world bank documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas...

28
Procurement Plan-Goods Country/Organisation: RWANDA Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP) Loan #: Credit IDA 51930 Description* Package Number Lot Number Procurement Method Pre-or Post Qualification Prior or Post Review If Prequalification add 7-13 wks List of Contracts 40/G/2012-EASSDP 4 ICB Post Qualification Prior Review 41/G/2012-EASSDP 3 ICB Post Qualification Prior Review 42/G/2012-EASSDP 2 ICB Post Qualification Prior Review 43/G/2012-EASSDP 1 ICB Post Qualification Prior Review 45/G/2012-EASSDP 1 ICB Post Qualification Prior Review Tender to supply of various IT equipment for EARP 67/G/2013-EASSDP 1 NCB Post Qualification Post Review Tender for supply of hotel services for various EARP meetings for the year 2014 68/G/2013-EASSDP 1 NCB Post Qualification Post Review 47/G/2012-EASSDP 1 ICB Post Qualification Prior Review Tender to supply office stationaries 49/G/2013-EASSDP 1 NCB Post Qualification Post Review BASIC DATA Norm Duration of Proc Steps Tender to supply wooden poles, concrete poles and steels and accessories Tender to supply Overhead ACSR Conductor, Overhead ABC Twisted Cables, MV Insulators and MV & LV accessories Tender to Supply of distribution Transformers and MV Overhead Switchgear Tender to supply and installation of solar water heaters for hospitals and schools Tender for supply of service connection meters Tender for supply of Tools and equipment for linesman 838940PROP0P110Box0382116B00PUBLIC0.xls 1 of 28 01/09/2014 3:10 AM Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 14-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Goods Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*Package

Number

Lot

Number

Procurement

Method

Pre-or Post

Qualification

Prior or Post

Review

If Prequalification

add 7-13 wks

List of Contracts

40/G/2012-EASSDP 4 ICB Post Qualification Prior Review

41/G/2012-EASSDP 3 ICB Post Qualification Prior Review

42/G/2012-EASSDP 2 ICB Post Qualification Prior Review

43/G/2012-EASSDP 1 ICB Post Qualification Prior Review

45/G/2012-EASSDP 1 ICB Post Qualification Prior Review

Tender to supply of various IT equipment for

EARP 67/G/2013-EASSDP 1 NCB Post Qualification Post Review

Tender for supply of hotel services for various

EARP meetings for the year 2014 68/G/2013-EASSDP 1 NCB Post Qualification Post Review

47/G/2012-EASSDP 1 ICB Post Qualification Prior Review

Tender to supply office stationaries 49/G/2013-EASSDP 1 NCB Post Qualification Post Review

BASIC DATA

Norm Duration of Proc Steps

Tender to supply wooden poles, concrete poles

and steels and accessories

Tender to supply Overhead ACSR Conductor,

Overhead ABC Twisted Cables, MV Insulators

and MV & LV accessories

Tender to Supply of distribution Transformers

and MV Overhead Switchgear

Tender to supply and installation of solar water

heaters for hospitals and schools

Tender for supply of service connection meters

Tender for supply of Tools and equipment for

linesman

838940PROP0P110Box0382116B00PUBLIC0.xls 1 of 28 01/09/2014 3:10 AM

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Goods

Total Cost

838940PROP0P110Box0382116B00PUBLIC0.xls 2 of 28 01/09/2014 3:10 AM

Page 3: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Goods Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Tender to supply of various IT equipment for

EARP

Tender for supply of hotel services for various

EARP meetings for the year 2014

Tender to supply office stationaries

Norm Duration of Proc Steps

Tender to supply wooden poles, concrete poles

and steels and accessories

Tender to supply Overhead ACSR Conductor,

Overhead ABC Twisted Cables, MV Insulators

and MV & LV accessories

Tender to Supply of distribution Transformers

and MV Overhead Switchgear

Tender to supply and installation of solar water

heaters for hospitals and schools

Tender for supply of service connection meters

Tender for supply of Tools and equipment for

linesman

If Post-Review, No-objection Dates are not needed

Spec Proc Notice

Advert

Plan

vs.

Actual

Prep &

Submission

by Ex Agency

No-objection

Date

On-line UNDB

Gateway

Nat Press

Bid Invitation

Date

Bid Closing-

Opening

Submission

Bid Eval Rpt

No-objection

Date

Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks

Actual

Plan 10-Apr-13 20-Apr-13 4-May-13 4-May-13 3-Jul-13 24-Jul-13 3-Aug-13

Actual

Plan 20-Jun-13 30-Jun-13 14-Jul-13 14-Jul-13 12-Sep-13 3-Oct-13 13-Oct-13

Actual

Plan 30-Dec-13 9-Jan-14 23-Jan-14 23-Jan-14 24-Mar-14 14-Apr-14 24-Apr-14

Actual

Plan 15-Jan-14 25-Jan-14 8-Feb-14 8-Feb-14 9-Apr-14 30-Apr-14 10-May-14

Actual

Plan 10-Dec-13 20-Dec-13 3-Jan-14 3-Jan-14 17-Feb-14 10-Mar-14 20-Mar-14

Actual

Plan 05-Jan-14 NA 5-Jan-14 5-Jan-14 9-Feb-14 2-Mar-14 NA

Actual

Plan 05-Jan-14 NA 5-Jan-14 5-Jan-14 9-Feb-14 2-Mar-14 NA

Actual

Plan 30-Oct-13 9-Nov-13 23-Nov-13 23-Nov-13 7-Jan-14 28-Jan-14 7-Feb-14

Actual

Plan 05-Jan-14 NA 5-Jan-14 5-Jan-14 9-Feb-14 2-Mar-14 NA

Actual

Bid EvaluationBidding Period

Draft Bid Documents, including

specs and quantities, draft SPN

838940PROP0P110Box0382116B00PUBLIC0.xls 3 of 28 01/09/2014 3:10 AM

Page 4: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Goods

Total Cost Plan

Actual

838940PROP0P110Box0382116B00PUBLIC0.xls 4 of 28 01/09/2014 3:10 AM

Page 5: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Goods Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Tender to supply of various IT equipment for

EARP

Tender for supply of hotel services for various

EARP meetings for the year 2014

Tender to supply office stationaries

Norm Duration of Proc Steps

Tender to supply wooden poles, concrete poles

and steels and accessories

Tender to supply Overhead ACSR Conductor,

Overhead ABC Twisted Cables, MV Insulators

and MV & LV accessories

Tender to Supply of distribution Transformers

and MV Overhead Switchgear

Tender to supply and installation of solar water

heaters for hospitals and schools

Tender for supply of service connection meters

Tender for supply of Tools and equipment for

linesman

Contract Implementation

Plan

vs.

Actual

Contract Amount

in US$'000

Date

Contract

Award

Date

Contract

Signature

Opening

of

Let of Credit

Arrival

of

Goods

Inspection

Final

Acceptance

Plan 1 wk 1.5-3 wks 4-9 wks

Actual

Plan 10-Aug-13 31-Aug-13 30-Oct-13 28-May-14 11-Jun-14

Actualdate

Plan 20-Oct-13 10-Nov-13 9-Jan-14 8-Jun-14 22-Jun-14

Actual

Plan 1-May-14 22-May-14 21-Jul-14 18-Dec-14 1-Jan-15

Actual

Plan 17-May-14 7-Jun-14 6-Aug-14 4-Dec-14 18-Dec-14

Actual

Plan 27-Mar-14 17-Apr-14 16-Jun-14 14-Oct-14 28-Oct-14

Actual

Plan 2-Mar-14 16-Mar-14 NA 14-Jun-14 21-Jun-14

Actual

Plan 2-Mar-14 16-Mar-14 NA 14-Jun-14 21-Jun-14

Actual

Plan 14-Feb-14 7-Mar-14 6-May-14 30-Jul-15 13-Aug-15

Actual

Plan 2-Mar-14 16-Mar-14 NA 14-Jun-14 21-Jun-14

Actual

Contract Finalization

838940PROP0P110Box0382116B00PUBLIC0.xls 5 of 28 01/09/2014 3:10 AM

Page 6: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Goods

Total Cost Plan #REF!

Actual #REF!

838940PROP0P110Box0382116B00PUBLIC0.xls 6 of 28 01/09/2014 3:10 AM

Page 7: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*Package

Number

Lot

Number

Lumpsum or

Bill of

Quantities

Procurement

Method

Pre-or Post

Qualification

Prior or Post

Review

If Prequalification

add 7-13 wks

List of Contracts

49/W/2012-EASSDP 4 Bill of Quantities ICB Post QualificationPrior or Post Review

50/W/2012-EASSDP 4 Bill of Quantities ICB Post QualificationPrior Review

33/EPC/2012-EASSDP 2 Lump sum ICB Post QualificationPrior Review

51/EPC/2012-EASSDP 1 Lump sum ICB Post QualificationPrior Review

60/EPC/2013-EASSDP 2 Lump sum ICB Post QualificationPrior Review

61/EPC/2013-EASSDP 1 Lump sum ICB Post QualificationPrior Review

Engineering, procurement and

construction contract for green field

areas (Southern Zone)

Basic Data

Engineering, procurement and

construction contract for green field

areas (Northern Zone)

Construction of 110kV line Bugarama-

Ntendezi (23km) and Construction of

110/30kV Ntendezi substation

Construction of 110/30/6.6kV Bugarama

substation EWSA scope

Norm Duration of Proc Steps

Construction of MV and LV lines with

EWSA supplied Materials (Southern

Zone)

Construction of MV and LV lines with

EWSA supplied Materials (Northern

Zone)

838940PROP0P110Box0382116B00PUBLIC0.xls 7 of 28 01/09/2014 3:10 AM

Page 8: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Total Cost

838940PROP0P110Box0382116B00PUBLIC0.xls 8 of 28 01/09/2014 3:10 AM

Page 9: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Engineering, procurement and

construction contract for green field

areas (Southern Zone)

Engineering, procurement and

construction contract for green field

areas (Northern Zone)

Construction of 110kV line Bugarama-

Ntendezi (23km) and Construction of

110/30kV Ntendezi substation

Construction of 110/30/6.6kV Bugarama

substation EWSA scope

Norm Duration of Proc Steps

Construction of MV and LV lines with

EWSA supplied Materials (Southern

Zone)

Construction of MV and LV lines with

EWSA supplied Materials (Northern

Zone)

If Post-Review, No-objection Dates are not needed

Spec Proc Notice

Advert

Plan

vs.

Actual

Prep &

Submission

by Ex Agency

No-objection

Date

On-line UNDB

Gateway

Nat Press

Bid Invitation

Date

Bid Closing-

Opening

Submission

Bid Eval Rpt

No-objection

Date

Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 1.5 - 2 wks 6 -12 wks 2 - 6wks 1 - 1.5 wks

Actual

Plan 01-Dec-13 11-Dec-13 25-Dec-13 25-Dec-13 23-Feb-14 4-Apr-14 14-Apr-14

Actual

Plan 15-Jan-14 25-Jan-14 8-Feb-14 8-Feb-14 9-Apr-14 19-May-14 29-May-14

Actual

Plan 05-Jun-13 14-Jun-13 24-Jun-13 24-Jun-13 17-Oct-13 26-Nov-13 6-Dec-13

Actual

Plan 08-Jul-13 19-Sep-13 24-Oct-13 24-Oct-13 22-Jan-14 19-Feb-14 1-Mar-14

Actual

Plan 15-Dec-13 27-Dec-13 10-Jan-14 10-Jan-14 14-Mar-14 11-Apr-14 21-Apr-14

Actual

Plan 15-Dec-13 27-Dec-13 10-Jan-14 10-Jan-14 14-Mar-14 11-Apr-14 21-Apr-14

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Bid EvaluationBidding Period

Draft Bid Documents, including specs

and quantities, draft SPN

838940PROP0P110Box0382116B00PUBLIC0.xls 9 of 28 01/09/2014 3:10 AM

Page 10: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Total Cost Plan

Actual

838940PROP0P110Box0382116B00PUBLIC0.xls 10 of 28 01/09/2014 3:10 AM

Page 11: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Engineering, procurement and

construction contract for green field

areas (Southern Zone)

Engineering, procurement and

construction contract for green field

areas (Northern Zone)

Construction of 110kV line Bugarama-

Ntendezi (23km) and Construction of

110/30kV Ntendezi substation

Construction of 110/30/6.6kV Bugarama

substation EWSA scope

Norm Duration of Proc Steps

Construction of MV and LV lines with

EWSA supplied Materials (Southern

Zone)

Construction of MV and LV lines with

EWSA supplied Materials (Northern

Zone)

Plan

vs.

Actual

Contract Amount

in US$ '000

Date

Contract

Award

Date

Contract

Signature

Mobilization

Advance

Payment

Substantial

Completion

Final

Acceptance

Plan 1 wk 1.5-3 wks

Actual

Plan 21-Apr-14 12-May-14 26-Jun-14 21-Jun-15 15-Jun-16

Actual

Plan 5-Jun-14 26-Jun-14 10-Aug-14 5-Aug-15 30-Jul-16

Actual

Plan 13-Dec-13 3-Jan-14 17-Feb-14 11-Aug-15 5-Aug-16

Actual

Plan 8-Mar-14 29-Mar-14 13-May-14 4-Nov-15 29-Oct-16

Actual

Plan 28-Apr-14 19-May-14 3-Jul-14 25-Dec-15 19-Dec-16

Actual

Plan 28-Apr-14 19-May-14 3-Jul-14 25-Dec-15 19-Dec-16

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Contract Finalization Contract Implementation

838940PROP0P110Box0382116B00PUBLIC0.xls 11 of 28 01/09/2014 3:10 AM

Page 12: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Total Cost Plan 0.00

Actual 0.00

838940PROP0P110Box0382116B00PUBLIC0.xls 12 of 28 01/09/2014 3:10 AM

Page 13: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Engineering, procurement and

construction contract for green field

areas (Southern Zone)

Engineering, procurement and

construction contract for green field

areas (Northern Zone)

Construction of 110kV line Bugarama-

Ntendezi (23km) and Construction of

110/30kV Ntendezi substation

Construction of 110/30/6.6kV Bugarama

substation EWSA scope

Norm Duration of Proc Steps

Construction of MV and LV lines with

EWSA supplied Materials (Southern

Zone)

Construction of MV and LV lines with

EWSA supplied Materials (Northern

Zone)

Final

Cost

Contract Implementation

838940PROP0P110Box0382116B00PUBLIC0.xls 13 of 28 01/09/2014 3:10 AM

Page 14: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Total Cost 0.00

0.00

838940PROP0P110Box0382116B00PUBLIC0.xls 14 of 28 01/09/2014 3:10 AM

Page 15: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Engineering, procurement and

construction contract for green field

areas (Southern Zone)

Engineering, procurement and

construction contract for green field

areas (Northern Zone)

Construction of 110kV line Bugarama-

Ntendezi (23km) and Construction of

110/30kV Ntendezi substation

Construction of 110/30/6.6kV Bugarama

substation EWSA scope

Norm Duration of Proc Steps

Construction of MV and LV lines with

EWSA supplied Materials (Southern

Zone)

Construction of MV and LV lines with

EWSA supplied Materials (Northern

Zone)

Comments

Tender under evaluation

Tender published

838940PROP0P110Box0382116B00PUBLIC0.xls 15 of 28 01/09/2014 3:10 AM

Page 16: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Works Total Cost

838940PROP0P110Box0382116B00PUBLIC0.xls 16 of 28 01/09/2014 3:10 AM

Page 17: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants Country/Organisation: RWANDA For Contracts under projects approved after the May 2002 Guidelines

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)If Post-Review, No-objection Dates are not needed

Loan #: Credit IDA 51930Contract

Type

Description*Selection

Method

Lumpsum

or

Time-Based

Prior/Post

Review

Plan

vs.

Actual

Prep &

Submission

by Ex Ag

No-objection

Date

On-line UNDB

Gateway

Nat Press

Submission of

Expression of

interest

Lead-time

before

shortlist

Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks 2 wks 2 wks

Actual

List of Contracts

CQS

Lumpsum

Post Review Plan 15-Jul-13 29-Jul-13 8-Aug-13 22-Aug-13 5-Sep-13

Actual

CQS

Lumpsum

Post Review Plan 25-Aug-14 8-Sep-14 18-Sep-14 2-Oct-14 16-Oct-14

Actual

QBS Lumpsum Prior Review Plan 20-Dec-13 3-Jan-14 13-Jan-14 27-Jan-14 10-Feb-14

Actual

IC Lumpsum Post Review Plan 15-Oct-13 29-Oct-13 8-Nov-13 22-Nov-13 6-Dec-13

Actual

CQS Time Based Post Review Plan 25-Dec-13 8-Jan-14 18-Jan-14 1-Feb-14 15-Feb-14

Actual

IC Lumpsum Post Review Plan 21-Nov-13 21-Nov-13 9-Dec-13 24-Dec-13 3-Jan-14

Actual

IC Lumpsum Post Review Plan 5-Dec-13 12-Dec-13 19-Dec-13 3-Jan-14 13-Jan-14

Actual

IC Lumpsum Post Review Plan 5-Dec-13 12-Dec-13 19-Dec-13 3-Jan-14 13-Jan-14

Consultancy services for

recruitment of independent pre-

shipment inspection agency

Request for EOI

(where required)Preparation

Terms of Reference

Norm Duration of Proc Steps

Consultancy Services for impact

evaluation phase 1

consultant to supervise contracts as

a Project Manager to mitigate the

issue of partiality during contract

management

Consultancy Services for impact

evaluation phase 2

Consultancy services for

eleboration of technical

specification of SWH

Study to establish and advise on

legal framework for new companies

to replace EWSA

Study to undertake the Energy

Sector Functional and

Organizational restructuring of

EWSA

Study to undertake scoping for

Management Information System

(MIS)838940PROP0P110Box0382116B00PUBLIC0.xls 17 of 28 01/09/2014 3:10 AM

Page 18: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants Actual

CQS Lumpsum Post Review Plan 5-Dec-13 12-Dec-13 19-Dec-13 2-Jan-14 16-Jan-14

Actual

CQS Lumpsum Post Review Plan 21-Nov-13 21-Nov-13 9-Dec-13 23-Dec-13 6-Jan-14

Actual

SSS Lumpsum Post Review Plan 22-Nov-13 22-Nov-13 Not Applicable 25-Nov-13 5-Dec-13

Actual

Total Cost Plan

Actual

Audit study to undertake separation

of assets

Development of Least cost Power

Development Plan

Short-term Consultant to Review

Proposed Strengthening Projects

for the EWSA HV and MV

Networks

Study to undertake scoping for

Management Information System

(MIS)

838940PROP0P110Box0382116B00PUBLIC0.xls 18 of 28 01/09/2014 3:10 AM

Page 19: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Consultancy services for

recruitment of independent pre-

shipment inspection agency

Norm Duration of Proc Steps

Consultancy Services for impact

evaluation phase 1

consultant to supervise contracts as

a Project Manager to mitigate the

issue of partiality during contract

management

Consultancy Services for impact

evaluation phase 2

Consultancy services for

eleboration of technical

specification of SWH

Study to establish and advise on

legal framework for new companies

to replace EWSA

Study to undertake the Energy

Sector Functional and

Organizational restructuring of

EWSA

Study to undertake scoping for

Management Information System

(MIS)

Submission

Date

No-objection

Date

1 - 2 wks

5-Sep-13 Not Applicable

16-Oct-14 Not Applicable

11-Feb-14 25-Feb-14

6-Dec-13 Not Applicable

16-Feb-14 2-Mar-14

3-Jan-14 Not Applicable

13-Jan-14 Not Applicable

13-Jan-14 Not Applicable

Request for Proposals

838940PROP0P110Box0382116B00PUBLIC0.xls 19 of 28 01/09/2014 3:10 AM

Page 20: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants

Total Cost

Audit study to undertake separation

of assets

Development of Least cost Power

Development Plan

Short-term Consultant to Review

Proposed Strengthening Projects

for the EWSA HV and MV

Networks

Study to undertake scoping for

Management Information System

(MIS)

16-Jan-14 Not Applicable

6-Jan-14 Not Applicable

5-Dec-13 Not Applicable

838940PROP0P110Box0382116B00PUBLIC0.xls 20 of 28 01/09/2014 3:10 AM

Page 21: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Consultancy services for

recruitment of independent pre-

shipment inspection agency

Norm Duration of Proc Steps

Consultancy Services for impact

evaluation phase 1

consultant to supervise contracts as

a Project Manager to mitigate the

issue of partiality during contract

management

Consultancy Services for impact

evaluation phase 2

Consultancy services for

eleboration of technical

specification of SWH

Study to establish and advise on

legal framework for new companies

to replace EWSA

Study to undertake the Energy

Sector Functional and

Organizational restructuring of

EWSA

Study to undertake scoping for

Management Information System

(MIS)

Plan

vs.

Actual

Invitation

Date

Submission/

Opening

Date

Submission

Evaluation

Report (T)

No-objection

Evaluation

Report (T)

Opening

Financial

Proposals

Preparation

Eval Report

(T) (F)

Negotiations (N)

Plan 4 to 12 wks 2 - 3 wks 0.5 - 2 wks 2 wks 1 - 2 wks 2 wks

Actual

Plan 5-Sep-13 3-Oct-13 17-Oct-13 Not Applicable 3-Oct-13 17-Oct-13 31-Oct-13

Actual

Plan 16-Oct-14 13-Nov-14 27-Nov-14 Not Applicable 13-Nov-14 27-Nov-14 11-Dec-14

Actual

Plan 28-Feb-14 19-Apr-14 10-May-14 24-May-14 7-Jun-14 14-Jun-14 28-Jun-14

Actual

Plan 6-Dec-13 13-Dec-13 20-Dec-13 Not Applicable 13-Dec-13 20-Dec-13 27-Dec-13

Actual

Plan 5-Mar-14 24-Apr-14 15-May-14 29-May-14 12-Jun-14 19-Jun-14 3-Jul-14

Actual

Plan 3-Jan-14 10-Jan-14 17-Jan-14 Not Applicable 10-Jan-14 17-Jan-14 19-Jan-14

Actual

Plan 13-Jan-14 20-Jan-14 27-Jan-14 Not Applicable 20-Jan-14 27-Jan-14 29-Jan-14

Actual

Plan 13-Jan-14 20-Jan-14 27-Jan-14 Not Applicable 20-Jan-14 27-Jan-14 29-Jan-14

Proposal Evaluation and Negotiation for Projects after May 2002

Technical (T) & Financial (F) and Negotions (N)

Consultant

Proposals

838940PROP0P110Box0382116B00PUBLIC0.xls 21 of 28 01/09/2014 3:10 AM

Page 22: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants

Total Cost

Audit study to undertake separation

of assets

Development of Least cost Power

Development Plan

Short-term Consultant to Review

Proposed Strengthening Projects

for the EWSA HV and MV

Networks

Study to undertake scoping for

Management Information System

(MIS) Actual

Plan 16-Jan-14 23-Jan-14 30-Jan-14 Not Applicable 23-Jan-14 30-Jan-14 6-Feb-14

Actual

Plan 6-Jan-14 13-Jan-14 20-Jan-14 Not Applicable 13-Jan-14 20-Jan-14 27-Jan-14

Actual

Plan 5-Dec-13 12-Dec-13 19-Dec-13 Not Applicable 12-Dec-13 19-Dec-13 21-Dec-13

Actual

Plan

Actual

838940PROP0P110Box0382116B00PUBLIC0.xls 22 of 28 01/09/2014 3:10 AM

Page 23: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Consultancy services for

recruitment of independent pre-

shipment inspection agency

Norm Duration of Proc Steps

Consultancy Services for impact

evaluation phase 1

consultant to supervise contracts as

a Project Manager to mitigate the

issue of partiality during contract

management

Consultancy Services for impact

evaluation phase 2

Consultancy services for

eleboration of technical

specification of SWH

Study to establish and advise on

legal framework for new companies

to replace EWSA

Study to undertake the Energy

Sector Functional and

Organizational restructuring of

EWSA

Study to undertake scoping for

Management Information System

(MIS)

Plan

vs.

Actual

Submission DateNo-objection

Date

Contract Amount

in

US$ '000

Contract Award Contract

Signature

Plan 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks

Actual

Plan 31-Oct-13 Not Applicable 7-Nov-13 21-Nov-13

Actual

Plan 11-Dec-14 Not Applicable 18-Dec-14 1-Jan-15

Actual

Plan 5-Jul-14 12-Jul-14 19-Jul-14 2-Aug-14

Actual

Plan 27-Dec-13 Not Applicable 3-Jan-14 17-Jan-14

Actual

Plan 10-Jul-14 17-Jul-14 24-Jul-14 7-Aug-14

Actual

Plan 19-Jan-14 Not Applicable 21-Jan-14 28-Jan-14

Actual

Plan 29-Jan-14 Not Applicable 31-Jan-14 7-Feb-14

Actual

Plan 29-Jan-14 Not Applicable 31-Jan-14 7-Feb-14

Draft Contract Contract Finalization

838940PROP0P110Box0382116B00PUBLIC0.xls 23 of 28 01/09/2014 3:10 AM

Page 24: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants

Total Cost

Audit study to undertake separation

of assets

Development of Least cost Power

Development Plan

Short-term Consultant to Review

Proposed Strengthening Projects

for the EWSA HV and MV

Networks

Study to undertake scoping for

Management Information System

(MIS) Actual

Plan 6-Feb-14 Not Applicable 13-Feb-14 27-Feb-14

Actual

Plan 27-Jan-14 Not Applicable 3-Feb-14 17-Feb-14

Actual

Plan 21-Dec-13 Not Applicable 23-Dec-13 30-Dec-13

Actual

Plan 0.00

Actual 0.00

838940PROP0P110Box0382116B00PUBLIC0.xls 24 of 28 01/09/2014 3:10 AM

Page 25: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants Country/Organisation: RWANDA

Project/Programme: Electricity Access Scale-Up and Sector Wide Approach Development Project (EASSDP)

Loan #: Credit IDA 51930

Description*

List of Contracts

Consultancy services for

recruitment of independent pre-

shipment inspection agency

Norm Duration of Proc Steps

Consultancy Services for impact

evaluation phase 1

consultant to supervise contracts as

a Project Manager to mitigate the

issue of partiality during contract

management

Consultancy Services for impact

evaluation phase 2

Consultancy services for

eleboration of technical

specification of SWH

Study to establish and advise on

legal framework for new companies

to replace EWSA

Study to undertake the Energy

Sector Functional and

Organizational restructuring of

EWSA

Study to undertake scoping for

Management Information System

(MIS)

Plan

vs.

Actual

Mobilization

Advance

Payment

Draft

Report

Final

Report

Final

Cost

Plan

Actual

Plan 21-Dec-13 20-Jan-14 19-Feb-14

Actual

Plan 31-Jan-15 2-Mar-15 1-Apr-15

Actual

Plan 16-Aug-14 11-Aug-15

Actual

Plan 24-Jan-14 23-Feb-14

Actual

Plan 21-Aug-14 10-Aug-16

Actual

Plan 4-Feb-14 21-Mar-14 5-Apr-14

Actual

Plan 14-Feb-14 31-Mar-14 15-Apr-14

Actual

Plan 14-Feb-14 31-Mar-14 15-Apr-14

Contract Implementation

838940PROP0P110Box0382116B00PUBLIC0.xls 25 of 28 01/09/2014 3:10 AM

Page 26: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Procurement Plan-Consultants

Total Cost

Audit study to undertake separation

of assets

Development of Least cost Power

Development Plan

Short-term Consultant to Review

Proposed Strengthening Projects

for the EWSA HV and MV

Networks

Study to undertake scoping for

Management Information System

(MIS) Actual

Plan 6-Mar-14 4-Jun-14

Actual

Plan 24-Feb-14 25-May-14

Actual

Plan 6-Jan-14 20-Feb-14 7-Mar-14

Actual

Plan 0.00

Actual 0.00

838940PROP0P110Box0382116B00PUBLIC0.xls 26 of 28 01/09/2014 3:10 AM

Page 27: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

SUMMARY

I Goods&Works Allocated Amounts Funds Available

1 Goods #REF!

2 Works #REF!

S/TOTAL #REF! 50,000,000.00

II Consultancy (TA)&Operating Cost

1 *Consultancy (TA) and operating costs 10,000,000.00

S/TOTAL 10,000,000.00 10,000,000.00

GENERAL TOTAL #REF! 60,000,000.00

Page 28: World Bank Documentdocuments.worldbank.org/curated/en/206871468305666424/pdf/838… · areas (Southern Zone) Basic Data Engineering, procurement and construction contract for green

Deficit

#REF!

-

#REF!