Workshop on Offshore Wind Development in India Potential & Prospects New Delhi, April 25th, 2013 Norbert Giese, REpower Systems SE

Installed capacity, On- and Offshore Wind Worldwide

Installed until 31.12.2012 world wide

Onshore Wind: 266 GW (98%)

Offshore Wind: 5 GW (2%)

Source: Wind Power Monthly page 56 4/2013

Not yet really significant, big potential

Where Offshore Wind began in 1991 : 11 x 450 kW in Vindeby, NW Lolland, Denmark (Picture: Norbert Giese)

The Offshore Market in Europe

Total Installations 1991 - 2012

- 1.662 # offshore WTGs installed worldwide - thereof in 2012: 369 #

- 4.995 MW total installed offshore worldwide - thereof in 2012: 1.166 MW

- 55 projects - thereof in 2012: 9 projects - 10 countries - Leading Markets so far: UK, DEN, BEL, GER, NED, SWE

- Total outside Europe: 244 MW in China

Source: EWEA / Wind Power Monthly

The Offshore Wind Industry Worldwide : History last 20 years and Near Future Next 4 years

Global Offshore Wind Industry in an important (or critical?) phase

1991 – 2011 in total 3.8 GW grid connected - mainly in Denmark and UK - mainly near shore, shallow water, 2 MW - 3 MW turbines

2012 – 2015 roughly 12 GW under credible development or order - this is a 15 times faster pace than in the first 20 years - thereof :

1/3 will be in the UK and 1/3 will be in Germany 1/3 will be in the rest of world and 2/3 have secured financing already in place 1/3 so far have not secured financing yet

Things get in motion…

Offshore? What kind of offshore?

1. Near to shore, < 20 km, mainly 5 - 15 km from the nearest harbour

2. Shallow water, < 20 m, mainly 5 - 15 m water depth

3. Mainly onshore turbines used with 2 - 3 MW

4. Strong wind regimes

Offshore I

more than 20 km, 1. Far from shore,

more than 20 km, up to 150 km from the nearest harbour

2. Deep water, up to 60 m water depth

3. Real offshore turbines

needed 4. Strong or very strong

wind regimes

Offshore II

1. Far from shore 2. Very deep water 3. For the time being

floating foundations needed

4. Strong or very strong wind regimes

Offshore III

Today’s offshore business…

Typical Challenges: „Waiting for the Cable…“

„AC/DC“ : An Australian Hard Rock Band?

Or is it something more?

AC : Alternating Current + Good for shorter distances and smaller capacities + Well proven + Delivery times of 18-24 Months + Relatively inexpensive - Higher grid losses, impossible for larger distances DC: Direct Current + Solution for larger distances and high power output + Minimal losses, unavoidable for larger distances - New technology, especially offshore - Limited suppliers (Siemens, ABB and only soon Alstom) - Long delivery times of currently > 60 months

Duddon Sands (UK)

Typical Challenges: Serious CAPEX Needs !

2003 2005 2007 2009 2011 2013 2015 2017

0,5

1,0

1,5

2,0

2,5

3,0

3,5

4,0

4,5

5,0

5,5

Alpha Ventus (D)

THB 1 (B)

Belwind 1 (B)

Greater Gabbard (UK)

Thanet (UK) Rhyl Flats (UK)

THB 2+3 (B)

NSO (D)

Cost / MW installed (m€/MW)

COE ~ €170/MWh

Rödsand 2 (DK) Robin Rigg (UK)

Gunfleet Sands (UK)

Lynn (UK)

Burbo (UK)

Barrow (UK)

Kentish (UK)

Scroby Sands (UK)

North Hoyle (UK) N.N. (D)

N.N. (UK)

Jahr 2019

COE ~ €120/MWh ~ £100/MWh

Typical Challenges: Maintenance and Repairs Offshore are Expensive due to Logistics and Weather

OWF

Support Base • Safe Harbour OMV • Heli Base • Backup Teams TS

Logistic Base Bremerhaven • Crew Change (10d) • Bunker • Spare Parts Supply

OMV • TS + MT • Accommodation of Service Technicians • Step over by Ampelman • Spare Parts Stock

Helicopter • TS Backup

- sWH to high - Crew Change

Trouble Shooting and Maintenance

11

Thornton Bank

Phase I 6 x 5M (30 MW)

alpha

ventus

6 x 5M (30 MW)

Ormonde

30 x 5M (150 MW)

Nordsee Ost

48 x 6M (295 MW)

Thornton Bank

Phase II & III

48 x 6M (295 MW)

Beatrice 2 x 5M (10 MW)

2006-2007 2008-2009 2009-2010 2011 2012-2013 2014

REpower’s Answer: Reliable “Super Turbines”

The True Success Factors in Offshore Wind

Dependability of Scheduling and Plans

Experienced People

Mastering Key Interfaces

Unconditional Quality Orientation

Health and Safety, without Alternative

Proven, reliable large WTGs

Solid political environment and incentive systems ( without alternative )