91
Wolcott Park Master Plan For: Town of West Hartford Document by: UConn’s Community Research & Design Collaborative Director Associate Professor Peter Miniutti Date: 01/25/2016 UConn’s Community Research & Design Collaborative (CRDC) is the umbrella organization for the outreach work of the landscape architecture faculty. Our mission is to be a regional leader in sustainable planning and design. We help our client’s plan and design affordable, equitable, and ecologically healthy environments. Our mission is accomplished by providing our client’s with objective, multi-disciplinary, state-of-the-art planning and design expertise. We promote and encourage academic-based collaborative research with an emphasis on “real world” projects as they apply to sustainable development. For additional information, please see: crdcuconn.wordpress.com peteprojects.wordpress.com or email Peter: [email protected] 1 10 Minute Walk 5 Minute Walk

Upload: others

Post on 16-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Wolcott Park Master Plan

For:Town of West Hartford

Document by: UConn’s Community Research & Design CollaborativeDirector Associate Professor Peter Miniutti

Date: 01/25/2016

UConn’s Community Research & Design Collaborative (CRDC) is the umbrella organization for the outreach work of the landscape architecture faculty. Our mission is to be a regional leader in sustainable planning and design. We help our client’s plan and design affordable, equitable, and ecologically healthy environments. Our mission is accomplished by providing our client’s with objective, multi-disciplinary, state-of-the-art planning and design expertise. We promote and encourage academic-based collaborative research with an emphasis on “real world” projects as they apply to sustainable development.

For additional information, please see: crdcuconn.wordpress.com peteprojects.wordpress.comor email Peter: [email protected] 1

10 Minute Walk

5 Minute Walk

Page 2: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

2

Wolcott Park Master Plan West Hartford, CT.

UConn’s presentation will include:

1.Brief overview of project and CRDC

2. Discussion of the previous meetings

3. Meeting results and conclusions

4. Preliminary ideas

5. Park structures

6.Next steps

Page 3: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

3

1. Brief Overview of CRDC

UConn’s Community Research & Design

Collaborative (CRDC) is the umbrella organization for the outreach work of the landscape architecture faculty.

• Our mission is to be a regional leader in sustainable planning and design. We help our client’s plan and design affordable, equitable, and ecologically healthy environments.

• Our mission is accomplished by providing our client’s with objective, multi-disciplinary, state-of-the-art planning and design expertise.

• We promote and encourage academic-based collaborative research (service learning) with an emphasis on “real world” projects as they apply to sustainable development.

The Wolcott Team from left to right: Undergraduate Student Mengzi Zheng, Graduate Student Samantha Stewart. Associate Professor Peter Miniutti, Adjunct Instructor Natalie Miniutti and Undergraduate Student Elizabeth Fontaine

Page 4: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

4

Brief  Overview  of  Peter  MiniuttiAssociate Professor Peter Miniutti:• Director of UConn’s CRDC• BS degree from UMass in Environmental Design and

MLA from Harvard University • 20+ years @ UConn, tenured in 2000

Current and Past Projects:• Downtown Storrs Mixed-Use Development• Lands of Unique Value for Town of Mansfield• Master Plan for Town Parks for West Hartford, CT.• Essex Stream Train Campus• Eco-Tech Park for Bridgeport

Vision&Plan&for&Fernridge&Park!West&Har4ord,&CT.! For: Friends of Fernridge Park Esther Spigel President Document by: UConn’s Community Research & Design Collaborative Director Associate Professor Peter Miniutti Date: 4.30.2015

UConn’s Community Research & Design Collaborative (CRDC) is the umbrella organization for the outreach work of the landscape architecture faculty. Our mission is to be a regional leader in sustainable planning and design. We help our client’s plan and design affordable, equitable, and ecologically healthy environments. Our mission is accomplished by providing our client’s with objective, multi-disciplinary, state-of-the-art planning and design expertise. We promote and encourage academic-based collaborative research with an emphasis on “real world” projects as they apply to sustainable development. For additional information, please email Peter: [email protected]

Page 5: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

2. UConn’s Role on Project

Associate Peter Miniutti role on this project:

• Facilitate communication between the public and town officials for the development of an updated Master Plan for the park.

• Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public.

• Create a series of design interventions (Master Plan) that will update the park based on the current and future needs of the users and town.

My definition of landscape architecture is the creation of meaningful and memorable exterior spaces.

7

Page 6: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Vision:  

The development of a substantive park renovation plan includes an assessment of the park as it is today, community outreach, drafting and tweaking a plan, setting a timeline and budget, and, finally, implementing the plan over a period of time.

6

Page 7: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Wolcott Park – Public Meeting Timeline

November: January March May

Meeting  2 Meeting  3 Meeting  411.15 11.16

CDescription: • Inventory & Analysis• Day and Night Meetings

Meeting emphasis: • Collection/documentation of

information from the general public

Meeting format:• Introduction and brief overview

of project methodology by Project Team

• Public work sessions led by the UConn Team

• Summary and Next Steps

Description:

• Review findings from January meeting

• Discuss implications of findings with review of preliminary Master Plan

Meeting emphasis: • Collection/documentation of

information from the general public regarding preliminary Master Plan

Meeting format:• Introduction and brief overview of

project methodology by Project Team

• Elicit public comment on preliminary Master Plan

• Summary and Next Steps

Description: • Review findings from November

meetings• Discuss implications of findings

with alternative layouts and other graphic products

Meeting emphasis: • Collection/documentation of

information from the general public regarding alternative layouts

Meeting format:• Introduction and brief overview

of project methodology by Project Team

• Public work sessions led by the UConn Team

• Summary and Next Steps

Description:

• Review findings from March meeting

• Discuss implications of findings with review of revised Master Plan

Meeting emphasis: • Collection/documentation of

information from the general public regarding revised Master Plan

Meeting format:• Introduction and brief overview

of project methodology by Project Team

• Elicit public comment on revised Master Plan

• Summary and Next Steps

9

Page 8: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

8

Wolcott Park Master Plan West Hartford, CT.

UConn’s presentation will include:

1. Brief overview of project and CRDC

2.Discussion of the previous meetings

3. Meeting results and conclusions

4. Preliminary ideas

5. Park structures

6.Next steps

Page 9: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Tool Kit

950 Parking Spaces

Loop Path

Path Segments (x6)

Bridge

Veto (x2)

Flower Beds

Trees (x10)

ParkingWildcard

Page 10: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Aerial of Wolcott Park

10

0                  25’                  50’                                    100’

1”  =  50’

Page 11: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Rules:

11

The primary reason for this meeting is to better understand your attitudes, feelings, desires and/or concernsregarding Wolcott Park. Every person’s experiences and opinions are important to us.

To have a productive and enjoyable meeting, we would like to go over some basic ground rules for this meeting.

1. All questions/comments will be directed to the moderator. The moderator will either answer questions/respond to the comments or solicit additional information from other meeting attendees.

2. Only one person speaks at a time so all comments can be addressed in an appropriate fashion. Under no circumstances will there be direct communication between meeting attendees. The exception to this rule is during the work sessions.

3. If interested in asking a question or making a comment, please raise your hand and themoderator will select speakers one at a time. Once selected, please

- State your name, address and any official affiliation with West Hartford- Questions/comments to be limited to 90 seconds in duration

4. Limit of one question per person until all individuals have been given an opportunity to comment. If time allows, additional questions/comments will be entertained.

5. If you would like to ask a question or have a comment and would prefer not to speak at the meeting, please send an email to [email protected]

Page 12: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

12

Meeting A Work Session

Page 13: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

13

Meeting A Work Session

Page 14: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

14

Meeting A Work Session

Page 15: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

15

Meeting A Work Session

Page 16: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

16

Meeting B Work Session

Page 17: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

17

Meeting B Work Session

Page 18: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

18

Meeting B Work Session

Page 19: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

19

Meeting B Work Session

Page 20: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

20

Meeting B Work Session

Page 21: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

21

Meeting B Work Session

Page 22: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

22

Meeting A Team Maps

Team 1

Page 23: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

23

Meeting A Team Maps

Team 2

Page 24: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

24

Meeting A Team Maps

Team 3

Page 25: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

25

Meeting A Team Maps

Team 4

Page 26: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

26

Meeting B Team Maps

Team 5

Page 27: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

27

Meeting B Team Maps

Team 6

Page 28: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

28

Meeting B Team Maps

Team 7

Page 29: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

29

Meeting B Team Maps

Team 8

Page 30: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

30

Meeting B Team Maps

Team 9

Page 31: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

31

Meeting B Team Maps

Team 10

Page 32: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

32

Wolcott Park Master Plan West Hartford, CT.

UConn’s presentation will include:

1. Brief overview of project and CRDC

2. Discussion of the previous meetings

3.Meeting results and conclusions

4. Preliminary ideas

5. Park structures

6.Next steps

Page 33: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsA.  Recreation:1. Bocce/horse  shoe  courts.2. No  additional  fields  for  play;  no  room.3. Retain  pickleball  courts  on  the  propertyB.  Amenities:1. Victory  garden  fence  – surrounds  the  gardens  

concern  if  removed:  the  garden  would  be  wide  open  so  not  good  for  gardeners  for  many  reasons.  Keep  as  fence!

2. Park  benches.3. Lighting  after  dark.4. Water  fountains.5. Update  bathrooms.6. Add  park  benches  around  newly  created  

walking  trails  for  rest.C.  Circulation:1. Multi-­‐generational  walkway;  exercise  area,  

stations.2. Trails  not  on  street.3. Put  a  bridge  over  stream.4. Extend  parking  lots.D.  Green  Space:1. Trees  near  the  benches  if  there  were  not  any  

near  by.2. Pond  needs  attention/clean.3. Larger  pond  for  fishing  location.  

B4

B2,6

A1

Team  1

0                      25’              50’                                    100’

1”  =  50’

C4

C4

B5

B3

A3

B1

C1-­‐2

C3

D1

D2-­‐3

Page 34: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsA.  Recreation:1. Tennis  courts  – spring  use.B.  Amenities:1. Renovate  restroom/concession  building.2. More  bike  parking  – check  inventory  3. Increase  lighting.4. Signage  – entrances,  wayfinding.C.  Circulation:1. Trails  from  community  gardens  to  park.2. HC  accessible  (building,  playground,  paths).3. Bike  lanes  to  park.4. Repave  /  repair  sidewalks5. Where  do  community  gardeners  park?6. Remove  drop  off  circle  by  restrooms  –

unused  space.7. Need  more  parking  – east  lot  into  forest?  Too  

wet?8. Ask  CL&P  for  use  of  corner  for  parking.9. Reconfigure  western  parking  lot.10. Repave  parking  lots  /  curbs.D.  Green  Space:1. Continue  trees  on  walkway.2. More  flowers.Other:1. Conard  students  – science  class?2. (Bad)  dog  clean  up  compliance  – not  enough  

space  for  dog  park.

Team  2  

0                      25’              50’                                    100’

1”  =  50’

B1

A1

B3

B4

D1

D2

C8

C7,9-­‐10

C9-­‐10

C6

C1

C2,4

B2

Page 35: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsA.  Recreation:1. Ice  skating.B.  Amenities:1. Demolish  restroom  building  and  build  new  

bathrooms.2. Senior  Center  activities  and  weather  proof  

shelter;  tai  chi,  dancing,  yoga.3. Use  of  amphitheater.4. Outdoor  lighting  for  skating.5. Entry  markers  /  gates.C.  Circulation:1. Retain  sidewalks  – not  safe  accessibility.  2. Enhance  the  pond  and  add  path.3. More  parking.

Pavilion

Team  3

0                      25’              50’                                    100’

1”  =  50’

B1

B2

A1

B4

B5

B5

B3

C3

C3-­‐4

C1

Page 36: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsA.  Recreation:1. Spectator  stands  for  baseball.2. Volleyball  court.B.  Amenities:1. More  garden  space.2. Water  fountains!C.  Circulation:1. Improve  walkways.2. Remove  unused  path  at  N.B.A3. More  parking.D.  Green  Space:1. Bridge  to  Children's’  Forest.

A2

A1

Team  4

0                      25’              50’                                    100’

1”  =  50’

C3

C3

C2

C1

D1

B1

B2

Page 37: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

A4

A4

D4-­‐5

CommentsA.  Recreation:1. Bigger  playground.2. Ice  skating  in  park.3. Hockey.4. Repavement  of  tennis and  basketball.B.  Amenities:1. Move  snack  shack.2. Better  lighting.3. LED  lighting.4. Solar  panels  for  baths.5. Lights  on  court  on  late.6. Renovate  bathrooms.C.  Circulation:1. Signs  for  trail.2. More  parking.3. Widen  sidewalk  near  baseball  field.4. Repave  walks.  Bad  puddles  near  pond.  5. Remove  path  to  N.B.A.D.  Green  Space:1. Beautification.2. Landscape  Pond.3. Replace  trees  as  needed.4. Pathway  in  forest  defined.  5. Boardwalk  through.

C3-­‐4

C5

Team  5

0                      25’              50’                                    100’

1”  =  50’

C2

D1-­‐2

D3

B1,4,6

B2-­‐3

B5

A2-­‐3

A1

Page 38: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Comments  A.  Recreation:1. Keep/improve  playground.  Good  nest  to  parking  

lot.  Fence  is  good  but  need  to  be  fixed.  2. Playground  needs  updating!3. Playground-­‐ Rubber  surface  instead  of  wood  

chips.4. Parent/child  swings in  playground.5. Area  for  toddlers  and  5+  in  playground.6. Tennis  court  renovations/  fix  lights.7. Soccer  field:  improve  southern  edge  against  

trees/playground.  8. Basketball  courts  – renewed.9. Add  adventure  park.B.  Amenities:1. Garden  area  – better  efforts  to  promote/advertise  

(signage?)  to  gardens.2. More  benches  and  seating  near  splash  pad.3. Clean,  unlocked  bathrooms.C.  Circulation:1. Sidewalks  make  wider  for  walkers  and  bikers  

together.  2. Wheel  chair  accessible  everywhere.  3. More  parking.4. Fix  drop  off.D.  Green  Space:1. Clean  (eliminate  growth)  and  make  better  

greenspace  in  trees  on  Wolcott/New  Britain  Ave  corner  =  entrance!

2. Signs  on  trees  (tree  species).3. Shade  near  splash  pad.4. Protect  forest  – Greenspace!  Encourage  Town  to  

maintain  Landscapes  in  forest/trails.  Wolcott  Parents  currently  do  landscaping  in  forest  to  keep  useful.

5. Keep  existing  bridge  in  forest.6. Open  up  forest.  7. Overgrown  trees/roots  (tripping  hazard)  need  to  

be  corrected.  Invasive  plants  – gone.  Poison  Ivy  control  – its  everywhere  making  space  unusable.  

D7

Team  6

0                      25’              50’                                    100’

1”  =  50’

A1-­‐5

A6

A7

A8

D4-­‐7

B1

B3

C3-­‐4

B2

D3

B4

C1-­‐2

D1

Page 39: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsA.  Recreation:1. Expand  playground.2. Add  turf  to  replace  mulch.3. Add  all  age  rides.4. Ice  skating  rink  on  existing  tennis  courts  

during  winter  months.B.  Amenities:1. Add  bleachers  /  seating  on  first  base  side.2. Update  lighting  fixtures.3. Update  concessions  stand.C.  Circulation:1. Repave  /  replace  sidewalks.2. Add  walk  path  signage.3. Add  30  parking  spots  (west).4. Repave  /  replace  parking  lots.D.  Green  Space:1. Add  fountain  in  pond.2. Update  /  fix  current  bridge  in  forest  (east  

side).

Team  7

0                      25’              50’                                    100’

1”  =  50’

A1-­‐3

A4

B1

B3

D2

D1

D1-­‐2

C3-­‐4

C4

B2

Page 40: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

D3

CommentsA.  Recreation:1. Consider  playground  options  that  would  

appeal  to  older  children  – add  more  not  eliminate  current.

2. Agrees  to  eliminate  sandbox.3. Preserve  sledding  hill.B.  Amenities:1. New  picnic  tables.2. Better  lighting  in  parking  lots.3. More  and  better  signage  (map  of  park,  

mileage  markers  on  loop).4. New  concession  and  bath  house  and  better  

lighting.5. Add  more  trash  and  recycling  bins  but  

eliminate  dumpster.6. Water  fountains  that  work.7. Bird  boxes  /  houses.C.  Circulation:1. Stairs  or  ramp  up  to  community  garden  from  

Wolcott  Road.2. Replace  both  long  walkways.3. Remove  path  near  N.B.A.4. Parking  – expand,  configure  east  and  west.5. Ask  CL&P  for  use  of  corner  for  

parking/property.D.  Plantings:1. Keep  existing  trees  as  much  as  possible.2. Signage  for  flora  and  fauna.3. Repair  boardwalk.  4. Clean  up  pond.5. Maintain  diverse  ecosystems.  6. Add  shade  tolerant  ground  cover.

Clean  Up  Edges

PlantNew  Trees

D6

C3

Team  8

0                      25’              50’                                    100’

1”  =  50’

C4

C5

C1

C2

D4

D1

A1-­‐5

A3

B2

B4

B1

B6

Page 41: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

D1

CommentsA.  Recreation:1. More  lights.2. Resurface  tennis  courts.3. Timer  on  court  lights.4. Volleyball  nets.5. Tetherball.  6. Climbing  wall.7. Lights  for  soccer  field.B.  Amenities:1. Access  to  restrooms  all  day  (x7  days  and  early  

evening  until  dusk.  In  summer  during  baseball  stay  open).

2. Benches  throughout  – trex  like.3. Water  fountains.4. Keep  trash  cans  out  during  winter.5. More  lights  along  walkways.6. Upgrade  existing  lights.7. Trex  picnic  tables.C.  Circulation:1. Replace  sidewalks.2. Extend  walkway  to  loop  (connect  to  New  

Britain  Ave.3. More  parking.4. Ask  CL&P  for  use  of  corner  for  

parking/property.D.  Green  Space:1. Repair  existing  boardwalk  with  trex.2. Clean  up  pond  and  bring  fountain  back!

Team  9

0                      25’              50’                                    100’

1”  =  50’

A1,7

B5-­‐6

A2-­‐3

A5-­‐6

B1

B7

B3

B2

C1

C3

C1 D

1

A4

C4

Page 42: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsA.  Recreation:1. Playground  -­‐ Make  it  accessible.2. Fix  the  gates.3. Add  swings.4. Add  playscape  for  older  kids  – if  no  room  get  rid  

of  sandbox.5. Skate  park.6. Ice  skating  rink.B.  Amenities:1. Please  revamp  Louise’s  garden.2. Fix  up  bathrooms.3. Get  rid  of  broken  water  fountains.C.  Circulation:1. Paths  – increase  ADA  accessible  paths.2. Additional  parking  on  Wolcott  Road.3. Ask  CL&P  for  use  of  corner  for  

parking/property.D.  Green  Space:1. We  like  the  pathway  and  the  pink  puff  trees.2. Maintain  paths  in  Wolcott  Forest.3. I’d  love  the  “raised  pathway”   in  the  forest  to  be  

updated.4. Add  tree  labels  to  forest.  5. Dredge  the  pond.6. We  like  the  park  but  want  improvements.  

Team  10

0                      25’              50’                                    100’

1”  =  50’

A1-­‐4

B2

C1

C2

D2-­‐4

D1

D5

C3

Page 43: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsA.  Fields  &  Courts:1. Spectator  stands  for  baseball.2. Soccer  field:  improve  southern  edge  against  trees/playground.  3. Lights  for  soccer  field.4. Basketball  courts  – renewed.5. Repavement  of  tennis  and  basketball6. Timer  on  court  lights.7. Tennis  courts  – spring  use.8. Resurface  tennis  courts.9. Tennis  court  renovations/  fix  lights.10. Retain  pickleball  courts  on  the  property11. No  additional  fields  for  play;  no  room.

B.  Playground:1. Keep/improve  playground.  Good  nest  to  parking  lot.  Fence  is  

good  but  need  to  be  fixed.  2. Playground  needs  updating!3. Playground-­‐ Rubber  surface  instead  of  wood  chips.4. Parent/child  swings  in  playground.5. Area  for  toddlers  and  5+  in  playground.6. Playground  -­‐ Make  it  accessible.7. Fix  the  gates.8. Add  swings.9. Add  playscape  for  older  kids  – if  no  room  get  rid  of  sandbox.10. Expand  playground.11. Add  turf  to  replace  mulch.12. Add  all  age  rides.13. Consider  playground  options  that  would  appeal  to  older  

children  – add  more  not  eliminate  current.14. Agrees  to  eliminate  sandbox.15. Bigger  playground.

C.  Other:1. Volleyball  court.2. Add  adventure  park.3. Skate  park.4. Ice  skating  rink.5. Ice  skating  in  park.6. Hockey.7. Ice  skating.8. Ice  skating  rink  on  existing  tennis  courts  during  winter  months.9. Preserve  sledding  hill.10. More  lights.11. Volleyball  nets.12. Tetherball.  13. Climbing  wall.14. Bocce/horse  shoe  courts.

Recreation

0                      25’              50’                                    100’

1”  =  50’

C1

A1

A4-­‐6

A2

A1-­‐15

C9

A2-­‐3

A5-­‐10

C12-­‐13

C11

A4-­‐8

C3

A14

Page 44: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsA.  Community  Garden:1. More  garden  space.2. Victory  garden  fence  – surrounds  the  gardens  concern  if  removed:  the  

garden  would  be  wide  open  so  not  good  for  gardeners  for  many  reasons.  Keep  as  fence!

3. Garden  area  – better  efforts  to  promote/advertise  (signage?)  to  gardens.

4. Please  revamp  Louise’s  garden.B.  Furnishings:1. Water  fountains!2. Water  fountains.3. Water  fountains  that  work.4. Water  fountains.5. Get  rid  of  broken  water  fountains.6. Park  benches.7. New  picnic  tables8. Add  park  benches  around  newly  created  walking  trails  for  rest.9. More  benches  and  seating  near  splash  pad.10. Benches  throughout  – trex  like.11. Keep  trash  cans  out  during  winter.12. Trex  picnic  tables.13. Add  more  trash  and  recycling  bins  but  eliminate  dumpster.C.  Lighting:1. Lighting  after  dark.2. Increase  lighting.3. Lights  on  court  on  late.4. Outdoor  lighting  for  skating.5. Better  lighting.6. LED  lighting.7. Better  lighting  in  parking  lots.8. More  lights  along  walkways.9. Upgrade  existing  lights.D.  Bathrooms  and  Concession:1. Update  bathrooms.2. Demolish  restroom  building  and  build  new  bathrooms.3. Move  snack  shack.4. Renovate  bathrooms.5. Renovate  restroom/concession  building.6. More  bike  parking  – check  inventory  7. Clean,  unlocked  bathrooms.8. New  concession  and  bath  house  and  better  lighting.9. Access  to  restrooms  all  day  (x7  days  and  early  evening  until  dusk.  In  

summer  during  baseball  stay  open).10. Fix  up  bathrooms.11. Solar  panels  for  baths.E.  Other:1. Signage  – entrances,  wayfinding.2. More  and  better  signage  (map  of  park,  mileage  markers  on  loop).3. Senior  Center  activities  and  weather  proof  shelter;  tai  chi,  dancing,  

yoga.4. Use  of  amphitheater.5. Entry  markers  /  gates.6. Bird  boxes  /  houses.

Amenities

0                      25’              50’                                    100’

1”  =  50’

A1-­‐4

D1-­‐11

E5

E3

E5

E4

E5

B7

B7

Page 45: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsA.  Vehicular  Circulation:1. More  parking.2. Extend  parking  lots.3. Additional  parking  on  Wolcott  Road.4. More  parking.5. Where  do  community  gardeners  park?6. Remove  drop  off  circle  by  restrooms  – unused  space.7. Need  more  parking  – east  lot  into  forest?  Too  wet?8. Reconfigure  western  parking  lot.9. Repave  parking  lots  /  curbs.10. More  parking.11. Add  30  parking  spots  (west).12. Repave  /  replace  parking  lots.13. Parking  – expand,  configure  east  and  west.14. Add  30  parking  spots  (west).15. Repave  /  replace  parking  lots.16. Parking  – expand,  configure  east  and  west.17. Ask  CL&P  for  use  of  corner  for  parking/property.18. Ask  CL&P  for  use  of  corner  for  parking/property.19. Ask  CL&P  for  use  of  corner  for  parking/property.20. Ask  CL&P  for  use  of  corner  for  parking.21. Ask  CL&P  for  use  of  corner  for  parking/property.

B.  Pedestrian  Circulation:1. Improve  walkways.2. Remove  unused  path  at  N.B.A3. Multi-­‐generational  walkway;  exercise  area,  stations.4. Trails  not  on  street.5. Put  a  bridge  over  stream.6. Trails  from  community  gardens  to  park.7. HC  accessible  (building,  playground,  paths).8. Bike  lanes  to  park.9. Repave  /  repair  sidewalks10. Retain  sidewalks  – not  safe  accessibility.  11. Enhance  the  pond  and  add  path.12. Repave  /  replace  sidewalks.13. Add  walk  path  signage.14. Stairs  or  ramp  up  to  community  garden  from  Wolcott  Road.15. Replace  both  long  walkways.16. Remove  path  near  N.B.A.17. Repave  /  replace  sidewalks.18. Add  walk  path  signage.19. Stairs  or  ramp  up  to  community  garden  from  Wolcott  Road.20. Replace  both  long  walkways.21. Remove  path  near  N.B.A.22. Replace  sidewalks.23. Extend  walkway  to  loop  (connect  to  New  Britain  Ave.24. Paths  – increase  ADA  accessible  paths.

Circulation

0                      25’              50’                                    100’

1”  =  50’

A

A

A17-­‐21

Page 46: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

CommentsGreen  Space:1. More  flowers  and  vegetation.2. Trees  near  the  benches  if  there  were  not  any  near  by.3. Pond  needs  attention/clean.4. Larger  pond  for  fishing  location.5. Continue  trees  on  walkway.6. More  flowers.7. Beautification.8. Landscape  Pond.9. Replace  trees  as  needed.10. Pathway  in  forest  defined.  11. Boardwalk  through.12. Clean  (eliminate  growth)  and  make  better  greenspace  

in  trees  on  Wolcott/New  Britain  Ave  corner  =  entrance!13. Signs  on  trees  (tree  species).14. Shade  near  splash  pad.15. Protect  forest  – Greenspace!  Encourage  Town  to  

maintain  Landscapes  in  forest/trails.  Wolcott  Parents  currently  do  landscaping  in  forest  to  keep  useful.

16. Keep  existing  bridge  in  forest.17. Open  up  forest.  18. Overgrown  trees/roots  (tripping  hazard)  need  to  be  

corrected.  Invasive  plants  – gone.  Poison  Ivy  control  –its  everywhere  making  space  unusable

19. Keep  existing  trees  as  much  as  possible.20. Signage  for  flora  and  fauna.21. Repair  boardwalk.  22. Clean  up  pond.23. Maintain  diverse  ecosystems.  24. Add  shade  tolerant  ground  cover.25. Repair  existing  boardwalk  with  trex.26. Clean  up  pond  and  bring  fountain  back!27. We  like  the  pathway  and  the  pink  puff  trees.28. Maintain  paths  in  Wolcott  Forest.29. I’d  love  the  “raised  pathway”    in  the  forest  to  be  

updated.30. Add  tree  labels  to  forest.  31. Dredge  the  pond.32. We  like  the  park  but  want  improvements.  

Green  Space  

0                      25’              50’                                    100’

1”  =  50’

1D1

26

D2

Page 47: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

47

Your Summary Analysis

Page 48: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

General  Legend  and  Notes:

Pond  and  stream  ecosystem

Forest  habitat

Mature  trees

Location  of  two  parking  areas

Playground

Park  entries

Perimeter  sidewalks  and  interior  walkway

Active  recreation

Community  gardens*

*  Beyond  the  gardens,  the  users  of  the  overall  park  show  extraordinary  passion  and  care  for  Wolcott  Park.

North                South

North                South

West                East

Site  Analysis:  Opportunities

Page 49: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

General  Legend  and  Notes:Entries  are  understated  and/or  dominated  by  the  auto.  Weak  sense  of  arrival.

Pedestrian  circulation  lacks  hierarchy,  is  incomplete,  is  not  ADA  compliant  and  is  under  scaled.

Overall  park  lacks  continuity  north  to  south  and  east  to  west.

Playground  is  wedged  in-­‐between  the  parking  lot  and  building.

Parking  lots  are  inefficient  and  lack  needed  capacity.

Pond  is  not  integrated  into  overall  park,  is  underutilized  and  has  poor  water  quality.

Planting  Notes:Park  lacks  “winter  structure”  due  to  lack  of  evergreen  trees  and/or  heavily  branched  deciduous  trees.

Little  to  no  understory  /shrub/herbaceous  planting  in  main  park  area.

North                South

North                South

West                East

Site  Analysis:  Constraints

Page 50: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

50

Wolcott Park Master Plan West Hartford, CT.

UConn’s presentation will include:

1. Brief overview of project and CRDC

2. Discussion of the previous meetings

3. Meeting results and conclusions

4.Preliminary ideas

5. Work session

6. Next steps

Page 51: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

East  Parking  -­‐ Existing

45  + spaces

24,000  sf  paving

Drop  Off

Page 52: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

East  Parking  -­‐ Proposed

75  + spaces

25,000  sf  paving

Page 53: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

East  Parking  -­‐ Comparison

75  + spaces+  30

25,000  sf  paving(1/333  sf)

45  + spaces

24,000  sf  paving(1/533  sf)

Page 54: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

East  Parking  -­‐ Comparison

Page 55: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

East  Parking  -­‐ Comparison

Page 56: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

West  Parking  -­‐ Existing

33  + spaces

19,300  sf  paving

Page 57: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

West  Parking  -­‐ Proposed

65  + spaces

20,300  sf  paving

Page 58: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

West  Parking  -­‐ Comparison

65  + spaces+  3220,300  sf  paving1/333  sf

33  + spaces

19,300  sf  paving1/533  sf

Page 59: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

West  Parking  -­‐ Comparison

Page 60: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Pedestrian  Circulation  -­‐ Existing

Page 61: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Pedestrian  Circulation  – Proposed

Page 62: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Pedestrian  Circulation  – Proposed

Page 63: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Pedestrian  Circulation  – Proposed  with  Use  Zones

Page 64: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Pedestrian  Circulation  – Comparison

Page 65: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Vegetation  -­‐ Existing

Page 66: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Vegetation  -­‐ Proposed

Page 67: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Vegetation  -­‐ Proposed

Page 68: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

68

Wolcott Park Master Plan West Hartford, CT.

UConn’s presentation will include:

1. Brief overview of project and CRDC

2. Discussion of the previous meetings

3. Meeting results and conclusions

4. Preliminary ideas

5.Park structures

6. Next steps

Page 69: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

69

Wolcott Park Structures

Existing Conditions; Bathhouse,

Concessions, Scorer’s Box

Pros and Cons:Concessions/Bathhouse-• Geometric, triangular shape doesn’t blend in

with the natural park setting• Massive, flat roof dominates the structure• Dark roof and wall tile colors are not inviting• Solid forms don’t invite natural light. • Heavy and oppressive scale

Scorer’s Box-• Traditional gable roof with metal roofing• Natural stone and clapboard siding• Simple scale• Appealing colors

Page 70: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

70

Wolcott Park Structures

Historical Collection- Long Vue

Farm, Henry Wolcott (1956)Pros:• Post and beam construction• New England vernacular• Gable roofs• Simple box forms

Page 71: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

71

Wolcott Park Structures

Case Study- Traditional ‘Bath

House’ and ConcessionsPros:• Post and beam construction• Shingle or metal roofing• Open and inviting garden-like structure• Recall of historic barn structure• Light and airy with screen walls• Gable roof with transom, allowing natural light• Small, human scale structure

Page 72: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

72

Wolcott Park Structures

Case Study- New England

Vernacular

Boothbay Botanical GardenPros:• Post and beam construction• Wood shingle roofs• Open and inviting garden-like structure• Recall of historic barn • Greenroof idea blends-in with natural setting• Pergolas and trellises transition to more open,

garden structures

Page 73: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

73

Wolcott Park Structures

Case Study- Contemporary

StructuresPros:• Wood, stone and glass construction• Gable or low-slope roofs• Small scale structures• Simple geometric forms• Natural colors and materials• Invite natural light

Page 74: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

74

Wolcott Park Structures

Case Study- Contemporary

Structures Pros:• Wood, stone and glass construction• Flat roofs• Light and airy materials and details• Small scale structures• Simple box forms• Natural colors and materials

Page 75: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

75

Wolcott Park Structures

Case Study- Recycled Materials

Shipping ContainersPros:• Recycled metal containers• Glass and steel construction• Playful boxes with flat roofs and awnings• Simple box forms• Colorful materials• Greenwall idea as an option

Page 76: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

76

Wolcott Park Structures

Case Study- Murals for climate-

controlled structuresPros:• Wood, stone and glass construction• Small scale structures• Simple geometric forms• Natural colors and materials• Artistic murals

Page 77: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

77

Wolcott Park Structures

Case Study- Shade Structures Pros:• Metal posts and fabric roofs• Sail-like canopy structures• Colorful and playful forms• Allows air and light as well as shade • Simple, geometric forms

Page 78: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

78

Wolcott Park Structures

Preliminary Design- Proposed

Structures

• Bathhouse • Concessions • Picnic Pavilion• Shade Structure • Pergolas• TrellisesPros:• Modular structures• Simple scale with tent-like roofs• Colorful and playful materials• Flexible, open and closed spaces

Page 79: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

79

Wolcott Park Master Plan West Hartford, CT.

UConn’s presentation will include:

1. Brief overview of project and CRDC

2. Discussion of the previous meetings

3. Meeting results and conclusions

4. Preliminary ideas

5. Park structures

6.Next steps

Page 80: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Our Summary Analysis

80

0                  25’                  50’                                    100’

1”  =  50’

Page 81: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Aerial of Wolcott Park

81

0                  100’              200’                              400’

1”  =  200’

Page 82: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

East Parking Lot and Playground

82

Page 83: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

West Parking Lot and Sports Fields

83

Page 84: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Open Lawns and Soccer Field

84

Page 85: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Aerial of Wolcott Park

85

A

C

DB

Section A

Section B

Section C Section D

Page 86: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Aerial of Wolcott Park

86

E

F

H

G

Section E

Section FSection H

Section G

Page 87: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Aerial of Wolcott Park

87

J

I

Section J

Section I

Page 88: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Town Engineering

88

0                  100’              200’                              400’

1”  =  200’

Page 89: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

Town Wetland

89

0                  100’              200’                              400’

1”  =  200’

Page 90: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

UConn Base with Contours

90

0                  100’              200’                              400’

1”  =  200’

Page 91: Wolcott Park Master Plan - WordPress.com · updated Master Plan for the park. •Coordinate the work efforts of town officials (Helen and Mark), town staff, consultants and the public

UConn Base with Trees and Lights

91

0                  100’              200’                              400’

1”  =  200’