working group 5 report - the ccsds collaborative … tc20-sc14 subcommittee/iso tc… · working...
TRANSCRIPT
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
1
WORKING GROUP 5 REPORT
Beijing, China
25 May 2007
Convenor: Séverin Drogoul, France
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
WG5 REPORT CONTENT
FALL MEETING REPORT IN PARIS
Held 25th to 26th October 06
PLENARY MEETING REPORT IN BEIJING
Held 21st to 23rd May 07
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
PREVIOUS STATUS [1/2](Projects moving to next stages, new projects proposed, etc.)
CD to be registeredProject breakdown structure (PL: R. Widmann)27026
CD/C circulatedQuality assurance requirements (PL: S. Drogoul)27025
CD to be registeredManagement specification and plan (PL: T. Deak)23462
CD/C circulatedNon conformance control system (PL: S. Kikuchi)23461
CD/C circulatedDependability assurance requirements (PL: A. Desroches)23460
IS publishedFunctional and technical specifications (PL: J. Chevalier)21351
DIS comments to be resolvedUse of off-the-shelf items (PL: R. Widmann)21350
IS under publicationProject reviews (PL: R. Widmann)21349
IS publishedRisk management (PL: T. Deak)17666
CD registeredProbabilistic risk assessment (PL: M. Stamatelatos)16193
CD/V circulatedLessons learned (PL: A. Desroches)16192
IS publishedQualification assessment (PL: V. Nikoulitchev)15865
IS publishedSafety requirements (PL: H. Baccini)14620-1
IS publishedProduct assurance (PL: . Marcoux)14300-2
RevisionStructuring of a programme (PL : TBD)14300-1
16 changes between 2005 and 2006 Plenary meetings held in Toulouse & Colorado (slides 1/2
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
PREVIOUS STATUS [2/2]
(Projects moving to next stages, new projects proposed, etc.)
JapanMaterials, mechanical parts and processesNWIP
ESAConfiguration managementNWIP
BrazilGlossary of termsNWIP
FranceCost and schedule managementNWI
ESAInformation and documentation managementNWI
GermanyProject organizationNWI
PL to be found by
16 changes between 2005 and 2006 Plenary meetings held in Toulouse & Colorado (slides 1/2
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
PARIS PARTICIPATION
Members – total experts: 12.
7 countries represented
Brazil – 1
Canada – 0
China – 0
France – 4
Germany – 1
Italy – 0
Japan – 2
Russia – 1
UK – 2
Ukraine – 0
US – 1
Liaison Organizations – 2
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
FALL MEETING REPORT IN PARIS(significant issues for plenary)
CD/C 16193 – Probabilistic Risk Assessment(PL : Michael Stamatelatos),Deletion by the Central Secretariat, due to a lack of progress.NWIP was submitted in Paris, in order to be reinstated as a CD.
CD/C 16192 – Lessons Learned – Principles and rules(PL: A. Desroches)New PL: I. Dummigan.Comments have been resolved, in order to go DIS stage.
CD/C 23460 – Dependability Assurance Requirements(PL: A. Desroches)New PL: E. Vergnault.Comments have been resolved. Delivery for DIS registration.This ISO standard relies on this ECSS-E-30B, and the table of severity ofconsequences was added.
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
FALL MEETING REPORT IN PARIS(significant issues for plenary)
WD 23462 – Guidelines to define the management framework for a spaceprojectPL: Thomas DeakWG5 confirmed that this document must be a Technical Report.
WD27026 – Programme Management - Project Breakdown StructurePL: Richard WidmannStill waiting for a draft. The process has to be accelerated. And SC14Secretariat gave an extension of time in order to leave enough time to get aCD.
IS 14300-1 – Structuring of a ProgrammePL: Thomas DeakRevision conducted per resolution #238 from the 16th Annual Plenary Meetingin Colorado Springs. Comparison with ECSS-M-00-B, and pr-EN 9200 (RGAéro 00040).
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
FALL MEETING REPORT IN PARIS(significant issues for plenary)
NWI 14N438 – Information and documentation management
The Project Leader was nominated: Mauro Marchi.
To go ahead with WD step.
NWI – Glossary of Terms
PL: João Matos
Sent to ISO Secretariat for registration.
The table taking into account the demand of ISO-ECSS coordination
group has been updated after a discussion for each document within
the WG.
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
BEIJING PARTICIPATION
Members – total experts: 20.
8 countries represented
Brazil – 2
Canada – 1
China – 9
France – 2
Germany – 1
Italy – 0
Japan – 2
Russia – 2
UK – 1
Ukraine – 0
US – 0
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
DECISIONS(projects moving to next stages, new projects proposed, etc.)
WD 27026 – Programme Management - Project BreakdownStructure(PL: Richard Widmann)Some difficulties for getting information form PL about this WD.Deadline for a draft is 30th June. If necessary, PL could be changed.
IS 14300-1 – Structuring of a Programme (PL: Thomas Deak)Small subgroup will prepare a draft, taking into account some textsfrom ECSS-M-00B and PrEN 9200 (Deadline: 30th September).
WD 10794 – Material, mechanical parts and processes (PL:Satoshi Kikuchi)The WD is based on ECSS-Q-70B. A check has to be done with WG6on normative references made in this standard, and the need to createor not some new ISO standards when a domain need to be covered.
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
DECISIONS(projects moving to next stages, new projects proposed, etc.)
WD 10795 – Glossary of Terms (PL: João Matos)
An International Space Station Glossary of Terms from NASA is taken
into account at this moment. Check has also to be done with IAQG
Glossary.
A guideline for Project Management has been proposed at TMB level
for all sectors (ISO/PC236). A counter proposal has been submitted by
ANSI to have only a Glossary of Terms. Information on status has
been provided by SC14 Secretariat. Necessary to implement
communication between WG5 and ISO/PC236 to take into account
existing IS.
Cost and schedule
An ISO Standard on “Cost and schedule” is considered to be
necessary. So, it is important to continue seeking for a project leader.
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
DECISIONS(projects moving to next stages, new projects proposed, etc.)
WG5 Standards databaseCanada will add its own information into existing database, which isvery useful when a NWIP is starting.
Framework of WG5 activitiesThe WG5 framework of standards was updated.
On Software product assurance, IAQG has initiated a WG. Output expectednext year. Needs on standards should be identified by Japan WG5member.
On project phasing and planning, need to get a document is confirmed byChina, Japan and Brazil. A project leader has to be identified to initiateNWI.
Voting membersChina has to identify a voting member.
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
WG 5 FRAMEWORK
RESOLUTION 226
[1/2]
Recall of Resolution 226 decided during Toulouse Meeting – May
2005:
WG convenors and WG members to develop a framework of standards
for the working groups of SC14 in order to help for identification of
future needs for standards to cover the main domains (hierarchical
structure for example...)”.
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
Space Systems Programme Management Framework ISO
TC20/SC14/WG5 - Rev 6 : 22th MAY 2007
IS 14300-1 Structuration of a programme (In revision) IS 14300-2 Product Assurance - Policy and principles (ECSS-Q-00B)
CD 27025 Quality Assurance (ECSS-Q-20B)
CD 23460 Dependability assurance (ECSS-Q-30B)
CD/V 23461 Nonconformance control system (ECSS-Q-20-09B)TR 23462 Guidelines to define the management framework for
a space project
IS 14620-1 Safety Requir. (part 2 to 3 =WG3) (ECSS-Q-40B)
WD 10795 Glossary of terms (EN 13701 = ECSS-P-001A)
IS 17666 Risk Mgt (Ch. 13 ISO 14300-1) (ECSS-M-00-03B)
WD 27026 Project breakdown structure (ECSS-M-10B)
NWIP Project organization (ECSS-M-20B)
Project phasing & planning (incl. in Ch. 8 ISO 14300-1)(ECSS-M-30A)
IS 15865 Qualification assessment
NWIP Configuration manag. (Ch. 10 ISO 14300-1 & 10007) (ECSS-M-
40B)
Engineering Management
Software product assurance (ECSS-Q-80A)
IS 14621-1 & 2 (WG1) EEE components (ECSS-Q-60A)
IS 16091 Integrated logistic support (WG3) (ECSS-M-70A)
NWIP Cost and schedule mgt (Ch. 9 ISO 14300-1) (ECSS-M-60B)
Verification (ECSS-E-10-02A = EN 14725)
Functional analysis (ECSS-E-10-05A = EN 14514)
Value analysis
WD 10789 Inform./document.mgt (Ch.12 ISO 14300-1) (ECSS-M50A)
CD 16193 Probabilistic risk assessment (PRA)
DIS 16192 Lessons learned – Principles and rules IS 21350 Use of the OTS items in new flight application
IS 21351 Functional & technical spec. (ECSS-E-10-Part6)
WD 10794 Materials, mechanical parts and processes (ECSS-70B)
WD NWIPDIS/ FDISISLegend :
CD
NEED TO BE CONFIRMEDNEW NEED CONFIRMED
IS 21349 Project review (ECSS-M-30-01A)
IS under revision
WG 5 FRAMEWO
RESOLUTION 2
[2/2]
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
DECISIONS [1/2](Projects moving to next stages, new projects proposed, etc. from last Plenary)
12 changes since 2006 Plenary meeting in Colorado (slides 1+2)
Initiate member body review (May 2009)Functional and technical specifications (PL: J. Chevalier)IS21351
Approved for IS publicationUse of off-the-shelf items (PL: R. Widmann)21350
Approved for IS publicationProject reviews (PL: R. Widmann)21349
Initiate member body review: April 2007Risk management (PL: T. Deak)IS17666
NWI reinstated and approved. Initate the
ballot for DIS
Probabilistic risk assessment (PL: M. Stamatelatos)CD16193
Wait for French translationLessons learned (PL: I. Dummigan)CD16192
Next review March 2009Qualification assessment (PL: V. Nikoulitchev)IS15865
CD before April 2008Programme Management – Glossary of terms (Matos, Joao BC)WD10795
CD before April 2008Programme Management Material, mechanical parts and
Processes (Kikuchi, Satoshi)
WD10794
CD before April 2008Programme Management – Information and Documentation
Management (Mauro Marchi)
WD10789
Waiting for voting results ReviewProduct assurance (PL:J. Marcoux)14300-2
ReviewProgram management (PL : TBD)14300-1
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
DECISIONS [2/2]
(Projects moving to next stages, new projects proposed, etc. from last plenary)
PL to findConfiguration managementNWI
PL to findCost and scheduleNWI
Working draft to be issued (CD
registered foreseen 12/2006)
Project breakdown structure (PL: R. Widmann)WD27026
CD comments to be dispositionedQuality assurance requirements (PL: S. Drogoul)CD27025
Approved for TR publicationManagement specification and plan (PL: T. Deak)
Name has changed “Guidelines to define a framework for
space project”
TR23462
CD comments resolvedNon conformance control system (PL: S. Kikuchi)CD23461
CD comments to be dispositionedDependability assurance requirements (PL: E. Vergnault)CD23460
12 changes since 2006 Plenary meeting in Colorado (slides 1+2)
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
B2Dependability assurance requirementsECSS Q-30-B /Draft C
planned 4Q 2007
Dependability assurance
requirements
CD 23460
N/AFunctional and technical specif.ECSS E-10-B Part 6Functional and technical specif.IS21351
A2ECSS NWIPUse of off-the-shelf itemsDIS21350
C3Project reviewsECSS M-30-01-A/Draft
B in preparation 2Q
2007
Project reviewsIS21349
B2Risk managementECSS M-00-03-B/
Draft B rev1
Risk management (member review
4/2007)
IS17666
N/AProbabilistic risk assessmentCD16193
N/ALessons learnedCD 16192
N/AQualification assessmentIS15865
C1Safety requirementsECSS Q40-B/Draft Cplanned 4Q 2007
Safety requirements (member bodyreview 12/2006
IS14620-1
N/AProduct assuranceECSS Q-00-BProduct assuranceIS14300-2
N/AStructuring of a ProgrammeIS14300-1
TitleID NumberTitleID Number
CAS
E
ECSS STANDARDISO STANDARD
WG 5 ISO-ECSS coordination
REFERENCE RECALL [1/3]
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
TitleID NumberTitleID Number
CAS
E
ECSS STANDARDISO STANDARD
N/AValue AnalysisValue AnalysisNWI
?Functional AnalysisECSS E-10-05-AFunctional AnalysisNWI
?VerificationECSS E-10-02-BVerificationNWI
?Engineering SystemECSS E-10-part 1-B
(partly)
Engineering ManagementNWI
B2Glossary of termsECSS P-001-BGlossary of termsWD 10795
B2Materials, Mechanical parts and
processes
ECSS Q-70-BMaterials, Mechanical parts and
processes
WD 10794
B2Cost and ScheduleECSS M-60-BCost and ScheduleNWIP
B2Information and Documentation
Management
ECSS M-50-BInformation and Documentation
Management
WD 10789
B2Configuration ManagementECSS M-40-BConfiguration ManagementNWIP
B2Project OrganisationECSS M-20-BProject Organisation14N512
B2Project breakdown structureECSS M-10-BProject breakdown structureWD 27026
WG 5 ISO-ECSS coordination
REFERENCE RECALL [1/3]
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
In conclusion ISO/ECSS coordination implementation, candidates are
• 1 “A2” = Merge activities within ISO;
• 2 “B1” = Independent development;
• 1 “C1” = Independent development;
• 1 “C3” = Adoption by ECSS;
• 7 “B2” = Adaptation by ISO with ECSS support identified by WG5.
WG 5 ISO-ECSS coordination
REFERENCE RECALL [1/3]
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
DECISIONS(projects moving to next stages, new projects proposed, etc.)
Orbital Debris Coordination Working Group (ODCWG)Hedley Stokes made a presentation of ODCWG outputs.
For WD 24113, ODCQG asks WG5 to provide comments on § 7 about
Orbital Debris Mitigation Plan (ODMP). Comments already prepared during
meeting and will be formally sent to ODCWG. Deadline: 1st June 2007.
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
PROPOSED RESOLUTIONS FOR PLENARY
Nothing to report
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
PARTICIPATION TO THE MEETINGS
0 2
0 1
0 0
12
1 0
2 2
00
1 1
2 4
6 0
2 1
Plenary Spring meeting
May 21th – 23th, 2006
Beijing (CHINA)
20 participants
Fall meeting
October 17th - 18th, 2005
Paris (FRANCE)
14 participants
Brazil
China
France
Germany
Italy
Japan
Russia
UK
Ukraine
USA
ESA
25 May 2007
AIRCRAFT AND SPACE VEHICLES
SPACE SYSTEMS AND OPERATIONS
Insert Working Group Title
Working Group #5
PROBLEMS/ PROPOSED SOLUTIONS(For action by the plenary)
Invite China to have a voting WG5 representative.
Invite US to encourage WG5 representative to attend and speed up present WD.
DTR 23462 “Guidelines to define the management framework for a space project
This DTR (Draft Technical Report) is under publication (TR). Necessary to check
comments have been resolved and to update the title in ISO status N250 by SC1
Secretariat as already asked during last fall meeting.
At TMB level a proposal has been made by BSI to introduce a NWI “Guideline on
Project Management” Oct-06 based on BS 6079:
ISO vote: BSI proposal accepted: 19 agree; 4 against; 2 abstain/14 ready to
participate. ANSI counter proposal: Only Glossary/Based on PMBOK Guide (exist
in 10+7 languages)/ANSI has made a counter proposal for a glossary
Necessary to associate TC20/SC14/W5 representative to take into account our is
For all PLs: necessary to send to WG Convenor all the WDs/CDs before release
ISO TC20/SC14 to check consistency and to be informed on progress & commen
taken into account.