WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT 1 Furnishing and Furniture work 2 Civil, Paint & Polishing work Net Total Contingences : @5% Total Amount Signature with seal of the tenderer SUMMARY In words (Rs. Tender Estimate By M/s BHAWANA ENTERPRISES PVT LTD. An Enterprises of Architects, Valuers Interior Designers Page 1 of 1 Seal with Signature Authorised Signatory M/s BHAWANA ENTERPRISES PVT LTD.

Upload: lamkhuong

Post on 11-Apr-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI.

S.

No.DESCRIPTION AMOUNT

1 Furnishing and Furniture work

2 Civil, Paint & Polishing work

Net Total

Contingences : @5%

Total Amount

Signature with seal of the tenderer

SUMMARY

In words (Rs.

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 1 of 1

Seal with Signature

Authorised Signatory

M/s BHAWANA ENTERPRISES PVT LTD.

Page 2: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

S.NO Particulars Qty Unit Unit

Rate

(In Rs.)

Gross Total

Amount

Furniture & Furnishing jobs - The works are to be carried out strictly as per the drawings

and designs provided. The contractor will be required to submit the PERT Chart for completing

the jobs.. This is the prestigious project and has to be carried out on fast Track basis. The time

of Completion will be the essence of this project. The costing of the commodities is based on the

CPWD/DSR 2012-14 or Market rates Analysis. The contractors will be required to get the

samples checked and approved by the consultant/Architect. The approved usage of the

materials will only be permitted, the failure, if found will lead to the either the imposition of the

penalty or the restructuring of the commodity as per the given specification. This will be the sole

prerogative of theARCHITECT/CONSULTANT FOR WHICH THE CONTRCTOR/VENDOR has no

right by whatsoever means to seek the intervention of court etc as this will be treated as the

infringement of the Articles of the Tender specifications regarding the usage of material.

Furnishing and Furniture work:

1 Low Height Storage / Base Cabinet: - This should be made in accordance with the

design provided. This comprises of 19mm Commercial board, 9 mm Commercial Ply,

molding margins of 1st class, made up of steam beach wood and the laminate of 1mm

thickness. The basic frame is to be made up of 19mm Board, while the back portion of

the cabinet facing the dead wall is to have 9mm thick Commercial Ply . The base

cabinet is to have Drawers of 7’’ height (or as shown in the drawing) while 16'' Deep,

these are to run on the Telescopic Channels. The lower end of the front of the

cabinet(beneath the drawers) is to have shutters of 19mm thick block Board. The

height of these being not less than 18’’.(or as shown in the drawing) in the front. The

inside portion having a depth of 16’’, should have provision of adjustable horizontal

Partition, made up of 19mm block board. Internal portions should be finished by

adhering 0.8mm thick Laminate of approved Color. The rates include proper composite

finishing of the commodity

56 sqft

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 1 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 3: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

as per the design specifications provided which includes all the materials requisites

required in the fabrication of the commodity. The rates to be quoted will be applicable

on the measurement of the front surface area of the commodity (length x height).

Measurement of the commodity

L D H (in inches)

178’’ 18” 30”

Poly Urethane /Melamine polish on the beading/margins/moldings must be provided.

Providing Carpentry assistance in the fabrication/electrical wiring in the cabinet are

the part of works, while fabricating this commodity. The storage Cabinet is to be

provided with proper lock & Key arrangement, 4’’ SS Handles etc. The complete work is

to be done to the complete satisfaction of the architect /Consultant.

2 Full Height Cabinet: - P/F of Full Height Storage as shown in the Design/Detailed

Drawing(fig.1). This is to be made up of 19 mm thick ply of approved make and

conforming to marine grade specification .. This should have 9 mm Ply at the back (The

Area facing the dead wall) . Provision for internal Divider with in the storage unit are to

be made by using 19mm thick ply of approved made. The Height of the storage unit

should not be less than 7’ from the ground level. All the Hardware such as 6” Handles

,Tower bolt , Latches, Magnet catcher, Locks etc should be of SS Finish . The exposed

external surfaces of the cabinet will be finished by 1mm thick Laminate of approved

make color /shade while the internal surfaces will be finished by using 0.8mm thick

laminate of approved made. All the works are to be finished to the satisfaction of the

Architect/Consultant. The mode of measurement will be done by calculating the front

finished surface area ( width x height)

148.00 Sqft

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 2 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 4: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

3 Low height Partitions:- Providing and fixing partition framing shall consist of Heavy

duty Aluminium Box Sections 50mm x 50mm @ 600mm c/c both ways Horizontally

and Vertically. The vertical alternate frames to be fixed to the ceiling with necessary

fixtures. The framing shall be finished with 8 mm thk. Commercial ply on both side and

finished with 1.00 mm thk. Laminate / Vineer finished with melamine polish. The

shade of laminate / vineer and polishing finish to be got approved from Bank /

Architect. The skirting should be as per approved laminate as per drawing and

direction. Rate shall be inclusive of necessary hardware items, etc. Complete. The edge

beadings with steam beach wood should be finished with melamine.

220 Sqft

Specification same as per above but of low ht as per the drawing. A 70mm x 15mm

steam beach moulding with champhered edge is to be provided on all external edges &

finished in mellamine as per details. Providing and Fixing inserted Soft board / White

boards / Glass maintaining the vertical surface lines and no extra measurements would

be taken for the soft boards / white boards / Glass.

4 Full Height Solid Partition: - Providing and fixing partition framing shall consist of

Heavy duty Aluminium Box Sections 50mm x 50mm @ 600mm c/c both ways

Horizontally and Vertically. The vertical alternate frames to be fixed to the ceiling with

necessary fixtures. The framing shall be finished with 8 mm thk. Commercial ply on

both side and finished with 1.00 mm thk. Laminate / Vineer finished with melamine

polish. The shade of laminate / vineer and polishing finish to be got approved from

Bank / Architect. The skirting should be as per approved laminate as per drawing and

direction. Rate shall be inclusive of necessary hardware items, etc. Complete. The edge

beadings with steam beach wood should be finished with melamine.

410.00 Sqft

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 3 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 5: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

5 Partly Glazed Partition: -Providing and fixing partition framing shall consist of Heavy

duty Aluminium Box Sections 50mm x 50mm @ 600mm c/c both ways Horizontally

and Vertically. The vertical alternate frames to be fixed to the ceiling with necessary

fixtures. The framing shall be finished with 8 mm thk. Commercial ply on both side and

finished with 1.00 mm thk. Laminate / Vineer finished with melamine polish. The

shade of laminate / vineer and polishing finish to be got approved from Bank /

Architect. The skirting should be as per approved laminate as per drawing and

direction. Rate shall be inclusive of necessary hardware items, etc. Complete. The edge

beadings with steam beach wood should be finished with melamine.

0 Sqft

Specification same as 3 above except for 8mm approved make clear float glass shall be

provided above 2’-6” from ffl or as advised by architect with necessary steam beach

moulding finished with melamine. The rate shall include necessary etching film /

LOGO.

Table (4' x 2') : - The basic ingredients of this commodity are 19mm block Board, 9mm

Ply, confirming to t basic formulation of Termite resistant CPU Trolley running on the

wheels, Keyboard Tray running on Telescopic Channels, SS finish Hardware’s (Make

Ozone/Hettich/Ebco/Godrej) such as locks , Handles, Hinges, Magnet catchers etc,

1mm thick Laminate on the outer surface & 0.8mm thick laminate in the internal

hidden areas, beadings of steam beach etc . As shown in the design and made to

understand the basic frame of this Unit is to be made up of 19mm Board. Modesty

Panel of 18’’x 24’’x 30’’. It is to have 2 drawers & 1 shutter. The drawers as shown in

the design should run on the telescopic channels. The Customer end of the Table

should be Blocked by using 19 mm Board. The exposed portion of the customer end is

blocked by converging it by almost 9’’ From the Top of the rear end of the Table at that

end. The entire exposed area is to be made up of 19mm Board.

2 Nso

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 4 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 6: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

Branch Manager Table (6'x 2'6") : - As shown in the design basic formulation

resembles the cash counter, the significant difference being the absence of MS sheet

the base cabinet is to have 2 drawers & 1 shutter. Composition of Hardware etc is the

same as that mentioned in base cabinet etc. The rates include finishing the work as per

the design given and to the complete satisfaction of the architect/Consultant.

Measurement of the commodity

L D H (in inches)

72” 30” to 32” 30”

1 No

7 SWO Counter/front counter: - This should be made in accordance with the design

provided. This comprises of 19mm board, 6mm W.P Ply , molding margins of 1st class

made up of steam beach wood and the laminate of 1mm thickness. Inside portion

should be painted properly after making proper base. The rates include proper

composite finishing of the commodity as per the design specifications provided which

includes all the materials requisites required in the fabrication of the commodity. The

counter comprises of 1 base cabinet measuring 18” x 24” x 30”(in inches).The base

cabinet in this case has 2 drawers of 7 inches each running on telescopic channels

while the shutter hanging on Earl Bihari hinge. Hardware made up of SS Like Hinges,

4’’ Handles, Locks of Godrej etc are to be provided .The counter top is laid on the base

cabinets at a height of 30 inches from floor level .The width of the counter top rangers

from 27 inches to 30 inches, as recommended by the architect. Footrest, space for UPS,

provision of necessary hardware etc. are the part to be kept in mind while fabricating

the counter. Melamine polish is to be provided on the moldings/margins, beadings etc.

while Enamel paint of the OFF- white color is to be provided in the inner parts of the

base cabinet. . The rates to be quoted are inclusive of labor charges and all the

materials requisite involved in the fabrication of the commodity as per the design given

and to the satisfaction of the architect.

13.00 Rft

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 5 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 7: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

Measurement of the commodity

L D H (in inches)

103” 40 t0 42” 58”

Measurement of the counter would be done along its linear length from one edge to the

other edge

8 Cash cabin Partition: Front Partition: - The specification is similar to that of the half

height partition. The significant difference is that the front part of the partition will be

having 12” thick block to give 18” wide counter top at the height of 46” from the ground

level. This top is to have 19mm thick telephonic black granite or as suggested by the

Architect, laid on it, having double molding on its edges. The area above the counter

top will be having a clear slit of 3”above which there will be 10mm thick plain float

glass having etching work on it. The rates include the fixing charges of the partition

and finishing the work as per the design given and to the complete satisfaction of the

architect/Consultant. The Height of the Partition from the Ground Level will be 84’’

inch.

289 Sq.ft.

• Side /Back Partition:- As Shown in the drawing the side partition is to have opaque

solid partition till the height of 46” from the ground level. It is to have 10mm plain float

glass with a slit of6” Das shown in Drawing, adhered to partition as shown in the

design. The back Partition are made same as side Partition except that no glass and slit

are provided in the Back Partition , in other words they areopaque or made as Solid

Partition. The W.P & Termite resistant Flush doors of 35 mm thickness with their

respective door frames are to be included in the quoted rates. Hard wares like Godrej

Night latch lock /door closers /Mortise locks /handles /door stoppers /latches etc are

to be provided with the respective doors. The rates include the Melamine Polish on the

wooden sections, fixing charges of the partition and finishing the work as per the

design given and to the complete satisfaction of the architect/Consultant. The Height of

the Partition from the Ground Level will be 84’’ inch.

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 6 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 8: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

9 Cash Counter: - The Linear length of the front running cash counter is to be divided

in two Compartments, As shown the base unit of each cash counter compartment is to

have 3 drawers of equal size running on telescopic channels & having individual

locking system. Each drawer should have a proper segregation in its internal part made

up of 12mm ply. These segregated areas are used for keeping different types of

currency. The back part of the drawer should have MS Sheet of 6 mm thick adhered for

safety & sandwiched in a manner to be invisible with the naked eye. Providing footrest,

keyboard tray running on telescopic channels, CPU Trolley etc is part of the fabrication.

The exposed areas of this module are required to have 1mm thick laminate adhered to

it , as shown in the Drawing.. The rates include fixing of Hardware Margin ,Molding,

Beading etc made up of 1st class Steam beach wood. Painting on internal portion of

the module by using enamel paint Melamine polish on Margin, Molding , Beading etc

finishing the work as per the design given and to the complete satisfaction of the

architect/Consultant.

Measurement of the commodity

L D H (in inches).

48” 24” to 27” 30”

9.6 Rft

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 7 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 9: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

10 Server Counter: - The basic composition of Server counter resembles to that of the

table. Having linear length of 4'. The base cabinet of this module will be of

18"x24"x30".This will be made up of 19mm Block board. Two Drawers running on the

Telescopic channels (Make Ozone/Hettich/Ebco) and one shutter hanging on Earl

bihari Hinges with internal adjustable portion (made up of 19mm Block board) will be

the basic formulation of the module . A 19mm Block board of the size 4'x2' will than be

laid on this base cabinet. The one and of this module will have base cabinet While the

other one will have 19mm Block board .The customer and of this module will be closed

by using 19mm block board. One Key board, CPU Trolley, providing Hardware, wire

manger, etc are the part of the work. internal portion of this module will be painted by

using enamel paint of approved shade/colour. While the margin, Beading etc made up

of 1st class Steam beach wood will be required to have melamine polish on them. The

complete work is to be done as per the satisfaction of the Architect/Consultant.

Measurement of the commodity

L D H (in inches).

48” 24” 30”

4 Rft

11 Paneling: - It is done by using 1”x1” thick Kail wood webbed horizontally & vertically in

a manner to give square of 24” x 24” along the said sections. A 9mm ply will then be

affixed on it & then 1mm laminate to cover the ply along the said pattern. The margins,

moldings, beadings etc. will have to be of 1st quality made out of steam Beachwood.

Melamine polish shall be provided on the margins, moldings, beadings etc. The rates

include finishing the work as per the design given and to the complete satisfaction of

the architect/Consultant.

566 sqft

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 8 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 10: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

12 Paneling in ATM - The walls in the ATM are to be covered by Paneeling. This Panelling

will be carried out by using 1X1inch Tubular sections made up of Aluminium having

required thickness. These are webbed as per the design given and required by the

Architect. These Compressed Flat extruded Aluminium strip is thanpressedonthese

sections with the helpof Cleats,screws etc. The gaps between the joints are filled with

the Silicon Transparent or coloured sealer.This entire work is to be carried out as per

the specification,as mentioned in the respective manuals of the reputed makes and to

the entiresatisfaction of he Architect.

320 Sq.ft

13 Side Tables: As shown in the design basic formulation resembles that of the Tables,

the significant difference being the change in the Top Board of the Table. Modesty Panel

is to have 2 drawers & 1 shutter./ provision of sliding shutters running on the SS, U

Channel etc. The rates include finishing the work as per the design given and to the

complete satisfaction of the architect/Consultant. Providing Carpentry assistance in

the fabrication/electrical wiring are the part of works while fabricating this commodity

Measurement of the commodity

L D H (in inches).

42” 18” 30”

1 Nos.

14 Notice Board :P/f of Notice Board made up of 19mm Block Board of the size as shown

in the drawing . This Block Board should have 9mm Commercial ply facing the dead

and of the wall . Pin Board of the required size is then adhered on the 12mm

Commercial ply. This pin Board is then covered by using the velvet cloth of approved

color (Basic cost @175 Rs /mtrs).The Exposed surfaces of the frame made up of 19mm

Block Board are covered by using 12mm thick steam Beach wood margin.Provision of

sliding glass with the help of U channels is to be made in the Notice Board 1.5”x1.5”

Tapper Beading , Locking arrangement, Providing of melamine polish on the beading

etc are the part of works. Complete work is to be finished as per the

instruction/Drawings provided by the Architect.

1 Nos

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 9 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 11: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

15 False Ceiling Work:- Plain Gypsum Board Ceiling (India Gypsum make/ST GOBAIN): -

Gypsum Ceiling: - Providing and fixing false ceiling at all height including providing

and fixing of frame work made of special sections, power pressed from M.S. sheets and

galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277 and

360 sqft

consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm

and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash

fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the

angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size

and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm

running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5

mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of

10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I.

intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long

G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm

high having flanges of 20 mm and 30 mm long,

the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm

centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum

board to ceiling section and perimeter channel with the help of dry wall screws of size

3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered

and square edges of the board with recommended jointing compound , jointing tapes ,

finishing with jointing compound in 3 layers covering upto 150 mm on both sides of

joint and two coats of primer suitable for board, all as per manufacturer's specification

and also including the cost of making openings for light fittings, grills, diffusers,

cutouts made with frame of perimeter channels suitably fixed, all complete as per

drawings, specification and direction of the Engineer in Charge but excluding the cost

of painting with :12.5 mm thick tapered edge gypsum fire resistant board conforming to

IS: 2095- Part I

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 10 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 12: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

•Modular Grid Ceiling (Arm Strong Ceiling/ST GOBAIN) : - Providing and Fixing 15 mm

thick densifiedtegular edged eco friendly light weight calcium silicate false ceiling tiles

of approved texture spintone/cosmos / Hexa or equivalent of size 595 x 595 mm in true

horizontal level, suspended on inter locking metal grid of hot dipped galvanised steel

sections (galvanising @ 120 grams per sqm including both side) consisting of main 'T'

runner suitably spaced at joints to get required length and of size 24x38 mm made from

0.33 mm thick (minimum) sheet, spaced 1200 mm centre to centre, and cross "T" of

size 24x28 mm made out of 0.33 mm (Minimum) sheet, 1200 mm long spaced between

main'T' at 600 mm centre to centre to form a grid of 1200x600 mm and secondary cross

'T' of length 600 mm and size 24 x28 mm made of 0.33 mm thick (Minimum) sheet to be

inter locked at middle of the 1200x 600 mm panel to from grid of size 600x600 mm,

resting on periphery walls /partitions on a Perimeter wall angle pre-coated steel of size

(24x24X3000 mm made of 0.40 mm thick (minimum) sheet with the help of rawl plugs

at 450 mm centre to centre with 25 mm long dry wall screws @ 230 mm interval and

laying 15 mm thick densified edgescalicum silicate ceiling tiles of approved texture

(Spintone / Cosmos/hexa) in the grid, including, cutting/ making opening for services

like diffusers, grills, light fittings, fixtures, smoke detectors etc., wherever required. >

85%,non - combustible as per B.S. 476 part IV, 100% humidity resistance and also

having thermal conductivity <0.043 w/m 0 KC.Complete work is to be finished as per

the instruction/Drawings provided by the Architect.

914 sqft

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 11 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 13: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

Main 'T' runners to be suspended from ceiling using G.I. slotted cleats of size

25x35x1.6 mm fixed to ceiling with 12.5 mm dia and 50 mm long dash fasteners, 4 mm

G.I. adjustable rods with galvanised steel level clips of size 85 x 30 x 0.8 mm, spaced at

1200 mm centre to centre along main 'T' , bottom exposed with 24 mm of all T-sections

shall be pre-painted with polyster baked paint, for all heights, as per specifications,

drawings and as directed by engineer-in-charge. Note :- Only calcium silicate false

ceiling area will be measured from wall to wall. No deduction shall be made for exposed

frames/opening (cut outs) having area less than 0.30 sqm.The calcium silicate ceiling

tile shall have NRC value of 0.50 (Minimum), light reflection

16 FRONT GLAZING ENTRANCE ;- P/f of the entrance Door made up of 2 ½ x 1 ½

Powder Coated (50 Microns) Aluminum Door Section (Make of Jindal, Hindalco

Eqvivalent) with Heavy Duty Floor Spring Machine. The Powder coated section is to be

used while framing the Door while 2 ½ x 1 ½ sections are to be used in fixed Glazing

Area. Plain Glass of 6 mm thickness with The Proper etching and the Bank logo are the

Part of the work. The Door should be provided with the fur lining to not leave the air

gap when in closed position. A good quality of rubber is to be used along with the

beading in the framing of the front door. Hardware like 18’’ Long handles, door lock etc

of reputed make such as that of Door set or equivalent are the part of the work. These

works are to be done as per DSR 2012,

286 Sqft

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 12 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 14: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

21.1 Providing and fixing aluminum work for doors, windows, ventilators and partitions

with extruded built up standard tubular sections/appropriate Z sections and other

sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash

fasteners of required dia and size, including necessary filling up the gaps adjunctions,

i.e. at top, bottom and sides with required EPDM rubberneoprene gasket etc.

Aluminum sections shall be smooth, rust free, straight, mitred and jointed

mechanically wherever required including cleat angle, Aluminum snap beading for

glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural

drawings and the directions of Architect/ Engineer-in-charge.

21.1.1.2 Powder coated aluminum (minimum thickness of powder

coating 50 micron) kg 387.60

17 Chairs:-

Visitors chair as per approved Godrej make .

3 nos

OFFICER'S chair as per approved Godrej make . 8 nos

B.M chair as per approved Godrej make . 1 nos

18 Sofa (3 Seater): - Providing Soaf sets in MS, with arm rest, legs and supportin heavy

quality material in Chomimum plated solid finish. Seats and back made of single

perofrated MS sheet (16 SWG).The rates include finishing the work as per the design

given and to the complete satisfaction of the architect/Consultant.

1 Nos.

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 13 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 15: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

19 Sofa (2 Seater): - The sofas as per the design shown should be made of Hollock wood

or of Teak wood frame, having 20”thick cushions of 40 density PU Foam on the seat &

back. The springs of sofa should be of good elasticity, while the coir and the jute should

form the basic of the cushions. Scotch guard velvet/tapestry of approved colour and

shade in a peculiar fashion would form the integral form of the design.12” thick on the

back. 2 Seater Sofa

The rates include finishing the work as per the design given and to the complete

satisfaction of the architect/Consultant.

0 Nos.

20 Cheque Drop Box/Writing table:- This will be made up of 12mm thick Commercial

ply , 19 mm board, 10mm thick beveled glass in a manner so that the top portion

when segregated forms 3 compartments of 4” x 4” x 6” size to accommodate Cheque

leaf lets/vouchers and the adjacent 1.5” horizontal block board having granite on top

with all the required moldings to act like a writing stand while the lower part of this

section to act as a Cheque drop box. The composite size of this commodity will be 48”

from floor level to the top edge.The rates include finishing the work as per the design

given and to the complete satisfaction of the architect/Consultant.

1 nos.

21 FULLY GLAZED PARTITION - WITH TOUGHENED GLASS

USING OZONE / HETTICH / GODREJ MAKE FITTINGS 0 Sqft

Providing and fixing of Fixed Glass partition with 10mm thick toughened glass using

Standard fittings of above - mentioned makes at the top and grouting at the bottom

with U - Shaped Aluminium rails and EPDM gaskets including cutting, making holes in

glass and fixing the fittings in floors, false ceiling etc. and making the same good with

necessary screw, sealent wherever required. The top fittings to be fitted to the Wooden

section fixed above the Gypsum board in the level of GI channels of False ceiling. All

the works Complete, While Providing furlining wherever neccesary , 18" SS Handles

and other required Hardware.(Make Godrej/Ebco)

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 14 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 16: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

23 MIRRORS IN TOILETS 2 Nos

24 DRESSING MIRROR FOR LOCKER ROOM 0 Nos

Providing and fixing dressing table made out of mirror of size 1' 6" x 3' 0" using 12mm

thk. Comm. Ply with 6mm thk. clear Mirror fixed on the wall & tray of size 1'6"x1'6"

with one drawer for cosmetics. (Measurement is measured only for mirror)

26 KEY BOX 1 Nos

27 BOXING FOR ROLLING SHUTTER

WITH LAMINATE FINISH 132 sqft

Providing & fixing ¾” BWR ply boxing for the rolling shutters. Necessary wooden

framing shall be provided. The boxing shall be finished on all exposed sides by 1mm

laminate and internally with enamel paint.

Note : rate shall include all necessary hardware fittings, etc.

28 TRAP DOOR FOR ROLLING SHUTTERS WITH LAMINATE

Providing and fixing 6mm thk. of approved make clear mirror (First Quality) on 12mm

thk. Marine ply. Mirror shall have a frame of 25mm x 25mm steam beach wooden

Providing and fixing key box of size 1' 6"x1' 6"x 6" with all sides and back with 18mm

thick comm. Ply wood and lockable glass shutters in 18mm ply , with 5 mm glass.

Necessary hooks to be provided inside the box. All exposed areas and inside to be

finished with 1 mm thick laminate of approved shade. The edges of shutter and box to

be lipped with steam beach beeding polished with melamine. Rate shall be inclusive of

all necessary approved fittings like hinges, locks, hooks etc. and any necessary

hardware items.

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 15 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 17: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI, MUMBAI.

Providing and fixing trap doors consisting of 1/2” thk. comm. ply shutters with a clear

opening of 4.5" opening for smooth operation of shutters and rest is closed with mirror

screws (for opening for servicing). The shutters shall be finished with approved 1mm

laminate, frame of 2” x 1 ½” wood sections shall be provided for proper support and

strength. Rate shall be inclusive of necessary fittings like hinges of approved make

make), ball catches, tower bolts, etc.

66.00 sqft

29 VERTICAL BLINDS WITH SCOTCH GUARD

Providing & fixing in place 100 mm. Vertical blinds of approved make, quality and color

shade & pattern. Rate shall include necessary scotch guard treatment on both sides.

The overlaps should be uniform & adequate. Basic Price (@120/Sqft)

0 sqft

30 3M SYNTHETIC DOOR MATS (4'-0" x 2'-0") 1 Nos

Providing & laying in place Synthetic Door Mats (3M) of sizes not less that 4' x 2').

Total for Furnishing works (In Rs)

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 16 of 16

Seal Signature

Authorised Signatury

M/sBHAWANA ENTERPRISES PVT LTD..

Page 18: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI , MUMBAI.

Particulas Qty Unit Rate per Total Amount

Unit {In Rs}

.Civil, Paint & Polishing work:

1 Plastic paint on Gypsum Ceiling :- This is to be done after doing

the proper filling of the joints in the ceiling of gypsum board,

scrubbing the unwanted layers of gypsum compound etc to attain

the uniform base & then applying 2 coats of primer on the same.

Also plastic paint done as per the specification provided by the

reputed makes like the Nerolac paints, Asian etc. are to be followed.

The shade/color/pattern are to be approved prior to the works by

the Architect/consultant.

360 sqft

2 Lustre paint on walls and roofs:- Providing & applying Luster

Paint on walls, columns & ceilings. The rate shall include

scrapping, levelling & preparing the surface. Primer coat +

(minimum) 3 coats to get evenly spread quality finish (roller finish)

of approved make, quality & shade shall be provided.

3690 sqft

3 Enamel Paint:- It is to be done as per the specification provided by

the reputed makes like Asian ,Nerolac etc. is to be provided on all

the window Grills, Shutters, Channel gates, Strong Room gate etc.

200 sqft.

S.N

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 1 of 6

Seal with Signature

Authorised Signatory

M/s BHAWANA ENTERPRISES PVY LTD..

Page 19: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI , MUMBAI.

4 PANTRY PLATFORM IN JET BLACK (WITH SINK & COCK) :-

Providing and laying platform of 2’-0” width (clear) and at 2’-8”

height (top) above FFL of approved 20 mm thick granite with bull

nosed edges. It shall be supported on RCC slab with vertical brick

wall supports. A 2” granite facia should be provided below the bull

nosed edge of granite platform. Rate shall be inclusive of making

cutouts and polishing the edges for 18 " x 18 " S. S. Nirali sink

without drain board (medium) or equivalent make). A flexible pipe

from sink to the nahni trap shall be provided. Rate shall also

include one jaguar continental C P SWAN NECK TAP with swinging

casted spout (no. 347).

4 Rft.

5 Channel Gate: - P/f of the Channel gate made out of 6mm thick

MS flat running on the channels having all the hardware’s like

handles, provision for lock etc. complete to the satisfaction of the

architect/owner.

297 sqft.

6 Rolling Shutter :-Supplying and fixing rolling shutters of approved

make, made of required size M.S. laths, interlocked together

through their entire length and jointedtogether at the end by end

locks, mounted on specially designed pipe shaft with brackets, side

guides and arrangements for inside and outside locking with push

and pull operation complete, including the cost of providing and

fixing necessary 27.5 cm long wire springs manufactured

from high tensile steel wire of adequate strength conforming to IS:

4454 -part 1 and M.S. top cover of required thickness for rolling

shutters.(80x1.25 mm M.S. laths with 1.25 mm thick top cover)

290 sqft.

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 2 of 6

Seal with Signature

Authorised Signatory

M/s BHAWANA ENTERPRISES PVY LTD..

Page 20: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI , MUMBAI.

7 Dismantling,Stacking & Dumping - Dismantling , stacking, &

Duming of the existing Brick work (approx 1100 Sqft Area )

Furniture & Electrical Works - The old furniture items are to be

dismantled and stacked in order to make it saleable. The existing

electrical wiring & the assecories is to be removed and stacked

properly to make it saleable. The Air conditioners will be repaired, if

required and reinstalled in the Branch as per the new layout. The

vendor has to quote his charges of dismantling and stacking of the

material. The unserviceable material will be dumped as per the

norms of the Navi Mumbai Development Authority. No additional

Payments will be made on this account by the Bank.

1 Lumpsum

8 Providing II class Burnt Brick masonry in cement motar 1:6 using

fly ash bricks in super structure including striking joints racking

out joints watering and scaffolding complete.

Cement mortar 1:6 (1 cement : 6 coarse sand)

6.9 Cum

9 Providing II Class BURNT Brick masonary in cement motar 1:4

using fly ash bricks in half thick wall including mild steel

longitudinal reinforcement of two bars of 6mm dia meter / two

hoop iron strips 25mmx 1.6 mm at every III course properly bend

and bounded at ends scaffolding racking out joints and watering

complete.

0 Sq.mtrs

10 CEMENT PLASTER (IN COARSE SAND)

20 mm cement plaster of mix :

1:6 (1 cement: 6 coarse sand)

45 Sq.mtrs

11 Neat cement punning. 0 Sq.mtrs

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 3 of 6

Seal with Signature

Authorised Signatory

M/s BHAWANA ENTERPRISES PVY LTD..

Page 21: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI , MUMBAI.

12 Providing and fixing of WC Sheet and wash basin with ready to

use condition for One each WC For HE & SHE: -. The works

include Trespassing of electrical conduits, Fitting of cistern, sheets

etc. GI Pipes of sizes 19mm, 25mm, 75 mm required for

distribution of water from the water Tank, to Taps. Providing water

proofing works in the Area of Bathroom by applying epoxy coating

on the water proofing course done on the base, Laying of 4" PVC

Waste Pipes from the Respective WC TO the main waste line, Fixing

of DADO 12" X 12" on walls upto 7ft height and antiskid Tiles of

12" x 12 " on floor. Providing and installing of wall hung European

WC ( BASIC COST OF Rs 9500.00 ) with Jet Spray, One urinal with

water flushing system enveloped by one vertical granite,with

polished moulded edges, a compartment of 3.5' height acting as a

seprator to the urinal is to be provided in HE Toilet.

1 lumsum

A design modal of wall hung having pedestrial shape ( basic cost Rs

12000.00 )is to be provided in SHE Toilet along with Jet Spray .

Providing Nahani Trap, Soap Dispenser, Paper Holder,roob hooks,

swan neck Cocks and wash basin ( 3 Nos ) embeeded in granite (

basic cost of wash basin Rs 3500.00) , The wash basins to have SS

Made Swan necked cock basic cost (Rs 900.00 with Looking mirrors

of 3ft x 2 ft are other important but not limited to give an elegant &

complete, ready to use WC. The entire job is to be carried to the

perfect satisfaction of the Architect /Consultant .

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 4 of 6

Seal with Signature

Authorised Signatory

M/s BHAWANA ENTERPRISES PVY LTD..

Page 22: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI , MUMBAI.

13 Vitrified Tiles Of Matching Floor TILE color in Branch --

Providing and laying vitrified floor tiles in different sizes (thickness

to be specified by the manufacturer) with water absorption less

than 0.08% and conforming to IS : 15622, of approved make, in all

colours and shades, laid on 20mm thick cement mortar 1:4 (1

cement : 4 coarse sand), including grouting the joints with white

/matching colored cement and matching pigments etc., complete.

OR Providing epoxy based 3 component metallic based screed

composition for Extra Heavy duty vehicles using 25- 50 Bags per

Sq.mtrs of Hardner are used to produce effective flooring surface

having a verstaile abrasion resistance and long life.Themake of

Ironite or equvialent as approved by the Architect can be used on

the clean surface of the green concrete. Tile Size -600 mmx 600

mm

70 Sq.mtrs

14 Providing and fixing factory made uPVC door frame made of uPVC

extruded sections having an overall dimension as below (tolerance

±1mm), with wall thickness 2.0 mm (± 0.2 mm), corners of the door

frame to be Jointed with galvanized brackets and stainless steel

screws, joints mitred and Plastic welded. The hinge side vertical of

the frames reinforced by galvanized M.S. tube of size 19 X 19 mm

and 1mm (± 0.1 mm) wall thickness and 3 nos. stainless steel

hinges fixed to the frame complete as per manufacturer’s

specification and direction of Architect/ Engineer- in-charge.

Extruded section profile size 48x40 mm

10.5 Rmtr.

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 5 of 6

Seal with Signature

Authorised Signatory

M/s BHAWANA ENTERPRISES PVY LTD..

Page 23: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

WORK ESTIMATE FOR SANPADA BRANCH , BOI , MUMBAI.

15 25 mm thick PVC flush door shutters made out of a one piece Multi

chamber extruded PVC section of the size of 762 mm X 25 mm or

less as per requirement with an average wall thickness of 1 mm (±

0.3 mm). PVC foam end cap of size 23x10 mm are provided on both

vertical edges to ensure the overall thickness of 25 mm. M.S. tube

having dimensions 19 mm x 19 mm and 1.0 mm (± 0.1 mm) is

inserted along the hinge side of the door. Core of the door shutter

should be filled with High Density Polyurethane foam. The Top &

Bottom edges of the shutter are covered with an end-cap of the size

25 mm X 11 mm. Door shutter shall be reinforced with special

polymeric reinforcements as per manufacturer’s specification and

direction of Engineer-in-charge to take up necessary hardware and

fixtures. Stickers indicating the locations of hardware will be

pasted at appropriate places

3.65 Sq.mtrs

TOTAL COST OF CIVIL WORKS Rs

Tender Estimate By

M/s BHAWANA ENTERPRISES PVT LTD.

An Enterprises of Architects, Valuers Interior Designers Page 6 of 6

Seal with Signature

Authorised Signatory

M/s BHAWANA ENTERPRISES PVY LTD..

Page 24: WORK ESTIMATE FOR SANPADA BRANCH , BOI… B IF… ·  · 2017-12-07WORK ESTIMATE FOR SANPADA BRANCH , BOI,MUMBAI. S. No. DESCRIPTION AMOUNT ... ,Tower bolt , Latches, ... the significant

14'-7

1

2"10'

STRONG

ROOM

G.W.C

L.W.C

7'-8"

3'-6"

6'-5"

4'

13'-9"

4'

2'-1

1"

46'-5

1

2"

37'-4"

24'-8"

13'-5

"

UPS ROOM

2'-6"

2'-6"

2'-6"

3'-9"

OTHER PROPERTY

PANTRY

CASHIER 1CASHIER 2

5'

4'

DRAWN BY:

TITLE:NOTES:

DRG.NO.:

PROJECT:

DATE REVISIONS

DWG.01

REVISIONS:

NORTH

ALL DIMENSIONS MUST BE CHECKED AND CORRELATED WITH

THE SITE MEASUREMENTS AND ANY AMBIGUITY MUST BE

IMMEDIATELY BROUGHT TO THE NOTICE OF THE ARCHITECTS

BEFORE COMMENCEMENT OF THE WORK.

ALL DIMENSIONS ON DRAWING TO BE READ AND NOT TO BE

MEASURED,ALL DIMENSIONS ARE PER SITE

DATE:

CHECKED BY:

PROJECT - Proposed plan

1.

Consultant - M/s Bhawana

Enterprises Pvt Ltd.

Scale - Actual.

Date - 11.7.2017.

PROPOSED LAYOUT

PLAN OF BOI,

SANPADA BRANCH.

06.06.2017

Interior Furnishing Plan

E

S

W

N

GROUND FLOOR

Assit Arc Sayali Thakur.

Project Manager

11.07.2017

B.M

C

AB

IN

ENTRANCE

2'-6"

9'-6"

7'

7'-3

"

12'-4"

E- LOBBY

24'-9

"

BANKING

AREA

STORAGE

L.H

. C

AB

IN

ET

SERVER

23.06.2017

3'-6"

7'-3"

6'

6'

OF

FIC

ER

SW

OS

WO

SW

OO

FF

IC

ER

15'

4'

5'-7"

28.06.2017

5'-5

"

3'-1"

6'-8"

3'-5"

4'-2

"

OFFICER

7'-5"

7'-5"

4'-5"

4'-1"

6'

1'-6"

4'

30.06.2017

5'-1"

7'-2

1 4"

10'-8

1

2"

4'-7

1

2"

9'-5"

1'

1'-10"

1'-10"

3'-9"

E- LOBBY

collapsible

door

3'-6"

3'

1'-8"

6"

9"

9"

11'-7"

6"