workshop on fixed-satellite service plan (appendix 30b)...technical examination exercise • concept...

29
WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B) 1

Upload: others

Post on 01-Oct-2020

16 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

WORKSHOP ON Fixed-Satellite Service PLAN

(Appendix 30B)

1

Page 2: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

2

Concept

BR Software used for Technical Examinations

Technical Examination and View Results

Questions?

Page 3: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Concept

3

FSS Plan: Allotments

Appendix 30B

List: Assignments

New systems (conversion, additional system,…

Terrestrial services Terrestrial services

Co

mp

atible

Compatible Compatible

Page 4: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Concept (cont.)

4

Categories of Protection Criteria

• To preserve current and future use of FSS and terrestrial services

• To protect existing allotments / assignments in the Plan / List

HARD Limits (If exceeded the finding is unfavorable and the assignment is returned back to the notifying administration)

Coordination Triggers (Agreements of affected administrations are required)

Page 5: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Concept (cont.)

5

PFD HARD limits

If exceeded, the submission is unfavorable and returned back to the notifying administration.

• Downlink PFD hard limit on the surface of the Earth

• Downlink PFD hard limit on any portion of the surface of the Earth

• Uplink PFD hard limit towards any location in the GSO-satellite orbit located beyond the coordination arc

Article 21 of Radio Regulations (to protect existing and future use of terrestrial services)

Annex 3 of Appendix 30B (to preserve current and future use of Fixed Satellite Service)

Page 6: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Concept (cont.)

6

Article 21 of Radio Regulations (to protect existing and future use of terrestrial services)

Frequency band Service

Limit in dB(W/m2) for angles

of arrival (d) above the horizontal plane Reference

bandwidth 0°-5° 5°-25° 25°-90°

4 500-4 800 MHz

5 670-5 725 MHz

(Nos. 5.453 and

5.455)

7 250-7 850 MHz

Fixed-satellite

(space-to-Earth)

Meteorological-

satellite

(space-to-Earth)

Mobile-satellite

Space research

–152 –152 + 0.5(d – 5) –142 4 kHz

10.7-11.7 GHz Fixed-satellite

(space-to-Earth)

(geostationary-satellite

orbit)

–150 –150+0.5(d – 5) –140 4 kHz

Page 7: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Concept (cont.)

7

Annex 3 of Appendix 30B (to preserve current and future use of Fixed Satellite Service)

Downlink PFD hard limit

on any portion of the surface of the Earth

-127.5dB (W/(m2 . MHz)) in 4 GHz

-114.0dB (W/(m2 . MHz)) in 10/11 GHz

Uplink PFD hard limit

towards any location in the geostationary-satellite orbit located

beyond the coordination arc

-140.0dB (W/(m2 . MHz)) beyond 10° in 6 GHz

-133.0dB (W/(m2 . MHz)) beyond 9° in 13 GHz

Page 8: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Concept (cont.)

8

Coordination Triggers

If exceeded, the agreement of affected administrations is required.

• Uplink single-entry C/I (at test points)

• Downlink single-entry C/I (at test points and grid points)

• Aggregate C/I (at test points)

• Identify the administrations whose territory is partially or wholly included in the service area of the network under examination

Annex 4 of Appendix 30B (to reach compatibility between Allotments / List and new systems within coordination arc)

Service area coverage examination (§6.6 of AP30B) (to identify the service area of the new FSS system)

Page 9: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Concept (cont.)

9

Compatibility within coordination arc (Annex 4 of AP30B)

Agreement is required when at least one of the following three conditions is not satisfied

Notes: Computation precision is 0.05dB for all

Tolerance is 0.25dB for aggregate C/I criteria of assignments not stemming from conversion (beyond the envelop characteristics of the initial allotment)

Uplink single-entry C/I ≥ 30dB, or (C/N)up +9dB,

or accepted value

Downlink single-entry C/I ≥ 26.65dB or (C/N)down +11.65dB

or accepted value (test points and grid points)

Over all aggregate C/I ≥ 21dB or (C/N)total+7dB

or accepted value

Page 10: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Concept (cont.)

10

Grid points for downlink examination (see note 19 of Annex 4 to AP 30B)

Nt

hTh

Nt

hThTh

d

dR

EgV

1

2

1

2

)(

)(

Introduced by WRC-07 to properly protect the service area of allotments / assignments from shaped beams

whose antenna diagrams contain a number of “holes” towards certain specific downlink test points.

The grid points are evenly generated inside and on the border of the service areas of the interfering networks.

The reference value at a grid point is interpolated from the reference values on the test points.

Note: If the value (RTh – ((C/N)d,Th – (C/N)d,Eg)) is lower than RTh, then

(RTh – ((C/N)d,Th – (C/N)d,Eg)) shall be used in the equation instead of RTh,

where: (C/N)d,Th: the downlink C/N value at test point Th;

(C/N)d,Eg: the downlink C/N value at test point Eg.

Page 11: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Concept (end)

11

Criteria in “Other provisions”

• Earth station e.i.r.p limits for angle from horizon <= 5° (§21.8- 21.12 of RR);

• Earth station elevation angle must be > 3 ° (§21.14 of RR);

• Downlink PFD Limits in Table 21-4 of RR (§21.16 -21.17 of RR);

• Uplink e.i.r.p limits towards GSO orbit for 3° or more off the main-lobe axis (§22.26-22.31 and §22.37 of RR);

• Longitude tolerance (+/-0.1 °) (§22.8 of RR);

• Pointing accuracy (§22.19 of RR)

Page 12: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• BR Software used for Technical Examinations

12

AP30B Provisions Criteria Software Publications

§6.3 a) “Other provisions” GIBC/PFD

AP30B/A6A/ Special Section (§6.7 of AP30B)

§6.3 b) Annex 3 of AP30B GIBC/Appendix 30B

§6.4 Annex 4 of AP30B

§6.6 (service area)

§6.19 a) (service area) GIBC/Appendix 30B

AP30B/A6B/ Special Section

(§6.23 or §6.25 of AP30B)

§6.19 b) “Other provisions” GIBC/PFD

§6.19 c) Annex 3 of AP30B GIBC/Appendix 30B

§6.21 Annex 4 of AP30B

§6.22

GIBC - Graphical Interface for Batch Calculations on PC (Note: GIBC requires having GIMS package installed.)

AP30BReport - Viewer of AP30B Reports

Page 13: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

CONTENT OF EXERCISE

1. EXAMINATION W.R.T HARD LIMITS UNDER ARTICLES 21 AND 22 OF RADIO REGULATIONS

2. EXAMINATION W.R.T HARD LIMITS UNDER ANNEX 3 OF APPENDIX 30B

3. IDENTIFICATION OF AFFECTED NETWORKS UNDER ANNEX 4 OF APPENDIX 30B

4. IDENTIFICATION OF TERRITORIES INCLUDED IN THE SERVICE AREA.

13

Page 14: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

INFORMATION ON THE NETWORK TO BE EXAMINED

• NETWORK ID: 114559900

• NETWORK NAME: AP30B_INCOMING

• ORBITAL POSITION: 650E

• NOTIFYING ADM: SUI

• NETWORK CONFIGURATION:

14

Page 15: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

INFORMATION ON THE EXISTING NETWORKS

15

Page 16: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

AP30B DATABASE AND GIMS FOR THIS EXERCISE

• The AP30B Incoming network and existing networks are stored in the following databases:

– AP30B_Database.mdb: containing non-graphical data

– AP30B_GIMS.mdb: containing graphical data (i.e gain contours and service area)

16

Page 17: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

• Technical Examination and View Results (Step 1)

Technical Examination Exercise

17

Using GIMS and AP30B databases

2. Connect your AP30B Database

1. Connect your GIMS Database

Page 18: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

• Technical Examination and View Results (Step 2 (1/2))

Technical Examination Exercise

18

Downlink PFD hard limit on the surface of the Earth (Article 21 of Radio Regulations)

1. Network ID (114559900)

3. Push “Start”

2. Type of Examination

“Hard Limits”

5. Open Folder to see

Examination Results

4. Location of Results File

Page 19: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

• Technical Examination and View Results (Step 2 (2/2))

Technical Examination Exercise

19

Downlink PFD hard limit on the surface of the Earth (Article 21 of Radio Regulations)

See details

PFD Limit is exceeded!

Check error message in MSG.LST !

Page 20: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

• Technical Examination and View Results (Step 3 (1/2))

Technical Examination Exercise

20

Annex 3 of Appendix 30B

1. Network ID (114559900)

3. Push “Start”

2. Type of Examination

“Annex 3 PFD”

5. Run AP30BReport

4. Location of Results File

Page 21: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Technical Examination and View Results (Step 3 (2/2))

21

Annex 3 of Appendix 30B

1. Open Annex 3 – PDF Results

3. Run Query of Results

See details

2. Set the View Criteria

Page 22: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

• Technical Examination and View Results (Step 4 (1/5))

Technical Examination Exercise

22

Annex 4 of Appendix 30B

1. Network ID (114559900)

4. Push “Start”

2. Type of Examination

“Annex 4 C/I”

6. Run AP30BReport

5. Location of Results File

3. Generate Grid

Page 23: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Technical Examination and View Results (Step 4 (2/5))

23

Annex 4 of Appendix 30B

1. Open Annex 4 – C/I

See details

2. Affected network summary

3. Run Query of Results

Page 24: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Technical Examination and View Results (Step 4 (3/5))

24

Annex 4 of Appendix 30B

See details

4. Technical exam summary

5. Run Query of Results

Page 25: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Technical Examination and View Results (Step 4 (4/5))

25

Annex 4 of Appendix 30B

6. C/I values at test and/or grid points

7. Filter Value (optional)

8. Run Query of Results

See details

Page 26: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Technical Examination and View Results (Step 4 (5/5))

26

Annex 4 of Appendix 30B

10. Filter Value (optional)

11. Run Query of Results

See details

9. Reference situation

Page 27: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

• Technical Examination and View Results (Step 5 (1/2))

Technical Examination Exercise

27

Service area coverage examination

1. Network ID (114559900)

3. Push “Start”

2. Type of Examination

“SA Coverage”

5. Run AP30BReport

4. Location of Results File

Page 28: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

Technical Examination Exercise

• Technical Examination and View Results (Step 5 (2/2))

28

Service area coverage examination

1. Open “SA Coverage”

2. Run Query of Results

See details

Page 29: WORKSHOP ON Fixed-Satellite Service PLAN (Appendix 30B)...Technical Examination Exercise • Concept (cont.) 7 Annex 3 of Appendix 30B (to preserve current and future use of Fixed

29

The Bureau has produced video presentations to assist

administrations in using the GIBC software package:

http://www.itu.int/en/ITU-R/space/plans/Pages/AP30B.aspx

WORKSHOP ON Fixed-Satellite Service PLAN

(Appendix 30B)