Environment

Legal Regulatory Suppliers Service Technology

Page 39: Wmu Malmo 2011 Power Pt

39

Internal Factors

Company strengths Company weaknesses Areas of vulnerability Profitability Productivity Customer satisfaction

Page 40: Wmu Malmo 2011 Power Pt

40

Other Internal Environmental Factors Load factors Service levels Transit times Frequency of sailings Schedule reliability Cargo damage statistics

Page 41: Wmu Malmo 2011 Power Pt

41

The Competitive Environment

Strength of competitors Weakness of competitors Market shares Technology Pricing

Page 42: Wmu Malmo 2011 Power Pt

42

Analysis of the Market Historical demand Current demand Forecast

Page 43: Wmu Malmo 2011 Power Pt

43

FORECASTING

Page 44: Wmu Malmo 2011 Power Pt

44

Sources of Data for Cargo Flow Studies

Government report (National and U.N.) Custom revenue statistics Manifests Census data Government statistical abstracts Industry commodity trade data Trade association reports Newspaper/trade journal traffic reports Port authority statistics Trade Conference data Market research consultants

Page 45: Wmu Malmo 2011 Power Pt

45

Sources of Data for Competitor Analyses

Advertising Sailing schedules Web sites Directories Classification society computer

searches Shipping directories Ships-on-order publications Search services

Page 46: Wmu Malmo 2011 Power Pt

46

Page 47: Wmu Malmo 2011 Power Pt

47

Page 48: Wmu Malmo 2011 Power Pt

48

Page 49: Wmu Malmo 2011 Power Pt

49

Pricing Studies

Tariffs Charter fixture data Industry scales Periodical summaries Cost analyses National and international

economic indices

Page 50: Wmu Malmo 2011 Power Pt

50

Pricing Perturbations

Government aid International conflicts and

calamities “Cut Throat” competition Predatory pricing practices Price wars Technology breakthroughs

Page 51: Wmu Malmo 2011 Power Pt

51

Global Events AffectingShipping and Shipbuilding

Natural Disasters Major Earthquakes (i.e. Kobe) Tsunami El Nino Effects Drought in Panama Global Warming Pollution Epidemics, Plague, etc.

Page 52: Wmu Malmo 2011 Power Pt

52

Global Events AffectingShipping and Shipbuilding

Economic Conflict Subsidies Embargoes Protectionism Trade Wars Monopolies Etc.

Page 53: Wmu Malmo 2011 Power Pt

53

Global Events Affecting Shipping and Shipbuilding

Protectionism Nationalism Tariffs Subsidies Cabotage Preferential treatment Bi-lateral trade agreements Cargo sharing Restriction on flow of capital Barriers to investment Government aid

Page 54: Wmu Malmo 2011 Power Pt

54

Global Events Affecting Shipping and Shipbuilding

Economy and Trade OPEC Shipbuilding Shifts: Europe to Japan to

Korea to China Availability of Capital for Investment World, Regional, and Local Economies Confidence of Investors Availability or Shortage of Workers Depressions and Recessions Inflation Market Volatility

Page 55: Wmu Malmo 2011 Power Pt

55

Global Events Affecting Shipping and Shipbuilding

Technology Channel Tunnel Second Isthmus Canal Superconductivity Fuel Cell Propulsion Post-Panamax Containerships Double Stack Rail Cars Land Bridges Etc.

Page 56: Wmu Malmo 2011 Power Pt

56

Global Events Affecting Shipping and Shipbuilding

Anti-Social Activities War Terrorism Piracy Drug Trade Government Corruption Commercial Corruption Etc.

Page 57: Wmu Malmo 2011 Power Pt

57

Global Events Affecting Shipping and Shipbuilding

Legal Impact of Marine Disasters Torrey Canyon Amoco Cadiz Herald of Free Enterprise Estonia Braer Erika Prestige Etc.

Page 58: Wmu Malmo 2011 Power Pt

58

Global Events Affecting Shipping and Shipbuilding

Shipping and Shipbuilding Conventions and Legislations

Port State Control Erika I and II Basel I and II Ballast Regulations Air Pollution Regulations Etc.

Page 59: Wmu Malmo 2011 Power Pt

59

Strategy Development

Corporate objectives

Strategic objectives

Page 60: Wmu Malmo 2011 Power Pt

60

“Objectives are the fundamental strategy

of a business.”- Drucker

Page 61: Wmu Malmo 2011 Power Pt

61

Corporate Objectives Profitability Return on Investment/Payback

period Market share Growth Stability Product or service quality Meeting market needs Competition

Page 62: Wmu Malmo 2011 Power Pt

59a

“No Smedley! I said we need more profits, not more prophets!”

Page 63: Wmu Malmo 2011 Power Pt

63

Strategic Objectives – Fixed Elements Competitive environment Company resources Management values Societal expectations

Page 64: Wmu Malmo 2011 Power Pt

64

Strategic Objectives – Controllable Elements Corporate structure Marketing policies Finance policies Accounting policies Manufacturing or service policies Human resources policies Research and development policies Organizational policies

Page 65: Wmu Malmo 2011 Power Pt

65

Strategic Issues

Volume of cargoes Actions of competitors Technological developments Governmental restraints Other external environmental

factors impacting the company’s ability to meet its projections.

Page 66: Wmu Malmo 2011 Power Pt

66

Strategy Selection

Develop a number of options Prepare pro forma financial

projections Compare alternatives against

corporate objectives Compare alternatives against each

other Select best alternative Optimize selected alternative

Page 67: Wmu Malmo 2011 Power Pt

67

Selection Process Pro forma financial projections Carry out simulations Perform sensitivity analyses Test options against financial

criteria Minimize risk Optimal use of corporate resources Examine impact of unexpected

changes in forecasts

Page 68: Wmu Malmo 2011 Power Pt

68

Risk Analysis

Risks we can afford to take Risks we cannot afford to take Risks we cannot afford not to

take.- Drucker

Page 69: Wmu Malmo 2011 Power Pt

69

Entry Plan Timing and scheduling Time table Coordination of corporate activities Coordination with external

organizations Marshalling of resources Government actions, permits,

licenses Political support

Page 70: Wmu Malmo 2011 Power Pt

70

Exit Plan - Actions

Scrap the plan Sell Swap Merge Withdraw gradually Withdraw completely

Page 71: Wmu Malmo 2011 Power Pt

71

Alternatives to Exit

Commit additional resources Shift priorities Reduce effort Merge

Page 72: Wmu Malmo 2011 Power Pt

72

Strategy Implementation Business plan Marketing plan Competitor plan Operations plan Financial plan Technology plan Organization plan Corporate development plan

Page 73: Wmu Malmo 2011 Power Pt

73

Business Plan Description of Company Company History Marketing Strategy Management Team Organization & Personnel Operations Funds Required & Their Use Financial Data Risks R & D Required Legal Issues Insurance Considerations Schedule

Page 74: Wmu Malmo 2011 Power Pt

74

Financing Plan Amount Requested Purpose of Financing Use of Funds Description of Collateral Source of Repayment Whether Seeking Other Debt Financing History of Company Description of Business Description of Market Financial History of Company Financial Projections Financial Assumptions Schedule of Assets & Liabilities Description of Management & Ownership Financial Status of Owners References

Page 75: Wmu Malmo 2011 Power Pt

75

“On second thought, maybe a periodic re-assessment of the MISSION STATEMENT might not be such a bad thing”

NON SEQUITUR-WILEY

Page 76: Wmu Malmo 2011 Power Pt

76

Mission Statement - Route Origin, destination and route Transit distance Transit time Frequency of service Delays in service, planned and unplanned Weather conditions Current Vessel traffic systems Canal characteristics Ice conditions

Page 77: Wmu Malmo 2011 Power Pt

77

Mission Statement - Cargo Quality of cargo Type of cargo Cargo characteristics Cargo stowage and securing

requirements Cargo care requirements

Page 78: Wmu Malmo 2011 Power Pt

78

Mission Statement - Infrastructure Port characteristics

Terminal characteristics Physical restrictions Port costs Cargo handling methods and rates Turnaround time Inland transport considerations Weather conditions Docking assistance and mooring

requirements Fuel availability and cost

Page 79: Wmu Malmo 2011 Power Pt

79

Mission Statement - Vessel

Type of vessel New, converted or existing vessel Number of vessels Capacity, normal and maximum Speed, normal and maximum Type of machinery if known Type and source of fuel Chewing – nationality, unions,

quarter standards

Page 80: Wmu Malmo 2011 Power Pt

80

Mission Statement- Commercial Existing or projected freight rates Competitor characteristics Anticipated market share Conferences Trade restrictions

Page 81: Wmu Malmo 2011 Power Pt

81

Mission Statement - Economic Required international rate of return

Prime and/or other rates Subsidies and/or grants Crew rates Insurance rates Fuel costs Tolls Port charges Vessel financing and interest rates Life of vessel Tax schedules

Page 82: Wmu Malmo 2011 Power Pt

82

Mission Statement - Government

Vessel registry and classification Governmental restrictions Cabotage laws Environmental restrictions Safety restrictions Registry

Page 83: Wmu Malmo 2011 Power Pt

83

Page 84: Wmu Malmo 2011 Power Pt

84

Planning Design Commercial Production

Page 85: Wmu Malmo 2011 Power Pt

85

Engineering

The art of applying – Knowledge Scientific principles

Page 86: Wmu Malmo 2011 Power Pt

86

DESIGN is the essence of ENGINEERING

- Buxton

Page 87: Wmu Malmo 2011 Power Pt

87

The CPCD Design Sequence

Concept Preliminary Contract Detailed

Page 88: Wmu Malmo 2011 Power Pt

88

Page 89: Wmu Malmo 2011 Power Pt

89

Design Drawings Sketches Artist renderings Diagrams/Schematics Computer imaging Calculations Models Model testing Research/Development Experimentation

Page 90: Wmu Malmo 2011 Power Pt

90

Design Includes

Industry standards Classification society rules Governmental regulations Manufacturers’ specifications Shipbuilder’s design detail

standards

Page 91: Wmu Malmo 2011 Power Pt

91

The Engineer Is Faced With Conflicting RequirementsExample

Physical – minimum weight Economic – minimum cost Social – maximum safety Environmental – minimum impact Commercial – maximum efficiency Esthetic – maximum stylishness Etc.

Page 92: Wmu Malmo 2011 Power Pt

92

The engineer resolves these conflicts and

searches for “optimum” solutions.

Page 93: Wmu Malmo 2011 Power Pt

93

Design is solving a problem with many VARIABLES.

Page 94: Wmu Malmo 2011 Power Pt

94

Design is an ITERATIVE process.

Page 95: Wmu Malmo 2011 Power Pt

95

Prior to 1970, designers used

The DESIGN SPIRAL.

Page 96: Wmu Malmo 2011 Power Pt

96

DESIGN SPIRAL Hull form Appropriate dimensions Hull prismatic coefficients Power estimates Weight estimates

- Hull- Machinery- Outfitting

Deadweight capacity

Page 97: Wmu Malmo 2011 Power Pt

97

Page 98: Wmu Malmo 2011 Power Pt

98

Page 99: Wmu Malmo 2011 Power Pt

99

Page 100: Wmu Malmo 2011 Power Pt

100

Page 101: Wmu Malmo 2011 Power Pt

101

Page 102: Wmu Malmo 2011 Power Pt

98a

Page 103: Wmu Malmo 2011 Power Pt

98b

Computers permit multiple criteria – multi variate search

patterns.

Page 104: Wmu Malmo 2011 Power Pt

104

“Conservative pressures increase as the design progresses.

Hence the early stages should be biased towards the novel.”

- Brown

Page 105: Wmu Malmo 2011 Power Pt

105

“New ships should be 25% novelty 75% well proven

practice.”

- Baker

Page 106: Wmu Malmo 2011 Power Pt

106

CONCEPT DESIGN

Requires Innovation Creativity Judgment Technical perception Economic awareness Analytic log “Hands on” control of the synthesis

process No computers

Page 107: Wmu Malmo 2011 Power Pt

107

Concept Design Synthesis takes place. Requirements evolve into form and

configuration. Some dimensions and principal

characteristics may evolve. Results in sketch or drawing. May include a written description. May include more than one

alternative. 10 to 80 man – days.

Page 108: Wmu Malmo 2011 Power Pt

108

Preliminary Design

Should also establish

Ability of vessel to meet mission statement.

Regulatory feasibility. Patent infringements (if any). Need for new technology. Model testing requirements.

Page 109: Wmu Malmo 2011 Power Pt

103a

Preliminary Design The second iteration in the design

process. Provides more detail. Provides more accurate dimensions. Focuses on essential features. Provides enough detail to verify.

- technical feasibility- economic feasibility

Provides outline specification. Provides enough information for

- Construction cost estimate- Operating cost estimate- Revenue generating estimate

Page 110: Wmu Malmo 2011 Power Pt

110

Contract Design The third iteration in the design process. Creates definitive description of the

vessel. Can be used as contract documents. Permits total meeting of the minds

between designer and builder. Increase details and accuracy of the

design. Increase accuracy of feasibility checks. Decreases risks.

Page 111: Wmu Malmo 2011 Power Pt

111

Typical Ship Design Package

Plans Specifications

Reference material- Drawings- Guidance calculations

Page 112: Wmu Malmo 2011 Power Pt

112

Contract Design

Should Avoid ambiguity Avoid excessive specifics. Be precise. Use legal terminology. Avoid use of guidance drawings.

Page 113: Wmu Malmo 2011 Power Pt

113

Classification Societies

Page 114: Wmu Malmo 2011 Power Pt

114

The Role of Classification Societies Construction Standards

- Rules- Survey

Maintenance and Repair Standards- Rules- Survey

Certification Safety Auditing (ISM) Environmental Auditing (ISO) Technical Guidance Regulatory – Flag state

Page 115: Wmu Malmo 2011 Power Pt

115

Page 116: Wmu Malmo 2011 Power Pt

116

THE IACS SOCIETIES

ABS BV CCS DNV GL KR

LR NK RINA RS CRS (Associate) IRS (Associate) PRS (Associate

Page 117: Wmu Malmo 2011 Power Pt

117

Class is not a substitute to an effective project management, inspection and survey program.

An owner cannot delegate his responsibility to assure that his vessel is seaworthy.

- Sundancer decision

Page 118: Wmu Malmo 2011 Power Pt

118

Page 119: Wmu Malmo 2011 Power Pt

119

Model Basins Resistance and Propulsion

- Still water- Waves

Seakeeping Mooring forces Maneuverability Forces and motions Propeller performance Wake field Ice breaking Wind resistance (wind tunnels) Smoke flow (wind tunnels)

Page 120: Wmu Malmo 2011 Power Pt

120

The Role of the Manufacturerin High Tech Equipment

Technical Information Quality Control During Manufacture Installation & Start-Up-Support Guarantees Service Stock of Spares Crew Training Documentation

Page 121: Wmu Malmo 2011 Power Pt

121

Consulting Naval Architectsand Marine Engineers

Transportation planning Marine economic analyses Conceptual design Preliminary design Contract design and specifications Working (detailed) drawings Plan review Tests, sea trials, witness same Construction and repair inspection Contract management (owner’s

representative) Guarantee engineering

Page 122: Wmu Malmo 2011 Power Pt

122

Terms Used for EngineersWorking in Marine Field

Naval Architect Marine Engineer Naval Engineer Naval Constructor Ocean Engineer Shipbuilding Engineer Marine Surveyor Licensed Marine Engineer

Page 123: Wmu Malmo 2011 Power Pt

123

Planning Design Commercial Production

Page 124: Wmu Malmo 2011 Power Pt

124

Commercial Selection of yards for invitation Request for expression of interest Invitation to bid Bid analysis invitation to bid Pro-forma contact invitation to bid Negotiations Financing Contracting

Page 125: Wmu Malmo 2011 Power Pt

125

Factors in Selecting Yards for Invitation

Physical characteristics Technical capabilities Experience Order book Employment Location Ability to assist financing Reputation References

Page 126: Wmu Malmo 2011 Power Pt

121

Page 127: Wmu Malmo 2011 Power Pt

121a

Page 128: Wmu Malmo 2011 Power Pt

128

Request for Expression of Interest

Simple and brief inquiry. Sent by e-mail or fax. Saves time and effort. Permits assessment of number

of yards participating.

Page 129: Wmu Malmo 2011 Power Pt

129

Invitation to Bid (RFP)

Best process. Make create legal obligations. Not to be used to develop price

estimates. Use standard formats. Formality is required. Use bid form.

Page 130: Wmu Malmo 2011 Power Pt

130

Information to be Sent in Invitation to Bid

Brief description of vessel. Name and address of person requesting

proposal. Number of vessels and options (if any). Documents

- Plans- Specifications- Pro-forma contract or Heads of Agreement

Required delivery. (cont’d.)

Page 131: Wmu Malmo 2011 Power Pt

131

Requirement for cash price Currency Financing terms Confidentiality of owner’s documents Performance bond (if any) Period of validity of bid Obligations on owner concerning bids Signature by authorized representative

(Cont’d.)

Page 132: Wmu Malmo 2011 Power Pt

132

Additional yard information- Quality information- Yard standard details- Current order book- Financial statement- Bank reference- Management plan- Technical plan- Major event schedule

Complete bid form

Page 133: Wmu Malmo 2011 Power Pt

133

Tips in Bidding

Hold bidders’ conference. Use addenda, if necessary. Be firm on submittal date. Create short list. Be courteous and fair. Ensure ethical practices.

Page 134: Wmu Malmo 2011 Power Pt

134

Bid Analysis Price for one vessel Price for a multiple vessel order Currency of payment Additional cost for financing Location of yard (and distance to where

vessel or vessels will be deployed) Cost of positioning vessel Reputation, experience and quality of yard Financial health of yard Proposed building schedule Owner’s costs as they relate to yard

location (i.e. inspectors’ housing, travel, taxes, etc.).

Page 135: Wmu Malmo 2011 Power Pt

135

Negotiations Have primary bidder and two back-up bidders. Beware of driving bidder below level of

profitability. Be well informed and prepared. Be aware of legal obligations in negotiating

stage. Have at total and complete meeting of the

minds. Yard to take total responsibility for design. Avoid split responsibilities. Review, in detail, all documents and initial

every page and drawing.- Contract- Specifications- Drawings

Page 136: Wmu Malmo 2011 Power Pt

136

Tips in Negotiating

Be fair. Be patient. Be firm, until it is absolutely

necessary to be flexible. Take enough time for the process.

Page 137: Wmu Malmo 2011 Power Pt

137

McCormack’s Rules for Negotiating Do not get stranded by “how much”.

Money issues are only one part of the transaction.

Let the other party go first (with terms and numbers).

Play in majors. Do not deal in round numbers. Avoid showdowns. Negotiate backwards. Trade places. Mollify then modify. Deflect with a question. Question positions but do not ignore them.

Page 138: Wmu Malmo 2011 Power Pt

138

McCormack’s Rules for Negotiating (Cont’d.)

Improve the offer with other parties’ self interest.

Consider barter. Keep your time frame quiet. Step back and relax. See emotional outbursts as

opportunities. Act in anger – never react in anger. Give the other parties side victories. Use candor.

Page 139: Wmu Malmo 2011 Power Pt

139

Silbiger’s Rules for Negotiating

Know your opponent. Know yourself. Do your homework. Understand your strategy. Understand your limits. Review your negotiations,

afterwards.

Page 140: Wmu Malmo 2011 Power Pt

133a

Buyers’ Market

Low prices Early delivery Attractive financing terms Proactive engineering Yard flexibility Buyers’ contract terms

Page 141: Wmu Malmo 2011 Power Pt

133b

Sellers’ Market

High prices Long delivery Little or no yard financing Sellers’ terms Inflexibility

Page 142: Wmu Malmo 2011 Power Pt

142

Ship Finance

Sources Equity Debt Grants

Page 143: Wmu Malmo 2011 Power Pt

143

World wide need for Ship Financing

$250,000,000,000 per year

Page 144: Wmu Malmo 2011 Power Pt

144

What form of financing to use?

FRICT approach Flexibility Risk Income Control Timing

Page 145: Wmu Malmo 2011 Power Pt

145

Factors to Consider in Financing Unused tax depreciation - Leasing

Excess debt - Equity Potential business risk - Equity Buyer’s market - Shipyard Credit Large earning power - Debt Strong, predictable cash flow - Debt Low stock price low expectation – Hybrid Long term, fixed rate- Bonds

Page 146: Wmu Malmo 2011 Power Pt

146

Debt Financing Least expensive Most restrictive Commercial or government loans Loans secured or collateralized Mortgages Possible pledge of:

- earnings- insurance- corporate guarantees- pledge of shares- personal guarantees

Seldom 100%

Page 147: Wmu Malmo 2011 Power Pt

147

Page 148: Wmu Malmo 2011 Power Pt

148

Sources of Debt Financing Commercial banks Ship finance banks Investment banks Government banks Commercial finance companies Saving and loan associations Pension funds Insurance companies Commercial credit companies Account receivable factors Manufacturers and vendors

Page 149: Wmu Malmo 2011 Power Pt

149

Debt – Commercial Finance Cos.

GE Capital Greyhound CIT Kleinwart Benson Henry Ansbacher Samuel Montagu Others

Page 150: Wmu Malmo 2011 Power Pt

150

Debt – Commercial Banks Norwegian owners -

Norwegian banks Chinese owners - Hong Kong

banks Japanese owners - Japanese

banks Greek owners - Non-Greek

banks

Page 151: Wmu Malmo 2011 Power Pt

151

Debt – Mezzanine Financing

Used when bank unwilling to loan owner sufficient money.

High yield corporate debt, i.e. Junk Bonds.

Closes gap. Provides high return. Compensates for high risk. Usually arranged by investment

banks.

Page 152: Wmu Malmo 2011 Power Pt

152

Debt - Bonds

Issued by shipowner Certificates of indebtedness Specific purposes Specific rates and period

Page 153: Wmu Malmo 2011 Power Pt

153

Debt – Ship MortgagesPurposes: Public record of lien Priority of the lien Sequence of prior liens Agreement between lender and

owner:- Operation- Insurance- Maintenance- Trading areas

Page 154: Wmu Malmo 2011 Power Pt

154

Debt – Factors Considered in Granting Loans

Age of business Type of operation Method of payment Currency of loan and repayment Collateral Character of management Credit history National economic factors Industry Mortgage and loan terms

Page 155: Wmu Malmo 2011 Power Pt

155

Page 156: Wmu Malmo 2011 Power Pt

156

Quality of Borrower Liner Co.

- Ability to Market it’s Service

Bulk Carrier Owner- Ability to Service Debt- Cash Flow- Quality of Charters

Page 157: Wmu Malmo 2011 Power Pt

157

Debt - Rates Floating (variable)

- usually tied to LIBOR Fixed

- Rare from commercial banks. “Swap”

- Swaps are more costly- Lender and third party who have excess variable and fixed rate funds arrange swap.

“Cap”- Protects against rising rates.- Lender pays interest over an agreed level.

“Collar”- Reduces extra costs for a cap.- A combination of a cap and “floor”.

Page 158: Wmu Malmo 2011 Power Pt

158

Spread Difference between cost of funds to

the lender and the borrower. Based on:

- Credit worthiness of owner- Risk in shipping operation- Size of loan- Period of loan- Type and amount of security- General supply and demand for loans

Page 159: Wmu Malmo 2011 Power Pt

159

Leases

Operating Finance

Page 160: Wmu Malmo 2011 Power Pt

160

Leveraged Leases

Most ship leases are leveraged leases.

Owner Lessor■ Provides equity portion of funding■ Provides debt portion■ Retains ownership ■ Holds mortgage■ Make lease payments ■ Receives assignment of lease

payments.■ Tax benefits■ Residual at end of lease (sometimes).

Page 161: Wmu Malmo 2011 Power Pt

161

Off-Balance Sheet Financing

Indebtedness does not show on balance sheet.

Usually done through chartering Not legal in U.S. nor GAAP.

Page 162: Wmu Malmo 2011 Power Pt

162

Sources of Equity Funds

Retained earnings Cash Flow Sale of Assets Sale of stock

- common- preferred

Limited partnerships

Page 163: Wmu Malmo 2011 Power Pt

163

Sale of Stock Public Offering

- Strict government controls- Rigorous accounting- Expensive- Time consuming

Private Placement- Insurance Cos. (casualty and property)- Mutual funds- Finance cos.

Page 164: Wmu Malmo 2011 Power Pt

164

Hybrid Financing Schemes

Convertible debt Debt with warrants DIFKO (Danish) K/G System (German) Blocked currency schemes Barter deals

Page 165: Wmu Malmo 2011 Power Pt

165

Government Grants Loans Loan guarantees Subsidized interest rates Cash grants (owner or builder) Cash or credit to allied industries Operating subsidies Favorable tax treatment Moratoria on debt repayment Training funds R & D Scrapping subsidies

Page 166: Wmu Malmo 2011 Power Pt

166

The Shipbuilding Contract

Page 167: Wmu Malmo 2011 Power Pt

167

ContractingWhy It Can Be Complicated

International transaction Different laws:

- construction/building- provision of services- sale of goods

More than 2 parties Much money Obligation may occur early, during

- bidding phase- negotiations

Constantly changing- laws- interpretations of law- tax regulations

Page 168: Wmu Malmo 2011 Power Pt

168

Contracting

Written (usually) Involves legal advice and

assistance Often starts with “Heads of

Agreement” and a “pro forma” contract

Sometimes letter of understanding

Page 169: Wmu Malmo 2011 Power Pt

169

Shipbuilding Is Governed By Many Laws

Contract law Other laws:

- tort- fraud- negligence- employment- environmental- etc.

Page 170: Wmu Malmo 2011 Power Pt

170

Contract

A promise enforceable by law. “A contract is a promise or set of

promises for the breach of which the law gives a remedy, or the performance of which the law in some way recognizes as a duty.”

Pact Sund Serventa (Promises made must be kept)

Page 171: Wmu Malmo 2011 Power Pt

171

Conditions for a Contract An offer An acceptance Consideration Intent to create a legal relationship In writing (sometimes oral) Parties are competent Form required by law Not impossible of performance Not contravene law or public policy

Page 172: Wmu Malmo 2011 Power Pt

172

An Offer Complete Free of ambiguities Properly communicated Fixed time of acceptance (or kept

open for a reasonable time) May be revoked

- before acceptance- providing offer provides for

notice of revocation.

Page 173: Wmu Malmo 2011 Power Pt

173

An Acceptance

Creates the binding contract Must be absolute and complete Qualified or conditional is NOT

an acceptance (it is a counter offer).

Silence is NOT an acceptance.

Page 174: Wmu Malmo 2011 Power Pt

174

A Contract May Be Voided

Material misrepresentations

Fraud Duress Improper conduct

Page 175: Wmu Malmo 2011 Power Pt

175

Shipbuilding Contracts

Specially drafted Owner or builder’s standard form Industry standard

- SAJ form- AWES form- MARAD form- Norwegian form-BIMCO

Page 176: Wmu Malmo 2011 Power Pt

PRINCIPAL ELEMENTS OF A SHIPBUILDING CONTRACT

166a

Page 177: Wmu Malmo 2011 Power Pt

177

A Comparison of Standard Form Shipbuilding Contracts

Page 178: Wmu Malmo 2011 Power Pt

178

Page 179: Wmu Malmo 2011 Power Pt

179

Basic Elements of a Shipbuilding Contract

The parties What is to be done Price Delivery Guarantees Tests Change procedures Right to reject Default Title Jurisdiction

Page 180: Wmu Malmo 2011 Power Pt

170

Escaping Contracts

Walk Away Delay Renegotiate Delivery Frustrate Greenfield Yards

Page 181: Wmu Malmo 2011 Power Pt

171

Planning Design Commercial Production

Page 182: Wmu Malmo 2011 Power Pt

182

Production Management

Specialized Management Techniques

To Plan and Control Projects To Complete Defined Work On Schedule Within Budget Meet Quality Constraints

Page 183: Wmu Malmo 2011 Power Pt

183

Purposes of Production Management

Fulfill original objectives Keep project within budget Keep project on schedule Coordinate project team Detect need for and take corrective

action Communicate progress to

management

Page 184: Wmu Malmo 2011 Power Pt

184

Define Project

State objectives and goals Prepare mission statement Develop work plan Create Work Breakdown

Structure Document (WBSD)

Page 185: Wmu Malmo 2011 Power Pt

185

Establish Schedule

Define Tasks Select milestones Define interrelationships Establish timing and deadlines

Page 186: Wmu Malmo 2011 Power Pt

186

Prepare Budget Identify or estimate all

costs Allow for

margins/contingencies Establish timing of

expenses Adopt financial controls Obtain approvals

Page 187: Wmu Malmo 2011 Power Pt

187

Team Budget Elements Wages Benefits Local taxes – if any Global taxes – if any Travel expenses Supplies and equipment Communication costs

Page 188: Wmu Malmo 2011 Power Pt

188

Owner’s Expense Budget Owner furnished equipment Crew costs Professional costs

Legal Accounting Technical

Stores and supplies Fuel and lube Entertainment and ceremonies

Page 189: Wmu Malmo 2011 Power Pt

189

Team Select and recruit team leader Develop team position/tasks Establish timing for each Recruit members Indoctrinate Delegate

Page 190: Wmu Malmo 2011 Power Pt

190

Managing Your Team Staying in control Evaluating your team Identifying and dealing with

different personality types Motivating your team Managing clients Effective team organization

Page 191: Wmu Malmo 2011 Power Pt

191

Control Project Communicate Coordinate Meetings – scheduled and

unscheduled Review and audit Make adjustments/corrections as

necessary Document

Page 192: Wmu Malmo 2011 Power Pt

192

Production Control Techniques

Full wall scale charts Gantt charts PERT CPM Programs

Page 193: Wmu Malmo 2011 Power Pt

193

Gantt Chart

Page 194: Wmu Malmo 2011 Power Pt

194

PERT Chart

Page 195: Wmu Malmo 2011 Power Pt

195

Monitor Critical Elements

Require production statistics Monitor milestones Watch critical paths Identify choke points/bottlenecks Make projections/extrapolations Anticipate problems

Page 196: Wmu Malmo 2011 Power Pt

196

When Things Go Wrong

Identify real problems Get input from team Investigate thoroughly Analyze possible solutions Take timely corrective action Meet with yard Communicate with stakeholders

Page 197: Wmu Malmo 2011 Power Pt

197

Tips Delegate effectively Be a good listener Be fair with everyone Use good time management Avoid bureaucracy Be decisive and clear Communicate thoroughly Insist on ethical behavior

Page 198: Wmu Malmo 2011 Power Pt

198

Production Activities Owner’s representative Contract management Project management Plan approval Inspection Quality control Testing Crewing, storing, fueling Delivery and acceptance Post production activities Warranty and guaranty Closing the project

Page 199: Wmu Malmo 2011 Power Pt

199

Detailed Design Materials Working plans Finished drawings Posted plans Vendor drawings Field sketches Shop drawings Schematics Drawing changes Operating manuals Safety manuals Maintenance, repair and trouble shooting manuals Test agendae, protocols and results Tech specs for equipment procurement

Page 200: Wmu Malmo 2011 Power Pt

200

Inspectors Hull Machinery Outfitting Electrical Coatings Welding

Page 201: Wmu Malmo 2011 Power Pt

201

Delivery and Acceptance Title passes when

- physically delivered- at another time, if both parties contractually agree- vessel registered- execution of bill of sale- when both parties so declare- when ship is in a “deliverable” state- bill is paid- builder completes his performanceprogressively

Page 202: Wmu Malmo 2011 Power Pt

202

Post Production Activities Deficiencies Unfinished work Temporary and permanent

documents Warranty and guaranty

Page 203: Wmu Malmo 2011 Power Pt

203

Management Science Techniques Linear programming Integer linear programming (simplex

method) Network flow models PERT/CPM Queuing models Inventory models Computer simulation Decision analysis Goal programming Analytic hierarchy process (AHP) Forecasting process models Dynamic programming

Page 204: Wmu Malmo 2011 Power Pt

192a

Innovative Techniques Clarification of aims Abstract reformulation Morphological synthesis Inductive reasoning Deductive reasoning Value analysis Brain storming Brain writing Heuristic programming

Page 205: Wmu Malmo 2011 Power Pt

192b

Innovative Techniques (Cont’d.)

Idea combinations Negative brain storming Re-thinking through questioning Lateral thinking Independent review S Curve strategy The in-and-out strategy The 5-15 idea generating

Page 206: Wmu Malmo 2011 Power Pt

206

ProblemSolving

DecisionMaking

Define the ProblemIdentify the AlternativesDetermine the Criteria

Evaluate the AlternativesChoose an Alternative

Implement the DecisionEvaluate the Results

Page 207: Wmu Malmo 2011 Power Pt

193b

Innovative Techniques (Cont’d.) Synetics process

Attribute listing PMI evaluation Matrix thinking Forced relationships Force field analysis The angel’s advocate Extrapolation and interpolation

Page 208: Wmu Malmo 2011 Power Pt

194

ComparingTechnologies

FeasibilityStudies

Ideal DesignIn one

TechnologyOptimization

Studies

Page 209: Wmu Malmo 2011 Power Pt

195

Economic Analysis

Page 210: Wmu Malmo 2011 Power Pt

210

Page 211: Wmu Malmo 2011 Power Pt

198

Page 212: Wmu Malmo 2011 Power Pt

199