Hinkley Point C Connection Project
Works PlansSection A - Puriton Ridge
4.1.2Do
cum
ent
Regulation 5(2)(j) of the Infrastructure Planning(Applications: Prescribed Forms and Procedure)Regulations 2009
![Page 2: Works Plans Section A - Puriton Ridge... · A AUG 2013 S.42/S.47 CONSULTATION ML JB PB Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will](https://reader033.vdocument.in/reader033/viewer/2022052020/6034453c7d3cbd64271022c7/html5/thumbnails/2.jpg)
A
B
C
D
EFG
HB3141
A372
A38
A38
A38
A38
A38
A39
A38
A39
A39
M5
M5
M5
M5
A39
A39
A39
A38
A38
A39
B3141
Chedzoy
Bawdrip
Horsey
ChiltonTrinity
Down End
LangMoor
The Dems
The Doles
Martland
EastBower
Parchey
Slape Cross
Bradney
Knowle
Dunwear
Eastover
Dunball
Walpole
HuntworthBusiness
Park
SydenhamBRIDGWATER
Puriton
Woolavington
23
SEC TION ASECTION B
Bridgwater
9
19
16
17
71
8
42
Sheet 1 -A/WP/PS/1
Sheet 2 -A/WP/PS/2
Sheet 6 -A/WP/PS/6
Sheet 3 -A/WP/PS/3
Sheet 5 -A/WP/PS/5
Sheet 4 -A/WP/PS/4
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDERKEY PLAN FOR WORKS PLANS
(REGULATION 5(2)(j))SECTION A
SHEET 1 OF 1SEDGEMOOR DISTRICT COUNCIL
KeyORDER LIMITSLOCAL AUTHORITYBOUNDARYSECTION BOUNDARYSHEET INDEX
0 200 400 600 800Metres
SITE MAP
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
GISA1
SCALE1:10,000
ISSUE
NG INVESTMENT No. APPLICATION No.
NG DRAWING No.
A/WP/KP/1
20897 EN020001DRAWING No.
13/NG/0011SHEET 1 OF 1 N/A
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471
TitleISSUE CHK'D APP'DDRAW
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
KEY PLAN FOR WORKS PLANS(REGULATION 5(2)(j))
SECTION ASEDGEMOOR DISTRICT COUNCIL
COMMENTSDATE
Coordinate System: British National GridUnits: MetreProjection: Transverse MercatorDatum: OSGB 1936Scale Factor: 0.9996
332622X Centroid Coordinate: 138434Y Centroid Coordinate:
A AUG 2013 S.42/S.47 CONSULTATION ML JB PB
NotesThis drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
B
B MAY 2014 FOR DCO SUBMISSION JC LD JB
![Page 3: Works Plans Section A - Puriton Ridge... · A AUG 2013 S.42/S.47 CONSULTATION ML JB PB Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will](https://reader033.vdocument.in/reader033/viewer/2022052020/6034453c7d3cbd64271022c7/html5/thumbnails/3.jpg)
1
2
63
54
""
CENTRE LINEOF WORK No. 4B
COMMENCEMENTOF WORK No. 4B
FOR CONTINUATIONSEE SHEET 2
Key
J
"%
%
)8"
8 8
8 LATTICE PYLON (NEW)
J
"%
%
)8"
8 8
8 LATTICE PYLON (REMOVED)8! T PYLON8! ! WOOD POLES
á á"
.
. .
áTEMPORARY MAST
ORDER LIMITSLOCAL AUTHORITYBOUNDARYSECTION BOUNDARYCOMMENCEMENT OF WORK
!
! TERMINATION OF WORKLIMIT OF DEVIATIONLIMIT OF DEVIATION & ORDERLIMITSTEMPORARY OHL DIVERSIONNEW UNDERGROUND CABLENEW OVERHEAD LINEOVERHEAD LINE TO BEREMOVEDSITE COMPOUNDWORK
SITE MAP
Notes
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
TitleISSUE
A
CHK'D APP'DDRAW
NG INVESTMENT No. APPLICATION No.
NG DRAWING No.
GIS
C
A1SCALE
1:2,500A/WP/PS/1
20897 EN020001
ISSUE
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS
(REGULATION 5(2)(j))SECTION A
SHEET 1 OF 6SEDGEMOOR DISTRICT COUNCIL
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
WORKS PLANS(REGULATION 5(2)(j))
SECTION ASEDGEMOOR DISTRICT COUNCIL
DRAWING No.
13/NG/0012
COMMENTSDATEAUG 2013
SHEET 1 OF 6 N/A
S.42/S.47 CONSULTATION OA
0 40 80 120 160 200Metres
FCoordinate System: British National GridUnits: MetreProjection: Transverse MercatorDatum: OSGB 1936Scale Factor: 0.9996
332454X Centroid Coordinate: 135900Y Centroid Coordinate:
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471
JB PBB FOR DCO SUBMISSION TCMAY 2014 LD JB
This drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
C FOR DCO SUBMISSION TCMAY 2014 LD JB
![Page 4: Works Plans Section A - Puriton Ridge... · A AUG 2013 S.42/S.47 CONSULTATION ML JB PB Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will](https://reader033.vdocument.in/reader033/viewer/2022052020/6034453c7d3cbd64271022c7/html5/thumbnails/4.jpg)
1
2
63
54
" "
""
CENTRE LINEOF WORK No. 4B
CENTRE LINEOF WORK No. 4B
FOR CONTINUATIONSEE SHEET 1
FOR CONTINUATION SEE SHEET 3
Key
J
"%
%
)8"
8 8
8 LATTICE PYLON (NEW)
J
"%
%
)8"
8 8
8 LATTICE PYLON (REMOVED)8! T PYLON8! ! WOOD POLES
á á"
.
. .
áTEMPORARY MAST
ORDER LIMITSLOCAL AUTHORITYBOUNDARYSECTION BOUNDARYCOMMENCEMENT OF WORK
!
! TERMINATION OF WORKLIMIT OF DEVIATIONLIMIT OF DEVIATION & ORDERLIMITSTEMPORARY OHL DIVERSIONNEW UNDERGROUND CABLENEW OVERHEAD LINEOVERHEAD LINE TO BEREMOVEDSITE COMPOUNDWORK
SITE MAP
Notes
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
TitleISSUE
A
CHK'D APP'DDRAW
NG INVESTMENT No. APPLICATION No.
NG DRAWING No.
GIS
C
A1SCALE
1:2,500A/WP/PS/2
20897 EN020001
ISSUE
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS
(REGULATION 5(2)(j))SECTION A
SHEET 2 OF 6SEDGEMOOR DISTRICT COUNCIL
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
WORKS PLANS(REGULATION 5(2)(j))
SECTION ASEDGEMOOR DISTRICT COUNCIL
DRAWING No.
13/NG/0012
COMMENTSDATEAUG 2013
SHEET 2 OF 6 N/A
S.42/S.47 CONSULTATION OA
0 40 80 120 160 200Metres
FCoordinate System: British National GridUnits: MetreProjection: Transverse MercatorDatum: OSGB 1936Scale Factor: 0.9996
333090X Centroid Coordinate: 137527Y Centroid Coordinate:
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471
JB PBB FOR DCO SUBMISSION TCMAY 2014 LD JB
This drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
C FOR DCO SUBMISSION TCMAY 2014 LD JB
![Page 5: Works Plans Section A - Puriton Ridge... · A AUG 2013 S.42/S.47 CONSULTATION ML JB PB Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will](https://reader033.vdocument.in/reader033/viewer/2022052020/6034453c7d3cbd64271022c7/html5/thumbnails/5.jpg)
1
2
63
54
" "
"
"
""
CENTRE LINEOF WORK No. 4B
CENTRE LINEOF WORK No. 4B
CENTRE LINEOF WORK No. 4B
COMPOUND ASSOCIATEDWITH WORK No. 2A
FOR CONTINUATIONSEE SHEET 2
FOR CONTINUATION SEE SHEET 4
FOR CONTINUATION
SEE
SHEE
T5
Key
J
"%
%
)8"
8 8
8 LATTICE PYLON (NEW)
J
"%
%
)8"
8 8
8 LATTICE PYLON (REMOVED)8! T PYLON8! ! WOOD POLES
á á"
.
. .
áTEMPORARY MAST
ORDER LIMITSLOCAL AUTHORITYBOUNDARYSECTION BOUNDARYCOMMENCEMENT OF WORK
!
! TERMINATION OF WORKLIMIT OF DEVIATIONLIMIT OF DEVIATION & ORDERLIMITSTEMPORARY OHL DIVERSIONNEW UNDERGROUND CABLENEW OVERHEAD LINEOVERHEAD LINE TO BEREMOVEDSITE COMPOUNDWORK
SITE MAP
Notes
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
TitleISSUE
A
CHK'D APP'DDRAW
NG INVESTMENT No. APPLICATION No.
NG DRAWING No.
GIS
C
A1SCALE
1:2,500A/WP/PS/3
20897 EN020001
ISSUE
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS
(REGULATION 5(2)(j))SECTION A
SHEET 3 OF 6SEDGEMOOR DISTRICT COUNCIL
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
WORKS PLANS(REGULATION 5(2)(j))
SECTION ASEDGEMOOR DISTRICT COUNCIL
DRAWING No.
13/NG/0012
COMMENTSDATEAUG 2013
SHEET 3 OF 6 N/A
S.42/S.47 CONSULTATION OA
0 40 80 120 160 200Metres
FCoordinate System: British National GridUnits: MetreProjection: Transverse MercatorDatum: OSGB 1936Scale Factor: 0.9996
333534X Centroid Coordinate: 139347Y Centroid Coordinate:
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471
JB PBB FOR DCO SUBMISSION TCMAY 2014 LD JB
This drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
C FOR DCO SUBMISSION TCMAY 2014 LD JB
![Page 6: Works Plans Section A - Puriton Ridge... · A AUG 2013 S.42/S.47 CONSULTATION ML JB PB Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will](https://reader033.vdocument.in/reader033/viewer/2022052020/6034453c7d3cbd64271022c7/html5/thumbnails/6.jpg)
1
2
63
54
SECTION A
SECTION B
" "
""
8!
8!
8
!
8
!
ZGA6
ZGA7
ZGA8
ZGA9
CENTRE LINEOF WORK No. 4B
CENTRE LINEOF WORK No. 4B
CENTRE LINEOF WORK No. 4B
CENTRE LINEOF WORK No. 4B
CENTRE LINEOF WORK No. 1B
CENTRE LINEOF WORK No. 1B
FOR
CONT
INUA
TION
SEE S
HEET
5
FOR CONTINUATIONSEE SHEET 3
Key
J
"%
%
)8"
8 8
8 LATTICE PYLON (NEW)
J
"%
%
)8"
8 8
8 LATTICE PYLON (REMOVED)8! T PYLON8! ! WOOD POLES
á á"
.
. .
áTEMPORARY MAST
ORDER LIMITSLOCAL AUTHORITYBOUNDARYSECTION BOUNDARYCOMMENCEMENT OF WORK
!
! TERMINATION OF WORKLIMIT OF DEVIATIONLIMIT OF DEVIATION & ORDERLIMITSTEMPORARY OHL DIVERSIONNEW UNDERGROUND CABLENEW OVERHEAD LINEOVERHEAD LINE TO BEREMOVEDSITE COMPOUNDWORK
SITE MAP
Notes
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
TitleISSUE
A
CHK'D APP'DDRAW
NG INVESTMENT No. APPLICATION No.
NG DRAWING No.
GIS
C
A1SCALE
1:2,500A/WP/PS/4
20897 EN020001
ISSUE
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS
(REGULATION 5(2)(j))SECTION A
SHEET 4 OF 6SEDGEMOOR DISTRICT COUNCIL
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
WORKS PLANS(REGULATION 5(2)(j))
SECTION ASEDGEMOOR DISTRICT COUNCIL
DRAWING No.
13/NG/0012
COMMENTSDATEAUG 2013
SHEET 4 OF 6 N/A
S.42/S.47 CONSULTATION OA
0 40 80 120 160 200Metres
FCoordinate System: British National GridUnits: MetreProjection: Transverse MercatorDatum: OSGB 1936Scale Factor: 0.9996
333880X Centroid Coordinate: 140722Y Centroid Coordinate:
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471
JB PBB FOR DCO SUBMISSION TCMAY 2014 LD JB
This drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
C FOR DCO SUBMISSION TCMAY 2014 LD JB
![Page 7: Works Plans Section A - Puriton Ridge... · A AUG 2013 S.42/S.47 CONSULTATION ML JB PB Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will](https://reader033.vdocument.in/reader033/viewer/2022052020/6034453c7d3cbd64271022c7/html5/thumbnails/7.jpg)
1
2
63
54
""
""
""
""
!(
!(
J" %
%
)8"
8
88
8!
8
!
8
!
8
!
8!
8!
J"%
%
)8"8
8 8
J"%
%
)8"8
8 8
á á"
.
. .
á
VQ044R
ZGA1
ZGA2
ZGA3
ZGA4
ZGA5
ZGA6
VQ044
VQ045
CENTRE LINEOF WORK No. 1B
CENTRE LINEOF WORK No. 2A (CABLES)
CENTRE LINEOF WORK No. 1A
TEMPORARYOHL DIVERSIONASSOCIATEDWITH WORK No. 1A
TERMINATIONOF WORK No. 1A
WORK No. 2A
COMPOUND ASSOCIATEDWITH WORK No. 2A
FOR
CONT
INUA
TION
SEE
SHEE
T 3
FOR CONTINUATION SEE SHEET 6
FOR CONTINUATION SEE SHEET 4
FOR CONTINUATION SEE SHEET 6
Key
J
"%
%
)8"
8 8
8 LATTICE PYLON (NEW)
J
"%
%
)8"
8 8
8 LATTICE PYLON (REMOVED)8! T PYLON8! ! WOOD POLES
á á"
.
. .
áTEMPORARY MAST
ORDER LIMITSLOCAL AUTHORITYBOUNDARYSECTION BOUNDARYCOMMENCEMENT OF WORK
!
! TERMINATION OF WORKLIMIT OF DEVIATIONLIMIT OF DEVIATION & ORDERLIMITSTEMPORARY OHL DIVERSIONNEW UNDERGROUND CABLENEW OVERHEAD LINEOVERHEAD LINE TO BEREMOVEDSITE COMPOUNDWORK
SITE MAP
Notes
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
TitleISSUE
A
CHK'D APP'DDRAW
NG INVESTMENT No. APPLICATION No.
NG DRAWING No.
GIS
C
A1SCALE
1:2,500A/WP/PS/5
20897 EN020001
ISSUE
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS
(REGULATION 5(2)(j))SECTION A
SHEET 5 OF 6SEDGEMOOR DISTRICT COUNCIL
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
WORKS PLANS(REGULATION 5(2)(j))
SECTION ASEDGEMOOR DISTRICT COUNCIL
DRAWING No.
13/NG/0012
COMMENTSDATEAUG 2013
SHEET 5 OF 6 N/A
S.42/S.47 CONSULTATION OA
0 40 80 120 160 200Metres
FCoordinate System: British National GridUnits: MetreProjection: Transverse MercatorDatum: OSGB 1936Scale Factor: 0.9996
332759X Centroid Coordinate: 140309Y Centroid Coordinate:
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471
JB PBB FOR DCO SUBMISSION TCMAY 2014 LD JB
This drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
C FOR DCO SUBMISSION TCMAY 2014 LD JB
![Page 8: Works Plans Section A - Puriton Ridge... · A AUG 2013 S.42/S.47 CONSULTATION ML JB PB Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will](https://reader033.vdocument.in/reader033/viewer/2022052020/6034453c7d3cbd64271022c7/html5/thumbnails/8.jpg)
1
2
63
54
""
J" %
%
)8"
8
88
J"%
%
)8"
8
88
8
!
8
!
8
!
J"%
%
)8"8
8 8
J"%
%
)8"8
8 8
J"%
%
)8"8
8 8
J"%
%
)8"8
8 8
á á"
.
..
á
á á"
.
. .
á
VQ044RVQ043R
ZGA1
ZGA2
ZGA3
VQ043
VQ044
VQ045
VQ042
CENTRE LINEOF WORK No. 1B
CENTRE LINEOF WORK No. 1A
CENTRE LINEOF WORK No. 2A (CABLES)
CENTRE LINEOF WORK No. 1A
TEMPORARYOHL DIVERSIONASSOCIATEDWITH WORK No. 1ACOMMENCEMENT
OF WORK No. 1B
COMMENCEMENTOF WORK No. 1A
TERMINATIONOF WORK No. 1A
WORK No. 2A
WORK No. 2A
FOR CONTINUATION SEE SHEET 5
Key
J
"%
%
)8"
8 8
8 LATTICE PYLON (NEW)
J
"%
%
)8"
8 8
8 LATTICE PYLON (REMOVED)8! T PYLON8! ! WOOD POLES
á á"
.
. .
áTEMPORARY MAST
ORDER LIMITSLOCAL AUTHORITYBOUNDARYSECTION BOUNDARYCOMMENCEMENT OF WORK
!
! TERMINATION OF WORKLIMIT OF DEVIATIONLIMIT OF DEVIATION & ORDERLIMITSTEMPORARY OHL DIVERSIONNEW UNDERGROUND CABLENEW OVERHEAD LINEOVERHEAD LINE TO BEREMOVEDSITE COMPOUNDWORK
SITE MAP
Notes
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
TitleISSUE
A
CHK'D APP'DDRAW
NG INVESTMENT No. APPLICATION No.
NG DRAWING No.
GIS
C
A1SCALE
1:2,500A/WP/PS/6
20897 EN020001
ISSUE
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS
(REGULATION 5(2)(j))SECTION A
SHEET 6 OF 6SEDGEMOOR DISTRICT COUNCIL
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
WORKS PLANS(REGULATION 5(2)(j))
SECTION ASEDGEMOOR DISTRICT COUNCIL
DRAWING No.
13/NG/0012
COMMENTSDATEAUG 2013
SHEET 6 OF 6 N/A
S.42/S.47 CONSULTATION OA
0 40 80 120 160 200Metres
FCoordinate System: British National GridUnits: MetreProjection: Transverse MercatorDatum: OSGB 1936Scale Factor: 0.9996
331968X Centroid Coordinate: 139696Y Centroid Coordinate:
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471
JB PBB FOR DCO SUBMISSION TCMAY 2014 LD JB
This drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
C FOR DCO SUBMISSION TCMAY 2014 LD JB