work variance request form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3....

11
1 Potential Impacts of Variance: Work Variance Request Form Groundwater Remedy Phase 1 Construction, PG&E Topock Compressor Station, Needles, California PG&E TOPOCK GROUNDWATER REMEDIATION PROJECT Work Variance Request #7 – Proposed changes to Construction Headquarters (CHQ) and Soil Processing Yard (SPY) Request Prepared By: PG&E Date Submitted: May 24, 2019 Variance Request No.: 7 Location: CHQ and SPY Request Approval From: DTSC and DOI Date Approval Required: June 7, 2019 Map Area: N/A Land Manager: BLM Land Owner Parcel No: 65016112 Current Vegetative Cover/Land Use: Minimal vegetation Existing Sensitive Resource? X No Yes, Specify: N/A Variance From: Mitigation Measure Work Plan/Procedure Response to Comments Drawing Permit Condition Other Detailed Description of Variance and Justification (Attach additional information if necessary): Attachments: Photo X Construction Drawing Aerial Photo MarkUp Correspondence Other Air Quality Hazardous Materials Aesthetic (see visualizations) Biological Resources Noise Water Resources Soils Paleo Resources Cultural Resources Hydrology and Water Quality X X Description and Justification: This Work Variance Request (WVR) addresses proposed changes at the CHQ and SPY to optimize the use of available space and minimize the amount of remedy infrastructure in these areas. The attached table summarizes the changes in remedy infrastructure in these areas from the final design to this WVR. The specifics are described below and included in the attached drawings/visualizations. a) Locate all temporary office and break trailers at the SPY. PG&E proposes to keep the three existing office trailers at their current locations in the SPY and add two additional office trailers and one break trailer for workers. The additional trailers will be equipped with aboveground sewage tanks, similar to the existing trailers. They will also be powered by Needles Electric. This will require the original SPY fence line to be extended south/southwest to encompass these trailers and the original truck entrance from National Trails Highway to the access road east of SPY. Neither changes reduce the overall area available for soil storage. b) Eliminate the workshop/sample processing building at the CHQ. The function planned for this building will be moved to the Carbon Amendment building at the MW20 Bench. Removal of this building reduces the amount of soil disturbance by approximately 334 cubic yards. c) Eliminate the sunshade at the CHQ. The function for the sunshade will be replaced by the break trailer for the workers. Removal of the sunshade reduces the amount of soil distance (i.e., installation of the footings) by approximately 14 cubic yards. d) Convert the utility pad at the CHQ to a smaller transformer/electrical panel pad. With the relocation of the six trailers to SPY and elimination of the workshop/sample processing building, PG&E proposes to convert the utility pad to smaller pad for a smaller transformer/electrical panel to serve the few remaining construction trailers at the CHQ. This reduces the amount of soil disturbance by approximately 61 cubic yards.

Upload: others

Post on 14-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb

1  

Potential Impacts of Variance: 

Work Variance Request Form Groundwater Remedy Phase 1 Construction, PG&E Topock Compressor Station, Needles, California 

PG&E TOPOCK GROUNDWATER REMEDIATION PROJECT 

Work Variance Request #7 – Proposed changes to Construction Headquarters (CHQ) and Soil Processing Yard (SPY) 

Request Prepared By: PG&E  

Date Submitted: May 24, 2019 

Variance Request No.: 7 

Location:  CHQ and SPY 

Request Approval From: DTSC and DOI 

Date Approval Required: June 7, 2019 

Map Area: N/A 

Land Manager: BLM         Land Owner Parcel No: 650‐161‐12 

Current Vegetative Cover/Land Use: Minimal vegetation  

Existing Sensitive Resource?   X   No          Yes, Specify: N/A 

Variance From:  Mitigation Measure  Work Plan/Procedure  Response to Comments 

Drawing  Permit Condition  Other   

Detailed Description of Variance and Justification (Attach additional information if necessary): 

Attachments:  Photo        X   Construction Drawing   Aerial Photo Mark‐Up  Correspondence  Other  

 Air Quality            Hazardous Materials  Aesthetic (see visualizations) 

 Biological Resources           Noise   Water Resources 

Soils           Paleo Resources 

Cultural Resources           Hydrology and Water Quality 

   

 

 

Description and Justification: 

This Work Variance Request (WVR) addresses proposed changes at the CHQ and SPY to optimize the use of available space and minimize the amount of remedy infrastructure in these areas. The attached table summarizes the changes in remedy infrastructure in these areas from the final design to this WVR. The specifics are described below and included in the attached drawings/visualizations. 

a) Locate all temporary office and break trailers at the SPY. PG&E proposes to keep the three existing office trailers at their current locations in the SPY and add two additional office trailers and one break trailer for workers. The additional trailers will be equipped with aboveground sewage tanks, similar to the existing trailers. They will also be powered by Needles Electric. 

This will require the original SPY fence line to be extended south/southwest to encompass these trailers and the original truck entrance from National Trails Highway to the access road east of SPY. Neither changes reduce the overall area available for soil storage.  

b) Eliminate the workshop/sample processing building at the CHQ. The function planned for this building will be moved to the Carbon Amendment building at the MW‐20 Bench. Removal of this building reduces the amount of soil disturbance by approximately 334 cubic yards. 

c) Eliminate the sunshade at the CHQ. The function for the sunshade will be replaced by the break trailer for the workers. Removal of the sunshade reduces the amount of soil distance (i.e., installation of the footings) by approximately 14 cubic yards.  

d) Convert the utility pad at the CHQ to a smaller transformer/electrical panel pad. With the relocation of the six trailers to SPY and elimination of the workshop/sample processing building, PG&E proposes to convert the utility pad to smaller pad for a smaller transformer/electrical panel to serve the few remaining construction trailers at the CHQ. This reduces the amount of soil disturbance by approximately 61 cubic yards.  

Page 2: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb
Page 3: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb

 

 

 

Changes in proposed remedy infrastructure at CHQ and SPY Final Design  Work Variance Request (WVR) #3  WVR #7 

Construction Headquarters (CHQ) 

10 construction trailers (6 @ approx. 12’x60’ each, 2 @ approx. 24’x60’ each, 2 @ approx. 12’x24’ each) 

10 construction trailers (2 @ approx. 12’x60’ each, 4 @ approx. 24’x60’ each) 

4 construction trailers (4 @ approx. 12’x60’ each) 

1 workshop/sample processing building (approx. 50’x60’) (eliminated)  

‐  ‐ 

1 sunshade (approx. 20’x150’ shaded area, 12 footings @ 4’x4’x2’ each) (eliminated) 

1 sunshade (approx. 50’x60’ shaded area) (eliminated) 

‐ 

1 utility pad (approx. 30’x30’)  1 utility pad (approx. 30’x30’)   1 transformer pad with electrical panel (approx. 8’x8’)  

2 underground sewage tanks (10,000 gallons each) (eliminated) 

‐  ‐ 

1 underground wastewater tank (1,000 gallons) (brought aboveground in WVR #3) 

1 aboveground wastewater tank with concrete pad (2,500 gallons)  

1 aboveground wastewater tank with concrete pad (2,500 gallons) (defers to end of Phase 2) 

1 decontamination pad (approx. 17’4”x80’)  1 decontamination pad (approx. 17’4”x80’)  1 decontamination pad (approx. 17’4”x80’) (defers to end of Phase 2) 

Security fence  Security fence  Security fence    

Soil Processing Yard (SPY) 

‐  Not included  6 construction trailers (4 @ approx. 24’x60’ each, 1 @ approx. 8’x28’, 1 @ approx. 8’x40’)   

Elevated water tank  Not included  Elevated water tank 

Covered break area (removed)  Not included  ‐ 

Security fence  Not included  Security fence (extended to NTH to encompass the construction trailers) 

Estimated Net Change in the Excavated Soil Volume 

A reduction of approx. 850 cubic yards  A reduction of approx. 409 cubic yards 

 

Page 4: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb

5

,

0

0

0

-

G

A

L

.

W

A

T

E

R

T

A

N

K

5

,

0

0

0

-

G

A

L

.

W

A

T

E

R

T

A

N

K

1

5

,

0

0

0

-

G

A

L

.

F

I

R

E

W

A

T

E

R

T

A

N

K

F

S

W

P

U

M

P

P

U

M

P

P

O

W

E

R

D

I

S

T

R

I

B

U

T

I

O

N

P

A

N

E

L T

E

L

E

C

O

M

P

A

N

E

L

T

R

A

N

S

F

O

R

M

E

R

S

E

I

S

M

I

C

R

E

S

T

R

A

I

N

T

S

(

T

Y

P

.

)

B

L

A

D

D

E

R

T

A

N

K

C

O

N

C

R

E

T

E

P

A

D

S

O

L

A

R

T

I

E

J

U

N

C

T

I

O

N

B

O

X

E

C

B

-

1

D

P

-

M

P

O

T

A

B

L

E

W

A

T

E

R

P

U

M

P

A

N

D

T

A

N

K

S

K

I

D

C

O

N

T

R

O

L

P

A

N

E

L

P

U

M

P

TOPOCK GROUNDWATER REMEDIATION PROJECT

12

/1

8/2

01

8, 1

7:1

9, G

:\A

pro

je

ct\P

GE

\R

C0

00

68

9\T

OP

OC

K\C

AD

D\F

in

al R

em

ed

y\IF

C\C

HG

A

lte

rn

ative

C

ost S

avin

gs\C

-1

5-0

1 th

ru

0

7 1

5-1

0.d

wg

, T

ab

: C

-1

5-0

1

0 90'

SCALE: 1"=30'

30' 60'

6

C-15-01

CONSTRUCTION

HEADQUARTERS YARD PLAN

1

C-15-06

LEGEND:

FENCE LINE

NOTES:

1. PARKING SURFACE WILL BE GRAVEL DURING

INITIAL CONSTRUCTION, BUT MAY BE PAVED

WITH ASPHALT IN THE FUTURE.

2. CONFIGURATION AND COMPOSITION OF THE

REMEDY SUPPORT AREA MAY CHANGE OVER

THE LIFE OF THE REMEDY. EXPECTED

CONFIGURATION DURING CONSTRUCTION IS

DEPICTED HERE.

3. FINAL LAYOUT OF TEMPORARY CONSTRUCTION

AND LAYDOWN AREAS TO BE DETERMINED BY

CONTRACTOR. REPRESENTATIVE USE OF THE

AREA IS DEPICTED HERE.

JPBMSL JEFAJW2/2/15 SUPPLEMENTAL PRE-FINAL (90%) DESIGN0

WLMKLD BJWAJW

8/5/15 90% RTC RESOLUTION1

RAO

BWWLM RAOAJW11/18/15 FINAL DESIGN2

BWWLM RAOAJW

11/9/16 100% BOD ERRATA INFO PACKAGE3

6/16/17 ISSUED FOR BID4BWJPB RAOAJW

PHASE 1

CONSTRUCTION TRAILERS

ISSUE FOR CONSTRUCTION 5MAGJPB RAOVJM

DECONTAMINATION PAD

PHASE 1 SHADED

REST AREA

11/16/18

CONTRACTOR TRAILERS AND

LAYDOWN AREA

N:2103788.89

E:7607689.57

N:2103771.48

E:7607688.40

N:2103792.58

E:7607609.44

N:2103775.70

E:7607609.07

N:2103926.01

E:7607666.17

N:2103943.91

E:7607693.58

N:2103874.16

E:7607775.74

N:2103836.91

E:7607742.38

N:2103876.94

E:7607697.69

N:2103914.19

E:7607731.04

1

S-15-22

2

C-15-06

DRAFT UTILITY CHANGES5MAGJPB RAOVJM

DRAFT

AutoCAD SHX Text
515
AutoCAD SHX Text
545
AutoCAD SHX Text
520
AutoCAD SHX Text
525
AutoCAD SHX Text
535
AutoCAD SHX Text
510
AutoCAD SHX Text
515
AutoCAD SHX Text
520
AutoCAD SHX Text
525
AutoCAD SHX Text
of
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
MICROFILM
AutoCAD SHX Text
PACIFIC GAS AND ELECTRIC COMPANY
AutoCAD SHX Text
REV
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SUPSD BY
AutoCAD SHX Text
SUPSDS
AutoCAD SHX Text
DWG LIST
AutoCAD SHX Text
BILL OF MATL
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
SAN FRANCISCO, CALIFORNIA
AutoCAD SHX Text
SO
AutoCAD SHX Text
SUPV
AutoCAD SHX Text
DSGN
AutoCAD SHX Text
DWN
AutoCAD SHX Text
CHKD
AutoCAD SHX Text
SCALES
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
SUPV
AutoCAD SHX Text
CHKD
AutoCAD SHX Text
DWN
AutoCAD SHX Text
GM/SPEC
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
APVD BY
AutoCAD SHX Text
SUPV
AutoCAD SHX Text
CHKD
AutoCAD SHX Text
DWN
AutoCAD SHX Text
GM/SPEC
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
APVD BY
AutoCAD SHX Text
R E V I S I O N S
AutoCAD SHX Text
R E V I S I O N S
AutoCAD SHX Text
N1808
AutoCAD SHX Text
GAS TRANSMISSION & DISTRIBUTION
CH013966
Text Box
APPROVED WORK VARIANCE REQUEST #3
Page 5: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb

AREA GRAVEL

E

A

S

T

E

N

D

G

R

A

V

E

L

6% GRADE

170' (17) PARKING STALLS

LAYDOWN/TRUCK PARKING

1

2

'

X

6

0

'

C

O

N

T

R

A

C

T

O

R

T

R

A

I

L

E

R

FRONT PARKING AREA

GRAVEL

T

R

U

C

K

E

N

T

R

A

N

C

E

1

2

'

X

6

0

'

C

O

N

T

R

A

C

T

O

R

T

R

A

I

L

E

R

1

2

'

X

6

0

'

C

O

N

T

R

A

C

T

O

R

T

R

A

I

L

E

R

1

2

'

X

6

0

'

C

O

N

T

R

A

C

T

O

R

T

R

A

I

L

E

R

1

6

0

'

(

1

6

)

P

A

R

K

I

N

G

S

T

A

L

L

S

TRUCK EXIT

1

9

0

'

(

1

9

)

P

A

R

K

I

N

G

S

T

A

L

L

S

G

R

A

V

E

L

CITY OF NEEDLES

ELECTRIC

PAD-MOUNTED

TRANSFORMER AND

ELECTRICAL PANEL.

V-DITCH

ENERGY DISSIPATOR

TOPOCK GROUNDWATER REMEDIATION PROJECT

- DRAFT -

NOT FOR

CONSTRUCTION

05

/2

4/2

01

9, 1

1:0

1, G

:\A

pro

je

ct\P

GE

\R

C0

00

68

9\T

OP

OC

K\C

AD

D\F

in

al R

em

ed

y\C

on

stru

ctio

n\C

-C

ivil\C

-1

5-0

1 th

ru

0

7 1

5-1

0.d

wg

, T

ab

: C

-1

5-0

1

0 90'

SCALE: 1"=30'

30' 60'

6

C-15-01

CONSTRUCTION

HEADQUARTERS YARD PLAN

LEGEND:

FENCE LINE

NOTES:

1. PARKING SURFACE WILL BE GRAVEL DURING INITIAL

CONSTRUCTION, BUT MAY BE PAVED WITH ASPHALT IN THE

FUTURE.

2. CONFIGURATION AND COMPOSITION OF THE REMEDY SUPPORT

AREA MAY CHANGE OVER THE LIFE OF THE REMEDY. EXPECTED

CONFIGURATION DURING CONSTRUCTION IS DEPICTED HERE.

3. FINAL LAYOUT OF TEMPORARY CONSTRUCTION AND LAYDOWN

AREAS TO BE DETERMINED BY CONTRACTOR. REPRESENTATIVE

USE OF THE AREA IS DEPICTED HERE.

JPBMSL JEFAJW2/2/15 SUPPLEMENTAL PRE-FINAL (90%) DESIGN0

WLMKLD BJWAJW

8/5/15 90% RTC RESOLUTION1

RAO

BWWLM RAOAJW11/18/15 FINAL DESIGN2

BWWLM RAOAJW

11/9/16 100% BOD ERRATA INFO PACKAGE3

6/16/17 ISSUED FOR BID4BWJPB RAOAJW

ISSUE FOR CONSTRUCTION 5MAGJPB RAOVJM

11/16/18

ISSUE FOR CONSTRUCTION 5MAGJPB RAOVJM

11/16/18

DRAFT CHQ REVISIONS6MAGJPB RAOVJM

5/24/19

AutoCAD SHX Text
515
AutoCAD SHX Text
545
AutoCAD SHX Text
520
AutoCAD SHX Text
525
AutoCAD SHX Text
535
AutoCAD SHX Text
510
AutoCAD SHX Text
515
AutoCAD SHX Text
520
AutoCAD SHX Text
525
AutoCAD SHX Text
of
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
MICROFILM
AutoCAD SHX Text
PACIFIC GAS AND ELECTRIC COMPANY
AutoCAD SHX Text
REV
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SUPSD BY
AutoCAD SHX Text
SUPSDS
AutoCAD SHX Text
DWG LIST
AutoCAD SHX Text
BILL OF MATL
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
SAN FRANCISCO, CALIFORNIA
AutoCAD SHX Text
SO
AutoCAD SHX Text
SUPV
AutoCAD SHX Text
DSGN
AutoCAD SHX Text
DWN
AutoCAD SHX Text
CHKD
AutoCAD SHX Text
SCALES
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
SUPV
AutoCAD SHX Text
CHKD
AutoCAD SHX Text
DWN
AutoCAD SHX Text
GM/SPEC
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
APVD BY
AutoCAD SHX Text
SUPV
AutoCAD SHX Text
CHKD
AutoCAD SHX Text
DWN
AutoCAD SHX Text
GM/SPEC
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
APVD BY
AutoCAD SHX Text
R E V I S I O N S
AutoCAD SHX Text
R E V I S I O N S
AutoCAD SHX Text
N1808
AutoCAD SHX Text
GAS TRANSMISSION & DISTRIBUTION
sthomas
Line
sthomas
Polygonal Line
sthomas
Polygonal Line
sthomas
Line
sthomas
Polygonal Line
sthomas
Polygonal Line
sthomas
Line
sthomas
Line
sthomas
Line
sthomas
Line
sthomas
Line
CH013966
Text Box
PROPOSED CHANGES TO CHQ - WORK VARIANCE REQUEST #7
Page 6: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb
CH013966
Text Box
WORK VARIANCE REQUEST #7 SEIR Viewpoint C - National Trails Highway looking southwest toward the Construction Headquarters
Page 7: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb

TOPOCK GROUNDWATER REMEDIATION PROJECT

3

05/19

/2016

, 13:2

7, G:

\Gra

phics

\AR\

TOPO

CK-0

1\Sub

mitta

l_100

%\D

WGs

\C-C

ivil\C

-15-

01 th

ru 08

_rev

0518

16.dw

g, Ta

b: C-

15-0

5

C-15-05

PARK MOABI SOIL STAGING AND

STORAGE SITE PLAN

JPBMSL JEFAJW2/2/15 SUPPLEMENTAL PRE-FINAL (90%) DESIGN0

NOTES:

1. FOR FENCING AND GRAVEL ROAD DETAILS,

SEE SHEETS C-00-05, C-00-06, AND C-00-07.

2. FINAL LAYOUT OF TEMPORARY

CONSTRUCTION AND LAYDOWN AREAS TO

BE DETERMINED BY CONTRACTOR.

REPRESENTATIVE USE OF THE AREA IS

DEPICTED HERE.

0 90'

SCALE: 1"=30'

30' 60'

8/5/151 90% RTC RESOLUTIONWLMKLD BJWAJW

RAO

BWWLM RAOAJW11/18/15 FINAL DESIGN2

- FINAL DESIGN -

FOR AGENCY

APPROVAL ONLY

JPBJPB RAOAJW

5/18/16 ROAD ALIGNMENT REVISION3

CH013966
Text Box
NOVEMBER 2015 FINAL DESIGN
Page 8: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb

PP

PP(N)

TRUCK PATH

POWER DISTRIBUTION

GATE WITH HIGHSECURITY PG&E LOCK

GATE WITH HIGHSECURITY PG&E LOCK

LINE FOR REMEDY

TRUCK PATH

N:2104223.81E:7607339.23

TOPOCK GROUNDWATER REMEDIATION PROJECT

- DRAFT -

NOT FORCONSTRUCTION

12/1

1/20

18, 1

0:06

, G:\A

proj

ect\P

GE\

RC

0006

89\T

OPO

CK\

CAD

D\F

inal

Rem

edy\

IFC

\C-C

ivil\

C-1

5-01

thru

07

15-1

0.dw

g, T

ab: C

-15-

05

5C-15-05

PARK MOABI SOIL STAGING ANDSTORAGE SITE PLAN

JPBMSL JEFAJW2/2/15 SUPPLEMENTAL PRE-FINAL (90%) DESIGN0

NOTES:FOR FENCING AND GRAVEL ROAD DETAILS, SEESHEETS C-00-05, C-00-06, AND C-00-07.FINAL LAYOUT OF TEMPORARY CONSTRUCTIONAND LAYDOWN AREAS TO BE DETERMINED BYCONTRACTOR. REPRESENTATIVE USE OF THEAREA IS DEPICTED HERE.

d. 6: PROPOSED 8' X 40' BREAK TRAILER

0 90'

SCALE: 1"=30'

30' 60'

8/5/151 90% RTC RESOLUTION WLMKLD BJWAJW

RAOBWWLM RAOAJW11/18/15 FINAL DESIGN2JPBJPB RAOAJW5/18/16 ROAD ALIGNMENT REVISION3

6/16/17 ISSUED FOR BID4 BWJPB RAOAJW11/16/18 ISSUE FOR CONSTRUCTION5 MAGJPB RAOVJM

BNSF RAILROAD STATE HWY 56

GATE WITH HIGHSECURITY PG&E LOCK

ELEVATED WATER TANK

6

CH013966
Text Box
PROPOSED CHANGES TO SPY - WORK VARIANCE REQUEST #7
Page 9: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb
CH013966
Text Box
WORK VARIANCE REQUEST #7 SEIR Viewpoint D - National Trails Highway looking north toward the Soil Processing Yard
Page 10: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb

Future Activity Allowance Determination Matrix for Work Variance Request (WVR)  

Work Variance Request No.   7      Date:  5/24/19 

Future Activity Allowance is an activity that is not considered in the remedy design but necessary to support the project objectives. Future Activity Allowance is a Material Deviation which is defined in the final groundwater remedy design as:  Material Deviation means a change or correction required to prevent a condition that would (1) render the approved design non‐compliant with codes, regulations, and /or engineering standard of practices, (2) render planned well locations and/or constructions fail to meet the project objectives, (3) cause significant schedule delay, and/or (4) cause a significant increase in costs. (CH2M Hill, 2015) 

 According to the SEIR Project Description, “The inclusion of the Future Activity Allowance is not intended to account for minor adjustments (work variances) of the remedy design during construction resulting from field conditions. DTSC’s objective for the inclusion of the Future Activity Allowance is to consider the potential impacts of needing to take additional but previously unforeseen activities that were not contemplated as part of the Final Remedy Design but are activities that would improve the performance of the remedy, or are necessary to gather additional information on the remedy performance, and/or aid in the transition of the active remedy to monitored natural attenuation.” (ESA, 2017)  1. Are all components of the WVR in the approved final design as reviewed in the SEIR? 

    ☐  Yes    ☒   No (8’x 40’ Break Trailer replacing covered break area in design)  2. Are all components of the WVR staying within an infrastructure alignment in the approved final 

design? 

☒  Yes     ☐  No 

If answers to both 1 and 2 are Yes, STOP – action is not Future Activity Allowance 

3. For components not in approved final design, will the WVR require new access not identified for use in the final design and create new ground disturbance beyond those anticipated in final design?        

☐  Yes     ☒  No 

If answer is No, STOP – action is not Future Activity Allowance.  If Yes, proceed…  4. For components not in approved final design and require new access or new ground disturbance, 

will the ground disturbing activity be outside the 2018 SEIR project boundary?   

☐  Yes     ☐  No 

If answer is Yes, STOP – action is subject to additional CEQA evaluation.  WVR approval will be considered after DTSC completes CEQA determination.  5. For WVR requiring new access and/or new ground disturbance, but project components are in 

approved final design and within the 2018 SEIR project boundary, is the variance necessitated by field conditions which are outside the control of the operator (e.g. refusal during drilling, unstable ground, existing design jeopardizes health and safety, modification to avoid archaeological resource, existing design does not conform to engineering standards, etc.)? 

☐  Yes     ☐  No 

If answer is No or otherwise explained in Section 7 below, action is Future Activity Allowance, follow Communication Protocol for Future Activities Allowance, Exhibit 3 to the Statement of Decision and Resolution of Approval.  If the answer is Yes, action is Future Activity Allowance, and DTSC will work with 

Page 11: Work Variance Request Form - dtsc-topock.com...wlm. rao 2 11/18/15 final design ajw wlm. bw rao 3. 5/18/16 road alignment revision ajw jpb. jpb rao 4 6/16/17 issued for bid ajw jpb

Future Activity Allowance Determination Matrix WVR No. 4  Page 2 of 2  Tribes to meet the time sensitivity of the WVR.  Regardless of response, because of new access and/or new ground disturbance, WVR action may be subject to Federal Consultation.  Inquire with BLM to determine whether there is a need to follow Consultation during Construction protocol.         6. Does the addition of WVR cause an exceedance from infrastructure limits specified in the 2018 

certified Final SEIR (Table 3‐1 for well boreholes; Table 3‐2 for pipeline trenches, electrical/ communication conduit, roadway improvements, or sizes of buildings and structures; Table 3‐4 for volume of soil disturbance and Table 3‐5 for water usage)?   

☐  Yes     ☐  No 

If answer is Yes, STOP – action is subject to additional CEQA evaluation.  WVR approval will be considered after DTSC completes a CEQA checklist to determine if there are new or substantially more significant environmental impacts than disclosed in the 2018 SEIR.   

7.  Other extenuating circumstances or information for FAA considerations:  ☐  No 

☐  Yes – provide information and/or justification            

Conclusion:  WVR No.    7        ☒  is not a FAA     ☐  is a FAA     Signature of DTSC reviewer:            Date:           06/14/2019