working internationally: delivering specifications for projects
DESCRIPTION
RIBA International - 23 rd March 2012. Working Internationally: Delivering Specifications for Projects. David Smith. Introduction. Role of the Local Partner. Appointment. Contents. Design Standards and Products. Specification Format and Content. Points to Note. Appointment. - PowerPoint PPT PresentationTRANSCRIPT
Working Internationally: Delivering Specifications for Projects
David Smith
RIBA International - 23rd March 2012
Contents
IntroductionAppointmentRole of the Local Partner
Specification Format and Content
Design Standards and Products
Points to Note
Appointment
• Factors Affecting Specifications– Level of Design– Responsibilities of the Team – Design Deliverables– Procurement Strategy– Form of Contract– Duties of Local Partner
• Identify Scopes• Planning Responsibility• Building Control
– Standards International/ Local• Building Codes e.g. IBC
– Sustainability Requirements– Be clear what will initiate payment
Role of the Local Partner
• What Can Go Wrong?– Different interpretations
• Quality• Levels of Design
– Contractor Design• Market capability
– Risk associated with handover• Dropping the baton
– Concept/ visual design intent being dumped as soon as a local Architect /Contractor is on board
• What To Do About It?– Clarify Issues
• Design Responsibility• Translations• Deliverables
– Sub-consultancy agreement• Responsibility Matrix • Manage Expectations
– Appoint local Designers ASAP– Clarify terms
• Performance Design etc. – Get the right people doing the
right tasks e.g. planning and permits
Design Standards and Products
• Standards– International– Local– Performance Criteria
• Local Construction Expertise– Material availability– Construction skill set
• Products– Source– Quality– Availability– Sustainability requirements– 3 items in Spec
• Performance, prescriptive, D&B
Specification Format and Content
• Format– CAWS– CSI– Local
• Content– Quality level– Local availability– Level of detail
• Language– Translation– Technical Checking– TimeKING ABDULAZIZ CENTRE FOR WORLD CULTURE – DHAHRAN, SAUDI ARABIA Reproduced by kind permission of Snøhetta & MIR
Points to Note
• Essential actions– Interrogate the appointment– Local partner selection– Use the specification
effectively– Secure quality– Ensure standards and
format are what’s required
YAS Marina – Abu Dhabi
Thank You