20
IS:ST 20. S2 add RECEIVED^ APR 2 5 2003 GEOSCIENCE ASSESSMENT FKorA Assessment Report For Claim 1077384 1229663 Client: 393100 - 946606 Ontario Limited April 212003 31D09NW2022 2.25467 HARVEY 010 20 BDtfd UI9262S0Z. E003/S2/170

Upload: trantu

Post on 14-May-2018

213 views

Category:

Documents


1 download

TRANSCRIPT

IS:ST 20. S2 add

RECEIVED^

APR 2 5 2003GEOSCIENCE ASSESSMENT

FKorA Assessment Report For Claim

10773841229663

Client: 393100 - 946606 Ontario Limited April 212003

31D09NW2022 2.25467 HARVEY 010

20 BDtfd UI9262S0Z. E003/S2/170

04/25/2803 15:21 705292B171 PAGE 03

Contents

1. Overview

2. (Section 9)

3. Physical Work (Section 10)

4. Product Potential

5. Daily Production Report For MarathonDrilling Log. (section 16)

6. Map - R2

7. Time Sheets

8. Foot notes

EXTRfl PPGE. 001

Overview

This assessment report was based on the (section) 16 of Requirements of Prospecting

Submissions for Assessment Credit.

In this report it is are intent to do Diamond Drilling on Claim # 122963. We will be drilling to a depth greater than 45" in hopes to find materials other than limestone.

The drilling was done by Marathon Drilling of Ottawa. Drill core stored at Rigbe's head office.

Rigbe's sent two men John Reid and Peter Howland to cut grid lines to enable the drilling crew to locate their holes. The drill hole log by Mike Tomlinson provided.

EXTRfl PflGE. 002

Assessment Credit Section 9

Description:

Intent:Harvey township is rich in mineral deposits such as Fermiculight, White Marble, Red limestoneand has the potential to show may other deposits. It is my intent lo take core samples at deeps

greater than 45' In search of other Mineral formationsOverburden:

The area that was observed was covered with a verity of trees ( White pine, Oak, Junipers, and Maple.) Minerals that were visual were limestone and red granite. Minimal amounts oftopsoil.O"-6"

Wildlife:There was no distictive wildlife notice at the time of work.

Terrain Covered:The walk to reach the area was approx 3 hours covering 6 kilometers. Walking North on the Harvey Twp. road allowance. At the end of the trial we turned West and walk for 15 minutes

through brush.

Water:To the west I km the Mississauga river runs

Time A Cost:Time was 5 days with a cost of S12000.00

Date Preformed:April 14 to 19

Person How Preformed Work:John Reed Rigbes employee

Peter Bowland Rigbes employee Marathon Drilling CO.LT

EXTRfl PflGE. 003 ouwiaiiu jtvigocs employee

Marathon Drilling CO.LT

flPR 25 '03 15=22 7052926171 PflGE.03

134/25/2083 15:21 7052926171 PAGE 84

Physical Work lot 21 con 6 East HalfAssessment Credit

SectionlO

Grid line cutting for locating drill holes:

Equipment:Two Honda 350 ATV , two chainsaws, Drill rig supplied by Marathon.

Volume A Uses:There is 300' of core sample witch will be tested.

Equipment Used: CostHonda ATV S250 perdayChainshaw S50 perday

Operator: CostJohn Reed @S 750.00 per/weekPeter Howland @S 650.00 per/week

Report: (SeeR-1)

Map: (See R-2 )

Total Applied to Assessment from Phyisical Work S2000.00

fiPR 25 '03 15:22 7052926171 PPGE.04

04/25/2003 15:21 7052925171 PAGE 05

Product potential:

Not avalible at this time, do to time frame testing has not yet been done.

APR 25 '03 15=23 7052926171 PRGE.05

D~

w

(SLO

ro

-o s ui roU3ro en

UnOBf )**jn 1 1 fa Urmj AO, tit

Diamond Journal (to com*** m* fer snd

Drilling fof9.au S^/^S

Log diamant pr***n** (b* ** * la iauBdn.TMktemapulAcncoRl. fcx wnmt * fwtat i to It Uj, CM mnnftvrrsla fttmM l tem l low Mi *wm pwt*a.

Fid h on svay pasa a* cases

o ̂

0*4'/l V/03Co . 0-wf w Cffcme

Conje^r* d'**9*on#cr\ pf^pr^tare cu WutSK* cfopion

C 6Fcotsge-Avaxwrwo*

From/0* "rS)T

Roonjpa

Typ^iKmcha

CI a,,

;0 1,7 0.

Artongt

Mzband pu (fart, m

le *-*i [

OpofHcorl

^"^ lFlJfl

.^A f'/ffMl™ L .

CVscnptwr (Colouf. gran *z*. fertr*. mineral, aftsrsfcn, ate.)

nearnjHbn (Couteut, grarujlom^na. tuAit. nansrauic tryittiJnmkm, etc l

^dZ.y^

Ss^

dim(W/CO)

Tar laatimt autfi o ftijskw, b*Jdhg. scJBstosty. measured (ram the lor^ aw o* tw ox*.

fcomptea ae canOSHalKjuai: tetetkn actiBeai*. atntfBqBui. L'aVa at resort far ngport A Tms tootfoctlna de la qrote.

M^iuuloofan vAM* am AMd

(jo

LOJ2,

JSL

Uw Re* rental*(T d* reKr* ntM fa \* or*

Hote Mo. Forage n* .

Page No. Page n'

Ucvtnt (T-*o Ut. Oxv m Lsl Md Lao? j. CM ^efcJ* stteoptudt)

do tftqperty Nl

65L&Q-

S-L

TaH

AUso

hj(Jlv.^

N3ea csCO

en ro

ra en roLO

ro m

en m(S en

T)i? en m

ra tn

nTl -

M (Jl

(S

Ul

ro .b.

-oQ Ul t\J 03 [\J CTi

Tl IDen mQ-o

U**tf Kriter. 9 tf he Mrw-g Act tt s

Diamond Journal da Compk*. t*h tom isd

Log darrunt prtMaO tetmutt H l* cn^t* urxrfAputtCtacofd Pin tmmi ill dinite (1 rfali l m. ^TIJ niiijajummmrill Iflfiinnil l tmii t juu to friHMIpjLi.l

ra in on every psfld R*

Dif^tg Com^oy

y

0*4 W fan Co.. Owrw or

Cvrptgnia (f*^Jor^atx\ procr^lvnau truira tfoptort

Dirrwntxxiidf ta

OHM?

CotarBeiiton

7 J

fmrtKia '

Rock type

leat FcoteeeAwnernam utH

1 O^J ^ Hole di ju teraq*

Description (Calour, gran sas, teitun, mfnr^s. altmaion, ftc.)

Descrv*oo (CcxjBV. vmiomtofo, tsxtiru. rrerefeux trwtarmftnn, etc.)

OXHTot tenure* such aa (ofaScin, bt-ckfrng, scrtjtoriry, mmwirwi Irom *w Kxig utfi (X the oort. Bteirptei*! c**J*rn*jLwi: totafon. ich**toSft*, UJaHfcjfcm. L'angfe ea mewrt pu- report jtrna toogrftjctnai (it la curt**.

Ke ((y fat

t*css

(TO

C?

/OO

/M.

Hcte*. Forage n*

V

L^ottan (Tifv Lot. Con. or LEI.

1-4 or rt S L#i-

C 'a i

10-LS&

JJL

ro en

w cs csOJ

ui

IsD

o (Jl toLO rOm

T)

CDm

D ~0

WUl I-J-7

G)

" @0nta\j\ ^^™^^[^ UndwwctoUodheWr*

* Mti^rrof t^pi^fiKi* DiafTKMld JCHJITUf rja ^ r|n MortwnOwrtBTKrt Efeabnimn du Mm) IT.., wuvriwi m.IU vtfwrin M*. Una. Dnlttng forage au ^

Log dtemant pnlg Aa. Ma rfcrm*feni*uwdto94rtrin ipiirfcrKwi ^*a6tflnMdi fifWa a de !a Lg\ OM (*fl**ioo*mafltt ttrvrwrl t teff a jour te* dotM

npto*) Mf tom ind FI in on e*ery page *t*d tJcrtrfi h(M*C4t*. Ramp* CM cstsei rrptr w) tfwn uran^laln* tt ScJwpepupe tesrto fcnmtt*e* H cna^tH* •rme)*n^Ma.

AlOrYjT/l 0 ^ ' /'Z. /l/'// '"rt "r*1 1&& 1 ca**ta-

7*7^srComp*9rt*a"eij*aTflQO. propotoJB au tfcjUre (f Oftuo

Footage W*aoesrminl

frotrVDertP *?*?*9

-j•VUl M

[\J . ..CTi

^3

To/A

f? fQG(Oa

Rock type Type de raite

L,t* f A-Ai*idZ?mi'3i*'6 ~* f8*l j'T^'

^ComjWH ^J^W^^ !^?(Si) K1)B^,m9cl*,.) ™

dHftykt OLt m/Ol rf i^e iQ^t/rtCCrif UvgM ty (SignAw)

X y y AXJ /^ ^"X au*

r 9f i Q *- f C/ fi/f-i/ll^ — ^Onor^on (CcBur. grain ML*, ttr&im. mtncrala. s*sr3*on, s-\.)

Oescripton (Couteui. UfWXriufiHiliw, taadur^. rrWn^rau^ trvisformatfork, ale)

Iuhi4 f ll^Cpsll:- 1O' 1 Lvyff J^/.C/

fSinri L~*c,l.l Sa* IJ ^,'O,L-/ 4*0.

~VLS{f ftfipi.-Sf* fi C^lfi^^ . IsPt' y Zr-S

oco^yMWf^,

———— r^ v ̂ — : ——— T") —— i — 7^ —/^ * trf. 13 (^* (^Jk'tr toaSc**

'^

Aa^tMieodraati hc*mw e* BWi*

f^ Kttly&K

hot ir o~-

ooCi

H—1 00

tQ d

t gi -t?

;^^jL-

-3

K) (Jl

ro ra ra

-

Mtfi Rgteranci ND

Hols Md PtgeNo. " Fffagan* Ptgen*

h-*

5 1/y 7 (Ji^ ' MI-*

"/iT?r5UK^UII fr^tvi tot. Con. ve Ld *9d umg.) raE/rpwrvrrllcw^in, ki (nx***±n. o* Mtvl* 4b*v]OMta) (Jl

, . i ^^-, roHot*rcf t-er Z& ^

d^O -^ i'^fc' |-'^i

Nom de la prct-'ifctt

IsSJs-FrenOe

-^9^7

tKA

A

(Cirt

'S^T

fa-2. (J&

AM1^m)y-, l^lWuTWM

"r Of fetiuftv BUO) 8V fuAnlk^v bfltfd^Q, scftfaAovtfy, fTMMWM (Von VM fang sxja of (fv OD^D. OTM txsntte* de car8d6rt8*(pes : fatefon, s*tls(DS*6, s*rtfcsltai- U'evta *st mosur^ per rapfion d rrag lonojhialnal de la orette. (WAX))

T)I. CDm

-n

sOD

m

ra CD

04/25/2003 15:21 7052926171•~~.23.2BBS leSiwri 1.NUT* UKiLLir** OU WCC f fct

PAGE 09

DAILY PRODUCTION REPORT

MARATHON DRILLINGA DIVISION OF 3018*44 CANADA LTD.

^r/7/4

ZS01 DELZOTTO AVE., QLOUCBSTEfl. ONTARIO, KIT 3V6 T*!' (613) B22-0871 Fix: (813) 822^7178

Fromk*? Tb ite™?*r'll^.M* Kin mn /J9

Client job # ———

N O - fro"! To

7

m/SA/t.0*/ MAr***

•td. Aug*r* P*n. Cona*Fnjm To From TO

~3

— ——————————— 7^

Materlale ChargeableWell ScreenRiMrCapeSilioa SandHolsplug

t FT.y FT.

7l Bog(D)

7 BaB(8)Protactlwe Casing /CementShelby TubesQ no utPenetration Cone*

7 Bag(s)7

7 BflgO)7

Pleromelera 7Poly Tubing f FT.

Coreboxea ff a0t*jflfefa WCO4Diamond Bits ' 7Caning Shoes fMlac. 7

P* lar

- f?. rfo/MOfif^ Tirn* FrnmAfiflC To ftL^f*

(^ - \(fU*la. ""r"* Fropo oci2 TD 4&W

Trteenai Casing Coring RemarkaFrom To From Tb From To

o /W' ^/Q

, A

/s/^ A&jZ'* ^ ^t^A'-isafit// 1 ff •czi- r y fcj*^

ex

Client Hour* Chargeable3llWAoc**6j*reparatlon ^7r 5 Mrs.Set up Hra.Waterline/ Water hauling PT. Hre.Moving botween holes Hr*.Well Installation Hra.Packer Yeating Mrs.Standby Hra.Total OHMer* Hour* Hnt.Total HalpePB Houra Hra.Total Predudlon Houra Mrs.

MatoriaUt Lost ^ Bpotain 7 Left In h o 1 a

Special iqulpmenl Rentala Charoaable:

Additional Ramedca:

Travel F 'om - To: M) |M CH KM Q

Cllont Approval

WhltB-Cllom'a oopy

Marathon

oopy Phk-Foreman'i copy

PPR 25 '03 15=26 7052926171 PPiGE.09

04/25/2003 15:21 7052926171fiPR.33.28e3 12:4flPM MBRflTHOH DRILLING 613 822. 7176

DAILY PRODUCTION REPORT

PAGE 10NO. 131 P. 3/4

MARATHON DRILLINGA DIVISION OF 3018*1* OANADA LTD.

2601 DEUZOTTO AVE., QCOUCiSTER, ONTARIO, K1T3V8 TW: (613) 822-0871 Pax: (813) 822-717C

Location Client Nar Client Job

Hole

2.

Ajcf/tffJ

ne Mtwb#SLData/^fl*

j jj

p

c^a,HeOt

Her Ipe ner

r -A

f

•iZ ttnqtf Tin,.^i. AifLf/tolf Time"* fatV* TlfTia C^™,^:** Trt ^^

H.BtwnFnoni

0

Tb

Std. Aufl*r*From Tb

Atn. Cone*From T6

Materials ChargeableWell ScreenRkttr

FT.FT,

CapsSilica Sand Baa(B)Holeplug 9eg(a)ProtectiveClement

CooingBag(*)

Shelby TubesQ rout Bag(a)Penetration ConesPlBzomsteriPoly TubingCoreboxBs ft mvej eettd

FT.

VAXfDiamond BitsCasing ShoesMisc.

TttoonM CarinaFrom

CI

Tb From Ib

Coring RemarksFram To

O /op' AM

lent Houri ChargeableSlte/Aocess Preparation Hrs,Setup Hre.Waterline/ Water hauling FT. Hre.Moving between holesWell InstallationPacker TaringStandbyTotal Drlllere HouraTotal Helper* Houra

Hrs.Hre.Hre.Hw.Hnj.Hrs.

Total Production Houra H ra.

Material*: Loat /Broken 1 Left In hole

Special Equipment Rental* Chargeable:

Additional Remerke:

Travel From: To; Mile* 0 KM Q

Client Approval

cilent's copy

Marathon Representative

oopy PlnkcForamen's copy

flPR 25 '03 15:26 7052926171 PPGE.10

04/25/2003 15:21 705292G171KK.Z3.2SKB 12:.a9m nflRATHOn DRILLING 613 832 7176

PAGE 11NO.131 P.4'4

DAILY PRODUCTION REPORTMARATHON DRILLINGA DIVISION OF 3018644 CANADA LTD.

2S01 DSLZOTTO AVE., GLOUCESTER, ONTAPIO, K1T 3V6 7*l; (813) 622-0671 F*X (619) 42a-717e

ft L. f Location — ̂ f^Lfefiwi. Data fyt-ftfallon P Kl^mai f 4S^tijJ fc^Ajf}

U& Oru.

nilnnfjob* -,... - - — . Ot

HerIpe her

7^- tt/rif&tl Time From -^K Tn Zfe*r f". . ,l tMHkV f Time From &S. To ^if*

A x^^HoM H. atom BM. Augwi Pon. Con**Ne- From TB Frer* Tc From

J

TD

Matariala ChargeableWell Screen f FT.Riser f FTCaps XSilica Sand J Bag(e)Holeplug j Bafl(s)Protective Casing fC~ement f Bag(s)Shelby Tubes JGrout ~/ Bag(B)Penetration Con*vPiezometers ~/Poly Tubing / FT.Coreboxm fi *J**/ tutt^wtfDiamond BiteCasing ShoosMisc.

THoonti CNlnp Coring RemirkaFrom li From Tb From To

f

Client Hour* ChargaableSlte/AccsfikEreparatlon 2 ^ J^ Hrw,S*t up Mrs.Waterline/ Water hauling FT. Hre.Moving between holes Mrs.Well Installation Hrs.Packer Teellng Hrs.Standby Hrs.Total Driller* Hour* Hre.Total Helper* Hour* Mrs.Total Production Hour* Hre.

Materials: Loat ; iroton 7 L*fl in nol*

Special Bqulpment Rental* Chargeable:

Additional Rwmerto:

Travel From: To: Miles D KM a

Client Approval

Whlta-Cllsnt's copy oopy

Marathon Representative

PinkcForwnan's copy

flPR 25 '03 15:27 7052926171 PflGE.ll

"04/25/2003 15:21 7052926171 PAGE 12' ' l nun urvii-i-.i"v3 DJ.J oc-t. iiiw ..-.-.—

MARATHON DRILLING CO. LTD.CORPORATE MEAD OFHCB: zeoi DELZOTTO

OTTAWA. ONTARIO KIT 9V8 T*!| (819) 822-0671 F*xi (913) 622-7176

TeH nTM 1-800-869-eOMEmail: marathon B magrriB.CB

Edcndcrry AggregatesCustom Crushing St Recycling903 Kelly Blvd. April 23, 2003Bridgenorth, Ontario Invoice #04-0931KOL l HO

Attention: Mr, Mike Tomliiuou Location: Buekhorn, Ontario

Dsscriptioii af Sprvioes Extennion To supply a trackmoum CME auger l rotary f core drill unit, including an experienced two-man crew, augers, rods, casing, tools, pump and vehicle equipped with a 500 gallon water tanlc

Scope of Work;

To drill \hrec Nq coreholes to approximately 100 feet in depth at a specified location.

Drilling Ratea:

Coring of Nq coreholos: 300 feet @ J 23.00 per foot S 6,900.00Mobilization St. Demobilization: Lump Sum S 1,500.00Move-in: Lump Sum S 500.00Move-out: Lump Sum S 500.00Supply of Transportation: Lump Sum S 500.00

Agreed Total Lump Sum including GST: S 10,500.00

Terms: Net 30 daysInterest due on all overdye accounts m thi rate of 296 par month (W*per annum) Thank You For Your Prompt PaymentOST #873023191

Sirvlnj North Am*"loa Sfnca 1881

www.uarairionDMiiine.64m

RPR 25 '03 15=27 7052926171 PAGE.12

\fertiC3! HoteS

E4 C4 A1

m y

100m 4

2S

100m 3

sa

100m 2

75'

100m 1

Claim* 122963

Post3 A 100m

B 100m

J Hole 1 was in E4

l Hole 2 was in C4

? Hole 3 was in A1

c100m

500m

Post2

w ec/i'NcCompany Uftt. Rigbe's 705-292-5455 l

REVISION DESCRIPTION [ DATEDRAWN

Petef BovstendCHECKED

Mte ToniinEonENOINEER

APPROVEDMke Tcmliison

DATE

Grid Unes For Maraltxin Drilling

BYi

o*ro \PPaj

Rebadatnar

DISTRICT 9

FILE

SCALE NONE f" f5 ! j DWG NO.

JREV Ft2

DWG NO. 1

UJ

8CL

'Dnj en rvl l/i Q r-

Rin

ro o

04/25/2003 15:21

7052928171PAGE

14

RPR 25

'03 15=28

7052926171PRGE.14

04/25/2003 15:21 7052926171 PAGE 15

Foot Notes

Drill Crews:Marathon Drilling 2501 Dezotto Ave Ottawa Ontario KIT 3V6

Prospector:Mike G. Tomlinson Lie. A52196 Cli.303482

This Report Was Done By Mike Tomlinson

RPR 25 '03 15=28 7052926171 PfiGE.15

ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINES

Transaction No:

Recording Date:

Approval Date:

Client(s):393100

Survey Type(s):

W0390.00680

2003-APR-25

2003-M AY-01

Work Report Summary

Status: APPROVEDWork Done from: 2003-APR-14

to: 2003-APR-19

946606 ONTARIO LIMITED

PDRILL

Work Report Details:

Perform Applied Assign Reserve Claim* Perform Approve Applied Approve Assign Approve Reserve Approve Due Date

SO 1077384 S11.900 811,900 S800 S800 S800 800 310,300 S10.300 2004-APR-27

SO 1077399 SO SO S800 S800 SO O SO SO 2004-MAY-19

811,900 S11,900 S1.600 51,600 S800 S800 510,300 510,300

External Credits:

Reserve:

SO

510,300 Reserve of Work ReporW: W0390.00680

S10,300 Total Remaining

Status of claim is based on information currently on record.

31D09NW2022 2.25467 HARVEY 900

2003-May-06 14:18 Armstrong-d Page 1 of 1

Ministr'y ofNorthern Developmentand Mines

Date: 2003-MAY-01

Ministers duDeveloppement du Nord et des Mines Ontario

GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E 6B5

946606 ONTARIO LIMITED903 KELLY BLVD.RR#1BRIDGENORTH, ONTARIOKOL1 HO CANADA

Tel: (888) 415-9845 Fax:(877)670-1555

Dear Sir or Madam

Submission Number: 2.25467 Transaction Number(s): W0390.00680

Subject: Approval of Assessment Work

We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.

At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.

If you have any question regarding this correspondence, please contact LUCILLE JEROME by email at [email protected] or by phone at (705) 670-5858.

Yours Sincerely,

Ron GashinskiSenior Manager, Mining Lands Section

Gc: Resident Geologist

Mike George Tomlinson (Agent)

946606 Ontario Limited (Assessment Office)

Assessment File Library

946606 Ontario Limited (Claim Holder)

Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:18238

CANADA

MINISTRY OF NORTHERN DEVELOPMENT AND MINES

PROVINCIAL MINING RECORDER'S OF'ICl

Mining Land Tenure Map

NAD 83 S degree (jrld

Those wishing to stake mining daims should consult with the Provincial Mining Recorders' Office of the Ministry of Northern Development and Mines for additional information on the status of the lands shown hereon. This map fs not intended for navigational, survey, or land title determination purposes as the information shown on this map ie compiled from various sources. Completeness and accuracy are not guaranteed, Additional information may also be obtained through the local Land Titles or Registry Office, or the Ministry of Natural Resources.

The information shown is derived from digital data available in the Provincial Mining Recorders' Office at the time of downloading from the Ministry of Northern Development and Mines web site.

General Information and Limitations This map may not show unregistered land tenure and interests inContact Information: Toll Free Mop Datum: NAD 83 land Indudlnj certain patents, leases, easements, right of ways.Provincial Minim) Recorders' Office Tel: 1 (888) 415-6845 ext 57*|jjection: Geographic Coordinates flooding rights, licences, or other form* of disposition of rights andWillet Green Miller Centre 933 Ramsey Lsk* Road Fax: 1 (877) S70-1444 Topographic Data Source: Land Information Onlarto interest from the Crown. Also certain land tenure and land usesSudbury ON P3E 6B5 Mining Land Tenure Source: Provincial Mining Recorders' Office that '"strict or prohibit free entry to stake mining claims may not bsHome Page: www.mndm.gov.on.co/MNDM/MINES/LANDSfmlsmnpge.htm illustrated.

Date l Time of Issue: Thu May 01 10:48:42 EOT 2003

TOWNSHIP l AREA PLAN HARVEY-EAST G-1293

ADMINISTRATIVE DISTRICTS t DIVISIONS

Mining DivisionLand Titles/Registry DivisionMinistry of Natural Resources District

Southern OntarioPETERBOROUGHBANCROFT

TOPOGRAPHIC

: Administrative Boundaries

l l Townshipl.....,.!

'f ': Concession, Lot

SBB Provincial Park

iaFii Indian Raaerve

i""; Cliff, Pit t Pila

Land Tenum

Freehold Patent

Surface And MMnsiR

SunWRijlht! Only

K

eV

Contour

MM Shafts

Railway

Road

Trail

Natural OK Plpalltw

UUEtlei

Tower

LnuahcM Patent

f B j SurftiM And Mining Rights

f,." Surtae* Right* Only

ra Mining Wghti Only

Licence of Occupaltort

lil ra

Surface And Mining Rightl

Surface Righn Only

Mining Right! Only

Order Ir) Council {Noi open for staking)

Watac Powflr Lsaae Agreement

Mining CH'irn

LAND TENURE WITHDRAWALS

Wtrti WtWm

w iW"rn

AtMC VWHdrawtl from DSpoeltion

Mlnlna Aa* Withdrawal TypM

Minim) R*8h!s Oily WWxiraiwn Oder In Coundl Wrihdirawal Typra

a CMy wnwnwn

IMPORTANT NOTICES

Hll* 1;4148B

. 2

31D09NW2022 2.25467 HARVEY 200