  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    1/27

    Reed Street YardsGlobal Water Technology Park

    A Project of Partnerships & Cooperation: Balancing

    Natural Resources & Economic Development

    Joshua Neudorfer

    Milwaukee, Wisconsin

    April 2013

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    2/27

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    3/27

    The Historic Menomonee River

    Valley

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    4/27

    Many Famous Companies

    Were Located in the Menomonee Valley

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    5/27

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    6/27

    Reed Street Yards Today

    View East

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    7/27

    Stakeholders & Partners Atlas Development Site Owner

    General Capital - Developer

    City of Milwaukee

    Wisconsin Department of Natural Resources

    Metropolitan Milwaukee Sewerage District

    Fund for Lake Michigan

    Milwaukee Water Council

    Surrounding Property Owners, Consultants, et al.

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    8/27

    The Project Site

    Reed Street Yards 17 Acres Industrial

    Rezoned as the RSY Development Incentive Zone (DIZ)

    Pre-historically this was Menomonee Valley Estuary with wild rice, water fowl,and diverse flora and fauna

    Industrial History Dates back to the Second Half of 1800s

    General Warehousing

    Gypsum Company

    Rail Yard Vermiculate Exfoliation Facility

    Furnace Warehouse

    Asbestos Warehouse

    Salt, Lime, and Sulfate Storage

    Tannery Facilities

    Gasoline Filling Station at the Street

    Purchased by the current land owner in the early 1990s

    Current owner has been actively and incrementally been moving the projectcloser to redevelopment

    Formed a development partnership with General Capital in the last few years

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    9/27

    Aerial 1957

    Reed Street Yards

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    10/27

    View West

    South Menomonee Canal

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    11/27

    Reed Street Yards

    The Big Picture Vision Create a World Class, Global Water Technology Business Park

    Adds new Business, Jobs, and Technology to Milwaukee Improves the Environment on which it is built

    Provides Public Access to the waterfront

    Increase Local & Regional Property Values

    Financially Successful

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    12/27

    The Big Picture Vision

    Global Water Technology Park

    A Redevelopment Project Consistent with the vision established

    in the Water Councils Mission

    To align the regional fresh water research community and water-

    related industries to establish the Milwaukee re ion as the World

    Water Hub for water research, economic development, andeducation.

    International, National, and Regional Businesses

    Incubator Businesses

    Academic Institutions Research & Development

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    13/27

    The Vision Important Details Demonstration Elements

    Storm water Native Landscape, Bio-infiltration, Phyto-Remediation, Porous

    Pavements, Urban Canopy Potential De-centralized Sanitary Treatment the Purple Pipe

    Innovative Technologies & Products

    Educational Signage & Education Opportunities

    Sustainable Design Approach Master Storm Water Plan

    Building Design Standards LEED Metrics

    Indigenous Plant Reintroduction Menomonee Valley Palette

    Improved Public Access

    Hank Aaron State Trail Extension

    Urban Plaza

    South Menomonee Canal Overlook, canoe & kayak launch, stabilization

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    14/27

    Redevelopment Planning City Led Planning Effort - Development Incentive Zone (DIZ)

    Standard Established

    Developer Team Project Vision

    Milwaukee Water Council/International Water Association

    (IWA) Design Charrette

    WDNR Voluntary Party Liability Protection (VPLE) ProgramParticipation

    Funding

    Private Investment

    TIF

    Grants

    Technology Partnerships

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    15/27

    Design Considerations Future and Existing Infrastructure Needs

    Future and Existing Parking Needs Trail System Connections

    Infrastructure v. Building-Centric Sustainability Considerations

    Canal & Dock Wall Improvements & Water Access

    Urban Canopy Density & Landscape Planting Strategies

    Real Estate Requirements and Physical Space Constraints

    Vehicular and Pedestrian Access Cost Effective Design

    Value Creation

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    16/27

    Remedial Action Plan Reduce and manage residual PAH, VOC, RCRA Metal, and

    Chloride concentrations in soil and groundwater;

    Groundwater Remediation by Natural Attenuation;

    Engineered Barriers Installation;

    -

    Vegetative Uptake; Soil Stabilization and Canal sheet-pile wall repair;

    Manage Soil Hotspots;

    Methane Mitigation.

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    17/27

    Storm Water

    Management StrategiesThe Now

    Engineered Bioswales;

    Stormwater treatment trains;

    Porous pavement;

    Phytoremediation plantings;

    Increased urban canopy; and Vegetated soil stabilization zones;

    Imagine The Future Sustainable Design Building Guidelines

    Living Roofs & Walls

    Rainwater Collection & Reuse

    Solar Power

    Heat Reclamation . . .

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    18/27

    Thinking Hard About WaterSustainability Solutions and

    Demonstration Projects

    The International WaterAssociation Design Charrette

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    19/27

    Start Big, Raise the Bar

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    20/27

    IWA Design Charrette Great Ideas Achieve the maximum aesthetic value

    from all water and energy elements to

    enhance livability and value to the

    developer

    Accommodate the requirements of

    development economics and

    performance metrics Address needs and challenges expected

    from climate change

    Identify research opportunities within

    the project to complement the

    technology demonstrations

    Integrate commercial and residential

    Incorporate heated effluent from the

    power plant for thermal energy needs

    and evaluate additional off-site uses

    Incorporate thermal energy to heat

    roads and eliminate the use of salt

    Take advantage of the cooling benefits of

    locating power plant effluent piping inthe canal

    Consider demonstration of bio-plastics

    technology for the black-water stream

    Consider creating a green infrastructure

    utility loop with north-south access

    points along the road corridor

    Identify the limitations on use of gray-

    water that has been treated to a higher

    water quality

    Evaluate feasibility of utilizing the canal

    as a reservoir component

    Evaluate how options are impacted by

    current utility regulations and standards,e.g., recycled water reuse limitations

    Address the network and control issues

    Develop a decision tree for future

    adaptation options and early, zero-regret

    actions

    development properties into the project

    Manage the project using intelligentsensors and systems to optimize demand

    timing and water source selection for

    lowering peaks, reduced energy

    consumption, and optimal use of

    available capacity

    Consider a utilidor

    Address LEED and other certificationissues raised by the project and overall

    development (e.g. ISI ENVISION

    certification)

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    21/27

    Monitoringand control

    DWTP

    Washing and cleaningPossibly urinals

    Drinking, cooking,

    personal hygieneGWTP

    The Smart Water Community Concept

    Water supply< 30 % ofnormalconsumption

    Toilet flushing BWTP

    RWTP

    Organic

    kitchen

    waste

    Emergencyoverflow

    Park with constructed reservoir/pond for storage, self-purification and recreation

    Out-door uses,irrigation Bio-soil

    fertilizerRainwaterharvestingStormwatercollection

    Infiltration Heat-

    pump

    Energy

    recovery

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    22/27

    Multi-Functional Water

    Treatment & Energy

    Recovery Facility

    Power

    Plant

    Gray-Water Pipeline

    Conceptual Model

    FutureCommercial

    Future

    TanneryResidential Gray-Water Pipeline

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    23/27

    The Purple Pipe Infrastructure Secondary water line return

    Purple = recycled water vs.

    Blue = Municipally supplied potable water

    Routes treated water back for reuse

    Recycled water may be sent to:

    Natural waters Irrigation

    Industrial water

    Chiller or other closed loop water system

    Toilet water Other non-potable sources

    In other parts of the world purple is treated sufficiently toreintroduce as a percentage of total potable water

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    24/27

    Storm Water Innovation Plaza

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    25/27

  • 7/30/2019 Workshop C Milwaukee's Reed Street Yards Project Josh Neudorfer

    26/27

    Continued Challenges Dock wall tie back hindrances

    Fill and geotechnically unsuitable soils Numerous stake holders

    Historic infrastructure

    Shallow water table

    Easement & utilities

    Project Costs

    The Real Estate Market

    And so on . . .