Work and wages
Bedaduri RamaMurthy
![Page 2: Work and weage by Bedaduri Rama Murty](https://reader036.vdocument.in/reader036/viewer/2022080909/55bebf00bb61eb1f7b8b45e3/html5/thumbnails/2.jpg)
Thanking You
![Page 3: Work and weage by Bedaduri Rama Murty](https://reader036.vdocument.in/reader036/viewer/2022080909/55bebf00bb61eb1f7b8b45e3/html5/thumbnails/3.jpg)
1) A can do a work in 6 days and B can do the same work in 5 days . The contractor for the work is Rs 220. how much shall B get if both of them work togetherAns)
B’s Share 220/(5+6)= 120/-
![Page 4: Work and weage by Bedaduri Rama Murty](https://reader036.vdocument.in/reader036/viewer/2022080909/55bebf00bb61eb1f7b8b45e3/html5/thumbnails/4.jpg)
2) A man con do a work in 10 days. With the help of a boy he can do the same work in6 days. If they get Rs 50/- for that work, what is the Share of Boy.
Ans) 10x6/(10-6) = 15 daysMan: Boy Share 15:10 3 : 250x3/5 = 30/-
![Page 5: Work and weage by Bedaduri Rama Murty](https://reader036.vdocument.in/reader036/viewer/2022080909/55bebf00bb61eb1f7b8b45e3/html5/thumbnails/5.jpg)
3) A,B and C Can do a work in6,8 and 12 days respectively. Doing that work to get together they get an amount of Rs 1300. What is the Share of B in that Amount.
Ans. Share of A:B:C 6: 8: 12 or 3 : 4 :61300x4/ (3+4+6) 1300x4/13
100x4 = 400
![Page 6: Work and weage by Bedaduri Rama Murty](https://reader036.vdocument.in/reader036/viewer/2022080909/55bebf00bb61eb1f7b8b45e3/html5/thumbnails/6.jpg)
4) A,B and C contract a work for Rs 550. together, A and B are supported to do 7/11 of the work. How much does C get?
Ans)
A and B Work 7/11 C Work (1-7/11) = 4/11 7/11 :4/11 or 7 : 4 550x4/11 or 50x4 = Rs-200/-