Workplace Safety and Health
Practices Award:
Gammon Construction Limited Singapore Branch
Simplified Traffic Diversions and Safe Earth Retaining System
Workplace Safety & Health Awards 2007
Simplified Traffic Diversions and Safe Earth Retaining System
for the Construction of DTL Chinatown Station / Tunnels Roof
Slabs
Safety
Agenda
1. Introduction
2. Original & Innovative Safety Solution
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
3. Comparisons
4. Evaluations
5. Conclusion
1. Introduction
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Gammon Construction Singapore Branch
• A1 Contractor in both Building & Civil Engineering
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Construction Project – Contract 909
- Design, Construction and Completion of Chinatown
Station and associated tunnels for Downtown Line 1
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
• Client : Land Transport Authority of Singapore
• Design Consultant : Lambeth (Gammon’ wholly
Subsidiary Company)
• Main Contractor : Gammon Construction Limited
Contract 909 – Site Overview
Overrun Tunnels Retail Area and Tunnels
C909 | C908C909 | C908
Existing Underpass
Chinatown Station
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
C909 Chinatown Station Layout PlanC909 Chinatown Station Layout Plan
Existing NEL Chinatown
Station
ShopHouses
Structural Arrangement
- Diaphragm wall - 2 rows Tension piles
- 3-level Slabs (Roof & Retail & Track) - Internal wall & Column
Roof
PermanentTemporary
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Roof
Retail
Track
D-wall
Column/WallStanchion
Construction Method
• Top-down construction
• 2-phase traffic diversion
• Early backfilling for road reinstatement
• Shallow cofferdam for roof construction
Work Area Work AreaDivert Road
Divert Road
Roof Cofferdam
Roof
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Phase 1 Phase 2
BackfillCofferdam
Roof Cofferdam
2a. Original Safety Solution
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
2a. Original Solution - Sheet pile + Strutting – Stage 1©
20
10
Ga
mm
on
Co
nstr
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
2a. Original Solution - Sheet pile + Strutting – Stage 2©
20
10
Ga
mm
on
Co
nstr
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
2a. Original Solution - Sheet pile + Strutting – Stage 3©
20
10
Ga
mm
on
Co
nstr
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
2b. Innovative Safety Solution
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
2b. Innovative Solution – Precast Retaining wall©
20
10
Ga
mm
on
Co
nstr
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
2b. Innovative Solution – Precast Retaining wall©
20
10
Ga
mm
on
Co
nstr
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
2b. Innovative Solution – Precast Retaining wall©
20
10
Ga
mm
on
Co
nstr
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Construction Photos
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Pre-cast retaining wall installationStrutted cofferdam and
Construction of roof slab
Construction Photographs©
20
10
Ga
mm
on
Co
nstr
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Pre-cast retaining wall installation
Backfilling & Road reinstatementRemoval of Struts and waterproofing
Construction of roof slab
South Side Excavation©
20
10
Ga
mm
on
Co
nstr
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
North Side Excavation©
20
10
Ga
mm
on
Co
nstr
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
3. Comparisons
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Major Improvements
Works Involved Original Scheme Innovative Scheme
General Mobilisation /
Demobilisation of machineries 3 stages 2 stages
Site Preparation 3 stages 2 stages
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Major Traffic Diversions 3 stages 2 stages
Sheetpiles 4 rows 1 row
Struttings 3 layers 1 layer
Major Excavation Phases 3 stages 2 stages
Major Construction Joints 2 1
3a. Lesser Risk/Hazard Exposure
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
HSE Risks Reduced Significantly
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Project Achievements
• No accident related to this Safety Solution.
• The project has no accident, stop work order nor fine.
• The project achieved over 4 million accident-free man-
hours.
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
• Project received the following safety recognitions;
- WSH Council’ SHARP awards – 2009, 2010 and 2011
(submitted and pending outcome),
- LTA’ ASAC Safety Champion 2010,
- BCA’ Productivity & Innovation Award 2011,
- UK’ ROSPA Gold Award 2010 & 2011.
3b. Time Saving
- 90 Working Days
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
3c. Cost Saving
- Closed to S$1 Million
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Cost Comparison:
Work Scope Cost for 3 phase S$ Cost for 2 phase S$
1 Site preparation (erect traffic barrier and hoarding) for 3 phase construction 275,000.00 200,000.00
2 Traffic diversion cost for traffic diversions 95,000.00 65,000.00
3 Road cutting & Road reinstatement cost for diversions (mobilization of rollers, material costs, road marking cost) 725,000.00 625,000.00
4 Sheetpiling cost for 2 rows of sheet pile ( mobilization cost of using silent piler, sheetpile cost, extraction cost) 800,000.00 400,000.00
5 Strutting works for North & South Cofferdam ( mobilization cost, machinery cost (lorry crane, mobile crane, generator
set for welding) material cost (walers, struts, struts, G30 concrete packing), labour cost) 1,000,000.00 500,000.00
Cost for having 2 construction joints on roof slab including (hy-rib formwork, hydrophilic water-stop, re-injectable grout
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Estimated Overall Cost Savings ≈ $1M
6Cost for having 2 construction joints on roof slab including (hy-rib formwork, hydrophilic water-stop, re-injectable grout
tube, labour cost, additional coupler costs, additional lapping bars cost, additional waterproofing cost – ie. Lapping of
waterproofing) 350,000.00 240,000.00
7 Additional Design cost - 707.50
8 Precast retaining wall - 529,000.00Sub-Total $3,245,000.00 $2,559,707.50
Estimated cost saving
9 Estimated Mandays cost = 30% of the cost savings
10 Therefore Total Cost Savings
$685,292.50
$364,500.00
$1,049,792.50
3d. Improved Productivity
- 4,500 man-days reduction
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
3e. Other Benefits
-Client Satisfaction
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
-Material Saving – Less Sheet-piles used
-Environmental Friendly – Less CO2 emission
4. Conclusion
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
Conclusion
• A comprehensive engineering solution that reduced hazard
/ risk and delivered good safety results.
• Cost saving of $1,000,000.
• Productivity improvement of 4,500 man-days.
©2
01
0 G
am
mo
n C
on
str
uctio
n L
imite
d.
All
Rig
hts
Re
se
rve
d
• Time saving of 90 working days.
• First of its kind in Singapore and favored by LTA for future
adoption.
• Successfully implemented and achieved the desirable
results.