KOSOVO Institutional Development for Education Project (IDEP) Procurement Plan - Works & Goods This is PP was updated on April 20, 2011 Prep. of Doc. Int. /a WB "No Objection" Int. /a Advert- izing Int. /a USD EUR 1 2 3 1 2 GOODS 3 P C1.2/GD-SH/10-01 1.2 Developing the Software for Municipal-to School Budget Allocation 1 40,540 30,000 SH PRIOR 21-Oct-10 14 4-Nov-10 7 11-Nov-10 3 4 R/A Hardsoft Integration 49,325 21-Oct-10 16-Nov-10 22-Nov-10 5 R/A Hardsoft Integration Amendment #1 extending completion date NA NA NA 6 P C1.2/GD-SH/10-02 1.2 Layout and Printing of Manual for School budget and Finances 4,500 SH PRIOR 25-Nov-10 14 9-Dec-10 7 16-Dec-10 3 7 R/A Blendi 3,900 26-Nov-10 7-Dec-10 8-Dec-10 8 P C1.2/GD/SH/11-03 1.2 Hardware for server for school finance 15,000 SH PRIOR 16-May-11 14 30-May-11 7 6-Jun-11 3 9 R/A Hardsoft systems 36,970 18-May-11 2-Jun-11 6-Jun-11 10 P C1.3/GD-ICB/SDG-01 1.3 IT equipment for SDG 1 199,301 ICB PRIOR 30-Dec-11 14 14-Feb-12 7 21-Feb-12 3 11 R/A JV Interadria and Telefoniku 164,947 30-Dec-11 14-Feb-12 16-Feb-12 12 p C1.3/GD-ICB/SDG-02 1.3 Teaching aids for SDG 1 61,738 NCB PRIOR 13-Jan-12 14 27-Jan-12 7 3-Feb-12 3 13 R/A 29-Feb-12 13-Mar-12 6-Apr-12 14 R/A Rebiding Procedure 21-Jun-12 13-May-12 22-Jun-12 15 P C1.3/GD-SH/SDG-04 1.3 Purchasing of books for SDG 1 21,445 SH PRIOR 6-Jan-12 14 20-Jan-12 7 27-Jan-12 3 16 R/A Korabi 14,331 6-Jan-12 9-Jan-12 12-Jan-12 17 P C1.3/GD-SH/SDG-03 1.3 Purchasing of music instruments for SDG 1 38,527 SH PRIOR 20-Jan-12 14 3-Feb-12 7 10-Feb-12 3 18 R/A Star Graf 52,878 16-Feb-12 22-Feb-12 28-Feb-12 0 19 P C1.3/GD-ICB/SDG-05 1.3 IT equipment for SDG for Round III 1 98,034 ICB PRIOR 10-Aug-12 14 24-Aug-12 7 31-Aug-12 3 20 R/A 21 P 1 40,540 370,511 22 R/A - 322,351 23 24 25 26 P C2.1/GD-SH/09-06 2.1 Developing a sofware for teacher licencing 1 35,000 SH PRIOR 12-Apr-10 14 26-Apr-10 7 03-May-10 3 27 R/A Hardsoft Integration 37,000 12-Apr-10 25-Jun-10 01-Jul-10 28 P C2.1/GD-SH/11-07 2.1 Hardware for server for teacher licesning database 15,000 SH PRIOR 16-May-11 14 30-May-11 7 06-Jun-11 3 GOODS Estim. No. of Lots Proc. Method WB Review 17-Oct-12 Appraisal Estimates P (planned) Enter New Estimates in EUR Under R/A Rows below COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF EDUCATION SYSTEM Component 1. Subtotals COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT CAPACITY IN PRIMARY & SECONDARY EDUCATION Ln. # Status P R/A d/ Comp. Description Contract Reference # Standard Prefix "KOS-IDEP/H3420/" removed from below listings Filename: 732500PROP0P1000PP0August010002012.xlsx Page 1 of 255 10/17/2012 1:05 AM Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: lengoc

Post on 22-May-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3

1

2 GOODS

3 P C1.2/GD-SH/10-01 1.2Developing the Software for Municipal-to

School Budget Allocation 1 40,540 30,000 SH PRIOR 21-Oct-10 14 4-Nov-10 7 11-Nov-10 3

4 R/A Hardsoft Integration 49,325 21-Oct-10 16-Nov-10 22-Nov-10

5 R/A Hardsoft Integration Amendment #1 extending completion date NA NA NA

6 P C1.2/GD-SH/10-02 1.2Layout and Printing of Manual for School

budget and Finances4,500 SH PRIOR 25-Nov-10 14 9-Dec-10 7 16-Dec-10 3

7 R/A Blendi 3,900 26-Nov-10 7-Dec-10 8-Dec-10

8 P C1.2/GD/SH/11-03 1.2 Hardware for server for school finance 15,000 SH PRIOR 16-May-11 14 30-May-11 7 6-Jun-11 3

9 R/A Hardsoft systems 36,970 18-May-11 2-Jun-11 6-Jun-11

10 P C1.3/GD-ICB/SDG-01 1.3 IT equipment for SDG 1 199,301 ICB PRIOR 30-Dec-11 14 14-Feb-12 7 21-Feb-12 3

11 R/A JV Interadria and Telefoniku 164,947 30-Dec-11 14-Feb-12 16-Feb-12

12 p C1.3/GD-ICB/SDG-02 1.3 Teaching aids for SDG 1 61,738 NCB PRIOR 13-Jan-12 14 27-Jan-12 7 3-Feb-12 3

13 R/A 29-Feb-12 13-Mar-12 6-Apr-12

14 R/A Rebiding Procedure 21-Jun-12 13-May-12 22-Jun-12

15 P C1.3/GD-SH/SDG-04 1.3 Purchasing of books for SDG 1 21,445 SH PRIOR 6-Jan-12 14 20-Jan-12 7 27-Jan-12 3

16 R/A Korabi 14,331 6-Jan-12 9-Jan-12 12-Jan-12

17 P C1.3/GD-SH/SDG-03 1.3 Purchasing of music instruments for SDG 1 38,527 SH PRIOR 20-Jan-12 14 3-Feb-12 7 10-Feb-12 3

18 R/A Star Graf 52,878 16-Feb-12 22-Feb-12 28-Feb-12 0

19 P C1.3/GD-ICB/SDG-05 1.3 IT equipment for SDG for Round III 1 98,034 ICB PRIOR 10-Aug-12 14 24-Aug-12 7 31-Aug-12 3

20 R/A

21 P 1 40,540 370,511

22 R/A - 322,351

23

24

25

26 P C2.1/GD-SH/09-06 2.1 Developing a sofware for teacher licencing 1 35,000 SH PRIOR 12-Apr-10 14 26-Apr-10 7 03-May-10 3

27 R/A Hardsoft Integration 37,000 12-Apr-10 25-Jun-10 01-Jul-10

28 P C2.1/GD-SH/11-07 2.1Hardware for server for teacher licesning

database15,000 SH PRIOR 16-May-11 14 30-May-11 7 06-Jun-11 3

GOODS

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

Component 1. Subtotals

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 1 of 255 10/17/2012 1:05 AM

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

29 R/A Hardsoft systems 18,485 18-May-11 02-Jun-11 06-Jun-11

30 P C2.1/GD-SH/12-02 2.1Teacher license production support

hardware and software1 29,000 SH PRIOR 03-Sep-12 14 17-Sep-12 7 24-Sep-12 3

31 R/A

32 P C2.1/GD-SH/11-09 2.1Computers for 7 regional +1 main offices

for licensing1 8,000 SH PRIOR 09-Jan-12 7 16-Jan-12 2 18-Jan-12 1

33 R/A SI Consulting 6,680 27-Dec-11 06-Jan-12 10-Jan-12

34 P C2.3/GD-SH/09-01 2.3 Computers & Peripherals for MED 1 6,400 4,736 SH PRIOR 07-Jan-09 14 21-Jan-09 7 28-Jan-09 3

35 R/A Illir Kosova 32,967 01-Oct-09 15-Oct-09 21-Oct-09

36 P C2.3/GD-SH/12-03 2.3Printing of brochures for the parents and

publication of test models1 41,800 20,000 SH PRIOR 01-Oct-12 14 15-Oct-12 7 22-Oct-12 3

37 R/A

38 P C2.3/GD-SH/09-03 2.3

Software (assessment analysis) Software

upgrades (for assessment) and

specialized equipment (optical readers)

1 88,600 65,564 SH PRIOR 05-Oct-09 14 19-Oct-09 7 26-Oct-09 3

39 R/A Comtrade Computers 70,240 04-Feb-10 19-Feb-10 NA

40 P C2.3/GD-SH/12-01 2.3 Development of the Item Bank Software 1 30,000 SH PRIOR 09-Jan-12 14 23-Jan-12 7 30-Jan-12 3

41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12

42 P C2.3/GD-SH/12-02 2.3Hardware Support for Item Bank Database

Application 1 20,000 SH PRIOR 16-May-12 14 10-Jun-12 7 17-Jun-12 3

43 R/A SI Consulting 21,066 16-May-12 08-Jun-12 15-Jun-12

44 P C2.4/GD-SH/09-01 2.4 Computer systems for EMIS 1 25,800 19,092 SH PRIOR 03-Aug-09 14 17-Aug-09 7 24-Aug-09 3

45 R/A Illir Kosova 27,940 05-Dec-09 07-Dec-09 08-Dec-09

46 p C2.4/G-ICB/09-01 2.4Firm - EMIS software upgrade & training at

the national, municipal and school levels1 88,100 200,000 ICB PRIOR 15-Nov-09 14 29-Nov-09 7 06-Dec-09 14

47 R/A Neocom & Edusoft 108,000 01-Mar-10 15-Mar-10 22-Jul-10

48 R/A Neocom & EdusoftAmendment #1 modification of original

contract27,000 28-Oct-11 17-Nov-11 NA

49 P C2.4/GD-SH/11-02 2.4 USB for EMIS 6,000 SH PRIOR 01-Jun-11 14 15-Jun-11 7 22-Jun-11 14

50 R/A Hardsoft systems 8,950 05-Jul-11 14-Aug-11 14-Aug-11

51 P C2.4/GD-SH/11-03 2.4 Backup software for three servers of EMIS 1 8,000 SH PRIOR 15-Nov-11 14 29-Nov-11 7 06-Dec-11 14

52 R/A SI Consulting 8,850 15-Nov-11 06-Dec-11 07-Dec-11

53 P C2.5/GD-SH/09-01 2.5 IT equipment for the PCT 1 13,200 9,768 SH PRIOR 30-Nov-08 14 14-Dec-08 7 21-Dec-08 3

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 2 of 255 10/17/2012 1:05 AM

Page 3: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

54 R/A Comtrade Computers 16,610 07-Nov-08 04-Dec-08 05-Dec-08

55 P C2.5/GD-SH/10-02 2.5 IT equipment for the PCT 1 13,200 2,800 SH PRIOR 30-Nov-08 14 14-Dec-08 7 21-Dec-08 3

56 R/A Comtrade Computers 3,521.42 09-Jun-10 23-Jun-10 25-Jun-10

57 P C2.5/GD-SH/09-03 2.5 Office furniture for the PCT 1 8,500 6,290 SH PRIOR 07-Jan-09 14 21-Jan-09 7 28-Jan-09 3

58 R/A SM Commerce - 6,088 07-Jan-09 03-Feb-09

59

60 P 9 285,600 459,250

61 R/A - - 409,459

62

63

64

65

70 P C3.1/GD-SH/12-01 3.1Design and Layout of the Guideline on

School Facilities Design- Norms and 1,000 SH PRIOR 12-Jan-12 14 26-Jan-12 7 02-Feb-12 3

71 R/A Trembelat 2,260 28-Mar-12 02-Apr-12 03-Apr-12

72 R/A Trembelat Amendment #1 extending completion date 21-Jun-12 26-Jun-12 NA

73 R/A Trembelat Amendment #2 extending completion date 17-Aug-12 NA

74 P C3.2/GD-SH/12-02 3.2Printing of the Guideline on School

Facilities Design- Norms and Standards2,000 SH PRIOR 28-Mar-12 14 11-Apr-12 7 18-Apr-12 3

75 R/A Grafika Rezniqi 1,829 28-Mar-12 02-Apr-12 03-Apr-12

76 R/A Grafika Rezniqi Amendment #1 extending completion date 21-Jun-12 26-Jun-12 NA

77 R/A Grafika Rezniqi Amendment #2 extending completion date 17-Aug-12 NA

78 P C3.2/GD-SH/10-01 3.2 Computers & Peripherals and Software 1 11,400 10,000 SH PRIOR 15-Jun-10 14 29-Jun-10 7 06-Jul-10 3

79 R/A Comtrade Computers - 7,483.21 15-Jun-10 23-Jun-10 25-Jun-10

80 p C3.2/GD-SH/10-02 3.2 Auto Cad 2011 1 6,081.00 4,500 SH PRIOR 19-Aug-10 14 02-Sep-10 7 09-Sep-10 3

81 R/A Comtrade Computers 3,991 19-Aug-10 25-Aug-10 27-Aug-10

82 P C3.3/GD-ICB/12-01 3.3Equipment for the model Basic Education

School (0-9)4 164,600 122,840 ICB PRIOR 20-Jul-12 45 03-Sep-12 3 06-Sep-12 2

83 R/A -

84 P C3.3/GD-NCB/12-02 3.3Furniture for the model Basic Education

School (0-9)3 81,000 200,000 NCB PRIOR 20-Jul-12 45 03-Sep-12 10 13-Sep-12 3

85 R/A -

86

Component 2. Subtotals

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

GOODS

WORKS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 3 of 255 10/17/2012 1:05 AM

Page 4: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

87 P C3.3/WK-ICB/11-01 3.3Basic Education Model Primary School

(Grades 0-9)1 1,650,300 1,500,000 ICB PRIOR 31-Oct-11 1 01-Nov-11 2 03-Nov-11 6

88 R/A Standard -$ 2,480,942 21-Nov-11 26-Jan-12 28-Jan-12

89

90 P 12 1,948,281 1,838,340

91 R/A - - 2,494,677

92

93

94 P C4.2/GD-SH/10-01 4.2 Publication of feasibility study 1 18,300 15,000 SH PRIOR 10-Nov-10 14 24-Nov-10 NA 3

95 R/A Rrota - 2,000 05-Nov-10 11-Nov-10 12-Nov-10

96

97 P 1 18,300 15,000

98 R/A - - 2,000

Legend: Conditional Formatting:

ICB = International Competitive Bidding (in accordance with section 2 of the Guidelines) Red Text Rows: = R/A Revised/Actuals

LIB = Limited International Bidding (in accordance with section 3.2 of the Guidelines) Yellow Columns:

NCB = National Competitive Bidding (in accordance with section 3.3 of the Guidelines) Cell turns normal again if cell for R/A (revised/actual) date is filled in.

SH = Shopping (in accordance with section 3.5 of the Guidelines) Condition 1:

MNL = In accordance with the procedures of the Grants Manual Cell value is less than of equal to cell below it (R/A)

NA = Not applicable

OTHER = Direct expenditures Condition 2:

Cell value is less than the "now" cell (G$2)

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All ICB contracts, first two NCB contracts, and first two shopping contracts irrespective of cost

All direct contracting (if any)

Database Subtotals Tool 49 4,504,362$ 10,482,347.00€

Exchange rate used on November 17, 2010 = 0.74

Cell turns red if planned date has passed

Component 4. Subtotals

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

GOODS

Component 3. Subtotals

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 4 of 255 10/17/2012 1:05 AM

Page 5: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

1

2 GOODS

3 P C1.2/GD-SH/10-01 1.2Developing the Software for Municipal-to

School Budget Allocation 1 40,540 30,000 SH PRIOR

4 R/A Hardsoft Integration 49,325

5 R/A Hardsoft Integration Amendment #1 extending completion date

6 P C1.2/GD-SH/10-02 1.2Layout and Printing of Manual for School

budget and Finances4,500 SH PRIOR

7 R/A Blendi 3,900

8 P C1.2/GD/SH/11-03 1.2 Hardware for server for school finance 15,000 SH PRIOR

9 R/A Hardsoft systems 36,970

10 P C1.3/GD-ICB/SDG-01 1.3 IT equipment for SDG 1 199,301 ICB PRIOR

11 R/A JV Interadria and Telefoniku 164,947

12 p C1.3/GD-ICB/SDG-02 1.3 Teaching aids for SDG 1 61,738 NCB PRIOR

13 R/A

14 R/A Rebiding Procedure

15 P C1.3/GD-SH/SDG-04 1.3 Purchasing of books for SDG 1 21,445 SH PRIOR

16 R/A Korabi 14,331

17 P C1.3/GD-SH/SDG-03 1.3 Purchasing of music instruments for SDG 1 38,527 SH PRIOR

18 R/A Star Graf 52,878

19 P C1.3/GD-ICB/SDG-05 1.3 IT equipment for SDG for Round III 1 98,034 ICB PRIOR

20 R/A

21 P 1 40,540 370,511

22 R/A - 322,351

23

24

25

26 P C2.1/GD-SH/09-06 2.1 Developing a sofware for teacher licencing 1 35,000 SH PRIOR

27 R/A Hardsoft Integration 37,000

28 P C2.1/GD-SH/11-07 2.1Hardware for server for teacher licesning

database15,000 SH PRIOR

GOODS

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

Component 1. Subtotals

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Schedule (dd-Mmm-yy)

Issue of

Documents Int.

/a Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a

Procurement Steps (1-11)

4 5 6

14-Nov-10 14 28-Nov-10 7 5-Dec-10 14

22-Nov-10 6-Dec-10 13-Dec-10

NA NA NA

19-Dec-10 14 2-Jan-11 7 9-Jan-11 14

8-Dec-10 23-Dec-10 24-Dec-10

9-Jun-11 14 23-Jun-11 7 30-Jun-11 14

6-Jun-11 20-Jun-11 21-Jun-11

24-Feb-12 42 6-Apr-12 7 13-Apr-12 14

16-Feb-12 23-Apr-12 14-May-12

6-Feb-12 42 6-Jul-12 7 15-Jun-12 14

12-Apr-12 25-May-12 29-May-12

25-Jun-12 6-Jul-12

30-Jan-12 7 6-Feb-12 7 13-Feb-12 7

12-Jan-12 26-Jan-12 31-Jan-12

13-Feb-12 14 27-Feb-12 7 5-Mar-12 14

28-Feb-12 0 12-Mar-12 0 4-Apr-12

3-Sep-12 28 1-Oct-12 7 8-Oct-12 14

06-May-10 14 20-May-10 7 27-May-10 14

01-Jul-10 09-Jul-10 20-Jul-10

09-Jun-11 14 23-Jun-11 7 30-Jun-11 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 5 of 255 10/17/2012 1:05 AM

Page 6: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

29 R/A Hardsoft systems 18,485

30 P C2.1/GD-SH/12-02 2.1Teacher license production support

hardware and software1 29,000 SH PRIOR

31 R/A

32 P C2.1/GD-SH/11-09 2.1Computers for 7 regional +1 main offices

for licensing1 8,000 SH PRIOR

33 R/A SI Consulting 6,680

34 P C2.3/GD-SH/09-01 2.3 Computers & Peripherals for MED 1 6,400 4,736 SH PRIOR

35 R/A Illir Kosova 32,967

36 P C2.3/GD-SH/12-03 2.3Printing of brochures for the parents and

publication of test models1 41,800 20,000 SH PRIOR

37 R/A

38 P C2.3/GD-SH/09-03 2.3

Software (assessment analysis) Software

upgrades (for assessment) and

specialized equipment (optical readers)

1 88,600 65,564 SH PRIOR

39 R/A Comtrade Computers 70,240

40 P C2.3/GD-SH/12-01 2.3 Development of the Item Bank Software 1 30,000 SH PRIOR

41 R/A Abellardo 37,128

42 P C2.3/GD-SH/12-02 2.3Hardware Support for Item Bank Database

Application 1 20,000 SH PRIOR

43 R/A SI Consulting 21,066

44 P C2.4/GD-SH/09-01 2.4 Computer systems for EMIS 1 25,800 19,092 SH PRIOR

45 R/A Illir Kosova 27,940

46 p C2.4/G-ICB/09-01 2.4Firm - EMIS software upgrade & training at

the national, municipal and school levels1 88,100 200,000 ICB PRIOR

47 R/A Neocom & Edusoft 108,000

48 R/A Neocom & EdusoftAmendment #1 modification of original

contract27,000

49 P C2.4/GD-SH/11-02 2.4 USB for EMIS 6,000 SH PRIOR

50 R/A Hardsoft systems 8,950

51 P C2.4/GD-SH/11-03 2.4 Backup software for three servers of EMIS 1 8,000 SH PRIOR

52 R/A SI Consulting 8,850

53 P C2.5/GD-SH/09-01 2.5 IT equipment for the PCT 1 13,200 9,768 SH PRIOR

Schedule (dd-Mmm-yy)

Issue of

Documents Int.

/a Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a

Procurement Steps (1-11)

4 5 6

06-Jun-11 20-Jun-11 21-Jun-11

27-Sep-12 14 11-Oct-12 7 18-Oct-12 14

19-Jan-12 7 26-Jan-12 7 02-Feb-12 2

10-Jan-12 20-Jan-12 25-Jan-12

31-Jan-09 14 14-Feb-09 7 21-Feb-09 14

11-Dec-09 18-Dec-09 06-Jan-10

18-Oct-12 14 01-Nov-12 7 08-Nov-12 14

29-Oct-09 14 12-Nov-09 7 19-Nov-09 14

31-Mar-10 09-Apr-10 20-Apr-10

02-Feb-12 14 16-Feb-12 7 15-Jun-12 14

30-Apr-12 16-May-12 23-May-12

15-Jun-12 14 29-Jun-12 7 06-Jul-12 14

15-May-12 29-Jun-12 04-Jul-12

27-Aug-09 14 10-Sep-09 7 17-Sep-09 14

17-Dec-09 28-Dec-09 06-Jan-10

20-Dec-09 14 03-Jan-10 7 10-Jan-10 14

26-Jul-10 30-Aug-10 18-Sep-10

NA NA NA

06-Jul-11 14 20-Jul-11 7 27-Jul-11 14

01-Aug-11 01-Aug-11 05-Aug-11

20-Dec-11 14 03-Jan-12 7 10-Jan-12 14

07-Dec-11 21-Dec-11 28-Dec-11

24-Dec-08 14 07-Jan-09 7 14-Jan-09 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 6 of 255 10/17/2012 1:05 AM

Page 7: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

54 R/A Comtrade Computers 16,610

55 P C2.5/GD-SH/10-02 2.5 IT equipment for the PCT 1 13,200 2,800 SH PRIOR

56 R/A Comtrade Computers 3,521.42

57 P C2.5/GD-SH/09-03 2.5 Office furniture for the PCT 1 8,500 6,290 SH PRIOR

58 R/A SM Commerce - 6,088

59

60 P 9 285,600 459,250

61 R/A - - 409,459

62

63

64

65

70 P C3.1/GD-SH/12-01 3.1Design and Layout of the Guideline on

School Facilities Design- Norms and 1,000 SH PRIOR

71 R/A Trembelat 2,260

72 R/A Trembelat Amendment #1 extending completion date

73 R/A Trembelat Amendment #2 extending completion date

74 P C3.2/GD-SH/12-02 3.2Printing of the Guideline on School

Facilities Design- Norms and Standards2,000 SH PRIOR

75 R/A Grafika Rezniqi 1,829

76 R/A Grafika Rezniqi Amendment #1 extending completion date

77 R/A Grafika Rezniqi Amendment #2 extending completion date

78 P C3.2/GD-SH/10-01 3.2 Computers & Peripherals and Software 1 11,400 10,000 SH PRIOR

79 R/A Comtrade Computers - 7,483.21

80 p C3.2/GD-SH/10-02 3.2 Auto Cad 2011 1 6,081.00 4,500 SH PRIOR

81 R/A Comtrade Computers 3,991

82 P C3.3/GD-ICB/12-01 3.3Equipment for the model Basic Education

School (0-9)4 164,600 122,840 ICB PRIOR

83 R/A -

84 P C3.3/GD-NCB/12-02 3.3Furniture for the model Basic Education

School (0-9)3 81,000 200,000 NCB PRIOR

85 R/A -

86

Component 2. Subtotals

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

GOODS

WORKS

Schedule (dd-Mmm-yy)

Issue of

Documents Int.

/a Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a

Procurement Steps (1-11)

4 5 6

10-Dec-08 22-Dec-08 25-Dec-08

24-Dec-08 14 07-Jan-09 7 14-Jan-09 14

14-Jul-10 26-Jul-10 19-Aug-10

31-Jan-09 14 14-Feb-09 7 21-Feb-09 14

10-Mar-09 20-Feb-09 24-Feb-09

05-Feb-12 14 19-Feb-12 7 26-Feb-12 14

03-Apr-12 18-Apr-12 05-Mar-12

NA NA NA

NA NA NA

21-Apr-12 14 05-May-12 7 12-May-12 14

03-Apr-12 19-Apr-12 03-May-12

NA NA NA

NA NA NA

09-Jul-10 14 23-Jul-10 7 30-Jul-10 14

14-Jul-10 26-Jul-10 19-Aug-10

12-Sep-10 14 26-Sep-10 7 03-Oct-10 14

27-Aug-10 10-Sep-10 18-Sep-10

08-Sep-12 30 08-Oct-12 14 22-Oct-12 10

06-Sep-12 2 08-Sep-12 30 08-Oct-12 10

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 7 of 255 10/17/2012 1:05 AM

Page 8: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

87 P C3.3/WK-ICB/11-01 3.3Basic Education Model Primary School

(Grades 0-9)1 1,650,300 1,500,000 ICB PRIOR

88 R/A Standard -$ 2,480,942

89

90 P 12 1,948,281 1,838,340

91 R/A - - 2,494,677

92

93

94 P C4.2/GD-SH/10-01 4.2 Publication of feasibility study 1 18,300 15,000 SH PRIOR

95 R/A Rrota - 2,000

96

97 P 1 18,300 15,000

98 R/A - - 2,000

Legend: Conditional Formatting:

ICB = International Competitive Bidding (in accordance with section 2 of the Guidelines) Red Text Rows: = R/A Revised/Actuals

LIB = Limited International Bidding (in accordance with section 3.2 of the Guidelines) Yellow Columns:

NCB = National Competitive Bidding (in accordance with section 3.3 of the Guidelines) Cell turns normal again if cell for R/A (revised/actual) date is filled in.

SH = Shopping (in accordance with section 3.5 of the Guidelines) Condition 1:

MNL = In accordance with the procedures of the Grants Manual Cell value is less than of equal to cell below it (R/A)

NA = Not applicable

OTHER = Direct expenditures Condition 2:

Cell value is less than the "now" cell (G$2)

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All ICB contracts, first two NCB contracts, and first two shopping contracts irrespective of cost

All direct contracting (if any)

Database Subtotals Tool 49 4,504,362$ 10,482,347.00€

Exchange rate used on November 17, 2010 = 0.74

Cell turns red if planned date has passed

Component 4. Subtotals

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

GOODS

Component 3. Subtotals

Schedule (dd-Mmm-yy)

Issue of

Documents Int.

/a Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a

Procurement Steps (1-11)

4 5 6

09-Nov-11 60 08-Jan-12 14 22-Jan-12 17

02-Jan-12 16-Mar-12 03-Apr-12

27-Nov-10 14 11-Dec-10 7 18-Dec-10 14

12-Nov-10 26-Nov-10 03-Dec-10

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 8 of 255 10/17/2012 1:05 AM

Page 9: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

1

2 GOODS

3 P C1.2/GD-SH/10-01 1.2Developing the Software for Municipal-to

School Budget Allocation 1 40,540 30,000 SH PRIOR

4 R/A Hardsoft Integration 49,325

5 R/A Hardsoft Integration Amendment #1 extending completion date

6 P C1.2/GD-SH/10-02 1.2Layout and Printing of Manual for School

budget and Finances4,500 SH PRIOR

7 R/A Blendi 3,900

8 P C1.2/GD/SH/11-03 1.2 Hardware for server for school finance 15,000 SH PRIOR

9 R/A Hardsoft systems 36,970

10 P C1.3/GD-ICB/SDG-01 1.3 IT equipment for SDG 1 199,301 ICB PRIOR

11 R/A JV Interadria and Telefoniku 164,947

12 p C1.3/GD-ICB/SDG-02 1.3 Teaching aids for SDG 1 61,738 NCB PRIOR

13 R/A

14 R/A Rebiding Procedure

15 P C1.3/GD-SH/SDG-04 1.3 Purchasing of books for SDG 1 21,445 SH PRIOR

16 R/A Korabi 14,331

17 P C1.3/GD-SH/SDG-03 1.3 Purchasing of music instruments for SDG 1 38,527 SH PRIOR

18 R/A Star Graf 52,878

19 P C1.3/GD-ICB/SDG-05 1.3 IT equipment for SDG for Round III 1 98,034 ICB PRIOR

20 R/A

21 P 1 40,540 370,511

22 R/A - 322,351

23

24

25

26 P C2.1/GD-SH/09-06 2.1 Developing a sofware for teacher licencing 1 35,000 SH PRIOR

27 R/A Hardsoft Integration 37,000

28 P C2.1/GD-SH/11-07 2.1Hardware for server for teacher licesning

database15,000 SH PRIOR

GOODS

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

Component 1. Subtotals

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Award Int.

/a Contract

Signature Int.

/a

Procurement Steps (1-11)

7 8 9

19-Dec-10 2 21-Dec-10 7 28-Dec-10 7

17-Dec-10 22-Dec-10 22-Dec-10

NA NA 18-Oct-11

23-Jan-11 2 25-Jan-11 7 1-Feb-11 7

30-Dec-10 10-Jan-11 10-Jan-11

14-Jul-11 2 16-Jul-11 7 23-Jul-11 7

29-Jun-11 1-Jul-11 0 1-Jul-11 0

15-Jun-12 2 17-Jun-12 7 24-Jun-12 7

21-Jul-12 12-Jul-12 12-Jul-12

29-Jun-12 2 1-Jul-12 7 8-Jul-12 7

13-Jun-12 NA NA

20-Feb-12 2 22-Feb-12 1 23-Feb-12 1

2-Feb-12 3-Feb-12 3-Feb-12

19-Mar-12 2 21-Mar-12 7 28-Mar-12 7

30-Apr-12 4-May-12 8-May-12

22-Oct-12 2 24-Oct-12 7 31-Oct-12 7

10-Jun-10 2 12-Jun-10 7 19-Jun-10 7

31-Jul-10 12-Aug-10 12-Aug-10

14-Jul-11 2 16-Jul-11 7 23-Jul-11 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 9 of 255 10/17/2012 1:05 AM

Page 10: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

29 R/A Hardsoft systems 18,485

30 P C2.1/GD-SH/12-02 2.1Teacher license production support

hardware and software1 29,000 SH PRIOR

31 R/A

32 P C2.1/GD-SH/11-09 2.1Computers for 7 regional +1 main offices

for licensing1 8,000 SH PRIOR

33 R/A SI Consulting 6,680

34 P C2.3/GD-SH/09-01 2.3 Computers & Peripherals for MED 1 6,400 4,736 SH PRIOR

35 R/A Illir Kosova 32,967

36 P C2.3/GD-SH/12-03 2.3Printing of brochures for the parents and

publication of test models1 41,800 20,000 SH PRIOR

37 R/A

38 P C2.3/GD-SH/09-03 2.3

Software (assessment analysis) Software

upgrades (for assessment) and

specialized equipment (optical readers)

1 88,600 65,564 SH PRIOR

39 R/A Comtrade Computers 70,240

40 P C2.3/GD-SH/12-01 2.3 Development of the Item Bank Software 1 30,000 SH PRIOR

41 R/A Abellardo 37,128

42 P C2.3/GD-SH/12-02 2.3Hardware Support for Item Bank Database

Application 1 20,000 SH PRIOR

43 R/A SI Consulting 21,066

44 P C2.4/GD-SH/09-01 2.4 Computer systems for EMIS 1 25,800 19,092 SH PRIOR

45 R/A Illir Kosova 27,940

46 p C2.4/G-ICB/09-01 2.4Firm - EMIS software upgrade & training at

the national, municipal and school levels1 88,100 200,000 ICB PRIOR

47 R/A Neocom & Edusoft 108,000

48 R/A Neocom & EdusoftAmendment #1 modification of original

contract27,000

49 P C2.4/GD-SH/11-02 2.4 USB for EMIS 6,000 SH PRIOR

50 R/A Hardsoft systems 8,950

51 P C2.4/GD-SH/11-03 2.4 Backup software for three servers of EMIS 1 8,000 SH PRIOR

52 R/A SI Consulting 8,850

53 P C2.5/GD-SH/09-01 2.5 IT equipment for the PCT 1 13,200 9,768 SH PRIOR

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Award Int.

/a Contract

Signature Int.

/a

Procurement Steps (1-11)

7 8 9

29-Jun-11 01-Jul-11 0 01-Jul-11 0

01-Nov-12 2 03-Nov-12 7 10-Nov-12 7

04-Feb-12 2 06-Feb-12 1 07-Feb-12 1

05-Feb-12 10-Feb-12 10-Feb-12

07-Mar-09 2 09-Mar-09 7 16-Mar-09 7

23-Feb-10 10-Mar-10 10-Mar-10 0

22-Nov-12 2 24-Nov-12 7 01-Dec-12 7

03-Dec-09 2 05-Dec-09 7 12-Dec-09 7

10-May-10 13-May-10 13-May-10

29-Jun-12 2 01-Jul-12 7 06-Jul-12 7

06-Jun-12 07-Jun-12 07-Jun-12

20-Jul-12 2 22-Jul-12 7 29-Jul-12 7

18-Jul-12 24-Jul-12 30-Jul-12

01-Oct-09 2 03-Oct-09 7 10-Oct-09 7

07-Feb-10 08-Mar-10 08-Mar-10

24-Jan-10 2 26-Jan-10 7 02-Feb-10 7

29-Sep-10 27-Oct-10 27-Oct-10 0

NA 29-Nov-11 30-Nov-11

10-Aug-11 2 12-Aug-11 7 19-Aug-11 7

12-Aug-11 16-Aug-11 16-Aug-11 0

24-Jan-12 2 26-Jan-12 7 02-Feb-12 7

04-Jan-12 10-Jan-12 10-Jan-12

28-Jan-09 2 30-Jan-09 7 06-Feb-09 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 10 of 255 10/17/2012 1:05 AM

Page 11: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

54 R/A Comtrade Computers 16,610

55 P C2.5/GD-SH/10-02 2.5 IT equipment for the PCT 1 13,200 2,800 SH PRIOR

56 R/A Comtrade Computers 3,521.42

57 P C2.5/GD-SH/09-03 2.5 Office furniture for the PCT 1 8,500 6,290 SH PRIOR

58 R/A SM Commerce - 6,088

59

60 P 9 285,600 459,250

61 R/A - - 409,459

62

63

64

65

70 P C3.1/GD-SH/12-01 3.1Design and Layout of the Guideline on

School Facilities Design- Norms and 1,000 SH PRIOR

71 R/A Trembelat 2,260

72 R/A Trembelat Amendment #1 extending completion date

73 R/A Trembelat Amendment #2 extending completion date

74 P C3.2/GD-SH/12-02 3.2Printing of the Guideline on School

Facilities Design- Norms and Standards2,000 SH PRIOR

75 R/A Grafika Rezniqi 1,829

76 R/A Grafika Rezniqi Amendment #1 extending completion date

77 R/A Grafika Rezniqi Amendment #2 extending completion date

78 P C3.2/GD-SH/10-01 3.2 Computers & Peripherals and Software 1 11,400 10,000 SH PRIOR

79 R/A Comtrade Computers - 7,483.21

80 p C3.2/GD-SH/10-02 3.2 Auto Cad 2011 1 6,081.00 4,500 SH PRIOR

81 R/A Comtrade Computers 3,991

82 P C3.3/GD-ICB/12-01 3.3Equipment for the model Basic Education

School (0-9)4 164,600 122,840 ICB PRIOR

83 R/A -

84 P C3.3/GD-NCB/12-02 3.3Furniture for the model Basic Education

School (0-9)3 81,000 200,000 NCB PRIOR

85 R/A -

86

Component 2. Subtotals

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

GOODS

WORKS

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Award Int.

/a Contract

Signature Int.

/a

Procurement Steps (1-11)

7 8 9

12-Jan-09 14-Jan-09 14-Jan-09

28-Jan-09 2 30-Jan-09 7 06-Feb-09 7

25-Aug-10 27-Aug-10 27-Aug-10

07-Mar-09 2 09-Mar-09 7 16-Mar-09 7

04-Mar-09 2 06-Mar-09 0 06-Mar-09 0

11-Mar-12 2 13-Mar-12 7 20-Mar-12 7

09-May-12 14-May-12 14-May-12

26-Jun-12 26-Jun-12 26-Jun-12

26-May-12 2 28-May-12 7 04-Jun-12 7

14-May-12 28-May-12 28-May-12

NA 26-Jun-12 26-Jun-12

NA

13-Aug-10 2 15-Aug-10 7 22-Aug-10 7

25-Aug-10 27-Aug-10 0 27-Aug-10 0

17-Oct-10 2 19-Oct-10 7 26-Oct-10 7

29-Sep-10 15-Oct-10 0 15-Oct-10 0

01-Nov-12 2 03-Nov-12 2 05-Nov-12 7

18-Oct-12 10 28-Oct-12 2 30-Oct-12 2

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 11 of 255 10/17/2012 1:05 AM

Page 12: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

87 P C3.3/WK-ICB/11-01 3.3Basic Education Model Primary School

(Grades 0-9)1 1,650,300 1,500,000 ICB PRIOR

88 R/A Standard -$ 2,480,942

89

90 P 12 1,948,281 1,838,340

91 R/A - - 2,494,677

92

93

94 P C4.2/GD-SH/10-01 4.2 Publication of feasibility study 1 18,300 15,000 SH PRIOR

95 R/A Rrota - 2,000

96

97 P 1 18,300 15,000

98 R/A - - 2,000

Legend: Conditional Formatting:

ICB = International Competitive Bidding (in accordance with section 2 of the Guidelines) Red Text Rows: = R/A Revised/Actuals

LIB = Limited International Bidding (in accordance with section 3.2 of the Guidelines) Yellow Columns:

NCB = National Competitive Bidding (in accordance with section 3.3 of the Guidelines) Cell turns normal again if cell for R/A (revised/actual) date is filled in.

SH = Shopping (in accordance with section 3.5 of the Guidelines) Condition 1:

MNL = In accordance with the procedures of the Grants Manual Cell value is less than of equal to cell below it (R/A)

NA = Not applicable

OTHER = Direct expenditures Condition 2:

Cell value is less than the "now" cell (G$2)

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All ICB contracts, first two NCB contracts, and first two shopping contracts irrespective of cost

All direct contracting (if any)

Database Subtotals Tool 49 4,504,362$ 10,482,347.00€

Exchange rate used on November 17, 2010 = 0.74

Cell turns red if planned date has passed

Component 4. Subtotals

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

GOODS

Component 3. Subtotals

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Award Int.

/a Contract

Signature Int.

/a

Procurement Steps (1-11)

7 8 9

20-Jun-12 8 29-Jun-12 3 02-Jul-12 14

20-Jun-12 29-Jun-12 29-Jun-12

01-Jan-11 2 03-Jan-11 7 10-Jan-11 7

10-Dec-10 13-Dec-10 0 13-Dec-10 0

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 12 of 255 10/17/2012 1:05 AM

Page 13: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

1

2 GOODS

3 P C1.2/GD-SH/10-01 1.2Developing the Software for Municipal-to

School Budget Allocation 1 40,540 30,000 SH PRIOR

4 R/A Hardsoft Integration 49,325

5 R/A Hardsoft Integration Amendment #1 extending completion date

6 P C1.2/GD-SH/10-02 1.2Layout and Printing of Manual for School

budget and Finances4,500 SH PRIOR

7 R/A Blendi 3,900

8 P C1.2/GD/SH/11-03 1.2 Hardware for server for school finance 15,000 SH PRIOR

9 R/A Hardsoft systems 36,970

10 P C1.3/GD-ICB/SDG-01 1.3 IT equipment for SDG 1 199,301 ICB PRIOR

11 R/A JV Interadria and Telefoniku 164,947

12 p C1.3/GD-ICB/SDG-02 1.3 Teaching aids for SDG 1 61,738 NCB PRIOR

13 R/A

14 R/A Rebiding Procedure

15 P C1.3/GD-SH/SDG-04 1.3 Purchasing of books for SDG 1 21,445 SH PRIOR

16 R/A Korabi 14,331

17 P C1.3/GD-SH/SDG-03 1.3 Purchasing of music instruments for SDG 1 38,527 SH PRIOR

18 R/A Star Graf 52,878

19 P C1.3/GD-ICB/SDG-05 1.3 IT equipment for SDG for Round III 1 98,034 ICB PRIOR

20 R/A

21 P 1 40,540 370,511

22 R/A - 322,351

23

24

25

26 P C2.1/GD-SH/09-06 2.1 Developing a sofware for teacher licencing 1 35,000 SH PRIOR

27 R/A Hardsoft Integration 37,000

28 P C2.1/GD-SH/11-07 2.1Hardware for server for teacher licesning

database15,000 SH PRIOR

GOODS

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

Component 1. Subtotals

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Schedule (dd-Mmm-yy)

Start

Exec. /b

Comple-

tion

Pysical

Progress %

Procurement Steps (1-11)

10 11 12

22-Dec-10 374 31-Dec-11

22-Dec-10 18-Oct-11 75

18-Oct-11 28-Dec-11 100

8-Feb-11 30 10-Mar-11

10-Jan-11 12-May-11 100

30-Jul-11 30 29-Aug-11

1-Jul-11 31 1-Aug-11 100

1-Jul-12 30 12-Sep-12

12-Jul-12

15-Jul-12 30 14-Aug-12

NA NA

24-Feb-12 8 3-Mar-12

3-Feb-12 28-Mar-12 100

4-Apr-12 13 8-Jun-12

8-May-12 11-Jun-12 100

7-Nov-12

12-Aug-10 460 15-Nov-11

12-Aug-10 15-Nov-11 100

30-Jul-11 30 29-Aug-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 13 of 255 10/17/2012 1:05 AM

Page 14: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

29 R/A Hardsoft systems 18,485

30 P C2.1/GD-SH/12-02 2.1Teacher license production support

hardware and software1 29,000 SH PRIOR

31 R/A

32 P C2.1/GD-SH/11-09 2.1Computers for 7 regional +1 main offices

for licensing1 8,000 SH PRIOR

33 R/A SI Consulting 6,680

34 P C2.3/GD-SH/09-01 2.3 Computers & Peripherals for MED 1 6,400 4,736 SH PRIOR

35 R/A Illir Kosova 32,967

36 P C2.3/GD-SH/12-03 2.3Printing of brochures for the parents and

publication of test models1 41,800 20,000 SH PRIOR

37 R/A

38 P C2.3/GD-SH/09-03 2.3

Software (assessment analysis) Software

upgrades (for assessment) and

specialized equipment (optical readers)

1 88,600 65,564 SH PRIOR

39 R/A Comtrade Computers 70,240

40 P C2.3/GD-SH/12-01 2.3 Development of the Item Bank Software 1 30,000 SH PRIOR

41 R/A Abellardo 37,128

42 P C2.3/GD-SH/12-02 2.3Hardware Support for Item Bank Database

Application 1 20,000 SH PRIOR

43 R/A SI Consulting 21,066

44 P C2.4/GD-SH/09-01 2.4 Computer systems for EMIS 1 25,800 19,092 SH PRIOR

45 R/A Illir Kosova 27,940

46 p C2.4/G-ICB/09-01 2.4Firm - EMIS software upgrade & training at

the national, municipal and school levels1 88,100 200,000 ICB PRIOR

47 R/A Neocom & Edusoft 108,000

48 R/A Neocom & EdusoftAmendment #1 modification of original

contract27,000

49 P C2.4/GD-SH/11-02 2.4 USB for EMIS 6,000 SH PRIOR

50 R/A Hardsoft systems 8,950

51 P C2.4/GD-SH/11-03 2.4 Backup software for three servers of EMIS 1 8,000 SH PRIOR

52 R/A SI Consulting 8,850

53 P C2.5/GD-SH/09-01 2.5 IT equipment for the PCT 1 13,200 9,768 SH PRIOR

Schedule (dd-Mmm-yy)

Start

Exec. /b

Comple-

tion

Pysical

Progress %

Procurement Steps (1-11)

10 11 12

01-Jul-11 31 01-Aug-11 100

17-Nov-12 31 18-Dec-12

08-Feb-12 12 20-Feb-12

10-Feb-12 100

23-Mar-09 60 22-May-09

10-Mar-10 45 29-Apr-10 100

08-Dec-12 30 07-Jan-13

19-Dec-09 30 18-Jan-10

13-May-10 45 28-Jun-10 100

13-Jul-12 30 07-Jun-13

07-Jun-12

05-Aug-12 30 30-Aug-12

30-Jul-12

17-Oct-09 30 16-Nov-09

08-Mar-10 30 29-Apr-10 100

27-Oct-10 30-May-12

27-Oct-10 29-Sep-12 100

30-Nov-11 30-May-12 100

26-Aug-11 30 25-Sep-11

16-Aug-11 16 01-Sep-11 100

09-Feb-12 30 10-Feb-12

10-Jan-12 27-Feb-12 100

13-Feb-09 60 14-Apr-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 14 of 255 10/17/2012 1:05 AM

Page 15: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

54 R/A Comtrade Computers 16,610

55 P C2.5/GD-SH/10-02 2.5 IT equipment for the PCT 1 13,200 2,800 SH PRIOR

56 R/A Comtrade Computers 3,521.42

57 P C2.5/GD-SH/09-03 2.5 Office furniture for the PCT 1 8,500 6,290 SH PRIOR

58 R/A SM Commerce - 6,088

59

60 P 9 285,600 459,250

61 R/A - - 409,459

62

63

64

65

70 P C3.1/GD-SH/12-01 3.1Design and Layout of the Guideline on

School Facilities Design- Norms and 1,000 SH PRIOR

71 R/A Trembelat 2,260

72 R/A Trembelat Amendment #1 extending completion date

73 R/A Trembelat Amendment #2 extending completion date

74 P C3.2/GD-SH/12-02 3.2Printing of the Guideline on School

Facilities Design- Norms and Standards2,000 SH PRIOR

75 R/A Grafika Rezniqi 1,829

76 R/A Grafika Rezniqi Amendment #1 extending completion date

77 R/A Grafika Rezniqi Amendment #2 extending completion date

78 P C3.2/GD-SH/10-01 3.2 Computers & Peripherals and Software 1 11,400 10,000 SH PRIOR

79 R/A Comtrade Computers - 7,483.21

80 p C3.2/GD-SH/10-02 3.2 Auto Cad 2011 1 6,081.00 4,500 SH PRIOR

81 R/A Comtrade Computers 3,991

82 P C3.3/GD-ICB/12-01 3.3Equipment for the model Basic Education

School (0-9)4 164,600 122,840 ICB PRIOR

83 R/A -

84 P C3.3/GD-NCB/12-02 3.3Furniture for the model Basic Education

School (0-9)3 81,000 200,000 NCB PRIOR

85 R/A -

86

Component 2. Subtotals

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

GOODS

WORKS

Schedule (dd-Mmm-yy)

Start

Exec. /b

Comple-

tion

Pysical

Progress %

Procurement Steps (1-11)

10 11 12

14-Jan-09 90 01-Apr-09 100

13-Feb-09 60 14-Apr-09

27-Aug-10 30 27-Sep-10 100

23-Mar-09 30 22-Apr-09

06-Mar-09 1 06-Mar-09 100

27-Mar-12 60 31-Aug-12

14-May-12 04-Jun-12

26-Jun-12

11-Jun-12 60 30-Sep-12

28-May-12 18-Jun-12

26-Jun-12

29-Aug-10 30 28-Sep-10

27-Aug-10 30 27-Sep-10 100

02-Nov-10 30 02-Dec-10

15-Oct-10 30 15-Nov-10 100

12-Nov-12 120 12-Mar-13

01-Nov-12 120 01-Mar-13

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 15 of 255 10/17/2012 1:05 AM

Page 16: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

87 P C3.3/WK-ICB/11-01 3.3Basic Education Model Primary School

(Grades 0-9)1 1,650,300 1,500,000 ICB PRIOR

88 R/A Standard -$ 2,480,942

89

90 P 12 1,948,281 1,838,340

91 R/A - - 2,494,677

92

93

94 P C4.2/GD-SH/10-01 4.2 Publication of feasibility study 1 18,300 15,000 SH PRIOR

95 R/A Rrota - 2,000

96

97 P 1 18,300 15,000

98 R/A - - 2,000

Legend: Conditional Formatting:

ICB = International Competitive Bidding (in accordance with section 2 of the Guidelines) Red Text Rows: = R/A Revised/Actuals

LIB = Limited International Bidding (in accordance with section 3.2 of the Guidelines) Yellow Columns:

NCB = National Competitive Bidding (in accordance with section 3.3 of the Guidelines) Cell turns normal again if cell for R/A (revised/actual) date is filled in.

SH = Shopping (in accordance with section 3.5 of the Guidelines) Condition 1:

MNL = In accordance with the procedures of the Grants Manual Cell value is less than of equal to cell below it (R/A)

NA = Not applicable

OTHER = Direct expenditures Condition 2:

Cell value is less than the "now" cell (G$2)

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All ICB contracts, first two NCB contracts, and first two shopping contracts irrespective of cost

All direct contracting (if any)

Database Subtotals Tool 49 4,504,362$ 10,482,347.00€

Exchange rate used on November 17, 2010 = 0.74

Cell turns red if planned date has passed

Component 4. Subtotals

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

GOODS

Component 3. Subtotals

Schedule (dd-Mmm-yy)

Start

Exec. /b

Comple-

tion

Pysical

Progress %

Procurement Steps (1-11)

10 11 12

16-Jul-12 468 30-Jun-13

29-Jun-12

17-Jan-11 30 16-Feb-11

13-Dec-10 133 25-Apr-11 100

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 16 of 255 10/17/2012 1:05 AM

Page 17: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

1

2 GOODS

3 P C1.2/GD-SH/10-01 1.2Developing the Software for Municipal-to

School Budget Allocation 1 40,540 30,000 SH PRIOR

4 R/A Hardsoft Integration 49,325

5 R/A Hardsoft Integration Amendment #1 extending completion date

6 P C1.2/GD-SH/10-02 1.2Layout and Printing of Manual for School

budget and Finances4,500 SH PRIOR

7 R/A Blendi 3,900

8 P C1.2/GD/SH/11-03 1.2 Hardware for server for school finance 15,000 SH PRIOR

9 R/A Hardsoft systems 36,970

10 P C1.3/GD-ICB/SDG-01 1.3 IT equipment for SDG 1 199,301 ICB PRIOR

11 R/A JV Interadria and Telefoniku 164,947

12 p C1.3/GD-ICB/SDG-02 1.3 Teaching aids for SDG 1 61,738 NCB PRIOR

13 R/A

14 R/A Rebiding Procedure

15 P C1.3/GD-SH/SDG-04 1.3 Purchasing of books for SDG 1 21,445 SH PRIOR

16 R/A Korabi 14,331

17 P C1.3/GD-SH/SDG-03 1.3 Purchasing of music instruments for SDG 1 38,527 SH PRIOR

18 R/A Star Graf 52,878

19 P C1.3/GD-ICB/SDG-05 1.3 IT equipment for SDG for Round III 1 98,034 ICB PRIOR

20 R/A

21 P 1 40,540 370,511

22 R/A - 322,351

23

24

25

26 P C2.1/GD-SH/09-06 2.1 Developing a sofware for teacher licencing 1 35,000 SH PRIOR

27 R/A Hardsoft Integration 37,000

28 P C2.1/GD-SH/11-07 2.1Hardware for server for teacher licesning

database15,000 SH PRIOR

GOODS

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

Component 1. Subtotals

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Schedule (dd-Mmm-yy)

Payment to

vendor %

Procurement Steps (1-11)

13

0 Completed

100 Completed

100 Completed

100 Completed

100 Completed

Completed

100 Completed

Procure-

ment

Account

s

Comments

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 17 of 255 10/17/2012 1:05 AM

Page 18: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

29 R/A Hardsoft systems 18,485

30 P C2.1/GD-SH/12-02 2.1Teacher license production support

hardware and software1 29,000 SH PRIOR

31 R/A

32 P C2.1/GD-SH/11-09 2.1Computers for 7 regional +1 main offices

for licensing1 8,000 SH PRIOR

33 R/A SI Consulting 6,680

34 P C2.3/GD-SH/09-01 2.3 Computers & Peripherals for MED 1 6,400 4,736 SH PRIOR

35 R/A Illir Kosova 32,967

36 P C2.3/GD-SH/12-03 2.3Printing of brochures for the parents and

publication of test models1 41,800 20,000 SH PRIOR

37 R/A

38 P C2.3/GD-SH/09-03 2.3

Software (assessment analysis) Software

upgrades (for assessment) and

specialized equipment (optical readers)

1 88,600 65,564 SH PRIOR

39 R/A Comtrade Computers 70,240

40 P C2.3/GD-SH/12-01 2.3 Development of the Item Bank Software 1 30,000 SH PRIOR

41 R/A Abellardo 37,128

42 P C2.3/GD-SH/12-02 2.3Hardware Support for Item Bank Database

Application 1 20,000 SH PRIOR

43 R/A SI Consulting 21,066

44 P C2.4/GD-SH/09-01 2.4 Computer systems for EMIS 1 25,800 19,092 SH PRIOR

45 R/A Illir Kosova 27,940

46 p C2.4/G-ICB/09-01 2.4Firm - EMIS software upgrade & training at

the national, municipal and school levels1 88,100 200,000 ICB PRIOR

47 R/A Neocom & Edusoft 108,000

48 R/A Neocom & EdusoftAmendment #1 modification of original

contract27,000

49 P C2.4/GD-SH/11-02 2.4 USB for EMIS 6,000 SH PRIOR

50 R/A Hardsoft systems 8,950

51 P C2.4/GD-SH/11-03 2.4 Backup software for three servers of EMIS 1 8,000 SH PRIOR

52 R/A SI Consulting 8,850

53 P C2.5/GD-SH/09-01 2.5 IT equipment for the PCT 1 13,200 9,768 SH PRIOR

Schedule (dd-Mmm-yy)

Payment to

vendor %

Procurement Steps (1-11)

13

Procure-

ment

Account

s

Comments

100 Completed

100 completed

COM

100 Completed

PUB

Combined beyond the

Shopping threshold.

Requested waiver to award

COM

100 Completed

Not Planned COM

Under Implementation

Not Planned

Under Implementation

COM

100 Completed

100 Completed

100 Completed

100 Completed

100 Completed

COM

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 18 of 255 10/17/2012 1:05 AM

Page 19: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

54 R/A Comtrade Computers 16,610

55 P C2.5/GD-SH/10-02 2.5 IT equipment for the PCT 1 13,200 2,800 SH PRIOR

56 R/A Comtrade Computers 3,521.42

57 P C2.5/GD-SH/09-03 2.5 Office furniture for the PCT 1 8,500 6,290 SH PRIOR

58 R/A SM Commerce - 6,088

59

60 P 9 285,600 459,250

61 R/A - - 409,459

62

63

64

65

70 P C3.1/GD-SH/12-01 3.1Design and Layout of the Guideline on

School Facilities Design- Norms and 1,000 SH PRIOR

71 R/A Trembelat 2,260

72 R/A Trembelat Amendment #1 extending completion date

73 R/A Trembelat Amendment #2 extending completion date

74 P C3.2/GD-SH/12-02 3.2Printing of the Guideline on School

Facilities Design- Norms and Standards2,000 SH PRIOR

75 R/A Grafika Rezniqi 1,829

76 R/A Grafika Rezniqi Amendment #1 extending completion date

77 R/A Grafika Rezniqi Amendment #2 extending completion date

78 P C3.2/GD-SH/10-01 3.2 Computers & Peripherals and Software 1 11,400 10,000 SH PRIOR

79 R/A Comtrade Computers - 7,483.21

80 p C3.2/GD-SH/10-02 3.2 Auto Cad 2011 1 6,081.00 4,500 SH PRIOR

81 R/A Comtrade Computers 3,991

82 P C3.3/GD-ICB/12-01 3.3Equipment for the model Basic Education

School (0-9)4 164,600 122,840 ICB PRIOR

83 R/A -

84 P C3.3/GD-NCB/12-02 3.3Furniture for the model Basic Education

School (0-9)3 81,000 200,000 NCB PRIOR

85 R/A -

86

Component 2. Subtotals

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

GOODS

WORKS

Schedule (dd-Mmm-yy)

Payment to

vendor %

Procurement Steps (1-11)

13

Procure-

ment

Account

s

Comments

100 Completed

COM

100 Completed

OEF

100 Completed

Completed

Under Implementation

Completed

under implementation

COM

100 Completed

100 Completed

COM

COM

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 19 of 255 10/17/2012 1:05 AM

Page 20: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

87 P C3.3/WK-ICB/11-01 3.3Basic Education Model Primary School

(Grades 0-9)1 1,650,300 1,500,000 ICB PRIOR

88 R/A Standard -$ 2,480,942

89

90 P 12 1,948,281 1,838,340

91 R/A - - 2,494,677

92

93

94 P C4.2/GD-SH/10-01 4.2 Publication of feasibility study 1 18,300 15,000 SH PRIOR

95 R/A Rrota - 2,000

96

97 P 1 18,300 15,000

98 R/A - - 2,000

Legend: Conditional Formatting:

ICB = International Competitive Bidding (in accordance with section 2 of the Guidelines) Red Text Rows: = R/A Revised/Actuals

LIB = Limited International Bidding (in accordance with section 3.2 of the Guidelines) Yellow Columns:

NCB = National Competitive Bidding (in accordance with section 3.3 of the Guidelines) Cell turns normal again if cell for R/A (revised/actual) date is filled in.

SH = Shopping (in accordance with section 3.5 of the Guidelines) Condition 1:

MNL = In accordance with the procedures of the Grants Manual Cell value is less than of equal to cell below it (R/A)

NA = Not applicable

OTHER = Direct expenditures Condition 2:

Cell value is less than the "now" cell (G$2)

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All ICB contracts, first two NCB contracts, and first two shopping contracts irrespective of cost

All direct contracting (if any)

Database Subtotals Tool 49 4,504,362$ 10,482,347.00€

Exchange rate used on November 17, 2010 = 0.74

Cell turns red if planned date has passed

Component 4. Subtotals

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

GOODS

Component 3. Subtotals

Schedule (dd-Mmm-yy)

Payment to

vendor %

Procurement Steps (1-11)

13

Procure-

ment

Account

s

Comments

CW

under implementation

PUB

100 Completed

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 20 of 255 10/17/2012 1:05 AM

Page 21: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

1

2 GOODS

3 P C1.2/GD-SH/10-01 1.2Developing the Software for Municipal-to

School Budget Allocation 1 40,540 30,000 SH PRIOR

4 R/A Hardsoft Integration 49,325

5 R/A Hardsoft Integration Amendment #1 extending completion date

6 P C1.2/GD-SH/10-02 1.2Layout and Printing of Manual for School

budget and Finances4,500 SH PRIOR

7 R/A Blendi 3,900

8 P C1.2/GD/SH/11-03 1.2 Hardware for server for school finance 15,000 SH PRIOR

9 R/A Hardsoft systems 36,970

10 P C1.3/GD-ICB/SDG-01 1.3 IT equipment for SDG 1 199,301 ICB PRIOR

11 R/A JV Interadria and Telefoniku 164,947

12 p C1.3/GD-ICB/SDG-02 1.3 Teaching aids for SDG 1 61,738 NCB PRIOR

13 R/A

14 R/A Rebiding Procedure

15 P C1.3/GD-SH/SDG-04 1.3 Purchasing of books for SDG 1 21,445 SH PRIOR

16 R/A Korabi 14,331

17 P C1.3/GD-SH/SDG-03 1.3 Purchasing of music instruments for SDG 1 38,527 SH PRIOR

18 R/A Star Graf 52,878

19 P C1.3/GD-ICB/SDG-05 1.3 IT equipment for SDG for Round III 1 98,034 ICB PRIOR

20 R/A

21 P 1 40,540 370,511

22 R/A - 322,351

23

24

25

26 P C2.1/GD-SH/09-06 2.1 Developing a sofware for teacher licencing 1 35,000 SH PRIOR

27 R/A Hardsoft Integration 37,000

28 P C2.1/GD-SH/11-07 2.1Hardware for server for teacher licesning

database15,000 SH PRIOR

GOODS

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

Component 1. Subtotals

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 21 of 255 10/17/2012 1:05 AM

Page 22: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

29 R/A Hardsoft systems 18,485

30 P C2.1/GD-SH/12-02 2.1Teacher license production support

hardware and software1 29,000 SH PRIOR

31 R/A

32 P C2.1/GD-SH/11-09 2.1Computers for 7 regional +1 main offices

for licensing1 8,000 SH PRIOR

33 R/A SI Consulting 6,680

34 P C2.3/GD-SH/09-01 2.3 Computers & Peripherals for MED 1 6,400 4,736 SH PRIOR

35 R/A Illir Kosova 32,967

36 P C2.3/GD-SH/12-03 2.3Printing of brochures for the parents and

publication of test models1 41,800 20,000 SH PRIOR

37 R/A

38 P C2.3/GD-SH/09-03 2.3

Software (assessment analysis) Software

upgrades (for assessment) and

specialized equipment (optical readers)

1 88,600 65,564 SH PRIOR

39 R/A Comtrade Computers 70,240

40 P C2.3/GD-SH/12-01 2.3 Development of the Item Bank Software 1 30,000 SH PRIOR

41 R/A Abellardo 37,128

42 P C2.3/GD-SH/12-02 2.3Hardware Support for Item Bank Database

Application 1 20,000 SH PRIOR

43 R/A SI Consulting 21,066

44 P C2.4/GD-SH/09-01 2.4 Computer systems for EMIS 1 25,800 19,092 SH PRIOR

45 R/A Illir Kosova 27,940

46 p C2.4/G-ICB/09-01 2.4Firm - EMIS software upgrade & training at

the national, municipal and school levels1 88,100 200,000 ICB PRIOR

47 R/A Neocom & Edusoft 108,000

48 R/A Neocom & EdusoftAmendment #1 modification of original

contract27,000

49 P C2.4/GD-SH/11-02 2.4 USB for EMIS 6,000 SH PRIOR

50 R/A Hardsoft systems 8,950

51 P C2.4/GD-SH/11-03 2.4 Backup software for three servers of EMIS 1 8,000 SH PRIOR

52 R/A SI Consulting 8,850

53 P C2.5/GD-SH/09-01 2.5 IT equipment for the PCT 1 13,200 9,768 SH PRIOR

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 22 of 255 10/17/2012 1:05 AM

Page 23: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

54 R/A Comtrade Computers 16,610

55 P C2.5/GD-SH/10-02 2.5 IT equipment for the PCT 1 13,200 2,800 SH PRIOR

56 R/A Comtrade Computers 3,521.42

57 P C2.5/GD-SH/09-03 2.5 Office furniture for the PCT 1 8,500 6,290 SH PRIOR

58 R/A SM Commerce - 6,088

59

60 P 9 285,600 459,250

61 R/A - - 409,459

62

63

64

65

70 P C3.1/GD-SH/12-01 3.1Design and Layout of the Guideline on

School Facilities Design- Norms and 1,000 SH PRIOR

71 R/A Trembelat 2,260

72 R/A Trembelat Amendment #1 extending completion date

73 R/A Trembelat Amendment #2 extending completion date

74 P C3.2/GD-SH/12-02 3.2Printing of the Guideline on School

Facilities Design- Norms and Standards2,000 SH PRIOR

75 R/A Grafika Rezniqi 1,829

76 R/A Grafika Rezniqi Amendment #1 extending completion date

77 R/A Grafika Rezniqi Amendment #2 extending completion date

78 P C3.2/GD-SH/10-01 3.2 Computers & Peripherals and Software 1 11,400 10,000 SH PRIOR

79 R/A Comtrade Computers - 7,483.21

80 p C3.2/GD-SH/10-02 3.2 Auto Cad 2011 1 6,081.00 4,500 SH PRIOR

81 R/A Comtrade Computers 3,991

82 P C3.3/GD-ICB/12-01 3.3Equipment for the model Basic Education

School (0-9)4 164,600 122,840 ICB PRIOR

83 R/A -

84 P C3.3/GD-NCB/12-02 3.3Furniture for the model Basic Education

School (0-9)3 81,000 200,000 NCB PRIOR

85 R/A -

86

Component 2. Subtotals

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

GOODS

WORKS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 23 of 255 10/17/2012 1:05 AM

Page 24: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

87 P C3.3/WK-ICB/11-01 3.3Basic Education Model Primary School

(Grades 0-9)1 1,650,300 1,500,000 ICB PRIOR

88 R/A Standard -$ 2,480,942

89

90 P 12 1,948,281 1,838,340

91 R/A - - 2,494,677

92

93

94 P C4.2/GD-SH/10-01 4.2 Publication of feasibility study 1 18,300 15,000 SH PRIOR

95 R/A Rrota - 2,000

96

97 P 1 18,300 15,000

98 R/A - - 2,000

Legend: Conditional Formatting:

ICB = International Competitive Bidding (in accordance with section 2 of the Guidelines) Red Text Rows: = R/A Revised/Actuals

LIB = Limited International Bidding (in accordance with section 3.2 of the Guidelines) Yellow Columns:

NCB = National Competitive Bidding (in accordance with section 3.3 of the Guidelines) Cell turns normal again if cell for R/A (revised/actual) date is filled in.

SH = Shopping (in accordance with section 3.5 of the Guidelines) Condition 1:

MNL = In accordance with the procedures of the Grants Manual Cell value is less than of equal to cell below it (R/A)

NA = Not applicable

OTHER = Direct expenditures Condition 2:

Cell value is less than the "now" cell (G$2)

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All ICB contracts, first two NCB contracts, and first two shopping contracts irrespective of cost

All direct contracting (if any)

Database Subtotals Tool 49 4,504,362$ 10,482,347.00€

Exchange rate used on November 17, 2010 = 0.74

Cell turns red if planned date has passed

Component 4. Subtotals

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

GOODS

Component 3. Subtotals

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 24 of 255 10/17/2012 1:05 AM

Page 25: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

1

2 GOODS

3 P C1.2/GD-SH/10-01 1.2Developing the Software for Municipal-to

School Budget Allocation 1 40,540 30,000 SH PRIOR

4 R/A Hardsoft Integration 49,325

5 R/A Hardsoft Integration Amendment #1 extending completion date

6 P C1.2/GD-SH/10-02 1.2Layout and Printing of Manual for School

budget and Finances4,500 SH PRIOR

7 R/A Blendi 3,900

8 P C1.2/GD/SH/11-03 1.2 Hardware for server for school finance 15,000 SH PRIOR

9 R/A Hardsoft systems 36,970

10 P C1.3/GD-ICB/SDG-01 1.3 IT equipment for SDG 1 199,301 ICB PRIOR

11 R/A JV Interadria and Telefoniku 164,947

12 p C1.3/GD-ICB/SDG-02 1.3 Teaching aids for SDG 1 61,738 NCB PRIOR

13 R/A

14 R/A Rebiding Procedure

15 P C1.3/GD-SH/SDG-04 1.3 Purchasing of books for SDG 1 21,445 SH PRIOR

16 R/A Korabi 14,331

17 P C1.3/GD-SH/SDG-03 1.3 Purchasing of music instruments for SDG 1 38,527 SH PRIOR

18 R/A Star Graf 52,878

19 P C1.3/GD-ICB/SDG-05 1.3 IT equipment for SDG for Round III 1 98,034 ICB PRIOR

20 R/A

21 P 1 40,540 370,511

22 R/A - 322,351

23

24

25

26 P C2.1/GD-SH/09-06 2.1 Developing a sofware for teacher licencing 1 35,000 SH PRIOR

27 R/A Hardsoft Integration 37,000

28 P C2.1/GD-SH/11-07 2.1Hardware for server for teacher licesning

database15,000 SH PRIOR

GOODS

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

Component 1. Subtotals

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 25 of 255 10/17/2012 1:05 AM

Page 26: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

29 R/A Hardsoft systems 18,485

30 P C2.1/GD-SH/12-02 2.1Teacher license production support

hardware and software1 29,000 SH PRIOR

31 R/A

32 P C2.1/GD-SH/11-09 2.1Computers for 7 regional +1 main offices

for licensing1 8,000 SH PRIOR

33 R/A SI Consulting 6,680

34 P C2.3/GD-SH/09-01 2.3 Computers & Peripherals for MED 1 6,400 4,736 SH PRIOR

35 R/A Illir Kosova 32,967

36 P C2.3/GD-SH/12-03 2.3Printing of brochures for the parents and

publication of test models1 41,800 20,000 SH PRIOR

37 R/A

38 P C2.3/GD-SH/09-03 2.3

Software (assessment analysis) Software

upgrades (for assessment) and

specialized equipment (optical readers)

1 88,600 65,564 SH PRIOR

39 R/A Comtrade Computers 70,240

40 P C2.3/GD-SH/12-01 2.3 Development of the Item Bank Software 1 30,000 SH PRIOR

41 R/A Abellardo 37,128

42 P C2.3/GD-SH/12-02 2.3Hardware Support for Item Bank Database

Application 1 20,000 SH PRIOR

43 R/A SI Consulting 21,066

44 P C2.4/GD-SH/09-01 2.4 Computer systems for EMIS 1 25,800 19,092 SH PRIOR

45 R/A Illir Kosova 27,940

46 p C2.4/G-ICB/09-01 2.4Firm - EMIS software upgrade & training at

the national, municipal and school levels1 88,100 200,000 ICB PRIOR

47 R/A Neocom & Edusoft 108,000

48 R/A Neocom & EdusoftAmendment #1 modification of original

contract27,000

49 P C2.4/GD-SH/11-02 2.4 USB for EMIS 6,000 SH PRIOR

50 R/A Hardsoft systems 8,950

51 P C2.4/GD-SH/11-03 2.4 Backup software for three servers of EMIS 1 8,000 SH PRIOR

52 R/A SI Consulting 8,850

53 P C2.5/GD-SH/09-01 2.5 IT equipment for the PCT 1 13,200 9,768 SH PRIOR

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 26 of 255 10/17/2012 1:05 AM

Page 27: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

54 R/A Comtrade Computers 16,610

55 P C2.5/GD-SH/10-02 2.5 IT equipment for the PCT 1 13,200 2,800 SH PRIOR

56 R/A Comtrade Computers 3,521.42

57 P C2.5/GD-SH/09-03 2.5 Office furniture for the PCT 1 8,500 6,290 SH PRIOR

58 R/A SM Commerce - 6,088

59

60 P 9 285,600 459,250

61 R/A - - 409,459

62

63

64

65

70 P C3.1/GD-SH/12-01 3.1Design and Layout of the Guideline on

School Facilities Design- Norms and 1,000 SH PRIOR

71 R/A Trembelat 2,260

72 R/A Trembelat Amendment #1 extending completion date

73 R/A Trembelat Amendment #2 extending completion date

74 P C3.2/GD-SH/12-02 3.2Printing of the Guideline on School

Facilities Design- Norms and Standards2,000 SH PRIOR

75 R/A Grafika Rezniqi 1,829

76 R/A Grafika Rezniqi Amendment #1 extending completion date

77 R/A Grafika Rezniqi Amendment #2 extending completion date

78 P C3.2/GD-SH/10-01 3.2 Computers & Peripherals and Software 1 11,400 10,000 SH PRIOR

79 R/A Comtrade Computers - 7,483.21

80 p C3.2/GD-SH/10-02 3.2 Auto Cad 2011 1 6,081.00 4,500 SH PRIOR

81 R/A Comtrade Computers 3,991

82 P C3.3/GD-ICB/12-01 3.3Equipment for the model Basic Education

School (0-9)4 164,600 122,840 ICB PRIOR

83 R/A -

84 P C3.3/GD-NCB/12-02 3.3Furniture for the model Basic Education

School (0-9)3 81,000 200,000 NCB PRIOR

85 R/A -

86

Component 2. Subtotals

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

GOODS

WORKS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 27 of 255 10/17/2012 1:05 AM

Page 28: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

87 P C3.3/WK-ICB/11-01 3.3Basic Education Model Primary School

(Grades 0-9)1 1,650,300 1,500,000 ICB PRIOR

88 R/A Standard -$ 2,480,942

89

90 P 12 1,948,281 1,838,340

91 R/A - - 2,494,677

92

93

94 P C4.2/GD-SH/10-01 4.2 Publication of feasibility study 1 18,300 15,000 SH PRIOR

95 R/A Rrota - 2,000

96

97 P 1 18,300 15,000

98 R/A - - 2,000

Legend: Conditional Formatting:

ICB = International Competitive Bidding (in accordance with section 2 of the Guidelines) Red Text Rows: = R/A Revised/Actuals

LIB = Limited International Bidding (in accordance with section 3.2 of the Guidelines) Yellow Columns:

NCB = National Competitive Bidding (in accordance with section 3.3 of the Guidelines) Cell turns normal again if cell for R/A (revised/actual) date is filled in.

SH = Shopping (in accordance with section 3.5 of the Guidelines) Condition 1:

MNL = In accordance with the procedures of the Grants Manual Cell value is less than of equal to cell below it (R/A)

NA = Not applicable

OTHER = Direct expenditures Condition 2:

Cell value is less than the "now" cell (G$2)

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All ICB contracts, first two NCB contracts, and first two shopping contracts irrespective of cost

All direct contracting (if any)

Database Subtotals Tool 49 4,504,362$ 10,482,347.00€

Exchange rate used on November 17, 2010 = 0.74

Cell turns red if planned date has passed

Component 4. Subtotals

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

GOODS

Component 3. Subtotals

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 28 of 255 10/17/2012 1:05 AM

Page 29: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

1

2 GOODS

3 P C1.2/GD-SH/10-01 1.2Developing the Software for Municipal-to

School Budget Allocation 1 40,540 30,000 SH PRIOR

4 R/A Hardsoft Integration 49,325

5 R/A Hardsoft Integration Amendment #1 extending completion date

6 P C1.2/GD-SH/10-02 1.2Layout and Printing of Manual for School

budget and Finances4,500 SH PRIOR

7 R/A Blendi 3,900

8 P C1.2/GD/SH/11-03 1.2 Hardware for server for school finance 15,000 SH PRIOR

9 R/A Hardsoft systems 36,970

10 P C1.3/GD-ICB/SDG-01 1.3 IT equipment for SDG 1 199,301 ICB PRIOR

11 R/A JV Interadria and Telefoniku 164,947

12 p C1.3/GD-ICB/SDG-02 1.3 Teaching aids for SDG 1 61,738 NCB PRIOR

13 R/A

14 R/A Rebiding Procedure

15 P C1.3/GD-SH/SDG-04 1.3 Purchasing of books for SDG 1 21,445 SH PRIOR

16 R/A Korabi 14,331

17 P C1.3/GD-SH/SDG-03 1.3 Purchasing of music instruments for SDG 1 38,527 SH PRIOR

18 R/A Star Graf 52,878

19 P C1.3/GD-ICB/SDG-05 1.3 IT equipment for SDG for Round III 1 98,034 ICB PRIOR

20 R/A

21 P 1 40,540 370,511

22 R/A - 322,351

23

24

25

26 P C2.1/GD-SH/09-06 2.1 Developing a sofware for teacher licencing 1 35,000 SH PRIOR

27 R/A Hardsoft Integration 37,000

28 P C2.1/GD-SH/11-07 2.1Hardware for server for teacher licesning

database15,000 SH PRIOR

GOODS

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

Component 1. Subtotals

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 29 of 255 10/17/2012 1:05 AM

Page 30: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

29 R/A Hardsoft systems 18,485

30 P C2.1/GD-SH/12-02 2.1Teacher license production support

hardware and software1 29,000 SH PRIOR

31 R/A

32 P C2.1/GD-SH/11-09 2.1Computers for 7 regional +1 main offices

for licensing1 8,000 SH PRIOR

33 R/A SI Consulting 6,680

34 P C2.3/GD-SH/09-01 2.3 Computers & Peripherals for MED 1 6,400 4,736 SH PRIOR

35 R/A Illir Kosova 32,967

36 P C2.3/GD-SH/12-03 2.3Printing of brochures for the parents and

publication of test models1 41,800 20,000 SH PRIOR

37 R/A

38 P C2.3/GD-SH/09-03 2.3

Software (assessment analysis) Software

upgrades (for assessment) and

specialized equipment (optical readers)

1 88,600 65,564 SH PRIOR

39 R/A Comtrade Computers 70,240

40 P C2.3/GD-SH/12-01 2.3 Development of the Item Bank Software 1 30,000 SH PRIOR

41 R/A Abellardo 37,128

42 P C2.3/GD-SH/12-02 2.3Hardware Support for Item Bank Database

Application 1 20,000 SH PRIOR

43 R/A SI Consulting 21,066

44 P C2.4/GD-SH/09-01 2.4 Computer systems for EMIS 1 25,800 19,092 SH PRIOR

45 R/A Illir Kosova 27,940

46 p C2.4/G-ICB/09-01 2.4Firm - EMIS software upgrade & training at

the national, municipal and school levels1 88,100 200,000 ICB PRIOR

47 R/A Neocom & Edusoft 108,000

48 R/A Neocom & EdusoftAmendment #1 modification of original

contract27,000

49 P C2.4/GD-SH/11-02 2.4 USB for EMIS 6,000 SH PRIOR

50 R/A Hardsoft systems 8,950

51 P C2.4/GD-SH/11-03 2.4 Backup software for three servers of EMIS 1 8,000 SH PRIOR

52 R/A SI Consulting 8,850

53 P C2.5/GD-SH/09-01 2.5 IT equipment for the PCT 1 13,200 9,768 SH PRIOR

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 30 of 255 10/17/2012 1:05 AM

Page 31: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

54 R/A Comtrade Computers 16,610

55 P C2.5/GD-SH/10-02 2.5 IT equipment for the PCT 1 13,200 2,800 SH PRIOR

56 R/A Comtrade Computers 3,521.42

57 P C2.5/GD-SH/09-03 2.5 Office furniture for the PCT 1 8,500 6,290 SH PRIOR

58 R/A SM Commerce - 6,088

59

60 P 9 285,600 459,250

61 R/A - - 409,459

62

63

64

65

70 P C3.1/GD-SH/12-01 3.1Design and Layout of the Guideline on

School Facilities Design- Norms and 1,000 SH PRIOR

71 R/A Trembelat 2,260

72 R/A Trembelat Amendment #1 extending completion date

73 R/A Trembelat Amendment #2 extending completion date

74 P C3.2/GD-SH/12-02 3.2Printing of the Guideline on School

Facilities Design- Norms and Standards2,000 SH PRIOR

75 R/A Grafika Rezniqi 1,829

76 R/A Grafika Rezniqi Amendment #1 extending completion date

77 R/A Grafika Rezniqi Amendment #2 extending completion date

78 P C3.2/GD-SH/10-01 3.2 Computers & Peripherals and Software 1 11,400 10,000 SH PRIOR

79 R/A Comtrade Computers - 7,483.21

80 p C3.2/GD-SH/10-02 3.2 Auto Cad 2011 1 6,081.00 4,500 SH PRIOR

81 R/A Comtrade Computers 3,991

82 P C3.3/GD-ICB/12-01 3.3Equipment for the model Basic Education

School (0-9)4 164,600 122,840 ICB PRIOR

83 R/A -

84 P C3.3/GD-NCB/12-02 3.3Furniture for the model Basic Education

School (0-9)3 81,000 200,000 NCB PRIOR

85 R/A -

86

Component 2. Subtotals

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

GOODS

WORKS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 31 of 255 10/17/2012 1:05 AM

Page 32: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Works & Goods

This is PP was updated on April 20, 2011

USD EUR

Estim.

No. of

Lots

Proc.

Method

WB

Review

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Ln.

#

Status

P

R/A

d/

Comp. Description

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

87 P C3.3/WK-ICB/11-01 3.3Basic Education Model Primary School

(Grades 0-9)1 1,650,300 1,500,000 ICB PRIOR

88 R/A Standard -$ 2,480,942

89

90 P 12 1,948,281 1,838,340

91 R/A - - 2,494,677

92

93

94 P C4.2/GD-SH/10-01 4.2 Publication of feasibility study 1 18,300 15,000 SH PRIOR

95 R/A Rrota - 2,000

96

97 P 1 18,300 15,000

98 R/A - - 2,000

Legend: Conditional Formatting:

ICB = International Competitive Bidding (in accordance with section 2 of the Guidelines) Red Text Rows: = R/A Revised/Actuals

LIB = Limited International Bidding (in accordance with section 3.2 of the Guidelines) Yellow Columns:

NCB = National Competitive Bidding (in accordance with section 3.3 of the Guidelines) Cell turns normal again if cell for R/A (revised/actual) date is filled in.

SH = Shopping (in accordance with section 3.5 of the Guidelines) Condition 1:

MNL = In accordance with the procedures of the Grants Manual Cell value is less than of equal to cell below it (R/A)

NA = Not applicable

OTHER = Direct expenditures Condition 2:

Cell value is less than the "now" cell (G$2)

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All ICB contracts, first two NCB contracts, and first two shopping contracts irrespective of cost

All direct contracting (if any)

Database Subtotals Tool 49 4,504,362$ 10,482,347.00€

Exchange rate used on November 17, 2010 = 0.74

Cell turns red if planned date has passed

Component 4. Subtotals

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

GOODS

Component 3. Subtotals

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 32 of 255 10/17/2012 1:05 AM

Page 33: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

1

2

3 CONSULTANTS

4 P C1.1/CS-IC/09-01 1.1Consultant - legal framework

development92,600 IC PRIOR 12-Mar-09 14 26-Mar-09 7 02-Apr-09 14

5 R/A Dennis Farrington 72,000 20-Dec-08 16-Jan-09 01-Apr-09

6 R/A Dennis Farrington 1.1Amendment #1 extending completion

dateNA NA NA

7 P C1.1/CS-IC/11-02 1.1 New legislation implementation 40,540 30,000 IC PRIOR 01-Nov-11 14 15-Nov-11 7 22-Nov-11 14

8 R/A Dennis Farrington 27,040 27-Oct-11 09-Nov-11 25-Nov-11

9 R/A Dennis FarringtonAmendment #1 modification of original

contract23-May-12 24-May-12 NA

10 PNo Number

1.2Consultant - financing formula

development107,500 79,550 IC PRIOR 03-Mar-08 14 18-Mar-09 7 25-Apr-08 14

11 R/A Rosalind Levacic 1.2 45,220 20-Jun-08 01-Jul-08

12 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract4,500 NA NA NA

13 R/A Rosalind Levacic 1.2 Amendment #2 modification of contract 14,379 NA NA NA

14 P C1.2/CS-IC/09-01 1.2Consultant - financing formula

development- SSS PRIOR 03-Mar-08 14 17-Mar-08 7 24-Mar-08 14

15 R/A Rosalind Levacic 1.2 35,540 21-Oct-09 22-Oct-09 NA

16 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract50,980 PRIOR NA NA NA

17 R/A Rosalind Levacic 1.2Amendment #2 modification of original

contract5,440 19-Mar-12 28-Mar-12 NA

18 P C1.2/CS-CQS/09-02 1.2 Firm - Survey evaluation - CQS PRIOR 15-May-09 14 29-May-09 7 05-Jun-09 14

19 R/A Prism Research 24,674 10-Mar-09 20-Mar-09 27-Mar-09

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 33 of 255 10/17/2012 1:05 AM

Page 34: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

20 R/A Prism Research 1.2Amendment #1 extending completion

dateNA NA NA

21 R/A Prism Research 1.2Amendment #2 extending completion

dateNA NA NA

22 P C1.2/CS-IC/09-03 1.2 Consultant - system data entry 6,800 IC PRIOR 03-Dec-09 14 17-Dec-09 7 24-Dec-09 14

23 R/A Besnik Limaj 6,400 19-Jan-09

24 P C1.2/CS-IC/09-05 1.2 Consultant - finance help desk-1 - IC PRIOR 14-Jul-09 14 29-Jul-09 7 05-Aug-09 14

25 R/A Pakize Isufaj 10,800 15-Jun-09 10-Jun-09 05-Aug-09

26 P C1.2/CS-IC/09-06 1.2 Consultant - finance help desk-2 - IC PRIOR 14-Jul-09 14 28-Jul-09 7 04-Aug-09 14

27 R/A Hysni Maxharraj 10,800 15-Jun-09 10-Jul-09 05-Aug-09

28 P C1.2/CS-IC/09-07 1.2 Consultant - training materials analyst - IC PRIOR 20-Sep-09 14 04-Oct-09 7 11-Oct-09 14

29 R/A Edi Bunjaku 1,300 20-Sep-09 01-Oct-09

30 P C1.2/CS-IC/10-08 1.2 Consultant - Head of help desk - IC PRIOR 18-Feb-10 14 04-Mar-10 7 11-Mar-10 14

31 R/A Pakize Isufaj 13,200 18-Feb-10 1 19-Feb-10 20-Feb-10

32 R/A Pakize Isufaj 1.2Amendment #1 modification of original

contractNA NA NA

33 R/A Pakize Isufaj 1.2Amendment #2 modification of original

contract13,200 NA NA NA

34 R/A Pakize Isufaj 1.2Amendment #3 modification of original

contract10,350 13-Mar-12 15-Mar-12 NA

35 P C1.2/CS-IC/10-09 1.2 Consultant - education finance 2 - IC PRIOR 01-Feb-09 14 15-Feb-09 7 22-Feb-09 14

36 R/A Vjolca Sellimi 1.2 10,800 08-Feb-09 19-Feb-10 17-Feb-10

37 R/A Vjolca Sellimi 1.2Amendment #1 modification of original

contractNA NA NA

38 R/A Vjolca Sellimi 1.2Amendment #2 modification of original

contract10,800 NA NA NA

39 R/A Vjolca Sellimi 1.2Amendment #3 modification of original

contract8,469 13-Mar-12 15-Mar-12 NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 34 of 255 10/17/2012 1:05 AM

Page 35: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

40 R/A Vjolca Sellimi 1.2Amendment # 4 modification of original

contract13-Aug-12 NA

41 P C1.2/CS-IC/11-10 1.2 Trainer for school financing level 6,000 IC PRIOR 23-May-11 14 06-Jun-11 7 13-Jun-11 14

42 R/A Mehmet Simnica 5,000 14-Jul-11 15-Jul-11 01-Aug-11

43 P C1.2/CS-IC/11-11 1.2 Trainer for school financing level 6,000 IC PRIOR 23-May-11 14 06-Jun-11 7 13-Jun-11 14

44 R/A Mevlide Shamolli 5,000 14-Jul-11 15-Jul-11 01-Aug-11

45 P C1.2/CS-IC/11-12 1.2 Trainer for school financing level 6,000 IC PRIOR 23-May-11 14 06-Jun-11 7 13-Jun-11 14

46 R/A Jeton Kryeziu 5,000 14-Jul-11 15-Jul-11 01-Aug-11

47 P C1.2/CS-IC/11-13 1.2 Trainer for school financing level 6,000 IC PRIOR 23-May-11 14 06-Jun-11 7 13-Jun-11 14

48 R/A Jeton Gashi 5,000 14-Jul-11 15-Jul-11 01-Aug-11

49 P C1.2/CS-IC/11-14 1.2 Trainer for school financing level 6,000 IC PRIOR 23-May-11 14 06-Jun-11 7 13-Jun-11 14

50 R/A Aferdita Strellci 5,000 14-Jul-11 15-Jul-11 01-Aug-11

51 P C1.2/CS-IC/11-15 1.2 Trainer for school procurement level 6,000 IC PRIOR 20-Sep-11 14 04-Oct-11 7 11-Oct-11 14

52 R/A Fadil Veseli 4,000 20-Sep-11 18-Oct-11 19-Oct-11

53 P C1.2/CS-IC/11-16 1.2 Trainer for school procurement level 6,000 IC PRIOR 20-Sep-11 14 04-Oct-11 7 11-Oct-11 14

54 R/A Mirevete Gerguri 4,000 20-Sep-11 18-Oct-11 19-Oct-11

55 P C1.2/CS-IC/11-17 1.2 Trainer for school procurement level 6,000 IC PRIOR 20-Sep-11 14 04-Oct-11 7 11-Oct-11 14

56 R/A Fatmire M Morina 4,000 20-Sep-11 18-Oct-11 19-Oct-11

57 P C1.2/CS-IC/11-18 1.2 Trainer for school procurement level 6,000 IC PRIOR 20-Sep-11 14 04-Oct-11 7 11-Oct-11 14

58 R/A Vllaznim Reshani 4,000 20-Sep-11 18-Oct-11 19-Oct-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 35 of 255 10/17/2012 1:05 AM

Page 36: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

59 P C1.2/CS-IC/11-19 1.2 Trainer for school procurement level 6,000 IC PRIOR 20-Sep-11 14 04-Oct-11 7 11-Oct-11 14

60 R/A Defrim Kuqi 4,000 20-Sep-11 18-Oct-11 19-Oct-11

61 P C1.2/CS-IC-12-01 1.2Education finance officer for operating

at Help Desk6,300 IC PRIOR 08-Jun-12 14 22-Jun-12 7 29-Jun-12 14

62 R/A Bersant R. Grabanice 1,200 06-Jun-12 11-Jun-12 11-Jun-12

63 PNo Number

1.3 Consultant - Manager of the SDGs 46,500 IC PRIOR 12-Apr-09 14 26-Apr-09 7 04-May-09 14

64 R/A Xhafer Ahmeti 15,600 12-May-09 27-May-09

65 P C1.3/CS-IC/09-02 1.3 Consultant - Manager of the SDGs - IC PRIOR 04-Jan-10 14 18-Jan-10 7 25-Jan-10 14

66 R/A Besim Kokollari 14,400 10-Feb-10 12-Feb-10 4 26-Feb-10 14

67 R/A Besim Kokollari 1.3Amendment #1 modification of original

contract- 12,818 NA NA NA

68 R/A Besim Kokollari 1.3Amendment #2 modification of original

contract10,800 14-Mar-12 16-Mar-12 NA

69 P C1.3/CS-IC/09-02 1.3 Consultant - SDG and MDG manuals - SSS PRIOR 20-May-09 14 03-Jun-09 7 10-Jun-09 14

70 R/A Remzi Salihu 7,800 20-May-09 12-Jun-09 NA

71 P C1.3/CS-QCBS/09-03 1.3Firm/NGO - school development grants

implem.463,600 QCBS PRIOR 20-May-09 14 03-Jun-09 7 10-Jun-09 45

72 R/A KEC, KOSOVO 266,935 20-May-09 11-Jun-09 11-Jun-09

73 R/A KEC, KOSOVO 1,3Amendment #1 modification of original

contract48,400 NA NA NA

74 R/A KEC, KOSOVO 1.3Amendment # 2 modification of original

contract11,840 28-Jun-12 29-Jun-12 NA

75

76

77

78 PC2.1/CS-IC/09-01

2.1Consultant - teacher's devel. and

licencing19,900 IC PRIOR 25-May-08 14 08-Jun-08 7 15-Jun-08 14

CONSULTANTS

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 36 of 255 10/17/2012 1:05 AM

Page 37: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

79 R/A Blerim Saqipi 11,960 25-May-08 03-Jun-08 04-Jul-08

80 R/A Blerim Saqipi 2.1Amendment #1 modification of original

contract14,950 NA NA NA

81 R/A Blerim Saqipi 2.1Amendment #2 modification of original

contract20,800 NA NA NA

82 R/A Blerim Saqipi 2.1Amendment #3 modification of original

contract13,407 22-Nov-10 NA NA

83 R/A Blerim Saqipi 2.1Amendment #4 modification of original

contract2,616 NA NA NA

84 R/A Blerim Saqipi 2.1Amendment # 5 modification of original

contract7,800 21-Jun-12 22-Jun-12 NA

85 PC2.1/CS-IC/09-02

2.1Consultant - teachers' professional

devel.62,700 IC PRIOR 03-Mar-08 14 17-Mar-08 7 24-Mar-08 14

86 R/A Pilar Romaguez 52,300 20-May-08 22-May-08 23-May-08

87 PC2.1/CS-IC/09-03

2.1Consultant - teachers' career/advance.

syst.IC PRIOR 03-Apr-09 14 18-Apr-09 7 25-Apr-09 14

88 R/A Pasi Ikonen 24,976

89 R/A Pasi Ikonen 2.1Amendment #1 extending completion

dateNA NA NA

90 PC2.1/CS-IC/09-04

2.1Consultant - teachers' performance

evaluation60,600 IC PRIOR 10-Apr-09 14 25-Apr-09 7 02-May-09 14

91 R/A Jorge Manzi 32,733

92 R/A Jorge ManziAmendment #1 extending completion

date

93 R/A Jorge ManziAmendment #2 extending completion

date

94 P C2.1/CS-IC/10-05 2.1Consultant - teachers' performance

evaluation112,900 82,100 IC PRIOR 15-Oct-10 14 29-Oct-10 7 05-Nov-10 14

95 R/A Nicole Saginor 2.1 48,400 18-Aug-10 25-Aug-10 26-Aug-10

98 R/A Nicole Saginor 2.1 43,950 13-Mar-12 29-Mar-12 NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 37 of 255 10/17/2012 1:05 AM

Page 38: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

99 P C2.1/CS-IC/11-07 - Prishtina region 2.1

Consultant for database population and

logistical support on performance

evaluation

- 6,400 IC PRIOR 30-May-11 14 13-Jun-11 7 20-Jun-11 14

100 R/A Edmond Krasniqi 6,000 10-Jun-11 15-Jun-11 20-Jun-11

101 R/A Edmond KrasniqiAmendment #1 extending completion

date20-Apr-12 26-Apr-12 NA

102 R/A Edmond KrasniqiAmendment # 2 modification of original

contract1,875 25-Jul-12 NA

103 P C2.1/CS-IC/11-08 - Prizren region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR 30-May-11 14 13-Jun-11 7 20-Jun-11 14

104 R/A Kreshnik Shatri 6,000 10-Jun-11 15-Jun-11 20-Jun-11

105 R/A Kreshnik ShatriAmendment #1 extending completion

date20-Apr-12 26-Apr-12 NA

106 R/A Kreshnik ShatriAmendment # 2 modification of original

contract1,875 25-Jul-12 NA

107 P C2.1/CS-IC/11-09 - Peja region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR 30-May-11 14 13-Jun-11 7 20-Jun-11 14

108 R/A Mentor Vokshi 6,000 10-Jun-11 15-Jun-11 20-Jun-11

109 R/A Mentor VokshiAmendment #1 extending completion

date20-Apr-12 26-Apr-12 NA

110 R/A Mentor VokshiAmendment # 2 modification of original

contract1,875 25-Jul-12 NA

111 P C2.1/CS-IC/11-10 - Gjakova region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR 30-May-11 14 13-Jun-11 7 20-Jun-11 14

112 R/A Armend Bajrami 6,000 10-Jun-11 15-Jun-11 20-Jun-11

113 R/A Armend BajramiAmendment #1 extending completion

date20-Apr-12 26-Apr-12 NA

114 R/A Armend BajramiAmendment # 2 modification of original

contract1,500 25-Jul-12 NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 38 of 255 10/17/2012 1:05 AM

Page 39: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

115 P C2.1/CS-IC/11-11 - Ferizaj region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR 30-May-11 14 13-Jun-11 7 20-Jun-11 14

116 R/A Donika Rexhepi 6,000 10-Jun-11 15-Jun-11 20-Jun-11

117 R/A Donika RexhepiAmendment #1 extending completion

date20-Apr-12 26-Apr-12 NA

118 R/A Donika RexhepiAmendment # 2 modification of original

contract1,500 25-Jul-12 NA

119 P C2.1/CS-IC/11-12 - Mitrovica region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR 10-Jun-11 14 24-Jun-11 7 01-Jul-11 14

120 R/A Zahir Ibishi 6,000 10-Jun-11 15-Jun-11 20-Jun-11

121 R/A Zahir IbishiAmendment #1 extending completion

date20-Apr-12 26-Apr-12 NA

122 R/A Zahir IbishiAmendment # 2 modification of original

contract1,500 25-Jul-12 NA

123 P C2.1/CS-IC/11-13 - Gjilan region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR 30-May-11 14 13-Jun-11 7 20-Jun-11 14

124 R/A Agim Ramadani 6,000 10-Jun-11 15-Jun-11 20-Jun-11

125 R/A Agim RamadaniAmendment #1 extending completion

date20-Apr-12 26-Apr-12 NA

126 R/A Agim RamadaniAmendment # 2 modification of original

contract1,875 25-Jul-12 NA

127 P C2.1/CS-IC/11-14 2.1Consultant on Teacher Development

Policies Study- 50,000 IC PRIOR 30-May-11 5 04-Jun-11 5 09-Jun-11 7

128 P David Lynn 47,830 10-Jun-11 17-Jun-11 20-Jun-11

129 R/A David Lynn 16-Mar-12 16-Mar-12 NA

130 p C2.1/CS-IC/11-15 2.1Consultant for the Managing the

database process8,000 IC PRIOR 10-Jun-11 14 24-Jun-11 7 01-Jul-11 7

131 R/A Mirlind Bruqi 8,000 10-Jun-11 23-Jun-11 01-Jul-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 39 of 255 10/17/2012 1:05 AM

Page 40: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

132 R/A Mirlind BruqiAmendment #1 extending completion

date20-Apr-12 26-Apr-12 NA

133 PC2.2/CS-SSS/10-02

2.2Consultant - curriculum unit and CACTI

capacity- SSS PRIOR 22-Jun-10 1 23-Jun-10 NA

134 R/A Camerron Harisson 45,243 33,480 22-Jun-10 1 23-Jun-10 NA

135 PC2.2/CS-IC/09-01

2.2Consultant - curriculum unit and CACTI

capacityIC PRIOR 08-Feb-09 14 22-Feb-09 7 01-Mar-09 14

136 R/A Camerron Harisson 56,000

137 PC2.3/CS-IC/09-01

2.3Consultant - assessment Unit and

MEST experts186,100 140,406 IC PRIOR 02-Apr-09 14 16-Apr-09 7 23-Apr-09 14

138 R/A Kelvin Gregory 75,600 25-Feb-09 03-Mar-09 03-Mar-09

139 PC2.3/CS-IC/09-03

2.3Consultant - test administration study

(intern.)46,960 IC PRIOR 25-Nov-09 14 09-Dec-09 7 16-Dec-09 14

140 R/A Steven Bakker 51,800 10-Dec-09 14 28-Dec-09 04-Jan-10

141 P C2.3/CS-IC/11-04 2.3 Consultant - Matura reform 50,000 IC PRIOR 23-May-11 14 06-Jun-11 7 13-Jun-11 14

142 R/A Steven Bakker 53,150 16-Jun-11 17-Jun-11 20-Jun-11

143 P C2.3/CS-SSS/12-01 2.3Supporting the Assessment Reform in

Kosovo29,000 SSS PRIOR 07-Jun-12 14 11-Jun-12 7 18-Jun-12 14

144 R/A Steven Bakker 28,800 07-Jun-12 11-Jun-12 NA

145 P C2.3/CS-IC-11-05 2.3IC on Capacity Building for External

Assessment in Kosovo50,000 IC PRIOR 23-May-11 14 06-Jun-11 7 13-Jun-11 14

146 R/A Kelvin Gregory 43,650 23-Aug-11 17-Oct-11 19-Oct-11

147 R/A Kelvin GregoryAmendment #1 extending completion

date16-May-12 18-May-12 NA

148 P C2.3/CS-IC-11-06 2.3Consultant Mother Tongue and Modern

Foreign Language Exams21,000 IC PRIOR 14-Oct-11 14 28-Oct-11 7 04-Nov-11 14

149 R/A Ivane Mindadze 10,150 14-Oct-11 17-Oct-11 18-Oct-11

150 P C2.3/CS-IC-11-07 2.3

Consultant for Supporting the Item

Bank Development in Kosovo External

Assessment

24,000 IC PRIOR 14-Oct-11 14 28-Oct-11 7 04-Nov-11 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 40 of 255 10/17/2012 1:05 AM

Page 41: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

151 R/A David Tchankotadze 12,520 14-Oct-11 17-Oct-11 19-Oct-11

152 PC2.4/CS-IC/09-03

2.4Consultant - EMIS TOR and Training

Needs Assitance.31,000 IC PRIOR 20-Nov-09 14 04-Dec-09 7 11-Dec-09 14

153 R/A Mircea Enache 23,560 05-Oct-09 16-Oct-09 16-Oct-09

154 R/A Mircea Enache 2.4Amendment #1 extending completion

dateNA NA NA

155 PC2.4/CS-IC/09-04

2.4 IT officer to support EMIS Department 35,676 IC PRIOR 25-Sep-09 14 10-Oct-09 7 12-Oct-09 14

156 R/A Bersant Krasniqi 6,000 15-Sep-09 19-Sep-09 25-Sep-09

157 R/A Bersant KrasniqiAmendment #1 modification of original

contractNA NA NA

158 R/A Bersant KrasniqiAmendment #2 extending completion

date13,013 06-Dec-10 NA NA

159 R/A Bersant KrasniqiAmendment # 3 extending completion

date8,400 18-Jun-12 26-Jun-12 NA

160 P C2.4/CS-IC/10-05 2.4Consultant to support the upgrade of

EMIS31,980 SSS PRIOR 19-Aug-10 14 02-Sep-10 NA

161 R/A Mircea Enache 31,980 19-Aug-10 27-Aug-10 NA

162 R/A Mircea EnacheAmendment #1 modification of original

contract10,000 15-Dec-11

163 PC2.5/CS-SSS/09-01

2.5 National firm to draft project action plan 20,300 SSS PRIOR 20-May-08 14 03-Jun-08 7 10-Jun-08 14

164 R/A Kosova Education Center KEC 12,780 NA

165 PNo Number

2.5 Project coordinator 71,300 IC PRIOR 14 7 14

166 R/A Xhafer Ahmeti 15,600

167 R/A Xhafer Ahmeti 2.5Amendment #1 modification of original

contract885 NA

168 R/A Xhafer Ahmeti 2.5Amendment #2 modification of original

contract1,300 NA

169 PC2.5/CS-IC/09-02

2.5 Project coordinator - IC PRIOR 16-Feb-09 14 02-Mar-09 7 09-Mar-09 14

170 R/A Edita Alo 26,400 09-Mar-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 41 of 255 10/17/2012 1:05 AM

Page 42: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

171 R/A Edita Alo 2.5Amendment #1 modification of original

contract56,393 NA NA NA

172 R/A Edita Alo 2.5Amendment # 2 modification of original

contractNA NA NA

173 R/A Edita Alo 2.5Amendment #3 modification of original

contract13,200 18-Jun-12 20-Jun-12 NA

174 PC2.5/CS-IC/09-03

2.5 Financial manager 61,100 IC PRIOR 28-Aug-08 14 11-Sep-08 7 18-Sep-08 14

175 R/A Gazmend Bajra 27,600

176 R/A Gazmend Bajra 2.5Amendment #1 modification of original

contract2,070 NA NA NA

177 R/A Gazmend Bajra 2.5Amendment #2 modification of original

contract27,111 NA NA NA

178 R/A Gazmend Bajra 2.5Amendment #3 modification of original

contract793 19-Jun-12 20-Jun-12 NA

179 P C2.5/CS-IC/12-02 2.5 Financial manager 9,000 IC PRIOR 13-Jun-12 14 27-Jun-12 7 04-Jul-12 14

180 R/A Mirjeta Hysa 7,200 13-Jun-12 13-Jun-12 13-Jun-12

181 PNo number

2.5 Procurement Officer 49,000 IC PRIOR 09-Jul-08 14 23-Jul-08 7 30-Jul-08 14

182 R/A Vlora Kuqi 13,800

183 PC2.5/CS-IC/09-04

2.5 Procurement Officer - IC PRIOR 11-Oct-09 14 25-Oct-09 7 01-Nov-09 14

184 R/A Luan Asllani 2.5 10,800 11-Oct-09 25-Oct-09 25-Oct-09

185 R/A Luan Asllani 2.5Amendment #1 modification of original

contractNA NA NA

186 R/A Luan Asllani 2.5Amendment #2 modification of original

contract5,400 NA NA NA

187 R/A Luan Asllani 2.5Amendment #3 modification of original

contract- 11,550 NA NA NA

188 R/A Luan Asllani 2.5Amendment #4 modification of original

contract6,300 18-Jun-12 20-Jun-12 NA

189 PC2.5/CS-IC/09-05

2.5 Administrative assistant 40,800 IC PRIOR 18-Apr-09 14 02-May-09 7 09-May-09 14

190 R/A Altin Ademi 6,000

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 42 of 255 10/17/2012 1:05 AM

Page 43: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

191 R/A Altin Ademi 2.5Amendment #1 modification of original

contract1,000 NA NA NA

192 R/A Altin Ademi 2.5Amendment #2 modification of original

contract16,450 NA NA NA

193 R/A Altin Ademi 2.5Amendment #3 modification of original

contract4,200 18-Jun-12 20-Jun-12 NA

194 PNo Number

2.5 Consultant - implementation adviser 55,700 IC PRIOR 25-May-08 14 08-Jun-08 7 15-Jun-08 14

195 R/A Vas Demetriou 54,194 25-Jun-08 01-Jul-08

196 R/A Vas Demetriou 2.5Amendment #1 extending completion

dateNA NA NA

197 R/A Vas Demetriou 2.5Amendment #2 extending completion

dateNA NA NA

198 P C2.5/CS-LCS/09-08 2.5 Firm - project accounts audit (external) 64,600 LSC PRIOR 31-Dec-10 14 14-Jan-11 7 21-Jan-11 15

199 R/A ERNST & YOUNG 2.5 1,000

200 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

201 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

202 P C2.5/CS-LCS/11-10 2.5 Firm - project accounts audit (external) - 25,600 LSC PRIOR 01-Sep-12 NA NA

203 R/A Ficadex Albania LTD Audit for period Jan.- Dec.2011 1,688

204 p C2.5/CS-SSS/12-01 2.5 Short Term Procurement Specialist 3,500 SSS PRIOR 23-Apr-12 14 07-May-12 7 14-May-12

205 R/A Aleksandar Najdovski 3,450 23-Apr-12 26-Apr-12 NA

206 R/A Aleksandar NajdovskiAmendment #1 extending completion

date15-May-12 15-May-12 NA

207

208

209

210 PC2.5/CS-IC/09-07

3Consultant - implementation adviserfor

component 3- PRIOR 09-Oct-09 14 23-Oct-09 7 30-Oct-09 14

211 R/A Vas Demetriou 45,120 SSS 01-Oct-09 14 09-Oct-09 7 NA 14

3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

CONSULTANTS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 43 of 255 10/17/2012 1:05 AM

Page 44: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

212 R/A Vas Demetriou 3Amendment #1 extending completion

dateNA NA NA

213 P C3.1/CS-SSS/11-01 3.1Implementation adviser for component

327,540 SSS PRIOR 03-Aug-11 14 17-Aug-11 7 24-Aug-11 14

214 R/A Vas Demetriou 37,840 03-Aug-11 17-Aug-11 NA

215 R/A Vas DemetriouAmendment #1 extending completion

date15-Jun-12 20-Jun-12 NA

216 PC3.1/CS-CQS/09-01

3.1Firm - school mapping and investment

planning166,700 CQS PRIOR 07-Dec-08 14 21-Dec-08 7 28-Dec-08 14

217 R/A TELOS 136,400 05-Dec-09 17-Dec-09 19-Dec-08

218 R/A TELOS 3.1Amendment #1 extending completion

dateNA NA NA

219 R/A TELOS 3.1Amendment #2 extending completion

dateNA NA NA

220 PC3.1/CS-CQS/09-02

3.1 Firm - inventory taking for 1100 schools 287,400 CQS PRIOR 09-Jul-09 14 23-Jul-09 7 30-Jul-09 14

221 R/A CMC 202,280 10-Aug-09 11-Sep-09 05-Aug-09

222 R/A CMC 3.1Amendment #1 extending completion

dateNA NA NA

223 R/A CMC 3.1Amendment # 2 extending completion

dateNA NA NA

224 PC3.1/CS-IC/09-04

3.1Consultant - Manager for 3.1 activities

(national)41,200 IC PRIOR 13-Apr-09 14 27-Apr-09 7 04-May-09 14

225 R/A Merita Behluli 16,200 08-Jan-09 10-Jan-09

226 R/A Merita Behluli 3.1Amendment #1 modification of original

contract1,300 NA NA NA

227 P C3.1/CS-SSS/10-05 3.1 Consultant for Priority 3 Activities 16,500 SSS PRIOR 01-Jul-10 14 15-Jul-10 NA

228 R/A Merita Behluli 16,500 01-Jul-10 22-Jul-10 NA

229 R/A Merita Behluli 3.1Amendment #1 modification of original

contract13,970 NA NA NA

230 R/A Merita Behluli 3.1Amendment #1 modification of original

contract7,150 28-Jun-12 NA

231 PC3.2/CS-CQS/09-01

3.2Firm - school standards and norms &

manual167,500 CQS PRIOR 07-Dec-08 14 21-Dec-08 7 28-Dec-08 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 44 of 255 10/17/2012 1:05 AM

Page 45: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

232 R/A EME 100,538

233 PC3.2/CS-SSS/10-02

3.2 School standards and norms & manual 40,000 SSS PRIOR 15-May-10 14 29-May-10 NA

234 R/A Daniel Dupety 3.2 38,760 01-Jun-10 08-Jun-10 NA

235 R/A Daniel Dupety 3.2Amendment #1 extending completion

dateNA NA NA

236 P C3.3/CS-QCBS/09-01 3.3Firm - design and supervision of model

schools572,400 450,000 QCBS PRIOR 26-Jul-10 14 09-Aug-10 7 16-Aug-10 45

237 R/A Urban plus 178,921 01-Jul-09 22-Jul-09 24-Jul-09

238 R/A Urban plus 3.3Amendment #1 extending completion

date14-Mar-12 16-Mar-12 NA

239

240

241 PC4.1/CS-IC/09-01

4.1Consultant - higher education legisl. &

sustain.69,800 IC PRIOR 02-Feb-09 14 16-Feb-09 7 23-Feb-09 14

242 R/A Steve Bristow 54,500 10-Dec-08 19-Dec-08

243 PNo Number

4.1Consultant - local counterpart of intern.

Cons.6,768 IC PRIOR 11-Apr-09 14 25-Apr-09 7 02-May-09 14

244 R/A Jehona Lushaku 4,800 05-Dec-08 12-Dec-08 06-Jun-09

245 PC4.1/CS-IC/09-02

4.1Consultant - local counterpart of intern.

Cons.14,100 SSS PRIOR 10-Jan-10 14 24-Jan-10 7 31-Jan-10 14

246 R/A Blerim Saqipi 2,600 10-Jan-10 13-Jan-10 NA

247 PC4.1/CS-IC/09-04

4.1 Consultant - evaluation of EPIP II - IC PRIOR 15-Aug-09 14 29-Aug-09 7 05-Sep-09 14

248 R/A Tom Guegon 13,026 05-Aug-09 11-Aug-09

249 PC4.1/CS-IC/09-05

4.1Consultant - SMD Grants (EPIP II)

procurement62,780 IC PRIOR 15-Aug-09 14 29-Aug-09 7 05-Sep-09 14

250 R/A Alexandar Najdovski 10-Aug-09 20-Aug-09 22-Aug-09

251 R/A Alexandar Najdovski 4.1Amendment #1 modification of original

contract20,550 NA NA NA

CONSULTANTS

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 45 of 255 10/17/2012 1:05 AM

Page 46: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

252 R/A Alexandar Najdovski 4.1Amendment #2 modification of original

contract30,900 NA NA NA

253 PC4.1/CS-IC/11-05

4.1

Consultant for the implementation of

higher education legislation

(international)

30,000 IC PRIOR 01-Nov-11 14 15-Nov-11 7 22-Nov-11 14

254 R/A Stephen l. Bristow 22,940 27-Oct-11 09-Nov-11 25-Nov-11

255 R/A Stephen l. BristowAmendment #1 extending completion

date21-May-12 22-May-12 NA

256 PC4.2/CS-IC/09-02

4.2Consultant - higher educ. financial

sustainability69,800 IC PRIOR 15-May-09 14 29-May-09 7 05-Jun-09 14

257 R/A Sigurd Hoellinger 4.2 66,725 10-Dec-08 19-Dec-08

258 R/A Sigurd Hoellinger 4.2Amendment #1 extending completion

dateNA NA NA

259 R/A Sigurd Hoellinger 4.2Amendment #2 extending completion

dateNA NA NA

260 R/A Sigurd Hoellinger 4.2Amendment #3 extending completion

dateNA NA NA

261 R/A Sigurd Hoellinger 4.2Amendment #4 extending completion

dateNA NA NA

Legend:

Green color under column A (line number) denotes ongoing activities

Orange color denotes activities to start

QCBS = Quality and Cost-based Selection (in accordance with sections 2.1 - 2.28 of the Guidelines)

FBC = Fixed Budget Selection (in accordance with section 3.5 of the Guidelines)

LCS = Least-Cost Selection (in accordance with section 3.6 of the Guidelines)

CQS = Selection Based on consultants' Qualifications (in accordance with section 3.7 of the Guidelines)

IC = Selection of Individual Consultants (in accordance with sections 5.1 - 5.4 of the Guidelines)

SSS = Single Source Selection in accordance with sections 3.09 - 3.13 of the Guidelines

NA = Not Applicable

OTHER = Direct expenditures

Notes:

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 46 of 255 10/17/2012 1:05 AM

Page 47: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep

of

TOR Int.

/a WB "No

Objection" Int.

/a EOI/

Advert.

Date Int.

/a

USD EUR 1 2 3

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

a/ Interval for preparation/clearance (days); working document PP only

b/ Number of days to execute the contract; working document PP only Fees for participation in PISA. This is not a procurement activity but it is keep in the PP for completeness

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All QCBS contracts, first two CQS contracts, and first two IC contracts irrespective of cost

All contracts with firms estimated to cost US$ 50,000 or more

All contracts with individual consultants (IC) estimated to cost US$ 25,000 or more

All Single source selection contracts

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 47 of 255 10/17/2012 1:05 AM

Page 48: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

1

2

3 CONSULTANTS

4 P C1.1/CS-IC/09-01 1.1Consultant - legal framework

development92,600 IC PRIOR

5 R/A Dennis Farrington 72,000

6 R/A Dennis Farrington 1.1Amendment #1 extending completion

date

7 P C1.1/CS-IC/11-02 1.1 New legislation implementation 40,540 30,000 IC PRIOR

8 R/A Dennis Farrington 27,040

9 R/A Dennis FarringtonAmendment #1 modification of original

contract

10 PNo Number

1.2Consultant - financing formula

development107,500 79,550 IC PRIOR

11 R/A Rosalind Levacic 1.2 45,220

12 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract4,500

13 R/A Rosalind Levacic 1.2 Amendment #2 modification of contract 14,379

14 P C1.2/CS-IC/09-01 1.2Consultant - financing formula

development- SSS PRIOR

15 R/A Rosalind Levacic 1.2 35,540

16 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract50,980 PRIOR

17 R/A Rosalind Levacic 1.2Amendment #2 modification of original

contract5,440

18 P C1.2/CS-CQS/09-02 1.2 Firm - Survey evaluation - CQS PRIOR

19 R/A Prism Research 24,674

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

16-Apr-09 7 23-Apr-09 NA

25-Apr-09 25-Apr-09 27-Apr-09

NA NA NA

06-Dec-11 7 13-Dec-11 NA

07-Dec-11 06-Jan-12 06-Jan-12

NA NA NA

09-Apr-08 7 16-Apr-08 NA

03-Jul-08

NA NA NA

NA NA NA

07-Apr-08 7 14-Apr-08 NA

NA NA NA

NA NA NA

NA NA NA

19-Jun-09 14 03-Jul-09 NA

06-Apr-09 30-Apr-09 12-May-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 48 of 255 10/17/2012 1:05 AM

Page 49: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

20 R/A Prism Research 1.2Amendment #1 extending completion

date

21 R/A Prism Research 1.2Amendment #2 extending completion

date

22 P C1.2/CS-IC/09-03 1.2 Consultant - system data entry 6,800 IC PRIOR

23 R/A Besnik Limaj 6,400

24 P C1.2/CS-IC/09-05 1.2 Consultant - finance help desk-1 - IC PRIOR

25 R/A Pakize Isufaj 10,800

26 P C1.2/CS-IC/09-06 1.2 Consultant - finance help desk-2 - IC PRIOR

27 R/A Hysni Maxharraj 10,800

28 P C1.2/CS-IC/09-07 1.2 Consultant - training materials analyst - IC PRIOR

29 R/A Edi Bunjaku 1,300

30 P C1.2/CS-IC/10-08 1.2 Consultant - Head of help desk - IC PRIOR

31 R/A Pakize Isufaj 13,200

32 R/A Pakize Isufaj 1.2Amendment #1 modification of original

contract

33 R/A Pakize Isufaj 1.2Amendment #2 modification of original

contract13,200

34 R/A Pakize Isufaj 1.2Amendment #3 modification of original

contract10,350

35 P C1.2/CS-IC/10-09 1.2 Consultant - education finance 2 - IC PRIOR

36 R/A Vjolca Sellimi 1.2 10,800

37 R/A Vjolca Sellimi 1.2Amendment #1 modification of original

contract

38 R/A Vjolca Sellimi 1.2Amendment #2 modification of original

contract10,800

39 R/A Vjolca Sellimi 1.2Amendment #3 modification of original

contract8,469

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

NA NA NA

NA NA NA

07-Jan-10 7 14-Jan-10 NA

06-Feb-09 12-Feb-09 12-Feb-09

20-Aug-09 7 27-Aug-09

03-Sep-09 10-Sep-09 10-Sep-09

18-Aug-09 7 25-Aug-09 7 01-Sep-09

03-Sep-09 10-Sep-09 11-Sep-09

25-Oct-09 7 01-Nov-09 7 08-Nov-09

NA 29-Oct-09 01-Nov-09

25-Mar-10 7 01-Apr-10 7 08-Apr-10

02-Mar-10 05-Mar-10 3 15-Mar-10

NA NA NA

NA NA NA

NA NA NA

08-Mar-09 7 15-Mar-09 7 22-Mar-09

02-Mar-10 05-Mar-10 15-Mar-10

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 49 of 255 10/17/2012 1:05 AM

Page 50: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

40 R/A Vjolca Sellimi 1.2Amendment # 4 modification of original

contract

41 P C1.2/CS-IC/11-10 1.2 Trainer for school financing level 6,000 IC PRIOR

42 R/A Mehmet Simnica 5,000

43 P C1.2/CS-IC/11-11 1.2 Trainer for school financing level 6,000 IC PRIOR

44 R/A Mevlide Shamolli 5,000

45 P C1.2/CS-IC/11-12 1.2 Trainer for school financing level 6,000 IC PRIOR

46 R/A Jeton Kryeziu 5,000

47 P C1.2/CS-IC/11-13 1.2 Trainer for school financing level 6,000 IC PRIOR

48 R/A Jeton Gashi 5,000

49 P C1.2/CS-IC/11-14 1.2 Trainer for school financing level 6,000 IC PRIOR

50 R/A Aferdita Strellci 5,000

51 P C1.2/CS-IC/11-15 1.2 Trainer for school procurement level 6,000 IC PRIOR

52 R/A Fadil Veseli 4,000

53 P C1.2/CS-IC/11-16 1.2 Trainer for school procurement level 6,000 IC PRIOR

54 R/A Mirevete Gerguri 4,000

55 P C1.2/CS-IC/11-17 1.2 Trainer for school procurement level 6,000 IC PRIOR

56 R/A Fatmire M Morina 4,000

57 P C1.2/CS-IC/11-18 1.2 Trainer for school procurement level 6,000 IC PRIOR

58 R/A Vllaznim Reshani 4,000

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

NA NA NA

27-Jun-11 14 11-Jul-11 14 25-Jul-11 14

15-Aug-11 09-Sep-11 13-Sep-11

27-Jun-11 14 11-Jul-11 14 25-Jul-11 14

15-Aug-11 09-Sep-11 13-Sep-11

27-Jun-11 14 11-Jul-11 14 25-Jul-11 14

15-Aug-11 09-Sep-11 13-Sep-11

27-Jun-11 14 11-Jul-11 14 25-Jul-11 14

15-Aug-11 09-Sep-11 13-Sep-11

27-Jun-11 14 11-Jul-11 14 25-Jul-11 14

15-Aug-11 09-Sep-11 13-Sep-11

25-Oct-11 14 08-Nov-11 14 22-Nov-11 14

02-Nov-11 18-Nov-11 01-Dec-11

25-Oct-11 14 08-Nov-11 14 22-Nov-11 14

02-Nov-11 18-Nov-11 01-Dec-11

25-Oct-11 14 08-Nov-11 14 22-Nov-11 14

02-Nov-11 18-Nov-11 01-Dec-11

25-Oct-11 14 08-Nov-11 14 22-Nov-11 14

02-Nov-11 18-Nov-11 01-Dec-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 50 of 255 10/17/2012 1:05 AM

Page 51: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

59 P C1.2/CS-IC/11-19 1.2 Trainer for school procurement level 6,000 IC PRIOR

60 R/A Defrim Kuqi 4,000

61 P C1.2/CS-IC-12-01 1.2Education finance officer for operating

at Help Desk6,300 IC PRIOR

62 R/A Bersant R. Grabanice 1,200

63 PNo Number

1.3 Consultant - Manager of the SDGs 46,500 IC PRIOR

64 R/A Xhafer Ahmeti 15,600

65 P C1.3/CS-IC/09-02 1.3 Consultant - Manager of the SDGs - IC PRIOR

66 R/A Besim Kokollari 14,400

67 R/A Besim Kokollari 1.3Amendment #1 modification of original

contract- 12,818

68 R/A Besim Kokollari 1.3Amendment #2 modification of original

contract10,800

69 P C1.3/CS-IC/09-02 1.3 Consultant - SDG and MDG manuals - SSS PRIOR

70 R/A Remzi Salihu 7,800

71 P C1.3/CS-QCBS/09-03 1.3Firm/NGO - school development grants

implem.463,600 QCBS PRIOR

72 R/A KEC, KOSOVO 266,935

73 R/A KEC, KOSOVO 1,3Amendment #1 modification of original

contract48,400

74 R/A KEC, KOSOVO 1.3Amendment # 2 modification of original

contract11,840

75

76

77

78 PC2.1/CS-IC/09-01

2.1Consultant - teacher's devel. and

licencing19,900 IC PRIOR

CONSULTANTS

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

25-Oct-11 14 08-Nov-11 14 22-Nov-11 14

02-Nov-11 18-Nov-11 01-Dec-11

13-Jul-12 14 27-Jul-12 14 10-Aug-12 14

11-Jun-12 02-Jul-12 03-Jul-12

18-May-09 7 28-May-09 10-Jun-09

08-Feb-10 7 15-Feb-10 7 22-Feb-10

15-Mar-10 7 22-Mar-10 28 20-Apr-10

NA NA NA

NA NA NA

24-Jun-09 7 01-Jul-09 7 08-Jul-09

NA NA 07-Jul-09

25-Jul-09 14 08-Aug-09 14 22-Aug-09 14

13-Jul-09 12-Aug-09 19-Aug-09

NA NA NA

NA NA NA

29-Jun-08 7 06-Jul-08 7 13-Jul-08

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 51 of 255 10/17/2012 1:05 AM

Page 52: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

79 R/A Blerim Saqipi 11,960

80 R/A Blerim Saqipi 2.1Amendment #1 modification of original

contract14,950

81 R/A Blerim Saqipi 2.1Amendment #2 modification of original

contract20,800

82 R/A Blerim Saqipi 2.1Amendment #3 modification of original

contract13,407

83 R/A Blerim Saqipi 2.1Amendment #4 modification of original

contract2,616

84 R/A Blerim Saqipi 2.1Amendment # 5 modification of original

contract7,800

85 PC2.1/CS-IC/09-02

2.1Consultant - teachers' professional

devel.62,700 IC PRIOR

86 R/A Pilar Romaguez 52,300

87 PC2.1/CS-IC/09-03

2.1Consultant - teachers' career/advance.

syst.IC PRIOR

88 R/A Pasi Ikonen 24,976

89 R/A Pasi Ikonen 2.1Amendment #1 extending completion

date

90 PC2.1/CS-IC/09-04

2.1Consultant - teachers' performance

evaluation60,600 IC PRIOR

91 R/A Jorge Manzi 32,733

92 R/A Jorge ManziAmendment #1 extending completion

date

93 R/A Jorge ManziAmendment #2 extending completion

date

94 P C2.1/CS-IC/10-05 2.1Consultant - teachers' performance

evaluation112,900 82,100 IC PRIOR

95 R/A Nicole Saginor 2.1 48,400

98 R/A Nicole Saginor 2.1 43,950

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

08-Jul-08 11-Jul-08 18-Jul-08

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

07-Apr-08 7 14-Apr-08 NA

01-Jun-08 03-Jun-08 03-Jun-08

09-May-09 7 16-May-09

25-May-09 27-May-09 27-May-09

NA NA NA

17-May-09 7 24-May-09 NA

10-Jun-09

19-Nov-10 14 03-Dec-10 7 10-Dec-10

10-Sep-10 20-Oct-10 25-Oct-10

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 52 of 255 10/17/2012 1:05 AM

Page 53: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

99 P C2.1/CS-IC/11-07 - Prishtina region 2.1

Consultant for database population and

logistical support on performance

evaluation

- 6,400 IC PRIOR

100 R/A Edmond Krasniqi 6,000

101 R/A Edmond KrasniqiAmendment #1 extending completion

date

102 R/A Edmond KrasniqiAmendment # 2 modification of original

contract1,875

103 P C2.1/CS-IC/11-08 - Prizren region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

104 R/A Kreshnik Shatri 6,000

105 R/A Kreshnik ShatriAmendment #1 extending completion

date

106 R/A Kreshnik ShatriAmendment # 2 modification of original

contract1,875

107 P C2.1/CS-IC/11-09 - Peja region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

108 R/A Mentor Vokshi 6,000

109 R/A Mentor VokshiAmendment #1 extending completion

date

110 R/A Mentor VokshiAmendment # 2 modification of original

contract1,875

111 P C2.1/CS-IC/11-10 - Gjakova region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

112 R/A Armend Bajrami 6,000

113 R/A Armend BajramiAmendment #1 extending completion

date

114 R/A Armend BajramiAmendment # 2 modification of original

contract1,500

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

04-Jul-11 14 18-Jul-11 7 25-Jul-11

22-Jun-11 11-Aug-11 25-Aug-11

NA NA NA

NA NA NA

04-Jul-11 14 18-Jul-11 7 25-Jul-11

22-Jun-11 11-Aug-11 25-Aug-11

NA NA NA

NA NA NA

04-Jul-11 14 18-Jul-11 7 25-Jul-11

22-Jun-11 11-Aug-11 25-Aug-11

NA NA NA

NA NA NA

04-Jul-11 14 18-Jul-11 7 25-Jul-11

22-Jun-11 11-Aug-11 25-Aug-11

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 53 of 255 10/17/2012 1:05 AM

Page 54: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

115 P C2.1/CS-IC/11-11 - Ferizaj region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

116 R/A Donika Rexhepi 6,000

117 R/A Donika RexhepiAmendment #1 extending completion

date

118 R/A Donika RexhepiAmendment # 2 modification of original

contract1,500

119 P C2.1/CS-IC/11-12 - Mitrovica region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

120 R/A Zahir Ibishi 6,000

121 R/A Zahir IbishiAmendment #1 extending completion

date

122 R/A Zahir IbishiAmendment # 2 modification of original

contract1,500

123 P C2.1/CS-IC/11-13 - Gjilan region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

124 R/A Agim Ramadani 6,000

125 R/A Agim RamadaniAmendment #1 extending completion

date

126 R/A Agim RamadaniAmendment # 2 modification of original

contract1,875

127 P C2.1/CS-IC/11-14 2.1Consultant on Teacher Development

Policies Study- 50,000 IC PRIOR

128 P David Lynn 47,830

129 R/A David Lynn

130 p C2.1/CS-IC/11-15 2.1Consultant for the Managing the

database process8,000 IC PRIOR

131 R/A Mirlind Bruqi 8,000

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

04-Jul-11 14 18-Jul-11 7 25-Jul-11

22-Jun-11 11-Aug-11 25-Aug-11

NA NA NA

NA NA NA

15-Jul-11 14 29-Jul-11 7 05-Aug-11

22-Jun-11 11-Aug-11 25-Aug-11

NA NA NA

NA NA NA

04-Jul-11 14 18-Jul-11 7 25-Jul-11

22-Jun-11 11-Aug-11 25-Aug-11

NA NA NA

NA NA NA

16-Jun-11 14 30-Jun-11 3 03-Jul-11

10-Aug-11 18-Aug-11 22-Aug-11

NA NA NA

08-Jul-11 14 22-Jul-11 7 29-Jul-11

11-Jul-11 10-Aug-11 25-Aug-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 54 of 255 10/17/2012 1:05 AM

Page 55: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

132 R/A Mirlind BruqiAmendment #1 extending completion

date

133 PC2.2/CS-SSS/10-02

2.2Consultant - curriculum unit and CACTI

capacity- SSS PRIOR

134 R/A Camerron Harisson 45,243 33,480

135 PC2.2/CS-IC/09-01

2.2Consultant - curriculum unit and CACTI

capacityIC PRIOR

136 R/A Camerron Harisson 56,000

137 PC2.3/CS-IC/09-01

2.3Consultant - assessment Unit and

MEST experts186,100 140,406 IC PRIOR

138 R/A Kelvin Gregory 75,600

139 PC2.3/CS-IC/09-03

2.3Consultant - test administration study

(intern.)46,960 IC PRIOR

140 R/A Steven Bakker 51,800

141 P C2.3/CS-IC/11-04 2.3 Consultant - Matura reform 50,000 IC PRIOR

142 R/A Steven Bakker 53,150

143 P C2.3/CS-SSS/12-01 2.3Supporting the Assessment Reform in

Kosovo29,000 SSS PRIOR

144 R/A Steven Bakker 28,800

145 P C2.3/CS-IC-11-05 2.3IC on Capacity Building for External

Assessment in Kosovo50,000 IC PRIOR

146 R/A Kelvin Gregory 43,650

147 R/A Kelvin GregoryAmendment #1 extending completion

date

148 P C2.3/CS-IC-11-06 2.3Consultant Mother Tongue and Modern

Foreign Language Exams21,000 IC PRIOR

149 R/A Ivane Mindadze 10,150

150 P C2.3/CS-IC-11-07 2.3

Consultant for Supporting the Item

Bank Development in Kosovo External

Assessment

24,000 IC PRIOR

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

NA NA NA

NA NA NA

NA NA NA

15-Mar-09 7 22-Mar-09 NA

08-Apr-09 14-Apr-09

07-May-09 7 14-May-09 NA

03-Apr-09 03-Apr-09 15-Apr-09

30-Dec-09 7 06-Jan-10 NA

04-Feb-10 16-Mar-10 17-Mar-10

27-Jun-11 7 04-Jul-11 7 11-Jul-11

01-Jul-11 10-Aug-11 17-Aug-11

02-Jul-12 7 09-Jul-12 7 16-Jul-12

NA NA NA

27-Jun-11 7 04-Jul-11 7 11-Jul-11

26-Oct-11 02-Nov-11 14-Nov-11

NA NA NA

18-Nov-11 7 25-Nov-11 7 02-Dec-11

26-Oct-11 02-Nov-11 04-Nov-11

18-Nov-11 7 25-Nov-11 7 02-Dec-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 55 of 255 10/17/2012 1:05 AM

Page 56: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

151 R/A David Tchankotadze 12,520

152 PC2.4/CS-IC/09-03

2.4Consultant - EMIS TOR and Training

Needs Assitance.31,000 IC PRIOR

153 R/A Mircea Enache 23,560

154 R/A Mircea Enache 2.4Amendment #1 extending completion

date

155 PC2.4/CS-IC/09-04

2.4 IT officer to support EMIS Department 35,676 IC PRIOR

156 R/A Bersant Krasniqi 6,000

157 R/A Bersant KrasniqiAmendment #1 modification of original

contract

158 R/A Bersant KrasniqiAmendment #2 extending completion

date13,013

159 R/A Bersant KrasniqiAmendment # 3 extending completion

date8,400

160 P C2.4/CS-IC/10-05 2.4Consultant to support the upgrade of

EMIS31,980 SSS PRIOR

161 R/A Mircea Enache 31,980

162 R/A Mircea EnacheAmendment #1 modification of original

contract10,000

163 PC2.5/CS-SSS/09-01

2.5 National firm to draft project action plan 20,300 SSS PRIOR

164 R/A Kosova Education Center KEC 12,780

165 PNo Number

2.5 Project coordinator 71,300 IC PRIOR

166 R/A Xhafer Ahmeti 15,600

167 R/A Xhafer Ahmeti 2.5Amendment #1 modification of original

contract885

168 R/A Xhafer Ahmeti 2.5Amendment #2 modification of original

contract1,300

169 PC2.5/CS-IC/09-02

2.5 Project coordinator - IC PRIOR

170 R/A Edita Alo 26,400

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

26-Oct-11 02-Nov-11 10-Nov-11

25-Dec-09 7 01-Jan-10 NA

30-Nov-09 07-Dec-09 08-Dec-09

NA NA NA

02-Nov-09 7 26-Nov-09 10-Dec-09

15-Nov-09 03-Dec-09 08-Dec-09

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

24-Jun-08 7 01-Jul-08 7 08-Jul-08

NA NA NA

7 7

NA NA NA

NA NA NA

23-Mar-09 7 30-Mar-09 7 06-Apr-09

10-Mar-09 06-Apr-09 27-Apr-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 56 of 255 10/17/2012 1:05 AM

Page 57: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

171 R/A Edita Alo 2.5Amendment #1 modification of original

contract56,393

172 R/A Edita Alo 2.5Amendment # 2 modification of original

contract

173 R/A Edita Alo 2.5Amendment #3 modification of original

contract13,200

174 PC2.5/CS-IC/09-03

2.5 Financial manager 61,100 IC PRIOR

175 R/A Gazmend Bajra 27,600

176 R/A Gazmend Bajra 2.5Amendment #1 modification of original

contract2,070

177 R/A Gazmend Bajra 2.5Amendment #2 modification of original

contract27,111

178 R/A Gazmend Bajra 2.5Amendment #3 modification of original

contract793

179 P C2.5/CS-IC/12-02 2.5 Financial manager 9,000 IC PRIOR

180 R/A Mirjeta Hysa 7,200

181 PNo number

2.5 Procurement Officer 49,000 IC PRIOR

182 R/A Vlora Kuqi 13,800

183 PC2.5/CS-IC/09-04

2.5 Procurement Officer - IC PRIOR

184 R/A Luan Asllani 2.5 10,800

185 R/A Luan Asllani 2.5Amendment #1 modification of original

contract

186 R/A Luan Asllani 2.5Amendment #2 modification of original

contract5,400

187 R/A Luan Asllani 2.5Amendment #3 modification of original

contract- 11,550

188 R/A Luan Asllani 2.5Amendment #4 modification of original

contract6,300

189 PC2.5/CS-IC/09-05

2.5 Administrative assistant 40,800 IC PRIOR

190 R/A Altin Ademi 6,000

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

NA NA NA

NA NA NA

NA NA NA

02-Oct-08 7 09-Oct-08 7 16-Oct-08

03-Jul-08

NA NA NA

NA NA NA

NA NA NA

18-Jul-12 7 25-Jul-12 7 01-Aug-12

14-Jun-12 15-Jun-12 15-May-12

13-Aug-08 7 20-Aug-08 7 27-Aug-08

03-Jul-08

15-Nov-09 7 22-Nov-09 7 29-Nov-09

11-Nov-09 20-Jan-10 21-Jan-10

NA NA N NA

NA NA NA

NA NA NA

NA NA NA

23-May-09 7 30-May-09 NA

21-Jun-09 23-Jun-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 57 of 255 10/17/2012 1:05 AM

Page 58: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

191 R/A Altin Ademi 2.5Amendment #1 modification of original

contract1,000

192 R/A Altin Ademi 2.5Amendment #2 modification of original

contract16,450

193 R/A Altin Ademi 2.5Amendment #3 modification of original

contract4,200

194 PNo Number

2.5 Consultant - implementation adviser 55,700 IC PRIOR

195 R/A Vas Demetriou 54,194

196 R/A Vas Demetriou 2.5Amendment #1 extending completion

date

197 R/A Vas Demetriou 2.5Amendment #2 extending completion

date

198 P C2.5/CS-LCS/09-08 2.5 Firm - project accounts audit (external) 64,600 LSC PRIOR

199 R/A ERNST & YOUNG 2.5 1,000

200 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

201 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

202 P C2.5/CS-LCS/11-10 2.5 Firm - project accounts audit (external) - 25,600 LSC PRIOR

203 R/A Ficadex Albania LTD Audit for period Jan.- Dec.2011 1,688

204 p C2.5/CS-SSS/12-01 2.5 Short Term Procurement Specialist 3,500 SSS PRIOR

205 R/A Aleksandar Najdovski 3,450

206 R/A Aleksandar NajdovskiAmendment #1 extending completion

date

207

208

209

210 PC2.5/CS-IC/09-07

3Consultant - implementation adviserfor

component 3- PRIOR

211 R/A Vas Demetriou 45,120 SSS

3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

CONSULTANTS

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

NA NA NA

NA NA NA

NA NA NA

29-Jun-08 7 06-Jul-08 7 13-Jul-08

16-Jul-08

NA NA NA

NA NA NA

05-Feb-11 14 19-Feb-11 NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

13-Nov-09 14 27-Nov-09 7 04-Dec-09

NA NA 09-Oct-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 58 of 255 10/17/2012 1:05 AM

Page 59: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

212 R/A Vas Demetriou 3Amendment #1 extending completion

date

213 P C3.1/CS-SSS/11-01 3.1Implementation adviser for component

327,540 SSS PRIOR

214 R/A Vas Demetriou 37,840

215 R/A Vas DemetriouAmendment #1 extending completion

date

216 PC3.1/CS-CQS/09-01

3.1Firm - school mapping and investment

planning166,700 CQS PRIOR

217 R/A TELOS 136,400

218 R/A TELOS 3.1Amendment #1 extending completion

date

219 R/A TELOS 3.1Amendment #2 extending completion

date

220 PC3.1/CS-CQS/09-02

3.1 Firm - inventory taking for 1100 schools 287,400 CQS PRIOR

221 R/A CMC 202,280

222 R/A CMC 3.1Amendment #1 extending completion

date

223 R/A CMC 3.1Amendment # 2 extending completion

date

224 PC3.1/CS-IC/09-04

3.1Consultant - Manager for 3.1 activities

(national)41,200 IC PRIOR

225 R/A Merita Behluli 16,200

226 R/A Merita Behluli 3.1Amendment #1 modification of original

contract1,300

227 P C3.1/CS-SSS/10-05 3.1 Consultant for Priority 3 Activities 16,500 SSS PRIOR

228 R/A Merita Behluli 16,500

229 R/A Merita Behluli 3.1Amendment #1 modification of original

contract13,970

230 R/A Merita Behluli 3.1Amendment #1 modification of original

contract7,150

231 PC3.2/CS-CQS/09-01

3.2Firm - school standards and norms &

manual167,500 CQS PRIOR

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

NA NA NA

07-Sep-11 14 21-Sep-11 7 28-Sep-11

NA NA NA

NA NA NA

11-Jan-09 14 25-Jan-09 NA

16-Jan-09 03-Mar-09 03-Mar-09

NA NA NA

NA NA NA

13-Aug-09 14 27-Aug-09 NA

17-Aug-09 30-Sep-09 06-Oct-09

NA NA NA

NA NA NA

18-May-09 7 25-May-09 NA

19-Jan-09 23-Jun-09 25-Jun-09

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

11-Jan-09 14 25-Jan-09 NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 59 of 255 10/17/2012 1:05 AM

Page 60: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

232 R/A EME 100,538

233 PC3.2/CS-SSS/10-02

3.2 School standards and norms & manual 40,000 SSS PRIOR

234 R/A Daniel Dupety 3.2 38,760

235 R/A Daniel Dupety 3.2Amendment #1 extending completion

date

236 P C3.3/CS-QCBS/09-01 3.3Firm - design and supervision of model

schools572,400 450,000 QCBS PRIOR

237 R/A Urban plus 178,921

238 R/A Urban plus 3.3Amendment #1 extending completion

date

239

240

241 PC4.1/CS-IC/09-01

4.1Consultant - higher education legisl. &

sustain.69,800 IC PRIOR

242 R/A Steve Bristow 54,500

243 PNo Number

4.1Consultant - local counterpart of intern.

Cons.6,768 IC PRIOR

244 R/A Jehona Lushaku 4,800

245 PC4.1/CS-IC/09-02

4.1Consultant - local counterpart of intern.

Cons.14,100 SSS PRIOR

246 R/A Blerim Saqipi 2,600

247 PC4.1/CS-IC/09-04

4.1 Consultant - evaluation of EPIP II - IC PRIOR

248 R/A Tom Guegon 13,026

249 PC4.1/CS-IC/09-05

4.1Consultant - SMD Grants (EPIP II)

procurement62,780 IC PRIOR

250 R/A Alexandar Najdovski

251 R/A Alexandar Najdovski 4.1Amendment #1 modification of original

contract20,550

CONSULTANTS

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

NA NA NA

NA NA NA

NA NA NA

30-Sep-10 14 14-Oct-10 14 28-Oct-10 14

24-Aug-09 02-Oct-09 03-Dec-09

NA NA NA

09-Mar-09 7 16-Mar-09 NA

08-Apr-09 08-Apr-09

16-May-09 7 23-May-09 NA

10-Jun-09 17-Jun-09 18-Jun-09

14-Feb-10 7 21-Feb-10 NA

NA NA NA

19-Sep-09 7 26-Sep-09 NA

22-Sep-09 01-Oct-09 03-Oct-09

19-Sep-09 7 26-Sep-09 NA

07-Sep-09 08-Sep-09 10-Sep-09

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 60 of 255 10/17/2012 1:05 AM

Page 61: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

252 R/A Alexandar Najdovski 4.1Amendment #2 modification of original

contract30,900

253 PC4.1/CS-IC/11-05

4.1

Consultant for the implementation of

higher education legislation

(international)

30,000 IC PRIOR

254 R/A Stephen l. Bristow 22,940

255 R/A Stephen l. BristowAmendment #1 extending completion

date

256 PC4.2/CS-IC/09-02

4.2Consultant - higher educ. financial

sustainability69,800 IC PRIOR

257 R/A Sigurd Hoellinger 4.2 66,725

258 R/A Sigurd Hoellinger 4.2Amendment #1 extending completion

date

259 R/A Sigurd Hoellinger 4.2Amendment #2 extending completion

date

260 R/A Sigurd Hoellinger 4.2Amendment #3 extending completion

date

261 R/A Sigurd Hoellinger 4.2Amendment #4 extending completion

date

Legend:

Green color under column A (line number) denotes ongoing activities

Orange color denotes activities to start

QCBS = Quality and Cost-based Selection (in accordance with sections 2.1 - 2.28 of the Guidelines)

FBC = Fixed Budget Selection (in accordance with section 3.5 of the Guidelines)

LCS = Least-Cost Selection (in accordance with section 3.6 of the Guidelines)

CQS = Selection Based on consultants' Qualifications (in accordance with section 3.7 of the Guidelines)

IC = Selection of Individual Consultants (in accordance with sections 5.1 - 5.4 of the Guidelines)

SSS = Single Source Selection in accordance with sections 3.09 - 3.13 of the Guidelines

NA = Not Applicable

OTHER = Direct expenditures

Notes:

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

NA NA NA

06-Dec-11 7 13-Dec-11 NA

07-Dec-11 12-Jan-12 27-Jan-12

NA NA NA

19-Jun-09 7 26-Jun-09 NA

30-Mar-09 06-Apr-09 06-May-09

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 61 of 255 10/17/2012 1:05 AM

Page 62: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

a/ Interval for preparation/clearance (days); working document PP only

b/ Number of days to execute the contract; working document PP only Fees for participation in PISA. This is not a procurement activity but it is keep in the PP for completeness

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All QCBS contracts, first two CQS contracts, and first two IC contracts irrespective of cost

All contracts with firms estimated to cost US$ 50,000 or more

All contracts with individual consultants (IC) estimated to cost US$ 25,000 or more

All Single source selection contracts

Schedule (dd-Mmm-yy)

Subm. of

EOI Int.

/a Eval. Of

EOI/SL Int.

/a WB "No

Objection" Int.

/a

4 5 6

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 62 of 255 10/17/2012 1:05 AM

Page 63: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

1

2

3 CONSULTANTS

4 P C1.1/CS-IC/09-01 1.1Consultant - legal framework

development92,600 IC PRIOR

5 R/A Dennis Farrington 72,000

6 R/A Dennis Farrington 1.1Amendment #1 extending completion

date

7 P C1.1/CS-IC/11-02 1.1 New legislation implementation 40,540 30,000 IC PRIOR

8 R/A Dennis Farrington 27,040

9 R/A Dennis FarringtonAmendment #1 modification of original

contract

10 PNo Number

1.2Consultant - financing formula

development107,500 79,550 IC PRIOR

11 R/A Rosalind Levacic 1.2 45,220

12 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract4,500

13 R/A Rosalind Levacic 1.2 Amendment #2 modification of contract 14,379

14 P C1.2/CS-IC/09-01 1.2Consultant - financing formula

development- SSS PRIOR

15 R/A Rosalind Levacic 1.2 35,540

16 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract50,980 PRIOR

17 R/A Rosalind Levacic 1.2Amendment #2 modification of original

contract5,440

18 P C1.2/CS-CQS/09-02 1.2 Firm - Survey evaluation - CQS PRIOR

19 R/A Prism Research 24,674

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA 7 10-Jul-09 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 63 of 255 10/17/2012 1:05 AM

Page 64: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

20 R/A Prism Research 1.2Amendment #1 extending completion

date

21 R/A Prism Research 1.2Amendment #2 extending completion

date

22 P C1.2/CS-IC/09-03 1.2 Consultant - system data entry 6,800 IC PRIOR

23 R/A Besnik Limaj 6,400

24 P C1.2/CS-IC/09-05 1.2 Consultant - finance help desk-1 - IC PRIOR

25 R/A Pakize Isufaj 10,800

26 P C1.2/CS-IC/09-06 1.2 Consultant - finance help desk-2 - IC PRIOR

27 R/A Hysni Maxharraj 10,800

28 P C1.2/CS-IC/09-07 1.2 Consultant - training materials analyst - IC PRIOR

29 R/A Edi Bunjaku 1,300

30 P C1.2/CS-IC/10-08 1.2 Consultant - Head of help desk - IC PRIOR

31 R/A Pakize Isufaj 13,200

32 R/A Pakize Isufaj 1.2Amendment #1 modification of original

contract

33 R/A Pakize Isufaj 1.2Amendment #2 modification of original

contract13,200

34 R/A Pakize Isufaj 1.2Amendment #3 modification of original

contract10,350

35 P C1.2/CS-IC/10-09 1.2 Consultant - education finance 2 - IC PRIOR

36 R/A Vjolca Sellimi 1.2 10,800

37 R/A Vjolca Sellimi 1.2Amendment #1 modification of original

contract

38 R/A Vjolca Sellimi 1.2Amendment #2 modification of original

contract10,800

39 R/A Vjolca Sellimi 1.2Amendment #3 modification of original

contract8,469

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 64 of 255 10/17/2012 1:05 AM

Page 65: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

40 R/A Vjolca Sellimi 1.2Amendment # 4 modification of original

contract

41 P C1.2/CS-IC/11-10 1.2 Trainer for school financing level 6,000 IC PRIOR

42 R/A Mehmet Simnica 5,000

43 P C1.2/CS-IC/11-11 1.2 Trainer for school financing level 6,000 IC PRIOR

44 R/A Mevlide Shamolli 5,000

45 P C1.2/CS-IC/11-12 1.2 Trainer for school financing level 6,000 IC PRIOR

46 R/A Jeton Kryeziu 5,000

47 P C1.2/CS-IC/11-13 1.2 Trainer for school financing level 6,000 IC PRIOR

48 R/A Jeton Gashi 5,000

49 P C1.2/CS-IC/11-14 1.2 Trainer for school financing level 6,000 IC PRIOR

50 R/A Aferdita Strellci 5,000

51 P C1.2/CS-IC/11-15 1.2 Trainer for school procurement level 6,000 IC PRIOR

52 R/A Fadil Veseli 4,000

53 P C1.2/CS-IC/11-16 1.2 Trainer for school procurement level 6,000 IC PRIOR

54 R/A Mirevete Gerguri 4,000

55 P C1.2/CS-IC/11-17 1.2 Trainer for school procurement level 6,000 IC PRIOR

56 R/A Fatmire M Morina 4,000

57 P C1.2/CS-IC/11-18 1.2 Trainer for school procurement level 6,000 IC PRIOR

58 R/A Vllaznim Reshani 4,000

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 65 of 255 10/17/2012 1:05 AM

Page 66: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

59 P C1.2/CS-IC/11-19 1.2 Trainer for school procurement level 6,000 IC PRIOR

60 R/A Defrim Kuqi 4,000

61 P C1.2/CS-IC-12-01 1.2Education finance officer for operating

at Help Desk6,300 IC PRIOR

62 R/A Bersant R. Grabanice 1,200

63 PNo Number

1.3 Consultant - Manager of the SDGs 46,500 IC PRIOR

64 R/A Xhafer Ahmeti 15,600

65 P C1.3/CS-IC/09-02 1.3 Consultant - Manager of the SDGs - IC PRIOR

66 R/A Besim Kokollari 14,400

67 R/A Besim Kokollari 1.3Amendment #1 modification of original

contract- 12,818

68 R/A Besim Kokollari 1.3Amendment #2 modification of original

contract10,800

69 P C1.3/CS-IC/09-02 1.3 Consultant - SDG and MDG manuals - SSS PRIOR

70 R/A Remzi Salihu 7,800

71 P C1.3/CS-QCBS/09-03 1.3Firm/NGO - school development grants

implem.463,600 QCBS PRIOR

72 R/A KEC, KOSOVO 266,935

73 R/A KEC, KOSOVO 1,3Amendment #1 modification of original

contract48,400

74 R/A KEC, KOSOVO 1.3Amendment # 2 modification of original

contract11,840

75

76

77

78 PC2.1/CS-IC/09-01

2.1Consultant - teacher's devel. and

licencing19,900 IC PRIOR

CONSULTANTS

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

24-Aug-12 NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

05-Sep-09 14 19-Sep-09 7 26-Sep-09 45

28-Aug-09 01-Sep-09 03-Sep-09

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 66 of 255 10/17/2012 1:05 AM

Page 67: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

79 R/A Blerim Saqipi 11,960

80 R/A Blerim Saqipi 2.1Amendment #1 modification of original

contract14,950

81 R/A Blerim Saqipi 2.1Amendment #2 modification of original

contract20,800

82 R/A Blerim Saqipi 2.1Amendment #3 modification of original

contract13,407

83 R/A Blerim Saqipi 2.1Amendment #4 modification of original

contract2,616

84 R/A Blerim Saqipi 2.1Amendment # 5 modification of original

contract7,800

85 PC2.1/CS-IC/09-02

2.1Consultant - teachers' professional

devel.62,700 IC PRIOR

86 R/A Pilar Romaguez 52,300

87 PC2.1/CS-IC/09-03

2.1Consultant - teachers' career/advance.

syst.IC PRIOR

88 R/A Pasi Ikonen 24,976

89 R/A Pasi Ikonen 2.1Amendment #1 extending completion

date

90 PC2.1/CS-IC/09-04

2.1Consultant - teachers' performance

evaluation60,600 IC PRIOR

91 R/A Jorge Manzi 32,733

92 R/A Jorge ManziAmendment #1 extending completion

date

93 R/A Jorge ManziAmendment #2 extending completion

date

94 P C2.1/CS-IC/10-05 2.1Consultant - teachers' performance

evaluation112,900 82,100 IC PRIOR

95 R/A Nicole Saginor 2.1 48,400

98 R/A Nicole Saginor 2.1 43,950

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 67 of 255 10/17/2012 1:05 AM

Page 68: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

99 P C2.1/CS-IC/11-07 - Prishtina region 2.1

Consultant for database population and

logistical support on performance

evaluation

- 6,400 IC PRIOR

100 R/A Edmond Krasniqi 6,000

101 R/A Edmond KrasniqiAmendment #1 extending completion

date

102 R/A Edmond KrasniqiAmendment # 2 modification of original

contract1,875

103 P C2.1/CS-IC/11-08 - Prizren region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

104 R/A Kreshnik Shatri 6,000

105 R/A Kreshnik ShatriAmendment #1 extending completion

date

106 R/A Kreshnik ShatriAmendment # 2 modification of original

contract1,875

107 P C2.1/CS-IC/11-09 - Peja region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

108 R/A Mentor Vokshi 6,000

109 R/A Mentor VokshiAmendment #1 extending completion

date

110 R/A Mentor VokshiAmendment # 2 modification of original

contract1,875

111 P C2.1/CS-IC/11-10 - Gjakova region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

112 R/A Armend Bajrami 6,000

113 R/A Armend BajramiAmendment #1 extending completion

date

114 R/A Armend BajramiAmendment # 2 modification of original

contract1,500

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 68 of 255 10/17/2012 1:05 AM

Page 69: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

115 P C2.1/CS-IC/11-11 - Ferizaj region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

116 R/A Donika Rexhepi 6,000

117 R/A Donika RexhepiAmendment #1 extending completion

date

118 R/A Donika RexhepiAmendment # 2 modification of original

contract1,500

119 P C2.1/CS-IC/11-12 - Mitrovica region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

120 R/A Zahir Ibishi 6,000

121 R/A Zahir IbishiAmendment #1 extending completion

date

122 R/A Zahir IbishiAmendment # 2 modification of original

contract1,500

123 P C2.1/CS-IC/11-13 - Gjilan region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

124 R/A Agim Ramadani 6,000

125 R/A Agim RamadaniAmendment #1 extending completion

date

126 R/A Agim RamadaniAmendment # 2 modification of original

contract1,875

127 P C2.1/CS-IC/11-14 2.1Consultant on Teacher Development

Policies Study- 50,000 IC PRIOR

128 P David Lynn 47,830

129 R/A David Lynn

130 p C2.1/CS-IC/11-15 2.1Consultant for the Managing the

database process8,000 IC PRIOR

131 R/A Mirlind Bruqi 8,000

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 69 of 255 10/17/2012 1:05 AM

Page 70: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

132 R/A Mirlind BruqiAmendment #1 extending completion

date

133 PC2.2/CS-SSS/10-02

2.2Consultant - curriculum unit and CACTI

capacity- SSS PRIOR

134 R/A Camerron Harisson 45,243 33,480

135 PC2.2/CS-IC/09-01

2.2Consultant - curriculum unit and CACTI

capacityIC PRIOR

136 R/A Camerron Harisson 56,000

137 PC2.3/CS-IC/09-01

2.3Consultant - assessment Unit and

MEST experts186,100 140,406 IC PRIOR

138 R/A Kelvin Gregory 75,600

139 PC2.3/CS-IC/09-03

2.3Consultant - test administration study

(intern.)46,960 IC PRIOR

140 R/A Steven Bakker 51,800

141 P C2.3/CS-IC/11-04 2.3 Consultant - Matura reform 50,000 IC PRIOR

142 R/A Steven Bakker 53,150

143 P C2.3/CS-SSS/12-01 2.3Supporting the Assessment Reform in

Kosovo29,000 SSS PRIOR

144 R/A Steven Bakker 28,800

145 P C2.3/CS-IC-11-05 2.3IC on Capacity Building for External

Assessment in Kosovo50,000 IC PRIOR

146 R/A Kelvin Gregory 43,650

147 R/A Kelvin GregoryAmendment #1 extending completion

date

148 P C2.3/CS-IC-11-06 2.3Consultant Mother Tongue and Modern

Foreign Language Exams21,000 IC PRIOR

149 R/A Ivane Mindadze 10,150

150 P C2.3/CS-IC-11-07 2.3

Consultant for Supporting the Item

Bank Development in Kosovo External

Assessment

24,000 IC PRIOR

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA 7 29-Mar-09 15

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

16-Jul-12 16-Jul-12 16-Jul-12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 70 of 255 10/17/2012 1:05 AM

Page 71: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

151 R/A David Tchankotadze 12,520

152 PC2.4/CS-IC/09-03

2.4Consultant - EMIS TOR and Training

Needs Assitance.31,000 IC PRIOR

153 R/A Mircea Enache 23,560

154 R/A Mircea Enache 2.4Amendment #1 extending completion

date

155 PC2.4/CS-IC/09-04

2.4 IT officer to support EMIS Department 35,676 IC PRIOR

156 R/A Bersant Krasniqi 6,000

157 R/A Bersant KrasniqiAmendment #1 modification of original

contract

158 R/A Bersant KrasniqiAmendment #2 extending completion

date13,013

159 R/A Bersant KrasniqiAmendment # 3 extending completion

date8,400

160 P C2.4/CS-IC/10-05 2.4Consultant to support the upgrade of

EMIS31,980 SSS PRIOR

161 R/A Mircea Enache 31,980

162 R/A Mircea EnacheAmendment #1 modification of original

contract10,000

163 PC2.5/CS-SSS/09-01

2.5 National firm to draft project action plan 20,300 SSS PRIOR

164 R/A Kosova Education Center KEC 12,780

165 PNo Number

2.5 Project coordinator 71,300 IC PRIOR

166 R/A Xhafer Ahmeti 15,600

167 R/A Xhafer Ahmeti 2.5Amendment #1 modification of original

contract885

168 R/A Xhafer Ahmeti 2.5Amendment #2 modification of original

contract1,300

169 PC2.5/CS-IC/09-02

2.5 Project coordinator - IC PRIOR

170 R/A Edita Alo 26,400

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 71 of 255 10/17/2012 1:05 AM

Page 72: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

171 R/A Edita Alo 2.5Amendment #1 modification of original

contract56,393

172 R/A Edita Alo 2.5Amendment # 2 modification of original

contract

173 R/A Edita Alo 2.5Amendment #3 modification of original

contract13,200

174 PC2.5/CS-IC/09-03

2.5 Financial manager 61,100 IC PRIOR

175 R/A Gazmend Bajra 27,600

176 R/A Gazmend Bajra 2.5Amendment #1 modification of original

contract2,070

177 R/A Gazmend Bajra 2.5Amendment #2 modification of original

contract27,111

178 R/A Gazmend Bajra 2.5Amendment #3 modification of original

contract793

179 P C2.5/CS-IC/12-02 2.5 Financial manager 9,000 IC PRIOR

180 R/A Mirjeta Hysa 7,200

181 PNo number

2.5 Procurement Officer 49,000 IC PRIOR

182 R/A Vlora Kuqi 13,800

183 PC2.5/CS-IC/09-04

2.5 Procurement Officer - IC PRIOR

184 R/A Luan Asllani 2.5 10,800

185 R/A Luan Asllani 2.5Amendment #1 modification of original

contract

186 R/A Luan Asllani 2.5Amendment #2 modification of original

contract5,400

187 R/A Luan Asllani 2.5Amendment #3 modification of original

contract- 11,550

188 R/A Luan Asllani 2.5Amendment #4 modification of original

contract6,300

189 PC2.5/CS-IC/09-05

2.5 Administrative assistant 40,800 IC PRIOR

190 R/A Altin Ademi 6,000

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 72 of 255 10/17/2012 1:05 AM

Page 73: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

191 R/A Altin Ademi 2.5Amendment #1 modification of original

contract1,000

192 R/A Altin Ademi 2.5Amendment #2 modification of original

contract16,450

193 R/A Altin Ademi 2.5Amendment #3 modification of original

contract4,200

194 PNo Number

2.5 Consultant - implementation adviser 55,700 IC PRIOR

195 R/A Vas Demetriou 54,194

196 R/A Vas Demetriou 2.5Amendment #1 extending completion

date

197 R/A Vas Demetriou 2.5Amendment #2 extending completion

date

198 P C2.5/CS-LCS/09-08 2.5 Firm - project accounts audit (external) 64,600 LSC PRIOR

199 R/A ERNST & YOUNG 2.5 1,000

200 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

201 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

202 P C2.5/CS-LCS/11-10 2.5 Firm - project accounts audit (external) - 25,600 LSC PRIOR

203 R/A Ficadex Albania LTD Audit for period Jan.- Dec.2011 1,688

204 p C2.5/CS-SSS/12-01 2.5 Short Term Procurement Specialist 3,500 SSS PRIOR

205 R/A Aleksandar Najdovski 3,450

206 R/A Aleksandar NajdovskiAmendment #1 extending completion

date

207

208

209

210 PC2.5/CS-IC/09-07

3Consultant - implementation adviserfor

component 3- PRIOR

211 R/A Vas Demetriou 45,120 SSS

3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

CONSULTANTS

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA 7 26-Feb-11 15

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 73 of 255 10/17/2012 1:05 AM

Page 74: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

212 R/A Vas Demetriou 3Amendment #1 extending completion

date

213 P C3.1/CS-SSS/11-01 3.1Implementation adviser for component

327,540 SSS PRIOR

214 R/A Vas Demetriou 37,840

215 R/A Vas DemetriouAmendment #1 extending completion

date

216 PC3.1/CS-CQS/09-01

3.1Firm - school mapping and investment

planning166,700 CQS PRIOR

217 R/A TELOS 136,400

218 R/A TELOS 3.1Amendment #1 extending completion

date

219 R/A TELOS 3.1Amendment #2 extending completion

date

220 PC3.1/CS-CQS/09-02

3.1 Firm - inventory taking for 1100 schools 287,400 CQS PRIOR

221 R/A CMC 202,280

222 R/A CMC 3.1Amendment #1 extending completion

date

223 R/A CMC 3.1Amendment # 2 extending completion

date

224 PC3.1/CS-IC/09-04

3.1Consultant - Manager for 3.1 activities

(national)41,200 IC PRIOR

225 R/A Merita Behluli 16,200

226 R/A Merita Behluli 3.1Amendment #1 modification of original

contract1,300

227 P C3.1/CS-SSS/10-05 3.1 Consultant for Priority 3 Activities 16,500 SSS PRIOR

228 R/A Merita Behluli 16,500

229 R/A Merita Behluli 3.1Amendment #1 modification of original

contract13,970

230 R/A Merita Behluli 3.1Amendment #1 modification of original

contract7,150

231 PC3.2/CS-CQS/09-01

3.2Firm - school standards and norms &

manual167,500 CQS PRIOR

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA 7 01-Feb-09 14

09-Mar-09 10-Mar-09

NA NA NA

NA NA NA

NA NA 7 03-Sep-09 14

15-Oct-09 25-Oct-09 26-Oct-09

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA 7 01-Feb-09 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 74 of 255 10/17/2012 1:05 AM

Page 75: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

232 R/A EME 100,538

233 PC3.2/CS-SSS/10-02

3.2 School standards and norms & manual 40,000 SSS PRIOR

234 R/A Daniel Dupety 3.2 38,760

235 R/A Daniel Dupety 3.2Amendment #1 extending completion

date

236 P C3.3/CS-QCBS/09-01 3.3Firm - design and supervision of model

schools572,400 450,000 QCBS PRIOR

237 R/A Urban plus 178,921

238 R/A Urban plus 3.3Amendment #1 extending completion

date

239

240

241 PC4.1/CS-IC/09-01

4.1Consultant - higher education legisl. &

sustain.69,800 IC PRIOR

242 R/A Steve Bristow 54,500

243 PNo Number

4.1Consultant - local counterpart of intern.

Cons.6,768 IC PRIOR

244 R/A Jehona Lushaku 4,800

245 PC4.1/CS-IC/09-02

4.1Consultant - local counterpart of intern.

Cons.14,100 SSS PRIOR

246 R/A Blerim Saqipi 2,600

247 PC4.1/CS-IC/09-04

4.1 Consultant - evaluation of EPIP II - IC PRIOR

248 R/A Tom Guegon 13,026

249 PC4.1/CS-IC/09-05

4.1Consultant - SMD Grants (EPIP II)

procurement62,780 IC PRIOR

250 R/A Alexandar Najdovski

251 R/A Alexandar Najdovski 4.1Amendment #1 modification of original

contract20,550

CONSULTANTS

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

11-Nov-10 14 25-Nov-10 7 02-Dec-10 45

20-Aug-10 25-Aug-10 26-Aug-10

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 75 of 255 10/17/2012 1:05 AM

Page 76: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

252 R/A Alexandar Najdovski 4.1Amendment #2 modification of original

contract30,900

253 PC4.1/CS-IC/11-05

4.1

Consultant for the implementation of

higher education legislation

(international)

30,000 IC PRIOR

254 R/A Stephen l. Bristow 22,940

255 R/A Stephen l. BristowAmendment #1 extending completion

date

256 PC4.2/CS-IC/09-02

4.2Consultant - higher educ. financial

sustainability69,800 IC PRIOR

257 R/A Sigurd Hoellinger 4.2 66,725

258 R/A Sigurd Hoellinger 4.2Amendment #1 extending completion

date

259 R/A Sigurd Hoellinger 4.2Amendment #2 extending completion

date

260 R/A Sigurd Hoellinger 4.2Amendment #3 extending completion

date

261 R/A Sigurd Hoellinger 4.2Amendment #4 extending completion

date

Legend:

Green color under column A (line number) denotes ongoing activities

Orange color denotes activities to start

QCBS = Quality and Cost-based Selection (in accordance with sections 2.1 - 2.28 of the Guidelines)

FBC = Fixed Budget Selection (in accordance with section 3.5 of the Guidelines)

LCS = Least-Cost Selection (in accordance with section 3.6 of the Guidelines)

CQS = Selection Based on consultants' Qualifications (in accordance with section 3.7 of the Guidelines)

IC = Selection of Individual Consultants (in accordance with sections 5.1 - 5.4 of the Guidelines)

SSS = Single Source Selection in accordance with sections 3.09 - 3.13 of the Guidelines

NA = Not Applicable

OTHER = Direct expenditures

Notes:

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 76 of 255 10/17/2012 1:05 AM

Page 77: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

a/ Interval for preparation/clearance (days); working document PP only

b/ Number of days to execute the contract; working document PP only Fees for participation in PISA. This is not a procurement activity but it is keep in the PP for completeness

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All QCBS contracts, first two CQS contracts, and first two IC contracts irrespective of cost

All contracts with firms estimated to cost US$ 50,000 or more

All contracts with individual consultants (IC) estimated to cost US$ 25,000 or more

All Single source selection contracts

Schedule (dd-Mmm-yy)

Prep.

Of

RFP Int.

/a WB "No

Objection" Int.

/a Issue

of

RFP/Inv. Int.

/a

7 8 9

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 77 of 255 10/17/2012 1:05 AM

Page 78: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

1

2

3 CONSULTANTS

4 P C1.1/CS-IC/09-01 1.1Consultant - legal framework

development92,600 IC PRIOR

5 R/A Dennis Farrington 72,000

6 R/A Dennis Farrington 1.1Amendment #1 extending completion

date

7 P C1.1/CS-IC/11-02 1.1 New legislation implementation 40,540 30,000 IC PRIOR

8 R/A Dennis Farrington 27,040

9 R/A Dennis FarringtonAmendment #1 modification of original

contract

10 PNo Number

1.2Consultant - financing formula

development107,500 79,550 IC PRIOR

11 R/A Rosalind Levacic 1.2 45,220

12 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract4,500

13 R/A Rosalind Levacic 1.2 Amendment #2 modification of contract 14,379

14 P C1.2/CS-IC/09-01 1.2Consultant - financing formula

development- SSS PRIOR

15 R/A Rosalind Levacic 1.2 35,540

16 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract50,980 PRIOR

17 R/A Rosalind Levacic 1.2Amendment #2 modification of original

contract5,440

18 P C1.2/CS-CQS/09-02 1.2 Firm - Survey evaluation - CQS PRIOR

19 R/A Prism Research 24,674

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

24-Jul-09 NA NA

19-Aug-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 78 of 255 10/17/2012 1:05 AM

Page 79: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

20 R/A Prism Research 1.2Amendment #1 extending completion

date

21 R/A Prism Research 1.2Amendment #2 extending completion

date

22 P C1.2/CS-IC/09-03 1.2 Consultant - system data entry 6,800 IC PRIOR

23 R/A Besnik Limaj 6,400

24 P C1.2/CS-IC/09-05 1.2 Consultant - finance help desk-1 - IC PRIOR

25 R/A Pakize Isufaj 10,800

26 P C1.2/CS-IC/09-06 1.2 Consultant - finance help desk-2 - IC PRIOR

27 R/A Hysni Maxharraj 10,800

28 P C1.2/CS-IC/09-07 1.2 Consultant - training materials analyst - IC PRIOR

29 R/A Edi Bunjaku 1,300

30 P C1.2/CS-IC/10-08 1.2 Consultant - Head of help desk - IC PRIOR

31 R/A Pakize Isufaj 13,200

32 R/A Pakize Isufaj 1.2Amendment #1 modification of original

contract

33 R/A Pakize Isufaj 1.2Amendment #2 modification of original

contract13,200

34 R/A Pakize Isufaj 1.2Amendment #3 modification of original

contract10,350

35 P C1.2/CS-IC/10-09 1.2 Consultant - education finance 2 - IC PRIOR

36 R/A Vjolca Sellimi 1.2 10,800

37 R/A Vjolca Sellimi 1.2Amendment #1 modification of original

contract

38 R/A Vjolca Sellimi 1.2Amendment #2 modification of original

contract10,800

39 R/A Vjolca Sellimi 1.2Amendment #3 modification of original

contract8,469

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 79 of 255 10/17/2012 1:05 AM

Page 80: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

40 R/A Vjolca Sellimi 1.2Amendment # 4 modification of original

contract

41 P C1.2/CS-IC/11-10 1.2 Trainer for school financing level 6,000 IC PRIOR

42 R/A Mehmet Simnica 5,000

43 P C1.2/CS-IC/11-11 1.2 Trainer for school financing level 6,000 IC PRIOR

44 R/A Mevlide Shamolli 5,000

45 P C1.2/CS-IC/11-12 1.2 Trainer for school financing level 6,000 IC PRIOR

46 R/A Jeton Kryeziu 5,000

47 P C1.2/CS-IC/11-13 1.2 Trainer for school financing level 6,000 IC PRIOR

48 R/A Jeton Gashi 5,000

49 P C1.2/CS-IC/11-14 1.2 Trainer for school financing level 6,000 IC PRIOR

50 R/A Aferdita Strellci 5,000

51 P C1.2/CS-IC/11-15 1.2 Trainer for school procurement level 6,000 IC PRIOR

52 R/A Fadil Veseli 4,000

53 P C1.2/CS-IC/11-16 1.2 Trainer for school procurement level 6,000 IC PRIOR

54 R/A Mirevete Gerguri 4,000

55 P C1.2/CS-IC/11-17 1.2 Trainer for school procurement level 6,000 IC PRIOR

56 R/A Fatmire M Morina 4,000

57 P C1.2/CS-IC/11-18 1.2 Trainer for school procurement level 6,000 IC PRIOR

58 R/A Vllaznim Reshani 4,000

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 80 of 255 10/17/2012 1:05 AM

Page 81: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

59 P C1.2/CS-IC/11-19 1.2 Trainer for school procurement level 6,000 IC PRIOR

60 R/A Defrim Kuqi 4,000

61 P C1.2/CS-IC-12-01 1.2Education finance officer for operating

at Help Desk6,300 IC PRIOR

62 R/A Bersant R. Grabanice 1,200

63 PNo Number

1.3 Consultant - Manager of the SDGs 46,500 IC PRIOR

64 R/A Xhafer Ahmeti 15,600

65 P C1.3/CS-IC/09-02 1.3 Consultant - Manager of the SDGs - IC PRIOR

66 R/A Besim Kokollari 14,400

67 R/A Besim Kokollari 1.3Amendment #1 modification of original

contract- 12,818

68 R/A Besim Kokollari 1.3Amendment #2 modification of original

contract10,800

69 P C1.3/CS-IC/09-02 1.3 Consultant - SDG and MDG manuals - SSS PRIOR

70 R/A Remzi Salihu 7,800

71 P C1.3/CS-QCBS/09-03 1.3Firm/NGO - school development grants

implem.463,600 QCBS PRIOR

72 R/A KEC, KOSOVO 266,935

73 R/A KEC, KOSOVO 1,3Amendment #1 modification of original

contract48,400

74 R/A KEC, KOSOVO 1.3Amendment # 2 modification of original

contract11,840

75

76

77

78 PC2.1/CS-IC/09-01

2.1Consultant - teacher's devel. and

licencing19,900 IC PRIOR

CONSULTANTS

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

10-Nov-09 14 24-Nov-09 14 08-Dec-09 7

05-Oct-09 12-Aug-09 19-Aug-09

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 81 of 255 10/17/2012 1:05 AM

Page 82: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

79 R/A Blerim Saqipi 11,960

80 R/A Blerim Saqipi 2.1Amendment #1 modification of original

contract14,950

81 R/A Blerim Saqipi 2.1Amendment #2 modification of original

contract20,800

82 R/A Blerim Saqipi 2.1Amendment #3 modification of original

contract13,407

83 R/A Blerim Saqipi 2.1Amendment #4 modification of original

contract2,616

84 R/A Blerim Saqipi 2.1Amendment # 5 modification of original

contract7,800

85 PC2.1/CS-IC/09-02

2.1Consultant - teachers' professional

devel.62,700 IC PRIOR

86 R/A Pilar Romaguez 52,300

87 PC2.1/CS-IC/09-03

2.1Consultant - teachers' career/advance.

syst.IC PRIOR

88 R/A Pasi Ikonen 24,976

89 R/A Pasi Ikonen 2.1Amendment #1 extending completion

date

90 PC2.1/CS-IC/09-04

2.1Consultant - teachers' performance

evaluation60,600 IC PRIOR

91 R/A Jorge Manzi 32,733

92 R/A Jorge ManziAmendment #1 extending completion

date

93 R/A Jorge ManziAmendment #2 extending completion

date

94 P C2.1/CS-IC/10-05 2.1Consultant - teachers' performance

evaluation112,900 82,100 IC PRIOR

95 R/A Nicole Saginor 2.1 48,400

98 R/A Nicole Saginor 2.1 43,950

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 82 of 255 10/17/2012 1:05 AM

Page 83: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

99 P C2.1/CS-IC/11-07 - Prishtina region 2.1

Consultant for database population and

logistical support on performance

evaluation

- 6,400 IC PRIOR

100 R/A Edmond Krasniqi 6,000

101 R/A Edmond KrasniqiAmendment #1 extending completion

date

102 R/A Edmond KrasniqiAmendment # 2 modification of original

contract1,875

103 P C2.1/CS-IC/11-08 - Prizren region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

104 R/A Kreshnik Shatri 6,000

105 R/A Kreshnik ShatriAmendment #1 extending completion

date

106 R/A Kreshnik ShatriAmendment # 2 modification of original

contract1,875

107 P C2.1/CS-IC/11-09 - Peja region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

108 R/A Mentor Vokshi 6,000

109 R/A Mentor VokshiAmendment #1 extending completion

date

110 R/A Mentor VokshiAmendment # 2 modification of original

contract1,875

111 P C2.1/CS-IC/11-10 - Gjakova region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

112 R/A Armend Bajrami 6,000

113 R/A Armend BajramiAmendment #1 extending completion

date

114 R/A Armend BajramiAmendment # 2 modification of original

contract1,500

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 83 of 255 10/17/2012 1:05 AM

Page 84: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

115 P C2.1/CS-IC/11-11 - Ferizaj region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

116 R/A Donika Rexhepi 6,000

117 R/A Donika RexhepiAmendment #1 extending completion

date

118 R/A Donika RexhepiAmendment # 2 modification of original

contract1,500

119 P C2.1/CS-IC/11-12 - Mitrovica region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

120 R/A Zahir Ibishi 6,000

121 R/A Zahir IbishiAmendment #1 extending completion

date

122 R/A Zahir IbishiAmendment # 2 modification of original

contract1,500

123 P C2.1/CS-IC/11-13 - Gjilan region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

124 R/A Agim Ramadani 6,000

125 R/A Agim RamadaniAmendment #1 extending completion

date

126 R/A Agim RamadaniAmendment # 2 modification of original

contract1,875

127 P C2.1/CS-IC/11-14 2.1Consultant on Teacher Development

Policies Study- 50,000 IC PRIOR

128 P David Lynn 47,830

129 R/A David Lynn

130 p C2.1/CS-IC/11-15 2.1Consultant for the Managing the

database process8,000 IC PRIOR

131 R/A Mirlind Bruqi 8,000

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 84 of 255 10/17/2012 1:05 AM

Page 85: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

132 R/A Mirlind BruqiAmendment #1 extending completion

date

133 PC2.2/CS-SSS/10-02

2.2Consultant - curriculum unit and CACTI

capacity- SSS PRIOR

134 R/A Camerron Harisson 45,243 33,480

135 PC2.2/CS-IC/09-01

2.2Consultant - curriculum unit and CACTI

capacityIC PRIOR

136 R/A Camerron Harisson 56,000

137 PC2.3/CS-IC/09-01

2.3Consultant - assessment Unit and

MEST experts186,100 140,406 IC PRIOR

138 R/A Kelvin Gregory 75,600

139 PC2.3/CS-IC/09-03

2.3Consultant - test administration study

(intern.)46,960 IC PRIOR

140 R/A Steven Bakker 51,800

141 P C2.3/CS-IC/11-04 2.3 Consultant - Matura reform 50,000 IC PRIOR

142 R/A Steven Bakker 53,150

143 P C2.3/CS-SSS/12-01 2.3Supporting the Assessment Reform in

Kosovo29,000 SSS PRIOR

144 R/A Steven Bakker 28,800

145 P C2.3/CS-IC-11-05 2.3IC on Capacity Building for External

Assessment in Kosovo50,000 IC PRIOR

146 R/A Kelvin Gregory 43,650

147 R/A Kelvin GregoryAmendment #1 extending completion

date

148 P C2.3/CS-IC-11-06 2.3Consultant Mother Tongue and Modern

Foreign Language Exams21,000 IC PRIOR

149 R/A Ivane Mindadze 10,150

150 P C2.3/CS-IC-11-07 2.3

Consultant for Supporting the Item

Bank Development in Kosovo External

Assessment

24,000 IC PRIOR

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

13-Apr-09 NA NA 2

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

16-Jul-12 16-Jul-12 16-Jul-12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 85 of 255 10/17/2012 1:05 AM

Page 86: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

151 R/A David Tchankotadze 12,520

152 PC2.4/CS-IC/09-03

2.4Consultant - EMIS TOR and Training

Needs Assitance.31,000 IC PRIOR

153 R/A Mircea Enache 23,560

154 R/A Mircea Enache 2.4Amendment #1 extending completion

date

155 PC2.4/CS-IC/09-04

2.4 IT officer to support EMIS Department 35,676 IC PRIOR

156 R/A Bersant Krasniqi 6,000

157 R/A Bersant KrasniqiAmendment #1 modification of original

contract

158 R/A Bersant KrasniqiAmendment #2 extending completion

date13,013

159 R/A Bersant KrasniqiAmendment # 3 extending completion

date8,400

160 P C2.4/CS-IC/10-05 2.4Consultant to support the upgrade of

EMIS31,980 SSS PRIOR

161 R/A Mircea Enache 31,980

162 R/A Mircea EnacheAmendment #1 modification of original

contract10,000

163 PC2.5/CS-SSS/09-01

2.5 National firm to draft project action plan 20,300 SSS PRIOR

164 R/A Kosova Education Center KEC 12,780

165 PNo Number

2.5 Project coordinator 71,300 IC PRIOR

166 R/A Xhafer Ahmeti 15,600

167 R/A Xhafer Ahmeti 2.5Amendment #1 modification of original

contract885

168 R/A Xhafer Ahmeti 2.5Amendment #2 modification of original

contract1,300

169 PC2.5/CS-IC/09-02

2.5 Project coordinator - IC PRIOR

170 R/A Edita Alo 26,400

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 86 of 255 10/17/2012 1:05 AM

Page 87: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

171 R/A Edita Alo 2.5Amendment #1 modification of original

contract56,393

172 R/A Edita Alo 2.5Amendment # 2 modification of original

contract

173 R/A Edita Alo 2.5Amendment #3 modification of original

contract13,200

174 PC2.5/CS-IC/09-03

2.5 Financial manager 61,100 IC PRIOR

175 R/A Gazmend Bajra 27,600

176 R/A Gazmend Bajra 2.5Amendment #1 modification of original

contract2,070

177 R/A Gazmend Bajra 2.5Amendment #2 modification of original

contract27,111

178 R/A Gazmend Bajra 2.5Amendment #3 modification of original

contract793

179 P C2.5/CS-IC/12-02 2.5 Financial manager 9,000 IC PRIOR

180 R/A Mirjeta Hysa 7,200

181 PNo number

2.5 Procurement Officer 49,000 IC PRIOR

182 R/A Vlora Kuqi 13,800

183 PC2.5/CS-IC/09-04

2.5 Procurement Officer - IC PRIOR

184 R/A Luan Asllani 2.5 10,800

185 R/A Luan Asllani 2.5Amendment #1 modification of original

contract

186 R/A Luan Asllani 2.5Amendment #2 modification of original

contract5,400

187 R/A Luan Asllani 2.5Amendment #3 modification of original

contract- 11,550

188 R/A Luan Asllani 2.5Amendment #4 modification of original

contract6,300

189 PC2.5/CS-IC/09-05

2.5 Administrative assistant 40,800 IC PRIOR

190 R/A Altin Ademi 6,000

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 87 of 255 10/17/2012 1:05 AM

Page 88: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

191 R/A Altin Ademi 2.5Amendment #1 modification of original

contract1,000

192 R/A Altin Ademi 2.5Amendment #2 modification of original

contract16,450

193 R/A Altin Ademi 2.5Amendment #3 modification of original

contract4,200

194 PNo Number

2.5 Consultant - implementation adviser 55,700 IC PRIOR

195 R/A Vas Demetriou 54,194

196 R/A Vas Demetriou 2.5Amendment #1 extending completion

date

197 R/A Vas Demetriou 2.5Amendment #2 extending completion

date

198 P C2.5/CS-LCS/09-08 2.5 Firm - project accounts audit (external) 64,600 LSC PRIOR

199 R/A ERNST & YOUNG 2.5 1,000

200 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

201 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

202 P C2.5/CS-LCS/11-10 2.5 Firm - project accounts audit (external) - 25,600 LSC PRIOR

203 R/A Ficadex Albania LTD Audit for period Jan.- Dec.2011 1,688

204 p C2.5/CS-SSS/12-01 2.5 Short Term Procurement Specialist 3,500 SSS PRIOR

205 R/A Aleksandar Najdovski 3,450

206 R/A Aleksandar NajdovskiAmendment #1 extending completion

date

207

208

209

210 PC2.5/CS-IC/09-07

3Consultant - implementation adviserfor

component 3- PRIOR

211 R/A Vas Demetriou 45,120 SSS

3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

CONSULTANTS

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

13-Mar-11 NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 88 of 255 10/17/2012 1:05 AM

Page 89: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

212 R/A Vas Demetriou 3Amendment #1 extending completion

date

213 P C3.1/CS-SSS/11-01 3.1Implementation adviser for component

327,540 SSS PRIOR

214 R/A Vas Demetriou 37,840

215 R/A Vas DemetriouAmendment #1 extending completion

date

216 PC3.1/CS-CQS/09-01

3.1Firm - school mapping and investment

planning166,700 CQS PRIOR

217 R/A TELOS 136,400

218 R/A TELOS 3.1Amendment #1 extending completion

date

219 R/A TELOS 3.1Amendment #2 extending completion

date

220 PC3.1/CS-CQS/09-02

3.1 Firm - inventory taking for 1100 schools 287,400 CQS PRIOR

221 R/A CMC 202,280

222 R/A CMC 3.1Amendment #1 extending completion

date

223 R/A CMC 3.1Amendment # 2 extending completion

date

224 PC3.1/CS-IC/09-04

3.1Consultant - Manager for 3.1 activities

(national)41,200 IC PRIOR

225 R/A Merita Behluli 16,200

226 R/A Merita Behluli 3.1Amendment #1 modification of original

contract1,300

227 P C3.1/CS-SSS/10-05 3.1 Consultant for Priority 3 Activities 16,500 SSS PRIOR

228 R/A Merita Behluli 16,500

229 R/A Merita Behluli 3.1Amendment #1 modification of original

contract13,970

230 R/A Merita Behluli 3.1Amendment #1 modification of original

contract7,150

231 PC3.2/CS-CQS/09-01

3.2Firm - school standards and norms &

manual167,500 CQS PRIOR

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

15-Feb-09 NA NA

10-Apr-09 19-Apr-09 13-May-09

NA NA NA

NA NA NA

17-Sep-09 NA NA

09-Nov-09

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

15-Feb-09 NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 89 of 255 10/17/2012 1:05 AM

Page 90: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

232 R/A EME 100,538

233 PC3.2/CS-SSS/10-02

3.2 School standards and norms & manual 40,000 SSS PRIOR

234 R/A Daniel Dupety 3.2 38,760

235 R/A Daniel Dupety 3.2Amendment #1 extending completion

date

236 P C3.3/CS-QCBS/09-01 3.3Firm - design and supervision of model

schools572,400 450,000 QCBS PRIOR

237 R/A Urban plus 178,921

238 R/A Urban plus 3.3Amendment #1 extending completion

date

239

240

241 PC4.1/CS-IC/09-01

4.1Consultant - higher education legisl. &

sustain.69,800 IC PRIOR

242 R/A Steve Bristow 54,500

243 PNo Number

4.1Consultant - local counterpart of intern.

Cons.6,768 IC PRIOR

244 R/A Jehona Lushaku 4,800

245 PC4.1/CS-IC/09-02

4.1Consultant - local counterpart of intern.

Cons.14,100 SSS PRIOR

246 R/A Blerim Saqipi 2,600

247 PC4.1/CS-IC/09-04

4.1 Consultant - evaluation of EPIP II - IC PRIOR

248 R/A Tom Guegon 13,026

249 PC4.1/CS-IC/09-05

4.1Consultant - SMD Grants (EPIP II)

procurement62,780 IC PRIOR

250 R/A Alexandar Najdovski

251 R/A Alexandar Najdovski 4.1Amendment #1 modification of original

contract20,550

CONSULTANTS

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

27-May-09

NA NA NA

NA NA NA

NA NA NA

16-Jan-11 14 30-Jan-11 14 13-Feb-11 7

01-Oct-10 15-Oct-10 09-Dec-10

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 90 of 255 10/17/2012 1:05 AM

Page 91: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

252 R/A Alexandar Najdovski 4.1Amendment #2 modification of original

contract30,900

253 PC4.1/CS-IC/11-05

4.1

Consultant for the implementation of

higher education legislation

(international)

30,000 IC PRIOR

254 R/A Stephen l. Bristow 22,940

255 R/A Stephen l. BristowAmendment #1 extending completion

date

256 PC4.2/CS-IC/09-02

4.2Consultant - higher educ. financial

sustainability69,800 IC PRIOR

257 R/A Sigurd Hoellinger 4.2 66,725

258 R/A Sigurd Hoellinger 4.2Amendment #1 extending completion

date

259 R/A Sigurd Hoellinger 4.2Amendment #2 extending completion

date

260 R/A Sigurd Hoellinger 4.2Amendment #3 extending completion

date

261 R/A Sigurd Hoellinger 4.2Amendment #4 extending completion

date

Legend:

Green color under column A (line number) denotes ongoing activities

Orange color denotes activities to start

QCBS = Quality and Cost-based Selection (in accordance with sections 2.1 - 2.28 of the Guidelines)

FBC = Fixed Budget Selection (in accordance with section 3.5 of the Guidelines)

LCS = Least-Cost Selection (in accordance with section 3.6 of the Guidelines)

CQS = Selection Based on consultants' Qualifications (in accordance with section 3.7 of the Guidelines)

IC = Selection of Individual Consultants (in accordance with sections 5.1 - 5.4 of the Guidelines)

SSS = Single Source Selection in accordance with sections 3.09 - 3.13 of the Guidelines

NA = Not Applicable

OTHER = Direct expenditures

Notes:

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 91 of 255 10/17/2012 1:05 AM

Page 92: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

a/ Interval for preparation/clearance (days); working document PP only

b/ Number of days to execute the contract; working document PP only Fees for participation in PISA. This is not a procurement activity but it is keep in the PP for completeness

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All QCBS contracts, first two CQS contracts, and first two IC contracts irrespective of cost

All contracts with firms estimated to cost US$ 50,000 or more

All contracts with individual consultants (IC) estimated to cost US$ 25,000 or more

All Single source selection contracts

Schedule (dd-Mmm-yy)

Sub. Of

Proposals Int.

/a Tech.

Eval. Int.

/a WB "No

Objection" Int.

/a

10 11 12

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 92 of 255 10/17/2012 1:05 AM

Page 93: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

1

2

3 CONSULTANTS

4 P C1.1/CS-IC/09-01 1.1Consultant - legal framework

development92,600 IC PRIOR

5 R/A Dennis Farrington 72,000

6 R/A Dennis Farrington 1.1Amendment #1 extending completion

date

7 P C1.1/CS-IC/11-02 1.1 New legislation implementation 40,540 30,000 IC PRIOR

8 R/A Dennis Farrington 27,040

9 R/A Dennis FarringtonAmendment #1 modification of original

contract

10 PNo Number

1.2Consultant - financing formula

development107,500 79,550 IC PRIOR

11 R/A Rosalind Levacic 1.2 45,220

12 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract4,500

13 R/A Rosalind Levacic 1.2 Amendment #2 modification of contract 14,379

14 P C1.2/CS-IC/09-01 1.2Consultant - financing formula

development- SSS PRIOR

15 R/A Rosalind Levacic 1.2 35,540

16 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract50,980 PRIOR

17 R/A Rosalind Levacic 1.2Amendment #2 modification of original

contract5,440

18 P C1.2/CS-CQS/09-02 1.2 Firm - Survey evaluation - CQS PRIOR

19 R/A Prism Research 24,674

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 7 30-Apr-09 14 14-May-09 14

NA 10-May-09 13-May-09

NA 25-Oct-09 25-Oct-09

NA 7 20-Dec-11 10 30-Dec-11 14

NA 10-Jan-12 12-Jan-12

NA 23-May-12 23-May-12

NA 7 23-Apr-08 14 08-May-08 14

NA 18-Jul-08 20-Jul-08

NA

NA 12-Mar-09 12-Mar-09

NA 7 21-Apr-08 14 05-May-08 14

NA 25-Oct-10 25-Oct-10

NA 09-Aug-10 10-Aug-10

NA 15-Mar-12 16-Mar-12

NA 7 31-Jul-09 21 21-Aug-09 14

20-Aug-09 24-Aug-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 93 of 255 10/17/2012 1:05 AM

Page 94: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

20 R/A Prism Research 1.2Amendment #1 extending completion

date

21 R/A Prism Research 1.2Amendment #2 extending completion

date

22 P C1.2/CS-IC/09-03 1.2 Consultant - system data entry 6,800 IC PRIOR

23 R/A Besnik Limaj 6,400

24 P C1.2/CS-IC/09-05 1.2 Consultant - finance help desk-1 - IC PRIOR

25 R/A Pakize Isufaj 10,800

26 P C1.2/CS-IC/09-06 1.2 Consultant - finance help desk-2 - IC PRIOR

27 R/A Hysni Maxharraj 10,800

28 P C1.2/CS-IC/09-07 1.2 Consultant - training materials analyst - IC PRIOR

29 R/A Edi Bunjaku 1,300

30 P C1.2/CS-IC/10-08 1.2 Consultant - Head of help desk - IC PRIOR

31 R/A Pakize Isufaj 13,200

32 R/A Pakize Isufaj 1.2Amendment #1 modification of original

contract

33 R/A Pakize Isufaj 1.2Amendment #2 modification of original

contract13,200

34 R/A Pakize Isufaj 1.2Amendment #3 modification of original

contract10,350

35 P C1.2/CS-IC/10-09 1.2 Consultant - education finance 2 - IC PRIOR

36 R/A Vjolca Sellimi 1.2 10,800

37 R/A Vjolca Sellimi 1.2Amendment #1 modification of original

contract

38 R/A Vjolca Sellimi 1.2Amendment #2 modification of original

contract10,800

39 R/A Vjolca Sellimi 1.2Amendment #3 modification of original

contract8,469

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 11-Feb-10 12-Feb-10

NA 09-Feb-10 13-Feb-10

NA 7 21-Jan-10 14 04-Feb-10 14

NA 25-Feb-09 25-Feb-09

NA 7 02-Sep-09 14 04-Sep-09 14

NA 10-Sep-09 15-Sep-09

NA 7 08-Sep-09 14 22-Sep-09 14

NA 10-Sep-09 15-Sep-09

NA 7 15-Nov-09 14 29-Nov-09 14

NA 10-Nov-09 13-Nov-09

NA 7 15-Apr-10 14 29-Apr-10 14

NA 15-Mar-10 15-Mar-10

NA 30-Jul-10 30-Jul-10

NA 15-Mar-11 21-Mar-11

NA 12-Mar-12 13-Mar-12

NA 7 29-Mar-09 14 12-Apr-09 14

NA 15-Mar-10 15-Mar-10

NA 22-Jul-10 22-Jul-10

NA 17-Mar-11 21-Mar-11

NA 12-Mar-12 3//13

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 94 of 255 10/17/2012 1:05 AM

Page 95: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

40 R/A Vjolca Sellimi 1.2Amendment # 4 modification of original

contract

41 P C1.2/CS-IC/11-10 1.2 Trainer for school financing level 6,000 IC PRIOR

42 R/A Mehmet Simnica 5,000

43 P C1.2/CS-IC/11-11 1.2 Trainer for school financing level 6,000 IC PRIOR

44 R/A Mevlide Shamolli 5,000

45 P C1.2/CS-IC/11-12 1.2 Trainer for school financing level 6,000 IC PRIOR

46 R/A Jeton Kryeziu 5,000

47 P C1.2/CS-IC/11-13 1.2 Trainer for school financing level 6,000 IC PRIOR

48 R/A Jeton Gashi 5,000

49 P C1.2/CS-IC/11-14 1.2 Trainer for school financing level 6,000 IC PRIOR

50 R/A Aferdita Strellci 5,000

51 P C1.2/CS-IC/11-15 1.2 Trainer for school procurement level 6,000 IC PRIOR

52 R/A Fadil Veseli 4,000

53 P C1.2/CS-IC/11-16 1.2 Trainer for school procurement level 6,000 IC PRIOR

54 R/A Mirevete Gerguri 4,000

55 P C1.2/CS-IC/11-17 1.2 Trainer for school procurement level 6,000 IC PRIOR

56 R/A Fatmire M Morina 4,000

57 P C1.2/CS-IC/11-18 1.2 Trainer for school procurement level 6,000 IC PRIOR

58 R/A Vllaznim Reshani 4,000

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 05-Aug-12 13-Aug-12

NA 7 01-Aug-11 14 15-Aug-11 14

NA 20-Sep-11 30-Sep-11

NA 7 01-Aug-11 14 15-Aug-11 14

NA 20-Sep-11 30-Sep-11

NA 7 01-Aug-11 14 15-Aug-11 14

NA 20-Sep-11 30-Sep-11

NA 7 01-Aug-11 14 15-Aug-11 14

NA 20-Sep-11 30-Sep-11

NA 7 01-Aug-11 14 15-Aug-11 14

NA 20-Sep-11 30-Sep-11

NA 7 29-Nov-11 14 13-Dec-11 14

NA 06-Dec-11 07-Dec-11

NA 7 29-Nov-11 14 13-Dec-11 14

NA 06-Dec-11 07-Dec-11

NA 7 29-Nov-11 14 13-Dec-11 14

NA 06-Dec-11 07-Dec-11

NA 7 29-Nov-11 14 13-Dec-11 14

NA 06-Dec-11 07-Dec-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 95 of 255 10/17/2012 1:05 AM

Page 96: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

59 P C1.2/CS-IC/11-19 1.2 Trainer for school procurement level 6,000 IC PRIOR

60 R/A Defrim Kuqi 4,000

61 P C1.2/CS-IC-12-01 1.2Education finance officer for operating

at Help Desk6,300 IC PRIOR

62 R/A Bersant R. Grabanice 1,200

63 PNo Number

1.3 Consultant - Manager of the SDGs 46,500 IC PRIOR

64 R/A Xhafer Ahmeti 15,600

65 P C1.3/CS-IC/09-02 1.3 Consultant - Manager of the SDGs - IC PRIOR

66 R/A Besim Kokollari 14,400

67 R/A Besim Kokollari 1.3Amendment #1 modification of original

contract- 12,818

68 R/A Besim Kokollari 1.3Amendment #2 modification of original

contract10,800

69 P C1.3/CS-IC/09-02 1.3 Consultant - SDG and MDG manuals - SSS PRIOR

70 R/A Remzi Salihu 7,800

71 P C1.3/CS-QCBS/09-03 1.3Firm/NGO - school development grants

implem.463,600 QCBS PRIOR

72 R/A KEC, KOSOVO 266,935

73 R/A KEC, KOSOVO 1,3Amendment #1 modification of original

contract48,400

74 R/A KEC, KOSOVO 1.3Amendment # 2 modification of original

contract11,840

75

76

77

78 PC2.1/CS-IC/09-01

2.1Consultant - teacher's devel. and

licencing19,900 IC PRIOR

CONSULTANTS

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 7 29-Nov-11 14 13-Dec-11 14

NA 06-Dec-11 07-Dec-11

NA 7 31-Aug-12 14 14-Sep-12 14

NA 16-Jul-12 16-Jul-12

NA 7 12-Jun-09 14 15-Jun-09 14

NA 25-May-09 25-May-09

NA 7 01-Mar-10 14 15-Mar-10 14

NA 21-Apr-10 14 05-May-10 1

NA 21-Apr-11 27-Apr-11

NA 13-Mar-12 14-Mar-12

NA 7 15-Jul-09 14 29-Jul-09 14

NA 12-Jul-09 12-Jul-09

15-Dec-09 7 22-Dec-09 14 05-Jan-10 14

14-Apr-10 26-May-10 10-Jun-10

NA 16-Jan-12 17-Jan-12

NA 25-Jun-12 28-Jun-12

NA 7 20-Jul-08 14 03-Aug-08 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 96 of 255 10/17/2012 1:05 AM

Page 97: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

79 R/A Blerim Saqipi 11,960

80 R/A Blerim Saqipi 2.1Amendment #1 modification of original

contract14,950

81 R/A Blerim Saqipi 2.1Amendment #2 modification of original

contract20,800

82 R/A Blerim Saqipi 2.1Amendment #3 modification of original

contract13,407

83 R/A Blerim Saqipi 2.1Amendment #4 modification of original

contract2,616

84 R/A Blerim Saqipi 2.1Amendment # 5 modification of original

contract7,800

85 PC2.1/CS-IC/09-02

2.1Consultant - teachers' professional

devel.62,700 IC PRIOR

86 R/A Pilar Romaguez 52,300

87 PC2.1/CS-IC/09-03

2.1Consultant - teachers' career/advance.

syst.IC PRIOR

88 R/A Pasi Ikonen 24,976

89 R/A Pasi Ikonen 2.1Amendment #1 extending completion

date

90 PC2.1/CS-IC/09-04

2.1Consultant - teachers' performance

evaluation60,600 IC PRIOR

91 R/A Jorge Manzi 32,733

92 R/A Jorge ManziAmendment #1 extending completion

date

93 R/A Jorge ManziAmendment #2 extending completion

date

94 P C2.1/CS-IC/10-05 2.1Consultant - teachers' performance

evaluation112,900 82,100 IC PRIOR

95 R/A Nicole Saginor 2.1 48,400

98 R/A Nicole Saginor 2.1 43,950

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 20-Jul-08 20-Jul-08

NA 05-Jul-09 05-Jul-09

NA 23-May-10 23-May-10

NA 21-Nov-10 22-Nov-10

NA 27-May-11 27-May-11

NA 20-Jun-12 20-Jun-12

NA 7 21-Apr-08 14 05-May-08 14

NA 10-Jun-08 10-Jun-08

NA 7 23-May-09 14 08-Jun-09 14

NA 10-Jun-09 24-Jun-09

NA 29-Nov-09 29-Nov-09

NA 7 01-Jun-09 14 10-Jun-09 14

NA 09-Jul-09 12-Jul-09

23-Nov-09 24-Nov-09

25-May-10 25-May-10

NA 120 09-Apr-11 20 29-Apr-11 14

NA 20-Apr-11 13-May-11

NA 12-Mar-12 12-Mar-12

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 97 of 255 10/17/2012 1:05 AM

Page 98: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

99 P C2.1/CS-IC/11-07 - Prishtina region 2.1

Consultant for database population and

logistical support on performance

evaluation

- 6,400 IC PRIOR

100 R/A Edmond Krasniqi 6,000

101 R/A Edmond KrasniqiAmendment #1 extending completion

date

102 R/A Edmond KrasniqiAmendment # 2 modification of original

contract1,875

103 P C2.1/CS-IC/11-08 - Prizren region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

104 R/A Kreshnik Shatri 6,000

105 R/A Kreshnik ShatriAmendment #1 extending completion

date

106 R/A Kreshnik ShatriAmendment # 2 modification of original

contract1,875

107 P C2.1/CS-IC/11-09 - Peja region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

108 R/A Mentor Vokshi 6,000

109 R/A Mentor VokshiAmendment #1 extending completion

date

110 R/A Mentor VokshiAmendment # 2 modification of original

contract1,875

111 P C2.1/CS-IC/11-10 - Gjakova region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

112 R/A Armend Bajrami 6,000

113 R/A Armend BajramiAmendment #1 extending completion

date

114 R/A Armend BajramiAmendment # 2 modification of original

contract1,500

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 7 01-Aug-11 21 22-Aug-11 14

NA 26-Aug-11 07-Sep-11

NA 19-Apr-12 20-Apr-12

NA 23-Jul-12 24-Jul-12

NA 7 01-Aug-11 21 22-Aug-11 14

NA 26-Aug-11 08-Sep-11

NA 19-Apr-12 20-Apr-12

NA 23-Jul-12 24-Jul-12

NA 7 01-Aug-11 21 22-Aug-11 14

NA 26-Aug-11 08-Sep-11

NA 19-Apr-12 20-Apr-12

NA 23-Jul-12 25-Jul-12

NA 7 01-Aug-11 21 22-Aug-11 14

NA 26-Aug-11 08-Sep-11

NA 19-Apr-12 20-Apr-12

NA 23-Jul-12 24-Jul-12

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 98 of 255 10/17/2012 1:05 AM

Page 99: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

115 P C2.1/CS-IC/11-11 - Ferizaj region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

116 R/A Donika Rexhepi 6,000

117 R/A Donika RexhepiAmendment #1 extending completion

date

118 R/A Donika RexhepiAmendment # 2 modification of original

contract1,500

119 P C2.1/CS-IC/11-12 - Mitrovica region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

120 R/A Zahir Ibishi 6,000

121 R/A Zahir IbishiAmendment #1 extending completion

date

122 R/A Zahir IbishiAmendment # 2 modification of original

contract1,500

123 P C2.1/CS-IC/11-13 - Gjilan region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

124 R/A Agim Ramadani 6,000

125 R/A Agim RamadaniAmendment #1 extending completion

date

126 R/A Agim RamadaniAmendment # 2 modification of original

contract1,875

127 P C2.1/CS-IC/11-14 2.1Consultant on Teacher Development

Policies Study- 50,000 IC PRIOR

128 P David Lynn 47,830

129 R/A David Lynn

130 p C2.1/CS-IC/11-15 2.1Consultant for the Managing the

database process8,000 IC PRIOR

131 R/A Mirlind Bruqi 8,000

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 7 01-Aug-11 21 22-Aug-11 14

NA 26-Aug-11 07-Sep-11

NA 19-Apr-12 20-Apr-12

NA 23-Jul-12 24-Jul-12

NA 7 12-Aug-11 21 02-Sep-11 14

NA 26-Aug-11 08-Sep-11

NA 19-Apr-12 20-Apr-12

NA 23-Jul-12 24-Jul-12

NA 7 01-Aug-11 21 22-Aug-11 14

NA 26-Aug-11 07-Sep-11

NA 19-Apr-12 20-Apr-12

NA 23-Jul-12 23-Jul-12

NA 2 05-Jul-11 5 10-Jul-11 3

NA 22-Aug-11 23-Sep-11

NA 16-Mar-12 16-Mar-12

NA 7 05-Aug-11 21 26-Aug-11 14

NA 26-Aug-11 10-Sep-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 99 of 255 10/17/2012 1:05 AM

Page 100: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

132 R/A Mirlind BruqiAmendment #1 extending completion

date

133 PC2.2/CS-SSS/10-02

2.2Consultant - curriculum unit and CACTI

capacity- SSS PRIOR

134 R/A Camerron Harisson 45,243 33,480

135 PC2.2/CS-IC/09-01

2.2Consultant - curriculum unit and CACTI

capacityIC PRIOR

136 R/A Camerron Harisson 56,000

137 PC2.3/CS-IC/09-01

2.3Consultant - assessment Unit and

MEST experts186,100 140,406 IC PRIOR

138 R/A Kelvin Gregory 75,600

139 PC2.3/CS-IC/09-03

2.3Consultant - test administration study

(intern.)46,960 IC PRIOR

140 R/A Steven Bakker 51,800

141 P C2.3/CS-IC/11-04 2.3 Consultant - Matura reform 50,000 IC PRIOR

142 R/A Steven Bakker 53,150

143 P C2.3/CS-SSS/12-01 2.3Supporting the Assessment Reform in

Kosovo29,000 SSS PRIOR

144 R/A Steven Bakker 28,800

145 P C2.3/CS-IC-11-05 2.3IC on Capacity Building for External

Assessment in Kosovo50,000 IC PRIOR

146 R/A Kelvin Gregory 43,650

147 R/A Kelvin GregoryAmendment #1 extending completion

date

148 P C2.3/CS-IC-11-06 2.3Consultant Mother Tongue and Modern

Foreign Language Exams21,000 IC PRIOR

149 R/A Ivane Mindadze 10,150

150 P C2.3/CS-IC-11-07 2.3

Consultant for Supporting the Item

Bank Development in Kosovo External

Assessment

24,000 IC PRIOR

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 19-Apr-12 20-Apr-12

NA 24-Jun-10 1 24-Jun-10 8

NA 24-Jun-10 1 24-Jun-10 8

15-Apr-09 7 20-Apr-09 14 04-May-09 14

NA 01-May-09 05-May-09

NA 7 21-May-09 14 04-Jun-09 14

NA 04-May-09 05-May-09

NA 7 13-Jan-10 14 27-Jan-10 14

NA 12-Apr-10 13-Apr-10 14

NA 7 18-Jul-11 14 01-Aug-11 14

NA 17-Aug-11 18-Aug-11

16-Jul-12 7 23-Jul-12 14 06-Aug-12 14

NA 13-Jun-12 18-Jun-12

NA 7 18-Jul-11 14 01-Aug-11 14

NA 14-Nov-11 02-Feb-12

NA 15-May-12 16-May-12

NA 7 09-Dec-11 14 23-Dec-11 14

NA 07-Nov-11 11-Nov-11

NA 7 09-Dec-11 14 23-Dec-11 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 100 of 255 10/17/2012 1:05 AM

Page 101: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

151 R/A David Tchankotadze 12,520

152 PC2.4/CS-IC/09-03

2.4Consultant - EMIS TOR and Training

Needs Assitance.31,000 IC PRIOR

153 R/A Mircea Enache 23,560

154 R/A Mircea Enache 2.4Amendment #1 extending completion

date

155 PC2.4/CS-IC/09-04

2.4 IT officer to support EMIS Department 35,676 IC PRIOR

156 R/A Bersant Krasniqi 6,000

157 R/A Bersant KrasniqiAmendment #1 modification of original

contract

158 R/A Bersant KrasniqiAmendment #2 extending completion

date13,013

159 R/A Bersant KrasniqiAmendment # 3 extending completion

date8,400

160 P C2.4/CS-IC/10-05 2.4Consultant to support the upgrade of

EMIS31,980 SSS PRIOR

161 R/A Mircea Enache 31,980

162 R/A Mircea EnacheAmendment #1 modification of original

contract10,000

163 PC2.5/CS-SSS/09-01

2.5 National firm to draft project action plan 20,300 SSS PRIOR

164 R/A Kosova Education Center KEC 12,780

165 PNo Number

2.5 Project coordinator 71,300 IC PRIOR

166 R/A Xhafer Ahmeti 15,600

167 R/A Xhafer Ahmeti 2.5Amendment #1 modification of original

contract885

168 R/A Xhafer Ahmeti 2.5Amendment #2 modification of original

contract1,300

169 PC2.5/CS-IC/09-02

2.5 Project coordinator - IC PRIOR

170 R/A Edita Alo 26,400

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 11-Nov-11 17-Nov-11

NA 7 08-Jan-10 14 22-Jan-10 14

NA 08-Dec-09 08-Dec-09

NA 14-Jun-10 15-Jun-10

NA 7 10-Dec-09 14 12-Dec-09 14

NA 08-Dec-09 11-Dec-09

NA 21-Jul-10 22-Jul-10

NA 06-Dec-10 07-Dec-10

NA 15-Jun-12 18-Jun-12

NA 7 09-Sep-10 14 23-Sep-10 14

NA 29-Aug-10 30-Aug-10

NA 7 15-Jul-08 14 29-Jul-08 14

NA

NA 7 14 14

NA

NA

NA

NA 7 13-Apr-09 14 27-Apr-09 14

NA 25-Apr-09 25-Apr-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 101 of 255 10/17/2012 1:05 AM

Page 102: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

171 R/A Edita Alo 2.5Amendment #1 modification of original

contract56,393

172 R/A Edita Alo 2.5Amendment # 2 modification of original

contract

173 R/A Edita Alo 2.5Amendment #3 modification of original

contract13,200

174 PC2.5/CS-IC/09-03

2.5 Financial manager 61,100 IC PRIOR

175 R/A Gazmend Bajra 27,600

176 R/A Gazmend Bajra 2.5Amendment #1 modification of original

contract2,070

177 R/A Gazmend Bajra 2.5Amendment #2 modification of original

contract27,111

178 R/A Gazmend Bajra 2.5Amendment #3 modification of original

contract793

179 P C2.5/CS-IC/12-02 2.5 Financial manager 9,000 IC PRIOR

180 R/A Mirjeta Hysa 7,200

181 PNo number

2.5 Procurement Officer 49,000 IC PRIOR

182 R/A Vlora Kuqi 13,800

183 PC2.5/CS-IC/09-04

2.5 Procurement Officer - IC PRIOR

184 R/A Luan Asllani 2.5 10,800

185 R/A Luan Asllani 2.5Amendment #1 modification of original

contract

186 R/A Luan Asllani 2.5Amendment #2 modification of original

contract5,400

187 R/A Luan Asllani 2.5Amendment #3 modification of original

contract- 11,550

188 R/A Luan Asllani 2.5Amendment #4 modification of original

contract6,300

189 PC2.5/CS-IC/09-05

2.5 Administrative assistant 40,800 IC PRIOR

190 R/A Altin Ademi 6,000

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 09-May-10 10-May-10

NA NA 22-Jul-10

NA 15-Jun-12 18-Jun-12

NA 7 23-Oct-08 14 06-Nov-08 14

NA

NA 02-Oct-09 02-Oct-09

NA 05-Oct-10 06-Oct-10

NA 15-Jun-12 19-Jun-12

NA 7 08-Aug-12 14 22-Aug-12 14

NA 15-May-12 15-May-12

NA 7 03-Sep-08 14 17-Sep-08 14

NA

NA 7 06-Dec-09 14 20-Dec-09 14

NA 22-Jan-10 22-Jan-10

NA 14-Jul-10 14-Jul-10

NA 20-Jan-11 20-Jan-11

NA 15-Jul-11 20-Jul-11

NA 15-Jun-12 15-Jun-12

NA 7 06-Jun-09 14 20-Jun-09 14

NA 12-Jul-09 12-Jul-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 102 of 255 10/17/2012 1:05 AM

Page 103: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

191 R/A Altin Ademi 2.5Amendment #1 modification of original

contract1,000

192 R/A Altin Ademi 2.5Amendment #2 modification of original

contract16,450

193 R/A Altin Ademi 2.5Amendment #3 modification of original

contract4,200

194 PNo Number

2.5 Consultant - implementation adviser 55,700 IC PRIOR

195 R/A Vas Demetriou 54,194

196 R/A Vas Demetriou 2.5Amendment #1 extending completion

date

197 R/A Vas Demetriou 2.5Amendment #2 extending completion

date

198 P C2.5/CS-LCS/09-08 2.5 Firm - project accounts audit (external) 64,600 LSC PRIOR

199 R/A ERNST & YOUNG 2.5 1,000

200 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

201 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

202 P C2.5/CS-LCS/11-10 2.5 Firm - project accounts audit (external) - 25,600 LSC PRIOR

203 R/A Ficadex Albania LTD Audit for period Jan.- Dec.2011 1,688

204 p C2.5/CS-SSS/12-01 2.5 Short Term Procurement Specialist 3,500 SSS PRIOR

205 R/A Aleksandar Najdovski 3,450

206 R/A Aleksandar NajdovskiAmendment #1 extending completion

date

207

208

209

210 PC2.5/CS-IC/09-07

3Consultant - implementation adviserfor

component 3- PRIOR

211 R/A Vas Demetriou 45,120 SSS

3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

CONSULTANTS

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 21-Feb-10 22-Feb-10

NA 15-Jul-10 15-Jul-10

NA 15-Jun-12 18-Jun-12

NA 7 20-Jul-08 14 03-Aug-08 14

NA 30-Jul-08 30-Jul-08

NA 17-Feb-09 17-Feb-09

NA 07-Sep-09 07-Sep-09

NA 7 20-Mar-11 14 03-Apr-11 21

NA NA NA

NA 22-Apr-12 1 23-Apr-12 14

NA 26-Apr-12 1 26-Apr-12

NA 15-May-12 15-May-12

NA NA 14 18-Dec-09 14

NA 12-Oct-09 13-Oct-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 103 of 255 10/17/2012 1:05 AM

Page 104: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

212 R/A Vas Demetriou 3Amendment #1 extending completion

date

213 P C3.1/CS-SSS/11-01 3.1Implementation adviser for component

327,540 SSS PRIOR

214 R/A Vas Demetriou 37,840

215 R/A Vas DemetriouAmendment #1 extending completion

date

216 PC3.1/CS-CQS/09-01

3.1Firm - school mapping and investment

planning166,700 CQS PRIOR

217 R/A TELOS 136,400

218 R/A TELOS 3.1Amendment #1 extending completion

date

219 R/A TELOS 3.1Amendment #2 extending completion

date

220 PC3.1/CS-CQS/09-02

3.1 Firm - inventory taking for 1100 schools 287,400 CQS PRIOR

221 R/A CMC 202,280

222 R/A CMC 3.1Amendment #1 extending completion

date

223 R/A CMC 3.1Amendment # 2 extending completion

date

224 PC3.1/CS-IC/09-04

3.1Consultant - Manager for 3.1 activities

(national)41,200 IC PRIOR

225 R/A Merita Behluli 16,200

226 R/A Merita Behluli 3.1Amendment #1 modification of original

contract1,300

227 P C3.1/CS-SSS/10-05 3.1 Consultant for Priority 3 Activities 16,500 SSS PRIOR

228 R/A Merita Behluli 16,500

229 R/A Merita Behluli 3.1Amendment #1 modification of original

contract13,970

230 R/A Merita Behluli 3.1Amendment #1 modification of original

contract7,150

231 PC3.2/CS-CQS/09-01

3.2Firm - school standards and norms &

manual167,500 CQS PRIOR

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 16-Dec-10 17-Dec-10

NA 7 05-Oct-11 14 19-Oct-11 14

NA 18-Aug-11 18-Aug-11

NA 14-Jun-12 14-Jun-12

NA 7 22-Feb-09 21 15-Mar-09 14

13-May-09 15-May-09 20-May-09

NA 26-Aug-09 27-Aug-09

NA 04-Nov-09 05-Nov-09

NA 7 24-Sep-09 21 15-Oct-09 14

18-Nov-09 18-Nov-09

NA 17-Jul-10 17-Jul-10

NA 14-Sep-10 14-Sep-10

NA 7 01-Jun-09 14 15-Jun-09 14

NA 02-Jul-09 04-Jul-09

NA 21-Feb-10 22-Feb-10

NA 7 22-Jul-10 14 05-Aug-10 14

NA 22-Jul-10 22-Jul-10

NA 23-Jul-11 28-Jul-11

NA 07-Jun-12 27-Jun-12

NA 7 22-Feb-09 21 15-Mar-09 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 104 of 255 10/17/2012 1:05 AM

Page 105: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

232 R/A EME 100,538

233 PC3.2/CS-SSS/10-02

3.2 School standards and norms & manual 40,000 SSS PRIOR

234 R/A Daniel Dupety 3.2 38,760

235 R/A Daniel Dupety 3.2Amendment #1 extending completion

date

236 P C3.3/CS-QCBS/09-01 3.3Firm - design and supervision of model

schools572,400 450,000 QCBS PRIOR

237 R/A Urban plus 178,921

238 R/A Urban plus 3.3Amendment #1 extending completion

date

239

240

241 PC4.1/CS-IC/09-01

4.1Consultant - higher education legisl. &

sustain.69,800 IC PRIOR

242 R/A Steve Bristow 54,500

243 PNo Number

4.1Consultant - local counterpart of intern.

Cons.6,768 IC PRIOR

244 R/A Jehona Lushaku 4,800

245 PC4.1/CS-IC/09-02

4.1Consultant - local counterpart of intern.

Cons.14,100 SSS PRIOR

246 R/A Blerim Saqipi 2,600

247 PC4.1/CS-IC/09-04

4.1 Consultant - evaluation of EPIP II - IC PRIOR

248 R/A Tom Guegon 13,026

249 PC4.1/CS-IC/09-05

4.1Consultant - SMD Grants (EPIP II)

procurement62,780 IC PRIOR

250 R/A Alexandar Najdovski

251 R/A Alexandar Najdovski 4.1Amendment #1 modification of original

contract20,550

CONSULTANTS

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

02-Jul-09 18-Jul-09

NA 7 05-Jun-10 21 26-Jun-10 14

NA 08-Jun-10 10-Jun-10

NA 12-Dec-10 12-Dec-10

20-Feb-11 7 27-Feb-11 14 13-Mar-11 14

20-Dec-10 28-Mar-11 29-Mar-11

NA 13-Mar-12 13-Mar-12

NA 7 23-Mar-09 14 06-Apr-09 14

NA 20-Apr-09 28-Apr-09

NA 7 30-May-09 14 13-Jun-09 14

NA 22-Jun-09 03-Jul-09

NA 7 28-Feb-10 14 14-Mar-10 14

NA 15-Jan-10 16-Jan-10

NA 7 03-Oct-09 14 17-Oct-09 14

NA 03-Oct-09 05-Oct-09

NA 7 03-Oct-09 14 17-Oct-09 14

NA 11-Sep-09 13-Sep-09

NA 14-Oct-09 15-Oct-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 105 of 255 10/17/2012 1:05 AM

Page 106: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

252 R/A Alexandar Najdovski 4.1Amendment #2 modification of original

contract30,900

253 PC4.1/CS-IC/11-05

4.1

Consultant for the implementation of

higher education legislation

(international)

30,000 IC PRIOR

254 R/A Stephen l. Bristow 22,940

255 R/A Stephen l. BristowAmendment #1 extending completion

date

256 PC4.2/CS-IC/09-02

4.2Consultant - higher educ. financial

sustainability69,800 IC PRIOR

257 R/A Sigurd Hoellinger 4.2 66,725

258 R/A Sigurd Hoellinger 4.2Amendment #1 extending completion

date

259 R/A Sigurd Hoellinger 4.2Amendment #2 extending completion

date

260 R/A Sigurd Hoellinger 4.2Amendment #3 extending completion

date

261 R/A Sigurd Hoellinger 4.2Amendment #4 extending completion

date

Legend:

Green color under column A (line number) denotes ongoing activities

Orange color denotes activities to start

QCBS = Quality and Cost-based Selection (in accordance with sections 2.1 - 2.28 of the Guidelines)

FBC = Fixed Budget Selection (in accordance with section 3.5 of the Guidelines)

LCS = Least-Cost Selection (in accordance with section 3.6 of the Guidelines)

CQS = Selection Based on consultants' Qualifications (in accordance with section 3.7 of the Guidelines)

IC = Selection of Individual Consultants (in accordance with sections 5.1 - 5.4 of the Guidelines)

SSS = Single Source Selection in accordance with sections 3.09 - 3.13 of the Guidelines

NA = Not Applicable

OTHER = Direct expenditures

Notes:

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

NA 14-Jan-10 15-Jan-10

NA 3 16-Dec-11 5 21-Dec-11 5

NA 27-Jan-12 01-Feb-12

NA 15-May-12 18-May-12

NA 7 03-Jul-09 14 17-Jul-09 14

NA 10-Jun-09 20-Jul-09

NA 18-Jan-10 18-Jan-10

NA 23-Mar-10 23-Mar-10

NA 24-May-10 24-May-10

NA 28-Aug-10 28-Aug-10

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 106 of 255 10/17/2012 1:05 AM

Page 107: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

a/ Interval for preparation/clearance (days); working document PP only

b/ Number of days to execute the contract; working document PP only Fees for participation in PISA. This is not a procurement activity but it is keep in the PP for completeness

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All QCBS contracts, first two CQS contracts, and first two IC contracts irrespective of cost

All contracts with firms estimated to cost US$ 50,000 or more

All contracts with individual consultants (IC) estimated to cost US$ 25,000 or more

All Single source selection contracts

Schedule (dd-Mmm-yy)

Open.

Of

Fin.

Proposals

Int.

/a Invitation

for

Neg. Int.

/a Negot.

/Draft

Contract Int.

/a

13 14 15

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 107 of 255 10/17/2012 1:05 AM

Page 108: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

1

2

3 CONSULTANTS

4 P C1.1/CS-IC/09-01 1.1Consultant - legal framework

development92,600 IC PRIOR

5 R/A Dennis Farrington 72,000

6 R/A Dennis Farrington 1.1Amendment #1 extending completion

date

7 P C1.1/CS-IC/11-02 1.1 New legislation implementation 40,540 30,000 IC PRIOR

8 R/A Dennis Farrington 27,040

9 R/A Dennis FarringtonAmendment #1 modification of original

contract

10 PNo Number

1.2Consultant - financing formula

development107,500 79,550 IC PRIOR

11 R/A Rosalind Levacic 1.2 45,220

12 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract4,500

13 R/A Rosalind Levacic 1.2 Amendment #2 modification of contract 14,379

14 P C1.2/CS-IC/09-01 1.2Consultant - financing formula

development- SSS PRIOR

15 R/A Rosalind Levacic 1.2 35,540

16 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract50,980 PRIOR

17 R/A Rosalind Levacic 1.2Amendment #2 modification of original

contract5,440

18 P C1.2/CS-CQS/09-02 1.2 Firm - Survey evaluation - CQS PRIOR

19 R/A Prism Research 24,674

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

28-May-09 7 04-Jun-09 7 11-Jun-09 202

20-May-09 08-Jun-09 0 08-Jun-09 206

31-Oct-09 1 31-Oct-09 1 31-Oct-09 210

13-Jan-12 7 20-Jan-12 7 27-Jan-12 150

26-Jan-12 26-Jan-12 26-Jan-12

24-May-12 25-May-12 25-May-12

23-May-08 7 30-May-08 7 06-Jun-08 120

22-Jul-08 25-Jul-08 25-Jul-08 442

21-Oct-08 21-Oct-08 9

13-Mar-09 13-Mar-09 13-Mar-09 63

19-May-08 7 26-May-08 7 02-Jun-08

29-Oct-10 12-Nov-09 12-Nov-09 279

18-Aug-10 18-Aug-10 18-Aug-10

28-Mar-12 28-Mar-12 28-Mar-12

04-Sep-09 14 18-Sep-09 7 25-Sep-09 90

31-Aug-09 02-Sep-09 02-Sep-09 179

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 108 of 255 10/17/2012 1:05 AM

Page 109: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

20 R/A Prism Research 1.2Amendment #1 extending completion

date

21 R/A Prism Research 1.2Amendment #2 extending completion

date

22 P C1.2/CS-IC/09-03 1.2 Consultant - system data entry 6,800 IC PRIOR

23 R/A Besnik Limaj 6,400

24 P C1.2/CS-IC/09-05 1.2 Consultant - finance help desk-1 - IC PRIOR

25 R/A Pakize Isufaj 10,800

26 P C1.2/CS-IC/09-06 1.2 Consultant - finance help desk-2 - IC PRIOR

27 R/A Hysni Maxharraj 10,800

28 P C1.2/CS-IC/09-07 1.2 Consultant - training materials analyst - IC PRIOR

29 R/A Edi Bunjaku 1,300

30 P C1.2/CS-IC/10-08 1.2 Consultant - Head of help desk - IC PRIOR

31 R/A Pakize Isufaj 13,200

32 R/A Pakize Isufaj 1.2Amendment #1 modification of original

contract

33 R/A Pakize Isufaj 1.2Amendment #2 modification of original

contract13,200

34 R/A Pakize Isufaj 1.2Amendment #3 modification of original

contract10,350

35 P C1.2/CS-IC/10-09 1.2 Consultant - education finance 2 - IC PRIOR

36 R/A Vjolca Sellimi 1.2 10,800

37 R/A Vjolca Sellimi 1.2Amendment #1 modification of original

contract

38 R/A Vjolca Sellimi 1.2Amendment #2 modification of original

contract10,800

39 R/A Vjolca Sellimi 1.2Amendment #3 modification of original

contract8,469

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

15-Feb-10 12-Feb-10 12-Feb-10 47

15-Feb-10 31-Mar-10 31-Mar-10 30

18-Feb-10 7 25-Feb-10 7 04-Mar-10 90

27-Feb-09 01-Mar-09 01-Mar-09 152

06-Sep-09 7 08-Sep-09 7 10-Sep-09 365

17-Sep-09 22-Sep-09 22-Sep-09 365

06-Oct-09 7 13-Oct-09 7 20-Oct-09 365

17-Sep-09 22-Sep-09 22-Sep-09

13-Dec-09 7 20-Dec-09 7 27-Dec-09 365

17-Nov-09 20-Nov-09 20-Nov-09 31

13-May-10 7 20-May-10 7 27-May-10

18-Mar-10 22-Mar-10 22-Mar-10 132

31-Jul-10 01-Aug-10 01-Aug-10 233

25-Mar-11 22-Mar-11 22-Mar-11

15-Mar-12 22-Mar-12 22-Mar-12

26-Apr-09 7 03-May-09 7 10-May-09

18-Mar-10 4 22-Mar-10 0 22-Mar-10 142

31-Jul-10 11-Aug-10 11-Aug-10 226

25-Mar-11 25-Mar-11 25-Mar-11

15-Mar-12 22-Mar-12 22-Mar-12

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 109 of 255 10/17/2012 1:05 AM

Page 110: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

40 R/A Vjolca Sellimi 1.2Amendment # 4 modification of original

contract

41 P C1.2/CS-IC/11-10 1.2 Trainer for school financing level 6,000 IC PRIOR

42 R/A Mehmet Simnica 5,000

43 P C1.2/CS-IC/11-11 1.2 Trainer for school financing level 6,000 IC PRIOR

44 R/A Mevlide Shamolli 5,000

45 P C1.2/CS-IC/11-12 1.2 Trainer for school financing level 6,000 IC PRIOR

46 R/A Jeton Kryeziu 5,000

47 P C1.2/CS-IC/11-13 1.2 Trainer for school financing level 6,000 IC PRIOR

48 R/A Jeton Gashi 5,000

49 P C1.2/CS-IC/11-14 1.2 Trainer for school financing level 6,000 IC PRIOR

50 R/A Aferdita Strellci 5,000

51 P C1.2/CS-IC/11-15 1.2 Trainer for school procurement level 6,000 IC PRIOR

52 R/A Fadil Veseli 4,000

53 P C1.2/CS-IC/11-16 1.2 Trainer for school procurement level 6,000 IC PRIOR

54 R/A Mirevete Gerguri 4,000

55 P C1.2/CS-IC/11-17 1.2 Trainer for school procurement level 6,000 IC PRIOR

56 R/A Fatmire M Morina 4,000

57 P C1.2/CS-IC/11-18 1.2 Trainer for school procurement level 6,000 IC PRIOR

58 R/A Vllaznim Reshani 4,000

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

29-Aug-11 7 05-Sep-11 7 12-Oct-11 171

11-Oct-11 12-Oct-11 12-Oct-11

29-Aug-11 7 05-Sep-11 7 12-Oct-11 171

11-Oct-11 12-Oct-11 12-Oct-11

29-Aug-11 7 05-Sep-11 7 12-Oct-11 171

11-Oct-11 12-Oct-11 12-Oct-11

29-Aug-11 7 05-Sep-11 7 12-Oct-11 171

11-Oct-11 12-Oct-11 12-Oct-11

29-Aug-11 7 05-Sep-11 7 12-Oct-11 171

11-Oct-11 12-Oct-11 12-Oct-11

27-Dec-11 7 03-Jan-12 7 10-Jan-12 123

12-Dec-11 12-Dec-11 12-Dec-11

27-Dec-11 7 03-Jan-12 7 10-Jan-12 123

12-Dec-11 12-Dec-11 12-Dec-11

27-Dec-11 7 03-Jan-12 7 10-Jan-12 123

12-Dec-11 12-Dec-11 12-Dec-11

27-Dec-11 7 03-Jan-12 7 10-Jan-12 123

12-Dec-11 12-Dec-11 12-Dec-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 110 of 255 10/17/2012 1:05 AM

Page 111: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

59 P C1.2/CS-IC/11-19 1.2 Trainer for school procurement level 6,000 IC PRIOR

60 R/A Defrim Kuqi 4,000

61 P C1.2/CS-IC-12-01 1.2Education finance officer for operating

at Help Desk6,300 IC PRIOR

62 R/A Bersant R. Grabanice 1,200

63 PNo Number

1.3 Consultant - Manager of the SDGs 46,500 IC PRIOR

64 R/A Xhafer Ahmeti 15,600

65 P C1.3/CS-IC/09-02 1.3 Consultant - Manager of the SDGs - IC PRIOR

66 R/A Besim Kokollari 14,400

67 R/A Besim Kokollari 1.3Amendment #1 modification of original

contract- 12,818

68 R/A Besim Kokollari 1.3Amendment #2 modification of original

contract10,800

69 P C1.3/CS-IC/09-02 1.3 Consultant - SDG and MDG manuals - SSS PRIOR

70 R/A Remzi Salihu 7,800

71 P C1.3/CS-QCBS/09-03 1.3Firm/NGO - school development grants

implem.463,600 QCBS PRIOR

72 R/A KEC, KOSOVO 266,935

73 R/A KEC, KOSOVO 1,3Amendment #1 modification of original

contract48,400

74 R/A KEC, KOSOVO 1.3Amendment # 2 modification of original

contract11,840

75

76

77

78 PC2.1/CS-IC/09-01

2.1Consultant - teacher's devel. and

licencing19,900 IC PRIOR

CONSULTANTS

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

27-Dec-11 7 03-Jan-12 7 10-Jan-12 123

12-Dec-11 12-Dec-11 12-Dec-11

28-Sep-12 7 05-Oct-12 7 12-Oct-12

17-Jul-12 17-Jul-12 17-Jul-12

20-Jun-09 7 23-Jun-09 7 25-Jun-09

27-May-09 28-May-09 01-May-09 244

29-Mar-10 7 05-Apr-10 7 11-May-11

06-May-10 4 11--May-10 11-May-10 365

05-May-11 05-May-11 6 11-May-11

16-Mar-12 22-Mar-12 22-Mar-12

12-Aug-09 7 19-Aug-09 7 26-Aug-09 365

14-Jul-09 15-Jul-09 15-Jul-09 138

19-Jan-10 7 26-Jan-10 7 21-Jun-10 731

11-Jun-10 14-Jun-10 7 21-Jun-10

30-Jan-12 21-Jan-12 21-Jan-12

29-Jun-12 29-Jun-12 01-Jul-12

17-Aug-08 7 24-Aug-08 7 26-May-10

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 111 of 255 10/17/2012 1:05 AM

Page 112: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

79 R/A Blerim Saqipi 11,960

80 R/A Blerim Saqipi 2.1Amendment #1 modification of original

contract14,950

81 R/A Blerim Saqipi 2.1Amendment #2 modification of original

contract20,800

82 R/A Blerim Saqipi 2.1Amendment #3 modification of original

contract13,407

83 R/A Blerim Saqipi 2.1Amendment #4 modification of original

contract2,616

84 R/A Blerim Saqipi 2.1Amendment # 5 modification of original

contract7,800

85 PC2.1/CS-IC/09-02

2.1Consultant - teachers' professional

devel.62,700 IC PRIOR

86 R/A Pilar Romaguez 52,300

87 PC2.1/CS-IC/09-03

2.1Consultant - teachers' career/advance.

syst.IC PRIOR

88 R/A Pasi Ikonen 24,976

89 R/A Pasi Ikonen 2.1Amendment #1 extending completion

date

90 PC2.1/CS-IC/09-04

2.1Consultant - teachers' performance

evaluation60,600 IC PRIOR

91 R/A Jorge Manzi 32,733

92 R/A Jorge ManziAmendment #1 extending completion

date

93 R/A Jorge ManziAmendment #2 extending completion

date

94 P C2.1/CS-IC/10-05 2.1Consultant - teachers' performance

evaluation112,900 82,100 IC PRIOR

95 R/A Nicole Saginor 2.1 48,400

98 R/A Nicole Saginor 2.1 43,950

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

22-Jul-08 01-Aug-08 01-Aug-08 341

01-Jul-09 08-Jul-09 15-Jun-09 115

25-May-10 26-May-10 26-May-10

08-Dec-10 10-Dec-10 15-Dec-10 168

30-May-11 01-Jun-11 01-Jun-11 60

22-Jun-12 25-Jun-12 01-Jul-12

19-May-08 7 26-May-08 7 02-Jun-08 90

12-Jun-08 12-Jun-08 12-Jun-08 141

23-Jun-09 7 30-Jun-09 7 06-Jul-09 30

26-Jun-09 4 30-Jun-09 0 30-Jun-09 138

30-Nov-09 15-Nov-09 0 15-Nov-09 77

20-Jun-09 7 21-Jul-09 7 28-Jul-09 30

19-Jul-09 2 21-Jul-09 20-Jul-09 133

25-Nov-09 1 26-Nov-09 4 30-Nov-09 182

26-May-10 0 26-May-10 0 26-May-10 50

13-May-11 14 27-May-11 7 15-Jun-11 290

23-May-11 24-May-11 15-Jun-11

29-Mar-12 30-Mar-12 30-Mar-12

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 112 of 255 10/17/2012 1:05 AM

Page 113: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

99 P C2.1/CS-IC/11-07 - Prishtina region 2.1

Consultant for database population and

logistical support on performance

evaluation

- 6,400 IC PRIOR

100 R/A Edmond Krasniqi 6,000

101 R/A Edmond KrasniqiAmendment #1 extending completion

date

102 R/A Edmond KrasniqiAmendment # 2 modification of original

contract1,875

103 P C2.1/CS-IC/11-08 - Prizren region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

104 R/A Kreshnik Shatri 6,000

105 R/A Kreshnik ShatriAmendment #1 extending completion

date

106 R/A Kreshnik ShatriAmendment # 2 modification of original

contract1,875

107 P C2.1/CS-IC/11-09 - Peja region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

108 R/A Mentor Vokshi 6,000

109 R/A Mentor VokshiAmendment #1 extending completion

date

110 R/A Mentor VokshiAmendment # 2 modification of original

contract1,875

111 P C2.1/CS-IC/11-10 - Gjakova region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

112 R/A Armend Bajrami 6,000

113 R/A Armend BajramiAmendment #1 extending completion

date

114 R/A Armend BajramiAmendment # 2 modification of original

contract1,500

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

05-Sep-11 14 19-Sep-11 7 15-Sep-11

11-Sep-11 15-Sep-11 15-Sep-11

26-Apr-12 27-Apr-12 27-Apr-12

05-Sep-11 14 19-Sep-11 16-Sep-11

15-Sep-11 16-Sep-11 16-Sep-11

26-Apr-12 27-Apr-12 27-Apr-12

05-Sep-11 14 19-Sep-11 7 16-Sep-11

15-Sep-11 16-Sep-11 16-Sep-11

26-Apr-12 27-Apr-12 27-Apr-12

05-Sep-11 14 19-Sep-11 7 16-Sep-11

15-Sep-11 16-Sep-11 16-Sep-11

26-Apr-12 27-Apr-12 27-Apr-12

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 113 of 255 10/17/2012 1:05 AM

Page 114: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

115 P C2.1/CS-IC/11-11 - Ferizaj region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

116 R/A Donika Rexhepi 6,000

117 R/A Donika RexhepiAmendment #1 extending completion

date

118 R/A Donika RexhepiAmendment # 2 modification of original

contract1,500

119 P C2.1/CS-IC/11-12 - Mitrovica region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

120 R/A Zahir Ibishi 6,000

121 R/A Zahir IbishiAmendment #1 extending completion

date

122 R/A Zahir IbishiAmendment # 2 modification of original

contract1,500

123 P C2.1/CS-IC/11-13 - Gjilan region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

124 R/A Agim Ramadani 6,000

125 R/A Agim RamadaniAmendment #1 extending completion

date

126 R/A Agim RamadaniAmendment # 2 modification of original

contract1,875

127 P C2.1/CS-IC/11-14 2.1Consultant on Teacher Development

Policies Study- 50,000 IC PRIOR

128 P David Lynn 47,830

129 R/A David Lynn

130 p C2.1/CS-IC/11-15 2.1Consultant for the Managing the

database process8,000 IC PRIOR

131 R/A Mirlind Bruqi 8,000

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

05-Sep-11 14 19-Sep-11 7 16-Sep-11

15-Sep-11 16-Sep-11 16-Sep-11

26-Apr-12 27-Apr-12 27-Apr-12

16-Sep-11 14 30-Sep-11 7 16-Sep-11

15-Sep-11 16-Sep-11 16-Sep-11

26-Apr-12 27-Apr-12 27-Apr-12

05-Sep-11 14 19-Sep-11 7 16-Sep-11

15-Sep-11 16-Sep-11 16-Sep-11

26-Apr-12 27-Apr-12 27-Apr-12

13-Jul-11 5 18-Jul-11 10 30-Sep-11 212

26-Sep-11 26-Sep-11 30-Sep-11

16-Mar-12 19-Mar-12 01-Mar-12

09-Sep-11 14 23-Sep-11 7 16-Sep-11

15-Sep-11 16-Sep-11 16-Sep-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 114 of 255 10/17/2012 1:05 AM

Page 115: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

132 R/A Mirlind BruqiAmendment #1 extending completion

date

133 PC2.2/CS-SSS/10-02

2.2Consultant - curriculum unit and CACTI

capacity- SSS PRIOR

134 R/A Camerron Harisson 45,243 33,480

135 PC2.2/CS-IC/09-01

2.2Consultant - curriculum unit and CACTI

capacityIC PRIOR

136 R/A Camerron Harisson 56,000

137 PC2.3/CS-IC/09-01

2.3Consultant - assessment Unit and

MEST experts186,100 140,406 IC PRIOR

138 R/A Kelvin Gregory 75,600

139 PC2.3/CS-IC/09-03

2.3Consultant - test administration study

(intern.)46,960 IC PRIOR

140 R/A Steven Bakker 51,800

141 P C2.3/CS-IC/11-04 2.3 Consultant - Matura reform 50,000 IC PRIOR

142 R/A Steven Bakker 53,150

143 P C2.3/CS-SSS/12-01 2.3Supporting the Assessment Reform in

Kosovo29,000 SSS PRIOR

144 R/A Steven Bakker 28,800

145 P C2.3/CS-IC-11-05 2.3IC on Capacity Building for External

Assessment in Kosovo50,000 IC PRIOR

146 R/A Kelvin Gregory 43,650

147 R/A Kelvin GregoryAmendment #1 extending completion

date

148 P C2.3/CS-IC-11-06 2.3Consultant Mother Tongue and Modern

Foreign Language Exams21,000 IC PRIOR

149 R/A Ivane Mindadze 10,150

150 P C2.3/CS-IC-11-07 2.3

Consultant for Supporting the Item

Bank Development in Kosovo External

Assessment

24,000 IC PRIOR

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

26-Apr-12 27-Apr-12 27-Apr-12

02-Jul-10 3 05-Jul-10 5 10-Jul-10 255

02-Jul-10 3 02-Jul-10 5 02-Jul-10 255

18-May-09 7 25-May-09 7 01-Jun-09 60

13-May-09 16 29-May-09 0 29-May-09 60

18-Jun-09 7 25-Jun-09 7 02-Jul-09 90

08-May-09 29-Jun-09 0 29-Jun-09 124

10-Feb-10 7 17-Feb-10 7 24-Feb-10 365

30-Apr-10 7 05-May-10 0 05-May-10 240

15-Aug-11 7 22-Aug-11 7 01-Sep-11 242

24-Aug-11 26-Aug-11 01-Sep-11

21-Jun-12 7 28-Jun-12 7 05-Jul-12

21-Jun-12 09-Jul-12 09-Jul-12

15-Aug-11 7 22-Aug-11 7 29-Aug-11 306

03-Feb-12 06-Feb-12 06-Feb-12

18-May-12 21-May-12 21-May-12

06-Jan-12 7 13-Jan-12 7 16-Nov-11 136

15-Nov-11 16-Nov-11 16-Nov-11

06-Jan-12 7 13-Jan-12 7 23-Nov-11 159

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 115 of 255 10/17/2012 1:05 AM

Page 116: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

151 R/A David Tchankotadze 12,520

152 PC2.4/CS-IC/09-03

2.4Consultant - EMIS TOR and Training

Needs Assitance.31,000 IC PRIOR

153 R/A Mircea Enache 23,560

154 R/A Mircea Enache 2.4Amendment #1 extending completion

date

155 PC2.4/CS-IC/09-04

2.4 IT officer to support EMIS Department 35,676 IC PRIOR

156 R/A Bersant Krasniqi 6,000

157 R/A Bersant KrasniqiAmendment #1 modification of original

contract

158 R/A Bersant KrasniqiAmendment #2 extending completion

date13,013

159 R/A Bersant KrasniqiAmendment # 3 extending completion

date8,400

160 P C2.4/CS-IC/10-05 2.4Consultant to support the upgrade of

EMIS31,980 SSS PRIOR

161 R/A Mircea Enache 31,980

162 R/A Mircea EnacheAmendment #1 modification of original

contract10,000

163 PC2.5/CS-SSS/09-01

2.5 National firm to draft project action plan 20,300 SSS PRIOR

164 R/A Kosova Education Center KEC 12,780

165 PNo Number

2.5 Project coordinator 71,300 IC PRIOR

166 R/A Xhafer Ahmeti 15,600

167 R/A Xhafer Ahmeti 2.5Amendment #1 modification of original

contract885

168 R/A Xhafer Ahmeti 2.5Amendment #2 modification of original

contract1,300

169 PC2.5/CS-IC/09-02

2.5 Project coordinator - IC PRIOR

170 R/A Edita Alo 26,400

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

22-Nov-11 23-Nov-11 23-Nov-11

05-Feb-10 7 12-Feb-10 7 19-Feb-10 90

11-Dec-09 14-Dec-09 1 15-Dec-09 197

17-Jun-10 8 25-Jun-10 0 25-Jun-10 67

15-Dec-09 7 15-Dec-09 7 15-Dec-09

12-Dec-09 3 15-Dec-09 0 15-Dec-09 237

31-Jul-10 09-Aug-10 0 09-Aug-10 128

14-Dec-10 15-Dec-10 15-Dec-10

26-Jun-12 26-Jun-12 01-Jul-12

07-Oct-10 7 14-Oct-10 7 05-Sep-11 117

03-Sep-10 03-Sep-10 05-Sep-10

12-Aug-08 7 19-Aug-08 7 26-Aug-08 30

20-Jun-08 20-Jun-08 38

7 7

10-Mar-08 0 10-Mar-08 365

11-Mar-09 0 11-Mar-09 20

01-Apr-09 0 01-Apr-09 29

11-May-09 7 18-May-09 7 12-May-10 780

27-Apr-09 12-May-09 1 12-May-09 364

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 116 of 255 10/17/2012 1:05 AM

Page 117: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

171 R/A Edita Alo 2.5Amendment #1 modification of original

contract56,393

172 R/A Edita Alo 2.5Amendment # 2 modification of original

contract

173 R/A Edita Alo 2.5Amendment #3 modification of original

contract13,200

174 PC2.5/CS-IC/09-03

2.5 Financial manager 61,100 IC PRIOR

175 R/A Gazmend Bajra 27,600

176 R/A Gazmend Bajra 2.5Amendment #1 modification of original

contract2,070

177 R/A Gazmend Bajra 2.5Amendment #2 modification of original

contract27,111

178 R/A Gazmend Bajra 2.5Amendment #3 modification of original

contract793

179 P C2.5/CS-IC/12-02 2.5 Financial manager 9,000 IC PRIOR

180 R/A Mirjeta Hysa 7,200

181 PNo number

2.5 Procurement Officer 49,000 IC PRIOR

182 R/A Vlora Kuqi 13,800

183 PC2.5/CS-IC/09-04

2.5 Procurement Officer - IC PRIOR

184 R/A Luan Asllani 2.5 10,800

185 R/A Luan Asllani 2.5Amendment #1 modification of original

contract

186 R/A Luan Asllani 2.5Amendment #2 modification of original

contract5,400

187 R/A Luan Asllani 2.5Amendment #3 modification of original

contract- 11,550

188 R/A Luan Asllani 2.5Amendment #4 modification of original

contract6,300

189 PC2.5/CS-IC/09-05

2.5 Administrative assistant 40,800 IC PRIOR

190 R/A Altin Ademi 6,000

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

12-May-10 0 12-May-10 0 12-May-10 82

22-Jul-10 02-Aug-10 0 02-Aug-10

20-Jun-12 21-Jun-12 01-Jul-12

20-Nov-08 7 27-Nov-08 7 15-Oct-10 624

06-Oct-08 15-Oct-08 365

03-Oct-09 15-Oct-09 15-Oct-09 365

08-Oct-10 14-Oct-10 15-Oct-10

20-Jun-12 21-Jun-12 01-Jun-12

05-Sep-12 7 12-Sep-12 1 19-Jun-12

15-May-12 19-May-12 19-Jun-12

01-Oct-08 7 08-Oct-08 7 15-Oct-08 365

06-Oct-08 15-Oct-08 365

03-Jan-10 7 10-Jan-10 7 01-Aug-11 334

27-Jan-10 03-Feb-10 0 03-Feb-10 365

11-Aug-10 12-Aug-10 12-Aug-10 175

21-Jan-11 01-Feb-11 01-Feb-11 180

03-Aug-11 03-Aug-11 01-Aug-11

20-Jun-12 21-Jun-12 01-Jul-12

04-Jul-09 7 11-Jul-09 7 15-Jul-10 716

14-Jul-09 15-Jul-09 0 15-Jul-09 365

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 117 of 255 10/17/2012 1:05 AM

Page 118: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

191 R/A Altin Ademi 2.5Amendment #1 modification of original

contract1,000

192 R/A Altin Ademi 2.5Amendment #2 modification of original

contract16,450

193 R/A Altin Ademi 2.5Amendment #3 modification of original

contract4,200

194 PNo Number

2.5 Consultant - implementation adviser 55,700 IC PRIOR

195 R/A Vas Demetriou 54,194

196 R/A Vas Demetriou 2.5Amendment #1 extending completion

date

197 R/A Vas Demetriou 2.5Amendment #2 extending completion

date

198 P C2.5/CS-LCS/09-08 2.5 Firm - project accounts audit (external) 64,600 LSC PRIOR

199 R/A ERNST & YOUNG 2.5 1,000

200 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

201 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

202 P C2.5/CS-LCS/11-10 2.5 Firm - project accounts audit (external) - 25,600 LSC PRIOR

203 R/A Ficadex Albania LTD Audit for period Jan.- Dec.2011 1,688

204 p C2.5/CS-SSS/12-01 2.5 Short Term Procurement Specialist 3,500 SSS PRIOR

205 R/A Aleksandar Najdovski 3,450

206 R/A Aleksandar NajdovskiAmendment #1 extending completion

date

207

208

209

210 PC2.5/CS-IC/09-07

3Consultant - implementation adviserfor

component 3- PRIOR

211 R/A Vas Demetriou 45,120 SSS

3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

CONSULTANTS

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

22-Feb-10 22-Feb-10 0 22-Feb-10 143

15-Jul-10 15-Jul-10 15-Jul-10

20-Jun-12 21-Jun-12 01-Jul-12

17-Aug-08 7 24-Aug-08 7 31-Aug-08 426

31-Jul-08 22-Aug-08 1 23-Aug-08 122

18-Feb-09 23-Dec-08 0 23-Dec-08 262

08-Sep-09 11-Sep-09 30-Jun-09 123

24-Apr-11 14 08-May-11 7 15-May-11 90

NA NA NA

07-May-12 1 08-May-12 1 09-May-12

27-Apr-12 30-Apr-12 30-Apr-12

15-May-12 15-May-12 15-May-12

01-Jan-10 7 08-Jan-10 7 15-Jan-10 531

13-Oct-09 15-Oct-09 16 01-Nov-09 425

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 118 of 255 10/17/2012 1:05 AM

Page 119: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

212 R/A Vas Demetriou 3Amendment #1 extending completion

date

213 P C3.1/CS-SSS/11-01 3.1Implementation adviser for component

327,540 SSS PRIOR

214 R/A Vas Demetriou 37,840

215 R/A Vas DemetriouAmendment #1 extending completion

date

216 PC3.1/CS-CQS/09-01

3.1Firm - school mapping and investment

planning166,700 CQS PRIOR

217 R/A TELOS 136,400

218 R/A TELOS 3.1Amendment #1 extending completion

date

219 R/A TELOS 3.1Amendment #2 extending completion

date

220 PC3.1/CS-CQS/09-02

3.1 Firm - inventory taking for 1100 schools 287,400 CQS PRIOR

221 R/A CMC 202,280

222 R/A CMC 3.1Amendment #1 extending completion

date

223 R/A CMC 3.1Amendment # 2 extending completion

date

224 PC3.1/CS-IC/09-04

3.1Consultant - Manager for 3.1 activities

(national)41,200 IC PRIOR

225 R/A Merita Behluli 16,200

226 R/A Merita Behluli 3.1Amendment #1 modification of original

contract1,300

227 P C3.1/CS-SSS/10-05 3.1 Consultant for Priority 3 Activities 16,500 SSS PRIOR

228 R/A Merita Behluli 16,500

229 R/A Merita Behluli 3.1Amendment #1 modification of original

contract13,970

230 R/A Merita Behluli 3.1Amendment #1 modification of original

contract7,150

231 PC3.2/CS-CQS/09-01

3.2Firm - school standards and norms &

manual167,500 CQS PRIOR

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

22-Dec-10 23-Dec-10 8 31-Dec-10 181

02-Nov-11 7 09-Nov-11 7 01-Sep-11 668

25-Aug-11 26-Aug-11 01-Sep-11

20-Jun-12 21-Jun-12 01-Jul-12

29-Mar-09 14 12-Apr-09 7 19-Apr-09 256

28-May-09 29-May-09 4 01-Jun-09 133

27-Aug-09 15-Aug-09 0 15-Aug-09 83

05-Nov-09 05-Nov-09 0 05-Nov-09 56

29-Oct-09 14 12-Nov-09 7 19-Nov-09 407

18-Dec-09 23-Dec-09 11 04-Jan-10 168

18-Jun-10 21-Jun-10 0 21-Jun-10 91

16-Sep-10 20-Sep-10 11 01-Oct-10 91

29-Jun-09 7 06-Jul-09 7 13-Jul-09 362

09-Jul-09 10-Jul-09 0 10-Jul-09 227

23-Feb-10 22-Feb-10 0 22-Feb-10 138

19-Aug-10 14 02-Sep-10 7 01-Aug-11 334

23-Jul-10 01-Aug-10 0 01-Aug-10 364

04-Aug-11 05-Aug-11 01-Aug-11

29-Jun-12 29-Jun-12 01-Jul-12

29-Mar-09 14 12-Apr-09 7 19-Apr-09 90

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 119 of 255 10/17/2012 1:05 AM

Page 120: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

232 R/A EME 100,538

233 PC3.2/CS-SSS/10-02

3.2 School standards and norms & manual 40,000 SSS PRIOR

234 R/A Daniel Dupety 3.2 38,760

235 R/A Daniel Dupety 3.2Amendment #1 extending completion

date

236 P C3.3/CS-QCBS/09-01 3.3Firm - design and supervision of model

schools572,400 450,000 QCBS PRIOR

237 R/A Urban plus 178,921

238 R/A Urban plus 3.3Amendment #1 extending completion

date

239

240

241 PC4.1/CS-IC/09-01

4.1Consultant - higher education legisl. &

sustain.69,800 IC PRIOR

242 R/A Steve Bristow 54,500

243 PNo Number

4.1Consultant - local counterpart of intern.

Cons.6,768 IC PRIOR

244 R/A Jehona Lushaku 4,800

245 PC4.1/CS-IC/09-02

4.1Consultant - local counterpart of intern.

Cons.14,100 SSS PRIOR

246 R/A Blerim Saqipi 2,600

247 PC4.1/CS-IC/09-04

4.1 Consultant - evaluation of EPIP II - IC PRIOR

248 R/A Tom Guegon 13,026

249 PC4.1/CS-IC/09-05

4.1Consultant - SMD Grants (EPIP II)

procurement62,780 IC PRIOR

250 R/A Alexandar Najdovski

251 R/A Alexandar Najdovski 4.1Amendment #1 modification of original

contract20,550

CONSULTANTS

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

20-Jul-09 21-Jul-09 0 21-Jul-09 289

10-Jul-10 14 24-Jul-10 7 31-Jul-10 183

11-Jun-10 15-Jun-10 0 15-Jun-10 168

30-Nov-10 30-Nov-10 0 30-Nov-10 61

27-Mar-11 7 03-Apr-11 7 01-Apr-11 456

31-Mar-11 01-Apr-11 1 01-Apr-11

16-Mar-12 22-Mar-12 22-Mar-12

20-Apr-09 7 27-Apr-09 7 04-May-09 50

01-May-09 01-May-09 7 08-May-09 145

27-Jun-09 7 04-Jul-09 7 11-Jul-09 60

07-Jul-09 08-Jul-09 2 10-Jul-09 155

28-Mar-10 7 04-Apr-10 7 20-Jan-10 70

19-Jan-10 20-Jan-10 0 20-Jan-10 70

31-Oct-09 7 07-Nov-09 7 14-Nov-09

15-Oct-09 19-Oct-09 1 20-Oct-09 51

31-Oct-09 7 07-Nov-09 7 14-Nov-09 412

17-Sep-09 01-Oct-09 4 05-Oct-09 10

19-Oct-09 15-Oct-09 0 05-Oct-09 87

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 120 of 255 10/17/2012 1:05 AM

Page 121: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

252 R/A Alexandar Najdovski 4.1Amendment #2 modification of original

contract30,900

253 PC4.1/CS-IC/11-05

4.1

Consultant for the implementation of

higher education legislation

(international)

30,000 IC PRIOR

254 R/A Stephen l. Bristow 22,940

255 R/A Stephen l. BristowAmendment #1 extending completion

date

256 PC4.2/CS-IC/09-02

4.2Consultant - higher educ. financial

sustainability69,800 IC PRIOR

257 R/A Sigurd Hoellinger 4.2 66,725

258 R/A Sigurd Hoellinger 4.2Amendment #1 extending completion

date

259 R/A Sigurd Hoellinger 4.2Amendment #2 extending completion

date

260 R/A Sigurd Hoellinger 4.2Amendment #3 extending completion

date

261 R/A Sigurd Hoellinger 4.2Amendment #4 extending completion

date

Legend:

Green color under column A (line number) denotes ongoing activities

Orange color denotes activities to start

QCBS = Quality and Cost-based Selection (in accordance with sections 2.1 - 2.28 of the Guidelines)

FBC = Fixed Budget Selection (in accordance with section 3.5 of the Guidelines)

LCS = Least-Cost Selection (in accordance with section 3.6 of the Guidelines)

CQS = Selection Based on consultants' Qualifications (in accordance with section 3.7 of the Guidelines)

IC = Selection of Individual Consultants (in accordance with sections 5.1 - 5.4 of the Guidelines)

SSS = Single Source Selection in accordance with sections 3.09 - 3.13 of the Guidelines

NA = Not Applicable

OTHER = Direct expenditures

Notes:

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

19-Jan-10 30-Dec-09 2 01-Jan-10 364

26-Dec-11 3 29-Dec-11 1 30-Dec-11 153

03-Feb-12 03-Feb-12 03-Feb-12

22-May-12 23-May-12 23-May-12

31-Jul-09 7 07-Aug-09 7 14-Aug-09 366

28-Jul-09 04-Sep-09 0 04-Sep-09 133

19-Jan-10 15-Jan-10 0 15-Jan-10 75

24-Mar-10 31-Mar-10 0 31-Mar-10 61

25-May-10 31-May-10 0 31-May-10 30

29-Jun-10 02-Jul-10 0 02-Jul-10 44

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 121 of 255 10/17/2012 1:05 AM

Page 122: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

a/ Interval for preparation/clearance (days); working document PP only

b/ Number of days to execute the contract; working document PP only Fees for participation in PISA. This is not a procurement activity but it is keep in the PP for completeness

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All QCBS contracts, first two CQS contracts, and first two IC contracts irrespective of cost

All contracts with firms estimated to cost US$ 50,000 or more

All contracts with individual consultants (IC) estimated to cost US$ 25,000 or more

All Single source selection contracts

Schedule (dd-Mmm-yy)

WB "No

Objection" Int.

/a Contract

Signature Int.

/a

Start

Ex

ec

. /b

16 17 18

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 122 of 255 10/17/2012 1:05 AM

Page 123: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

1

2

3 CONSULTANTS

4 P C1.1/CS-IC/09-01 1.1Consultant - legal framework

development92,600 IC PRIOR

5 R/A Dennis Farrington 72,000

6 R/A Dennis Farrington 1.1Amendment #1 extending completion

date

7 P C1.1/CS-IC/11-02 1.1 New legislation implementation 40,540 30,000 IC PRIOR

8 R/A Dennis Farrington 27,040

9 R/A Dennis FarringtonAmendment #1 modification of original

contract

10 PNo Number

1.2Consultant - financing formula

development107,500 79,550 IC PRIOR

11 R/A Rosalind Levacic 1.2 45,220

12 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract4,500

13 R/A Rosalind Levacic 1.2 Amendment #2 modification of contract 14,379

14 P C1.2/CS-IC/09-01 1.2Consultant - financing formula

development- SSS PRIOR

15 R/A Rosalind Levacic 1.2 35,540

16 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract50,980 PRIOR

17 R/A Rosalind Levacic 1.2Amendment #2 modification of original

contract5,440

18 P C1.2/CS-CQS/09-02 1.2 Firm - Survey evaluation - CQS PRIOR

19 R/A Prism Research 24,674

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

30-Dec-09

31-Dec-09 100 100

31-May-10 100 100

30-Sep-12

04-Oct-08

10-Oct-09 100 100

30-Oct-08 100 100

10-May-09 100 100

31-Dec-12

18-Aug-10 100 100

28-Mar-12 82 82

24-Dec-09

28-Feb-10 100 100

81 81

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 123 of 255 10/17/2012 1:05 AM

Page 124: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

20 R/A Prism Research 1.2Amendment #1 extending completion

date

21 R/A Prism Research 1.2Amendment #2 extending completion

date

22 P C1.2/CS-IC/09-03 1.2 Consultant - system data entry 6,800 IC PRIOR

23 R/A Besnik Limaj 6,400

24 P C1.2/CS-IC/09-05 1.2 Consultant - finance help desk-1 - IC PRIOR

25 R/A Pakize Isufaj 10,800

26 P C1.2/CS-IC/09-06 1.2 Consultant - finance help desk-2 - IC PRIOR

27 R/A Hysni Maxharraj 10,800

28 P C1.2/CS-IC/09-07 1.2 Consultant - training materials analyst - IC PRIOR

29 R/A Edi Bunjaku 1,300

30 P C1.2/CS-IC/10-08 1.2 Consultant - Head of help desk - IC PRIOR

31 R/A Pakize Isufaj 13,200

32 R/A Pakize Isufaj 1.2Amendment #1 modification of original

contract

33 R/A Pakize Isufaj 1.2Amendment #2 modification of original

contract13,200

34 R/A Pakize Isufaj 1.2Amendment #3 modification of original

contract10,350

35 P C1.2/CS-IC/10-09 1.2 Consultant - education finance 2 - IC PRIOR

36 R/A Vjolca Sellimi 1.2 10,800

37 R/A Vjolca Sellimi 1.2Amendment #1 modification of original

contract

38 R/A Vjolca Sellimi 1.2Amendment #2 modification of original

contract10,800

39 R/A Vjolca Sellimi 1.2Amendment #3 modification of original

contract8,469

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

31-Mar-10 100 100

30-Apr-10 100 100

02-Jun-10

31-Jul-09 100 100

09-Sep-09

21-Sep-10 50 50

20-Oct-10

28-Feb-10 44 44

27-Dec-10

21-Dec-09 100 100

31-Dec-12

01-Aug-10 100 100

22-Mar-11 100 100

22-Mar-12 100 100

31-Dec-12

11-Aug-10 100 100

25-Mar-11 100 100

22-Mar-12 100 100

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 124 of 255 10/17/2012 1:05 AM

Page 125: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

40 R/A Vjolca Sellimi 1.2Amendment # 4 modification of original

contract

41 P C1.2/CS-IC/11-10 1.2 Trainer for school financing level 6,000 IC PRIOR

42 R/A Mehmet Simnica 5,000

43 P C1.2/CS-IC/11-11 1.2 Trainer for school financing level 6,000 IC PRIOR

44 R/A Mevlide Shamolli 5,000

45 P C1.2/CS-IC/11-12 1.2 Trainer for school financing level 6,000 IC PRIOR

46 R/A Jeton Kryeziu 5,000

47 P C1.2/CS-IC/11-13 1.2 Trainer for school financing level 6,000 IC PRIOR

48 R/A Jeton Gashi 5,000

49 P C1.2/CS-IC/11-14 1.2 Trainer for school financing level 6,000 IC PRIOR

50 R/A Aferdita Strellci 5,000

51 P C1.2/CS-IC/11-15 1.2 Trainer for school procurement level 6,000 IC PRIOR

52 R/A Fadil Veseli 4,000

53 P C1.2/CS-IC/11-16 1.2 Trainer for school procurement level 6,000 IC PRIOR

54 R/A Mirevete Gerguri 4,000

55 P C1.2/CS-IC/11-17 1.2 Trainer for school procurement level 6,000 IC PRIOR

56 R/A Fatmire M Morina 4,000

57 P C1.2/CS-IC/11-18 1.2 Trainer for school procurement level 6,000 IC PRIOR

58 R/A Vllaznim Reshani 4,000

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

31-Mar-12

08-Dec-11 100 76

31-Mar-12

12-Dec-11 100 76

31-Mar-12

12-Dec-11 100 76

31-Mar-12

09-Dec-11 100 72

31-Mar-12

13-Dec-11 100 72

12-May-12

02-Jan-12 20 20

12-May-12

06-Mar-12 100 85

12-May-12

29-Feb-12 100 93

12-May-12

28-Feb-12 100 96

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 125 of 255 10/17/2012 1:05 AM

Page 126: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

59 P C1.2/CS-IC/11-19 1.2 Trainer for school procurement level 6,000 IC PRIOR

60 R/A Defrim Kuqi 4,000

61 P C1.2/CS-IC-12-01 1.2Education finance officer for operating

at Help Desk6,300 IC PRIOR

62 R/A Bersant R. Grabanice 1,200

63 PNo Number

1.3 Consultant - Manager of the SDGs 46,500 IC PRIOR

64 R/A Xhafer Ahmeti 15,600

65 P C1.3/CS-IC/09-02 1.3 Consultant - Manager of the SDGs - IC PRIOR

66 R/A Besim Kokollari 14,400

67 R/A Besim Kokollari 1.3Amendment #1 modification of original

contract- 12,818

68 R/A Besim Kokollari 1.3Amendment #2 modification of original

contract10,800

69 P C1.3/CS-IC/09-02 1.3 Consultant - SDG and MDG manuals - SSS PRIOR

70 R/A Remzi Salihu 7,800

71 P C1.3/CS-QCBS/09-03 1.3Firm/NGO - school development grants

implem.463,600 QCBS PRIOR

72 R/A KEC, KOSOVO 266,935

73 R/A KEC, KOSOVO 1,3Amendment #1 modification of original

contract48,400

74 R/A KEC, KOSOVO 1.3Amendment # 2 modification of original

contract11,840

75

76

77

78 PC2.1/CS-IC/09-01

2.1Consultant - teacher's devel. and

licencing19,900 IC PRIOR

CONSULTANTS

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

12-May-12

29-Feb-12 100 76

17-Nov-12

24-Jun-10

31-Dec-09 67 67

31-Dec-12

11-May-11 100 100

22-Mar-12 100 100

26-Aug-10

30-Nov-09 92 92

21-Oct-12

21-Jan-12 75 75

30-Jun-12

30-Jun-13

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 126 of 255 10/17/2012 1:05 AM

Page 127: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

79 R/A Blerim Saqipi 11,960

80 R/A Blerim Saqipi 2.1Amendment #1 modification of original

contract14,950

81 R/A Blerim Saqipi 2.1Amendment #2 modification of original

contract20,800

82 R/A Blerim Saqipi 2.1Amendment #3 modification of original

contract13,407

83 R/A Blerim Saqipi 2.1Amendment #4 modification of original

contract2,616

84 R/A Blerim Saqipi 2.1Amendment # 5 modification of original

contract7,800

85 PC2.1/CS-IC/09-02

2.1Consultant - teachers' professional

devel.62,700 IC PRIOR

86 R/A Pilar Romaguez 52,300

87 PC2.1/CS-IC/09-03

2.1Consultant - teachers' career/advance.

syst.IC PRIOR

88 R/A Pasi Ikonen 24,976

89 R/A Pasi Ikonen 2.1Amendment #1 extending completion

date

90 PC2.1/CS-IC/09-04

2.1Consultant - teachers' performance

evaluation60,600 IC PRIOR

91 R/A Jorge Manzi 32,733

92 R/A Jorge ManziAmendment #1 extending completion

date

93 R/A Jorge ManziAmendment #2 extending completion

date

94 P C2.1/CS-IC/10-05 2.1Consultant - teachers' performance

evaluation112,900 82,100 IC PRIOR

95 R/A Nicole Saginor 2.1 48,400

98 R/A Nicole Saginor 2.1 43,950

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

08-Jul-09 100 100

26-May-10 100 100

30-Jun-12 87 87

01-Jun-11 100 100

31-Jul-11 100 100

31-Aug-08

31-Oct-08 100 100

15-Nov-09

15-Nov-09

31-Jan-10 100 83

30-Nov-09

30-Nov-09

31-May-10

15-Jul-10 100

31-Mar-13

30-Mar-12 85 85

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 127 of 255 10/17/2012 1:05 AM

Page 128: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

99 P C2.1/CS-IC/11-07 - Prishtina region 2.1

Consultant for database population and

logistical support on performance

evaluation

- 6,400 IC PRIOR

100 R/A Edmond Krasniqi 6,000

101 R/A Edmond KrasniqiAmendment #1 extending completion

date

102 R/A Edmond KrasniqiAmendment # 2 modification of original

contract1,875

103 P C2.1/CS-IC/11-08 - Prizren region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

104 R/A Kreshnik Shatri 6,000

105 R/A Kreshnik ShatriAmendment #1 extending completion

date

106 R/A Kreshnik ShatriAmendment # 2 modification of original

contract1,875

107 P C2.1/CS-IC/11-09 - Peja region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

108 R/A Mentor Vokshi 6,000

109 R/A Mentor VokshiAmendment #1 extending completion

date

110 R/A Mentor VokshiAmendment # 2 modification of original

contract1,875

111 P C2.1/CS-IC/11-10 - Gjakova region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

112 R/A Armend Bajrami 6,000

113 R/A Armend BajramiAmendment #1 extending completion

date

114 R/A Armend BajramiAmendment # 2 modification of original

contract1,500

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

31-Jul-12

30-Apr-12

31-Jul-12

30-Apr-12

31-Jul-12

30-Apr-12

31-Jul-12

30-Apr-12 80 80

58 58

64 64

52 52

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 128 of 255 10/17/2012 1:05 AM

Page 129: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

115 P C2.1/CS-IC/11-11 - Ferizaj region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

116 R/A Donika Rexhepi 6,000

117 R/A Donika RexhepiAmendment #1 extending completion

date

118 R/A Donika RexhepiAmendment # 2 modification of original

contract1,500

119 P C2.1/CS-IC/11-12 - Mitrovica region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

120 R/A Zahir Ibishi 6,000

121 R/A Zahir IbishiAmendment #1 extending completion

date

122 R/A Zahir IbishiAmendment # 2 modification of original

contract1,500

123 P C2.1/CS-IC/11-13 - Gjilan region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

124 R/A Agim Ramadani 6,000

125 R/A Agim RamadaniAmendment #1 extending completion

date

126 R/A Agim RamadaniAmendment # 2 modification of original

contract1,875

127 P C2.1/CS-IC/11-14 2.1Consultant on Teacher Development

Policies Study- 50,000 IC PRIOR

128 P David Lynn 47,830

129 R/A David Lynn

130 p C2.1/CS-IC/11-15 2.1Consultant for the Managing the

database process8,000 IC PRIOR

131 R/A Mirlind Bruqi 8,000

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

31-Jul-12

30-Apr-12

31-Jul-12

30-Apr-12

31-Jul-12

30-Apr-12

31-May-12

29-Feb-12

31-Jul-12

30-Apr-12

80 80

80 80

88 88

83 83

77 77

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 129 of 255 10/17/2012 1:05 AM

Page 130: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

132 R/A Mirlind BruqiAmendment #1 extending completion

date

133 PC2.2/CS-SSS/10-02

2.2Consultant - curriculum unit and CACTI

capacity- SSS PRIOR

134 R/A Camerron Harisson 45,243 33,480

135 PC2.2/CS-IC/09-01

2.2Consultant - curriculum unit and CACTI

capacityIC PRIOR

136 R/A Camerron Harisson 56,000

137 PC2.3/CS-IC/09-01

2.3Consultant - assessment Unit and

MEST experts186,100 140,406 IC PRIOR

138 R/A Kelvin Gregory 75,600

139 PC2.3/CS-IC/09-03

2.3Consultant - test administration study

(intern.)46,960 IC PRIOR

140 R/A Steven Bakker 51,800

141 P C2.3/CS-IC/11-04 2.3 Consultant - Matura reform 50,000 IC PRIOR

142 R/A Steven Bakker 53,150

143 P C2.3/CS-SSS/12-01 2.3Supporting the Assessment Reform in

Kosovo29,000 SSS PRIOR

144 R/A Steven Bakker 28,800

145 P C2.3/CS-IC-11-05 2.3IC on Capacity Building for External

Assessment in Kosovo50,000 IC PRIOR

146 R/A Kelvin Gregory 43,650

147 R/A Kelvin GregoryAmendment #1 extending completion

date

148 P C2.3/CS-IC-11-06 2.3Consultant Mother Tongue and Modern

Foreign Language Exams21,000 IC PRIOR

149 R/A Ivane Mindadze 10,150

150 P C2.3/CS-IC-11-07 2.3

Consultant for Supporting the Item

Bank Development in Kosovo External

Assessment

24,000 IC PRIOR

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

31-Mar-11

31-Mar-11 100 100

31-Jul-09

02-Jul-10 100 81

30-Dec-09

31-Oct-09 100 73

24-Feb-11

31-Dec-10 100 100

30-Apr-12

09-Mar-12 100 95

30-Apr-13

31-Dec-12

30-Jun-12 0 0

31-Mar-12

08-Mar-12 76 76

30-Apr-12

88 88

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 130 of 255 10/17/2012 1:05 AM

Page 131: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

151 R/A David Tchankotadze 12,520

152 PC2.4/CS-IC/09-03

2.4Consultant - EMIS TOR and Training

Needs Assitance.31,000 IC PRIOR

153 R/A Mircea Enache 23,560

154 R/A Mircea Enache 2.4Amendment #1 extending completion

date

155 PC2.4/CS-IC/09-04

2.4 IT officer to support EMIS Department 35,676 IC PRIOR

156 R/A Bersant Krasniqi 6,000

157 R/A Bersant KrasniqiAmendment #1 modification of original

contract

158 R/A Bersant KrasniqiAmendment #2 extending completion

date13,013

159 R/A Bersant KrasniqiAmendment # 3 extending completion

date8,400

160 P C2.4/CS-IC/10-05 2.4Consultant to support the upgrade of

EMIS31,980 SSS PRIOR

161 R/A Mircea Enache 31,980

162 R/A Mircea EnacheAmendment #1 modification of original

contract10,000

163 PC2.5/CS-SSS/09-01

2.5 National firm to draft project action plan 20,300 SSS PRIOR

164 R/A Kosova Education Center KEC 12,780

165 PNo Number

2.5 Project coordinator 71,300 IC PRIOR

166 R/A Xhafer Ahmeti 15,600

167 R/A Xhafer Ahmeti 2.5Amendment #1 modification of original

contract885

168 R/A Xhafer Ahmeti 2.5Amendment #2 modification of original

contract1,300

169 PC2.5/CS-IC/09-02

2.5 Project coordinator - IC PRIOR

170 R/A Edita Alo 26,400

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

21-Mar-12 46 46

20-May-10

30-Jun-10

31-Aug-10 100 100

30-Jun-13

09-Aug-10 100 100

15-Dec-10 100 100

26-Jun-12 80 80

31-Dec-11

31-Dec-11 100 100

25-Sep-08

28-Jul-08 100 100

10-Mar-09

31-Mar-09

30-Apr-09 100 73

31-Dec-12

11-May-10 100 100

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 131 of 255 10/17/2012 1:05 AM

Page 132: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

171 R/A Edita Alo 2.5Amendment #1 modification of original

contract56,393

172 R/A Edita Alo 2.5Amendment # 2 modification of original

contract

173 R/A Edita Alo 2.5Amendment #3 modification of original

contract13,200

174 PC2.5/CS-IC/09-03

2.5 Financial manager 61,100 IC PRIOR

175 R/A Gazmend Bajra 27,600

176 R/A Gazmend Bajra 2.5Amendment #1 modification of original

contract2,070

177 R/A Gazmend Bajra 2.5Amendment #2 modification of original

contract27,111

178 R/A Gazmend Bajra 2.5Amendment #3 modification of original

contract793

179 P C2.5/CS-IC/12-02 2.5 Financial manager 9,000 IC PRIOR

180 R/A Mirjeta Hysa 7,200

181 PNo number

2.5 Procurement Officer 49,000 IC PRIOR

182 R/A Vlora Kuqi 13,800

183 PC2.5/CS-IC/09-04

2.5 Procurement Officer - IC PRIOR

184 R/A Luan Asllani 2.5 10,800

185 R/A Luan Asllani 2.5Amendment #1 modification of original

contract

186 R/A Luan Asllani 2.5Amendment #2 modification of original

contract5,400

187 R/A Luan Asllani 2.5Amendment #3 modification of original

contract- 11,550

188 R/A Luan Asllani 2.5Amendment #4 modification of original

contract6,300

189 PC2.5/CS-IC/09-05

2.5 Administrative assistant 40,800 IC PRIOR

190 R/A Altin Ademi 6,000

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

02-Aug-10 100 100

30-Jun-12 100 100

30-Jun-12

15-Oct-09 100 100

15-Oct-10 100 100

30-Jun-12 100 100

30-Jun-12 100 100

30-Jun-13

15-Oct-09

15-Oct-09 100 100

31-Dec-12

03-Feb-11 100 100

03-Feb-11 100 100

31-Jul-11 100 100

30-Jun-12 100 100

31-Aug-12

31-Dec-12

15-Jul-10 100 100

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 132 of 255 10/17/2012 1:05 AM

Page 133: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

191 R/A Altin Ademi 2.5Amendment #1 modification of original

contract1,000

192 R/A Altin Ademi 2.5Amendment #2 modification of original

contract16,450

193 R/A Altin Ademi 2.5Amendment #3 modification of original

contract4,200

194 PNo Number

2.5 Consultant - implementation adviser 55,700 IC PRIOR

195 R/A Vas Demetriou 54,194

196 R/A Vas Demetriou 2.5Amendment #1 extending completion

date

197 R/A Vas Demetriou 2.5Amendment #2 extending completion

date

198 P C2.5/CS-LCS/09-08 2.5 Firm - project accounts audit (external) 64,600 LSC PRIOR

199 R/A ERNST & YOUNG 2.5 1,000

200 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

201 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

202 P C2.5/CS-LCS/11-10 2.5 Firm - project accounts audit (external) - 25,600 LSC PRIOR

203 R/A Ficadex Albania LTD Audit for period Jan.- Dec.2011 1,688

204 p C2.5/CS-SSS/12-01 2.5 Short Term Procurement Specialist 3,500 SSS PRIOR

205 R/A Aleksandar Najdovski 3,450

206 R/A Aleksandar NajdovskiAmendment #1 extending completion

date

207

208

209

210 PC2.5/CS-IC/09-07

3Consultant - implementation adviserfor

component 3- PRIOR

211 R/A Vas Demetriou 45,120 SSS

3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

CONSULTANTS

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

15-Jul-10 100 100

30-Jun-12 100 100

31-Oct-09

23-Dec-08 100 100

11-Sep-09 100 100

31-Oct-09 100 100

13-Aug-11

100 100

100 100

NA

100 100

30-Jun-12

15-May-12

28-Jun-12

30-Jun-11

31-Dec-10

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 133 of 255 10/17/2012 1:05 AM

Page 134: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

212 R/A Vas Demetriou 3Amendment #1 extending completion

date

213 P C3.1/CS-SSS/11-01 3.1Implementation adviser for component

327,540 SSS PRIOR

214 R/A Vas Demetriou 37,840

215 R/A Vas DemetriouAmendment #1 extending completion

date

216 PC3.1/CS-CQS/09-01

3.1Firm - school mapping and investment

planning166,700 CQS PRIOR

217 R/A TELOS 136,400

218 R/A TELOS 3.1Amendment #1 extending completion

date

219 R/A TELOS 3.1Amendment #2 extending completion

date

220 PC3.1/CS-CQS/09-02

3.1 Firm - inventory taking for 1100 schools 287,400 CQS PRIOR

221 R/A CMC 202,280

222 R/A CMC 3.1Amendment #1 extending completion

date

223 R/A CMC 3.1Amendment # 2 extending completion

date

224 PC3.1/CS-IC/09-04

3.1Consultant - Manager for 3.1 activities

(national)41,200 IC PRIOR

225 R/A Merita Behluli 16,200

226 R/A Merita Behluli 3.1Amendment #1 modification of original

contract1,300

227 P C3.1/CS-SSS/10-05 3.1 Consultant for Priority 3 Activities 16,500 SSS PRIOR

228 R/A Merita Behluli 16,500

229 R/A Merita Behluli 3.1Amendment #1 modification of original

contract13,970

230 R/A Merita Behluli 3.1Amendment #1 modification of original

contract7,150

231 PC3.2/CS-CQS/09-01

3.2Firm - school standards and norms &

manual167,500 CQS PRIOR

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

30-Jun-11 100 60

30-Jun-13

30-Jun-12 30 0

31-Dec-09

12-Oct-09

06-Nov-09

31-Dec-09 100 95

31-Dec-10

21-Jun-10

20-Sep-10

31-Dec-10 100 100

10-Jul-10

22-Feb-10

10-Jul-10 100 96

30-Jun-13

31-Jul-11 100 100

30-Jun-12 90 90

21-Dec-09

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 134 of 255 10/17/2012 1:05 AM

Page 135: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

232 R/A EME 100,538

233 PC3.2/CS-SSS/10-02

3.2 School standards and norms & manual 40,000 SSS PRIOR

234 R/A Daniel Dupety 3.2 38,760

235 R/A Daniel Dupety 3.2Amendment #1 extending completion

date

236 P C3.3/CS-QCBS/09-01 3.3Firm - design and supervision of model

schools572,400 450,000 QCBS PRIOR

237 R/A Urban plus 178,921

238 R/A Urban plus 3.3Amendment #1 extending completion

date

239

240

241 PC4.1/CS-IC/09-01

4.1Consultant - higher education legisl. &

sustain.69,800 IC PRIOR

242 R/A Steve Bristow 54,500

243 PNo Number

4.1Consultant - local counterpart of intern.

Cons.6,768 IC PRIOR

244 R/A Jehona Lushaku 4,800

245 PC4.1/CS-IC/09-02

4.1Consultant - local counterpart of intern.

Cons.14,100 SSS PRIOR

246 R/A Blerim Saqipi 2,600

247 PC4.1/CS-IC/09-04

4.1 Consultant - evaluation of EPIP II - IC PRIOR

248 R/A Tom Guegon 13,026

249 PC4.1/CS-IC/09-05

4.1Consultant - SMD Grants (EPIP II)

procurement62,780 IC PRIOR

250 R/A Alexandar Najdovski

251 R/A Alexandar Najdovski 4.1Amendment #1 modification of original

contract20,550

CONSULTANTS

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

06-May-10 60 60

30-Jan-11

30-Nov-10

30-Jan-11 100 93

31-May-13

30-Jun-12 52 52

30-Dec-09

30-Sep-09 100 99

12-Dec-09

12-Dec-09 50 50

31-Mar-10

31-Mar-10 100 100

10-Dec-09

10-Dec-09 100 93

31-Dec-10

15-Oct-09 100 100

31-Dec-09 100 100

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 135 of 255 10/17/2012 1:05 AM

Page 136: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

252 R/A Alexandar Najdovski 4.1Amendment #2 modification of original

contract30,900

253 PC4.1/CS-IC/11-05

4.1

Consultant for the implementation of

higher education legislation

(international)

30,000 IC PRIOR

254 R/A Stephen l. Bristow 22,940

255 R/A Stephen l. BristowAmendment #1 extending completion

date

256 PC4.2/CS-IC/09-02

4.2Consultant - higher educ. financial

sustainability69,800 IC PRIOR

257 R/A Sigurd Hoellinger 4.2 66,725

258 R/A Sigurd Hoellinger 4.2Amendment #1 extending completion

date

259 R/A Sigurd Hoellinger 4.2Amendment #2 extending completion

date

260 R/A Sigurd Hoellinger 4.2Amendment #3 extending completion

date

261 R/A Sigurd Hoellinger 4.2Amendment #4 extending completion

date

Legend:

Green color under column A (line number) denotes ongoing activities

Orange color denotes activities to start

QCBS = Quality and Cost-based Selection (in accordance with sections 2.1 - 2.28 of the Guidelines)

FBC = Fixed Budget Selection (in accordance with section 3.5 of the Guidelines)

LCS = Least-Cost Selection (in accordance with section 3.6 of the Guidelines)

CQS = Selection Based on consultants' Qualifications (in accordance with section 3.7 of the Guidelines)

IC = Selection of Individual Consultants (in accordance with sections 5.1 - 5.4 of the Guidelines)

SSS = Single Source Selection in accordance with sections 3.09 - 3.13 of the Guidelines

NA = Not Applicable

OTHER = Direct expenditures

Notes:

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

31-Dec-10 100 100

30-Jun-12

22-May-12

30-Jun-12 92 92

15-Aug-10

15-Jan-10

31-Mar-10

31-May-10

30-Jun-10

15-Aug-10 100 92

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 136 of 255 10/17/2012 1:05 AM

Page 137: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

a/ Interval for preparation/clearance (days); working document PP only

b/ Number of days to execute the contract; working document PP only Fees for participation in PISA. This is not a procurement activity but it is keep in the PP for completeness

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All QCBS contracts, first two CQS contracts, and first two IC contracts irrespective of cost

All contracts with firms estimated to cost US$ 50,000 or more

All contracts with individual consultants (IC) estimated to cost US$ 25,000 or more

All Single source selection contracts

Schedule (dd-Mmm-yy)

Compl. Pysical

Progress %

Payment to

vendor %

19

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 137 of 255 10/17/2012 1:05 AM

Page 138: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

1

2

3 CONSULTANTS

4 P C1.1/CS-IC/09-01 1.1Consultant - legal framework

development92,600 IC PRIOR

5 R/A Dennis Farrington 72,000

6 R/A Dennis Farrington 1.1Amendment #1 extending completion

date

7 P C1.1/CS-IC/11-02 1.1 New legislation implementation 40,540 30,000 IC PRIOR

8 R/A Dennis Farrington 27,040

9 R/A Dennis FarringtonAmendment #1 modification of original

contract

10 PNo Number

1.2Consultant - financing formula

development107,500 79,550 IC PRIOR

11 R/A Rosalind Levacic 1.2 45,220

12 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract4,500

13 R/A Rosalind Levacic 1.2 Amendment #2 modification of contract 14,379

14 P C1.2/CS-IC/09-01 1.2Consultant - financing formula

development- SSS PRIOR

15 R/A Rosalind Levacic 1.2 35,540

16 R/A Rosalind Levacic 1.2Amendment #1 modification of original

contract50,980 PRIOR

17 R/A Rosalind Levacic 1.2Amendment #2 modification of original

contract5,440

18 P C1.2/CS-CQS/09-02 1.2 Firm - Survey evaluation - CQS PRIOR

19 R/A Prism Research 24,674

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

Completed

Completed

Completed

Under Implementation

Completed

Completed

Completed

Completed

Completed

Under Implementation

Not planned

Completed

Comments

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 138 of 255 10/17/2012 1:05 AM

Page 139: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

20 R/A Prism Research 1.2Amendment #1 extending completion

date

21 R/A Prism Research 1.2Amendment #2 extending completion

date

22 P C1.2/CS-IC/09-03 1.2 Consultant - system data entry 6,800 IC PRIOR

23 R/A Besnik Limaj 6,400

24 P C1.2/CS-IC/09-05 1.2 Consultant - finance help desk-1 - IC PRIOR

25 R/A Pakize Isufaj 10,800

26 P C1.2/CS-IC/09-06 1.2 Consultant - finance help desk-2 - IC PRIOR

27 R/A Hysni Maxharraj 10,800

28 P C1.2/CS-IC/09-07 1.2 Consultant - training materials analyst - IC PRIOR

29 R/A Edi Bunjaku 1,300

30 P C1.2/CS-IC/10-08 1.2 Consultant - Head of help desk - IC PRIOR

31 R/A Pakize Isufaj 13,200

32 R/A Pakize Isufaj 1.2Amendment #1 modification of original

contract

33 R/A Pakize Isufaj 1.2Amendment #2 modification of original

contract13,200

34 R/A Pakize Isufaj 1.2Amendment #3 modification of original

contract10,350

35 P C1.2/CS-IC/10-09 1.2 Consultant - education finance 2 - IC PRIOR

36 R/A Vjolca Sellimi 1.2 10,800

37 R/A Vjolca Sellimi 1.2Amendment #1 modification of original

contract

38 R/A Vjolca Sellimi 1.2Amendment #2 modification of original

contract10,800

39 R/A Vjolca Sellimi 1.2Amendment #3 modification of original

contract8,469

Comments

Completed

Completed

Completed

Not planned

Terminated on 22-March-10

Not planned

Terminated on:28-Feb-10

Completed

Completed

Completed

Completed

Under Implementation

Completed

Completed

Completed

Under Implementation

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 139 of 255 10/17/2012 1:05 AM

Page 140: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

40 R/A Vjolca Sellimi 1.2Amendment # 4 modification of original

contract

41 P C1.2/CS-IC/11-10 1.2 Trainer for school financing level 6,000 IC PRIOR

42 R/A Mehmet Simnica 5,000

43 P C1.2/CS-IC/11-11 1.2 Trainer for school financing level 6,000 IC PRIOR

44 R/A Mevlide Shamolli 5,000

45 P C1.2/CS-IC/11-12 1.2 Trainer for school financing level 6,000 IC PRIOR

46 R/A Jeton Kryeziu 5,000

47 P C1.2/CS-IC/11-13 1.2 Trainer for school financing level 6,000 IC PRIOR

48 R/A Jeton Gashi 5,000

49 P C1.2/CS-IC/11-14 1.2 Trainer for school financing level 6,000 IC PRIOR

50 R/A Aferdita Strellci 5,000

51 P C1.2/CS-IC/11-15 1.2 Trainer for school procurement level 6,000 IC PRIOR

52 R/A Fadil Veseli 4,000

53 P C1.2/CS-IC/11-16 1.2 Trainer for school procurement level 6,000 IC PRIOR

54 R/A Mirevete Gerguri 4,000

55 P C1.2/CS-IC/11-17 1.2 Trainer for school procurement level 6,000 IC PRIOR

56 R/A Fatmire M Morina 4,000

57 P C1.2/CS-IC/11-18 1.2 Trainer for school procurement level 6,000 IC PRIOR

58 R/A Vllaznim Reshani 4,000

Comments

The Consultant has completed

his task and has been paid for

The Consultant has completed

his task and has been paid for

The Consultant has completed

his task and has been paid for

The Consultant has completed

his task and has been paid for

The Consultant has completed

his task and has been paid for

Resign on Janaury 3,2012

The Consultant has completed

his task and has been paid for

The Consultant has completed

his task and has been paid for

The Consultant has completed

his task and has been paid for

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 140 of 255 10/17/2012 1:05 AM

Page 141: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

59 P C1.2/CS-IC/11-19 1.2 Trainer for school procurement level 6,000 IC PRIOR

60 R/A Defrim Kuqi 4,000

61 P C1.2/CS-IC-12-01 1.2Education finance officer for operating

at Help Desk6,300 IC PRIOR

62 R/A Bersant R. Grabanice 1,200

63 PNo Number

1.3 Consultant - Manager of the SDGs 46,500 IC PRIOR

64 R/A Xhafer Ahmeti 15,600

65 P C1.3/CS-IC/09-02 1.3 Consultant - Manager of the SDGs - IC PRIOR

66 R/A Besim Kokollari 14,400

67 R/A Besim Kokollari 1.3Amendment #1 modification of original

contract- 12,818

68 R/A Besim Kokollari 1.3Amendment #2 modification of original

contract10,800

69 P C1.3/CS-IC/09-02 1.3 Consultant - SDG and MDG manuals - SSS PRIOR

70 R/A Remzi Salihu 7,800

71 P C1.3/CS-QCBS/09-03 1.3Firm/NGO - school development grants

implem.463,600 QCBS PRIOR

72 R/A KEC, KOSOVO 266,935

73 R/A KEC, KOSOVO 1,3Amendment #1 modification of original

contract48,400

74 R/A KEC, KOSOVO 1.3Amendment # 2 modification of original

contract11,840

75

76

77

78 PC2.1/CS-IC/09-01

2.1Consultant - teacher's devel. and

licencing19,900 IC PRIOR

CONSULTANTS

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

Comments

The Consultant has completed

his task and has been paid for

Under Implementation

Terminated on: 31-Dec-2009

Completed

Completed

Under Implementation

Completed

Completed

Completed

Under Implementation

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 141 of 255 10/17/2012 1:05 AM

Page 142: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

79 R/A Blerim Saqipi 11,960

80 R/A Blerim Saqipi 2.1Amendment #1 modification of original

contract14,950

81 R/A Blerim Saqipi 2.1Amendment #2 modification of original

contract20,800

82 R/A Blerim Saqipi 2.1Amendment #3 modification of original

contract13,407

83 R/A Blerim Saqipi 2.1Amendment #4 modification of original

contract2,616

84 R/A Blerim Saqipi 2.1Amendment # 5 modification of original

contract7,800

85 PC2.1/CS-IC/09-02

2.1Consultant - teachers' professional

devel.62,700 IC PRIOR

86 R/A Pilar Romaguez 52,300

87 PC2.1/CS-IC/09-03

2.1Consultant - teachers' career/advance.

syst.IC PRIOR

88 R/A Pasi Ikonen 24,976

89 R/A Pasi Ikonen 2.1Amendment #1 extending completion

date

90 PC2.1/CS-IC/09-04

2.1Consultant - teachers' performance

evaluation60,600 IC PRIOR

91 R/A Jorge Manzi 32,733

92 R/A Jorge ManziAmendment #1 extending completion

date

93 R/A Jorge ManziAmendment #2 extending completion

date

94 P C2.1/CS-IC/10-05 2.1Consultant - teachers' performance

evaluation112,900 82,100 IC PRIOR

95 R/A Nicole Saginor 2.1 48,400

98 R/A Nicole Saginor 2.1 43,950

Comments

Completed

Completed

Under implementation

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Under implementation

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 142 of 255 10/17/2012 1:05 AM

Page 143: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

99 P C2.1/CS-IC/11-07 - Prishtina region 2.1

Consultant for database population and

logistical support on performance

evaluation

- 6,400 IC PRIOR

100 R/A Edmond Krasniqi 6,000

101 R/A Edmond KrasniqiAmendment #1 extending completion

date

102 R/A Edmond KrasniqiAmendment # 2 modification of original

contract1,875

103 P C2.1/CS-IC/11-08 - Prizren region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

104 R/A Kreshnik Shatri 6,000

105 R/A Kreshnik ShatriAmendment #1 extending completion

date

106 R/A Kreshnik ShatriAmendment # 2 modification of original

contract1,875

107 P C2.1/CS-IC/11-09 - Peja region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

108 R/A Mentor Vokshi 6,000

109 R/A Mentor VokshiAmendment #1 extending completion

date

110 R/A Mentor VokshiAmendment # 2 modification of original

contract1,875

111 P C2.1/CS-IC/11-10 - Gjakova region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

112 R/A Armend Bajrami 6,000

113 R/A Armend BajramiAmendment #1 extending completion

date

114 R/A Armend BajramiAmendment # 2 modification of original

contract1,500

Comments

Completed

Completed

Under implementation

Completed

Completed

Under implementation

Completed

Completed

Under implementation

Completed

Completed

Under implementation

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 143 of 255 10/17/2012 1:05 AM

Page 144: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

115 P C2.1/CS-IC/11-11 - Ferizaj region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

116 R/A Donika Rexhepi 6,000

117 R/A Donika RexhepiAmendment #1 extending completion

date

118 R/A Donika RexhepiAmendment # 2 modification of original

contract1,500

119 P C2.1/CS-IC/11-12 - Mitrovica region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

120 R/A Zahir Ibishi 6,000

121 R/A Zahir IbishiAmendment #1 extending completion

date

122 R/A Zahir IbishiAmendment # 2 modification of original

contract1,500

123 P C2.1/CS-IC/11-13 - Gjilan region 2.1

Consultant for database population and

logistical support on performance

evaluation

6,400 IC PRIOR

124 R/A Agim Ramadani 6,000

125 R/A Agim RamadaniAmendment #1 extending completion

date

126 R/A Agim RamadaniAmendment # 2 modification of original

contract1,875

127 P C2.1/CS-IC/11-14 2.1Consultant on Teacher Development

Policies Study- 50,000 IC PRIOR

128 P David Lynn 47,830

129 R/A David Lynn

130 p C2.1/CS-IC/11-15 2.1Consultant for the Managing the

database process8,000 IC PRIOR

131 R/A Mirlind Bruqi 8,000

Comments

Completed

Completed

Under implementation

Completed

Completed

Under implementation

Completed

Completed

Under implementation

Completed

The Consultant has completed

his task and has been paid for

Completed

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 144 of 255 10/17/2012 1:05 AM

Page 145: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

132 R/A Mirlind BruqiAmendment #1 extending completion

date

133 PC2.2/CS-SSS/10-02

2.2Consultant - curriculum unit and CACTI

capacity- SSS PRIOR

134 R/A Camerron Harisson 45,243 33,480

135 PC2.2/CS-IC/09-01

2.2Consultant - curriculum unit and CACTI

capacityIC PRIOR

136 R/A Camerron Harisson 56,000

137 PC2.3/CS-IC/09-01

2.3Consultant - assessment Unit and

MEST experts186,100 140,406 IC PRIOR

138 R/A Kelvin Gregory 75,600

139 PC2.3/CS-IC/09-03

2.3Consultant - test administration study

(intern.)46,960 IC PRIOR

140 R/A Steven Bakker 51,800

141 P C2.3/CS-IC/11-04 2.3 Consultant - Matura reform 50,000 IC PRIOR

142 R/A Steven Bakker 53,150

143 P C2.3/CS-SSS/12-01 2.3Supporting the Assessment Reform in

Kosovo29,000 SSS PRIOR

144 R/A Steven Bakker 28,800

145 P C2.3/CS-IC-11-05 2.3IC on Capacity Building for External

Assessment in Kosovo50,000 IC PRIOR

146 R/A Kelvin Gregory 43,650

147 R/A Kelvin GregoryAmendment #1 extending completion

date

148 P C2.3/CS-IC-11-06 2.3Consultant Mother Tongue and Modern

Foreign Language Exams21,000 IC PRIOR

149 R/A Ivane Mindadze 10,150

150 P C2.3/CS-IC-11-07 2.3

Consultant for Supporting the Item

Bank Development in Kosovo External

Assessment

24,000 IC PRIOR

Comments

Completed

Completed

Completed

Not planned

The Consultant has completed

his task and has been paid for

The Consultant has completed

his task and has been paid for

Completed

The Consultant has completed

his task and has been paid for

Under implementation

Completed

Under implementation

The Consultant has completed

his task and has been paid for

Under Implementation

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 145 of 255 10/17/2012 1:05 AM

Page 146: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

151 R/A David Tchankotadze 12,520

152 PC2.4/CS-IC/09-03

2.4Consultant - EMIS TOR and Training

Needs Assitance.31,000 IC PRIOR

153 R/A Mircea Enache 23,560

154 R/A Mircea Enache 2.4Amendment #1 extending completion

date

155 PC2.4/CS-IC/09-04

2.4 IT officer to support EMIS Department 35,676 IC PRIOR

156 R/A Bersant Krasniqi 6,000

157 R/A Bersant KrasniqiAmendment #1 modification of original

contract

158 R/A Bersant KrasniqiAmendment #2 extending completion

date13,013

159 R/A Bersant KrasniqiAmendment # 3 extending completion

date8,400

160 P C2.4/CS-IC/10-05 2.4Consultant to support the upgrade of

EMIS31,980 SSS PRIOR

161 R/A Mircea Enache 31,980

162 R/A Mircea EnacheAmendment #1 modification of original

contract10,000

163 PC2.5/CS-SSS/09-01

2.5 National firm to draft project action plan 20,300 SSS PRIOR

164 R/A Kosova Education Center KEC 12,780

165 PNo Number

2.5 Project coordinator 71,300 IC PRIOR

166 R/A Xhafer Ahmeti 15,600

167 R/A Xhafer Ahmeti 2.5Amendment #1 modification of original

contract885

168 R/A Xhafer Ahmeti 2.5Amendment #2 modification of original

contract1,300

169 PC2.5/CS-IC/09-02

2.5 Project coordinator - IC PRIOR

170 R/A Edita Alo 26,400

Comments

The Consultant has completed

his task and has been paid for

Completed

Completed

Completed

Completed

Under Implementation

Completed

Completed

Completed Not planned

Completed

Completed

Completed

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 146 of 255 10/17/2012 1:05 AM

Page 147: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

171 R/A Edita Alo 2.5Amendment #1 modification of original

contract56,393

172 R/A Edita Alo 2.5Amendment # 2 modification of original

contract

173 R/A Edita Alo 2.5Amendment #3 modification of original

contract13,200

174 PC2.5/CS-IC/09-03

2.5 Financial manager 61,100 IC PRIOR

175 R/A Gazmend Bajra 27,600

176 R/A Gazmend Bajra 2.5Amendment #1 modification of original

contract2,070

177 R/A Gazmend Bajra 2.5Amendment #2 modification of original

contract27,111

178 R/A Gazmend Bajra 2.5Amendment #3 modification of original

contract793

179 P C2.5/CS-IC/12-02 2.5 Financial manager 9,000 IC PRIOR

180 R/A Mirjeta Hysa 7,200

181 PNo number

2.5 Procurement Officer 49,000 IC PRIOR

182 R/A Vlora Kuqi 13,800

183 PC2.5/CS-IC/09-04

2.5 Procurement Officer - IC PRIOR

184 R/A Luan Asllani 2.5 10,800

185 R/A Luan Asllani 2.5Amendment #1 modification of original

contract

186 R/A Luan Asllani 2.5Amendment #2 modification of original

contract5,400

187 R/A Luan Asllani 2.5Amendment #3 modification of original

contract- 11,550

188 R/A Luan Asllani 2.5Amendment #4 modification of original

contract6,300

189 PC2.5/CS-IC/09-05

2.5 Administrative assistant 40,800 IC PRIOR

190 R/A Altin Ademi 6,000

Comments

Completed

Completed

Under Implementation

Completed

Completed

Completed

Completed

Under Implementation

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 147 of 255 10/17/2012 1:05 AM

Page 148: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

191 R/A Altin Ademi 2.5Amendment #1 modification of original

contract1,000

192 R/A Altin Ademi 2.5Amendment #2 modification of original

contract16,450

193 R/A Altin Ademi 2.5Amendment #3 modification of original

contract4,200

194 PNo Number

2.5 Consultant - implementation adviser 55,700 IC PRIOR

195 R/A Vas Demetriou 54,194

196 R/A Vas Demetriou 2.5Amendment #1 extending completion

date

197 R/A Vas Demetriou 2.5Amendment #2 extending completion

date

198 P C2.5/CS-LCS/09-08 2.5 Firm - project accounts audit (external) 64,600 LSC PRIOR

199 R/A ERNST & YOUNG 2.5 1,000

200 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

201 R/A KPMG 2.5 Firm - project accounts audit (external) 1,700

202 P C2.5/CS-LCS/11-10 2.5 Firm - project accounts audit (external) - 25,600 LSC PRIOR

203 R/A Ficadex Albania LTD Audit for period Jan.- Dec.2011 1,688

204 p C2.5/CS-SSS/12-01 2.5 Short Term Procurement Specialist 3,500 SSS PRIOR

205 R/A Aleksandar Najdovski 3,450

206 R/A Aleksandar NajdovskiAmendment #1 extending completion

date

207

208

209

210 PC2.5/CS-IC/09-07

3Consultant - implementation adviserfor

component 3- PRIOR

211 R/A Vas Demetriou 45,120 SSS

3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

CONSULTANTS

Comments

Completed

Completed

Under Implementation

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 148 of 255 10/17/2012 1:05 AM

Page 149: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

212 R/A Vas Demetriou 3Amendment #1 extending completion

date

213 P C3.1/CS-SSS/11-01 3.1Implementation adviser for component

327,540 SSS PRIOR

214 R/A Vas Demetriou 37,840

215 R/A Vas DemetriouAmendment #1 extending completion

date

216 PC3.1/CS-CQS/09-01

3.1Firm - school mapping and investment

planning166,700 CQS PRIOR

217 R/A TELOS 136,400

218 R/A TELOS 3.1Amendment #1 extending completion

date

219 R/A TELOS 3.1Amendment #2 extending completion

date

220 PC3.1/CS-CQS/09-02

3.1 Firm - inventory taking for 1100 schools 287,400 CQS PRIOR

221 R/A CMC 202,280

222 R/A CMC 3.1Amendment #1 extending completion

date

223 R/A CMC 3.1Amendment # 2 extending completion

date

224 PC3.1/CS-IC/09-04

3.1Consultant - Manager for 3.1 activities

(national)41,200 IC PRIOR

225 R/A Merita Behluli 16,200

226 R/A Merita Behluli 3.1Amendment #1 modification of original

contract1,300

227 P C3.1/CS-SSS/10-05 3.1 Consultant for Priority 3 Activities 16,500 SSS PRIOR

228 R/A Merita Behluli 16,500

229 R/A Merita Behluli 3.1Amendment #1 modification of original

contract13,970

230 R/A Merita Behluli 3.1Amendment #1 modification of original

contract7,150

231 PC3.2/CS-CQS/09-01

3.2Firm - school standards and norms &

manual167,500 CQS PRIOR

Comments

The Consultant has completed

his task and has been paid for

Completed

Under Implementation

Completed

Completed

The Consultant has completed

his task and has been paid for

the work completed. However,

Combined Areas A and B

Completed

Completed

Completed

The Consultant has completed

his task and has been paid for

Completed

Completed

Under Implementation

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 149 of 255 10/17/2012 1:05 AM

Page 150: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

232 R/A EME 100,538

233 PC3.2/CS-SSS/10-02

3.2 School standards and norms & manual 40,000 SSS PRIOR

234 R/A Daniel Dupety 3.2 38,760

235 R/A Daniel Dupety 3.2Amendment #1 extending completion

date

236 P C3.3/CS-QCBS/09-01 3.3Firm - design and supervision of model

schools572,400 450,000 QCBS PRIOR

237 R/A Urban plus 178,921

238 R/A Urban plus 3.3Amendment #1 extending completion

date

239

240

241 PC4.1/CS-IC/09-01

4.1Consultant - higher education legisl. &

sustain.69,800 IC PRIOR

242 R/A Steve Bristow 54,500

243 PNo Number

4.1Consultant - local counterpart of intern.

Cons.6,768 IC PRIOR

244 R/A Jehona Lushaku 4,800

245 PC4.1/CS-IC/09-02

4.1Consultant - local counterpart of intern.

Cons.14,100 SSS PRIOR

246 R/A Blerim Saqipi 2,600

247 PC4.1/CS-IC/09-04

4.1 Consultant - evaluation of EPIP II - IC PRIOR

248 R/A Tom Guegon 13,026

249 PC4.1/CS-IC/09-05

4.1Consultant - SMD Grants (EPIP II)

procurement62,780 IC PRIOR

250 R/A Alexandar Najdovski

251 R/A Alexandar Najdovski 4.1Amendment #1 modification of original

contract20,550

CONSULTANTS

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

Comments

Terminated on: 6-May-2010

CompletedThe Consultant has completed

his task and has been paid for

the work completed. However,

Completed

Under Implementation

Completed

Terminated on: 12-Dec-09

Completed

Not planned

The Consultant has completed

his task and has been paid for

Completed

Completed

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 150 of 255 10/17/2012 1:05 AM

Page 151: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

252 R/A Alexandar Najdovski 4.1Amendment #2 modification of original

contract30,900

253 PC4.1/CS-IC/11-05

4.1

Consultant for the implementation of

higher education legislation

(international)

30,000 IC PRIOR

254 R/A Stephen l. Bristow 22,940

255 R/A Stephen l. BristowAmendment #1 extending completion

date

256 PC4.2/CS-IC/09-02

4.2Consultant - higher educ. financial

sustainability69,800 IC PRIOR

257 R/A Sigurd Hoellinger 4.2 66,725

258 R/A Sigurd Hoellinger 4.2Amendment #1 extending completion

date

259 R/A Sigurd Hoellinger 4.2Amendment #2 extending completion

date

260 R/A Sigurd Hoellinger 4.2Amendment #3 extending completion

date

261 R/A Sigurd Hoellinger 4.2Amendment #4 extending completion

date

Legend:

Green color under column A (line number) denotes ongoing activities

Orange color denotes activities to start

QCBS = Quality and Cost-based Selection (in accordance with sections 2.1 - 2.28 of the Guidelines)

FBC = Fixed Budget Selection (in accordance with section 3.5 of the Guidelines)

LCS = Least-Cost Selection (in accordance with section 3.6 of the Guidelines)

CQS = Selection Based on consultants' Qualifications (in accordance with section 3.7 of the Guidelines)

IC = Selection of Individual Consultants (in accordance with sections 5.1 - 5.4 of the Guidelines)

SSS = Single Source Selection in accordance with sections 3.09 - 3.13 of the Guidelines

NA = Not Applicable

OTHER = Direct expenditures

Notes:

Comments

Completed

Completed

The Consultant has completed

his task and has been paid for

the work completed. However,

Completed

Completed

Completed

Completed

The Consultant has completed

his task and has been paid for

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 151 of 255 10/17/2012 1:05 AM

Page 152: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Consultants

This is PP was updated on April 20, 2010

USD EUR

Ln. #

Status

P

R/A

d/

Comp.

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Activity WB

Review

17-Oct-12Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows

below

Proc.

Method

a/ Interval for preparation/clearance (days); working document PP only

b/ Number of days to execute the contract; working document PP only Fees for participation in PISA. This is not a procurement activity but it is keep in the PP for completeness

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Prior Review:

All QCBS contracts, first two CQS contracts, and first two IC contracts irrespective of cost

All contracts with firms estimated to cost US$ 50,000 or more

All contracts with individual consultants (IC) estimated to cost US$ 25,000 or more

All Single source selection contracts

Comments

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 152 of 255 10/17/2012 1:05 AM

Page 153: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Training

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Preparation

of

Plan

Logistics

and Budget

Int.

/a WB "No

Objection" Int.

/a

Start

Procurement Steps (1-19)

USD EUR 1 2 3

1

2

3 TRAINING

4 P W/C1.1/10-01 1.1 Workshops on new legislation - PRIOR 01-Jan-08 14 15-Jan-08 14 29-Jan-08

5 R/A 13,043

* 6 P WC1.1/11-02 1.1 In support of new legistlation at municipal. 2,500 PRIOR 1-Jul-12 14 15-Jul-12 14 29-Jul-12

7 R/A

8 P T/C1.2/10-01 1.2 Study visit on education finance (UK) 30,500 PRIOR 01-Nov-08 14 15-Nov-08 14 29-Nov-08

9 R/A 16,576 14-Nov-08

10 P W/C1.2/09-04 1.2 Workshop For The 3 Pilot Municipalties PRIOR 20-Aug-09 14 3-Sep-09 14 17-Sep-09

11 R/A 1,750 20-Aug-09 25-Aug-09 29-Aug-09

12 P T/C1.2/10-02 1.2 Training - implementation of financing formula,

Albania

- 30,000 PRIOR 04-Oct-10 14 18-Oct-10 14 01-Nov-10

13 R/A 6,349 25-Jun-10 29-Jun-10 08-Jul-10

14 P W/C1.2/09-03 1.2 10 Workshop's for financing formula PRIOR 29-Oct-09 14 12-Nov-09 14 26-Nov-09

15 R/A 14,700 29-Oct-09 1-Nov-09 03-Nov-09

16P

W/C1.2/11-01 1.2 Workshop Education budget planning in

municipalities

5,000 PRIOR20-Oct-11

14 03-Nov-11 14 17-Nov-11

17 R/A 310 20-Oct-11 24-Oct-11 24-Oct-11

18 P W/C1.2/11-02 1.2 Additional Training Aids for Finance 1,000 PRIOR 11-Nov-11 14 25-Nov-11 14 09-Dec-11

19 R/A 310 11-Nov-11 15-Nov-11 16-Nov-11

20P

W/C1.2/12-01 1.2 Conference on Reforming the education Financing

mechanisms

10,000 PRIOR09-Jan-12

14 23-Jan-12 14 06-Feb-12

21 R/A - 03-May-12 09-May-12

22 P W/C1.3/11-03 1.3 Workshop, for SGAB 486 PRIOR 09-Feb-11 14 23-Feb-11 14 09-Mar-11

23 R/A 352 09-Feb-11 09-Feb-11 21-Feb-11

24P

W/C1.3/11-04 1.3 Workshop for SDG, Grant agreement signing

ceremony

1,320 PRIOR 10-Mar-11 14 24-Mar-11 14 07-Apr-11

25 R/A 445 10-Mar-11 14-Mar-11 21-Mar-11

26

27 P 30,500 50,306

28 R/A - 53,835

29

30

31

32 TRAINING

33 P T/C2.1/11-01 2.1 Performance evaluation of teachers and licencing PRIOR 1-Jan-08 14 15-Jan-08 14 29-Jan-08

34 R/A 8,465

35 P T/C2.1/11-02 2.1 Study visit - Teacher Performance Assessment 25,396 20,000 PRIOR 01-Jul-11 14 15-Jul-11 14 29-Jul-11

36 R/A 26,998 23-Aug-11 25-Aug 26-Sep-11

37 P W/C2.1/11-03 2.1 Workshops - Teacher Performance/lincencing - 3,000 PRIOR 03-Oct-11 14 17-Oct-11 14 31-Oct-11

38 R/A 682 3-Oct-11 1 3-Oct-11 06-Oct-11

Ln.

#

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Comp. WB

Review Activity Description

17-Oct-12

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

COMPONENT 1. STRENGTHENING ORGANIZATION & FINANCING OF

EDUCATION SYSTEM

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT CAPACITY IN

PRIMARY & SECONDARY EDUCATION

Component 1. Subtotals

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 153 of 255 10/17/2012 1:05 AM

Page 154: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Training

This is PP was updated on April 20, 2010

39 p W/C2.1/11-04 2.1 Workshop - Teacher Licencing 10,000 PRIOR 19-Dec-11 14 2-Jan-12 14 16-Jan-12

40 R/A 1,680 6-Dec-11 12-Dec-11 13-Dec-11

41 R/A 1,320 13-Jan-12

42 P W/C2.1/09-04 2.1 Workshop - Teacher Licencing PRIOR 1-Jan-09 14 15-Jan-09 14 29-Jan-09

43 R/A 1,728

44 p W/C2.3/10-01 2.3 Assessment & examinations PRIOR 1-Jan-08 14 15-Jan-08 14 29-Jan-08

45 RA 9,427

46 P W/C2.3/11-03 2.3 Training on assessment 3,000 PRIOR 11-Oct-11 14 25-Oct-11 14 08-Nov-11

47 RA 880 11-Oct-11 10-Nov-11 13-Oct-11

48 RA Workshop for Assemssement Unit 1,144 13-Jan-12

49 P W/C2.3/11-04 2.3 Workshop on the Test and Design 2,000 11-Nov-11 14 25-Nov-11 14 09-Dec-11

50 R/A 880 11-Nov-11 15-Nov-11 24-Nov-11

51 R/A Test Item development 900 27-Feb-12 6-Mar-12 07-Mar-12

51P

W/C2.3/11-04 2.3 Conference Vision for the Matura 2015 in Kosovo 25,100 PRIOR 4-Nov-11 14 18-Nov-11 14 02-Dec-11

52 R 25,100 4-Nov-11 11-Nov-11 21-Nov-11

53 P T/C2.3/11-01 2.3 Study visit on assessment 20,000 PRIOR 1-Jul-12 14 15-Jul-12 40 24-Aug-12

54 R/A

55 P T/C2.3/11-02 2.3 Participation in the ECA education Conference 5,631 PRIOR 6-Sep-11 14 20-Sep-11 14 04-Oct-11

56 R 6-Sep-11 20-Sep-11 23-Oct-11

57P

T/2.3/11-03 2.3 Study Visit on Teacher Professional

Development(Slovenia)

3,691 PRIOR 15-Nov-11 14 29-Nov-11 14 13-Dec-11

58 R/A 15-Nov-11 17-Nov-11

59 P T/2.3/12-04 2.3 Training for Matura test Administrators 25,700 PRIOR 3-Apr-12 14 17-Apr-12 14 01-May-12

60 R/A 25,700 3-Apr-12 17-Apr-12

61P

W/2.3/12-05 2.3 Confernce for AU teacher performance

assessment

15,000 PRIOR 1-Jul-12 14 15-Jul-12 14 29-Jul-12

62 R/A

63 P T/C2.4/10-01 2.4 Study visits - EMIS staff (7 participants) 29,700 44,496 PRIOR 15-Jan-10 14 29-Jan-10 14 12-Feb-10

64 R/A 7,980 20-Jul-10 23-Jul-10 10-Aug-10

65 P T/C2.5/10-06 2.5 Project Confferences - PRIOR 01-Jan-08 14 15-Jan-08 14 29-Jan-08

66 R/A 5,427

67 P T/C2.5/09-01 2.5 Procurement training in Skopje PRIOR 30-Mar-09 14 04/13/2009 14 27-Apr-09

68 R/A 639 30-Mar-09 31-Mar-09 07-Apr-09

69 P T/C2.5/10-02 2.5 Procurement training 3,500 PRIOR 15-Jan-10 14 29-Jan-10 14 12-Feb-10

70 R/A 1,300 19-Apr-10 14-May-10 31-May-10

71 P T/C2.5/10-04 2.5 Procurement training 1,307 PRIOR 5-Oct-10 14 19-Oct-10 14 2-Nov-10

72 R/A 1,281 6-Oct-10 10-Oct-10 18-Oct-10

73 P T/C2.5/10-03 2.5 Staff Professional Development 11,217 9,000 PRIOR 09-Jan-12 14 23-Jan-12 14 06-Feb-12

74 R/A Disbursment & FM training, Tirana 12.13.03.2012 907 21-Feb-12 06-Mar 12-Mar-12

75 P T/C2.5/10-05 2.5 Financal management training 1,164 PRIOR 22-Dec-10 14 5-Jan-11 14 19-Jan-11

76 R/A 956 22-Dec-10 10-Jan-11 19-Jan-10

77

78 P 69,813 189,089

79 R/A - 97,693

80

81

82

83 TRAINING

84 P T/C3.1/10-01 3.1 School Mapping - PRIOR 01-Jan-08 14 15-Jan-08 14 29-Jan-08

85 R/A 22,564 7-Sep-09

86 P T/C3.1/10-02 3.1 Safeguards training - PRIOR 01-Jan-08 14 15-Jan-08 14 29-Jan-08

87 R/A 3,035

88 P T/C3.1/10-03 3.1 School mapping, investement planning and

inventory taking

- PRIOR 01-Jan-08 14 15-Jan-08 14 29-Jan-08

89 R/A 1,590

90 P T/C3.1/10-04 3.2 Standards and Norms on School Design - PRIOR 01-Jan-08 14 15-Jan-08 14 29-Jan-08

Component 2. Subtotals

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE EFFICIENT

DESIGNS IN KOSOVO'S SCHOOLS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 154 of 255 10/17/2012 1:05 AM

Page 155: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Training

This is PP was updated on April 20, 2010

91 R/A 2,475

92 P T/C3.2/10-01 3.2 Overseas study visit on school design - 15,000 PRIOR 20-Sep-10 14 04-Oct-10 14 18-Oct-10

93 R/A 12,214 20-Sep-10 24-Sep-10 11-Oct-10

94P

W/3.2/12-02 3.2 Public presentation of School Design manual in

municipaities

- 500 PRIOR01-Jul-12

14 15-Jul-12 14 29-Jul-12

95 R/A -

96 P W/3.2/12-03 3.2 Conference on School Buildings and Standards - 10,000 PRIOR 01-Jul-12 14 15-Jul-12 14 29-Jul-12

97 R/A -

98 P W/3.3/12-01 3.3 Study visit for ID 5,000 PRIOR 18-Jun-12 14 2-Jul-12 14 16-Jul-12

99 R/A 2,977 18-Jun-12

100 P - 30,500

101 R/A - 44,855

102

103

104

105 TRAINING

106 P T/C4.1/10-01 4.1 Workshop on Higher Education Legislation - 1,684 PRIOR 19-Jul-10 14 02-Aug-10 14 16-Aug-10

107 R/A 1,685 28-Jul-10

108 P T/C4.1/10-01 4.1 Workshop on Higher Education Legislation - 5,000 PRIOR 01-Mar-12 14 15-Mar-12 14 29-Mar-12

109 R/A -

110 P W/C4.2/10-02 4.2 Workshop on Higer Education PRIOR 5-Jun-10 14 19-Jun-10 14 03-Jul-10

111 R/A 1,369 5-Jun-10 10-Jun-10 03-Aug-10

112 P T/C4.2/11-01 4.2 Workshop on Financing of Higher Education - 2,000 PRIOR 01-Mar-12 14 15-Mar-12 14 29-Mar-12

113 R/A -

114 P - 8,684

115 R/A - 3,054

Database Subtotals Tool 200,626 981,730

* on going activities

Component 4. Subtotals

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER EDUCATION

Component 3. Subtotals

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 155 of 255 10/17/2012 1:05 AM

Page 156: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Training

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Ex

ec

. /b

Compl. Pysical

Progress %

Payment to

vendor %

Procurement Steps (1-19)

4

30 28-Feb-08 STU

3 100 100 implemented

2 31-Jul-12

30 29-Dec-08 STU

4 22-Nov-08 100 100 implemented

2 19-Nov-09

2 30-Aug-09 100 100 implemented

120 01-Mar-11 STU

11-Jul-10 100 100 implemented

90 24-Feb-10

05-Feb-10 100 100 implemented

4 21-Nov-11

24-Oct-11 100 100 implemented

4 13-Dec-11

16-Nov-11 100 100 implemented

4 10-Feb-12

1 10-Mar-11

0 21-Feb-11 100 100 implemented

1 08-Apr-11

0 21-Mar-11 100 100 implemented

30 28-Feb-08

100 100 implemented

1 30-Jul-11 WOR

30-Sep-11 100 100 implemented

1 01-Nov-11 WOR

7 13-Oct-11 100 100 implemented

Procure-

ment

Accoun

ts

Comments

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 156 of 255 10/17/2012 1:05 AM

Page 157: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Training

This is PP was updated on April 20, 2010

1 17-Jan-12

15-Dec-11 100 100

30 28-Feb-09

100 100 implemented

2 31-Jan-08

100 100

1 09-Nov-11

14-Oct-11 100 100

7 16-Dec-11

25-Nov-11 100 100 implemented

08-Mar-12 100 100 implemented

2 04-Dec-11 Not planned

22-Nov-11 100 100 implemented

30 23-Sep-12

2 06-Oct-11 Not planned

27-Oct-11 100 100

2 15-Dec-11

Not planned

2 03-May-12

2 31-Jul-12

30 14-Mar-10 STU

13-Aug-10 100 100 implemented

30 28-Feb-08 STU

3 30-Apr-09

3 10-Apr-09 100 100 Implemented

30 14-Mar-10 STU

4-Jun-10 100 100 Implemented

30 2-Dec-10

22-Oct-10 100 100 Implemented

1 07-Feb-12 STU

13-Mar-12 100 100 implemented

5 24-Jan-11

21-Jan-10 100 100 implemented

30 28-Feb-08 STU

100 100 implemented

30 28-Feb-08 STU

100 100 implemented

30 28-Feb-08 STU

100 100 implemented

30 28-Feb-08 STU

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 157 of 255 10/17/2012 1:05 AM

Page 158: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Training

This is PP was updated on April 20, 2010

100 100 implemented

30 17-Nov-10 STU

6 17-Oct-10 100 100 Implemented

30 28-Aug-12 STU

30 28-Aug-12 STU

2 18-Jul-12

30 15-Sep-10 STU

28-Jul-10 100 100 Implemented

1 30-Mar-12 STU

1 04-Jul-10

1 03-Aug-10 100 100 Implemented

1 30-Mar-12 STU

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 158 of 255 10/17/2012 1:05 AM

Page 159: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Training

This is PP was updated on April 20, 2010

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 159 of 255 10/17/2012 1:05 AM

Page 160: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

1

2

3

4 Municipal Grants (15)

5 P C1.2/MG#1 1.2 1. Kacanik 1 35,000 16,200 MNL Post 05-Oct-09 14 19-Oct-09 NA 3 22-Oct-09 14

6 R/A - 16,197

7 P C1.2/MG#2 1.2 2. Gjilan 1 35,000 21,200 MNL Post 05-Oct-09 14 19-Oct-09 NA 3 22-Oct-09 14

8 R/A - 17,354

9 P C1.2/MG#3 1.2 3. Istog 1 35,000 10,890 MNL Post 05-Oct-09 14 19-Oct-09 NA 3 22-Oct-09 14

10 R/A - -

11 P 15 105,000 48,290

12 R/A - - 33,551

13

14 P C1.3/SDG/01 1.3 Gjon Serreçi 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

15 R/A - 10,000 14-Feb-11 NA NA NA

16 P C1.3/SDG/02 1.3 Ahmet Hoxha 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

17 R/A - 10,000 14-Feb-11 NA NA NA

18 P C1.3/SDG/03 1.3 Naim Frasheri 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

19 R/A - 9,605 1-May-11 NA NA NA

20 P C1.3/SDG/04 1.3 Dituria - Ferizaj 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

21 R/A - 6,180 14-Feb-11 NA NA NA

22 P C1.3/SDG/05 1.3 Ali Hadri 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

23 R/A - 6,140 14-Feb-11 NA NA NA

24 P C1.3/SDG/06 1.3 Ismail Luma 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

25 R/A - 8,725 14-Feb-11 NA NA NA

26 P C1.3/SDG/07 1.3 Zenel Hajdini 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

27 R/A - 10,000 14-Feb-11 NA NA NA

28 P C1.3/SDG/08 1.3 Haradin Bajrami (Jeronim de Rada) 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

29 R/A - 10,000 14-Feb-11 NA NA NA

30 P C1.3/SDG/09 1.3 Bajram Curri 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

31 R/A - 10,000 14-Feb-11 NA NA NA

32 P C1.3/SDG/10 1.3 F.Guri dhe V.Qaka 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

33 R/A - 13,661 1-May-11 NA NA NA

32 P C1.3/SDG/11 1.3 Dituria - Kaqanik 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

33 R/A - 5,825 14-Feb-11 NA NA NA

34 P C1.3/SDG/14 1.3 Sh. F. Kabashi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

35 R/A - 5,100 14-Feb-11 NA NA NA

36 P C1.3/SDG/15 1.3 Ardhmeria 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

37 R/A - 5,335 14-Feb-11 NA NA NA

38 P C1.3/SDG/16 1.3 Zenun Cocaj 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

39 R/A - 8,040 14-Feb-11 NA NA NA

40 P C1.3/SDG/17 1.3 Izvor 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

41 R/A - 5,435 14-Feb-11 NA NA NA

42 P C1.3/SDG/18 1.3 Zef Lush Marku 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

17-Oct-12

COMPONENT 1. STRENGTHENING ORGANIZATION &

FINANCING OF EDUCATION SYSTEM

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Subtotal Municipal Grants

GRANTS

First round, Primary School Grants

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 160 of 255 10/17/2012 1:05 AM

Page 161: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

43 R/A - 8,130 14-Feb-11 NA NA NA

44 P C1.3/SDG/19 1.3 Nazmi Buduri 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

45 R/A - 8,040 14-Feb-11 NA NA NA

46 P C1.3/SDG/22 1.3 Drita 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

47 R/A - 5,210 14-Feb-11 NA NA NA

48 P C1.3/SDG/23 1.3 K. I Manastirit 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

49 R/A - 8,940 14-Feb-11 NA NA NA

50 P C1.3/SDG/24 1.3 Ilmi Bahtijari 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

51 R/A - 9,395 14-Feb-11 NA NA NA

52 P C1.3/SDG/25 1.3 Fetah Sylejmani 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

53 R/A - 8,075 1-May-11 NA NA NA

54 P C1.3/SDG/26 1.3 Haxhi Ymer Lutfiu 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

55 R/A - 4,437 14-Feb-11 NA NA NA

56 P C1.3/SDG/27 1.3 Vellazerimi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

57 R/A - 7,815 14-Feb-11 NA NA NA

58 P C1.3/SDG/28 1.3 Zef Lush Marku - Bregoc 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

59 R/A - 9,615 14-Feb-11 NA NA NA

60 P C1.3/SDG/29 1.3 Nimon Ferizi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

61 R/A - 5,385 14-Feb-11 NA NA NA

62 P C1.3/SDG/30 1.3 Fehmi Agani 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

63 R/A - 8,075 14-Feb-11 NA NA NA

64 P C1.3/SDG/31 1.3 Ganimer Terbeshi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

65 R/A - 6,085 14-Feb-11 NA NA NA

66 P C1.3/SDG/32 1.3 7 Shtatori 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

67 R/A - 5,225 14-Feb-11 NA NA NA

68 P C1.3/SDG/33 1.3 Fan Noli 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

69 R/A - 5,510 14-Feb-11 NA NA NA

70 P C1.3/SDG/34 1.3 Rilindja 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

71 R/A - 4,435 14-Feb-11 NA NA NA

72 P C1.3/SDG/35 1.3 Mustafe Ibishi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

73 R/A - 8,185 14-Feb-11 NA NA NA

74 P C1.3/SDG/36 1.3 Jusf Gervalla 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

75 R/A - 6,695 14-Feb-11 NA NA NA

76 P C1.3/SDG/38 1.3 7 Shtatori - Rahovec 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

77 R/A - 5,755 14-Feb-11 NA NA NA

78 P C1.3/SDG/40 1.3 Rifat Berisha 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

79 R/A - 6,290 14-Feb-11 NA NA NA

80 P C1.3/SDG/41 1.3 Vesel Pagarusha 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

81 R/A - 6,285 14-Feb-11 NA NA NA

82 P C1.3/SDG/42 1.3 Ismet Jashari Kumanova 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

83 R/A - 5,265 14-Feb-11 NA NA NA

84 P C1.3/SDG/43 1.3 Tafil Kelmendi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

85 R/A - 5,685 14-Feb-11 NA NA NA

86 P C1.3/SDG/44 1.3 Bajram Curri - Drenoc 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

87 R/A - 6,450 14-Feb-11 NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 161 of 255 10/17/2012 1:05 AM

Page 162: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

88 P C1.3/SDG/46 1.3 Xhemajl Kada 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

89 R/A - 8,425 14-Feb-11 NA NA NA

90 P C1.3/SDG/47 1.3 7 Shtatori - Vitomirice 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

91 R/A - 9,340 14-Feb-11 NA NA NA

92 P C1.3/SDG/48 1.3 Deshmoret e Kombit 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

93 R/A - 8,945 14-Feb-11 NA NA NA

94 P C1.3/SDG/49 1.3 Skenderbeu 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

95 R/A - 6,900 14-Feb-11 NA NA NA

96 P C1.3/SDG/50 1.3 Ndre Mjeda 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

97 R/A - 8,560 14-Feb-11 NA NA NA

98 P C1.3/SDG/51 1.3 Avni Rrustemi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

99 R/A - 7,450 14-Feb-11 NA NA NA

100 P C1.3/SDG/52 1.3 Fan Noli - Lluk I Bregut 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

101 R/A - 6,975 14-Feb-11 NA NA NA

102 P C1.3/SDG/53 1.3 Emin Duraku 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

103 R/A - 9,000 14-Feb-11 NA NA NA

104 P C1.3/SDG/54 1.3 Ali Krasniqi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

105 R/A - 8,425 14-Feb-11 NA NA NA

106 P C1.3/SDG/55 1.3 Azem Bejta 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

107 R/A - 6,730 14-Feb-11 NA NA NA

108 P C1.3/SDG/56 1.3 Tre Deshmoret 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

109 R/A - 8,945 14-Feb-11 NA NA NA

110 P C1.3/SDG/57 1.3 Ate Gjergj Fishta 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

111 R/A - 4,675 14-Feb-11 NA NA NA

112 P C1.3/SDG/58 1.3 Drita - Gramqel 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

113 R/A - 7,365 14-Feb-11 NA NA NA

114 P C1.3/SDG/59 1.3 Heronjt e Dukagjinit 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

115 R/A - 5,265 14-Feb-11 NA NA NA

116 P C1.3/SDG/60 1.3 Faik Konica 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

117 R/A - 4,715 14-Feb-11 NA NA NA

118 P C1.3/SDG/61 1.3 Esat Mekuli 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

119 R/A - 4,510 14-Feb-11 NA NA NA

120 P C1.3/SDG/62 1.3 Rexhep Kadrijaj 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

121 R/A - 5,500 14-Feb-11 NA NA NA

122 P C1.3/SDG/64 1.3 Avni Rrustemi - Mramuer 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

123 R/A - 7,155 14-Feb-11 NA NA NA

124 P C1.3/SDG/65 1.3 Nexhmi Mustafa 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

125 R/A - 7,180 14-Feb-11 NA NA NA

126 P C1.3/SDG/66 1.3 Tefik Canga 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

127 R/A - 6,565 14-Feb-11 NA NA NA

128 P C1.3/SDG/67 1.3 Pjeter Bogdani 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

129 R/A - 10,000 14-Feb-11 NA NA NA

130 P C1.3/SDG/68 1.3 Sami Frasheri 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

131 R/A - 7,710 14-Feb-11 NA NA NA

132 P C1.3/SDG/70 1.3 Jahe Hasani 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 162 of 255 10/17/2012 1:05 AM

Page 163: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

133 R/A - 5,370 14-Feb-11 NA NA NA

134 P C1.3/SDG/71 1.3 Luigj Gurakuqi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

135 R/A - 9,680 14-Feb-11 NA NA NA

136 P C1.3/SDG/72 1.3 Drita - Majac 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

137 R/A - 9,790 14-Feb-11 NA NA NA

138 P C1.3/SDG/73 1.3 Laura Scotti 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

139 R/A - 4,805 14-Feb-11 NA NA NA

140 P C1.3/SDG/74 1.3 Lismir 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

141 R/A - 4,755 14-Feb-11 NA NA NA

142 P C1.3/SDG/75 1.3 Naim Frasheri - Bresnice 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

143 R/A - 7,180 14-Feb-11 NA NA NA

144 P C1.3/SDG/76 1.3 Migjeni 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

145 R/A - 7,450 14-Feb-11 NA NA NA

146 P C1.3/SDG/77 1.3 Knez Llazar 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

147 R/A - 10,000 1-May-11 NA NA NA

148 P C1.3/SDG/78 1.3 Aferdita 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

149 R/A - 7,030 14-Feb-11 NA NA NA

150 P C1.3/SDG/79 1.3 Bajram Curri - Shurdhan 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

151 R/A - 4,630 14-Feb-11 NA NA NA

152 P C1.3/SDG/80 1.3 Fetah Qerimi 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

153 R/A - 5,690 14-Feb-11 NA NA NA

154 P C1.3/SDG/81 1.3 Liria 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

155 R/A - 5,435 14-Feb-11 NA NA NA

156 P C1.3/SDG/82 1.3 Kadri Zeka 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

157 R/A - 6,480 14-Feb-11 NA NA NA

158 P C1.3/SDG/83 1.3 Sadri Misini 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

159 R/A - 6,885 14-Feb-11 NA NA NA

160 P C1.3/SDG/84 1.3 Asdreni 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

161 R/A - 6,095 14-Feb-11 NA NA NA

162 P C1.3/SDG/86 1.3 Hysen Terpeza 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

163 R/A - 6,010 14-Feb-11 NA NA NA

164 P C1.3/SDG/87 1.3 Vellezerit Gervalla 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

165 R/A - 8,470 14-Feb-11 NA NA NA

166 P C1.3/SDG/88 1.3 Deshmoret e 5 Prillit 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

167 R/A - 7,095 14-Feb-11 NA NA NA

168 P C1.3/SDG/90 1.3 Gjon Serreci - Mogille 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

169 R/A - 5,980 14-Feb-11 NA NA NA

170 P C1.3/SDG/91 1.3 Deshmoret e Qendreses 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

171 R/A - 5,485 14-Feb-11 NA NA NA

172 P C1.3/SDG/92 1.3 Desjmoret e Drenices 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

173 R/A - 5,140 14-Feb-11 NA NA NA

174 P C1.3/SDG/93 1.3 Xheve Lladrovci 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

175 R/A - 5,435 14-Feb-11 NA NA NA

176 P C1.3/SDG/94 1.3 Shote Galica 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

177 R/A - 6,480 14-Feb-11 NA NA NA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 163 of 255 10/17/2012 1:05 AM

Page 164: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

178 P C1.3/SDG/96 1.3 Abedin Rexha 1 - 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

179 R/A - 6,180 14-Feb-11 NA NA NA

180 P C1.3/SDG/98 1.3 Habib Jusufi 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

181 R/A 5,345 14-Feb-11 NA NA NA

182 P C1.3/SDG/99 1.3 Jusuf Rexha 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

183 R/A 6,115 14-Feb-11 NA NA NA

184 P C1.3/SDG/100 1.3 Sefedin Smakolli 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

185 R/A 5,625 14-Feb-11 NA NA NA

186 P C1.3/SDG/101 1.3 Trepca 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

187 R/A 7,620 14-Feb-11 NA NA NA

188 P C1.3/SDG/102 1.3 Bedri Gjinaj 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

189 R/A 7,165 14-Feb-11 NA NA NA

190 P C1.3/SDG/104 1.3 Azem Bejta - Dubovc 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

191 R/A 6,090 14-Feb-11 NA NA NA

192 P C1.3/SDG/105 1.3 Bajram Curri - Dumnice 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

193 R/A 6,255 14-Feb-11 NA NA NA

194 P C1.3/SDG/106 1.3 Gj.K. Skenderbeu 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

195 R/A 7,350 14-Feb-11 NA NA NA

196 P C1.3/SDG/107 1.3 Adem Voca 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

197 R/A 5,075 14-Feb-11 NA NA NA

198 P C1.3/SDG/108 1.3 Emin Duraku - Novolane 1 10,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

199 R/A 6,555 14-Feb-11 NA NA NA

200 P C1.3/SDG/111 1.3 Dardania 1 10,000 MNL Post 16-Jan-12 14 30-Jan-12 NA 3 02-Feb-12 14

201 R/A 5,005 NA NA NA

202 P C1.3/SDG/112 1.3 K. Kristoforidhi 1 10,000 MNL Post 16-Jan-12 14 30-Jan-12 NA 3 02-Feb-12 14

203 R/A 6,585 NA NA NA

204 P C1.3/SDG/113 1.3 Fehmi Agani 1 10,000 MNL Post 16-Jan-12 14 30-Jan-12 NA 3 02-Feb-12 14

205 R/A 6,180 NA NA NA

206 P C1.3/SDG/114 1.3 Shtjefen Gjeqovi 1 10,000 MNL Post 16-Jan-12 14 30-Jan-12 NA 3 02-Feb-12 14

207 R/A 8,125 NA NA NA

208 P C1.3/SDG/115 1.3 Abdullah Shabani 1 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

209 R/A 8,565

210 P C1.3/SDG/116 1.3 G. Luma 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

211 R/A 5,110

212 P C1.3/SDG/117 1.3 Sharski Odredi 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

213 R/A 8,510

214 P C1.3/SDG/118 1.3 Sezai Surroi 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

215 R/A 7,495

216 P C1.3/SDG/119 1.3 Mic Sokoli 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

217 R/A 6,165

218 P C1.3/SDG/120 1.3 Haziz Tolaj 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

219 R/A 7,275

220 P C1.3/SDG/121 1.3 Luigj Gurakuqi 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

221 R/A 8,030

SECOND ROUND PRIMARY SCHOOL

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 164 of 255 10/17/2012 1:05 AM

Page 165: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

222 P C1.3/SDG/123 1.3 Sadri Duhla 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

223 R/A 10,000

224 P C1.3/SDG/124 1.3 Deshmoret e Tivarit 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

225 R/A 8,000

226 P C1.3/SDG/125 1.3 Sahban Spahiu 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

227 R/A 9,445

228 P C1.3/SDG/126 1.3 Ferhat Binishi 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

229 R/A 6,260

230 P C1.3/SDG/127 1.3 Ukshin Miftari 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

231 R/A 6,050

232 P C1.3/SDG/128 1.3 Qemajl Bakia 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

233 R/A 5,850

234 P C1.3/SDG/130 1.3 Pataqan I ulet 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

235 R/A 5,510

236 P C1.3/SDG/131 1.3 4 Deshmoret 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

237 R/A 7,835

238 P C1.3/SDG/132 1.3 Afrim Buqaj 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

239 R/A 5,710

240 P C1.3/SDG/133 1.3 Deshmoret e fshatit Bubavec 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

241 R/A 6,000

242 P C1.3/SDG/134 1.3 Gjergj Kastrioti 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

243 R/A 7,850

244 P C1.3/SDG/136 1.3 Ramiz Sadiku 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

245 R/A 7,505

246 P C1.3/SDG/137 1.3 Jusuf Gervalla 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

247 R/A 7,095

248 P C1.3/SDG/138 1.3 Nena Tereze 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

249 R/A 8,025

250 P C1.3/SDG/139 1.3 Shkendija 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

251 R/A 10,000

252 P C1.3/SDG/140 1.3 Ganimete Terbeshi 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

253 R/A 6,515

254 P C1.3/SDG/142 1.3 Mitrush Kurteli 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

255 R/A 7,875

256 P C1.3/SDG/143 1.3 Xhavit Ahmeti 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

257 R/A 10,000

258 P C1.3/SDG/144 1.3 Zahir Pajaziti 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

259 R/A 8,560

260 P C1.3/SDG/145 1.3 Kadri Kadriu 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

261 R/A 7,750

262 P C1.3/SDG/147 1.3 Daut Bogujevci 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

263 R/A 6,850

264 P C1.3/SDG/148 1.3 Bajram Curri 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

265 R/A 9,705

266 P C1.3/SDG/149 1.3 Fazli Grajcevci 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 165 of 255 10/17/2012 1:05 AM

Page 166: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

267 R/A 7,685

268 P C1.3/SDG/150 1.3 Gradjevinsko Saobracajna Skola 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

269 R/A 7,767

270 P C1.3/SDG/152 1.3 Vehbi Ibrahimi 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

271 R/A 5,055

272 P C1.3/SDG/153 1.3 Esat Berisha 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

273 R/A 5,600

274 P C1.3/SDG/154 1.3 Fan Noli 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

275 R/A 10,000

276 P C1.3/SDG/155 1.3 Kenan Halimi 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

277 R/A 6,590

278 P C1.3/SDG/156 1.3 Halil Alidema 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

279 R/A 9,520

280 P C1.3/SDG/157 1.3 Ali Gashi 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

281 R/A 6,090

282 P C1.3/SDG/158 1.3 28 Nentori 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

283 R/A 5,896

284 P C1.3/SDG/159 1.3 Shaban Jashari 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

285 R/A 10,000

286 P C1.3/SDG/160 1.3 Shote Galica 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

287 R/A 9,035

288 P C1.3/SDG/161 1.3 Fazli Grajcevci 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

289 R/A 10,000

290 P C1.3/SDG/163 1.3 Lumni Surdulli 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

291 R/A 5,790

292 P C1.3/SDG/164 1.3 SHMU 2 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

293 R/A 10,000

294 P C1.3/SDG/165 1.3 Mihaliq 10,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

295 R/A 5,290

296 P C1.3/SDG/166 1.3 Tefik Canga 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

297 R/A 10,000

298 P C1.3/SDG/167 1.3 SH.m.f.u. Tern 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

299 R/A 6,805

300 P C1.3/SDG/168 1.3 A. Bajrami 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

301 R/A 4,825

302 P C1.3/SDG/169 1.3 Zenel Hajdini 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

303 R/A 9,830

304 P C1.3/SDG/170 1.3 Sinan Thaci 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

305 R/A 4,835

306 P C1.3/SDG/171 1.3 Fatmir Berisha 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

307 R/A 7,825

308 P C1.3/SDG/172 1.3 7 Marsi 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

309 R/A 7,330

310 P C1.3/SDG/173 1.3 Iliria 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

THIRD ROUND PRIMARY SCHOOL

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 166 of 255 10/17/2012 1:05 AM

Page 167: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

311 R/A 5,155

312 P C1.3/SDG/174 1.3 Shkendija 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

313 R/A 7,410

314 P C1.3/SDG/175 1.3 Svetlost, Krusheva 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

315 R/A 4,350

316 P C1.3/SDG/176 1.3 Durak Ahmeti 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

317 R/A 6,600

318 P C1.3/SDG/177 1.3 Luigj Gurakuqi 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

319 R/A 4,950

320 P C1.3/SDG/178 1.3 Mark Zef Prenaj 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

321 R/A 4,950

322 P C1.3/SDG/179 1.3 Heronjt e Kosoves 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

323 R/A 6,585

324 P C1.3/SDG/180 1.3 Liria 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

325 R/A 6,285

326 P C1.3/SDG/181 1.3 Eqrem Qabej 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

327 R/A 6,015

328 P C1.3/SDG/182 1.3 Ganimete Terbeshi 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

329 R/A 6,460

330 P C1.3/SDG/183 1.3 Hasan Prishitna 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

331 R/A 5,080

332 P C1.3/SDG/184 1.3 Afrim Krasniqi 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

333 R/A 5,240

334 P C1.3/SDG/185 1.3 Rilindja 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

335 R/A 6,375

336 P C1.3/SDG/186 1.3 Hill Mosi 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

337 R/A 5,895

338 P C1.3/SDG/187 1.3 Vaso Pashe Shkodrani 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

339 R/A 8,685

340 P C1.3/SDG/188 1.3 Martin Camaj 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

341 R/A 8,520

342 P C1.3/SDG/189 1.3 Ardhemrija 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

343 R/A 4,920

344 P C1.3/SDG/190 1.3 Isa Boletini 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

345 R/A 6,985

346 P C1.3/SDG/191 1.3 Gjergj Fishta 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

347 R/A 10,000

348 P C1.3/SDG/192 1.3 Asim Vokshi 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

349 R/A 9,040

350 P C1.3/SDG/193 1.3 Shefki Kuleta 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

351 R/A 8,380

352 P C1.3/SDG/194 1.3 Mihail Grameno 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

353 R/A 10,000

354 P C1.3/SDG/195 1.3 Liria 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

355 R/A 7,290

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 167 of 255 10/17/2012 1:05 AM

Page 168: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

356 P C1.3/SDG/196 1.3 Nazim Hikmet 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

357 R/A 8,285

358 P C1.3/SDG/197 1.3 Nuhi Berisha 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

359 R/A 4,410

360 P C1.3/SDG/198 1.3 Idriz Seferi 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

361 R/A 4,070

362 P C1.3/SDG/199 1.3 Skender Emerllahu 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

363 R/A 6,555

364 P C1.3/SDG/200 1.3 Dositej Obradovic 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

365 R/A 6,285

366 P C1.3/SDG/201 1.3 Mehdi Sylejman Bytyqi 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

367 R/A 4,795

368 P C1.3/SDG/202 1.3 Minatori 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

369 R/A 4,520

370 P C1.3/SDG/203 1.3 Liria 10,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

371 R/A 7,445

372 P 1,830,321

373 R/A 1,272,846

374

375 P C1.3/SDG/10 1.3 F. Guri V.Caka 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

376 R/A 13,661 14-Feb-11 NA NA NA

377 P C1.3/SDG/12 1.3 Dardania 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

378 R/A - 8,610 14-Feb-11 NA NA NA

379 P C1.3/SDG/13 1.3 K. I Manastirit - Firaje 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

380 R/A - 6,912 14-Feb-11 NA NA NA

381 P C1.3/SDG/20 1.3 Gjimnazi II Gjuhersor 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

382 R/A 14,100 14-Feb-11 NA NA NA

383 P C1.3/SDG/21 1.3 Jeta e Re 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

384 R/A 15,000 14-Feb-11 NA NA NA

385 P C1.3/SDG/37 1.3 12 Maji 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

386 R/A 10,806 14-Feb-11 NA NA NA

387 P C1.3/SDG/39 1.3 Lasgush Poradeci 1 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

388 R/A 11,995 14-Feb-11 NA NA NA

389 P C1.3/SDG/45 1.3 Shaban Spahija 1 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

390 R/A 15,000 14-Feb-11 NA NA NA

391 P C1.3/SDG/63 1.3 Gj. Sami Frasheri 1 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

392 R/A 15,000 14-Feb-11 NA NA NA

393 P C1.3/SDG/69 1.3 Aleksander Xhuvani 1 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

394 R/A 15,000 14-Feb-11 NA NA NA

395 P C1.3/SDG/85 1.3 Veliko Rapotovo 1 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

Subtotal School Development Grants - primary

First round, Secondary School Grants

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 168 of 255 10/17/2012 1:05 AM

Page 169: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

396 R/A 8,740 14-Feb-11 NA NA NA

397 P C1.3/SDG/89 1.3 Shkolla e Mesme e Mjekesise 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

398 R/A - 7,641 14-Feb-11 NA NA NA

399 P C1.3/SDG/95 1.3 Gj,K. Skenderbeu 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

400 R/A - 15,000 14-Feb-11 NA NA NA

401 P C1.3/SDG/97 1.3 Anton Cetta 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

402 R/A - 15,000 14-Feb-11 NA NA NA

403 P C1.3/SDG/103 1.3 Arkitekt Sinani 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

404 R/A - 13,549 14-Feb-11 NA NA NA

405 P C1.3/SDG/109 1.3 Eqrem Qabej 1 - 15,000 MNL Post 14-Mar-11 14 28-Mar-11 NA 3 31-Mar-11 14

406 R/A - 15,000 14-Feb-11 NA NA NA

407 P C1.3/SDG/110 1.3 Pjeter Bogdani 1 - 15,000 MNL Post 16-Jan-12 14 30-Jan-12 NA 3 02-Feb-12 14

408 R/A - 13,885

409 P C1.3/SDG/122 1.3 Gani Cavdarbashi 1 - 15,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

410 R/A - 15,000

411 P C1.3/SDG/129 1.3 Hysni Zajmi 1 - 15,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

412 R/A - 15,000

413 P C1.3/SDG/135 1.3 Odhise Pakali 1 - 15,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

414 R/A - 9,650

415 P C1.3/SDG/141 1.3 Eqrem Qabej 1 - 15,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

416 R/A - 11,634

417 P C1.3/SDG/146 1.3 Isa Boletini 1 - 15,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

418 R/A - 15,000

419 P C1.3/SDG/151 1.3 Arberia 1 - 15,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

420 R/A - 12,912

421 P C1.3/SDG/162 1.3 Frang Bardhi 1 - 15,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

422 R/A - 15,000

423 P C1.3/SDG/110 1.3 1 - 15,000 MNL Post 16-Jan-12 30 15-Feb-12 NA 30 16-Mar-12 20

424 R/A -

425 P C1.3/SDG/ 1.3 SH.M.L 1 - 15,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

426 R/A 8,432

427 P C1.3/SDG/ 1.3 Sh. E mesme ekonomike 1 - 15,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

428 R/A 6,899

429 P C1.3/SDG/ 1.3 Fehmi Lladrovci 1 - 15,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

430 R/A 15,000

431 P C1.3/SDG/ 1.3 Hamez Jashari 1 - 15,000 MNL Post 07-May-12 30 06-Jun-12 NA 30 06-Jul-12 20

432 R/A 12,762

433 P 435,000

434 R/A 352,188

435

436 15 105,000 2,313,611

437 - - 1,658,584

Component 1. Totals (Grants)

Subtotal School Development Grants - Secondary

SECOND ROUND - SECONDARY SCHOOLS

THIRD ROUND - SECONDARY SCHOOLS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 169 of 255 10/17/2012 1:05 AM

Page 170: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a Advert-

izing Int.

/a Issue of

Documents Int.

/a

Procurement Steps (1-11)

USD EUR 1 2 3 4

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Database Subtotals Tool 15 181,846 141,378

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 170 of 255 10/17/2012 1:05 AM

Page 171: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

1

2

3

4 Municipal Grants (15)

5 P C1.2/MG#1 1.2 1. Kacanik 1 35,000 16,200 MNL Post

6 R/A - 16,197

7 P C1.2/MG#2 1.2 2. Gjilan 1 35,000 21,200 MNL Post

8 R/A - 17,354

9 P C1.2/MG#3 1.2 3. Istog 1 35,000 10,890 MNL Post

10 R/A - -

11 P 15 105,000 48,290

12 R/A - - 33,551

13

14 P C1.3/SDG/01 1.3 Gjon Serreçi 1 10,000 MNL Post

15 R/A - 10,000

16 P C1.3/SDG/02 1.3 Ahmet Hoxha 1 - 10,000 MNL Post

17 R/A - 10,000

18 P C1.3/SDG/03 1.3 Naim Frasheri 1 - 10,000 MNL Post

19 R/A - 9,605

20 P C1.3/SDG/04 1.3 Dituria - Ferizaj 1 - 10,000 MNL Post

21 R/A - 6,180

22 P C1.3/SDG/05 1.3 Ali Hadri 1 - 10,000 MNL Post

23 R/A - 6,140

24 P C1.3/SDG/06 1.3 Ismail Luma 1 - 10,000 MNL Post

25 R/A - 8,725

26 P C1.3/SDG/07 1.3 Zenel Hajdini 1 - 10,000 MNL Post

27 R/A - 10,000

28 P C1.3/SDG/08 1.3 Haradin Bajrami (Jeronim de Rada) 1 - 10,000 MNL Post

29 R/A - 10,000

30 P C1.3/SDG/09 1.3 Bajram Curri 1 - 10,000 MNL Post

31 R/A - 10,000

32 P C1.3/SDG/10 1.3 F.Guri dhe V.Qaka 1 - 10,000 MNL Post

33 R/A - 13,661

32 P C1.3/SDG/11 1.3 Dituria - Kaqanik 1 - 10,000 MNL Post

33 R/A - 5,825

34 P C1.3/SDG/14 1.3 Sh. F. Kabashi 1 - 10,000 MNL Post

35 R/A - 5,100

36 P C1.3/SDG/15 1.3 Ardhmeria 1 - 10,000 MNL Post

37 R/A - 5,335

38 P C1.3/SDG/16 1.3 Zenun Cocaj 1 - 10,000 MNL Post

39 R/A - 8,040

40 P C1.3/SDG/17 1.3 Izvor 1 - 10,000 MNL Post

41 R/A - 5,435

42 P C1.3/SDG/18 1.3 Zef Lush Marku 1 - 10,000 MNL Post

17-Oct-12

COMPONENT 1. STRENGTHENING ORGANIZATION &

FINANCING OF EDUCATION SYSTEM

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Subtotal Municipal Grants

GRANTS

First round, Primary School Grants

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

05-Nov-09 7 12-Nov-09 14 26-Nov-09 2 28-Nov-09 7

05-Nov-09 7 12-Nov-09 14 26-Nov-09 2 28-Nov-09 7

05-Nov-09 7 12-Nov-09 14 26-Nov-09 2 28-Nov-09 7

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 171 of 255 10/17/2012 1:05 AM

Page 172: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

43 R/A - 8,130

44 P C1.3/SDG/19 1.3 Nazmi Buduri 1 - 10,000 MNL Post

45 R/A - 8,040

46 P C1.3/SDG/22 1.3 Drita 1 - 10,000 MNL Post

47 R/A - 5,210

48 P C1.3/SDG/23 1.3 K. I Manastirit 1 - 10,000 MNL Post

49 R/A - 8,940

50 P C1.3/SDG/24 1.3 Ilmi Bahtijari 1 - 10,000 MNL Post

51 R/A - 9,395

52 P C1.3/SDG/25 1.3 Fetah Sylejmani 1 - 10,000 MNL Post

53 R/A - 8,075

54 P C1.3/SDG/26 1.3 Haxhi Ymer Lutfiu 1 - 10,000 MNL Post

55 R/A - 4,437

56 P C1.3/SDG/27 1.3 Vellazerimi 1 - 10,000 MNL Post

57 R/A - 7,815

58 P C1.3/SDG/28 1.3 Zef Lush Marku - Bregoc 1 - 10,000 MNL Post

59 R/A - 9,615

60 P C1.3/SDG/29 1.3 Nimon Ferizi 1 - 10,000 MNL Post

61 R/A - 5,385

62 P C1.3/SDG/30 1.3 Fehmi Agani 1 - 10,000 MNL Post

63 R/A - 8,075

64 P C1.3/SDG/31 1.3 Ganimer Terbeshi 1 - 10,000 MNL Post

65 R/A - 6,085

66 P C1.3/SDG/32 1.3 7 Shtatori 1 - 10,000 MNL Post

67 R/A - 5,225

68 P C1.3/SDG/33 1.3 Fan Noli 1 - 10,000 MNL Post

69 R/A - 5,510

70 P C1.3/SDG/34 1.3 Rilindja 1 - 10,000 MNL Post

71 R/A - 4,435

72 P C1.3/SDG/35 1.3 Mustafe Ibishi 1 - 10,000 MNL Post

73 R/A - 8,185

74 P C1.3/SDG/36 1.3 Jusf Gervalla 1 - 10,000 MNL Post

75 R/A - 6,695

76 P C1.3/SDG/38 1.3 7 Shtatori - Rahovec 1 - 10,000 MNL Post

77 R/A - 5,755

78 P C1.3/SDG/40 1.3 Rifat Berisha 1 - 10,000 MNL Post

79 R/A - 6,290

80 P C1.3/SDG/41 1.3 Vesel Pagarusha 1 - 10,000 MNL Post

81 R/A - 6,285

82 P C1.3/SDG/42 1.3 Ismet Jashari Kumanova 1 - 10,000 MNL Post

83 R/A - 5,265

84 P C1.3/SDG/43 1.3 Tafil Kelmendi 1 - 10,000 MNL Post

85 R/A - 5,685

86 P C1.3/SDG/44 1.3 Bajram Curri - Drenoc 1 - 10,000 MNL Post

87 R/A - 6,450

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 172 of 255 10/17/2012 1:05 AM

Page 173: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

88 P C1.3/SDG/46 1.3 Xhemajl Kada 1 - 10,000 MNL Post

89 R/A - 8,425

90 P C1.3/SDG/47 1.3 7 Shtatori - Vitomirice 1 - 10,000 MNL Post

91 R/A - 9,340

92 P C1.3/SDG/48 1.3 Deshmoret e Kombit 1 - 10,000 MNL Post

93 R/A - 8,945

94 P C1.3/SDG/49 1.3 Skenderbeu 1 - 10,000 MNL Post

95 R/A - 6,900

96 P C1.3/SDG/50 1.3 Ndre Mjeda 1 - 10,000 MNL Post

97 R/A - 8,560

98 P C1.3/SDG/51 1.3 Avni Rrustemi 1 - 10,000 MNL Post

99 R/A - 7,450

100 P C1.3/SDG/52 1.3 Fan Noli - Lluk I Bregut 1 - 10,000 MNL Post

101 R/A - 6,975

102 P C1.3/SDG/53 1.3 Emin Duraku 1 - 10,000 MNL Post

103 R/A - 9,000

104 P C1.3/SDG/54 1.3 Ali Krasniqi 1 - 10,000 MNL Post

105 R/A - 8,425

106 P C1.3/SDG/55 1.3 Azem Bejta 1 - 10,000 MNL Post

107 R/A - 6,730

108 P C1.3/SDG/56 1.3 Tre Deshmoret 1 - 10,000 MNL Post

109 R/A - 8,945

110 P C1.3/SDG/57 1.3 Ate Gjergj Fishta 1 - 10,000 MNL Post

111 R/A - 4,675

112 P C1.3/SDG/58 1.3 Drita - Gramqel 1 - 10,000 MNL Post

113 R/A - 7,365

114 P C1.3/SDG/59 1.3 Heronjt e Dukagjinit 1 - 10,000 MNL Post

115 R/A - 5,265

116 P C1.3/SDG/60 1.3 Faik Konica 1 - 10,000 MNL Post

117 R/A - 4,715

118 P C1.3/SDG/61 1.3 Esat Mekuli 1 - 10,000 MNL Post

119 R/A - 4,510

120 P C1.3/SDG/62 1.3 Rexhep Kadrijaj 1 - 10,000 MNL Post

121 R/A - 5,500

122 P C1.3/SDG/64 1.3 Avni Rrustemi - Mramuer 1 - 10,000 MNL Post

123 R/A - 7,155

124 P C1.3/SDG/65 1.3 Nexhmi Mustafa 1 - 10,000 MNL Post

125 R/A - 7,180

126 P C1.3/SDG/66 1.3 Tefik Canga 1 - 10,000 MNL Post

127 R/A - 6,565

128 P C1.3/SDG/67 1.3 Pjeter Bogdani 1 - 10,000 MNL Post

129 R/A - 10,000

130 P C1.3/SDG/68 1.3 Sami Frasheri 1 - 10,000 MNL Post

131 R/A - 7,710

132 P C1.3/SDG/70 1.3 Jahe Hasani 1 - 10,000 MNL Post

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 173 of 255 10/17/2012 1:05 AM

Page 174: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

133 R/A - 5,370

134 P C1.3/SDG/71 1.3 Luigj Gurakuqi 1 - 10,000 MNL Post

135 R/A - 9,680

136 P C1.3/SDG/72 1.3 Drita - Majac 1 - 10,000 MNL Post

137 R/A - 9,790

138 P C1.3/SDG/73 1.3 Laura Scotti 1 - 10,000 MNL Post

139 R/A - 4,805

140 P C1.3/SDG/74 1.3 Lismir 1 - 10,000 MNL Post

141 R/A - 4,755

142 P C1.3/SDG/75 1.3 Naim Frasheri - Bresnice 1 - 10,000 MNL Post

143 R/A - 7,180

144 P C1.3/SDG/76 1.3 Migjeni 1 - 10,000 MNL Post

145 R/A - 7,450

146 P C1.3/SDG/77 1.3 Knez Llazar 1 - 10,000 MNL Post

147 R/A - 10,000

148 P C1.3/SDG/78 1.3 Aferdita 1 - 10,000 MNL Post

149 R/A - 7,030

150 P C1.3/SDG/79 1.3 Bajram Curri - Shurdhan 1 - 10,000 MNL Post

151 R/A - 4,630

152 P C1.3/SDG/80 1.3 Fetah Qerimi 1 - 10,000 MNL Post

153 R/A - 5,690

154 P C1.3/SDG/81 1.3 Liria 1 - 10,000 MNL Post

155 R/A - 5,435

156 P C1.3/SDG/82 1.3 Kadri Zeka 1 - 10,000 MNL Post

157 R/A - 6,480

158 P C1.3/SDG/83 1.3 Sadri Misini 1 - 10,000 MNL Post

159 R/A - 6,885

160 P C1.3/SDG/84 1.3 Asdreni 1 - 10,000 MNL Post

161 R/A - 6,095

162 P C1.3/SDG/86 1.3 Hysen Terpeza 1 - 10,000 MNL Post

163 R/A - 6,010

164 P C1.3/SDG/87 1.3 Vellezerit Gervalla 1 - 10,000 MNL Post

165 R/A - 8,470

166 P C1.3/SDG/88 1.3 Deshmoret e 5 Prillit 1 - 10,000 MNL Post

167 R/A - 7,095

168 P C1.3/SDG/90 1.3 Gjon Serreci - Mogille 1 - 10,000 MNL Post

169 R/A - 5,980

170 P C1.3/SDG/91 1.3 Deshmoret e Qendreses 1 - 10,000 MNL Post

171 R/A - 5,485

172 P C1.3/SDG/92 1.3 Desjmoret e Drenices 1 - 10,000 MNL Post

173 R/A - 5,140

174 P C1.3/SDG/93 1.3 Xheve Lladrovci 1 - 10,000 MNL Post

175 R/A - 5,435

176 P C1.3/SDG/94 1.3 Shote Galica 1 - 10,000 MNL Post

177 R/A - 6,480

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 174 of 255 10/17/2012 1:05 AM

Page 175: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

178 P C1.3/SDG/96 1.3 Abedin Rexha 1 - 10,000 MNL Post

179 R/A - 6,180

180 P C1.3/SDG/98 1.3 Habib Jusufi 1 10,000 MNL Post

181 R/A 5,345

182 P C1.3/SDG/99 1.3 Jusuf Rexha 1 10,000 MNL Post

183 R/A 6,115

184 P C1.3/SDG/100 1.3 Sefedin Smakolli 1 10,000 MNL Post

185 R/A 5,625

186 P C1.3/SDG/101 1.3 Trepca 1 10,000 MNL Post

187 R/A 7,620

188 P C1.3/SDG/102 1.3 Bedri Gjinaj 1 10,000 MNL Post

189 R/A 7,165

190 P C1.3/SDG/104 1.3 Azem Bejta - Dubovc 1 10,000 MNL Post

191 R/A 6,090

192 P C1.3/SDG/105 1.3 Bajram Curri - Dumnice 1 10,000 MNL Post

193 R/A 6,255

194 P C1.3/SDG/106 1.3 Gj.K. Skenderbeu 1 10,000 MNL Post

195 R/A 7,350

196 P C1.3/SDG/107 1.3 Adem Voca 1 10,000 MNL Post

197 R/A 5,075

198 P C1.3/SDG/108 1.3 Emin Duraku - Novolane 1 10,000 MNL Post

199 R/A 6,555

200 P C1.3/SDG/111 1.3 Dardania 1 10,000 MNL Post

201 R/A 5,005

202 P C1.3/SDG/112 1.3 K. Kristoforidhi 1 10,000 MNL Post

203 R/A 6,585

204 P C1.3/SDG/113 1.3 Fehmi Agani 1 10,000 MNL Post

205 R/A 6,180

206 P C1.3/SDG/114 1.3 Shtjefen Gjeqovi 1 10,000 MNL Post

207 R/A 8,125

208 P C1.3/SDG/115 1.3 Abdullah Shabani 1 10,000 MNL Post

209 R/A 8,565

210 P C1.3/SDG/116 1.3 G. Luma 10,000 MNL Post

211 R/A 5,110

212 P C1.3/SDG/117 1.3 Sharski Odredi 10,000 MNL Post

213 R/A 8,510

214 P C1.3/SDG/118 1.3 Sezai Surroi 10,000 MNL Post

215 R/A 7,495

216 P C1.3/SDG/119 1.3 Mic Sokoli 10,000 MNL Post

217 R/A 6,165

218 P C1.3/SDG/120 1.3 Haziz Tolaj 10,000 MNL Post

219 R/A 7,275

220 P C1.3/SDG/121 1.3 Luigj Gurakuqi 10,000 MNL Post

221 R/A 8,030

SECOND ROUND PRIMARY SCHOOL

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

16-Feb-12 7 23-Feb-12 14 08-Mar-12 2 10-Mar-12 7

NA NA 08-Mar-11 16-Mar-11

16-Feb-12 7 23-Feb-12 14 08-Mar-12 2 10-Mar-12 7

NA NA 08-Mar-11 16-Mar-11

16-Feb-12 7 23-Feb-12 14 08-Mar-12 2 10-Mar-12 7

NA NA 08-Mar-11 16-Mar-11

16-Feb-12 7 23-Feb-12 14 08-Mar-12 2 10-Mar-12 7

NA NA 08-Mar-11 16-Mar-11

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 175 of 255 10/17/2012 1:05 AM

Page 176: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

222 P C1.3/SDG/123 1.3 Sadri Duhla 10,000 MNL Post

223 R/A 10,000

224 P C1.3/SDG/124 1.3 Deshmoret e Tivarit 10,000 MNL Post

225 R/A 8,000

226 P C1.3/SDG/125 1.3 Sahban Spahiu 10,000 MNL Post

227 R/A 9,445

228 P C1.3/SDG/126 1.3 Ferhat Binishi 10,000 MNL Post

229 R/A 6,260

230 P C1.3/SDG/127 1.3 Ukshin Miftari 10,000 MNL Post

231 R/A 6,050

232 P C1.3/SDG/128 1.3 Qemajl Bakia 10,000 MNL Post

233 R/A 5,850

234 P C1.3/SDG/130 1.3 Pataqan I ulet 10,000 MNL Post

235 R/A 5,510

236 P C1.3/SDG/131 1.3 4 Deshmoret 10,000 MNL Post

237 R/A 7,835

238 P C1.3/SDG/132 1.3 Afrim Buqaj 10,000 MNL Post

239 R/A 5,710

240 P C1.3/SDG/133 1.3 Deshmoret e fshatit Bubavec 10,000 MNL Post

241 R/A 6,000

242 P C1.3/SDG/134 1.3 Gjergj Kastrioti 10,000 MNL Post

243 R/A 7,850

244 P C1.3/SDG/136 1.3 Ramiz Sadiku 10,000 MNL Post

245 R/A 7,505

246 P C1.3/SDG/137 1.3 Jusuf Gervalla 10,000 MNL Post

247 R/A 7,095

248 P C1.3/SDG/138 1.3 Nena Tereze 10,000 MNL Post

249 R/A 8,025

250 P C1.3/SDG/139 1.3 Shkendija 10,000 MNL Post

251 R/A 10,000

252 P C1.3/SDG/140 1.3 Ganimete Terbeshi 10,000 MNL Post

253 R/A 6,515

254 P C1.3/SDG/142 1.3 Mitrush Kurteli 10,000 MNL Post

255 R/A 7,875

256 P C1.3/SDG/143 1.3 Xhavit Ahmeti 10,000 MNL Post

257 R/A 10,000

258 P C1.3/SDG/144 1.3 Zahir Pajaziti 10,000 MNL Post

259 R/A 8,560

260 P C1.3/SDG/145 1.3 Kadri Kadriu 10,000 MNL Post

261 R/A 7,750

262 P C1.3/SDG/147 1.3 Daut Bogujevci 10,000 MNL Post

263 R/A 6,850

264 P C1.3/SDG/148 1.3 Bajram Curri 10,000 MNL Post

265 R/A 9,705

266 P C1.3/SDG/149 1.3 Fazli Grajcevci 10,000 MNL Post

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 176 of 255 10/17/2012 1:05 AM

Page 177: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

267 R/A 7,685

268 P C1.3/SDG/150 1.3 Gradjevinsko Saobracajna Skola 10,000 MNL Post

269 R/A 7,767

270 P C1.3/SDG/152 1.3 Vehbi Ibrahimi 10,000 MNL Post

271 R/A 5,055

272 P C1.3/SDG/153 1.3 Esat Berisha 10,000 MNL Post

273 R/A 5,600

274 P C1.3/SDG/154 1.3 Fan Noli 10,000 MNL Post

275 R/A 10,000

276 P C1.3/SDG/155 1.3 Kenan Halimi 10,000 MNL Post

277 R/A 6,590

278 P C1.3/SDG/156 1.3 Halil Alidema 10,000 MNL Post

279 R/A 9,520

280 P C1.3/SDG/157 1.3 Ali Gashi 10,000 MNL Post

281 R/A 6,090

282 P C1.3/SDG/158 1.3 28 Nentori 10,000 MNL Post

283 R/A 5,896

284 P C1.3/SDG/159 1.3 Shaban Jashari 10,000 MNL Post

285 R/A 10,000

286 P C1.3/SDG/160 1.3 Shote Galica 10,000 MNL Post

287 R/A 9,035

288 P C1.3/SDG/161 1.3 Fazli Grajcevci 10,000 MNL Post

289 R/A 10,000

290 P C1.3/SDG/163 1.3 Lumni Surdulli 10,000 MNL Post

291 R/A 5,790

292 P C1.3/SDG/164 1.3 SHMU 2 10,000 MNL Post

293 R/A 10,000

294 P C1.3/SDG/165 1.3 Mihaliq 10,000 MNL Post

295 R/A 5,290

296 P C1.3/SDG/166 1.3 Tefik Canga 10,000 MNL Post

297 R/A 10,000

298 P C1.3/SDG/167 1.3 SH.m.f.u. Tern 10,000 MNL Post

299 R/A 6,805

300 P C1.3/SDG/168 1.3 A. Bajrami 10,000 MNL Post

301 R/A 4,825

302 P C1.3/SDG/169 1.3 Zenel Hajdini 10,000 MNL Post

303 R/A 9,830

304 P C1.3/SDG/170 1.3 Sinan Thaci 10,000 MNL Post

305 R/A 4,835

306 P C1.3/SDG/171 1.3 Fatmir Berisha 10,000 MNL Post

307 R/A 7,825

308 P C1.3/SDG/172 1.3 7 Marsi 10,000 MNL Post

309 R/A 7,330

310 P C1.3/SDG/173 1.3 Iliria 10,000 MNL Post

THIRD ROUND PRIMARY SCHOOL

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 177 of 255 10/17/2012 1:05 AM

Page 178: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

311 R/A 5,155

312 P C1.3/SDG/174 1.3 Shkendija 10,000 MNL Post

313 R/A 7,410

314 P C1.3/SDG/175 1.3 Svetlost, Krusheva 10,000 MNL Post

315 R/A 4,350

316 P C1.3/SDG/176 1.3 Durak Ahmeti 10,000 MNL Post

317 R/A 6,600

318 P C1.3/SDG/177 1.3 Luigj Gurakuqi 10,000 MNL Post

319 R/A 4,950

320 P C1.3/SDG/178 1.3 Mark Zef Prenaj 10,000 MNL Post

321 R/A 4,950

322 P C1.3/SDG/179 1.3 Heronjt e Kosoves 10,000 MNL Post

323 R/A 6,585

324 P C1.3/SDG/180 1.3 Liria 10,000 MNL Post

325 R/A 6,285

326 P C1.3/SDG/181 1.3 Eqrem Qabej 10,000 MNL Post

327 R/A 6,015

328 P C1.3/SDG/182 1.3 Ganimete Terbeshi 10,000 MNL Post

329 R/A 6,460

330 P C1.3/SDG/183 1.3 Hasan Prishitna 10,000 MNL Post

331 R/A 5,080

332 P C1.3/SDG/184 1.3 Afrim Krasniqi 10,000 MNL Post

333 R/A 5,240

334 P C1.3/SDG/185 1.3 Rilindja 10,000 MNL Post

335 R/A 6,375

336 P C1.3/SDG/186 1.3 Hill Mosi 10,000 MNL Post

337 R/A 5,895

338 P C1.3/SDG/187 1.3 Vaso Pashe Shkodrani 10,000 MNL Post

339 R/A 8,685

340 P C1.3/SDG/188 1.3 Martin Camaj 10,000 MNL Post

341 R/A 8,520

342 P C1.3/SDG/189 1.3 Ardhemrija 10,000 MNL Post

343 R/A 4,920

344 P C1.3/SDG/190 1.3 Isa Boletini 10,000 MNL Post

345 R/A 6,985

346 P C1.3/SDG/191 1.3 Gjergj Fishta 10,000 MNL Post

347 R/A 10,000

348 P C1.3/SDG/192 1.3 Asim Vokshi 10,000 MNL Post

349 R/A 9,040

350 P C1.3/SDG/193 1.3 Shefki Kuleta 10,000 MNL Post

351 R/A 8,380

352 P C1.3/SDG/194 1.3 Mihail Grameno 10,000 MNL Post

353 R/A 10,000

354 P C1.3/SDG/195 1.3 Liria 10,000 MNL Post

355 R/A 7,290

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 178 of 255 10/17/2012 1:05 AM

Page 179: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

356 P C1.3/SDG/196 1.3 Nazim Hikmet 10,000 MNL Post

357 R/A 8,285

358 P C1.3/SDG/197 1.3 Nuhi Berisha 10,000 MNL Post

359 R/A 4,410

360 P C1.3/SDG/198 1.3 Idriz Seferi 10,000 MNL Post

361 R/A 4,070

362 P C1.3/SDG/199 1.3 Skender Emerllahu 10,000 MNL Post

363 R/A 6,555

364 P C1.3/SDG/200 1.3 Dositej Obradovic 10,000 MNL Post

365 R/A 6,285

366 P C1.3/SDG/201 1.3 Mehdi Sylejman Bytyqi 10,000 MNL Post

367 R/A 4,795

368 P C1.3/SDG/202 1.3 Minatori 10,000 MNL Post

369 R/A 4,520

370 P C1.3/SDG/203 1.3 Liria 10,000 MNL Post

371 R/A 7,445

372 P 1,830,321

373 R/A 1,272,846

374

375 P C1.3/SDG/10 1.3 F. Guri V.Caka 1 - 15,000 MNL Post

376 R/A 13,661

377 P C1.3/SDG/12 1.3 Dardania 1 - 15,000 MNL Post

378 R/A - 8,610

379 P C1.3/SDG/13 1.3 K. I Manastirit - Firaje 1 - 15,000 MNL Post

380 R/A - 6,912

381 P C1.3/SDG/20 1.3 Gjimnazi II Gjuhersor 1 - 15,000 MNL Post

382 R/A 14,100

383 P C1.3/SDG/21 1.3 Jeta e Re 1 - 15,000 MNL Post

384 R/A 15,000

385 P C1.3/SDG/37 1.3 12 Maji 1 - 15,000 MNL Post

386 R/A 10,806

387 P C1.3/SDG/39 1.3 Lasgush Poradeci 1 15,000 MNL Post

388 R/A 11,995

389 P C1.3/SDG/45 1.3 Shaban Spahija 1 15,000 MNL Post

390 R/A 15,000

391 P C1.3/SDG/63 1.3 Gj. Sami Frasheri 1 15,000 MNL Post

392 R/A 15,000

393 P C1.3/SDG/69 1.3 Aleksander Xhuvani 1 15,000 MNL Post

394 R/A 15,000

395 P C1.3/SDG/85 1.3 Veliko Rapotovo 1 15,000 MNL Post

Subtotal School Development Grants - primary

First round, Secondary School Grants

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 179 of 255 10/17/2012 1:05 AM

Page 180: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

396 R/A 8,740

397 P C1.3/SDG/89 1.3 Shkolla e Mesme e Mjekesise 1 - 15,000 MNL Post

398 R/A - 7,641

399 P C1.3/SDG/95 1.3 Gj,K. Skenderbeu 1 - 15,000 MNL Post

400 R/A - 15,000

401 P C1.3/SDG/97 1.3 Anton Cetta 1 - 15,000 MNL Post

402 R/A - 15,000

403 P C1.3/SDG/103 1.3 Arkitekt Sinani 1 - 15,000 MNL Post

404 R/A - 13,549

405 P C1.3/SDG/109 1.3 Eqrem Qabej 1 - 15,000 MNL Post

406 R/A - 15,000

407 P C1.3/SDG/110 1.3 Pjeter Bogdani 1 - 15,000 MNL Post

408 R/A - 13,885

409 P C1.3/SDG/122 1.3 Gani Cavdarbashi 1 - 15,000 MNL Post

410 R/A - 15,000

411 P C1.3/SDG/129 1.3 Hysni Zajmi 1 - 15,000 MNL Post

412 R/A - 15,000

413 P C1.3/SDG/135 1.3 Odhise Pakali 1 - 15,000 MNL Post

414 R/A - 9,650

415 P C1.3/SDG/141 1.3 Eqrem Qabej 1 - 15,000 MNL Post

416 R/A - 11,634

417 P C1.3/SDG/146 1.3 Isa Boletini 1 - 15,000 MNL Post

418 R/A - 15,000

419 P C1.3/SDG/151 1.3 Arberia 1 - 15,000 MNL Post

420 R/A - 12,912

421 P C1.3/SDG/162 1.3 Frang Bardhi 1 - 15,000 MNL Post

422 R/A - 15,000

423 P C1.3/SDG/110 1.3 1 - 15,000 MNL Post

424 R/A -

425 P C1.3/SDG/ 1.3 SH.M.L 1 - 15,000 MNL Post

426 R/A 8,432

427 P C1.3/SDG/ 1.3 Sh. E mesme ekonomike 1 - 15,000 MNL Post

428 R/A 6,899

429 P C1.3/SDG/ 1.3 Fehmi Lladrovci 1 - 15,000 MNL Post

430 R/A 15,000

431 P C1.3/SDG/ 1.3 Hamez Jashari 1 - 15,000 MNL Post

432 R/A 12,762

433 P 435,000

434 R/A 352,188

435

436 15 105,000 2,313,611

437 - - 1,658,584

Component 1. Totals (Grants)

Subtotal School Development Grants - Secondary

SECOND ROUND - SECONDARY SCHOOLS

THIRD ROUND - SECONDARY SCHOOLS

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

14-Apr-11 7 21-Apr-11 14 05-May-11 2 07-May-11 7

NA NA 08-Mar-11 16-Mar-11

16-Feb-12 7 23-Feb-12 14 08-Mar-12 2 10-Mar-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

05-Apr-12 10 15-Apr-12 15 30-Apr-12 10 10-May-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

26-Jul-12 10 05-Aug-12 15 20-Aug-12 10 30-Aug-12 7

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 180 of 255 10/17/2012 1:05 AM

Page 181: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Database Subtotals Tool 15 181,846 141,378

Schedule (dd-Mmm-yy)

Sub-

mission

of Bids Int.

/a Evalu-

ation &

Recomm. Int.

/a WB "No

Objection" Int.

/a Contract

Award Int.

/a

Procurement Steps (1-

11)5 6 7 8

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 181 of 255 10/17/2012 1:05 AM

Page 182: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

1

2

3

4 Municipal Grants (15)

5 P C1.2/MG#1 1.2 1. Kacanik 1 35,000 16,200 MNL Post

6 R/A - 16,197

7 P C1.2/MG#2 1.2 2. Gjilan 1 35,000 21,200 MNL Post

8 R/A - 17,354

9 P C1.2/MG#3 1.2 3. Istog 1 35,000 10,890 MNL Post

10 R/A - -

11 P 15 105,000 48,290

12 R/A - - 33,551

13

14 P C1.3/SDG/01 1.3 Gjon Serreçi 1 10,000 MNL Post

15 R/A - 10,000

16 P C1.3/SDG/02 1.3 Ahmet Hoxha 1 - 10,000 MNL Post

17 R/A - 10,000

18 P C1.3/SDG/03 1.3 Naim Frasheri 1 - 10,000 MNL Post

19 R/A - 9,605

20 P C1.3/SDG/04 1.3 Dituria - Ferizaj 1 - 10,000 MNL Post

21 R/A - 6,180

22 P C1.3/SDG/05 1.3 Ali Hadri 1 - 10,000 MNL Post

23 R/A - 6,140

24 P C1.3/SDG/06 1.3 Ismail Luma 1 - 10,000 MNL Post

25 R/A - 8,725

26 P C1.3/SDG/07 1.3 Zenel Hajdini 1 - 10,000 MNL Post

27 R/A - 10,000

28 P C1.3/SDG/08 1.3 Haradin Bajrami (Jeronim de Rada) 1 - 10,000 MNL Post

29 R/A - 10,000

30 P C1.3/SDG/09 1.3 Bajram Curri 1 - 10,000 MNL Post

31 R/A - 10,000

32 P C1.3/SDG/10 1.3 F.Guri dhe V.Qaka 1 - 10,000 MNL Post

33 R/A - 13,661

32 P C1.3/SDG/11 1.3 Dituria - Kaqanik 1 - 10,000 MNL Post

33 R/A - 5,825

34 P C1.3/SDG/14 1.3 Sh. F. Kabashi 1 - 10,000 MNL Post

35 R/A - 5,100

36 P C1.3/SDG/15 1.3 Ardhmeria 1 - 10,000 MNL Post

37 R/A - 5,335

38 P C1.3/SDG/16 1.3 Zenun Cocaj 1 - 10,000 MNL Post

39 R/A - 8,040

40 P C1.3/SDG/17 1.3 Izvor 1 - 10,000 MNL Post

41 R/A - 5,435

42 P C1.3/SDG/18 1.3 Zef Lush Marku 1 - 10,000 MNL Post

17-Oct-12

COMPONENT 1. STRENGTHENING ORGANIZATION &

FINANCING OF EDUCATION SYSTEM

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Subtotal Municipal Grants

GRANTS

First round, Primary School Grants

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

05-Dec-09 7 12-Dec-09 30 11-Jan-10

05-Dec-09 7 12-Dec-09 30 11-Jan-10

05-Dec-09 7 12-Dec-09 30 11-Jan-10

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 182 of 255 10/17/2012 1:05 AM

Page 183: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

43 R/A - 8,130

44 P C1.3/SDG/19 1.3 Nazmi Buduri 1 - 10,000 MNL Post

45 R/A - 8,040

46 P C1.3/SDG/22 1.3 Drita 1 - 10,000 MNL Post

47 R/A - 5,210

48 P C1.3/SDG/23 1.3 K. I Manastirit 1 - 10,000 MNL Post

49 R/A - 8,940

50 P C1.3/SDG/24 1.3 Ilmi Bahtijari 1 - 10,000 MNL Post

51 R/A - 9,395

52 P C1.3/SDG/25 1.3 Fetah Sylejmani 1 - 10,000 MNL Post

53 R/A - 8,075

54 P C1.3/SDG/26 1.3 Haxhi Ymer Lutfiu 1 - 10,000 MNL Post

55 R/A - 4,437

56 P C1.3/SDG/27 1.3 Vellazerimi 1 - 10,000 MNL Post

57 R/A - 7,815

58 P C1.3/SDG/28 1.3 Zef Lush Marku - Bregoc 1 - 10,000 MNL Post

59 R/A - 9,615

60 P C1.3/SDG/29 1.3 Nimon Ferizi 1 - 10,000 MNL Post

61 R/A - 5,385

62 P C1.3/SDG/30 1.3 Fehmi Agani 1 - 10,000 MNL Post

63 R/A - 8,075

64 P C1.3/SDG/31 1.3 Ganimer Terbeshi 1 - 10,000 MNL Post

65 R/A - 6,085

66 P C1.3/SDG/32 1.3 7 Shtatori 1 - 10,000 MNL Post

67 R/A - 5,225

68 P C1.3/SDG/33 1.3 Fan Noli 1 - 10,000 MNL Post

69 R/A - 5,510

70 P C1.3/SDG/34 1.3 Rilindja 1 - 10,000 MNL Post

71 R/A - 4,435

72 P C1.3/SDG/35 1.3 Mustafe Ibishi 1 - 10,000 MNL Post

73 R/A - 8,185

74 P C1.3/SDG/36 1.3 Jusf Gervalla 1 - 10,000 MNL Post

75 R/A - 6,695

76 P C1.3/SDG/38 1.3 7 Shtatori - Rahovec 1 - 10,000 MNL Post

77 R/A - 5,755

78 P C1.3/SDG/40 1.3 Rifat Berisha 1 - 10,000 MNL Post

79 R/A - 6,290

80 P C1.3/SDG/41 1.3 Vesel Pagarusha 1 - 10,000 MNL Post

81 R/A - 6,285

82 P C1.3/SDG/42 1.3 Ismet Jashari Kumanova 1 - 10,000 MNL Post

83 R/A - 5,265

84 P C1.3/SDG/43 1.3 Tafil Kelmendi 1 - 10,000 MNL Post

85 R/A - 5,685

86 P C1.3/SDG/44 1.3 Bajram Curri - Drenoc 1 - 10,000 MNL Post

87 R/A - 6,450

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 183 of 255 10/17/2012 1:05 AM

Page 184: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

88 P C1.3/SDG/46 1.3 Xhemajl Kada 1 - 10,000 MNL Post

89 R/A - 8,425

90 P C1.3/SDG/47 1.3 7 Shtatori - Vitomirice 1 - 10,000 MNL Post

91 R/A - 9,340

92 P C1.3/SDG/48 1.3 Deshmoret e Kombit 1 - 10,000 MNL Post

93 R/A - 8,945

94 P C1.3/SDG/49 1.3 Skenderbeu 1 - 10,000 MNL Post

95 R/A - 6,900

96 P C1.3/SDG/50 1.3 Ndre Mjeda 1 - 10,000 MNL Post

97 R/A - 8,560

98 P C1.3/SDG/51 1.3 Avni Rrustemi 1 - 10,000 MNL Post

99 R/A - 7,450

100 P C1.3/SDG/52 1.3 Fan Noli - Lluk I Bregut 1 - 10,000 MNL Post

101 R/A - 6,975

102 P C1.3/SDG/53 1.3 Emin Duraku 1 - 10,000 MNL Post

103 R/A - 9,000

104 P C1.3/SDG/54 1.3 Ali Krasniqi 1 - 10,000 MNL Post

105 R/A - 8,425

106 P C1.3/SDG/55 1.3 Azem Bejta 1 - 10,000 MNL Post

107 R/A - 6,730

108 P C1.3/SDG/56 1.3 Tre Deshmoret 1 - 10,000 MNL Post

109 R/A - 8,945

110 P C1.3/SDG/57 1.3 Ate Gjergj Fishta 1 - 10,000 MNL Post

111 R/A - 4,675

112 P C1.3/SDG/58 1.3 Drita - Gramqel 1 - 10,000 MNL Post

113 R/A - 7,365

114 P C1.3/SDG/59 1.3 Heronjt e Dukagjinit 1 - 10,000 MNL Post

115 R/A - 5,265

116 P C1.3/SDG/60 1.3 Faik Konica 1 - 10,000 MNL Post

117 R/A - 4,715

118 P C1.3/SDG/61 1.3 Esat Mekuli 1 - 10,000 MNL Post

119 R/A - 4,510

120 P C1.3/SDG/62 1.3 Rexhep Kadrijaj 1 - 10,000 MNL Post

121 R/A - 5,500

122 P C1.3/SDG/64 1.3 Avni Rrustemi - Mramuer 1 - 10,000 MNL Post

123 R/A - 7,155

124 P C1.3/SDG/65 1.3 Nexhmi Mustafa 1 - 10,000 MNL Post

125 R/A - 7,180

126 P C1.3/SDG/66 1.3 Tefik Canga 1 - 10,000 MNL Post

127 R/A - 6,565

128 P C1.3/SDG/67 1.3 Pjeter Bogdani 1 - 10,000 MNL Post

129 R/A - 10,000

130 P C1.3/SDG/68 1.3 Sami Frasheri 1 - 10,000 MNL Post

131 R/A - 7,710

132 P C1.3/SDG/70 1.3 Jahe Hasani 1 - 10,000 MNL Post

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 184 of 255 10/17/2012 1:05 AM

Page 185: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

133 R/A - 5,370

134 P C1.3/SDG/71 1.3 Luigj Gurakuqi 1 - 10,000 MNL Post

135 R/A - 9,680

136 P C1.3/SDG/72 1.3 Drita - Majac 1 - 10,000 MNL Post

137 R/A - 9,790

138 P C1.3/SDG/73 1.3 Laura Scotti 1 - 10,000 MNL Post

139 R/A - 4,805

140 P C1.3/SDG/74 1.3 Lismir 1 - 10,000 MNL Post

141 R/A - 4,755

142 P C1.3/SDG/75 1.3 Naim Frasheri - Bresnice 1 - 10,000 MNL Post

143 R/A - 7,180

144 P C1.3/SDG/76 1.3 Migjeni 1 - 10,000 MNL Post

145 R/A - 7,450

146 P C1.3/SDG/77 1.3 Knez Llazar 1 - 10,000 MNL Post

147 R/A - 10,000

148 P C1.3/SDG/78 1.3 Aferdita 1 - 10,000 MNL Post

149 R/A - 7,030

150 P C1.3/SDG/79 1.3 Bajram Curri - Shurdhan 1 - 10,000 MNL Post

151 R/A - 4,630

152 P C1.3/SDG/80 1.3 Fetah Qerimi 1 - 10,000 MNL Post

153 R/A - 5,690

154 P C1.3/SDG/81 1.3 Liria 1 - 10,000 MNL Post

155 R/A - 5,435

156 P C1.3/SDG/82 1.3 Kadri Zeka 1 - 10,000 MNL Post

157 R/A - 6,480

158 P C1.3/SDG/83 1.3 Sadri Misini 1 - 10,000 MNL Post

159 R/A - 6,885

160 P C1.3/SDG/84 1.3 Asdreni 1 - 10,000 MNL Post

161 R/A - 6,095

162 P C1.3/SDG/86 1.3 Hysen Terpeza 1 - 10,000 MNL Post

163 R/A - 6,010

164 P C1.3/SDG/87 1.3 Vellezerit Gervalla 1 - 10,000 MNL Post

165 R/A - 8,470

166 P C1.3/SDG/88 1.3 Deshmoret e 5 Prillit 1 - 10,000 MNL Post

167 R/A - 7,095

168 P C1.3/SDG/90 1.3 Gjon Serreci - Mogille 1 - 10,000 MNL Post

169 R/A - 5,980

170 P C1.3/SDG/91 1.3 Deshmoret e Qendreses 1 - 10,000 MNL Post

171 R/A - 5,485

172 P C1.3/SDG/92 1.3 Desjmoret e Drenices 1 - 10,000 MNL Post

173 R/A - 5,140

174 P C1.3/SDG/93 1.3 Xheve Lladrovci 1 - 10,000 MNL Post

175 R/A - 5,435

176 P C1.3/SDG/94 1.3 Shote Galica 1 - 10,000 MNL Post

177 R/A - 6,480

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 185 of 255 10/17/2012 1:05 AM

Page 186: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

178 P C1.3/SDG/96 1.3 Abedin Rexha 1 - 10,000 MNL Post

179 R/A - 6,180

180 P C1.3/SDG/98 1.3 Habib Jusufi 1 10,000 MNL Post

181 R/A 5,345

182 P C1.3/SDG/99 1.3 Jusuf Rexha 1 10,000 MNL Post

183 R/A 6,115

184 P C1.3/SDG/100 1.3 Sefedin Smakolli 1 10,000 MNL Post

185 R/A 5,625

186 P C1.3/SDG/101 1.3 Trepca 1 10,000 MNL Post

187 R/A 7,620

188 P C1.3/SDG/102 1.3 Bedri Gjinaj 1 10,000 MNL Post

189 R/A 7,165

190 P C1.3/SDG/104 1.3 Azem Bejta - Dubovc 1 10,000 MNL Post

191 R/A 6,090

192 P C1.3/SDG/105 1.3 Bajram Curri - Dumnice 1 10,000 MNL Post

193 R/A 6,255

194 P C1.3/SDG/106 1.3 Gj.K. Skenderbeu 1 10,000 MNL Post

195 R/A 7,350

196 P C1.3/SDG/107 1.3 Adem Voca 1 10,000 MNL Post

197 R/A 5,075

198 P C1.3/SDG/108 1.3 Emin Duraku - Novolane 1 10,000 MNL Post

199 R/A 6,555

200 P C1.3/SDG/111 1.3 Dardania 1 10,000 MNL Post

201 R/A 5,005

202 P C1.3/SDG/112 1.3 K. Kristoforidhi 1 10,000 MNL Post

203 R/A 6,585

204 P C1.3/SDG/113 1.3 Fehmi Agani 1 10,000 MNL Post

205 R/A 6,180

206 P C1.3/SDG/114 1.3 Shtjefen Gjeqovi 1 10,000 MNL Post

207 R/A 8,125

208 P C1.3/SDG/115 1.3 Abdullah Shabani 1 10,000 MNL Post

209 R/A 8,565

210 P C1.3/SDG/116 1.3 G. Luma 10,000 MNL Post

211 R/A 5,110

212 P C1.3/SDG/117 1.3 Sharski Odredi 10,000 MNL Post

213 R/A 8,510

214 P C1.3/SDG/118 1.3 Sezai Surroi 10,000 MNL Post

215 R/A 7,495

216 P C1.3/SDG/119 1.3 Mic Sokoli 10,000 MNL Post

217 R/A 6,165

218 P C1.3/SDG/120 1.3 Haziz Tolaj 10,000 MNL Post

219 R/A 7,275

220 P C1.3/SDG/121 1.3 Luigj Gurakuqi 10,000 MNL Post

221 R/A 8,030

SECOND ROUND PRIMARY SCHOOL

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

17-Mar-12 7 24-Mar-12 30 23-Apr-12

16-Mar-11 0 16-Mar-11 122 16-Jul-11

17-Mar-12 7 24-Mar-12 30 23-Apr-12

16-Mar-11 0 16-Mar-11 122 16-Jul-11

17-Mar-12 7 24-Mar-12 30 23-Apr-12

16-Mar-11 0 16-Mar-11 122 16-Jul-11

17-Mar-12 7 24-Mar-12 30 23-Apr-12

16-Mar-11 0 16-Mar-11 122 16-Jul-11

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 186 of 255 10/17/2012 1:05 AM

Page 187: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

222 P C1.3/SDG/123 1.3 Sadri Duhla 10,000 MNL Post

223 R/A 10,000

224 P C1.3/SDG/124 1.3 Deshmoret e Tivarit 10,000 MNL Post

225 R/A 8,000

226 P C1.3/SDG/125 1.3 Sahban Spahiu 10,000 MNL Post

227 R/A 9,445

228 P C1.3/SDG/126 1.3 Ferhat Binishi 10,000 MNL Post

229 R/A 6,260

230 P C1.3/SDG/127 1.3 Ukshin Miftari 10,000 MNL Post

231 R/A 6,050

232 P C1.3/SDG/128 1.3 Qemajl Bakia 10,000 MNL Post

233 R/A 5,850

234 P C1.3/SDG/130 1.3 Pataqan I ulet 10,000 MNL Post

235 R/A 5,510

236 P C1.3/SDG/131 1.3 4 Deshmoret 10,000 MNL Post

237 R/A 7,835

238 P C1.3/SDG/132 1.3 Afrim Buqaj 10,000 MNL Post

239 R/A 5,710

240 P C1.3/SDG/133 1.3 Deshmoret e fshatit Bubavec 10,000 MNL Post

241 R/A 6,000

242 P C1.3/SDG/134 1.3 Gjergj Kastrioti 10,000 MNL Post

243 R/A 7,850

244 P C1.3/SDG/136 1.3 Ramiz Sadiku 10,000 MNL Post

245 R/A 7,505

246 P C1.3/SDG/137 1.3 Jusuf Gervalla 10,000 MNL Post

247 R/A 7,095

248 P C1.3/SDG/138 1.3 Nena Tereze 10,000 MNL Post

249 R/A 8,025

250 P C1.3/SDG/139 1.3 Shkendija 10,000 MNL Post

251 R/A 10,000

252 P C1.3/SDG/140 1.3 Ganimete Terbeshi 10,000 MNL Post

253 R/A 6,515

254 P C1.3/SDG/142 1.3 Mitrush Kurteli 10,000 MNL Post

255 R/A 7,875

256 P C1.3/SDG/143 1.3 Xhavit Ahmeti 10,000 MNL Post

257 R/A 10,000

258 P C1.3/SDG/144 1.3 Zahir Pajaziti 10,000 MNL Post

259 R/A 8,560

260 P C1.3/SDG/145 1.3 Kadri Kadriu 10,000 MNL Post

261 R/A 7,750

262 P C1.3/SDG/147 1.3 Daut Bogujevci 10,000 MNL Post

263 R/A 6,850

264 P C1.3/SDG/148 1.3 Bajram Curri 10,000 MNL Post

265 R/A 9,705

266 P C1.3/SDG/149 1.3 Fazli Grajcevci 10,000 MNL Post

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 187 of 255 10/17/2012 1:05 AM

Page 188: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

267 R/A 7,685

268 P C1.3/SDG/150 1.3 Gradjevinsko Saobracajna Skola 10,000 MNL Post

269 R/A 7,767

270 P C1.3/SDG/152 1.3 Vehbi Ibrahimi 10,000 MNL Post

271 R/A 5,055

272 P C1.3/SDG/153 1.3 Esat Berisha 10,000 MNL Post

273 R/A 5,600

274 P C1.3/SDG/154 1.3 Fan Noli 10,000 MNL Post

275 R/A 10,000

276 P C1.3/SDG/155 1.3 Kenan Halimi 10,000 MNL Post

277 R/A 6,590

278 P C1.3/SDG/156 1.3 Halil Alidema 10,000 MNL Post

279 R/A 9,520

280 P C1.3/SDG/157 1.3 Ali Gashi 10,000 MNL Post

281 R/A 6,090

282 P C1.3/SDG/158 1.3 28 Nentori 10,000 MNL Post

283 R/A 5,896

284 P C1.3/SDG/159 1.3 Shaban Jashari 10,000 MNL Post

285 R/A 10,000

286 P C1.3/SDG/160 1.3 Shote Galica 10,000 MNL Post

287 R/A 9,035

288 P C1.3/SDG/161 1.3 Fazli Grajcevci 10,000 MNL Post

289 R/A 10,000

290 P C1.3/SDG/163 1.3 Lumni Surdulli 10,000 MNL Post

291 R/A 5,790

292 P C1.3/SDG/164 1.3 SHMU 2 10,000 MNL Post

293 R/A 10,000

294 P C1.3/SDG/165 1.3 Mihaliq 10,000 MNL Post

295 R/A 5,290

296 P C1.3/SDG/166 1.3 Tefik Canga 10,000 MNL Post

297 R/A 10,000

298 P C1.3/SDG/167 1.3 SH.m.f.u. Tern 10,000 MNL Post

299 R/A 6,805

300 P C1.3/SDG/168 1.3 A. Bajrami 10,000 MNL Post

301 R/A 4,825

302 P C1.3/SDG/169 1.3 Zenel Hajdini 10,000 MNL Post

303 R/A 9,830

304 P C1.3/SDG/170 1.3 Sinan Thaci 10,000 MNL Post

305 R/A 4,835

306 P C1.3/SDG/171 1.3 Fatmir Berisha 10,000 MNL Post

307 R/A 7,825

308 P C1.3/SDG/172 1.3 7 Marsi 10,000 MNL Post

309 R/A 7,330

310 P C1.3/SDG/173 1.3 Iliria 10,000 MNL Post

THIRD ROUND PRIMARY SCHOOL

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 188 of 255 10/17/2012 1:05 AM

Page 189: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

311 R/A 5,155

312 P C1.3/SDG/174 1.3 Shkendija 10,000 MNL Post

313 R/A 7,410

314 P C1.3/SDG/175 1.3 Svetlost, Krusheva 10,000 MNL Post

315 R/A 4,350

316 P C1.3/SDG/176 1.3 Durak Ahmeti 10,000 MNL Post

317 R/A 6,600

318 P C1.3/SDG/177 1.3 Luigj Gurakuqi 10,000 MNL Post

319 R/A 4,950

320 P C1.3/SDG/178 1.3 Mark Zef Prenaj 10,000 MNL Post

321 R/A 4,950

322 P C1.3/SDG/179 1.3 Heronjt e Kosoves 10,000 MNL Post

323 R/A 6,585

324 P C1.3/SDG/180 1.3 Liria 10,000 MNL Post

325 R/A 6,285

326 P C1.3/SDG/181 1.3 Eqrem Qabej 10,000 MNL Post

327 R/A 6,015

328 P C1.3/SDG/182 1.3 Ganimete Terbeshi 10,000 MNL Post

329 R/A 6,460

330 P C1.3/SDG/183 1.3 Hasan Prishitna 10,000 MNL Post

331 R/A 5,080

332 P C1.3/SDG/184 1.3 Afrim Krasniqi 10,000 MNL Post

333 R/A 5,240

334 P C1.3/SDG/185 1.3 Rilindja 10,000 MNL Post

335 R/A 6,375

336 P C1.3/SDG/186 1.3 Hill Mosi 10,000 MNL Post

337 R/A 5,895

338 P C1.3/SDG/187 1.3 Vaso Pashe Shkodrani 10,000 MNL Post

339 R/A 8,685

340 P C1.3/SDG/188 1.3 Martin Camaj 10,000 MNL Post

341 R/A 8,520

342 P C1.3/SDG/189 1.3 Ardhemrija 10,000 MNL Post

343 R/A 4,920

344 P C1.3/SDG/190 1.3 Isa Boletini 10,000 MNL Post

345 R/A 6,985

346 P C1.3/SDG/191 1.3 Gjergj Fishta 10,000 MNL Post

347 R/A 10,000

348 P C1.3/SDG/192 1.3 Asim Vokshi 10,000 MNL Post

349 R/A 9,040

350 P C1.3/SDG/193 1.3 Shefki Kuleta 10,000 MNL Post

351 R/A 8,380

352 P C1.3/SDG/194 1.3 Mihail Grameno 10,000 MNL Post

353 R/A 10,000

354 P C1.3/SDG/195 1.3 Liria 10,000 MNL Post

355 R/A 7,290

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 189 of 255 10/17/2012 1:05 AM

Page 190: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

356 P C1.3/SDG/196 1.3 Nazim Hikmet 10,000 MNL Post

357 R/A 8,285

358 P C1.3/SDG/197 1.3 Nuhi Berisha 10,000 MNL Post

359 R/A 4,410

360 P C1.3/SDG/198 1.3 Idriz Seferi 10,000 MNL Post

361 R/A 4,070

362 P C1.3/SDG/199 1.3 Skender Emerllahu 10,000 MNL Post

363 R/A 6,555

364 P C1.3/SDG/200 1.3 Dositej Obradovic 10,000 MNL Post

365 R/A 6,285

366 P C1.3/SDG/201 1.3 Mehdi Sylejman Bytyqi 10,000 MNL Post

367 R/A 4,795

368 P C1.3/SDG/202 1.3 Minatori 10,000 MNL Post

369 R/A 4,520

370 P C1.3/SDG/203 1.3 Liria 10,000 MNL Post

371 R/A 7,445

372 P 1,830,321

373 R/A 1,272,846

374

375 P C1.3/SDG/10 1.3 F. Guri V.Caka 1 - 15,000 MNL Post

376 R/A 13,661

377 P C1.3/SDG/12 1.3 Dardania 1 - 15,000 MNL Post

378 R/A - 8,610

379 P C1.3/SDG/13 1.3 K. I Manastirit - Firaje 1 - 15,000 MNL Post

380 R/A - 6,912

381 P C1.3/SDG/20 1.3 Gjimnazi II Gjuhersor 1 - 15,000 MNL Post

382 R/A 14,100

383 P C1.3/SDG/21 1.3 Jeta e Re 1 - 15,000 MNL Post

384 R/A 15,000

385 P C1.3/SDG/37 1.3 12 Maji 1 - 15,000 MNL Post

386 R/A 10,806

387 P C1.3/SDG/39 1.3 Lasgush Poradeci 1 15,000 MNL Post

388 R/A 11,995

389 P C1.3/SDG/45 1.3 Shaban Spahija 1 15,000 MNL Post

390 R/A 15,000

391 P C1.3/SDG/63 1.3 Gj. Sami Frasheri 1 15,000 MNL Post

392 R/A 15,000

393 P C1.3/SDG/69 1.3 Aleksander Xhuvani 1 15,000 MNL Post

394 R/A 15,000

395 P C1.3/SDG/85 1.3 Veliko Rapotovo 1 15,000 MNL Post

Subtotal School Development Grants - primary

First round, Secondary School Grants

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 190 of 255 10/17/2012 1:05 AM

Page 191: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

396 R/A 8,740

397 P C1.3/SDG/89 1.3 Shkolla e Mesme e Mjekesise 1 - 15,000 MNL Post

398 R/A - 7,641

399 P C1.3/SDG/95 1.3 Gj,K. Skenderbeu 1 - 15,000 MNL Post

400 R/A - 15,000

401 P C1.3/SDG/97 1.3 Anton Cetta 1 - 15,000 MNL Post

402 R/A - 15,000

403 P C1.3/SDG/103 1.3 Arkitekt Sinani 1 - 15,000 MNL Post

404 R/A - 13,549

405 P C1.3/SDG/109 1.3 Eqrem Qabej 1 - 15,000 MNL Post

406 R/A - 15,000

407 P C1.3/SDG/110 1.3 Pjeter Bogdani 1 - 15,000 MNL Post

408 R/A - 13,885

409 P C1.3/SDG/122 1.3 Gani Cavdarbashi 1 - 15,000 MNL Post

410 R/A - 15,000

411 P C1.3/SDG/129 1.3 Hysni Zajmi 1 - 15,000 MNL Post

412 R/A - 15,000

413 P C1.3/SDG/135 1.3 Odhise Pakali 1 - 15,000 MNL Post

414 R/A - 9,650

415 P C1.3/SDG/141 1.3 Eqrem Qabej 1 - 15,000 MNL Post

416 R/A - 11,634

417 P C1.3/SDG/146 1.3 Isa Boletini 1 - 15,000 MNL Post

418 R/A - 15,000

419 P C1.3/SDG/151 1.3 Arberia 1 - 15,000 MNL Post

420 R/A - 12,912

421 P C1.3/SDG/162 1.3 Frang Bardhi 1 - 15,000 MNL Post

422 R/A - 15,000

423 P C1.3/SDG/110 1.3 1 - 15,000 MNL Post

424 R/A -

425 P C1.3/SDG/ 1.3 SH.M.L 1 - 15,000 MNL Post

426 R/A 8,432

427 P C1.3/SDG/ 1.3 Sh. E mesme ekonomike 1 - 15,000 MNL Post

428 R/A 6,899

429 P C1.3/SDG/ 1.3 Fehmi Lladrovci 1 - 15,000 MNL Post

430 R/A 15,000

431 P C1.3/SDG/ 1.3 Hamez Jashari 1 - 15,000 MNL Post

432 R/A 12,762

433 P 435,000

434 R/A 352,188

435

436 15 105,000 2,313,611

437 - - 1,658,584

Component 1. Totals (Grants)

Subtotal School Development Grants - Secondary

SECOND ROUND - SECONDARY SCHOOLS

THIRD ROUND - SECONDARY SCHOOLS

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

14-May-11 7 21-May-11 30 20-Jun-11

16-Mar-11 0 16-Mar-11 122 16-Jul-11

17-Mar-12 7 24-Mar-12 30 23-Apr-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

17-May-12 7 24-May-12 130 01-Oct-12

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

06-Sep-12 7 13-Sep-12 130 21-Jan-13

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 191 of 255 10/17/2012 1:05 AM

Page 192: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Database Subtotals Tool 15 181,846 141,378

Schedule (dd-Mmm-yy)

Contract

Signature Int.

/a

Start

Exec. /b

Comple-

tion

Procurement Steps (1-

11)9 10 11

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 192 of 255 10/17/2012 1:05 AM

Page 193: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

1

2

3

4 Municipal Grants (15)

5 P C1.2/MG#1 1.2 1. Kacanik 1 35,000 16,200 MNL Post

6 R/A - 16,197

7 P C1.2/MG#2 1.2 2. Gjilan 1 35,000 21,200 MNL Post

8 R/A - 17,354

9 P C1.2/MG#3 1.2 3. Istog 1 35,000 10,890 MNL Post

10 R/A - -

11 P 15 105,000 48,290

12 R/A - - 33,551

13

14 P C1.3/SDG/01 1.3 Gjon Serreçi 1 10,000 MNL Post

15 R/A - 10,000

16 P C1.3/SDG/02 1.3 Ahmet Hoxha 1 - 10,000 MNL Post

17 R/A - 10,000

18 P C1.3/SDG/03 1.3 Naim Frasheri 1 - 10,000 MNL Post

19 R/A - 9,605

20 P C1.3/SDG/04 1.3 Dituria - Ferizaj 1 - 10,000 MNL Post

21 R/A - 6,180

22 P C1.3/SDG/05 1.3 Ali Hadri 1 - 10,000 MNL Post

23 R/A - 6,140

24 P C1.3/SDG/06 1.3 Ismail Luma 1 - 10,000 MNL Post

25 R/A - 8,725

26 P C1.3/SDG/07 1.3 Zenel Hajdini 1 - 10,000 MNL Post

27 R/A - 10,000

28 P C1.3/SDG/08 1.3 Haradin Bajrami (Jeronim de Rada) 1 - 10,000 MNL Post

29 R/A - 10,000

30 P C1.3/SDG/09 1.3 Bajram Curri 1 - 10,000 MNL Post

31 R/A - 10,000

32 P C1.3/SDG/10 1.3 F.Guri dhe V.Qaka 1 - 10,000 MNL Post

33 R/A - 13,661

32 P C1.3/SDG/11 1.3 Dituria - Kaqanik 1 - 10,000 MNL Post

33 R/A - 5,825

34 P C1.3/SDG/14 1.3 Sh. F. Kabashi 1 - 10,000 MNL Post

35 R/A - 5,100

36 P C1.3/SDG/15 1.3 Ardhmeria 1 - 10,000 MNL Post

37 R/A - 5,335

38 P C1.3/SDG/16 1.3 Zenun Cocaj 1 - 10,000 MNL Post

39 R/A - 8,040

40 P C1.3/SDG/17 1.3 Izvor 1 - 10,000 MNL Post

41 R/A - 5,435

42 P C1.3/SDG/18 1.3 Zef Lush Marku 1 - 10,000 MNL Post

17-Oct-12

COMPONENT 1. STRENGTHENING ORGANIZATION &

FINANCING OF EDUCATION SYSTEM

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Subtotal Municipal Grants

GRANTS

First round, Primary School Grants

MDG

MDG

MDG

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

Comments

Procure-

ment

Accounts

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 193 of 255 10/17/2012 1:05 AM

Page 194: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

43 R/A - 8,130

44 P C1.3/SDG/19 1.3 Nazmi Buduri 1 - 10,000 MNL Post

45 R/A - 8,040

46 P C1.3/SDG/22 1.3 Drita 1 - 10,000 MNL Post

47 R/A - 5,210

48 P C1.3/SDG/23 1.3 K. I Manastirit 1 - 10,000 MNL Post

49 R/A - 8,940

50 P C1.3/SDG/24 1.3 Ilmi Bahtijari 1 - 10,000 MNL Post

51 R/A - 9,395

52 P C1.3/SDG/25 1.3 Fetah Sylejmani 1 - 10,000 MNL Post

53 R/A - 8,075

54 P C1.3/SDG/26 1.3 Haxhi Ymer Lutfiu 1 - 10,000 MNL Post

55 R/A - 4,437

56 P C1.3/SDG/27 1.3 Vellazerimi 1 - 10,000 MNL Post

57 R/A - 7,815

58 P C1.3/SDG/28 1.3 Zef Lush Marku - Bregoc 1 - 10,000 MNL Post

59 R/A - 9,615

60 P C1.3/SDG/29 1.3 Nimon Ferizi 1 - 10,000 MNL Post

61 R/A - 5,385

62 P C1.3/SDG/30 1.3 Fehmi Agani 1 - 10,000 MNL Post

63 R/A - 8,075

64 P C1.3/SDG/31 1.3 Ganimer Terbeshi 1 - 10,000 MNL Post

65 R/A - 6,085

66 P C1.3/SDG/32 1.3 7 Shtatori 1 - 10,000 MNL Post

67 R/A - 5,225

68 P C1.3/SDG/33 1.3 Fan Noli 1 - 10,000 MNL Post

69 R/A - 5,510

70 P C1.3/SDG/34 1.3 Rilindja 1 - 10,000 MNL Post

71 R/A - 4,435

72 P C1.3/SDG/35 1.3 Mustafe Ibishi 1 - 10,000 MNL Post

73 R/A - 8,185

74 P C1.3/SDG/36 1.3 Jusf Gervalla 1 - 10,000 MNL Post

75 R/A - 6,695

76 P C1.3/SDG/38 1.3 7 Shtatori - Rahovec 1 - 10,000 MNL Post

77 R/A - 5,755

78 P C1.3/SDG/40 1.3 Rifat Berisha 1 - 10,000 MNL Post

79 R/A - 6,290

80 P C1.3/SDG/41 1.3 Vesel Pagarusha 1 - 10,000 MNL Post

81 R/A - 6,285

82 P C1.3/SDG/42 1.3 Ismet Jashari Kumanova 1 - 10,000 MNL Post

83 R/A - 5,265

84 P C1.3/SDG/43 1.3 Tafil Kelmendi 1 - 10,000 MNL Post

85 R/A - 5,685

86 P C1.3/SDG/44 1.3 Bajram Curri - Drenoc 1 - 10,000 MNL Post

87 R/A - 6,450

Comments

Procure-

ment

Accounts

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 194 of 255 10/17/2012 1:05 AM

Page 195: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

88 P C1.3/SDG/46 1.3 Xhemajl Kada 1 - 10,000 MNL Post

89 R/A - 8,425

90 P C1.3/SDG/47 1.3 7 Shtatori - Vitomirice 1 - 10,000 MNL Post

91 R/A - 9,340

92 P C1.3/SDG/48 1.3 Deshmoret e Kombit 1 - 10,000 MNL Post

93 R/A - 8,945

94 P C1.3/SDG/49 1.3 Skenderbeu 1 - 10,000 MNL Post

95 R/A - 6,900

96 P C1.3/SDG/50 1.3 Ndre Mjeda 1 - 10,000 MNL Post

97 R/A - 8,560

98 P C1.3/SDG/51 1.3 Avni Rrustemi 1 - 10,000 MNL Post

99 R/A - 7,450

100 P C1.3/SDG/52 1.3 Fan Noli - Lluk I Bregut 1 - 10,000 MNL Post

101 R/A - 6,975

102 P C1.3/SDG/53 1.3 Emin Duraku 1 - 10,000 MNL Post

103 R/A - 9,000

104 P C1.3/SDG/54 1.3 Ali Krasniqi 1 - 10,000 MNL Post

105 R/A - 8,425

106 P C1.3/SDG/55 1.3 Azem Bejta 1 - 10,000 MNL Post

107 R/A - 6,730

108 P C1.3/SDG/56 1.3 Tre Deshmoret 1 - 10,000 MNL Post

109 R/A - 8,945

110 P C1.3/SDG/57 1.3 Ate Gjergj Fishta 1 - 10,000 MNL Post

111 R/A - 4,675

112 P C1.3/SDG/58 1.3 Drita - Gramqel 1 - 10,000 MNL Post

113 R/A - 7,365

114 P C1.3/SDG/59 1.3 Heronjt e Dukagjinit 1 - 10,000 MNL Post

115 R/A - 5,265

116 P C1.3/SDG/60 1.3 Faik Konica 1 - 10,000 MNL Post

117 R/A - 4,715

118 P C1.3/SDG/61 1.3 Esat Mekuli 1 - 10,000 MNL Post

119 R/A - 4,510

120 P C1.3/SDG/62 1.3 Rexhep Kadrijaj 1 - 10,000 MNL Post

121 R/A - 5,500

122 P C1.3/SDG/64 1.3 Avni Rrustemi - Mramuer 1 - 10,000 MNL Post

123 R/A - 7,155

124 P C1.3/SDG/65 1.3 Nexhmi Mustafa 1 - 10,000 MNL Post

125 R/A - 7,180

126 P C1.3/SDG/66 1.3 Tefik Canga 1 - 10,000 MNL Post

127 R/A - 6,565

128 P C1.3/SDG/67 1.3 Pjeter Bogdani 1 - 10,000 MNL Post

129 R/A - 10,000

130 P C1.3/SDG/68 1.3 Sami Frasheri 1 - 10,000 MNL Post

131 R/A - 7,710

132 P C1.3/SDG/70 1.3 Jahe Hasani 1 - 10,000 MNL Post

Comments

Procure-

ment

Accounts

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 195 of 255 10/17/2012 1:05 AM

Page 196: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

133 R/A - 5,370

134 P C1.3/SDG/71 1.3 Luigj Gurakuqi 1 - 10,000 MNL Post

135 R/A - 9,680

136 P C1.3/SDG/72 1.3 Drita - Majac 1 - 10,000 MNL Post

137 R/A - 9,790

138 P C1.3/SDG/73 1.3 Laura Scotti 1 - 10,000 MNL Post

139 R/A - 4,805

140 P C1.3/SDG/74 1.3 Lismir 1 - 10,000 MNL Post

141 R/A - 4,755

142 P C1.3/SDG/75 1.3 Naim Frasheri - Bresnice 1 - 10,000 MNL Post

143 R/A - 7,180

144 P C1.3/SDG/76 1.3 Migjeni 1 - 10,000 MNL Post

145 R/A - 7,450

146 P C1.3/SDG/77 1.3 Knez Llazar 1 - 10,000 MNL Post

147 R/A - 10,000

148 P C1.3/SDG/78 1.3 Aferdita 1 - 10,000 MNL Post

149 R/A - 7,030

150 P C1.3/SDG/79 1.3 Bajram Curri - Shurdhan 1 - 10,000 MNL Post

151 R/A - 4,630

152 P C1.3/SDG/80 1.3 Fetah Qerimi 1 - 10,000 MNL Post

153 R/A - 5,690

154 P C1.3/SDG/81 1.3 Liria 1 - 10,000 MNL Post

155 R/A - 5,435

156 P C1.3/SDG/82 1.3 Kadri Zeka 1 - 10,000 MNL Post

157 R/A - 6,480

158 P C1.3/SDG/83 1.3 Sadri Misini 1 - 10,000 MNL Post

159 R/A - 6,885

160 P C1.3/SDG/84 1.3 Asdreni 1 - 10,000 MNL Post

161 R/A - 6,095

162 P C1.3/SDG/86 1.3 Hysen Terpeza 1 - 10,000 MNL Post

163 R/A - 6,010

164 P C1.3/SDG/87 1.3 Vellezerit Gervalla 1 - 10,000 MNL Post

165 R/A - 8,470

166 P C1.3/SDG/88 1.3 Deshmoret e 5 Prillit 1 - 10,000 MNL Post

167 R/A - 7,095

168 P C1.3/SDG/90 1.3 Gjon Serreci - Mogille 1 - 10,000 MNL Post

169 R/A - 5,980

170 P C1.3/SDG/91 1.3 Deshmoret e Qendreses 1 - 10,000 MNL Post

171 R/A - 5,485

172 P C1.3/SDG/92 1.3 Desjmoret e Drenices 1 - 10,000 MNL Post

173 R/A - 5,140

174 P C1.3/SDG/93 1.3 Xheve Lladrovci 1 - 10,000 MNL Post

175 R/A - 5,435

176 P C1.3/SDG/94 1.3 Shote Galica 1 - 10,000 MNL Post

177 R/A - 6,480

Comments

Procure-

ment

Accounts

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 196 of 255 10/17/2012 1:05 AM

Page 197: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

178 P C1.3/SDG/96 1.3 Abedin Rexha 1 - 10,000 MNL Post

179 R/A - 6,180

180 P C1.3/SDG/98 1.3 Habib Jusufi 1 10,000 MNL Post

181 R/A 5,345

182 P C1.3/SDG/99 1.3 Jusuf Rexha 1 10,000 MNL Post

183 R/A 6,115

184 P C1.3/SDG/100 1.3 Sefedin Smakolli 1 10,000 MNL Post

185 R/A 5,625

186 P C1.3/SDG/101 1.3 Trepca 1 10,000 MNL Post

187 R/A 7,620

188 P C1.3/SDG/102 1.3 Bedri Gjinaj 1 10,000 MNL Post

189 R/A 7,165

190 P C1.3/SDG/104 1.3 Azem Bejta - Dubovc 1 10,000 MNL Post

191 R/A 6,090

192 P C1.3/SDG/105 1.3 Bajram Curri - Dumnice 1 10,000 MNL Post

193 R/A 6,255

194 P C1.3/SDG/106 1.3 Gj.K. Skenderbeu 1 10,000 MNL Post

195 R/A 7,350

196 P C1.3/SDG/107 1.3 Adem Voca 1 10,000 MNL Post

197 R/A 5,075

198 P C1.3/SDG/108 1.3 Emin Duraku - Novolane 1 10,000 MNL Post

199 R/A 6,555

200 P C1.3/SDG/111 1.3 Dardania 1 10,000 MNL Post

201 R/A 5,005

202 P C1.3/SDG/112 1.3 K. Kristoforidhi 1 10,000 MNL Post

203 R/A 6,585

204 P C1.3/SDG/113 1.3 Fehmi Agani 1 10,000 MNL Post

205 R/A 6,180

206 P C1.3/SDG/114 1.3 Shtjefen Gjeqovi 1 10,000 MNL Post

207 R/A 8,125

208 P C1.3/SDG/115 1.3 Abdullah Shabani 1 10,000 MNL Post

209 R/A 8,565

210 P C1.3/SDG/116 1.3 G. Luma 10,000 MNL Post

211 R/A 5,110

212 P C1.3/SDG/117 1.3 Sharski Odredi 10,000 MNL Post

213 R/A 8,510

214 P C1.3/SDG/118 1.3 Sezai Surroi 10,000 MNL Post

215 R/A 7,495

216 P C1.3/SDG/119 1.3 Mic Sokoli 10,000 MNL Post

217 R/A 6,165

218 P C1.3/SDG/120 1.3 Haziz Tolaj 10,000 MNL Post

219 R/A 7,275

220 P C1.3/SDG/121 1.3 Luigj Gurakuqi 10,000 MNL Post

221 R/A 8,030

SECOND ROUND PRIMARY SCHOOL

Comments

Procure-

ment

Accounts

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 197 of 255 10/17/2012 1:05 AM

Page 198: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

222 P C1.3/SDG/123 1.3 Sadri Duhla 10,000 MNL Post

223 R/A 10,000

224 P C1.3/SDG/124 1.3 Deshmoret e Tivarit 10,000 MNL Post

225 R/A 8,000

226 P C1.3/SDG/125 1.3 Sahban Spahiu 10,000 MNL Post

227 R/A 9,445

228 P C1.3/SDG/126 1.3 Ferhat Binishi 10,000 MNL Post

229 R/A 6,260

230 P C1.3/SDG/127 1.3 Ukshin Miftari 10,000 MNL Post

231 R/A 6,050

232 P C1.3/SDG/128 1.3 Qemajl Bakia 10,000 MNL Post

233 R/A 5,850

234 P C1.3/SDG/130 1.3 Pataqan I ulet 10,000 MNL Post

235 R/A 5,510

236 P C1.3/SDG/131 1.3 4 Deshmoret 10,000 MNL Post

237 R/A 7,835

238 P C1.3/SDG/132 1.3 Afrim Buqaj 10,000 MNL Post

239 R/A 5,710

240 P C1.3/SDG/133 1.3 Deshmoret e fshatit Bubavec 10,000 MNL Post

241 R/A 6,000

242 P C1.3/SDG/134 1.3 Gjergj Kastrioti 10,000 MNL Post

243 R/A 7,850

244 P C1.3/SDG/136 1.3 Ramiz Sadiku 10,000 MNL Post

245 R/A 7,505

246 P C1.3/SDG/137 1.3 Jusuf Gervalla 10,000 MNL Post

247 R/A 7,095

248 P C1.3/SDG/138 1.3 Nena Tereze 10,000 MNL Post

249 R/A 8,025

250 P C1.3/SDG/139 1.3 Shkendija 10,000 MNL Post

251 R/A 10,000

252 P C1.3/SDG/140 1.3 Ganimete Terbeshi 10,000 MNL Post

253 R/A 6,515

254 P C1.3/SDG/142 1.3 Mitrush Kurteli 10,000 MNL Post

255 R/A 7,875

256 P C1.3/SDG/143 1.3 Xhavit Ahmeti 10,000 MNL Post

257 R/A 10,000

258 P C1.3/SDG/144 1.3 Zahir Pajaziti 10,000 MNL Post

259 R/A 8,560

260 P C1.3/SDG/145 1.3 Kadri Kadriu 10,000 MNL Post

261 R/A 7,750

262 P C1.3/SDG/147 1.3 Daut Bogujevci 10,000 MNL Post

263 R/A 6,850

264 P C1.3/SDG/148 1.3 Bajram Curri 10,000 MNL Post

265 R/A 9,705

266 P C1.3/SDG/149 1.3 Fazli Grajcevci 10,000 MNL Post

Comments

Procure-

ment

Accounts

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 198 of 255 10/17/2012 1:05 AM

Page 199: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

267 R/A 7,685

268 P C1.3/SDG/150 1.3 Gradjevinsko Saobracajna Skola 10,000 MNL Post

269 R/A 7,767

270 P C1.3/SDG/152 1.3 Vehbi Ibrahimi 10,000 MNL Post

271 R/A 5,055

272 P C1.3/SDG/153 1.3 Esat Berisha 10,000 MNL Post

273 R/A 5,600

274 P C1.3/SDG/154 1.3 Fan Noli 10,000 MNL Post

275 R/A 10,000

276 P C1.3/SDG/155 1.3 Kenan Halimi 10,000 MNL Post

277 R/A 6,590

278 P C1.3/SDG/156 1.3 Halil Alidema 10,000 MNL Post

279 R/A 9,520

280 P C1.3/SDG/157 1.3 Ali Gashi 10,000 MNL Post

281 R/A 6,090

282 P C1.3/SDG/158 1.3 28 Nentori 10,000 MNL Post

283 R/A 5,896

284 P C1.3/SDG/159 1.3 Shaban Jashari 10,000 MNL Post

285 R/A 10,000

286 P C1.3/SDG/160 1.3 Shote Galica 10,000 MNL Post

287 R/A 9,035

288 P C1.3/SDG/161 1.3 Fazli Grajcevci 10,000 MNL Post

289 R/A 10,000

290 P C1.3/SDG/163 1.3 Lumni Surdulli 10,000 MNL Post

291 R/A 5,790

292 P C1.3/SDG/164 1.3 SHMU 2 10,000 MNL Post

293 R/A 10,000

294 P C1.3/SDG/165 1.3 Mihaliq 10,000 MNL Post

295 R/A 5,290

296 P C1.3/SDG/166 1.3 Tefik Canga 10,000 MNL Post

297 R/A 10,000

298 P C1.3/SDG/167 1.3 SH.m.f.u. Tern 10,000 MNL Post

299 R/A 6,805

300 P C1.3/SDG/168 1.3 A. Bajrami 10,000 MNL Post

301 R/A 4,825

302 P C1.3/SDG/169 1.3 Zenel Hajdini 10,000 MNL Post

303 R/A 9,830

304 P C1.3/SDG/170 1.3 Sinan Thaci 10,000 MNL Post

305 R/A 4,835

306 P C1.3/SDG/171 1.3 Fatmir Berisha 10,000 MNL Post

307 R/A 7,825

308 P C1.3/SDG/172 1.3 7 Marsi 10,000 MNL Post

309 R/A 7,330

310 P C1.3/SDG/173 1.3 Iliria 10,000 MNL Post

THIRD ROUND PRIMARY SCHOOL

Comments

Procure-

ment

Accounts

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 199 of 255 10/17/2012 1:05 AM

Page 200: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

311 R/A 5,155

312 P C1.3/SDG/174 1.3 Shkendija 10,000 MNL Post

313 R/A 7,410

314 P C1.3/SDG/175 1.3 Svetlost, Krusheva 10,000 MNL Post

315 R/A 4,350

316 P C1.3/SDG/176 1.3 Durak Ahmeti 10,000 MNL Post

317 R/A 6,600

318 P C1.3/SDG/177 1.3 Luigj Gurakuqi 10,000 MNL Post

319 R/A 4,950

320 P C1.3/SDG/178 1.3 Mark Zef Prenaj 10,000 MNL Post

321 R/A 4,950

322 P C1.3/SDG/179 1.3 Heronjt e Kosoves 10,000 MNL Post

323 R/A 6,585

324 P C1.3/SDG/180 1.3 Liria 10,000 MNL Post

325 R/A 6,285

326 P C1.3/SDG/181 1.3 Eqrem Qabej 10,000 MNL Post

327 R/A 6,015

328 P C1.3/SDG/182 1.3 Ganimete Terbeshi 10,000 MNL Post

329 R/A 6,460

330 P C1.3/SDG/183 1.3 Hasan Prishitna 10,000 MNL Post

331 R/A 5,080

332 P C1.3/SDG/184 1.3 Afrim Krasniqi 10,000 MNL Post

333 R/A 5,240

334 P C1.3/SDG/185 1.3 Rilindja 10,000 MNL Post

335 R/A 6,375

336 P C1.3/SDG/186 1.3 Hill Mosi 10,000 MNL Post

337 R/A 5,895

338 P C1.3/SDG/187 1.3 Vaso Pashe Shkodrani 10,000 MNL Post

339 R/A 8,685

340 P C1.3/SDG/188 1.3 Martin Camaj 10,000 MNL Post

341 R/A 8,520

342 P C1.3/SDG/189 1.3 Ardhemrija 10,000 MNL Post

343 R/A 4,920

344 P C1.3/SDG/190 1.3 Isa Boletini 10,000 MNL Post

345 R/A 6,985

346 P C1.3/SDG/191 1.3 Gjergj Fishta 10,000 MNL Post

347 R/A 10,000

348 P C1.3/SDG/192 1.3 Asim Vokshi 10,000 MNL Post

349 R/A 9,040

350 P C1.3/SDG/193 1.3 Shefki Kuleta 10,000 MNL Post

351 R/A 8,380

352 P C1.3/SDG/194 1.3 Mihail Grameno 10,000 MNL Post

353 R/A 10,000

354 P C1.3/SDG/195 1.3 Liria 10,000 MNL Post

355 R/A 7,290

Comments

Procure-

ment

Accounts

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 200 of 255 10/17/2012 1:05 AM

Page 201: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

356 P C1.3/SDG/196 1.3 Nazim Hikmet 10,000 MNL Post

357 R/A 8,285

358 P C1.3/SDG/197 1.3 Nuhi Berisha 10,000 MNL Post

359 R/A 4,410

360 P C1.3/SDG/198 1.3 Idriz Seferi 10,000 MNL Post

361 R/A 4,070

362 P C1.3/SDG/199 1.3 Skender Emerllahu 10,000 MNL Post

363 R/A 6,555

364 P C1.3/SDG/200 1.3 Dositej Obradovic 10,000 MNL Post

365 R/A 6,285

366 P C1.3/SDG/201 1.3 Mehdi Sylejman Bytyqi 10,000 MNL Post

367 R/A 4,795

368 P C1.3/SDG/202 1.3 Minatori 10,000 MNL Post

369 R/A 4,520

370 P C1.3/SDG/203 1.3 Liria 10,000 MNL Post

371 R/A 7,445

372 P 1,830,321

373 R/A 1,272,846

374

375 P C1.3/SDG/10 1.3 F. Guri V.Caka 1 - 15,000 MNL Post

376 R/A 13,661

377 P C1.3/SDG/12 1.3 Dardania 1 - 15,000 MNL Post

378 R/A - 8,610

379 P C1.3/SDG/13 1.3 K. I Manastirit - Firaje 1 - 15,000 MNL Post

380 R/A - 6,912

381 P C1.3/SDG/20 1.3 Gjimnazi II Gjuhersor 1 - 15,000 MNL Post

382 R/A 14,100

383 P C1.3/SDG/21 1.3 Jeta e Re 1 - 15,000 MNL Post

384 R/A 15,000

385 P C1.3/SDG/37 1.3 12 Maji 1 - 15,000 MNL Post

386 R/A 10,806

387 P C1.3/SDG/39 1.3 Lasgush Poradeci 1 15,000 MNL Post

388 R/A 11,995

389 P C1.3/SDG/45 1.3 Shaban Spahija 1 15,000 MNL Post

390 R/A 15,000

391 P C1.3/SDG/63 1.3 Gj. Sami Frasheri 1 15,000 MNL Post

392 R/A 15,000

393 P C1.3/SDG/69 1.3 Aleksander Xhuvani 1 15,000 MNL Post

394 R/A 15,000

395 P C1.3/SDG/85 1.3 Veliko Rapotovo 1 15,000 MNL Post

Subtotal School Development Grants - primary

First round, Secondary School Grants

Comments

Procure-

ment

Accounts

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGP

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 201 of 255 10/17/2012 1:05 AM

Page 202: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

396 R/A 8,740

397 P C1.3/SDG/89 1.3 Shkolla e Mesme e Mjekesise 1 - 15,000 MNL Post

398 R/A - 7,641

399 P C1.3/SDG/95 1.3 Gj,K. Skenderbeu 1 - 15,000 MNL Post

400 R/A - 15,000

401 P C1.3/SDG/97 1.3 Anton Cetta 1 - 15,000 MNL Post

402 R/A - 15,000

403 P C1.3/SDG/103 1.3 Arkitekt Sinani 1 - 15,000 MNL Post

404 R/A - 13,549

405 P C1.3/SDG/109 1.3 Eqrem Qabej 1 - 15,000 MNL Post

406 R/A - 15,000

407 P C1.3/SDG/110 1.3 Pjeter Bogdani 1 - 15,000 MNL Post

408 R/A - 13,885

409 P C1.3/SDG/122 1.3 Gani Cavdarbashi 1 - 15,000 MNL Post

410 R/A - 15,000

411 P C1.3/SDG/129 1.3 Hysni Zajmi 1 - 15,000 MNL Post

412 R/A - 15,000

413 P C1.3/SDG/135 1.3 Odhise Pakali 1 - 15,000 MNL Post

414 R/A - 9,650

415 P C1.3/SDG/141 1.3 Eqrem Qabej 1 - 15,000 MNL Post

416 R/A - 11,634

417 P C1.3/SDG/146 1.3 Isa Boletini 1 - 15,000 MNL Post

418 R/A - 15,000

419 P C1.3/SDG/151 1.3 Arberia 1 - 15,000 MNL Post

420 R/A - 12,912

421 P C1.3/SDG/162 1.3 Frang Bardhi 1 - 15,000 MNL Post

422 R/A - 15,000

423 P C1.3/SDG/110 1.3 1 - 15,000 MNL Post

424 R/A -

425 P C1.3/SDG/ 1.3 SH.M.L 1 - 15,000 MNL Post

426 R/A 8,432

427 P C1.3/SDG/ 1.3 Sh. E mesme ekonomike 1 - 15,000 MNL Post

428 R/A 6,899

429 P C1.3/SDG/ 1.3 Fehmi Lladrovci 1 - 15,000 MNL Post

430 R/A 15,000

431 P C1.3/SDG/ 1.3 Hamez Jashari 1 - 15,000 MNL Post

432 R/A 12,762

433 P 435,000

434 R/A 352,188

435

436 15 105,000 2,313,611

437 - - 1,658,584

Component 1. Totals (Grants)

Subtotal School Development Grants - Secondary

SECOND ROUND - SECONDARY SCHOOLS

THIRD ROUND - SECONDARY SCHOOLS

Comments

Procure-

ment

Accounts

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

SDGS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 202 of 255 10/17/2012 1:05 AM

Page 203: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Database Subtotals Tool 15 181,846 141,378

Comments

Procure-

ment

Accounts

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 203 of 255 10/17/2012 1:05 AM

Page 204: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

1

2

3

4 Municipal Grants (15)

5 P C1.2/MG#1 1.2 1. Kacanik 1 35,000 16,200 MNL Post

6 R/A - 16,197

7 P C1.2/MG#2 1.2 2. Gjilan 1 35,000 21,200 MNL Post

8 R/A - 17,354

9 P C1.2/MG#3 1.2 3. Istog 1 35,000 10,890 MNL Post

10 R/A - -

11 P 15 105,000 48,290

12 R/A - - 33,551

13

14 P C1.3/SDG/01 1.3 Gjon Serreçi 1 10,000 MNL Post

15 R/A - 10,000

16 P C1.3/SDG/02 1.3 Ahmet Hoxha 1 - 10,000 MNL Post

17 R/A - 10,000

18 P C1.3/SDG/03 1.3 Naim Frasheri 1 - 10,000 MNL Post

19 R/A - 9,605

20 P C1.3/SDG/04 1.3 Dituria - Ferizaj 1 - 10,000 MNL Post

21 R/A - 6,180

22 P C1.3/SDG/05 1.3 Ali Hadri 1 - 10,000 MNL Post

23 R/A - 6,140

24 P C1.3/SDG/06 1.3 Ismail Luma 1 - 10,000 MNL Post

25 R/A - 8,725

26 P C1.3/SDG/07 1.3 Zenel Hajdini 1 - 10,000 MNL Post

27 R/A - 10,000

28 P C1.3/SDG/08 1.3 Haradin Bajrami (Jeronim de Rada) 1 - 10,000 MNL Post

29 R/A - 10,000

30 P C1.3/SDG/09 1.3 Bajram Curri 1 - 10,000 MNL Post

31 R/A - 10,000

32 P C1.3/SDG/10 1.3 F.Guri dhe V.Qaka 1 - 10,000 MNL Post

33 R/A - 13,661

32 P C1.3/SDG/11 1.3 Dituria - Kaqanik 1 - 10,000 MNL Post

33 R/A - 5,825

34 P C1.3/SDG/14 1.3 Sh. F. Kabashi 1 - 10,000 MNL Post

35 R/A - 5,100

36 P C1.3/SDG/15 1.3 Ardhmeria 1 - 10,000 MNL Post

37 R/A - 5,335

38 P C1.3/SDG/16 1.3 Zenun Cocaj 1 - 10,000 MNL Post

39 R/A - 8,040

40 P C1.3/SDG/17 1.3 Izvor 1 - 10,000 MNL Post

41 R/A - 5,435

42 P C1.3/SDG/18 1.3 Zef Lush Marku 1 - 10,000 MNL Post

17-Oct-12

COMPONENT 1. STRENGTHENING ORGANIZATION &

FINANCING OF EDUCATION SYSTEM

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Subtotal Municipal Grants

GRANTS

First round, Primary School Grants

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 204 of 255 10/17/2012 1:05 AM

Page 205: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

43 R/A - 8,130

44 P C1.3/SDG/19 1.3 Nazmi Buduri 1 - 10,000 MNL Post

45 R/A - 8,040

46 P C1.3/SDG/22 1.3 Drita 1 - 10,000 MNL Post

47 R/A - 5,210

48 P C1.3/SDG/23 1.3 K. I Manastirit 1 - 10,000 MNL Post

49 R/A - 8,940

50 P C1.3/SDG/24 1.3 Ilmi Bahtijari 1 - 10,000 MNL Post

51 R/A - 9,395

52 P C1.3/SDG/25 1.3 Fetah Sylejmani 1 - 10,000 MNL Post

53 R/A - 8,075

54 P C1.3/SDG/26 1.3 Haxhi Ymer Lutfiu 1 - 10,000 MNL Post

55 R/A - 4,437

56 P C1.3/SDG/27 1.3 Vellazerimi 1 - 10,000 MNL Post

57 R/A - 7,815

58 P C1.3/SDG/28 1.3 Zef Lush Marku - Bregoc 1 - 10,000 MNL Post

59 R/A - 9,615

60 P C1.3/SDG/29 1.3 Nimon Ferizi 1 - 10,000 MNL Post

61 R/A - 5,385

62 P C1.3/SDG/30 1.3 Fehmi Agani 1 - 10,000 MNL Post

63 R/A - 8,075

64 P C1.3/SDG/31 1.3 Ganimer Terbeshi 1 - 10,000 MNL Post

65 R/A - 6,085

66 P C1.3/SDG/32 1.3 7 Shtatori 1 - 10,000 MNL Post

67 R/A - 5,225

68 P C1.3/SDG/33 1.3 Fan Noli 1 - 10,000 MNL Post

69 R/A - 5,510

70 P C1.3/SDG/34 1.3 Rilindja 1 - 10,000 MNL Post

71 R/A - 4,435

72 P C1.3/SDG/35 1.3 Mustafe Ibishi 1 - 10,000 MNL Post

73 R/A - 8,185

74 P C1.3/SDG/36 1.3 Jusf Gervalla 1 - 10,000 MNL Post

75 R/A - 6,695

76 P C1.3/SDG/38 1.3 7 Shtatori - Rahovec 1 - 10,000 MNL Post

77 R/A - 5,755

78 P C1.3/SDG/40 1.3 Rifat Berisha 1 - 10,000 MNL Post

79 R/A - 6,290

80 P C1.3/SDG/41 1.3 Vesel Pagarusha 1 - 10,000 MNL Post

81 R/A - 6,285

82 P C1.3/SDG/42 1.3 Ismet Jashari Kumanova 1 - 10,000 MNL Post

83 R/A - 5,265

84 P C1.3/SDG/43 1.3 Tafil Kelmendi 1 - 10,000 MNL Post

85 R/A - 5,685

86 P C1.3/SDG/44 1.3 Bajram Curri - Drenoc 1 - 10,000 MNL Post

87 R/A - 6,450

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 205 of 255 10/17/2012 1:05 AM

Page 206: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

88 P C1.3/SDG/46 1.3 Xhemajl Kada 1 - 10,000 MNL Post

89 R/A - 8,425

90 P C1.3/SDG/47 1.3 7 Shtatori - Vitomirice 1 - 10,000 MNL Post

91 R/A - 9,340

92 P C1.3/SDG/48 1.3 Deshmoret e Kombit 1 - 10,000 MNL Post

93 R/A - 8,945

94 P C1.3/SDG/49 1.3 Skenderbeu 1 - 10,000 MNL Post

95 R/A - 6,900

96 P C1.3/SDG/50 1.3 Ndre Mjeda 1 - 10,000 MNL Post

97 R/A - 8,560

98 P C1.3/SDG/51 1.3 Avni Rrustemi 1 - 10,000 MNL Post

99 R/A - 7,450

100 P C1.3/SDG/52 1.3 Fan Noli - Lluk I Bregut 1 - 10,000 MNL Post

101 R/A - 6,975

102 P C1.3/SDG/53 1.3 Emin Duraku 1 - 10,000 MNL Post

103 R/A - 9,000

104 P C1.3/SDG/54 1.3 Ali Krasniqi 1 - 10,000 MNL Post

105 R/A - 8,425

106 P C1.3/SDG/55 1.3 Azem Bejta 1 - 10,000 MNL Post

107 R/A - 6,730

108 P C1.3/SDG/56 1.3 Tre Deshmoret 1 - 10,000 MNL Post

109 R/A - 8,945

110 P C1.3/SDG/57 1.3 Ate Gjergj Fishta 1 - 10,000 MNL Post

111 R/A - 4,675

112 P C1.3/SDG/58 1.3 Drita - Gramqel 1 - 10,000 MNL Post

113 R/A - 7,365

114 P C1.3/SDG/59 1.3 Heronjt e Dukagjinit 1 - 10,000 MNL Post

115 R/A - 5,265

116 P C1.3/SDG/60 1.3 Faik Konica 1 - 10,000 MNL Post

117 R/A - 4,715

118 P C1.3/SDG/61 1.3 Esat Mekuli 1 - 10,000 MNL Post

119 R/A - 4,510

120 P C1.3/SDG/62 1.3 Rexhep Kadrijaj 1 - 10,000 MNL Post

121 R/A - 5,500

122 P C1.3/SDG/64 1.3 Avni Rrustemi - Mramuer 1 - 10,000 MNL Post

123 R/A - 7,155

124 P C1.3/SDG/65 1.3 Nexhmi Mustafa 1 - 10,000 MNL Post

125 R/A - 7,180

126 P C1.3/SDG/66 1.3 Tefik Canga 1 - 10,000 MNL Post

127 R/A - 6,565

128 P C1.3/SDG/67 1.3 Pjeter Bogdani 1 - 10,000 MNL Post

129 R/A - 10,000

130 P C1.3/SDG/68 1.3 Sami Frasheri 1 - 10,000 MNL Post

131 R/A - 7,710

132 P C1.3/SDG/70 1.3 Jahe Hasani 1 - 10,000 MNL Post

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 206 of 255 10/17/2012 1:05 AM

Page 207: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

133 R/A - 5,370

134 P C1.3/SDG/71 1.3 Luigj Gurakuqi 1 - 10,000 MNL Post

135 R/A - 9,680

136 P C1.3/SDG/72 1.3 Drita - Majac 1 - 10,000 MNL Post

137 R/A - 9,790

138 P C1.3/SDG/73 1.3 Laura Scotti 1 - 10,000 MNL Post

139 R/A - 4,805

140 P C1.3/SDG/74 1.3 Lismir 1 - 10,000 MNL Post

141 R/A - 4,755

142 P C1.3/SDG/75 1.3 Naim Frasheri - Bresnice 1 - 10,000 MNL Post

143 R/A - 7,180

144 P C1.3/SDG/76 1.3 Migjeni 1 - 10,000 MNL Post

145 R/A - 7,450

146 P C1.3/SDG/77 1.3 Knez Llazar 1 - 10,000 MNL Post

147 R/A - 10,000

148 P C1.3/SDG/78 1.3 Aferdita 1 - 10,000 MNL Post

149 R/A - 7,030

150 P C1.3/SDG/79 1.3 Bajram Curri - Shurdhan 1 - 10,000 MNL Post

151 R/A - 4,630

152 P C1.3/SDG/80 1.3 Fetah Qerimi 1 - 10,000 MNL Post

153 R/A - 5,690

154 P C1.3/SDG/81 1.3 Liria 1 - 10,000 MNL Post

155 R/A - 5,435

156 P C1.3/SDG/82 1.3 Kadri Zeka 1 - 10,000 MNL Post

157 R/A - 6,480

158 P C1.3/SDG/83 1.3 Sadri Misini 1 - 10,000 MNL Post

159 R/A - 6,885

160 P C1.3/SDG/84 1.3 Asdreni 1 - 10,000 MNL Post

161 R/A - 6,095

162 P C1.3/SDG/86 1.3 Hysen Terpeza 1 - 10,000 MNL Post

163 R/A - 6,010

164 P C1.3/SDG/87 1.3 Vellezerit Gervalla 1 - 10,000 MNL Post

165 R/A - 8,470

166 P C1.3/SDG/88 1.3 Deshmoret e 5 Prillit 1 - 10,000 MNL Post

167 R/A - 7,095

168 P C1.3/SDG/90 1.3 Gjon Serreci - Mogille 1 - 10,000 MNL Post

169 R/A - 5,980

170 P C1.3/SDG/91 1.3 Deshmoret e Qendreses 1 - 10,000 MNL Post

171 R/A - 5,485

172 P C1.3/SDG/92 1.3 Desjmoret e Drenices 1 - 10,000 MNL Post

173 R/A - 5,140

174 P C1.3/SDG/93 1.3 Xheve Lladrovci 1 - 10,000 MNL Post

175 R/A - 5,435

176 P C1.3/SDG/94 1.3 Shote Galica 1 - 10,000 MNL Post

177 R/A - 6,480

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 207 of 255 10/17/2012 1:05 AM

Page 208: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

178 P C1.3/SDG/96 1.3 Abedin Rexha 1 - 10,000 MNL Post

179 R/A - 6,180

180 P C1.3/SDG/98 1.3 Habib Jusufi 1 10,000 MNL Post

181 R/A 5,345

182 P C1.3/SDG/99 1.3 Jusuf Rexha 1 10,000 MNL Post

183 R/A 6,115

184 P C1.3/SDG/100 1.3 Sefedin Smakolli 1 10,000 MNL Post

185 R/A 5,625

186 P C1.3/SDG/101 1.3 Trepca 1 10,000 MNL Post

187 R/A 7,620

188 P C1.3/SDG/102 1.3 Bedri Gjinaj 1 10,000 MNL Post

189 R/A 7,165

190 P C1.3/SDG/104 1.3 Azem Bejta - Dubovc 1 10,000 MNL Post

191 R/A 6,090

192 P C1.3/SDG/105 1.3 Bajram Curri - Dumnice 1 10,000 MNL Post

193 R/A 6,255

194 P C1.3/SDG/106 1.3 Gj.K. Skenderbeu 1 10,000 MNL Post

195 R/A 7,350

196 P C1.3/SDG/107 1.3 Adem Voca 1 10,000 MNL Post

197 R/A 5,075

198 P C1.3/SDG/108 1.3 Emin Duraku - Novolane 1 10,000 MNL Post

199 R/A 6,555

200 P C1.3/SDG/111 1.3 Dardania 1 10,000 MNL Post

201 R/A 5,005

202 P C1.3/SDG/112 1.3 K. Kristoforidhi 1 10,000 MNL Post

203 R/A 6,585

204 P C1.3/SDG/113 1.3 Fehmi Agani 1 10,000 MNL Post

205 R/A 6,180

206 P C1.3/SDG/114 1.3 Shtjefen Gjeqovi 1 10,000 MNL Post

207 R/A 8,125

208 P C1.3/SDG/115 1.3 Abdullah Shabani 1 10,000 MNL Post

209 R/A 8,565

210 P C1.3/SDG/116 1.3 G. Luma 10,000 MNL Post

211 R/A 5,110

212 P C1.3/SDG/117 1.3 Sharski Odredi 10,000 MNL Post

213 R/A 8,510

214 P C1.3/SDG/118 1.3 Sezai Surroi 10,000 MNL Post

215 R/A 7,495

216 P C1.3/SDG/119 1.3 Mic Sokoli 10,000 MNL Post

217 R/A 6,165

218 P C1.3/SDG/120 1.3 Haziz Tolaj 10,000 MNL Post

219 R/A 7,275

220 P C1.3/SDG/121 1.3 Luigj Gurakuqi 10,000 MNL Post

221 R/A 8,030

SECOND ROUND PRIMARY SCHOOL

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 208 of 255 10/17/2012 1:05 AM

Page 209: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

222 P C1.3/SDG/123 1.3 Sadri Duhla 10,000 MNL Post

223 R/A 10,000

224 P C1.3/SDG/124 1.3 Deshmoret e Tivarit 10,000 MNL Post

225 R/A 8,000

226 P C1.3/SDG/125 1.3 Sahban Spahiu 10,000 MNL Post

227 R/A 9,445

228 P C1.3/SDG/126 1.3 Ferhat Binishi 10,000 MNL Post

229 R/A 6,260

230 P C1.3/SDG/127 1.3 Ukshin Miftari 10,000 MNL Post

231 R/A 6,050

232 P C1.3/SDG/128 1.3 Qemajl Bakia 10,000 MNL Post

233 R/A 5,850

234 P C1.3/SDG/130 1.3 Pataqan I ulet 10,000 MNL Post

235 R/A 5,510

236 P C1.3/SDG/131 1.3 4 Deshmoret 10,000 MNL Post

237 R/A 7,835

238 P C1.3/SDG/132 1.3 Afrim Buqaj 10,000 MNL Post

239 R/A 5,710

240 P C1.3/SDG/133 1.3 Deshmoret e fshatit Bubavec 10,000 MNL Post

241 R/A 6,000

242 P C1.3/SDG/134 1.3 Gjergj Kastrioti 10,000 MNL Post

243 R/A 7,850

244 P C1.3/SDG/136 1.3 Ramiz Sadiku 10,000 MNL Post

245 R/A 7,505

246 P C1.3/SDG/137 1.3 Jusuf Gervalla 10,000 MNL Post

247 R/A 7,095

248 P C1.3/SDG/138 1.3 Nena Tereze 10,000 MNL Post

249 R/A 8,025

250 P C1.3/SDG/139 1.3 Shkendija 10,000 MNL Post

251 R/A 10,000

252 P C1.3/SDG/140 1.3 Ganimete Terbeshi 10,000 MNL Post

253 R/A 6,515

254 P C1.3/SDG/142 1.3 Mitrush Kurteli 10,000 MNL Post

255 R/A 7,875

256 P C1.3/SDG/143 1.3 Xhavit Ahmeti 10,000 MNL Post

257 R/A 10,000

258 P C1.3/SDG/144 1.3 Zahir Pajaziti 10,000 MNL Post

259 R/A 8,560

260 P C1.3/SDG/145 1.3 Kadri Kadriu 10,000 MNL Post

261 R/A 7,750

262 P C1.3/SDG/147 1.3 Daut Bogujevci 10,000 MNL Post

263 R/A 6,850

264 P C1.3/SDG/148 1.3 Bajram Curri 10,000 MNL Post

265 R/A 9,705

266 P C1.3/SDG/149 1.3 Fazli Grajcevci 10,000 MNL Post

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 209 of 255 10/17/2012 1:05 AM

Page 210: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

267 R/A 7,685

268 P C1.3/SDG/150 1.3 Gradjevinsko Saobracajna Skola 10,000 MNL Post

269 R/A 7,767

270 P C1.3/SDG/152 1.3 Vehbi Ibrahimi 10,000 MNL Post

271 R/A 5,055

272 P C1.3/SDG/153 1.3 Esat Berisha 10,000 MNL Post

273 R/A 5,600

274 P C1.3/SDG/154 1.3 Fan Noli 10,000 MNL Post

275 R/A 10,000

276 P C1.3/SDG/155 1.3 Kenan Halimi 10,000 MNL Post

277 R/A 6,590

278 P C1.3/SDG/156 1.3 Halil Alidema 10,000 MNL Post

279 R/A 9,520

280 P C1.3/SDG/157 1.3 Ali Gashi 10,000 MNL Post

281 R/A 6,090

282 P C1.3/SDG/158 1.3 28 Nentori 10,000 MNL Post

283 R/A 5,896

284 P C1.3/SDG/159 1.3 Shaban Jashari 10,000 MNL Post

285 R/A 10,000

286 P C1.3/SDG/160 1.3 Shote Galica 10,000 MNL Post

287 R/A 9,035

288 P C1.3/SDG/161 1.3 Fazli Grajcevci 10,000 MNL Post

289 R/A 10,000

290 P C1.3/SDG/163 1.3 Lumni Surdulli 10,000 MNL Post

291 R/A 5,790

292 P C1.3/SDG/164 1.3 SHMU 2 10,000 MNL Post

293 R/A 10,000

294 P C1.3/SDG/165 1.3 Mihaliq 10,000 MNL Post

295 R/A 5,290

296 P C1.3/SDG/166 1.3 Tefik Canga 10,000 MNL Post

297 R/A 10,000

298 P C1.3/SDG/167 1.3 SH.m.f.u. Tern 10,000 MNL Post

299 R/A 6,805

300 P C1.3/SDG/168 1.3 A. Bajrami 10,000 MNL Post

301 R/A 4,825

302 P C1.3/SDG/169 1.3 Zenel Hajdini 10,000 MNL Post

303 R/A 9,830

304 P C1.3/SDG/170 1.3 Sinan Thaci 10,000 MNL Post

305 R/A 4,835

306 P C1.3/SDG/171 1.3 Fatmir Berisha 10,000 MNL Post

307 R/A 7,825

308 P C1.3/SDG/172 1.3 7 Marsi 10,000 MNL Post

309 R/A 7,330

310 P C1.3/SDG/173 1.3 Iliria 10,000 MNL Post

THIRD ROUND PRIMARY SCHOOL

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 210 of 255 10/17/2012 1:05 AM

Page 211: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

311 R/A 5,155

312 P C1.3/SDG/174 1.3 Shkendija 10,000 MNL Post

313 R/A 7,410

314 P C1.3/SDG/175 1.3 Svetlost, Krusheva 10,000 MNL Post

315 R/A 4,350

316 P C1.3/SDG/176 1.3 Durak Ahmeti 10,000 MNL Post

317 R/A 6,600

318 P C1.3/SDG/177 1.3 Luigj Gurakuqi 10,000 MNL Post

319 R/A 4,950

320 P C1.3/SDG/178 1.3 Mark Zef Prenaj 10,000 MNL Post

321 R/A 4,950

322 P C1.3/SDG/179 1.3 Heronjt e Kosoves 10,000 MNL Post

323 R/A 6,585

324 P C1.3/SDG/180 1.3 Liria 10,000 MNL Post

325 R/A 6,285

326 P C1.3/SDG/181 1.3 Eqrem Qabej 10,000 MNL Post

327 R/A 6,015

328 P C1.3/SDG/182 1.3 Ganimete Terbeshi 10,000 MNL Post

329 R/A 6,460

330 P C1.3/SDG/183 1.3 Hasan Prishitna 10,000 MNL Post

331 R/A 5,080

332 P C1.3/SDG/184 1.3 Afrim Krasniqi 10,000 MNL Post

333 R/A 5,240

334 P C1.3/SDG/185 1.3 Rilindja 10,000 MNL Post

335 R/A 6,375

336 P C1.3/SDG/186 1.3 Hill Mosi 10,000 MNL Post

337 R/A 5,895

338 P C1.3/SDG/187 1.3 Vaso Pashe Shkodrani 10,000 MNL Post

339 R/A 8,685

340 P C1.3/SDG/188 1.3 Martin Camaj 10,000 MNL Post

341 R/A 8,520

342 P C1.3/SDG/189 1.3 Ardhemrija 10,000 MNL Post

343 R/A 4,920

344 P C1.3/SDG/190 1.3 Isa Boletini 10,000 MNL Post

345 R/A 6,985

346 P C1.3/SDG/191 1.3 Gjergj Fishta 10,000 MNL Post

347 R/A 10,000

348 P C1.3/SDG/192 1.3 Asim Vokshi 10,000 MNL Post

349 R/A 9,040

350 P C1.3/SDG/193 1.3 Shefki Kuleta 10,000 MNL Post

351 R/A 8,380

352 P C1.3/SDG/194 1.3 Mihail Grameno 10,000 MNL Post

353 R/A 10,000

354 P C1.3/SDG/195 1.3 Liria 10,000 MNL Post

355 R/A 7,290

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 211 of 255 10/17/2012 1:05 AM

Page 212: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

356 P C1.3/SDG/196 1.3 Nazim Hikmet 10,000 MNL Post

357 R/A 8,285

358 P C1.3/SDG/197 1.3 Nuhi Berisha 10,000 MNL Post

359 R/A 4,410

360 P C1.3/SDG/198 1.3 Idriz Seferi 10,000 MNL Post

361 R/A 4,070

362 P C1.3/SDG/199 1.3 Skender Emerllahu 10,000 MNL Post

363 R/A 6,555

364 P C1.3/SDG/200 1.3 Dositej Obradovic 10,000 MNL Post

365 R/A 6,285

366 P C1.3/SDG/201 1.3 Mehdi Sylejman Bytyqi 10,000 MNL Post

367 R/A 4,795

368 P C1.3/SDG/202 1.3 Minatori 10,000 MNL Post

369 R/A 4,520

370 P C1.3/SDG/203 1.3 Liria 10,000 MNL Post

371 R/A 7,445

372 P 1,830,321

373 R/A 1,272,846

374

375 P C1.3/SDG/10 1.3 F. Guri V.Caka 1 - 15,000 MNL Post

376 R/A 13,661

377 P C1.3/SDG/12 1.3 Dardania 1 - 15,000 MNL Post

378 R/A - 8,610

379 P C1.3/SDG/13 1.3 K. I Manastirit - Firaje 1 - 15,000 MNL Post

380 R/A - 6,912

381 P C1.3/SDG/20 1.3 Gjimnazi II Gjuhersor 1 - 15,000 MNL Post

382 R/A 14,100

383 P C1.3/SDG/21 1.3 Jeta e Re 1 - 15,000 MNL Post

384 R/A 15,000

385 P C1.3/SDG/37 1.3 12 Maji 1 - 15,000 MNL Post

386 R/A 10,806

387 P C1.3/SDG/39 1.3 Lasgush Poradeci 1 15,000 MNL Post

388 R/A 11,995

389 P C1.3/SDG/45 1.3 Shaban Spahija 1 15,000 MNL Post

390 R/A 15,000

391 P C1.3/SDG/63 1.3 Gj. Sami Frasheri 1 15,000 MNL Post

392 R/A 15,000

393 P C1.3/SDG/69 1.3 Aleksander Xhuvani 1 15,000 MNL Post

394 R/A 15,000

395 P C1.3/SDG/85 1.3 Veliko Rapotovo 1 15,000 MNL Post

Subtotal School Development Grants - primary

First round, Secondary School Grants

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 212 of 255 10/17/2012 1:05 AM

Page 213: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

396 R/A 8,740

397 P C1.3/SDG/89 1.3 Shkolla e Mesme e Mjekesise 1 - 15,000 MNL Post

398 R/A - 7,641

399 P C1.3/SDG/95 1.3 Gj,K. Skenderbeu 1 - 15,000 MNL Post

400 R/A - 15,000

401 P C1.3/SDG/97 1.3 Anton Cetta 1 - 15,000 MNL Post

402 R/A - 15,000

403 P C1.3/SDG/103 1.3 Arkitekt Sinani 1 - 15,000 MNL Post

404 R/A - 13,549

405 P C1.3/SDG/109 1.3 Eqrem Qabej 1 - 15,000 MNL Post

406 R/A - 15,000

407 P C1.3/SDG/110 1.3 Pjeter Bogdani 1 - 15,000 MNL Post

408 R/A - 13,885

409 P C1.3/SDG/122 1.3 Gani Cavdarbashi 1 - 15,000 MNL Post

410 R/A - 15,000

411 P C1.3/SDG/129 1.3 Hysni Zajmi 1 - 15,000 MNL Post

412 R/A - 15,000

413 P C1.3/SDG/135 1.3 Odhise Pakali 1 - 15,000 MNL Post

414 R/A - 9,650

415 P C1.3/SDG/141 1.3 Eqrem Qabej 1 - 15,000 MNL Post

416 R/A - 11,634

417 P C1.3/SDG/146 1.3 Isa Boletini 1 - 15,000 MNL Post

418 R/A - 15,000

419 P C1.3/SDG/151 1.3 Arberia 1 - 15,000 MNL Post

420 R/A - 12,912

421 P C1.3/SDG/162 1.3 Frang Bardhi 1 - 15,000 MNL Post

422 R/A - 15,000

423 P C1.3/SDG/110 1.3 1 - 15,000 MNL Post

424 R/A -

425 P C1.3/SDG/ 1.3 SH.M.L 1 - 15,000 MNL Post

426 R/A 8,432

427 P C1.3/SDG/ 1.3 Sh. E mesme ekonomike 1 - 15,000 MNL Post

428 R/A 6,899

429 P C1.3/SDG/ 1.3 Fehmi Lladrovci 1 - 15,000 MNL Post

430 R/A 15,000

431 P C1.3/SDG/ 1.3 Hamez Jashari 1 - 15,000 MNL Post

432 R/A 12,762

433 P 435,000

434 R/A 352,188

435

436 15 105,000 2,313,611

437 - - 1,658,584

Component 1. Totals (Grants)

Subtotal School Development Grants - Secondary

SECOND ROUND - SECONDARY SCHOOLS

THIRD ROUND - SECONDARY SCHOOLS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 213 of 255 10/17/2012 1:05 AM

Page 214: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Database Subtotals Tool 15 181,846 141,378

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 214 of 255 10/17/2012 1:05 AM

Page 215: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

1

2

3

4 Municipal Grants (15)

5 P C1.2/MG#1 1.2 1. Kacanik 1 35,000 16,200 MNL Post

6 R/A - 16,197

7 P C1.2/MG#2 1.2 2. Gjilan 1 35,000 21,200 MNL Post

8 R/A - 17,354

9 P C1.2/MG#3 1.2 3. Istog 1 35,000 10,890 MNL Post

10 R/A - -

11 P 15 105,000 48,290

12 R/A - - 33,551

13

14 P C1.3/SDG/01 1.3 Gjon Serreçi 1 10,000 MNL Post

15 R/A - 10,000

16 P C1.3/SDG/02 1.3 Ahmet Hoxha 1 - 10,000 MNL Post

17 R/A - 10,000

18 P C1.3/SDG/03 1.3 Naim Frasheri 1 - 10,000 MNL Post

19 R/A - 9,605

20 P C1.3/SDG/04 1.3 Dituria - Ferizaj 1 - 10,000 MNL Post

21 R/A - 6,180

22 P C1.3/SDG/05 1.3 Ali Hadri 1 - 10,000 MNL Post

23 R/A - 6,140

24 P C1.3/SDG/06 1.3 Ismail Luma 1 - 10,000 MNL Post

25 R/A - 8,725

26 P C1.3/SDG/07 1.3 Zenel Hajdini 1 - 10,000 MNL Post

27 R/A - 10,000

28 P C1.3/SDG/08 1.3 Haradin Bajrami (Jeronim de Rada) 1 - 10,000 MNL Post

29 R/A - 10,000

30 P C1.3/SDG/09 1.3 Bajram Curri 1 - 10,000 MNL Post

31 R/A - 10,000

32 P C1.3/SDG/10 1.3 F.Guri dhe V.Qaka 1 - 10,000 MNL Post

33 R/A - 13,661

32 P C1.3/SDG/11 1.3 Dituria - Kaqanik 1 - 10,000 MNL Post

33 R/A - 5,825

34 P C1.3/SDG/14 1.3 Sh. F. Kabashi 1 - 10,000 MNL Post

35 R/A - 5,100

36 P C1.3/SDG/15 1.3 Ardhmeria 1 - 10,000 MNL Post

37 R/A - 5,335

38 P C1.3/SDG/16 1.3 Zenun Cocaj 1 - 10,000 MNL Post

39 R/A - 8,040

40 P C1.3/SDG/17 1.3 Izvor 1 - 10,000 MNL Post

41 R/A - 5,435

42 P C1.3/SDG/18 1.3 Zef Lush Marku 1 - 10,000 MNL Post

17-Oct-12

COMPONENT 1. STRENGTHENING ORGANIZATION &

FINANCING OF EDUCATION SYSTEM

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Subtotal Municipal Grants

GRANTS

First round, Primary School Grants

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 215 of 255 10/17/2012 1:05 AM

Page 216: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

43 R/A - 8,130

44 P C1.3/SDG/19 1.3 Nazmi Buduri 1 - 10,000 MNL Post

45 R/A - 8,040

46 P C1.3/SDG/22 1.3 Drita 1 - 10,000 MNL Post

47 R/A - 5,210

48 P C1.3/SDG/23 1.3 K. I Manastirit 1 - 10,000 MNL Post

49 R/A - 8,940

50 P C1.3/SDG/24 1.3 Ilmi Bahtijari 1 - 10,000 MNL Post

51 R/A - 9,395

52 P C1.3/SDG/25 1.3 Fetah Sylejmani 1 - 10,000 MNL Post

53 R/A - 8,075

54 P C1.3/SDG/26 1.3 Haxhi Ymer Lutfiu 1 - 10,000 MNL Post

55 R/A - 4,437

56 P C1.3/SDG/27 1.3 Vellazerimi 1 - 10,000 MNL Post

57 R/A - 7,815

58 P C1.3/SDG/28 1.3 Zef Lush Marku - Bregoc 1 - 10,000 MNL Post

59 R/A - 9,615

60 P C1.3/SDG/29 1.3 Nimon Ferizi 1 - 10,000 MNL Post

61 R/A - 5,385

62 P C1.3/SDG/30 1.3 Fehmi Agani 1 - 10,000 MNL Post

63 R/A - 8,075

64 P C1.3/SDG/31 1.3 Ganimer Terbeshi 1 - 10,000 MNL Post

65 R/A - 6,085

66 P C1.3/SDG/32 1.3 7 Shtatori 1 - 10,000 MNL Post

67 R/A - 5,225

68 P C1.3/SDG/33 1.3 Fan Noli 1 - 10,000 MNL Post

69 R/A - 5,510

70 P C1.3/SDG/34 1.3 Rilindja 1 - 10,000 MNL Post

71 R/A - 4,435

72 P C1.3/SDG/35 1.3 Mustafe Ibishi 1 - 10,000 MNL Post

73 R/A - 8,185

74 P C1.3/SDG/36 1.3 Jusf Gervalla 1 - 10,000 MNL Post

75 R/A - 6,695

76 P C1.3/SDG/38 1.3 7 Shtatori - Rahovec 1 - 10,000 MNL Post

77 R/A - 5,755

78 P C1.3/SDG/40 1.3 Rifat Berisha 1 - 10,000 MNL Post

79 R/A - 6,290

80 P C1.3/SDG/41 1.3 Vesel Pagarusha 1 - 10,000 MNL Post

81 R/A - 6,285

82 P C1.3/SDG/42 1.3 Ismet Jashari Kumanova 1 - 10,000 MNL Post

83 R/A - 5,265

84 P C1.3/SDG/43 1.3 Tafil Kelmendi 1 - 10,000 MNL Post

85 R/A - 5,685

86 P C1.3/SDG/44 1.3 Bajram Curri - Drenoc 1 - 10,000 MNL Post

87 R/A - 6,450

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 216 of 255 10/17/2012 1:05 AM

Page 217: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

88 P C1.3/SDG/46 1.3 Xhemajl Kada 1 - 10,000 MNL Post

89 R/A - 8,425

90 P C1.3/SDG/47 1.3 7 Shtatori - Vitomirice 1 - 10,000 MNL Post

91 R/A - 9,340

92 P C1.3/SDG/48 1.3 Deshmoret e Kombit 1 - 10,000 MNL Post

93 R/A - 8,945

94 P C1.3/SDG/49 1.3 Skenderbeu 1 - 10,000 MNL Post

95 R/A - 6,900

96 P C1.3/SDG/50 1.3 Ndre Mjeda 1 - 10,000 MNL Post

97 R/A - 8,560

98 P C1.3/SDG/51 1.3 Avni Rrustemi 1 - 10,000 MNL Post

99 R/A - 7,450

100 P C1.3/SDG/52 1.3 Fan Noli - Lluk I Bregut 1 - 10,000 MNL Post

101 R/A - 6,975

102 P C1.3/SDG/53 1.3 Emin Duraku 1 - 10,000 MNL Post

103 R/A - 9,000

104 P C1.3/SDG/54 1.3 Ali Krasniqi 1 - 10,000 MNL Post

105 R/A - 8,425

106 P C1.3/SDG/55 1.3 Azem Bejta 1 - 10,000 MNL Post

107 R/A - 6,730

108 P C1.3/SDG/56 1.3 Tre Deshmoret 1 - 10,000 MNL Post

109 R/A - 8,945

110 P C1.3/SDG/57 1.3 Ate Gjergj Fishta 1 - 10,000 MNL Post

111 R/A - 4,675

112 P C1.3/SDG/58 1.3 Drita - Gramqel 1 - 10,000 MNL Post

113 R/A - 7,365

114 P C1.3/SDG/59 1.3 Heronjt e Dukagjinit 1 - 10,000 MNL Post

115 R/A - 5,265

116 P C1.3/SDG/60 1.3 Faik Konica 1 - 10,000 MNL Post

117 R/A - 4,715

118 P C1.3/SDG/61 1.3 Esat Mekuli 1 - 10,000 MNL Post

119 R/A - 4,510

120 P C1.3/SDG/62 1.3 Rexhep Kadrijaj 1 - 10,000 MNL Post

121 R/A - 5,500

122 P C1.3/SDG/64 1.3 Avni Rrustemi - Mramuer 1 - 10,000 MNL Post

123 R/A - 7,155

124 P C1.3/SDG/65 1.3 Nexhmi Mustafa 1 - 10,000 MNL Post

125 R/A - 7,180

126 P C1.3/SDG/66 1.3 Tefik Canga 1 - 10,000 MNL Post

127 R/A - 6,565

128 P C1.3/SDG/67 1.3 Pjeter Bogdani 1 - 10,000 MNL Post

129 R/A - 10,000

130 P C1.3/SDG/68 1.3 Sami Frasheri 1 - 10,000 MNL Post

131 R/A - 7,710

132 P C1.3/SDG/70 1.3 Jahe Hasani 1 - 10,000 MNL Post

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 217 of 255 10/17/2012 1:05 AM

Page 218: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

133 R/A - 5,370

134 P C1.3/SDG/71 1.3 Luigj Gurakuqi 1 - 10,000 MNL Post

135 R/A - 9,680

136 P C1.3/SDG/72 1.3 Drita - Majac 1 - 10,000 MNL Post

137 R/A - 9,790

138 P C1.3/SDG/73 1.3 Laura Scotti 1 - 10,000 MNL Post

139 R/A - 4,805

140 P C1.3/SDG/74 1.3 Lismir 1 - 10,000 MNL Post

141 R/A - 4,755

142 P C1.3/SDG/75 1.3 Naim Frasheri - Bresnice 1 - 10,000 MNL Post

143 R/A - 7,180

144 P C1.3/SDG/76 1.3 Migjeni 1 - 10,000 MNL Post

145 R/A - 7,450

146 P C1.3/SDG/77 1.3 Knez Llazar 1 - 10,000 MNL Post

147 R/A - 10,000

148 P C1.3/SDG/78 1.3 Aferdita 1 - 10,000 MNL Post

149 R/A - 7,030

150 P C1.3/SDG/79 1.3 Bajram Curri - Shurdhan 1 - 10,000 MNL Post

151 R/A - 4,630

152 P C1.3/SDG/80 1.3 Fetah Qerimi 1 - 10,000 MNL Post

153 R/A - 5,690

154 P C1.3/SDG/81 1.3 Liria 1 - 10,000 MNL Post

155 R/A - 5,435

156 P C1.3/SDG/82 1.3 Kadri Zeka 1 - 10,000 MNL Post

157 R/A - 6,480

158 P C1.3/SDG/83 1.3 Sadri Misini 1 - 10,000 MNL Post

159 R/A - 6,885

160 P C1.3/SDG/84 1.3 Asdreni 1 - 10,000 MNL Post

161 R/A - 6,095

162 P C1.3/SDG/86 1.3 Hysen Terpeza 1 - 10,000 MNL Post

163 R/A - 6,010

164 P C1.3/SDG/87 1.3 Vellezerit Gervalla 1 - 10,000 MNL Post

165 R/A - 8,470

166 P C1.3/SDG/88 1.3 Deshmoret e 5 Prillit 1 - 10,000 MNL Post

167 R/A - 7,095

168 P C1.3/SDG/90 1.3 Gjon Serreci - Mogille 1 - 10,000 MNL Post

169 R/A - 5,980

170 P C1.3/SDG/91 1.3 Deshmoret e Qendreses 1 - 10,000 MNL Post

171 R/A - 5,485

172 P C1.3/SDG/92 1.3 Desjmoret e Drenices 1 - 10,000 MNL Post

173 R/A - 5,140

174 P C1.3/SDG/93 1.3 Xheve Lladrovci 1 - 10,000 MNL Post

175 R/A - 5,435

176 P C1.3/SDG/94 1.3 Shote Galica 1 - 10,000 MNL Post

177 R/A - 6,480

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 218 of 255 10/17/2012 1:05 AM

Page 219: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

178 P C1.3/SDG/96 1.3 Abedin Rexha 1 - 10,000 MNL Post

179 R/A - 6,180

180 P C1.3/SDG/98 1.3 Habib Jusufi 1 10,000 MNL Post

181 R/A 5,345

182 P C1.3/SDG/99 1.3 Jusuf Rexha 1 10,000 MNL Post

183 R/A 6,115

184 P C1.3/SDG/100 1.3 Sefedin Smakolli 1 10,000 MNL Post

185 R/A 5,625

186 P C1.3/SDG/101 1.3 Trepca 1 10,000 MNL Post

187 R/A 7,620

188 P C1.3/SDG/102 1.3 Bedri Gjinaj 1 10,000 MNL Post

189 R/A 7,165

190 P C1.3/SDG/104 1.3 Azem Bejta - Dubovc 1 10,000 MNL Post

191 R/A 6,090

192 P C1.3/SDG/105 1.3 Bajram Curri - Dumnice 1 10,000 MNL Post

193 R/A 6,255

194 P C1.3/SDG/106 1.3 Gj.K. Skenderbeu 1 10,000 MNL Post

195 R/A 7,350

196 P C1.3/SDG/107 1.3 Adem Voca 1 10,000 MNL Post

197 R/A 5,075

198 P C1.3/SDG/108 1.3 Emin Duraku - Novolane 1 10,000 MNL Post

199 R/A 6,555

200 P C1.3/SDG/111 1.3 Dardania 1 10,000 MNL Post

201 R/A 5,005

202 P C1.3/SDG/112 1.3 K. Kristoforidhi 1 10,000 MNL Post

203 R/A 6,585

204 P C1.3/SDG/113 1.3 Fehmi Agani 1 10,000 MNL Post

205 R/A 6,180

206 P C1.3/SDG/114 1.3 Shtjefen Gjeqovi 1 10,000 MNL Post

207 R/A 8,125

208 P C1.3/SDG/115 1.3 Abdullah Shabani 1 10,000 MNL Post

209 R/A 8,565

210 P C1.3/SDG/116 1.3 G. Luma 10,000 MNL Post

211 R/A 5,110

212 P C1.3/SDG/117 1.3 Sharski Odredi 10,000 MNL Post

213 R/A 8,510

214 P C1.3/SDG/118 1.3 Sezai Surroi 10,000 MNL Post

215 R/A 7,495

216 P C1.3/SDG/119 1.3 Mic Sokoli 10,000 MNL Post

217 R/A 6,165

218 P C1.3/SDG/120 1.3 Haziz Tolaj 10,000 MNL Post

219 R/A 7,275

220 P C1.3/SDG/121 1.3 Luigj Gurakuqi 10,000 MNL Post

221 R/A 8,030

SECOND ROUND PRIMARY SCHOOL

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 219 of 255 10/17/2012 1:05 AM

Page 220: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

222 P C1.3/SDG/123 1.3 Sadri Duhla 10,000 MNL Post

223 R/A 10,000

224 P C1.3/SDG/124 1.3 Deshmoret e Tivarit 10,000 MNL Post

225 R/A 8,000

226 P C1.3/SDG/125 1.3 Sahban Spahiu 10,000 MNL Post

227 R/A 9,445

228 P C1.3/SDG/126 1.3 Ferhat Binishi 10,000 MNL Post

229 R/A 6,260

230 P C1.3/SDG/127 1.3 Ukshin Miftari 10,000 MNL Post

231 R/A 6,050

232 P C1.3/SDG/128 1.3 Qemajl Bakia 10,000 MNL Post

233 R/A 5,850

234 P C1.3/SDG/130 1.3 Pataqan I ulet 10,000 MNL Post

235 R/A 5,510

236 P C1.3/SDG/131 1.3 4 Deshmoret 10,000 MNL Post

237 R/A 7,835

238 P C1.3/SDG/132 1.3 Afrim Buqaj 10,000 MNL Post

239 R/A 5,710

240 P C1.3/SDG/133 1.3 Deshmoret e fshatit Bubavec 10,000 MNL Post

241 R/A 6,000

242 P C1.3/SDG/134 1.3 Gjergj Kastrioti 10,000 MNL Post

243 R/A 7,850

244 P C1.3/SDG/136 1.3 Ramiz Sadiku 10,000 MNL Post

245 R/A 7,505

246 P C1.3/SDG/137 1.3 Jusuf Gervalla 10,000 MNL Post

247 R/A 7,095

248 P C1.3/SDG/138 1.3 Nena Tereze 10,000 MNL Post

249 R/A 8,025

250 P C1.3/SDG/139 1.3 Shkendija 10,000 MNL Post

251 R/A 10,000

252 P C1.3/SDG/140 1.3 Ganimete Terbeshi 10,000 MNL Post

253 R/A 6,515

254 P C1.3/SDG/142 1.3 Mitrush Kurteli 10,000 MNL Post

255 R/A 7,875

256 P C1.3/SDG/143 1.3 Xhavit Ahmeti 10,000 MNL Post

257 R/A 10,000

258 P C1.3/SDG/144 1.3 Zahir Pajaziti 10,000 MNL Post

259 R/A 8,560

260 P C1.3/SDG/145 1.3 Kadri Kadriu 10,000 MNL Post

261 R/A 7,750

262 P C1.3/SDG/147 1.3 Daut Bogujevci 10,000 MNL Post

263 R/A 6,850

264 P C1.3/SDG/148 1.3 Bajram Curri 10,000 MNL Post

265 R/A 9,705

266 P C1.3/SDG/149 1.3 Fazli Grajcevci 10,000 MNL Post

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 220 of 255 10/17/2012 1:05 AM

Page 221: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

267 R/A 7,685

268 P C1.3/SDG/150 1.3 Gradjevinsko Saobracajna Skola 10,000 MNL Post

269 R/A 7,767

270 P C1.3/SDG/152 1.3 Vehbi Ibrahimi 10,000 MNL Post

271 R/A 5,055

272 P C1.3/SDG/153 1.3 Esat Berisha 10,000 MNL Post

273 R/A 5,600

274 P C1.3/SDG/154 1.3 Fan Noli 10,000 MNL Post

275 R/A 10,000

276 P C1.3/SDG/155 1.3 Kenan Halimi 10,000 MNL Post

277 R/A 6,590

278 P C1.3/SDG/156 1.3 Halil Alidema 10,000 MNL Post

279 R/A 9,520

280 P C1.3/SDG/157 1.3 Ali Gashi 10,000 MNL Post

281 R/A 6,090

282 P C1.3/SDG/158 1.3 28 Nentori 10,000 MNL Post

283 R/A 5,896

284 P C1.3/SDG/159 1.3 Shaban Jashari 10,000 MNL Post

285 R/A 10,000

286 P C1.3/SDG/160 1.3 Shote Galica 10,000 MNL Post

287 R/A 9,035

288 P C1.3/SDG/161 1.3 Fazli Grajcevci 10,000 MNL Post

289 R/A 10,000

290 P C1.3/SDG/163 1.3 Lumni Surdulli 10,000 MNL Post

291 R/A 5,790

292 P C1.3/SDG/164 1.3 SHMU 2 10,000 MNL Post

293 R/A 10,000

294 P C1.3/SDG/165 1.3 Mihaliq 10,000 MNL Post

295 R/A 5,290

296 P C1.3/SDG/166 1.3 Tefik Canga 10,000 MNL Post

297 R/A 10,000

298 P C1.3/SDG/167 1.3 SH.m.f.u. Tern 10,000 MNL Post

299 R/A 6,805

300 P C1.3/SDG/168 1.3 A. Bajrami 10,000 MNL Post

301 R/A 4,825

302 P C1.3/SDG/169 1.3 Zenel Hajdini 10,000 MNL Post

303 R/A 9,830

304 P C1.3/SDG/170 1.3 Sinan Thaci 10,000 MNL Post

305 R/A 4,835

306 P C1.3/SDG/171 1.3 Fatmir Berisha 10,000 MNL Post

307 R/A 7,825

308 P C1.3/SDG/172 1.3 7 Marsi 10,000 MNL Post

309 R/A 7,330

310 P C1.3/SDG/173 1.3 Iliria 10,000 MNL Post

THIRD ROUND PRIMARY SCHOOL

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 221 of 255 10/17/2012 1:05 AM

Page 222: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

311 R/A 5,155

312 P C1.3/SDG/174 1.3 Shkendija 10,000 MNL Post

313 R/A 7,410

314 P C1.3/SDG/175 1.3 Svetlost, Krusheva 10,000 MNL Post

315 R/A 4,350

316 P C1.3/SDG/176 1.3 Durak Ahmeti 10,000 MNL Post

317 R/A 6,600

318 P C1.3/SDG/177 1.3 Luigj Gurakuqi 10,000 MNL Post

319 R/A 4,950

320 P C1.3/SDG/178 1.3 Mark Zef Prenaj 10,000 MNL Post

321 R/A 4,950

322 P C1.3/SDG/179 1.3 Heronjt e Kosoves 10,000 MNL Post

323 R/A 6,585

324 P C1.3/SDG/180 1.3 Liria 10,000 MNL Post

325 R/A 6,285

326 P C1.3/SDG/181 1.3 Eqrem Qabej 10,000 MNL Post

327 R/A 6,015

328 P C1.3/SDG/182 1.3 Ganimete Terbeshi 10,000 MNL Post

329 R/A 6,460

330 P C1.3/SDG/183 1.3 Hasan Prishitna 10,000 MNL Post

331 R/A 5,080

332 P C1.3/SDG/184 1.3 Afrim Krasniqi 10,000 MNL Post

333 R/A 5,240

334 P C1.3/SDG/185 1.3 Rilindja 10,000 MNL Post

335 R/A 6,375

336 P C1.3/SDG/186 1.3 Hill Mosi 10,000 MNL Post

337 R/A 5,895

338 P C1.3/SDG/187 1.3 Vaso Pashe Shkodrani 10,000 MNL Post

339 R/A 8,685

340 P C1.3/SDG/188 1.3 Martin Camaj 10,000 MNL Post

341 R/A 8,520

342 P C1.3/SDG/189 1.3 Ardhemrija 10,000 MNL Post

343 R/A 4,920

344 P C1.3/SDG/190 1.3 Isa Boletini 10,000 MNL Post

345 R/A 6,985

346 P C1.3/SDG/191 1.3 Gjergj Fishta 10,000 MNL Post

347 R/A 10,000

348 P C1.3/SDG/192 1.3 Asim Vokshi 10,000 MNL Post

349 R/A 9,040

350 P C1.3/SDG/193 1.3 Shefki Kuleta 10,000 MNL Post

351 R/A 8,380

352 P C1.3/SDG/194 1.3 Mihail Grameno 10,000 MNL Post

353 R/A 10,000

354 P C1.3/SDG/195 1.3 Liria 10,000 MNL Post

355 R/A 7,290

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 222 of 255 10/17/2012 1:05 AM

Page 223: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

356 P C1.3/SDG/196 1.3 Nazim Hikmet 10,000 MNL Post

357 R/A 8,285

358 P C1.3/SDG/197 1.3 Nuhi Berisha 10,000 MNL Post

359 R/A 4,410

360 P C1.3/SDG/198 1.3 Idriz Seferi 10,000 MNL Post

361 R/A 4,070

362 P C1.3/SDG/199 1.3 Skender Emerllahu 10,000 MNL Post

363 R/A 6,555

364 P C1.3/SDG/200 1.3 Dositej Obradovic 10,000 MNL Post

365 R/A 6,285

366 P C1.3/SDG/201 1.3 Mehdi Sylejman Bytyqi 10,000 MNL Post

367 R/A 4,795

368 P C1.3/SDG/202 1.3 Minatori 10,000 MNL Post

369 R/A 4,520

370 P C1.3/SDG/203 1.3 Liria 10,000 MNL Post

371 R/A 7,445

372 P 1,830,321

373 R/A 1,272,846

374

375 P C1.3/SDG/10 1.3 F. Guri V.Caka 1 - 15,000 MNL Post

376 R/A 13,661

377 P C1.3/SDG/12 1.3 Dardania 1 - 15,000 MNL Post

378 R/A - 8,610

379 P C1.3/SDG/13 1.3 K. I Manastirit - Firaje 1 - 15,000 MNL Post

380 R/A - 6,912

381 P C1.3/SDG/20 1.3 Gjimnazi II Gjuhersor 1 - 15,000 MNL Post

382 R/A 14,100

383 P C1.3/SDG/21 1.3 Jeta e Re 1 - 15,000 MNL Post

384 R/A 15,000

385 P C1.3/SDG/37 1.3 12 Maji 1 - 15,000 MNL Post

386 R/A 10,806

387 P C1.3/SDG/39 1.3 Lasgush Poradeci 1 15,000 MNL Post

388 R/A 11,995

389 P C1.3/SDG/45 1.3 Shaban Spahija 1 15,000 MNL Post

390 R/A 15,000

391 P C1.3/SDG/63 1.3 Gj. Sami Frasheri 1 15,000 MNL Post

392 R/A 15,000

393 P C1.3/SDG/69 1.3 Aleksander Xhuvani 1 15,000 MNL Post

394 R/A 15,000

395 P C1.3/SDG/85 1.3 Veliko Rapotovo 1 15,000 MNL Post

Subtotal School Development Grants - primary

First round, Secondary School Grants

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 223 of 255 10/17/2012 1:05 AM

Page 224: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

396 R/A 8,740

397 P C1.3/SDG/89 1.3 Shkolla e Mesme e Mjekesise 1 - 15,000 MNL Post

398 R/A - 7,641

399 P C1.3/SDG/95 1.3 Gj,K. Skenderbeu 1 - 15,000 MNL Post

400 R/A - 15,000

401 P C1.3/SDG/97 1.3 Anton Cetta 1 - 15,000 MNL Post

402 R/A - 15,000

403 P C1.3/SDG/103 1.3 Arkitekt Sinani 1 - 15,000 MNL Post

404 R/A - 13,549

405 P C1.3/SDG/109 1.3 Eqrem Qabej 1 - 15,000 MNL Post

406 R/A - 15,000

407 P C1.3/SDG/110 1.3 Pjeter Bogdani 1 - 15,000 MNL Post

408 R/A - 13,885

409 P C1.3/SDG/122 1.3 Gani Cavdarbashi 1 - 15,000 MNL Post

410 R/A - 15,000

411 P C1.3/SDG/129 1.3 Hysni Zajmi 1 - 15,000 MNL Post

412 R/A - 15,000

413 P C1.3/SDG/135 1.3 Odhise Pakali 1 - 15,000 MNL Post

414 R/A - 9,650

415 P C1.3/SDG/141 1.3 Eqrem Qabej 1 - 15,000 MNL Post

416 R/A - 11,634

417 P C1.3/SDG/146 1.3 Isa Boletini 1 - 15,000 MNL Post

418 R/A - 15,000

419 P C1.3/SDG/151 1.3 Arberia 1 - 15,000 MNL Post

420 R/A - 12,912

421 P C1.3/SDG/162 1.3 Frang Bardhi 1 - 15,000 MNL Post

422 R/A - 15,000

423 P C1.3/SDG/110 1.3 1 - 15,000 MNL Post

424 R/A -

425 P C1.3/SDG/ 1.3 SH.M.L 1 - 15,000 MNL Post

426 R/A 8,432

427 P C1.3/SDG/ 1.3 Sh. E mesme ekonomike 1 - 15,000 MNL Post

428 R/A 6,899

429 P C1.3/SDG/ 1.3 Fehmi Lladrovci 1 - 15,000 MNL Post

430 R/A 15,000

431 P C1.3/SDG/ 1.3 Hamez Jashari 1 - 15,000 MNL Post

432 R/A 12,762

433 P 435,000

434 R/A 352,188

435

436 15 105,000 2,313,611

437 - - 1,658,584

Component 1. Totals (Grants)

Subtotal School Development Grants - Secondary

SECOND ROUND - SECONDARY SCHOOLS

THIRD ROUND - SECONDARY SCHOOLS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 224 of 255 10/17/2012 1:05 AM

Page 225: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Database Subtotals Tool 15 181,846 141,378

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 225 of 255 10/17/2012 1:05 AM

Page 226: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

1

2

3

4 Municipal Grants (15)

5 P C1.2/MG#1 1.2 1. Kacanik 1 35,000 16,200 MNL Post

6 R/A - 16,197

7 P C1.2/MG#2 1.2 2. Gjilan 1 35,000 21,200 MNL Post

8 R/A - 17,354

9 P C1.2/MG#3 1.2 3. Istog 1 35,000 10,890 MNL Post

10 R/A - -

11 P 15 105,000 48,290

12 R/A - - 33,551

13

14 P C1.3/SDG/01 1.3 Gjon Serreçi 1 10,000 MNL Post

15 R/A - 10,000

16 P C1.3/SDG/02 1.3 Ahmet Hoxha 1 - 10,000 MNL Post

17 R/A - 10,000

18 P C1.3/SDG/03 1.3 Naim Frasheri 1 - 10,000 MNL Post

19 R/A - 9,605

20 P C1.3/SDG/04 1.3 Dituria - Ferizaj 1 - 10,000 MNL Post

21 R/A - 6,180

22 P C1.3/SDG/05 1.3 Ali Hadri 1 - 10,000 MNL Post

23 R/A - 6,140

24 P C1.3/SDG/06 1.3 Ismail Luma 1 - 10,000 MNL Post

25 R/A - 8,725

26 P C1.3/SDG/07 1.3 Zenel Hajdini 1 - 10,000 MNL Post

27 R/A - 10,000

28 P C1.3/SDG/08 1.3 Haradin Bajrami (Jeronim de Rada) 1 - 10,000 MNL Post

29 R/A - 10,000

30 P C1.3/SDG/09 1.3 Bajram Curri 1 - 10,000 MNL Post

31 R/A - 10,000

32 P C1.3/SDG/10 1.3 F.Guri dhe V.Qaka 1 - 10,000 MNL Post

33 R/A - 13,661

32 P C1.3/SDG/11 1.3 Dituria - Kaqanik 1 - 10,000 MNL Post

33 R/A - 5,825

34 P C1.3/SDG/14 1.3 Sh. F. Kabashi 1 - 10,000 MNL Post

35 R/A - 5,100

36 P C1.3/SDG/15 1.3 Ardhmeria 1 - 10,000 MNL Post

37 R/A - 5,335

38 P C1.3/SDG/16 1.3 Zenun Cocaj 1 - 10,000 MNL Post

39 R/A - 8,040

40 P C1.3/SDG/17 1.3 Izvor 1 - 10,000 MNL Post

41 R/A - 5,435

42 P C1.3/SDG/18 1.3 Zef Lush Marku 1 - 10,000 MNL Post

17-Oct-12

COMPONENT 1. STRENGTHENING ORGANIZATION &

FINANCING OF EDUCATION SYSTEM

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Subtotal Municipal Grants

GRANTS

First round, Primary School Grants

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 226 of 255 10/17/2012 1:05 AM

Page 227: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

43 R/A - 8,130

44 P C1.3/SDG/19 1.3 Nazmi Buduri 1 - 10,000 MNL Post

45 R/A - 8,040

46 P C1.3/SDG/22 1.3 Drita 1 - 10,000 MNL Post

47 R/A - 5,210

48 P C1.3/SDG/23 1.3 K. I Manastirit 1 - 10,000 MNL Post

49 R/A - 8,940

50 P C1.3/SDG/24 1.3 Ilmi Bahtijari 1 - 10,000 MNL Post

51 R/A - 9,395

52 P C1.3/SDG/25 1.3 Fetah Sylejmani 1 - 10,000 MNL Post

53 R/A - 8,075

54 P C1.3/SDG/26 1.3 Haxhi Ymer Lutfiu 1 - 10,000 MNL Post

55 R/A - 4,437

56 P C1.3/SDG/27 1.3 Vellazerimi 1 - 10,000 MNL Post

57 R/A - 7,815

58 P C1.3/SDG/28 1.3 Zef Lush Marku - Bregoc 1 - 10,000 MNL Post

59 R/A - 9,615

60 P C1.3/SDG/29 1.3 Nimon Ferizi 1 - 10,000 MNL Post

61 R/A - 5,385

62 P C1.3/SDG/30 1.3 Fehmi Agani 1 - 10,000 MNL Post

63 R/A - 8,075

64 P C1.3/SDG/31 1.3 Ganimer Terbeshi 1 - 10,000 MNL Post

65 R/A - 6,085

66 P C1.3/SDG/32 1.3 7 Shtatori 1 - 10,000 MNL Post

67 R/A - 5,225

68 P C1.3/SDG/33 1.3 Fan Noli 1 - 10,000 MNL Post

69 R/A - 5,510

70 P C1.3/SDG/34 1.3 Rilindja 1 - 10,000 MNL Post

71 R/A - 4,435

72 P C1.3/SDG/35 1.3 Mustafe Ibishi 1 - 10,000 MNL Post

73 R/A - 8,185

74 P C1.3/SDG/36 1.3 Jusf Gervalla 1 - 10,000 MNL Post

75 R/A - 6,695

76 P C1.3/SDG/38 1.3 7 Shtatori - Rahovec 1 - 10,000 MNL Post

77 R/A - 5,755

78 P C1.3/SDG/40 1.3 Rifat Berisha 1 - 10,000 MNL Post

79 R/A - 6,290

80 P C1.3/SDG/41 1.3 Vesel Pagarusha 1 - 10,000 MNL Post

81 R/A - 6,285

82 P C1.3/SDG/42 1.3 Ismet Jashari Kumanova 1 - 10,000 MNL Post

83 R/A - 5,265

84 P C1.3/SDG/43 1.3 Tafil Kelmendi 1 - 10,000 MNL Post

85 R/A - 5,685

86 P C1.3/SDG/44 1.3 Bajram Curri - Drenoc 1 - 10,000 MNL Post

87 R/A - 6,450

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 227 of 255 10/17/2012 1:05 AM

Page 228: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

88 P C1.3/SDG/46 1.3 Xhemajl Kada 1 - 10,000 MNL Post

89 R/A - 8,425

90 P C1.3/SDG/47 1.3 7 Shtatori - Vitomirice 1 - 10,000 MNL Post

91 R/A - 9,340

92 P C1.3/SDG/48 1.3 Deshmoret e Kombit 1 - 10,000 MNL Post

93 R/A - 8,945

94 P C1.3/SDG/49 1.3 Skenderbeu 1 - 10,000 MNL Post

95 R/A - 6,900

96 P C1.3/SDG/50 1.3 Ndre Mjeda 1 - 10,000 MNL Post

97 R/A - 8,560

98 P C1.3/SDG/51 1.3 Avni Rrustemi 1 - 10,000 MNL Post

99 R/A - 7,450

100 P C1.3/SDG/52 1.3 Fan Noli - Lluk I Bregut 1 - 10,000 MNL Post

101 R/A - 6,975

102 P C1.3/SDG/53 1.3 Emin Duraku 1 - 10,000 MNL Post

103 R/A - 9,000

104 P C1.3/SDG/54 1.3 Ali Krasniqi 1 - 10,000 MNL Post

105 R/A - 8,425

106 P C1.3/SDG/55 1.3 Azem Bejta 1 - 10,000 MNL Post

107 R/A - 6,730

108 P C1.3/SDG/56 1.3 Tre Deshmoret 1 - 10,000 MNL Post

109 R/A - 8,945

110 P C1.3/SDG/57 1.3 Ate Gjergj Fishta 1 - 10,000 MNL Post

111 R/A - 4,675

112 P C1.3/SDG/58 1.3 Drita - Gramqel 1 - 10,000 MNL Post

113 R/A - 7,365

114 P C1.3/SDG/59 1.3 Heronjt e Dukagjinit 1 - 10,000 MNL Post

115 R/A - 5,265

116 P C1.3/SDG/60 1.3 Faik Konica 1 - 10,000 MNL Post

117 R/A - 4,715

118 P C1.3/SDG/61 1.3 Esat Mekuli 1 - 10,000 MNL Post

119 R/A - 4,510

120 P C1.3/SDG/62 1.3 Rexhep Kadrijaj 1 - 10,000 MNL Post

121 R/A - 5,500

122 P C1.3/SDG/64 1.3 Avni Rrustemi - Mramuer 1 - 10,000 MNL Post

123 R/A - 7,155

124 P C1.3/SDG/65 1.3 Nexhmi Mustafa 1 - 10,000 MNL Post

125 R/A - 7,180

126 P C1.3/SDG/66 1.3 Tefik Canga 1 - 10,000 MNL Post

127 R/A - 6,565

128 P C1.3/SDG/67 1.3 Pjeter Bogdani 1 - 10,000 MNL Post

129 R/A - 10,000

130 P C1.3/SDG/68 1.3 Sami Frasheri 1 - 10,000 MNL Post

131 R/A - 7,710

132 P C1.3/SDG/70 1.3 Jahe Hasani 1 - 10,000 MNL Post

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 228 of 255 10/17/2012 1:05 AM

Page 229: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

133 R/A - 5,370

134 P C1.3/SDG/71 1.3 Luigj Gurakuqi 1 - 10,000 MNL Post

135 R/A - 9,680

136 P C1.3/SDG/72 1.3 Drita - Majac 1 - 10,000 MNL Post

137 R/A - 9,790

138 P C1.3/SDG/73 1.3 Laura Scotti 1 - 10,000 MNL Post

139 R/A - 4,805

140 P C1.3/SDG/74 1.3 Lismir 1 - 10,000 MNL Post

141 R/A - 4,755

142 P C1.3/SDG/75 1.3 Naim Frasheri - Bresnice 1 - 10,000 MNL Post

143 R/A - 7,180

144 P C1.3/SDG/76 1.3 Migjeni 1 - 10,000 MNL Post

145 R/A - 7,450

146 P C1.3/SDG/77 1.3 Knez Llazar 1 - 10,000 MNL Post

147 R/A - 10,000

148 P C1.3/SDG/78 1.3 Aferdita 1 - 10,000 MNL Post

149 R/A - 7,030

150 P C1.3/SDG/79 1.3 Bajram Curri - Shurdhan 1 - 10,000 MNL Post

151 R/A - 4,630

152 P C1.3/SDG/80 1.3 Fetah Qerimi 1 - 10,000 MNL Post

153 R/A - 5,690

154 P C1.3/SDG/81 1.3 Liria 1 - 10,000 MNL Post

155 R/A - 5,435

156 P C1.3/SDG/82 1.3 Kadri Zeka 1 - 10,000 MNL Post

157 R/A - 6,480

158 P C1.3/SDG/83 1.3 Sadri Misini 1 - 10,000 MNL Post

159 R/A - 6,885

160 P C1.3/SDG/84 1.3 Asdreni 1 - 10,000 MNL Post

161 R/A - 6,095

162 P C1.3/SDG/86 1.3 Hysen Terpeza 1 - 10,000 MNL Post

163 R/A - 6,010

164 P C1.3/SDG/87 1.3 Vellezerit Gervalla 1 - 10,000 MNL Post

165 R/A - 8,470

166 P C1.3/SDG/88 1.3 Deshmoret e 5 Prillit 1 - 10,000 MNL Post

167 R/A - 7,095

168 P C1.3/SDG/90 1.3 Gjon Serreci - Mogille 1 - 10,000 MNL Post

169 R/A - 5,980

170 P C1.3/SDG/91 1.3 Deshmoret e Qendreses 1 - 10,000 MNL Post

171 R/A - 5,485

172 P C1.3/SDG/92 1.3 Desjmoret e Drenices 1 - 10,000 MNL Post

173 R/A - 5,140

174 P C1.3/SDG/93 1.3 Xheve Lladrovci 1 - 10,000 MNL Post

175 R/A - 5,435

176 P C1.3/SDG/94 1.3 Shote Galica 1 - 10,000 MNL Post

177 R/A - 6,480

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 229 of 255 10/17/2012 1:05 AM

Page 230: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

178 P C1.3/SDG/96 1.3 Abedin Rexha 1 - 10,000 MNL Post

179 R/A - 6,180

180 P C1.3/SDG/98 1.3 Habib Jusufi 1 10,000 MNL Post

181 R/A 5,345

182 P C1.3/SDG/99 1.3 Jusuf Rexha 1 10,000 MNL Post

183 R/A 6,115

184 P C1.3/SDG/100 1.3 Sefedin Smakolli 1 10,000 MNL Post

185 R/A 5,625

186 P C1.3/SDG/101 1.3 Trepca 1 10,000 MNL Post

187 R/A 7,620

188 P C1.3/SDG/102 1.3 Bedri Gjinaj 1 10,000 MNL Post

189 R/A 7,165

190 P C1.3/SDG/104 1.3 Azem Bejta - Dubovc 1 10,000 MNL Post

191 R/A 6,090

192 P C1.3/SDG/105 1.3 Bajram Curri - Dumnice 1 10,000 MNL Post

193 R/A 6,255

194 P C1.3/SDG/106 1.3 Gj.K. Skenderbeu 1 10,000 MNL Post

195 R/A 7,350

196 P C1.3/SDG/107 1.3 Adem Voca 1 10,000 MNL Post

197 R/A 5,075

198 P C1.3/SDG/108 1.3 Emin Duraku - Novolane 1 10,000 MNL Post

199 R/A 6,555

200 P C1.3/SDG/111 1.3 Dardania 1 10,000 MNL Post

201 R/A 5,005

202 P C1.3/SDG/112 1.3 K. Kristoforidhi 1 10,000 MNL Post

203 R/A 6,585

204 P C1.3/SDG/113 1.3 Fehmi Agani 1 10,000 MNL Post

205 R/A 6,180

206 P C1.3/SDG/114 1.3 Shtjefen Gjeqovi 1 10,000 MNL Post

207 R/A 8,125

208 P C1.3/SDG/115 1.3 Abdullah Shabani 1 10,000 MNL Post

209 R/A 8,565

210 P C1.3/SDG/116 1.3 G. Luma 10,000 MNL Post

211 R/A 5,110

212 P C1.3/SDG/117 1.3 Sharski Odredi 10,000 MNL Post

213 R/A 8,510

214 P C1.3/SDG/118 1.3 Sezai Surroi 10,000 MNL Post

215 R/A 7,495

216 P C1.3/SDG/119 1.3 Mic Sokoli 10,000 MNL Post

217 R/A 6,165

218 P C1.3/SDG/120 1.3 Haziz Tolaj 10,000 MNL Post

219 R/A 7,275

220 P C1.3/SDG/121 1.3 Luigj Gurakuqi 10,000 MNL Post

221 R/A 8,030

SECOND ROUND PRIMARY SCHOOL

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 230 of 255 10/17/2012 1:05 AM

Page 231: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

222 P C1.3/SDG/123 1.3 Sadri Duhla 10,000 MNL Post

223 R/A 10,000

224 P C1.3/SDG/124 1.3 Deshmoret e Tivarit 10,000 MNL Post

225 R/A 8,000

226 P C1.3/SDG/125 1.3 Sahban Spahiu 10,000 MNL Post

227 R/A 9,445

228 P C1.3/SDG/126 1.3 Ferhat Binishi 10,000 MNL Post

229 R/A 6,260

230 P C1.3/SDG/127 1.3 Ukshin Miftari 10,000 MNL Post

231 R/A 6,050

232 P C1.3/SDG/128 1.3 Qemajl Bakia 10,000 MNL Post

233 R/A 5,850

234 P C1.3/SDG/130 1.3 Pataqan I ulet 10,000 MNL Post

235 R/A 5,510

236 P C1.3/SDG/131 1.3 4 Deshmoret 10,000 MNL Post

237 R/A 7,835

238 P C1.3/SDG/132 1.3 Afrim Buqaj 10,000 MNL Post

239 R/A 5,710

240 P C1.3/SDG/133 1.3 Deshmoret e fshatit Bubavec 10,000 MNL Post

241 R/A 6,000

242 P C1.3/SDG/134 1.3 Gjergj Kastrioti 10,000 MNL Post

243 R/A 7,850

244 P C1.3/SDG/136 1.3 Ramiz Sadiku 10,000 MNL Post

245 R/A 7,505

246 P C1.3/SDG/137 1.3 Jusuf Gervalla 10,000 MNL Post

247 R/A 7,095

248 P C1.3/SDG/138 1.3 Nena Tereze 10,000 MNL Post

249 R/A 8,025

250 P C1.3/SDG/139 1.3 Shkendija 10,000 MNL Post

251 R/A 10,000

252 P C1.3/SDG/140 1.3 Ganimete Terbeshi 10,000 MNL Post

253 R/A 6,515

254 P C1.3/SDG/142 1.3 Mitrush Kurteli 10,000 MNL Post

255 R/A 7,875

256 P C1.3/SDG/143 1.3 Xhavit Ahmeti 10,000 MNL Post

257 R/A 10,000

258 P C1.3/SDG/144 1.3 Zahir Pajaziti 10,000 MNL Post

259 R/A 8,560

260 P C1.3/SDG/145 1.3 Kadri Kadriu 10,000 MNL Post

261 R/A 7,750

262 P C1.3/SDG/147 1.3 Daut Bogujevci 10,000 MNL Post

263 R/A 6,850

264 P C1.3/SDG/148 1.3 Bajram Curri 10,000 MNL Post

265 R/A 9,705

266 P C1.3/SDG/149 1.3 Fazli Grajcevci 10,000 MNL Post

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 231 of 255 10/17/2012 1:05 AM

Page 232: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

267 R/A 7,685

268 P C1.3/SDG/150 1.3 Gradjevinsko Saobracajna Skola 10,000 MNL Post

269 R/A 7,767

270 P C1.3/SDG/152 1.3 Vehbi Ibrahimi 10,000 MNL Post

271 R/A 5,055

272 P C1.3/SDG/153 1.3 Esat Berisha 10,000 MNL Post

273 R/A 5,600

274 P C1.3/SDG/154 1.3 Fan Noli 10,000 MNL Post

275 R/A 10,000

276 P C1.3/SDG/155 1.3 Kenan Halimi 10,000 MNL Post

277 R/A 6,590

278 P C1.3/SDG/156 1.3 Halil Alidema 10,000 MNL Post

279 R/A 9,520

280 P C1.3/SDG/157 1.3 Ali Gashi 10,000 MNL Post

281 R/A 6,090

282 P C1.3/SDG/158 1.3 28 Nentori 10,000 MNL Post

283 R/A 5,896

284 P C1.3/SDG/159 1.3 Shaban Jashari 10,000 MNL Post

285 R/A 10,000

286 P C1.3/SDG/160 1.3 Shote Galica 10,000 MNL Post

287 R/A 9,035

288 P C1.3/SDG/161 1.3 Fazli Grajcevci 10,000 MNL Post

289 R/A 10,000

290 P C1.3/SDG/163 1.3 Lumni Surdulli 10,000 MNL Post

291 R/A 5,790

292 P C1.3/SDG/164 1.3 SHMU 2 10,000 MNL Post

293 R/A 10,000

294 P C1.3/SDG/165 1.3 Mihaliq 10,000 MNL Post

295 R/A 5,290

296 P C1.3/SDG/166 1.3 Tefik Canga 10,000 MNL Post

297 R/A 10,000

298 P C1.3/SDG/167 1.3 SH.m.f.u. Tern 10,000 MNL Post

299 R/A 6,805

300 P C1.3/SDG/168 1.3 A. Bajrami 10,000 MNL Post

301 R/A 4,825

302 P C1.3/SDG/169 1.3 Zenel Hajdini 10,000 MNL Post

303 R/A 9,830

304 P C1.3/SDG/170 1.3 Sinan Thaci 10,000 MNL Post

305 R/A 4,835

306 P C1.3/SDG/171 1.3 Fatmir Berisha 10,000 MNL Post

307 R/A 7,825

308 P C1.3/SDG/172 1.3 7 Marsi 10,000 MNL Post

309 R/A 7,330

310 P C1.3/SDG/173 1.3 Iliria 10,000 MNL Post

THIRD ROUND PRIMARY SCHOOL

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 232 of 255 10/17/2012 1:05 AM

Page 233: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

311 R/A 5,155

312 P C1.3/SDG/174 1.3 Shkendija 10,000 MNL Post

313 R/A 7,410

314 P C1.3/SDG/175 1.3 Svetlost, Krusheva 10,000 MNL Post

315 R/A 4,350

316 P C1.3/SDG/176 1.3 Durak Ahmeti 10,000 MNL Post

317 R/A 6,600

318 P C1.3/SDG/177 1.3 Luigj Gurakuqi 10,000 MNL Post

319 R/A 4,950

320 P C1.3/SDG/178 1.3 Mark Zef Prenaj 10,000 MNL Post

321 R/A 4,950

322 P C1.3/SDG/179 1.3 Heronjt e Kosoves 10,000 MNL Post

323 R/A 6,585

324 P C1.3/SDG/180 1.3 Liria 10,000 MNL Post

325 R/A 6,285

326 P C1.3/SDG/181 1.3 Eqrem Qabej 10,000 MNL Post

327 R/A 6,015

328 P C1.3/SDG/182 1.3 Ganimete Terbeshi 10,000 MNL Post

329 R/A 6,460

330 P C1.3/SDG/183 1.3 Hasan Prishitna 10,000 MNL Post

331 R/A 5,080

332 P C1.3/SDG/184 1.3 Afrim Krasniqi 10,000 MNL Post

333 R/A 5,240

334 P C1.3/SDG/185 1.3 Rilindja 10,000 MNL Post

335 R/A 6,375

336 P C1.3/SDG/186 1.3 Hill Mosi 10,000 MNL Post

337 R/A 5,895

338 P C1.3/SDG/187 1.3 Vaso Pashe Shkodrani 10,000 MNL Post

339 R/A 8,685

340 P C1.3/SDG/188 1.3 Martin Camaj 10,000 MNL Post

341 R/A 8,520

342 P C1.3/SDG/189 1.3 Ardhemrija 10,000 MNL Post

343 R/A 4,920

344 P C1.3/SDG/190 1.3 Isa Boletini 10,000 MNL Post

345 R/A 6,985

346 P C1.3/SDG/191 1.3 Gjergj Fishta 10,000 MNL Post

347 R/A 10,000

348 P C1.3/SDG/192 1.3 Asim Vokshi 10,000 MNL Post

349 R/A 9,040

350 P C1.3/SDG/193 1.3 Shefki Kuleta 10,000 MNL Post

351 R/A 8,380

352 P C1.3/SDG/194 1.3 Mihail Grameno 10,000 MNL Post

353 R/A 10,000

354 P C1.3/SDG/195 1.3 Liria 10,000 MNL Post

355 R/A 7,290

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 233 of 255 10/17/2012 1:05 AM

Page 234: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

356 P C1.3/SDG/196 1.3 Nazim Hikmet 10,000 MNL Post

357 R/A 8,285

358 P C1.3/SDG/197 1.3 Nuhi Berisha 10,000 MNL Post

359 R/A 4,410

360 P C1.3/SDG/198 1.3 Idriz Seferi 10,000 MNL Post

361 R/A 4,070

362 P C1.3/SDG/199 1.3 Skender Emerllahu 10,000 MNL Post

363 R/A 6,555

364 P C1.3/SDG/200 1.3 Dositej Obradovic 10,000 MNL Post

365 R/A 6,285

366 P C1.3/SDG/201 1.3 Mehdi Sylejman Bytyqi 10,000 MNL Post

367 R/A 4,795

368 P C1.3/SDG/202 1.3 Minatori 10,000 MNL Post

369 R/A 4,520

370 P C1.3/SDG/203 1.3 Liria 10,000 MNL Post

371 R/A 7,445

372 P 1,830,321

373 R/A 1,272,846

374

375 P C1.3/SDG/10 1.3 F. Guri V.Caka 1 - 15,000 MNL Post

376 R/A 13,661

377 P C1.3/SDG/12 1.3 Dardania 1 - 15,000 MNL Post

378 R/A - 8,610

379 P C1.3/SDG/13 1.3 K. I Manastirit - Firaje 1 - 15,000 MNL Post

380 R/A - 6,912

381 P C1.3/SDG/20 1.3 Gjimnazi II Gjuhersor 1 - 15,000 MNL Post

382 R/A 14,100

383 P C1.3/SDG/21 1.3 Jeta e Re 1 - 15,000 MNL Post

384 R/A 15,000

385 P C1.3/SDG/37 1.3 12 Maji 1 - 15,000 MNL Post

386 R/A 10,806

387 P C1.3/SDG/39 1.3 Lasgush Poradeci 1 15,000 MNL Post

388 R/A 11,995

389 P C1.3/SDG/45 1.3 Shaban Spahija 1 15,000 MNL Post

390 R/A 15,000

391 P C1.3/SDG/63 1.3 Gj. Sami Frasheri 1 15,000 MNL Post

392 R/A 15,000

393 P C1.3/SDG/69 1.3 Aleksander Xhuvani 1 15,000 MNL Post

394 R/A 15,000

395 P C1.3/SDG/85 1.3 Veliko Rapotovo 1 15,000 MNL Post

Subtotal School Development Grants - primary

First round, Secondary School Grants

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 234 of 255 10/17/2012 1:05 AM

Page 235: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

396 R/A 8,740

397 P C1.3/SDG/89 1.3 Shkolla e Mesme e Mjekesise 1 - 15,000 MNL Post

398 R/A - 7,641

399 P C1.3/SDG/95 1.3 Gj,K. Skenderbeu 1 - 15,000 MNL Post

400 R/A - 15,000

401 P C1.3/SDG/97 1.3 Anton Cetta 1 - 15,000 MNL Post

402 R/A - 15,000

403 P C1.3/SDG/103 1.3 Arkitekt Sinani 1 - 15,000 MNL Post

404 R/A - 13,549

405 P C1.3/SDG/109 1.3 Eqrem Qabej 1 - 15,000 MNL Post

406 R/A - 15,000

407 P C1.3/SDG/110 1.3 Pjeter Bogdani 1 - 15,000 MNL Post

408 R/A - 13,885

409 P C1.3/SDG/122 1.3 Gani Cavdarbashi 1 - 15,000 MNL Post

410 R/A - 15,000

411 P C1.3/SDG/129 1.3 Hysni Zajmi 1 - 15,000 MNL Post

412 R/A - 15,000

413 P C1.3/SDG/135 1.3 Odhise Pakali 1 - 15,000 MNL Post

414 R/A - 9,650

415 P C1.3/SDG/141 1.3 Eqrem Qabej 1 - 15,000 MNL Post

416 R/A - 11,634

417 P C1.3/SDG/146 1.3 Isa Boletini 1 - 15,000 MNL Post

418 R/A - 15,000

419 P C1.3/SDG/151 1.3 Arberia 1 - 15,000 MNL Post

420 R/A - 12,912

421 P C1.3/SDG/162 1.3 Frang Bardhi 1 - 15,000 MNL Post

422 R/A - 15,000

423 P C1.3/SDG/110 1.3 1 - 15,000 MNL Post

424 R/A -

425 P C1.3/SDG/ 1.3 SH.M.L 1 - 15,000 MNL Post

426 R/A 8,432

427 P C1.3/SDG/ 1.3 Sh. E mesme ekonomike 1 - 15,000 MNL Post

428 R/A 6,899

429 P C1.3/SDG/ 1.3 Fehmi Lladrovci 1 - 15,000 MNL Post

430 R/A 15,000

431 P C1.3/SDG/ 1.3 Hamez Jashari 1 - 15,000 MNL Post

432 R/A 12,762

433 P 435,000

434 R/A 352,188

435

436 15 105,000 2,313,611

437 - - 1,658,584

Component 1. Totals (Grants)

Subtotal School Development Grants - Secondary

SECOND ROUND - SECONDARY SCHOOLS

THIRD ROUND - SECONDARY SCHOOLS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 235 of 255 10/17/2012 1:05 AM

Page 236: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Grants

This is PP was updated on April 20, 2010

USD EUR

17-Oct-12

Proc.

Method

WB

Review

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Estim.

No. of

Lots

Ln. # Comp. Description

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Database Subtotals Tool 15 181,846 141,378

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 236 of 255 10/17/2012 1:05 AM

Page 237: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Operational Expenditures

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a

Start

Exec. /b

Procurement Steps (1-11)

USD EUR 1 2 10

1

2

3

4 P 2.5 Pension contributions for local consultants - 8,190 NA Post 20-Apr-11

5 R/A

6 P 2.5 Translation services - 30,000 NA Post 20-Apr-11

7 R/A -$

6 P 2.5 Phone cards 5,750 NA Post 20-Apr-11

7 R/A -$ -

8 P 2.5 Fuel 4,500 NA Post 20-Apr-11

9 R/A -$ -

10 P 2.5 Vehicle maintenance NA Post 20-Apr-11

11 R/A -$ -

12 P 2.5 Advertisements 680 NA Post 20-Apr-11

13 R/A -$ -

14 P 2.5 Hospitality 2,710 NA Post 20-Apr-11

15 R/A -$ -

16 P 2.5 Office supplies & consumables 3,756 NA Post 20-Apr-11

17 R/A -$ -

18

19 P - 55,586

20 R/A - -

= R/A Revised/Actuals

Cell turns normal again if cell for R/A (revised/actual) date is filled in.

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Proc.

Method

WB

Review

17-Oct-12

Cell turns red if planned date has passed

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

OPERATIONAL EXPENDITURES

Component 2. Subtotals

Ln.

#

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Comp. Description

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 237 of 255 10/17/2012 1:05 AM

Page 238: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Operational Expenditures

This is PP was updated on April 20, 2010

Schedule (dd-Mmm-yy)

Prep.

of

Doc. Int.

/a WB "No

Objection" Int.

/a

Start

Exec. /b

Procurement Steps (1-11)

USD EUR 1 2 10

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Proc.

Method

WB

Review

17-Oct-12

Ln.

#

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Comp. Description

Database Subtotals Tool -$

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 238 of 255 10/17/2012 1:05 AM

Page 239: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Operational Expenditures

This is PP was updated on April 20, 2010

USD EUR

1

2

3

4 P 2.5 Pension contributions for local consultants - 8,190 NA Post

5 R/A

6 P 2.5 Translation services - 30,000 NA Post

7 R/A -$

6 P 2.5 Phone cards 5,750 NA Post

7 R/A -$ -

8 P 2.5 Fuel 4,500 NA Post

9 R/A -$ -

10 P 2.5 Vehicle maintenance NA Post

11 R/A -$ -

12 P 2.5 Advertisements 680 NA Post

13 R/A -$ -

14 P 2.5 Hospitality 2,710 NA Post

15 R/A -$ -

16 P 2.5 Office supplies & consumables 3,756 NA Post

17 R/A -$ -

18

19 P - 55,586

20 R/A - -

= R/A Revised/Actuals

Cell turns normal again if cell for R/A (revised/actual) date is filled in.

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Proc.

Method

WB

Review

17-Oct-12

Cell turns red if planned date has passed

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

OPERATIONAL EXPENDITURES

Component 2. Subtotals

Ln.

#

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Comp. Description

Schedule (dd-Mmm-yy)

Comple-

tion

Procurement Steps (1-11)

11

OPER

OPER

OPER

OPER

OPER

OPER

OPER

OPER

Procure-

ment

Account

s

Comments

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 239 of 255 10/17/2012 1:05 AM

Page 240: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Operational Expenditures

This is PP was updated on April 20, 2010

USD EUR

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Proc.

Method

WB

Review

17-Oct-12

Ln.

#

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Comp. Description

Database Subtotals Tool -$

Schedule (dd-Mmm-yy)

Comple-

tion

Procurement Steps (1-11)

11

Procure-

ment

Account

s

Comments

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 240 of 255 10/17/2012 1:05 AM

Page 241: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Operational Expenditures

This is PP was updated on April 20, 2010

USD EUR

1

2

3

4 P 2.5 Pension contributions for local consultants - 8,190 NA Post

5 R/A

6 P 2.5 Translation services - 30,000 NA Post

7 R/A -$

6 P 2.5 Phone cards 5,750 NA Post

7 R/A -$ -

8 P 2.5 Fuel 4,500 NA Post

9 R/A -$ -

10 P 2.5 Vehicle maintenance NA Post

11 R/A -$ -

12 P 2.5 Advertisements 680 NA Post

13 R/A -$ -

14 P 2.5 Hospitality 2,710 NA Post

15 R/A -$ -

16 P 2.5 Office supplies & consumables 3,756 NA Post

17 R/A -$ -

18

19 P - 55,586

20 R/A - -

= R/A Revised/Actuals

Cell turns normal again if cell for R/A (revised/actual) date is filled in.

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Proc.

Method

WB

Review

17-Oct-12

Cell turns red if planned date has passed

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

OPERATIONAL EXPENDITURES

Component 2. Subtotals

Ln.

#

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Comp. Description

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 241 of 255 10/17/2012 1:05 AM

Page 242: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Operational Expenditures

This is PP was updated on April 20, 2010

USD EUR

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Proc.

Method

WB

Review

17-Oct-12

Ln.

#

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Comp. Description

Database Subtotals Tool -$

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 242 of 255 10/17/2012 1:05 AM

Page 243: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Operational Expenditures

This is PP was updated on April 20, 2010

USD EUR

1

2

3

4 P 2.5 Pension contributions for local consultants - 8,190 NA Post

5 R/A

6 P 2.5 Translation services - 30,000 NA Post

7 R/A -$

6 P 2.5 Phone cards 5,750 NA Post

7 R/A -$ -

8 P 2.5 Fuel 4,500 NA Post

9 R/A -$ -

10 P 2.5 Vehicle maintenance NA Post

11 R/A -$ -

12 P 2.5 Advertisements 680 NA Post

13 R/A -$ -

14 P 2.5 Hospitality 2,710 NA Post

15 R/A -$ -

16 P 2.5 Office supplies & consumables 3,756 NA Post

17 R/A -$ -

18

19 P - 55,586

20 R/A - -

= R/A Revised/Actuals

Cell turns normal again if cell for R/A (revised/actual) date is filled in.

Notes:

a/ Interval for preparation or clearance (in days); working document PP only

b/ Number of days to execute the contract; working document PP only

c/ Estimates include price contingencies

d/ Status: P=Planned (original scope and estimate); R/A=Revised or Actual

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Proc.

Method

WB

Review

17-Oct-12

Cell turns red if planned date has passed

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

OPERATIONAL EXPENDITURES

Component 2. Subtotals

Ln.

#

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Comp. Description

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 243 of 255 10/17/2012 1:05 AM

Page 244: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Operational Expenditures

This is PP was updated on April 20, 2010

USD EUR

Appraisal Estimates

P (planned)

Enter New Estimates

in EUR

Under R/A Rows below

Proc.

Method

WB

Review

17-Oct-12

Ln.

#

Status

P

R/A

d/

Contract Reference #

Standard Prefix

"KOS-IDEP/H3420/"

removed from

below listings

Comp. Description

Database Subtotals Tool -$

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 244 of 255 10/17/2012 1:05 AM

Page 245: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Financial Management

This is PP was updated on April 20, 2010

Appraisal

Estimate

0.8811302 1.304650037 0.8825757 1.4101501 0.9109201 1.4723999 0.9282910 1.4336498722 0.91829143 1.294050015 0.870000004 1.22845 0.83257089008 1.32595 0.86392 1.2940500 0.8700000 1.2940500 0.8700000 1.2940500 0.8700000 1.2940500 0.8700000 1.2940500 0.8700000 1.2940500 0.8700000 1.2940500

USD to EUR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑

EUR USD XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD

A B C D F H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AJ AK AL AJ AK AL AJ AK AL AJ AK

Value &

Formula Value J*I$3 Value J*J$3 M*L$3 Value M*M$3 P*O$3 Value P*P$3 S*R$3 Value S*S$3 V*U$3 Value V*V$3 Y*X$3 Value Y*Y$3 AB*AA$3 Value AB*AB$3 AE*AD$3 Value AE*AE$3 AH*AG$3 Value AH*AH$3 AK*AJ$3 Value AK*AK$3 AK*AJ$3 Value AK*AK$3 AK*AJ$3 Value AK*AK$3 AK*AJ$3 Value AK*AK$3 AK*AJ$3 Value

1

2

3

4 Dennis Farrington 1.1 Legal framework 72,000.00 72,000.00 - - - - - - 41,289.12 28,800.00 26,446.79 18,634.32 14,400.00 12,528.00 17,689.68 14,400.00 11,989.02 - - - - 18,634.32 14,400.00 12,528.00 - - - - - - - - -

5 Dennis Farrington 1.1 Implementation of new legislation 27,040.00 27,040.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

6 Rosalind Levacic 1.2 Financing formula 44,496.03 44,496.03 26,719.85 20,480.47 18,075.57 - - 16,331.87 11,092.01 10,296.61 9,250.11 6,452.14 5,924.94 - - - - - - 10,519.50 8,129.13 7,072.34 19,871.77 15,356.26 13,359.95 12,062.11 9,321.21 8,109.45 - - - - - - -

7 Rosalind Levacic 1.2 Financing formula 91,960.00 91,960.00 - - - - - - - - 8,374.33 6,471.41 5,630.13 13,663.29 11,122.38 9,260.17 - - - - - - - - 5,116.67 3,954.00 3,439.98 3,411.48 2,636.28 2,293.56 - - 4,372.57 3,378.98

8 Prism Research 1.2 Baseline survey 24,674.00 24,674.00 - - - - - - - - - - - - - - 15,964.69 12,337.00 10,733.19 15,964.69 12,337.00 10,733.19 - - - - - - - - -

9 Besnik Limaj 1.2 Data analysis 6,400.00 6,400.00 - - - - 5,654.02 3,840.00 3,564.64 - - 3,312.77 2,560.00 2,227.20 - - - - - - - - - - - - - - - - -

10 Edi Bunjaku 1.2 Training materials analyst 1,300.00 1,300.00 - - - - - - - - - - - - - - - - 1,682.27 1,300.00 1,131.00 - - - - - - - - -

11 Pakize Isufaj 1.2 Finance expert for Help Desk-1 5,374.00 5,374.00 - - - - - - - - 3,865.33 2,987.00 2,598.69 2,211.21 1,800.00 1,498.63 - - 759.62 587.01 510.70 4,270.37 3,300.00 2,871.00 - - 4,092.69 3,162.70 2,751.55 - - - - -

12 Hysni Maxharraj 1.2 Finance expert for Help Desk-2 4,787.00 4,787.00 - - - - - - - - 3,865.33 2,987.00 2,598.69 2,211.21 1,800.00 1,498.63 - - - - - - - - - - - - - - -

13 Pakize Isufaj 1.2 Head of Help Desk 13,200.00 13,200.00 - - - - - - - - - - - - - - 3,341.24 2,582.00 2,246.34 - - 5,693.82 4,400.00 3,828.00 - - - - - - -

14 Pakize Isufaj 1.2 Head of Help Desk 23,550.00 23,550.00 - - - - - - - - - - - - - - - - - - - - - - - - 4,092.69 3,162.70 2,751.55 4,448.04 3,437.30 2,990.45 4,448.04 3,437.30

15 Vjolca Sellimi 1.2 Education Finance Expert 2 10,800.00 10,800.00 - - - - - - - - - - - - - - 2,734.33 2,113.00 1,838.31 3,493.94 2,700.00 2,349.00 4,658.58 3,600.00 3,132.00 3,353.79 2,591.70 2,254.78 - - 3,634.77 2,808.83 2,443.68 -

16 Vjolca Sellimi 1.2 Education Finance Expert 2 19,269.00 19,269.00 - - - - - - - - - - - - - - - - - - - - - - - - - 3,353.79 2,591.70 2,254.78 - - 3,634.08 2,808.30

17 Mehmet Simnica 1.2 Trainer on school financing 3,800.00 3,800.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4,917.39 3,800.00

18 Mevlide Shamolli 1.2 Trainer on school financing 3,800.00 3,800.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4,917.39 3,800.00

19 Jeton Kryeziu 1.2 Trainer on school financing 3,800.00 3,800.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4,917.39 3,800.00

20 Jeton Gashi 1.2 Trainer on school financing 3,600.00 3,600.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4,658.58 3,600.00

21 Aferdita Strellci 1.2 Trainer on school financing 3,600.00 3,600.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4,658.58 3,600.00

22 Fadil Veseli 1.2 Trainer on school procurement 4,000.00 4,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

23 Mirvete Gerguri 1.2 Trainer on school procurement 4,000.00 4,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

24 Fatmire M Morina 1.2 Trainer on school procurement 4,000.00 4,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

25 Vllaznim Reshani 1.2 Trainer on school procurement 4,000.00 4,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

26 Defrim Kuqi 1.2 Trainer on school procurement 4,000.00 4,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

27 Bersant R. Grabanica 1.2 Education finance officer for operating at

Help Desk 6,300.00 1,200.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

28 Xhafer Ahmeti 1.3 Task Manager of the SDG component 10,400.00 10,400.00 - - - - 3,828.24 2,600.00 2,413.56 5,591.23 3,900.00 3,581.34 5,046.80 3,900.00 3,393.00 - - - - - - - - - - - - - - - - -

29 Besim Kokollari 1,3 Task Manager of the SDG component 14,400.00 14,400.00 - - - - - - - - - - - - - - 1,108.97 856.98 745.57 4,658.58 3,600.00 3,132.00 6,211.44 4,800.00 4,176.00 4,462.14 3,448.20 2,999.93 - - - - -

30 Besim Kokollari 1,3 Task Manager of the SDG component 23,618.00 23,618.00 - - - - - - - - - - - - - - - - - - - - - - - - - 4,462.14 3,448.20 2,999.93 4,855.02 3,751.80 3,264.07 4,855.02 3,751.80

30 Local staff 1.2 Pension contributions 2,360.00 2,360.00 - - - - 191.41 130.00 120.68 279.56 195.00 179.07 638.87 493.70 429.52 221.12 180.00 149.86 - - 397.21 306.95 267.05 621.14 480.00 417.60 828.19 640.00 556.80 414.10 320.00 278.40 414.10 320.00 278.40 828.19 640.00 556.80 828.19 640.00

31 ?? 1.2 Other services 3,381.77 3,381.77 - - - - 2,411.79 1,638.00 1,520.54 2,227.55 1,553.76 1,426.80 - - - - - - 245.88 190.01 165.31 - - - - - - - - - - -

32 Remzi Salihu 1.2 &

1.3 Consultant on SDG and MDG 7,150.00 7,150.00 - - - - - - - - 7,233.74 5,590.00 4,863.30 1,916.38 1,560.00 1,298.81 - - - - - - - - - - - - - - -

33 KEC 1.3 Consultant to manage MDGs and SDGs 266,935.00 266,935.00 - - - - - - - - - - - - 53,091.37 40,040.25 34,591.50 - - - - - - - - - 103,628.17 80,080.50 69,670.04 - - -

34 KEC 1.3 Amendment #1 modification of original

contract 60,240.00 60,240.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

35 Alexandar Najdovski 1.3 Procurement Supervision of SMD Grants

(EPIP II) (international) 20,550.00 20,550.00 - - - - - - - - 3,988.91 3,082.50 2,681.78 27,151.82 22,102.50 18,401.90 - - - - - - - - - - - - - - -

36 798,784.80 793,684.80 26,719.85 20,480.47 18,075.57 - - - 28,417.33 19,300.01 17,916.03 58,637.57 40,900.90 37,558.95 54,960.39 42,471.61 36,950.30 65,064.71 52,964.88 44,097.02 53,091.37 40,040.25 34,591.50 35,071.45 27,102.08 23,578.81 69,197.07 53,473.26 46,521.74 29,454.14 22,761.21 19,802.25 17,439.39 13,476.60 11,724.64 119,362.37 92,239.38 80,248.26 13,766.01 10,637.93 9,255.00 42,207.23 32,616.38

37 - - - - - - - - - - - - -

37 Goods -

38 Hardsoft Integration 1.2Developing the Software for Municipal-to

School Budget Allocation49,235.00 49,235.00 -

39 Blendi 1.2Printing of brochures for the buxheting and

financing of schools3,900.00 3,900.00 - 3,900.00

40 Hardsoft Systems 1.2 Hardware for server for school finance 36,970.00 36,970.00 - 36,970.00 -

41 JV Interadria and telefoniku 1.3 IT equipment for SDG - - - - -

42 ? 1.3 Teaching aids for SDG - - - - -

43 Korabi 1.3 Purchasing of books for SDG - - - - -

44 Star graf 1.3 Purchasing of music Instruments for SDG - - - - -

41 ? 1.3 IT equipment for SDG for Round III - - - - -

45 SubTotal Goods 90,105.00 90,105.00 - 3,900.00 -

46 - - - - - - - - - - - - -

47 Workshop 1.1 Legal framework 13,043.20 13,043.20 - - - - - - - - 16,730.38 12,928.70 11,247.97 - - - - 148.17 114.50 99.62 - - - - - - - - - - -

48 ? 1.1 In support of new legistlation at municipal. 2,500.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

49 Study visit to UK 1.2 Education finance 16,576.85 16,576.85 21,626.99 16,576.85 14,630.32 - - - - - - - - - - - - - - - - - - - - - - - - -

50 Training 1.2 Training for Municipalities in the

implementation of the financing Formula 14,700.56 14,700.56 3,873.51 2,969.00 2,620.37 - - - - - - - - 8,439.80 6,870.28 5,720.00 - - 5,822.29 4,499.28 3,914.37 468.45 362.00 314.94 - - - - - - - - -

51 ? 1.2 Workshop Education budget planning in

municipalities 5,000.00 310.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

51 Training 1.2 Additional Training Aids for Finance 1,000.00 310.00 - 220.00

52 Training 1.2 Conference on Reforming the education

Financing mechanisms 10,000.00 -

53 Training 1.2 Training - implementation of financing

formula, Albania 6,348.81 6,348.81 - - - - - - - - - - - - - - - - - - - - - - 8,215.68 6,348.81 5,523.46 - - - - - - -

54 Workshop 1.3 Workshop for SGAB 352.00 352.00 - - - - - - - - - - - - - - - - - - - - - - - - - 455.51 352.00 306.24 - - - - -

55 Workshop 1.3 Workshop for SDG, Grant agreement signing

ceremony 445.00 445.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - 575.85 445.00 387.15 - - -

56 69,966.42 52,086.42 25,500.49 19,545.85 17,250.69 - - - - - - - - - 16,730.38 12,928.70 11,247.97 8,439.80 6,870.28 5,720.00 - - - 5,970.46 4,613.78 4,013.99 468.45 362.00 314.94 8,215.68 6,348.81 5,523.46 455.51 352.00 306.24 575.85 4,345.00 3,780.15 - - - - 220.00

57 - - - - - - - - - - - - -

58 - - - - - - - - - - - - -

59 - - - - - - - - - - - - -

60 - - - - - - - - - - - - -

61 1. Kacanik 1.2 Municipal development grants 24,256.00 24,256.00 - - - - - - - - 10,599.56 8,191.00 7,126.17 6,907.57 5,623.00 4,681.55 - - 2,934.91 2,268.00 1,973.16 148.82 115.00 100.05 - - - - - - - - -

62 2. Gjilan 1.2 Municipal development grants 21,200.00 21,200.00 - - - - - - - - 21,028.31 16,250.00 14,137.50 - - - - 1,427.98 1,103.50 960.05 - - 2,679.98 2,071.00 1,801.77 - - - - - - -

63 3. Istog 1.2 Municipal development grants 10,890.00 10,890.00 - - - - - - - - - - - - - - - - - - - 8,708.72 6,729.82 5,854.94 - - - - - - -

64 4. Klina 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

65 5. Shtime 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

66 6. Mitrovica 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

67 7. Peja 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

68 8. Gjakova 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

69 9. Prizreni 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

70 10. Suhareka 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

71 11. Ferizaj 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

72 12. Podujeva 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

73 13. Prishtina 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

74 14. Other 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

75 15. Other 1.2 Municipal development grants - - - - - - - - - - - - - - - - - - - - - - - - - - - -

76 56,346.00 56,346.00 - - - - - - - - - - - - 31,627.88 24,441.00 21,263.67 6,907.57 5,623.00 4,681.55 - - - 4,362.89 3,371.50 2,933.21 148.82 115.00 100.05 11,388.70 8,800.82 7,656.71 455.51 352.00 306.24 - - - - - - - -

77 Other services 1.2 Implementation of the school development

grants (including monitoring and training) 3,191.76 3,191.76 - - - - 2,411.79 1,638.00 1,520.54 2,227.55 1,553.76 1,426.80 - - - - - - - - - - -

78 - - - -

79 C1.3/SDG/01 1.3 Gjon Serreçi 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

80 C1.3/SDG/02 1.3 Ahemet Hoxha 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

81 C1.3/SDG/03 1.3 Naim Frasheri 9,605.00 9,605.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

82 C1.3/SDG/04 1.3 Dituria - Ferizaj 6,180.00 6,180.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

83 C1.3/SDG/05 1.3 Ali Hadri 6,140.00 6,140.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

84 C1.3/SDG/06 1.3 Ismail Luma 8,725.00 8,725.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

85 C1.3/SDG/07 1.3 Zenel Hajdini 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

86 C1.3/SDG/08 1.3 Haradin Bajrami (Jeronim de Rada) 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

87 C1.3/SDG/09 1.3 Bajram Curri 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - 1,339.34 1,035.00 900.45 - - -

88 C1.3/SDG/11 1.3 Dituria - Kaqanik 5,825.00 5,825.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

89 C1.3/SDG/14 1.3 Sh. F. Kabashi 5,100.00 5,100.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

90 C1.3/SDG/15 1.3 Ardhmeria 5,335.00 5,335.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

91 C1.3/SDG/16 1.3 Zenun Cocaj 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

92 C1.3/SDG/17 1.3 Izvor 5,435.00 5,435.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

93 C1.3/SDG/18 1.3 Zef Lush Marku 8,130.00 8,130.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

94 C1.3/SDG/19 1.3 Nazmi Buduri 8,040.00 8,040.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

95 C1.3/SDG/22 1.3 Drita 5,210.00 5,210.00 - - - - - - - - - - - - - - - - - - - - - - 8,724.74 6,742.20 5,865.71 - - -

96 C1.3/SDG/23 1.3 K. I Manastirit 8,940.00 8,940.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

97 C1.3/SDG/24 1.3 Ilmi Bahtijari 9,395.00 9,395.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

98 C1.3/SDG/25 1.3 Fetah Sylejmani 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

99 C1.3/SDG/26 1.3 Haxhi Ymer Lutfiu 4,437.00 4,437.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

100 C1.3/SDG/27 1.3 Vellazerimi 7,815.00 7,815.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

101 C1.3/SDG/28 1.3 Zef Lush Marku - Bregoc 9,615.00 9,615.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

102 C1.3/SDG/29 1.3 Nimon Ferizi 5,385.00 5,385.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

103 C1.3/SDG/30 1.3 Fehmi Agani 8,075.00 8,075.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

104 C1.3/SDG/31 1.3 Ganimer Terbeshi 6,085.00 6,085.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

105 C1.3/SDG/32 1.3 7 Shtatori 5,255.00 5,255.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

106 C1.3/SDG/33 1.3 Fan Noli 5,510.00 5,510.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

107 C1.3/SDG/34 1.3 Rilindja 4,435.00 4,435.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

108 C1.3/SDG/35 1.3 Mustafe Ibishi 8,185.00 8,185.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

109 C1.3/SDG/36 1.3 Jusf Gervalla 6,695.00 6,695.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

110 C1.3SDG/38 1.3 7 Shtatori - Rahovec 5,755.00 5,755.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

111 C1.3SDG/40 1.3 Rifat Berisha 6,290.00 6,290.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

112 C1.3SDG/41 1.3 Vesel Pagarusha 6,285.00 6,285.00 - - - - - - - - - - - - - - - - - - - - - - 6,398.83 4,944.81 4,301.98 - - -

113 C1.3SDG/42 1.3 Ismet Jashari Kumanova 5,265.00 5,265.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

114 C1.3SDG/43 1.3 Tafil Kelmendi 5,685.00 5,685.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

115 C1.3SDG/44 1.3 Bajram Curri - Drenoc 6,450.00 6,450.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

116 C1.3/SDG/46 1.3 Xhemajl Kada 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

117 C1.3/SDG/47 1.3 7 Shtatori - Vitomirice 9,340.00 9,340.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

118 C1.3/SDG/48 1.3 Deshmoret e Kombit 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

119 C1.3/SDG/49 1.3 Skenderbeu 6,900.00 6,900.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

120 C1.3/SDG/50 1.3 Ndre Mjeda 8,560.00 8,560.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

121 C1.3/SDG/51 1.3 Avni Rrustemi 7,450.00 7,450.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

122 C1.3/SDG/52 1.3 Fan Noli - Lluk I Bregut 6,975.00 6,975.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

123 C1.3/SDG/53 1.3 Emin Duraku 9,000.00 9,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

124 C1.3/SDG/54 1.3 Ali Krasniqi 8,425.00 8,425.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

125 C1.3/SDG/55 1.3 Azem Bejta 6,730.00 6,730.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

126 C1.3/SDG/56 1.3 Tre Deshmoret 8,945.00 8,945.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

127 C1.3/SDG/57 1.3 Ate Gjergj Fishta 4,675.00 4,675.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

128 C1.3/SDG/58 1.3 Drita - Gramqel 7,365.00 7,365.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

129 C1.3/SDG/59 1.3 Heronjt e Dukagjinit 5,265.00 5,265.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

130 C1.3/SDG/60 1.3 Faik Konica 4,715.00 4,715.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

131 C1.3/SDG/61 1.3 Esat Mekuli 4,510.00 4,510.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

132 C1.3/SDG/62 1.3 Rexhep Kadrijaj 5,500.00 5,500.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

133 C1.3/SDG/64 1.3 Avni Rrustemi - Mramuer 7,155.00 7,155.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

134 C1.3/SDG/65 1.3 Nexhmi Mustafa 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

135 C1.3/SDG/66 1.3 Tefik Canga 6,565.00 6,565.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

136 C1.3/SDG/67 1.3 Pjeter Bogdani 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

137 C1.3/SDG/68 1.3 Sami Frasheri 7,710.00 7,710.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

138 C1.3/SDG/70 1.3 Jahe Hasani 5,370.00 5,370.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

139 C1.3/SDG/71 1.3 Luigj Gurakuqi 9,680.00 9,680.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

140 C1.3/SDG/72 1.3 Drita - Majac 9,790.00 9,790.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

141 C1.3/SDG/73 1.3 Laura Scotti 4,805.00 4,805.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

142 C1.3/SDG/74 1.3 Lismir 4,755.00 4,755.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

143 C1.3/SDG/75 1.3 Naim Frasheri - Bresnice 7,180.00 7,180.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

Municipal Development Grants

Subtotal Municipal Development Grants

Primary Schools

Payments under

WA #10

Please update rates as per WA

Ln. #

Consultant

Contractor/Supplier

or

Activity

Comp.

School Development Grants

GRANTS

Subtotal CONSULTANTS

TRAINING

Subtotal Training

Activity

CONSULTANTS

Enter

EUR

Values

Payments under

WA #6

Please update rates as per WA

Payments under

WA #9

Please update rates as per WA

Enter

EUR

Values

Payments under

WA #7

Please update rates as per WA

Payments under

WA #5

Please update rates as per WA

COMPONENT 1. STRENGTHENING ORGANIZATION &

FINANCING OF EDUCATION SYSTEM

Payments

WA #3

Please update rates as per WA

Enter

EUR

Values

Payments under

WA #12

Please update rates as per WA

Payments under

WA #11

Please update rates as per WA

Enter

EUR

Values

Payments under

WA #13

Please update rates as per WA

Enter

EUR

Values

Obligations

(Contracts

Signed &

Other Direct

Expenditures)

Enter

EUR

Values

Enter

EUR

Values

Enter

EUR

Values

Payments

WA #1

Please update rates as per WA

Enter

EUR

Values

Enter

EUR

Values

Enter

EUR

Values

Payments

WA #2

Please update rates as per WA

EUR

Enter

EUR

Values

Payments

WA #4

Please update rates as per WA

Enter

EUR

Values

Enter

EUR

Values

Payments under

Direct Payments

Please update rates as per WA

Payments under

WA #8

Please update rates as per WA

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 245 of 255 10/17/2012 1:05 AM

Page 246: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Financial Management

This is PP was updated on April 20, 2010

144 C1.3/SDG/76 1.3 Migjeni 7,450.00 7,450.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

145 C1.3/SDG/77 1.3 Knez Llazar 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

146 C1.3/SDG/78 1.3 Aferdita 7,030.00 7,030.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

147 C1.3/SDG/79 1.3 Bajram Curri - Shurdhan 4,630.00 4,630.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

148 C1.3/SDG/80 1.3 Fetah Qerimi 5,690.00 5,690.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

149 C1.3/SDG/81 1.3 Liria 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

150 C1.3/SDG/82 1.3 Kadri Zeka 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

151 C1.3/SDG/83 1.3 Sadri Misini 6,885.00 6,885.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

152 C1.3/SDG/84 1.3 Asdreni 6,095.00 6,095.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

153 C1.3/SDG/86 1.3 Hysen Terpeza 6,010.00 6,010.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

154 C1.3/SDG/87 1.3 Vellezerit Gervalla 8,470.00 8,470.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

155 C1.3/SDG/88 1.3 Deshmoret e 5 Prillit 7,095.00 7,095.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

156 C1.3/SDG/90 1.3 Gjon Serreci - Mogille 5,980.00 5,980.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

157 C1.3/SDG/91 1.3 Deshmoret e Qendreses 5,485.00 5,485.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

158 C1.3/SDG/92 1.3 Desjmoret e Drenices 5,140.00 5,140.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

159 C1.3/SDG/93 1.3 Xheve Lladrovci 5,435.00 5,435.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

160 C1.3/SDG/94 1.3 Shote Galica 6,480.00 6,480.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

161 C1.3/SDG/96 1.3 Abedin Rexha 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

162 C1.3/SDG/98 1.3 Habib Jusufi 5,345.00 5,345.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

163 C1.3/SDG/99 1.3 Jusuf Rexha 6,115.00 6,115.00 - - - - - - - - - - - - - - - - - - - - - - 4,833.28 3,735.00 3,249.45 - - -

164 C1.3/SDG/100 1.3 Sefedin Smakolli 5,625.00 5,625.00 - - - - - - - - - - - - - - - - - - - - - - 6,406.78 4,950.95 4,307.33 - - -

165 C1.3/SDG/101 1.3 Trepca 7,620.00 7,620.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

166 C1.3/SDG/102 1.3 Bedri Gjinaj 7,165.00 7,165.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

167 C1.3/SDG/104 1.3 Azem Bejta - Dubovc 6,090.00 6,090.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

168 C1.3/SDG/105 1.3 Bajram Curri - Dumnice 6,255.00 6,255.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

169 C1.3/SDG/106 1.3 Gj.K. Skenderbeu 7,350.00 7,350.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

170 C1.3/SDG/107 1.3 Adem Voca 5,075.00 5,075.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

171 C1.3/SDG/108 1.3 Emin Duraku - Novolane 6,555.00 6,555.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

-

172 C1.3/SDG/111 1.3 Dardania 5,005.00 5,005.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

173 C1.3/SDG/112 1.3 K. Kristoforidhi 6,585.00 6,585.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

174 C1.3/SDG/113 1.3 Fehmi Agani 6,180.00 6,180.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

175 C1.3/SDG/114 1.3 Shtjefen Gjeqovi 8,125.00 8,125.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

176 C1.3/SDG/115 1.3 Abdullah Shabani 8,565.00 8,565.00 - - - - - - - - - - - - - - - - - - - - - - - - 647,517.63 500,380.69 435,331.20 313,323.76 242,126.47

177 C1.3/SDG/116 1.3 G. Luma 5,110.00 5,110.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

178 C1.3/SDG/117 1.3 Sharski Odredi 8,510.00 8,510.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

179 C1.3/SDG/118 1.3 Sezai Surroi 7,495.00 7,495.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

180 C1.3/SDG/119 1.3 Mic Sokoli 6,165.00 6,165.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

181 C1.3/SDG/120 1.3 Haziz Tola 7,275.00 7,275.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

182 C1.3/SDG/121 1.3 Luigj Gurakuqi 8,030.00 8,030.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

183 C1.3/SDG/123 1.3 Sadri Duhla 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

184 C1.3/SDG/124 1.3 Deshmoret e Tivarit 8,000.00 8,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

185 C1.3/SDG/125 1.3 Shaban Shabani 9,445.00 9,445.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

186 C1.3/SDG/126 1.3 Ferhat Binishi 6,260.00 6,260.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

187 C1.3/SDG/127 1.3 Ukshin Miftari 6,050.00 6,050.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

188 C1.3/SDG/128 1.3 Qemajl Bakia 5,850.00 5,850.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

189 C1.3/SDG/130 1.3 Pataq I ulet 5,510.00 5,510.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

190 C1.3/SDG/131 1.3 4 Deshmoret 7,836.00 7,836.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

191 C1.3/SDG/132 1.3 Arfim Buqaj 5,710.00 5,710.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

192 C1.3/SDG/133 1.3 Deshmoret e fshatit bubavec 6,000.00 6,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

193 C1.3/SDG/134 1.3 Gjergj Kastrioti 7,850.00 7,850.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

194 C1.3/SDG/136 1.3 Ramiz Sadiku 7,505.00 7,505.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

195 C1.3/SDG/137 1.3 Jusuf Gervalla 7,095.00 7,095.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

196 C1.3/SDG/138 1.3 Nene Tereza 8,025.00 8,025.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

197 C1.3/SDG/139 1.3 Shkendija 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

198 C1.3/SDG/140 1.3 Ganimete Terbeshi 6,515.00 6,515.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

199 C1.3/SDG/142 1.3 Mitrush Kuteli 7,875.00 7,875.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

200 C1.3/SDG/143 1.3 Xhavit Ahmeti 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

201 C1.3/SDG/144 1.3 Zahir Pajaziti 8,560.00 8,560.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

202 C1.3/SDG/145 1.3 Kadri Kadriu 7,750.00 7,750.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

203 C1.3/SDG/147 1.3 Daut Bogujevci 6,850.00 6,850.00 -

204 C1.3/SDG/148 1.3 Bajram Curri 9,705.00 9,705.00 -

205 C1.3/SDG/149 1.3 Fazli Grajcevci 7,685.00 7,685.00 -

206 C1.3/SDG/150 1.3 Gradjevinsko Saobracajna Skola 7,767.00 7,767.00 -

207 C1.3/SDG/152 1.3 Vehbi Ibrahimi 5,055.00 5,055.00 -

208 C1.3/SDG/153 1.3 Esat Berisha 5,600.00 5,600.00 -

209 C1.3/SDG/154 1.3 Fan Noli 10,000.00 10,000.00 -

210 C1.3/SDG/155 1.3 Kenan Halimi 6,590.00 6,590.00 -

211 C1.3/SDG/156 1.3 Halil Alidema 9,520.00 9,520.00 -

212 C1.3/SDG/157 1.3 Ali Gashi 6,090.00 6,090.00 -

213 C1.3/SDG/158 1.3 28 Nentori 5,615.00 5,615.00 -

214 C1.3/SDG/159 1.3 Shaban Jashari 10,000.00 10,000.00 -

215 C1.3/SDG/160 1.3 Shote Galica 9,035.00 9,035.00 -

213 C1.3/SDG/161 1.3 Fazli Grajcevci 10,000.00 10,000.00 -

214 C1.3/SDG/163 1.3 Lumni Surdulli 5,790.00 5,790.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

215 C1.3/SDG/164 1.3 SHMU 2 10,000.00 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

216 C1.3/SDG/165 1.3 Mihaliq 5,290.00 5,290.00 -

217 1,027,190.00 1,027,190.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 27,702.97 21,407.96 18,624.93 647,517.63 500,380.69 435,331.20 313,323.76 242,566.47

218 -

219 C1.3/SDG/10 1.3 F. Guri V.Caka 13,661.00 13,661.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

220 C1.3/SDG/12 1.3 Dardania 8,610.00 8,610.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

221 C1.3/SDG/13 1.3 K. I Manastirit - Firaje 6,912.00 6,912.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

222 C1.3/SDG/20 1.3 Gjimnazi II Gjuhersor 14,100.00 14,100.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

223 C1.3/SDG/21 1.3 Jeta e Re 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

224 C1.3/SDG/37 1.3 12 Maji 10,806.00 10,806.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

225 C1.3/SDG/39 1.3 Lasgush Poradeci 11,995.00 11,995.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

226 C1.3/SDG/45 1.3 Shaban Spahija 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

227 C1.3/SDG/63 1.3 Gj. Sami Frasheri 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

228 C1.3/SDG/69 1.3 Aleksander Xhuvani 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

229 C1.3/SDG/85 1.3 Veliko Rapotovo 8,740.00 8,740.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

230 C1.3/SDG/89 1.3 Shkolla e Mesme e Mjekesise 7,641.00 7,641.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

231 C1.3/SDG/95 1.3 Gj,K. Skenderbeu 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

232 C1.3/SDG/97 1.3 Anton Cetta 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

233 C1.3/SDG/103 1.3 Arkitekt Sinani 13,549.00 13,549.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

234 C1.3/SDG/109 1.3 Eqrem Qabej 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

-

235 C1.3/SDG/110 1.3 Pjeter Bogdani 13,885.00 13,885.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

236 C1.3/SDG/122 1.3 Gani Cavderbashi 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

237 C1.3/SDG/129 1.3 Hysni Zajmi 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

238 C1.3/SDG/135 1.3 Odhise Paskali 9,650.00 9,650.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

239 C1.3/SDG/141 1.3 Eqrem Qabej 11,634.00 11,634.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

240 C1.3/SDG/146 1.3 Isa Boletini 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

241 C1.3/SDG/151 1.3 Arberia 12,912.01 12,912.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

242 C1.3/SDG/162 1.3 Frang Bardhi 15,000.00 15,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

SDG Round 3

243 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

244 309,095.00 309,095.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

245

246 2,354,678.98 2,331,698.98 52,220.34 40,026.32 35,326.26 - - - 28,417.33 19,300.01 17,916.03 58,637.57 40,900.90 37,558.95 103,318.65 79,841.31 69,461.94 80,412.08 65,458.16 54,498.56 53,091.37 40,040.25 34,591.50 45,404.80 35,087.36 30,526.00 69,814.33 53,950.26 46,936.73 49,058.52 37,910.84 32,982.43 18,350.41 13,828.60 12,337.12 147,641.19 117,992.34 102,653.34 661,283.65 511,018.62 444,586.20 355,530.99 275,402.85

247

248

249

250

251 Blerim Saqipi 2.1 Consultant on licensing and delivery of in-

service teacher training (national) 71,533.00 71,533.00 3,120.72 2,392.00 2,111.12 8,432.70 5,980.00 5,447.30 - - 5,143.94 3,588.00 3,294.83 5,383.25 4,160.00 3,619.20 6,068.54 4,940.00 4,112.90 - - - - 7,570.19 5,850.00 5,089.50 7,486.08 5,785.00 5,032.95 10,641.62 8,223.50 7,154.45 6,206.26 4,796.00 4,172.52 5,656.95 4,371.51 3,803.21 3,785.10 2,925.00

252 Pilar Romaguera 2.1 Consultant to assist in teachers' professional

development (international) 36,805.00 36,805.00 23,301.44 17,860.30 15,763.07 - - 27,057.81 18,376.67 17,058.90 814.41 568.07 521.65 - - - - - - - - - - - - - - - - - - -

253 Pasi Ikonen 2.1 Consultant to design teacher training career

advancement system 15,416.00 15,416.00 - - - - - - 10,966.92 7,649.65 7,024.61 - - 9,541.48 7,767.09 6,466.65 - - - - - - - - - - - - - - -

254 Jorge Manzi 2.1 Consultant to assist in teachers' performance

evaluation (international) - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

255 Nicole Saginor 2.1 Consultant - teachers' performance

evaluation 92,350.00 92,350.00 - - - - - - - - - - - - - - - - - - - - - - - - 6,848.02 5,291.93 4,603.98 24,467.99 18,908.07

256 David Lynn 2.1 Consultant on Teacher Development Policies

Study 47,830.00 47,830.00 - - - - - - - - - - - - - - - - - - - - - - - - - - 18,311.71 14,150.70

257 Edmond Krasniqi 2.1 Consultant for database population and

logistical support on performance evaluation 6,000.00 6,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

258 Kreshnik Shatri 2.1 Consultant for database population and

logistical support on performance evaluation 6,000.00 6,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

259 Mentor Vokshi 2.1 Consultant for database population and

logistical support on performance evaluation 6,000.00 6,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

260 Armend Bajrami 2.1 Consultant for database population and

logistical support on performance evaluation 6,000.00 6,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

261 Donika Rexhepi 2.1 Consultant for database population and

logistical support on performance evaluation 6,000.00 6,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

262 Zahir ibishi 2.1 Consultant for database population and

logistical support on performance evaluation 6,000.00 6,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

263 Agim Ramadani 2.1 Consultant for database population and

logistical support on performance evaluation 6,000.00 6,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

264 Mirlind Bruqi 2.1 Consultant for the Managing the database

process 8,000.00 8,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

265 Camerron Harisson 2.2 Consultant to develop institutional capacities 44,738.30 44,738.30 - - - - - - - - - - - - - - 53,110.00 41,041.69 35,706.27 - - - - 4,783.60 3,696.61 3,216.05 - - - - -

266 Camerron Harisson 2.2 Consultant to develop institutional capacities

of curriculum unit and CACTI (international) 27,059.00 27,059.00 - - - - - - - - - - - - - - - - - - - - 20,320.42 15,702.96 13,661.58 14,695.21 11,355.98 9,879.70 - - -

267 Kelvin Gregory 2.3 Consultant to build capacity in Assessment

Unit and MEST experts (international) 41,196.00 41,196.00 - - - - - - - - - - - - - - - - 32,769.22 25,322.99 22,031.00 - - 20,540.46 15,873.00 13,809.51 - - - - -

268 Kelvin Gregory 2.3 IC on Capacity Building for External

Assessment in Kosovo 43,650.00 43,650.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

269 Steven Bakker 2.3 Consultant to carry out the study on test

administration (international) 51,800.00 51,800.00 - - - - - - - - - - - - - - 13,406.36 10,360.00 9,013.20 40,219.07 31,080.00 27,039.60 13,406.36 10,360.00 9,013.20 - - - - - - -

270 Steven Bakker 2.3 Consultant - Matura reform 53,150.00 53,150.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - 8,553.39 6,609.78 5,750.51 24,993.94 19,314.51

271 Ivane Mindadze 2.3 Consultant Mother Tongue and Modern

Foreign Language Exams 10,150.00 10,150.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3,943.81 3,047.65

272 David Tchankotadze 2.3 Consultant for Supporting the Item Bank

Development in Kosovo External Assessment 12,520.00 12,520.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

273 Steven Bakker 2.3 Supporting the Assessment Reform in

Kosovo 29,000.00 28,800.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

274 Mircea Enache 2.4 Consultant to work on the EMIS TOR and

training needs assessment (international) 23,560.00 23,560.00 - - - - - - - - - - - - - - 18,292.69 14,136.00 12,298.32 12,195.13 9,424.00 8,198.88 - - - - - - - - -

275 Mircea Enache 2.4 Consultant to work on the EMIS TOR and

training needs assessment (international) 31,980.00 31,980.00 - - - - - - - - - - - - - - - - - - - - 8,276.74 6,396.00 5,564.52 8,276.74 6,396.00 5,564.52 8,276.74 6,396.00 5,564.52 8,276.74 6,396.00

276 Mircea Enache 2.4 Consultant to work on the EMIS TOR and

training needs assessment (international) 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

277 Bersant Krasniqi 2.4 IT officer to support EMIS department

(national) 21,413.00 21,413.00 - - - - - - - - - - 1,535.56 1,250.00 1,040.71 - - 1,941.08 1,500.00 1,305.00 2,523.01 1,949.70 1,696.24 2,006.17 1,550.30 1,348.76 2,614.89 2,020.70 1,758.01 2,614.89 2,020.70 1,758.01 2,016.91 1,558.60 1,355.98 3,623.34 2,800.00

278 Kosova Education Center 2.5 Firm to draft project action plan (national) 12,780.00 12,780.00 16,673.43 12,780.00 11,279.32 - - - - - - - - - - - - - - - - - - - - - - - - -

279 Xhafer Ahmeti 2.5 Project coordinator (national) 13,000.00 13,000.00 10,176.27 7,800.00 6,884.09 5,499.59 3,900.00 3,552.59 1,914.12 1,300.00 1,206.78 - - - - - - - - - - - - - - - - - - - - -

280 Edita Alo 2.5 Project coordinator (national) 82,793.00 82,793.00 - - - - 5,053.28 3,432.00 3,185.89 9,462.09 6,600.00 6,060.72 8,540.73 6,600.00 5,742.00 5,405.18 4,400.00 3,663.31 - - 8,540.73 6,600.00 5,742.00 8,540.73 6,600.00 5,742.00 11,387.64 8,800.00 7,656.00 2,846.91 2,200.00 1,914.00 - - 6,733.20 5,203.20 4,526.78 8,924.80 6,896.80

281 Edita Alo 2.5 Project coordinator (national) 13,200.00 13,200.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

281 Gazmend Bajra 2.5 Financial manager (national) 56,781.00 56,781.00 3,750.87 2,875.00 2,537.41 4,865.02 3,450.00 3,142.67 5,079.78 3,450.00 3,202.60 4,946.09 3,450.00 3,168.11 5,022.86 3,881.50 3,376.91 3,249.27 2,645.02 2,202.17 - - 5,134.18 3,967.53 3,451.75 5,134.18 3,967.53 3,451.75 6,845.52 5,290.00 4,602.30 4,914.75 3,797.96 3,304.23 4,914.67 3,797.90 3,304.17 5,353.54 4,137.04 3,599.22 5,353.61 4,137.10

282 Gazmend Bajra 2.5 Financial manager (national) 793.00 793.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

282 Mirjeta Hysa 2.5 Financial manager (national) 9,000.00 7,200.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

282 Vlora Kuqi 2.5 Procurement Officer (national) 13,800.00 13,800.00 3,750.87 2,875.00 2,537.41 4,865.02 3,450.00 3,142.67 5,079.78 3,450.00 3,202.60 4,946.09 3,450.00 3,168.11 1,488.16 1,150.00 1,000.50 - - - - - - - - - - - - - - - - -

283 Luan Asllani 2.5 Procurement Officer (national) 16,200.00 16,200.00 - - - - - - - - - - 1,004.87 818.00 681.04 - - 3,493.55 2,699.70 2,348.74 3,493.94 2,700.00 2,349.00 4,658.58 3,600.00 3,132.00 3,353.79 2,591.70 2,254.78 3,353.79 2,591.70 2,254.78 - - -

284 Luan Asllani 2.5 Procurement Officer (national) 11,550.00 11,550.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3,994.15 3,086.55 2,685.30 4,244.55 3,280.05

285 Luan Asllani 2.5 Procurement Officer (national) 6,300.00 6,300.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

285 Altin Ademi 2.5 Administrative assistant (national) 23,450.00 23,450.00 - - - - - - 1,792.06 1,250.00 1,147.86 1,941.08 1,500.00 1,305.00 1,228.45 1,000.00 832.57 - - 2,717.51 2,100.00 1,827.00 2,717.51 2,100.00 1,827.00 3,623.34 2,800.00 2,436.00 2,737.05 2,115.10 1,840.14 2,622.13 2,026.30 1,762.88 2,820.12 2,179.30 1,895.99 2,820.12 2,179.30

286 Altin Ademi 2.5 Administrative assistant (national) 4,200.00 4,200.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

286 Vas Demetriou 2.5 Implementation adviser (international) 39,465.78 39,465.78 4,618.71 3,540.19 3,124.49 26,521.33 18,807.45 17,132.08 767.37 521.17 483.80 13,487.03 9,407.48 8,638.81 9,304.79 7,190.44 6,255.68 - - - - - - - - - - - - - - - - -

287 Alexandar Najdovski 2.5 Procurement consultant (international) 30,900.00 30,900.00 - - - - - - - - - - - - - - 17,993.77 13,905.00 12,097.35 15,994.46 12,360.00 10,753.20 - - - - - - - - -

288 Ernest & Young , KPMG 2.5 Firm to audit project accounts (external) 2,700.00 2,700.00 - - - - - - - - 1,294.05 1,000.00 870.00 - - - - - - 2,199.89 1,700.00 1,479.00 - - - - - - - - -

289 KPMG 2.5 Firm to audit project accounts (external) 3,400.00 3,400.00 - - - - - - - - - - - - - - - - - - - - - - - - - - 2,199.89 1,700.00 1,479.00 -

290 Ficadex Albania LTD 2.5 Firm to audit project accounts (external) 25,600.00 1,688.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

291 - - - - - - - - - - - - - - - - - - - - - - - - - - -

292 Hardsoft Integration 2.1 Developing a sofware for teacher licencing 37,000.00 37,000.00 - - - - - - - - - - - - 49,060.15 37,000.00 31,964.97 - - - - - - - - - - - - - -

293 ? 2.1 Teacher license production support hardware

and software 29,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

294 SI Consulting 2.1 Computers for 7 regional +1 main offices for

licensing 6,680.00 6,680.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Subtotal Secondary Schools

Subtotal Component 1

COMPONENT 2. BUILDING INSTITUTIONS & MANAGEMENT

CAPACITY IN PRIMARY & SECONDARY EDUCATION

CONSULTANTS

GOODS

Subtotal Primary Schools

Secondary Schools

SECOND ROUND FOR SECONDARY SCHOOLS

SECOND ROUND FOR PRIMARY SCHOOLS

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 246 of 255 10/17/2012 1:05 AM

Page 247: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Financial Management

This is PP was updated on April 20, 2010

294 Comtrade Computers 2.3 Software (assessment analysis) Software

upgrades (for assessment) and specialized 70,240.00 70,240.00 - - - - - - - - - - - - 93,134.09 70,239.52 60,681.19 - - - - - - - - - - - - - -

295 ? 2.3 Printing of brochures for the parents and

publication of test models 20,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

296 Illir Kosova 2.3 IT Equipment for MEDs 32,967.00 32,967.00 - - - - - - - - - - - - - - 42,660.95 32,967.00 28,681.29 - - - - - - - - - - -

279 Abellardo 2.3 Development of the Item Bank Software 30,000.00 37,128.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

280 SI Consulting 2.3 Hardware Support for Item Bank Database

Application 20,000.00 21,066.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

280 Illir Kosova 2.4 IT Equipment for EMIS 27,940.00 27,940.00 - - - - - - - - - - - - - - 36,155.76 27,940.00 24,307.80 - - - - - - - - - - -

281 Neocom & Edusoft 2.4 EMIS Upgrade 135,000.00 135,000.00 - - - - - - - - - - - - 42,960.78 32,400.00 27,990.95 - - - - 13,975.74 10,800.00 9,396.00 - - 65,685.98 50,760.00 44,161.20 - - -

282 Hardsoft Systems 2.4 USB for EMIS 8,950.00 8,950.00 - - - - - - - - - - - - - - - - - - - - - - - - - 11,581.75 8,950.00 7,786.50 -

283 SI Consulting 2.4 Backup software for three servers of EMIS 8,850.00 8,850.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

283 SM Commerce 2.5 Furniture for PST 6,088.00 6,088.00 - - - - 8,963.97 6,088.00 5,651.44 - - - - - - - - - - - - - - - - - - - - -

284 Comtrade Computers 2.5 IT Equipment for PCT 16,610.38 16,610.38 - - - - 24,457.12 16,610.38 15,419.27 - - - - - - - - - - - - - - - - - - - - - -

285 Comtrade Computers 2.5 IT Equipment for PCT 3,521.42 3,521.42 - - - - - - - - - - - - - - - - - - 4,556.89 3,521.42 3,063.64 - - - - - - -

286 Codex 2.5 Office Renovation 996.80 996.80 - - 1,405.64 996.80 908.01 - - - - - - - - - - - - - - - - - - - - - - -

287 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

288 Study visit - U.S. 2.1 Performance evaluation of teachers 26,998.00 26,998.00 - - - - - - - - - - - - - - - - - - - - - - - - - - 34,936.76 26,998.00

289 Workshops 2.1 Performance evaluation of teachers and

licencing 8,464.70 8,464.70 - - - - - - - - 2,199.76 1,699.90 1,478.91 7,322.79 5,961.00 4,962.96 - - 1,040.16 803.80 699.31 - - - - - - - - - - -

290 ? 2.1 Workshops - Teacher

Performance/lincencing 3,000.00 682.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

291 Workshops 2.1 Teacher licensing 1,727.80 1,727.80 - - - - 2,544.01 1,727.80 1,603.90 - - - - - - - - - - - - - - - - - - - - -

292 ? 2.1 Workshop - Teacher Licencing 10,000.00 1,680.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

293 ? 2.3 Training on assessment S. Bakker 3,000.00 880.00 - - - - - - - - - - - - - - - - - - - - - - - - - - 939.93 726.35

294 ? 2.3 Continuation on Training on assessment S.

Bakker 2,000.00 880.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

294 Study visit 1 2.3 Assessment & examinations 9,426.70 9,426.70 - - - - - - - - - - - - - - 3,738.16 2,888.73 2,513.20 8,460.50 6,538.00 5,688.06 - - - - - - - - 314.58 243.10

295 ? 2.3 Study visit on assessment 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

295 ? 2.3 Conference Vision for the Matura 2015 in

Kosovo 50,800.00 50,800.00 - 8,960.52 6,924.40

296 Conference - Germany 2.3 Participation in the ECA education

Conference 5,631.00 5,631.00 - - - - - - - - - - - - - - - - - - - - - - - - - - 4,701.67 3,633.30

297 Workshop 2.3 Workshop on the Test and Design, S.Bakker 880.00 -

298 Study visit 2.4 EMIS 7,980.00 7,980.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

299 Conferences 2.5 Conferences 5,426.50 5,426.50 - - - - 2,054.00 1,395.00 1,294.97 - - 3,532.76 2,730.00 2,375.10 1,054.01 858.00 714.35 - - - - 573.91 443.50 385.85 - - - - - - - - -

300 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

301 Training 2.5 Procurement training 3,221.00 3,221.00 - - - - 940.86 639.00 593.18 - - - - - - - - - - 1,658.83 1,281.89 1,115.24 1,682.27 1,300.00 1,131.00 - - - - - - -

302 ? 2.5 Staff Professional Development 9,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

303 Training - Financial

Management 2.5 Financial management training 1,164.00 1,164.00 - 1,237.14 956.02 831.74

304 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

305 For all local consultants 2.5 Pension contributions 6,163.70 6,163.10 469.67 360.00 317.73 760.07 539.00 490.99 856.64 581.80 540.08 1,057.32 737.50 677.24 812.48 627.86 546.24 621.18 505.66 421.00 - - 1,091.39 843.39 733.75 1,091.39 843.39 733.75 1,455.16 1,124.50 978.32 1,009.11 779.81 678.43 785.57 607.06 528.14 1,315.95 1,016.92 884.72 1,545.77 1,194.52

306 For all local consultants 2.5 Pension contributions 8,191.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

307 2.5 Translation services 35,357.77 35,357.77 3,256.41 2,496.00 2,202.91 - - - - 5,567.78 3,883.64 3,566.31 4,371.30 3,378.00 2,938.86 - - - - 14,461.69 11,175.53 9,722.71 2,008.74 1,552.29 1,350.49 16,657.41 12,872.31 11,198.91 784.45 606.20 527.39 988.03 763.52 664.26 621.14 480.00 417.60 7,770.69 6,004.94

308 2.5 Translation services 41,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

309 2.5 Phone cards 4,919.52 4,919.52 489.37 375.10 331.05 476.57 337.96 307.85 634.60 431.00 400.09 840.35 586.16 538.27 825.45 637.88 554.96 698.89 568.92 473.67 - - 803.14 620.64 539.96 892.38 689.60 599.95 870.07 672.36 584.95 870.07 672.36 584.95 870.07 672.36 584.95 870.07 672.36 584.95 895.95 692.36

310 2.5 Phone cards 5,750.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

311 2.5 Fuel 1,108.98 1,108.98 99.15 76.00 67.08 - - - - - - 908.42 702.00 610.74 228.50 186.01 154.87 - - 187.60 144.97 126.12 - - - - - - - - - - -

312 2.5 Fuel 4,500.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 486.14 375.67 326.83 12.94 10.00

313 2.5 Vehicle Maintenance 1,628.53 1,628.53 2,107.40 1,628.53 1,416.82 - -

314 2.5 Advertisments 4,271.97 4,271.97 1,785.65 1,212.75 1,125.78 78.00 1,285.92 993.72 864.54 1,498.28 1,219.65 1,015.45 767.85

315 2.5 Advertisments 680.00 - - - - - - - - - - -

316 2.5 Hospitality 977.25 977.25 485.42 372.07 328.38 - - - - - - - - - 435.49 336.53 292.78 - - - - - - - - 347.65 268.65 233.73 1,754.62 1,355.91 1,179.64 - - - - 511.02 394.90

317 2.5 Other 2,710.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 671.34 518.79

318 2.5 Office supplies & consumables 3,546.55 3,546.55 121.33 93.00 82.08 2,766.01 2,137.48 1,859.61 - 468.30 1,097.06 847.77 737.56 - - 714.32 552.00 480.24 1,236.48 955.51 831.29 3,459.50 2,673.39

319 2.5 Office supplies & consumables 3,756.00 - - - - - - - - - - - - - - - - - -

320 1,817,187.65 1,640,124.05 70,313.67 53,894.66 47,566.12 52,825.93 37,461.21 34,124.17 87,189.00 59,215.57 54,969.28 59,024.08 41,248.50 37,806.52 52,219.89 40,353.84 35,107.84 39,457.02 32,119.35 26,741.64 185,155.02 139,639.52 120,637.10 224,768.69 174,162.28 151,113.76 148,043.06 115,170.74 99,530.51 90,055.93 69,592.31 60,545.31 86,685.60 66,987.83 58,279.41 111,727.66 86,339.52 75,115.38 68,564.42 52,984.37 46,096.40 173,466.41 134,049.23

321

322

323

324

325 Standard 3.3Basic Education Model Primary School

(Grades 0-9)1,500,000.00 2,480,942.47 - - - - - - - - - - - - - - - - - - - - - - - - - - -

326 - - - - - - - - - - - - - - - - - - - - - - - - - - -

327 - - - - - - - - - - - - - - - - - - - - - - - - - - -

328 ? 3.3Equipment for the model Basic Education

School (0-9)122,840.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

329 ? 3.3Furniture for the model Basic Education

School (0-9)200,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - -

330 Comtrade Computers 3.1 Autocad 2 Licence 3,991.00 3,991.00 - - - - - - - - - - - - - - - - - - 5,164.55 3,991.00 3,472.17 - - - - - - -

331 Comtrade Computers 3.2 Computers & Peripherals and Software 7,483.21 7,483.21 - - - - - - - - - - - - - - - - - - 9,683.65 7,483.21 6,510.39 (9,683.65) (7,483.21) (6,510.39) 9,683.65 7,483.21 6,510.39 - - -

332 Trembelat 3.1Design and Layout of the Guideline on School

Facilities Design- Norms and Standards1,000.00 2,260.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

333 Grafika Rezniqi 3.1Printing of the Guideline on School Facilities

Design- Norms and Standards2,000.00 1,829.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

333 - - - - - - - - - - - - - - - - - - - - - - - - - - -

334 TELOS 3.1 Firm to assist in the development of school

database, school mapping and investment 129,580.00 129,580.00 - - - - 20,083.53 13,640.00 12,661.89 58,664.95 40,920.00 37,576.49 97,079.63 75,020.00 65,267.40 - - - - - - - - - - - - - - - - -

335 CMC 3.1 Firm to carry out inventory taking for Area A &

B (1100 school locations) (national) 202,280.00 202,280.00 - - - - - - - - - - 24,849.09 20,228.00 16,841.24 53,642.63 40,456.00 34,950.67 104,704.17 80,912.00 70,393.44 - - - - - - - 78,528.13 60,684.00 52,795.08 - - -

336 Merita Behluli 3 Task Manager for Priority 3 Activities

(national) 16,716.00 16,716.00 - - - - - - 5,217.05 3,639.00 3,341.66 5,240.90 4,050.00 3,523.50 3,316.81 2,700.00 2,247.94 - - 5,357.37 4,140.00 3,601.80 2,830.10 2,187.01 1,902.70 - - 7,686.66 5,940.00 5,167.80 - - - - -

337 Local staff 3 Pension contributions - - - - - - - 260.85 181.95 167.08 262.05 202.50 176.18 165.84 135.00 112.40 - - 267.87 207.00 180.09 141.50 109.35 95.13 - - - - - - - - -

338 Vas Demetriou 3 Implementation of Comp 3 (international) 27,194.00 27,194.00 - - - - - - - - - - 7,747.29 6,306.56 5,250.66 - - - - 16,050.21 12,403.08 10,790.68 - - 10,979.48 8,484.59 7,381.59 - - - - -

339 Vas Demetriou 3 Implementation adviser for component 3 37,840.00 37,840.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

340 Urban Plus 3.2 Firm to design and supervise the model

primary school (international) 178,921.00 178,921.00 - - - - - - - - - - - - - - 41,295.39 31,144.00 26,905.86 - - - - - - - - 9,909.83 7,658.00 6,662.46 - - -

341 EME 3.2 Firm to assist in the development of school

facility standards and a manual for the design 60,332.00 60,332.00 - - - - - - - - 32,524.65 25,134.00 21,866.58 43,227.07 35,188.30 29,296.75 - - - - - - - - - - - - - - - -

342 Daniel Dupety 3.2 Consultant to assist in the development of

school facility standards and a manual for the 35,992.00 35,992.00 - - - - - - - - - - - - 28,266.60 21,318.00 18,417.01 13,981.50 10,804.45 9,399.87 - 3,870.00

343 Merita Behluli 3.3 Consultant for Priority 3 Activities 16,500.00 16,500.00 - - - - - - - - - - - - - - - - - 2,419.87 1,870.00 1,626.90 6,120.86 4,730.00 4,115.10 - - 3,131.60 2,420.00 2,105.40 1,992.84 1,540.00 1,339.80 -

344 Merita Behluli 3.3 Consultant for Priority 3 Activities 21,120.00 21,120.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9,679.49 7,480.00

345 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

346 Study visit 3.2 School mapping 22,564.00 22,564.00 - - - - - - 17,457.55 12,177.00 11,182.03 8,952.24 6,918.00 6,018.66 4,261.49 3,469.00 2,888.19 - - - - - - - - - - - - - - - - -

347 Workshop 3.1 Safeguards training 3,034.90 3,034.90 - - - - - - - - 2,316.22 1,789.90 1,557.21 1,529.42 1,245.00 1,036.55 - - - - - - - - - - - - - - - -

348 Workshops 3.1 School mapping, investement planning and

inventory taking 1,590.40 1,590.40 - - - - - - - - 1,636.97 1,265.00 1,100.55 - - - - - 421.08 325.40 283.10 - - - - - - - - - - -

349 Study visit 3.2 Standards and Norms on School Design 2,475.00 2,475.00 - - - - - - - - - - - - - - - 3,202.77 2,475.00 2,153.25 - - - - - - - - - - - -

350 Study visit 3.2 Overseas study visit on school design 12,214.00 12,214.00 - - - - - - - - - - - - - - - - - - - - 15,805.53 12,214.00 10,626.18 12,874.83 9,949.25 8,655.85 - - - - -

351 ? 3.2 Public presentation of manual in

municipaities 500.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

352 ? 3.2 Conference on School Buildings and

Standards 10,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

353 Study visits 3.1 Closing advances - (15,757.65) (12,177.00) (10,593.99) - (7,239.00) (15,805.53) (12,214.00) (10,626.18)

354 2,616,167.51 3,264,858.98 - - - - - - 20,083.53 13,640.00 12,661.89 81,600.41 56,917.95 52,267.27 132,255.02 102,202.40 88,916.09 85,097.02 69,271.86 57,673.73 123,204.62 92,918.00 80,273.54 113,953.27 80,820.40 76,611.68 35,423.18 27,373.89 23,815.28 36,774.58 28,418.21 24,723.84 6,051.79 8,546.63 4,068.67 101,253.21 78,245.21 68,073.33 1,992.84 1,540.00 1,339.80 9,679.49 7,480.00

355

356

357

358

359 Rrota 4.2 Publication of feasibility study 2,000.00 2,000.00 - - - - - - - - - - - - - - - - - - - - - - 2,588.10 2,000.00 1,740.00 - - -

360 - - - - - - - - - - - - - - - - - - - - - - - - - - -

361 Steve Bristow 4.1 Consultant to review and draft higher

education legislation (international) 54,327.00 54,327.00 - - - - - - 11,827.61 8,250.00 7,575.90 7,343.45 5,674.78 4,937.06 - - 53,572.57 40,403.16 34,905.02 - - - - - - - - - - - - - -

362 Stephen L.Bristow 4.1 Consultant for the implementation of higher

education legislation (international) 22,940.00 22,940.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

363 Jehona Lushaku 4.1 Consultant to support the efforts of the

international consultants on legislation and 2,400.00 2,400.00 - - - - - - - - - - - - - - - - - - - - - - - - 3,105.72 2,400.00 2,088.00 -

364 Blerim Saqipi 4.1 Consultant to support the efforts of the

international consultants on legislation and 2,600.00 2,600.00 - - - - - - - - - - - - - - 12,509.52 9,666.95 8,410.25 3,364.53 2,600.00 2,262.00 - - - - - - - - -

365 Sigurd Hoellinger 4.2 Consultant to study financial sustainability of

higher education (international) 61,565.00 61,565.00 - - - - - - - - 7,883.35 6,092.00 5,300.04 48,893.19 39,800.72 33,136.92 - - - - 7,772.26 6,006.15 5,225.35 - - - - - - - - -

366 Thomas Gougen 4.1 Consultant 12,164.00 12,164.00 - - - - - - - - - - 14,942.88 12,164.01 10,127.40 - - - - - - - - - - - - - - -

367 - - - - - - - - - - - - - - - - - - - - - - - - - - -

368 Workshop 4.1 Higher education legislation 1,684.70 1,684.70 - - - - - - - - 2,180.09 1,684.70 1,465.69 - - - - - - - - - - 251.05 194.00 168.78 - - - - -

369 ? 4.1 Workshop on Higher Education Legislation 5,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

370 Workshop 4.2 Financng of higher education 1,369.90 1,369.90 - - - - - - - - 1,772.72 1,369.90 1,191.81 - - - - - - - - - - - - - - - - -

371 ? 4.2 Workshop on Financing of Higher Education 2,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

372 168,050.60 161,050.60 - - - - - - - - - 11,827.61 8,250.00 7,575.90 19,179.61 14,821.38 12,894.60 63,836.07 51,964.73 43,264.32 53,572.57 40,403.16 34,905.02 12,509.52 9,666.95 8,410.25 11,136.79 8,606.15 7,487.35 - - - 251.05 194.00 168.78 2,588.10 2,000.00 1,740.00 3,105.72 2,400.00 2,088.00 - -

373

374 - - - - - - - - - - - - - - - - - - - - - - - - - - -

375

376 6,956,084.74 7,397,732.61 122,534.01 93,920.98 82,892.37 52,825.93 37,461.21 34,124.17 135,689.87 92,155.58 85,547.20 211,089.68 147,317.35 135,208.63 306,973.16 237,218.93 206,380.47 268,802.18 218,814.10 182,178.25 415,023.58 313,000.93 270,407.16 396,636.28 299,736.99 266,661.69 264,417.36 205,101.04 177,769.88 175,889.04 135,921.36 118,251.58 111,338.85 89,557.06 74,853.98 363,210.16 284,577.07 247,582.05 734,946.63 567,942.99 494,110.40 538,676.89 416,932.08 GRAND TOTALS

Subtotal Component 4

CONSULTANTS

TRAINING

Subtotal Component 3

GOODS

COMPONENT 4. FINANCING MECHANISMS FOR HIGHER

EDUCATION

GOODS

CONSULTANTS

TRAINING

UNALLOCATED

OPEARATIONS

Subtotal Component 2

COMPONENT 3. CREATING CONDITIONS TO INTRODUCE

EFFICIENT DESIGNS IN KOSOVO'S SCHOOLS

WORKS

TRAINING

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 247 of 255 10/17/2012 1:05 AM

Page 248: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Financial Management

This is PP was updated on April 20, 2010

0.8700000 1.2940500 0.8700000 1.2940500 0.8700000 1.2940500 0.8700000 1.2940500 0.8700000 1.2940500 0.8700000 1.2940500 0.8700000 1.2698000 0.7875255 0.8563770 1.2698000 0.8563770

EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑ EUR to USD ↑ USD to EUR ↑ EUR to XDR ↑ EUR to USD ↑ EUR to XDR ↑

XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD XDR USD EUR XDR USD EUR XDR

AL AJ AK AL AJ AK AL AJ AK AL AJ AK AL AJ AK AL AJ AK AL AM AN AO AP AQ AR AS AT AU AV AW AX AY AZ BA BB

AK*AK$3 AK*AJ$3 Value AK*AK$3 AK*AJ$3 Value AK*AK$3 AK*AJ$3 Value AK*AK$3 AK*AJ$3 Value AK*AK$3 AK*AJ$3 Value AK*AK$3 AK*AJ$3 Value AK*AK$3 U+X+AA+AD

+AG+AJ

J+M+P+S

+V+Y+AB

+AE+AH+AK

K+N+Q+T+W

+Z+AC+AF

+AI+AL

G-AM (pink)

Greem cells are

EUR to USD

H-AN (yellow)

Pink cells are

USD to EUR

AQ/AR$3

EUR to XDR AM+AP AN+AQ AO+AR AW*AV$3 Value AW*AX$3 AS+AV AT+AW AU+AX

E-BA305

At Component

Level Only

- - - - - - - - - - - - - 96,247.44 72,000.00 63,491.81 - - - 96,247.44 72,000.00 63,491.81 - - - 96,247.44 72,000.00 63,491.81 contracted

- 5,183.72 4,005.81 3,485.05 22,036.65 17,029.21 14,815.41 - - - - - - - - 27,220.37 21,035.02 18,300.47 7,625.12 6,004.98 5,142.53 34,845.49 27,040.00 23,442.99 38,094.00 30,000.00 25,691.31 72,939.49 57,040.00 49,134.30

- - - - - - - - - - - - - 94,755.21 70,831.22 62,838.87 - - - 94,755.21 70,831.22 62,838.87 30,656.21 - - 125,411.42 70,831.22 62,838.87 Completed

2,939.71 3,813.82 2,947.20 2,564.06 18,874.04 14,585.25 12,689.17 - - - - - - - - 57,626.20 45,095.50 38,816.78 59,508.54 46,864.50 40,133.68 117,134.75 91,960.00 78,950.46 - - - 117,134.75 91,960.00 78,950.46 Contracted

- - - - - - - - - - - - - 31,929.39 24,674.00 21,466.38 - - - 31,929.39 24,674.00 21,466.38 - - 31,929.39 24,674.00 21,466.38 Contracted

- - - - - - - - - - - - - 8,966.78 6,400.00 5,791.84 - - - 8,966.78 6,400.00 5,791.84 - - 8,966.78 6,400.00 5,791.84 Completed

- - - - - - - - - - - - - 1,682.27 1,300.00 1,131.00 - - - 1,682.27 1,300.00 1,131.00 - - 1,682.27 1,300.00 1,131.00 Completed

- - - - - - - - - - - - - 15,199.21 11,836.71 10,230.57 (8,206.35) (6,462.71) (5,534.52) 6,992.87 5,374.00 4,696.05 - - 6,992.87 5,374.00 4,696.05 Completed

- - - - - - - - - - - - - 6,076.54 4,787.00 4,097.32 - - - 6,076.54 4,787.00 4,097.32 - - 6,076.54 4,787.00 4,097.32 Completed

- 4,092.69 3,162.70 2,751.55 - - - - - - - - - - 13,127.75 10,144.70 8,825.89 3,879.62 3,055.30 2,616.49 17,007.37 13,200.00 11,442.38 - - - 17,007.37 13,200.00 11,442.38 Contracted

2,990.45 - - 4,270.37 3,300.00 2,871.00 - - - - - - - - 17,259.13 13,337.30 11,603.45 12,968.09 10,212.70 8,745.92 30,227.22 23,550.00 20,349.37 - - - 30,227.22 23,550.00 20,349.37

- - - - - - - - - - - - - 17,875.40 13,813.53 12,017.77 (3,826.58) (3,013.53) (2,580.72) 14,048.82 10,800.00 9,437.05 - - - 14,048.82 10,800.00 9,437.05 Contracted

2,443.22 3,353.79 2,591.70 2,254.78 3,493.94 2,700.00 2,349.00 - - - - - - - - 13,835.59 10,691.70 9,301.78 10,891.46 8,577.30 7,345.40 24,727.05 19,269.00 16,647.18 - - - 24,727.05 19,269.00 16,647.18

3,306.00 - - - - - - - - - - - - 4,917.39 3,800.00 3,306.00 - - - 4,917.39 3,800.00 3,306.00 1,269.80 1,000.00 856.38 6,187.19 4,800.00 4,162.38

3,306.00 - - - - - - - - - - - - 4,917.39 3,800.00 3,306.00 - - - 4,917.39 3,800.00 3,306.00 1,269.80 1,000.00 856.38 6,187.19 4,800.00 4,162.38

3,306.00 - - - - - - - - - - - - 4,917.39 3,800.00 3,306.00 - - - 4,917.39 3,800.00 3,306.00 1,269.80 1,000.00 856.38 6,187.19 4,800.00 4,162.38

3,132.00 - - - - - - - - - - - - 4,658.58 3,600.00 3,132.00 - - - 4,658.58 3,600.00 3,132.00 1,269.80 1,000.00 856.38 5,928.38 4,600.00 3,988.38

3,132.00 - - - - - - - - - - - - 4,658.58 3,600.00 3,132.00 - - - 4,658.58 3,600.00 3,132.00 1,269.80 1,000.00 856.38 5,928.38 4,600.00 3,988.38

- 1,035.24 800.00 696.00 - - - - - - - - - - 1,035.24 800.00 696.00 4,063.36 3,200.00 2,740.41 5,098.60 4,000.00 3,436.41 2,539.60 2,000.00 1,712.75 7,638.20 6,000.00 5,149.16

- - - 4,348.01 3,360.00 2,923.20 - - - - - - - - 4,348.01 3,360.00 2,923.20 812.67 640.00 548.08 5,160.68 4,000.00 3,471.28 2,539.60 2,000.00 1,712.75 7,700.28 6,000.00 5,184.04

- - - 4,787.99 3,700.00 3,219.00 - - - - - - - - 4,787.99 3,700.00 3,219.00 380.94 300.00 256.91 5,168.93 4,000.00 3,475.91 2,539.60 2,000.00 1,712.75 7,708.53 6,000.00 5,188.67

- - - 4,969.15 3,840.00 3,340.80 - - - - - - - - 4,969.15 3,840.00 3,340.80 203.17 160.00 137.02 5,172.32 4,000.00 3,477.82 2,539.60 2,000.00 1,712.75 7,711.92 6,000.00 5,190.57

- - - 3,933.91 3,040.00 2,644.80 - - - - - - - - 3,933.91 3,040.00 2,644.80 1,219.01 960.00 822.12 5,152.92 4,000.00 3,466.92 2,539.60 2,000.00 1,712.75 7,692.52 6,000.00 5,179.68

- - - - - - - - - - - - - - - - 1,523.76 1,200.00 1,027.65 1,523.76 1,200.00 1,027.65 - - - 1,523.76 1,200.00 1,027.65

- - - - - - - - - - - - - 14,466.27 10,400.00 9,387.89 - - - 14,466.27 10,400.00 9,387.89 - - 14,466.27 10,400.00 9,387.89 Completed

- - - - - - - - - - - - - 16,441.14 12,705.18 11,053.51 2,152.08 1,694.82 1,451.40 18,593.22 14,400.00 12,504.91 - - - 18,593.22 14,400.00 12,504.91 Contracted

3,264.07 4,462.27 3,448.30 3,000.02 4,658.58 3,600.00 3,132.00 - - - - - - - - 23,293.03 18,000.10 15,660.09 7,133.61 5,617.90 4,811.04 30,426.64 23,618.00 20,471.13 - - - 30,426.64 23,618.00 20,471.13

556.80 414.10 320.00 278.40 - - - - - - - - - - 6,076.18 4,665.65 4,069.37 (2,927.71) (2,305.65) (1,974.51) 3,148.47 2,360.00 2,094.87 - - - 3,148.47 2,360.00 2,094.87

- - - - - - - - - - - - - 4,885.22 3,381.77 3,112.65 - - - 4,885.22 3,381.77 3,112.65 - - - 4,885.22 3,381.77 3,112.65

- - - - - - - - - - - - - 9,150.12 7,150.00 6,162.11 - - - 9,150.12 7,150.00 6,162.11 - - 9,150.12 7,150.00 6,162.11 Completed

- - - - - - - - - - - - - 156,719.54 120,120.75 104,261.53 186,424.73 146,814.25 125,728.35 343,144.27 266,935.00 229,989.88 - - 343,144.27 266,935.00 229,989.88 Evaluated

- 103,628.17 80,080.50 69,670.04 12,526.40 9,680.00 8,421.60 - - - - - - - - 116,154.58 - 78,091.64 76,492.75 60,240.00 51,588.15 192,647.33 60,240.00 129,679.79 - - 192,647.33 60,240.00 129,679.79 contracted

- - - - - - - - - - - - - 31,140.73 25,185.00 21,083.67 (5,885.52) (4,635.00) (3,969.31) 25,255.20 20,550.00 17,114.37 - - 25,255.20 20,550.00 17,114.37

28,376.25 125,983.80 97,356.21 84,699.90 83,899.03 64,834.46 56,405.98 - - - - - - - - - - - - 823,271.71 540,895.13 549,802.18 354,432.75 279,124.86 239,036.11 1,177,704.46 820,019.99 788,838.29 87,797.21 45,000.00 38,536.97 1,265,501.67 865,019.99 827,375.26

- - - - - - -

49,325.00 - 49,325.00 - (114.28) (90.00) (77.07) (114.28) 49,235.00 (77.07) - - - (114.28) 49,235.00 (77.07) contracted

- 3,900.00 - - - - - 3,900.00 - - - - 3,900.00 -

- 36,970.00 - - - - - 36,970.00 - - - - 36,970.00 -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

14,331.40 - 14,331.40 - (18,198.01) (14,331.40) (12,273.08) (18,198.01) - (12,273.08) - - (18,198.01) - (12,273.08)

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

63,656.40 - 104,526.40 - (18,312.29) (14,421.40) (12,350.16) (18,312.29) 90,105.00 (12,350.16) - - - (18,312.29) 90,105.00 (12,350.16)

- - - - - - -

- - - - - - - - - - - - - 16,878.55 13,043.20 11,347.58 - - - 16,878.55 13,043.20 11,347.58 - - 16,878.55 13,043.20 11,347.58

- - - - - - - - - - - - - - - - - - - - - - 3,174.50 2,500.00 2,140.94 3,174.50 2,500.00 2,140.94

- - - - - - - - - - - - - 21,626.99 16,576.85 14,630.32 - - - 21,626.99 16,576.85 14,630.32 - - 21,626.99 16,576.85 14,630.32

- - - - - - - - - - - - - 18,604.04 14,700.56 12,569.68 - - - 18,604.04 14,700.56 12,569.68 - - - 18,604.04 14,700.56 12,569.68

- - - - - - - - - - - - - - - - 393.64 310.00 265.48 393.64 310.00 265.48 6,349.00 5,000.00 4,281.89 6,742.64 5,310.00 4,547.36

- - - - - - - - - - - - - 8,215.68 6,348.81 5,523.46 - - - 8,215.68 6,348.81 5,523.46 - - - 8,215.68 6,348.81 5,523.46

- - - - - - - - - - - - - 455.51 352.00 306.24 - - - 455.51 352.00 306.24 - - 455.51 352.00 306.24

- - - - - - - - - - - - - 575.85 445.00 387.15 - - - 575.85 445.00 387.15 - - - 575.85 445.00 387.15

191.40 - - - - - - - - - - - - - - - - - - 66,356.62 51,466.42 44,764.44 393.64 310.00 265.48 66,750.26 51,776.42 45,029.92 9,523.50 7,500.00 6,422.83 76,273.76 59,276.42 51,452.74

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - - - - - - - - 20,590.86 16,197.00 13,880.93 10,233.32 8,059.00 6,901.54 30,824.18 24,256.00 20,782.47 - - 30,824.18 24,256.00 20,782.47

- - - - - - - - - - - - - 25,136.27 19,424.50 16,899.32 2,254.53 1,775.50 1,520.50 27,390.80 21,200.00 18,419.81 - - 27,390.80 21,200.00 18,419.81

- - - - - - - - - - - - - 8,708.72 6,729.82 5,854.94 5,282.60 4,160.18 3,562.68 13,991.32 10,890.00 9,417.63 - - 13,991.32 10,890.00 9,417.63

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - 54,435.86 42,351.32 36,635.18 17,770.44 13,994.68 11,984.72 72,206.30 56,346.00 48,619.91 - - - 72,206.30 56,346.00 48,619.91

- - - - - - - 4,639.34 3,191.76 2,947.35 - - - 4,639.34 3,191.76 2,947.35 - - 4,639.34 3,191.76 2,947.35

- - -

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 12,196.43 9,605.00 8,225.50 12,196.43 9,605.00 8,225.50 - - - 12,196.43 9,605.00 8,225.50

- - - - - - - - - - - - - - - - 7,847.36 6,180.00 5,292.41 7,847.36 6,180.00 5,292.41 - - - 7,847.36 6,180.00 5,292.41

- - - - - - - - - - - - - - - - 7,796.57 6,140.00 5,258.15 7,796.57 6,140.00 5,258.15 - - - 7,796.57 6,140.00 5,258.15

- - - - - - - - - - - - - - - - 11,079.01 8,725.00 7,471.89 11,079.01 8,725.00 7,471.89 - - - 11,079.01 8,725.00 7,471.89

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - 1,339.34 1,035.00 900.45 11,383.76 8,965.00 7,677.42 12,723.10 10,000.00 8,577.87 - - - 12,723.10 10,000.00 8,577.87

- - - - - - - - - - - - - - - - 7,396.59 5,825.00 4,988.40 7,396.59 5,825.00 4,988.40 - - - 7,396.59 5,825.00 4,988.40

- - - - - - - - - - - - - - - - 6,475.98 5,100.00 4,367.52 6,475.98 5,100.00 4,367.52 - - - 6,475.98 5,100.00 4,367.52

- - - - - - - - - - - - - - - - 6,774.38 5,335.00 4,568.77 6,774.38 5,335.00 4,568.77 - - - 6,774.38 5,335.00 4,568.77

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 6,901.36 5,435.00 4,654.41 6,901.36 5,435.00 4,654.41 - - - 6,901.36 5,435.00 4,654.41

- - - - - - - - - - - - - - - - 10,323.47 8,130.00 6,962.35 10,323.47 8,130.00 6,962.35 - - - 10,323.47 8,130.00 6,962.35

- - - - - - - - - - - - - - - - 10,209.19 8,040.00 6,885.27 10,209.19 8,040.00 6,885.27 - - - 10,209.19 8,040.00 6,885.27

- - - - - - - - - - - - - 8,724.74 6,742.20 5,865.71 (1,945.59) (1,532.20) (1,312.14) 6,779.16 5,210.00 4,553.57 - - - 6,779.16 5,210.00 4,553.57

- - - - - - - - - - - - - - - - 11,352.01 8,940.00 7,656.01 11,352.01 8,940.00 7,656.01 - - - 11,352.01 8,940.00 7,656.01

- - - - - - - - - - - - - - - - 11,929.77 9,395.00 8,045.66 11,929.77 9,395.00 8,045.66 - - - 11,929.77 9,395.00 8,045.66

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 5,634.10 4,437.00 3,799.74 5,634.10 4,437.00 3,799.74 - - - 5,634.10 4,437.00 3,799.74

- - - - - - - - - - - - - - - - 9,923.49 7,815.00 6,692.59 9,923.49 7,815.00 6,692.59 - - - 9,923.49 7,815.00 6,692.59

- - - - - - - - - - - - - - - - 12,209.13 9,615.00 8,234.06 12,209.13 9,615.00 8,234.06 - - - 12,209.13 9,615.00 8,234.06

- - - - - - - - - - - - - - - - 6,837.87 5,385.00 4,611.59 6,837.87 5,385.00 4,611.59 - - - 6,837.87 5,385.00 4,611.59

- - - - - - - - - - - - - - - - 10,253.64 8,075.00 6,915.24 10,253.64 8,075.00 6,915.24 - - - 10,253.64 8,075.00 6,915.24

- - - - - - - - - - - - - - - - 7,726.73 6,085.00 5,211.05 7,726.73 6,085.00 5,211.05 - - - 7,726.73 6,085.00 5,211.05

- - - - - - - - - - - - - - - - 6,672.80 5,255.00 4,500.26 6,672.80 5,255.00 4,500.26 - - - 6,672.80 5,255.00 4,500.26

- - - - - - - - - - - - - - - - 6,996.60 5,510.00 4,718.64 6,996.60 5,510.00 4,718.64 - - - 6,996.60 5,510.00 4,718.64

- - - - - - - - - - - - - - - - 5,631.56 4,435.00 3,798.03 5,631.56 4,435.00 3,798.03 - - - 5,631.56 4,435.00 3,798.03

- - - - - - - - - - - - - - - - 10,393.31 8,185.00 7,009.45 10,393.31 8,185.00 7,009.45 - - - 10,393.31 8,185.00 7,009.45

- - - - - - - - - - - - - - - - 8,501.31 6,695.00 5,733.44 8,501.31 6,695.00 5,733.44 - - - 8,501.31 6,695.00 5,733.44

- - - - - - - - - - - - - - - - 7,307.70 5,755.00 4,928.45 7,307.70 5,755.00 4,928.45 - - - 7,307.70 5,755.00 4,928.45

- - - - - - - - - - - - - - - - 7,987.04 6,290.00 5,386.61 7,987.04 6,290.00 5,386.61 - - - 7,987.04 6,290.00 5,386.61

- - - - - - - - - - - - - 6,398.83 4,944.81 4,301.98 1,701.77 1,340.19 1,147.71 8,100.60 6,285.00 5,449.69 - - - 8,100.60 6,285.00 5,449.69

- - - - - - - - - - - - - - - - 6,685.50 5,265.00 4,508.82 6,685.50 5,265.00 4,508.82 - - - 6,685.50 5,265.00 4,508.82

- - - - - - - - - - - - - - - - 7,218.81 5,685.00 4,868.50 7,218.81 5,685.00 4,868.50 - - - 7,218.81 5,685.00 4,868.50

- - - - - - - - - - - - - - - - 8,190.21 6,450.00 5,523.63 8,190.21 6,450.00 5,523.63 - - - 8,190.21 6,450.00 5,523.63

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 11,859.93 9,340.00 7,998.56 11,859.93 9,340.00 7,998.56 - - - 11,859.93 9,340.00 7,998.56

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 8,761.62 6,900.00 5,909.00 8,761.62 6,900.00 5,909.00 - - - 8,761.62 6,900.00 5,909.00

- - - - - - - - - - - - - - - - 10,869.49 8,560.00 7,330.59 10,869.49 8,560.00 7,330.59 - - - 10,869.49 8,560.00 7,330.59

- - - - - - - - - - - - - - - - 9,460.01 7,450.00 6,380.01 9,460.01 7,450.00 6,380.01 - - - 9,460.01 7,450.00 6,380.01

- - - - - - - - - - - - - - - - 8,856.86 6,975.00 5,973.23 8,856.86 6,975.00 5,973.23 - - - 8,856.86 6,975.00 5,973.23

- - - - - - - - - - - - - - - - 11,428.20 9,000.00 7,707.39 11,428.20 9,000.00 7,707.39 - - - 11,428.20 9,000.00 7,707.39

- - - - - - - - - - - - - - - - 10,698.07 8,425.00 7,214.98 10,698.07 8,425.00 7,214.98 - - - 10,698.07 8,425.00 7,214.98

- - - - - - - - - - - - - - - - 8,545.75 6,730.00 5,763.42 8,545.75 6,730.00 5,763.42 - - - 8,545.75 6,730.00 5,763.42

- - - - - - - - - - - - - - - - 11,358.36 8,945.00 7,660.29 11,358.36 8,945.00 7,660.29 - - - 11,358.36 8,945.00 7,660.29

- - - - - - - - - - - - - - - - 5,936.32 4,675.00 4,003.56 5,936.32 4,675.00 4,003.56 - - - 5,936.32 4,675.00 4,003.56

- - - - - - - - - - - - - - - - 9,352.08 7,365.00 6,307.22 9,352.08 7,365.00 6,307.22 - - - 9,352.08 7,365.00 6,307.22

- - - - - - - - - - - - - - - - 6,685.50 5,265.00 4,508.82 6,685.50 5,265.00 4,508.82 - - - 6,685.50 5,265.00 4,508.82

- - - - - - - - - - - - - - - - 5,987.11 4,715.00 4,037.82 5,987.11 4,715.00 4,037.82 - - - 5,987.11 4,715.00 4,037.82

- - - - - - - - - - - - - - - - 5,726.80 4,510.00 3,862.26 5,726.80 4,510.00 3,862.26 - - - 5,726.80 4,510.00 3,862.26

- - - - - - - - - - - - - - - - 6,983.90 5,500.00 4,710.07 6,983.90 5,500.00 4,710.07 - - - 6,983.90 5,500.00 4,710.07

- - - - - - - - - - - - - - - - 9,085.42 7,155.00 6,127.38 9,085.42 7,155.00 6,127.38 - - - 9,085.42 7,155.00 6,127.38

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 8,336.24 6,565.00 5,622.12 8,336.24 6,565.00 5,622.12 - - - 8,336.24 6,565.00 5,622.12

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 9,790.16 7,710.00 6,602.67 9,790.16 7,710.00 6,602.67 - - - 9,790.16 7,710.00 6,602.67

- - - - - - - - - - - - - - - - 6,818.83 5,370.00 4,598.74 6,818.83 5,370.00 4,598.74 - - - 6,818.83 5,370.00 4,598.74

- - - - - - - - - - - - - - - - 12,291.66 9,680.00 8,289.73 12,291.66 9,680.00 8,289.73 - - - 12,291.66 9,680.00 8,289.73

- - - - - - - - - - - - - - - - 12,431.34 9,790.00 8,383.93 12,431.34 9,790.00 8,383.93 - - - 12,431.34 9,790.00 8,383.93

- - - - - - - - - - - - - - - - 6,101.39 4,805.00 4,114.89 6,101.39 4,805.00 4,114.89 - - - 6,101.39 4,805.00 4,114.89

- - - - - - - - - - - - - - - - 6,037.90 4,755.00 4,072.07 6,037.90 4,755.00 4,072.07 - - - 6,037.90 4,755.00 4,072.07

- - - - - - - - - - - - - - - - 9,117.16 7,180.00 6,148.79 9,117.16 7,180.00 6,148.79 - - - 9,117.16 7,180.00 6,148.79

EUR

Payments under

WA #19

Please update rates as per WA

Enter

EUR

Values

Payments under

WA #15

Please update rates as per WA

Enter

EUR

Values

Payments under

WA #16

Please update rates as per WA

Enter

EUR

Values

Payments under

WA #14

Please update rates as per WA

Enter

EUR

Values

Payments under

WA #17

Please update rates as per WA

Enter

EUR

Values

Payments under

WA #18

Please update rates as per WA

Enter

EUR

Values

Payments under

WA #13

Please update rates as per WA

Comments

Total

Requirement

XDR

Surplus

or

Deficit

XDR

Total

Requirement

USD

Estimate for Uncommitted Items

Please use current rates

Insert

Estimate

in this colmn. USD

Total

Requirement

EUR

Total Commitments To Date

XDR

Equivalent

Equivalent

XDR EUR

Amounts Unpaid To Date

Please use current rates

USD

Cumulative Amounts Paid To date

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 248 of 255 10/17/2012 1:05 AM

Page 249: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Financial Management

This is PP was updated on April 20, 2010

- - - - - - - - - - - - - - - - 9,460.01 7,450.00 6,380.01 9,460.01 7,450.00 6,380.01 - - - 9,460.01 7,450.00 6,380.01

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 8,926.69 7,030.00 6,020.33 8,926.69 7,030.00 6,020.33 - - - 8,926.69 7,030.00 6,020.33

- - - - - - - - - - - - - - - - 5,879.17 4,630.00 3,965.03 5,879.17 4,630.00 3,965.03 - - - 5,879.17 4,630.00 3,965.03

- - - - - - - - - - - - - - - - 7,225.16 5,690.00 4,872.79 7,225.16 5,690.00 4,872.79 - - - 7,225.16 5,690.00 4,872.79

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 8,742.57 6,885.00 5,896.16 8,742.57 6,885.00 5,896.16 - - - 8,742.57 6,885.00 5,896.16

- - - - - - - - - - - - - - - - 7,739.43 6,095.00 5,219.62 7,739.43 6,095.00 5,219.62 - - - 7,739.43 6,095.00 5,219.62

- - - - - - - - - - - - - - - - 7,631.50 6,010.00 5,146.83 7,631.50 6,010.00 5,146.83 - - - 7,631.50 6,010.00 5,146.83

- - - - - - - - - - - - - - - - 10,755.21 8,470.00 7,253.51 10,755.21 8,470.00 7,253.51 - - - 10,755.21 8,470.00 7,253.51

- - - - - - - - - - - - - - - - 9,009.23 7,095.00 6,075.99 9,009.23 7,095.00 6,075.99 - - - 9,009.23 7,095.00 6,075.99

- - - - - - - - - - - - - - - - 7,593.40 5,980.00 5,121.13 7,593.40 5,980.00 5,121.13 - - - 7,593.40 5,980.00 5,121.13

- - - - - - - - - - - - - - - - 6,964.85 5,485.00 4,697.23 6,964.85 5,485.00 4,697.23 - - - 6,964.85 5,485.00 4,697.23

- - - - - - - - - - - - - - - - 6,526.77 5,140.00 4,401.78 6,526.77 5,140.00 4,401.78 - - - 6,526.77 5,140.00 4,401.78

- - - - - - - - - - - - - - - - 6,901.36 5,435.00 4,654.41 6,901.36 5,435.00 4,654.41 - - - 6,901.36 5,435.00 4,654.41

- - - - - - - - - - - - - - - - 8,228.30 6,480.00 5,549.32 8,228.30 6,480.00 5,549.32 - - - 8,228.30 6,480.00 5,549.32

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 6,787.08 5,345.00 4,577.34 6,787.08 5,345.00 4,577.34 - - - 6,787.08 5,345.00 4,577.34

- - - - - - - - - - - - - 4,833.28 3,735.00 3,249.45 3,022.12 2,380.00 2,038.18 7,855.40 6,115.00 5,287.63 - - - 7,855.40 6,115.00 5,287.63

- - - - - - - - - - - - - 6,406.78 4,950.95 4,307.33 855.91 674.05 577.24 7,262.69 5,625.00 4,884.57 - - - 7,262.69 5,625.00 4,884.57

- - - - - - - - - - - - - - - - 9,675.88 7,620.00 6,525.59 9,675.88 7,620.00 6,525.59 - - - 9,675.88 7,620.00 6,525.59

- - - - - - - - - - - - - - - - 9,098.12 7,165.00 6,135.94 9,098.12 7,165.00 6,135.94 - - - 9,098.12 7,165.00 6,135.94

- - - - - - - - - - - - - - - - 7,733.08 6,090.00 5,215.34 7,733.08 6,090.00 5,215.34 - - - 7,733.08 6,090.00 5,215.34

- - - - - - - - - - - - - - - - 7,942.60 6,255.00 5,356.64 7,942.60 6,255.00 5,356.64 - - - 7,942.60 6,255.00 5,356.64

- - - - - - - - - - - - - - - - 9,333.03 7,350.00 6,294.37 9,333.03 7,350.00 6,294.37 - - - 9,333.03 7,350.00 6,294.37

- - - - - - - - - - - - - - - - 6,444.24 5,075.00 4,346.11 6,444.24 5,075.00 4,346.11 - - - 6,444.24 5,075.00 4,346.11

- - - - - - - - - - - - - - - - 8,323.54 6,555.00 5,613.55 8,323.54 6,555.00 5,613.55 - - - 8,323.54 6,555.00 5,613.55

- - - - - - - - - - - - - - - - 6,355.35 5,005.00 4,286.17 6,355.35 5,005.00 4,286.17 - - - 6,355.35 5,005.00 4,286.17

- - - - - - - - - - - - - - - - 8,361.63 6,585.00 5,639.24 8,361.63 6,585.00 5,639.24 - - - 8,361.63 6,585.00 5,639.24

- - - - - - - - - - - - - - - - 7,847.36 6,180.00 5,292.41 7,847.36 6,180.00 5,292.41 - - - 7,847.36 6,180.00 5,292.41

- - - - - - - - - - - - - - - - 10,317.13 8,125.00 6,958.06 10,317.13 8,125.00 6,958.06 - - - 10,317.13 8,125.00 6,958.06

210,650.03 79,580.43 61,497.18 53,502.55 - - - - - - - - - - 1,040,421.82 804,004.34 699,483.78 (1,010,048.87) (795,439.34) (681,195.96) 30,372.94 8,565.00 18,287.82 - - - 30,372.94 8,565.00 18,287.82

- - - - - - - - - - - - - - - - 6,488.68 5,110.00 4,376.09 6,488.68 5,110.00 4,376.09 - - - 6,488.68 5,110.00 4,376.09

- - - - - - - - - - - - - - - - 10,806.00 8,510.00 7,287.77 10,806.00 8,510.00 7,287.77 - - - 10,806.00 8,510.00 7,287.77

- - - - - - - - - - - - - - - - 9,517.15 7,495.00 6,418.55 9,517.15 7,495.00 6,418.55 - - - 9,517.15 7,495.00 6,418.55

- - - - - - - - - - - - - - - - 7,828.32 6,165.00 5,279.56 7,828.32 6,165.00 5,279.56 - - - 7,828.32 6,165.00 5,279.56

- - - - - - - - - - - - - - - - 9,237.80 7,275.00 6,230.14 9,237.80 7,275.00 6,230.14 - - - 9,237.80 7,275.00 6,230.14

- - - - - - - - - - - - - - - - 10,196.49 8,030.00 6,876.71 10,196.49 8,030.00 6,876.71 - - - 10,196.49 8,030.00 6,876.71

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 10,158.40 8,000.00 6,851.02 10,158.40 8,000.00 6,851.02 - - - 10,158.40 8,000.00 6,851.02

- - - - - - - - - - - - - - - - 11,993.26 9,445.00 8,088.48 11,993.26 9,445.00 8,088.48 - - - 11,993.26 9,445.00 8,088.48

- - - - - - - - - - - - - - - - 7,948.95 6,260.00 5,360.92 7,948.95 6,260.00 5,360.92 - - - 7,948.95 6,260.00 5,360.92

- - - - - - - - - - - - - - - - 7,682.29 6,050.00 5,181.08 7,682.29 6,050.00 5,181.08 - - - 7,682.29 6,050.00 5,181.08

- - - - - - - - - - - - - - - - 7,428.33 5,850.00 5,009.81 7,428.33 5,850.00 5,009.81 - - - 7,428.33 5,850.00 5,009.81

- - - - - - - - - - - - - - - - 6,996.60 5,510.00 4,718.64 6,996.60 5,510.00 4,718.64 - - - 6,996.60 5,510.00 4,718.64

- - - - - - - - - - - - - - - - 9,950.15 7,836.00 6,710.57 9,950.15 7,836.00 6,710.57 - - - 9,950.15 7,836.00 6,710.57

- - - - - - - - - - - - - - - - 7,250.56 5,710.00 4,889.91 7,250.56 5,710.00 4,889.91 - - - 7,250.56 5,710.00 4,889.91

- - - - - - - - - - - - - - - - 7,618.80 6,000.00 5,138.26 7,618.80 6,000.00 5,138.26 - - - 7,618.80 6,000.00 5,138.26

- - - - - - - - - - - - - - - - 9,967.93 7,850.00 6,722.56 9,967.93 7,850.00 6,722.56 - - - 9,967.93 7,850.00 6,722.56

- - - - - - - - - - - - - - - - 9,529.85 7,505.00 6,427.11 9,529.85 7,505.00 6,427.11 - - - 9,529.85 7,505.00 6,427.11

- - - - - - - - - - - - - - - - 9,009.23 7,095.00 6,075.99 9,009.23 7,095.00 6,075.99 - - - 9,009.23 7,095.00 6,075.99

- - - - - - - - - - - - - - - - 10,190.15 8,025.00 6,872.43 10,190.15 8,025.00 6,872.43 - - - 10,190.15 8,025.00 6,872.43

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 8,272.75 6,515.00 5,579.30 8,272.75 6,515.00 5,579.30 - - - 8,272.75 6,515.00 5,579.30

- - - - - - - - - - - - - - - - 9,999.68 7,875.00 6,743.97 9,999.68 7,875.00 6,743.97 - - - 9,999.68 7,875.00 6,743.97

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

- - - - - - - - - - - - - - - - 10,869.49 8,560.00 7,330.59 10,869.49 8,560.00 7,330.59 - - - 10,869.49 8,560.00 7,330.59

- - - - - - - - - - - - - - - - 9,840.95 7,750.00 6,636.92 9,840.95 7,750.00 6,636.92 - - - 9,840.95 7,750.00 6,636.92

- - - - - - - - - - - - - - - - 7,352.14 5,790.00 4,958.42 7,352.14 5,790.00 4,958.42 - - - 7,352.14 5,790.00 4,958.42

- - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77 - - - 12,698.00 10,000.00 8,563.77

210,650.03 79,580.43 61,497.18 53,502.55 - - - - - - - - - - - - - - - 1,068,124.79 828,604.06 718,108.70 110,441.74 86,975.70 74,483.99 1,178,566.53 912,388.00 792,592.69 - - - 1,178,566.53 912,388.00 792,592.69 -

- - - - - - - - - - - - - - - - 17,346.74 13,661.00 11,698.97 17,346.74 13,661.00 11,698.97 - - - 17,346.74 13,661.00 11,698.97

- - - - - - - - - - - - - - - - 10,932.98 8,610.00 7,373.41 10,932.98 8,610.00 7,373.41 - - - 10,932.98 8,610.00 7,373.41

- - - - - - - - - - - - - - - - 8,776.86 6,912.00 5,919.28 8,776.86 6,912.00 5,919.28 - - - 8,776.86 6,912.00 5,919.28

- - - - - - - - - - - - - - - - 17,904.18 14,100.00 12,074.92 17,904.18 14,100.00 12,074.92 - - - 17,904.18 14,100.00 12,074.92

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 13,721.46 10,806.00 9,254.01 13,721.46 10,806.00 9,254.01 - - - 13,721.46 10,806.00 9,254.01

- - - - - - - - - - - - - - - - 15,231.25 11,995.00 10,272.24 15,231.25 11,995.00 10,272.24 - - - 15,231.25 11,995.00 10,272.24

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 11,098.05 8,740.00 7,484.73 11,098.05 8,740.00 7,484.73 - - - 11,098.05 8,740.00 7,484.73

- - - - - - - - - - - - - - - - 9,702.54 7,641.00 6,543.58 9,702.54 7,641.00 6,543.58 - - - 9,702.54 7,641.00 6,543.58

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 17,204.52 13,549.00 11,603.05 17,204.52 13,549.00 11,603.05 - - - 17,204.52 13,549.00 11,603.05

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 17,631.17 13,885.00 11,890.79 17,631.17 13,885.00 11,890.79 - - - 17,631.17 13,885.00 11,890.79

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 12,253.57 9,650.00 8,264.04 12,253.57 9,650.00 8,264.04 - - - 12,253.57 9,650.00 8,264.04

- - - - - - - - - - - - - - - - 14,772.85 11,634.00 9,963.09 14,772.85 11,634.00 9,963.09 - - - 14,772.85 11,634.00 9,963.09

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

- - - - - - - - - - - - - - - - 16,395.66 12,912.00 11,057.54 16,395.66 12,912.00 11,057.54 - - - 16,395.66 12,912.00 11,057.54

- - - - - - - - - - - - - - - - 19,047.00 15,000.00 12,845.66 19,047.00 15,000.00 12,845.66 - - - 19,047.00 15,000.00 12,845.66

383,113.85 296,058.00 257,570.46

- - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - 383,113.85 296,058.00 257,570.46 - - - - - - - - - - - - - - - 392,488.83 309,095.00 264,701.85 392,488.83 309,095.00 264,701.85 - - - 392,488.83 309,095.00 264,701.85

239,217.68 205,564.23 158,853.39 138,202.45 467,012.89 424,548.86 313,976.44 - - - - - - - - - - - - 2,012,188.98 1,567,843.33 1,349,310.51 875,527.40 689,500.24 590,472.15 2,887,716.38 2,149,625.41 1,939,782.66 97,320.71 52,500.00 44,959.79 2,971,364.14 2,295,422.17 1,975,339.64 574,660.36

2,544.75 3,280.42 2,535.00 2,205.45 5,551.47 4,290.00 3,732.30 - - - - - - - - 78,327.24 59,836.01 52,320.48 14,852.84 11,696.99 10,017.03 93,180.08 71,533.00 62,337.52 - - 93,180.08 71,533.00 62,337.52 Contracted

- - - - - - - - - - - - - 51,173.66 36,805.04 33,343.62 1,126.34 (0.04) (0.03) 52,300.00 36,805.00 33,343.58 - - - 52,300.00 36,805.00 33,343.58 Completed

- - - - - - - - - - - - - 20,508.40 15,416.74 13,491.26 4,467.44 (0.74) (0.63) 24,975.84 15,416.00 13,490.63 - - 24,975.84 15,416.00 13,490.63 Completed

- - - - - - - - - - - - - - - - 32,733.76 - - 32,733.76 - - - - - 32,733.76 - - Contracted

16,450.02 - - 43,842.41 33,880.00 29,475.60 - - - - - - - - 75,158.42 58,080.00 50,529.60 (75,158.42) 34,270.00 29,348.04 - 92,350.00 79,877.64 - - - - 92,350.00 79,877.64 Contracted

12,311.11 - - 32,924.10 25,442.68 22,135.13 - - - - - - - - 51,235.81 39,593.38 34,446.24 (51,235.81) 8,236.62 7,053.65 - 47,830.00 41,499.89 - - - - 47,830.00 41,499.89 -

- - - 2,882.50 2,227.50 1,937.93 - - - - - - - - 2,882.50 2,227.50 1,937.93 (2,882.50) 3,772.50 3,230.68 - 6,000.00 5,168.61 - - - - 6,000.00 5,168.61 -

- - - 2,162.36 1,671.00 1,453.77 - - - - - - - - 2,162.36 1,671.00 1,453.77 (2,162.36) 4,329.00 3,707.26 - 6,000.00 5,161.03 - - - - 6,000.00 5,161.03 -

- - - 2,135.18 1,650.00 1,435.50 - - - - - - - - 2,135.18 1,650.00 1,435.50 (2,135.18) 4,350.00 3,725.24 - 6,000.00 5,160.74 - - - - 6,000.00 5,160.74 -

- - - 2,863.09 2,212.50 1,924.88 - - - - - - - - 2,863.09 2,212.50 1,924.88 (2,863.09) 3,787.50 3,243.53 - 6,000.00 5,168.40 - - - 6,000.00 5,168.40 -

- - - 3,396.88 2,625.00 2,283.75 - - - - - - - - 3,396.88 2,625.00 2,283.75 (3,396.88) 3,375.00 2,890.27 - 6,000.00 5,174.02 - - - 6,000.00 5,174.02 -

- - - 2,911.61 2,250.00 1,957.50 - - - - - - - - 2,911.61 2,250.00 1,957.50 (2,911.61) 3,750.00 3,211.41 - 6,000.00 5,168.91 - - - 6,000.00 5,168.91 -

- - - 2,935.88 2,268.75 1,973.81 - - - - - - - - 2,935.88 2,268.75 1,973.81 (2,935.88) 3,731.25 3,195.36 - 6,000.00 5,169.17 - - - 6,000.00 5,169.17 -

- - - 9,058.35 7,000.00 6,090.00 - - - - - - - - 9,058.35 7,000.00 6,090.00 (9,058.35) 1,000.00 856.38 - 8,000.00 6,946.38 - - - - 8,000.00 6,946.38 -

- - - - - - - - - - - - - 57,893.60 44,738.30 38,922.32 - - - 57,893.60 44,738.30 38,922.32 - - 57,893.60 44,738.30 38,922.32 Contracted

- - - - - - - - - - - - - 35,015.62 27,058.94 23,541.28 0.08 0.06 0.05 35,015.70 27,059.00 23,541.33 - - - 35,015.70 27,059.00 23,541.33 Contracted

- - - - - - - - - - - - - 53,309.67 41,195.99 35,840.51 0.01 0.01 0.01 53,309.68 41,196.00 35,840.52 - - - 53,309.68 41,196.00 35,840.52 Contracted

- - - - - - - - - - - - - - - - 55,426.77 43,650.00 37,380.86 55,426.77 43,650.00 37,380.86 63,490.00 50,000.00 42,818.85 118,916.77 93,650.00 80,199.71

- - - - - - - - - - - - - 67,031.79 51,800.00 45,066.00 - - - 67,031.79 51,800.00 45,066.00 - - - 67,031.79 51,800.00 45,066.00 Contracted

16,803.62 15,718.00 12,146.36 10,567.33 - - - - - - - - - - 49,265.32 38,070.65 33,121.47 19,147.76 15,079.35 12,913.61 68,413.08 53,150.00 46,035.07 - - - 68,413.08 53,150.00 46,035.07 Contracted

2,651.46 3,380.06 2,612.00 2,272.44 - - - - - - - - - - 7,323.87 5,659.65 4,923.90 5,701.85 4,490.35 3,845.43 13,025.72 10,150.00 8,769.33 - - - 13,025.72 10,150.00 8,769.33 not planned

- 4,309.19 3,330.00 2,897.10 3,231.24 2,497.00 2,172.39 - - - - - - - - 7,540.43 5,827.00 5,069.49 8,498.77 6,693.00 5,731.73 16,039.20 12,520.00 10,801.22 - - - 16,039.20 12,520.00 10,801.22 not planned

- - - - - - - - - - - - - - - - - - 36,570.24 28,800.00 24,663.66 36,570.24 28,800.00 24,663.66 - - - 36,570.24 28,800.00 24,663.66 not planned

- - - - - - - - - - - - - 30,487.82 23,560.00 20,497.20 - - - 30,487.82 23,560.00 20,497.20 - - 30,487.82 23,560.00 20,497.20 Contracted

5,564.52 8,276.74 6,396.00 5,564.52 - - - - - - - - - - 41,383.72 31,980.00 27,822.60 - - - 41,383.72 31,980.00 27,822.60 - - 41,383.72 31,980.00 27,822.60 Contracted

- - - - - - - - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77

2,436.00 2,614.89 2,020.70 1,758.01 2,717.51 2,100.00 1,827.00 - - - - - - - - 24,208.22 18,770.70 16,283.72 3,355.19 2,642.30 2,262.80 27,563.42 21,413.00 18,546.53 - - 27,563.42 21,413.00 18,546.53 Contracted

- - - - - - - - - - - - - 16,673.43 12,780.00 11,279.32 - - - 16,673.43 12,780.00 11,279.32 - - 16,673.43 12,780.00 11,279.32 Completed

- - - - - - - - - - - - - 17,589.98 13,000.00 11,643.46 - - - 17,589.98 13,000.00 11,643.46 - - 17,589.98 13,000.00 11,643.46 Completed

6,000.22 8,156.66 6,303.20 5,483.78 8,540.73 6,600.00 5,742.00 - - - - - - - - 92,132.68 70,235.20 61,458.71 15,945.89 12,557.80 10,754.21 108,078.57 82,793.00 72,212.93 - - 108,078.57 82,793.00 72,212.93 Contracted

- - - - - - - - - - - - - - - - - 16,761.36 13,200.00 11,304.18 16,761.36 13,200.00 11,304.18 - - 16,761.36 13,200.00 11,304.18

3,599.28 4,914.74 3,797.95 3,304.22 3,642.22 2,814.59 2,448.69 - - - - - - - - 73,121.31 55,459.12 48,695.47 1,678.52 1,321.88 1,132.03 74,799.83 56,781.00 49,827.50 - - 74,799.83 56,781.00 49,827.50 Contracted

- - - 1,026.83 793.50 690.35 - - - - - - - - 1,026.83 793.50 690.35 (0.63) (0.50) (0.43) 1,026.19 793.00 689.92 - - 1,026.19 793.00 689.92

- - - - - - - - - - - - - - - - 9,142.56 7,200.00 6,165.91 9,142.56 7,200.00 6,165.91 - - 9,142.56 7,200.00 6,165.91

- - - - - - - - - - - - - 20,129.92 14,375.00 13,051.29 (730.14) (575.00) (492.42) 19,399.78 13,800.00 12,558.87 - - 19,399.78 13,800.00 12,558.87 Completed

- - - - - - - - - - - - - 19,358.51 15,001.10 13,020.34 1,522.36 1,198.90 1,026.71 20,880.88 16,200.00 14,047.05 - - - 20,880.88 16,200.00 14,047.05 Contracted

2,853.64 3,907.97 3,019.95 2,627.36 4,076.26 3,150.00 2,740.50 - - - - - - - - 16,222.92 12,536.55 10,906.80 (1,252.72) (986.55) (844.86) 14,970.20 11,550.00 10,061.94 - - - 14,970.20 11,550.00 10,061.94 Contracted

- - - - - - - - - - - - - - - - 7,999.74 6,300.00 5,395.18 7,999.74 6,300.00 5,395.18 - - - 7,999.74 6,300.00 5,395.18

1,895.99 2,614.89 2,020.70 1,758.01 2,717.51 2,100.00 1,827.00 - - - - - - - - 30,351.75 23,370.70 20,355.44 100.70 79.30 67.91 30,452.45 23,450.00 20,423.35 - - 30,452.45 23,450.00 20,423.35 Contracted

- - - - - - - - - - - - - - - - 5,333.16 4,200.00 3,596.78 5,333.16 4,200.00 3,596.78 - - 5,333.16 4,200.00 3,596.78

- - - - - - - - - - - - - 54,699.23 39,466.73 35,634.86 (506.23) (0.95) (0.81) 54,193.00 39,465.78 35,634.05 - - 54,193.00 39,465.78 35,634.05 Contracted

- - - - - - - - - - - - - 33,988.22 26,265.00 22,850.55 5,885.52 4,635.00 3,969.31 39,873.75 30,900.00 26,819.86 - - 39,873.75 30,900.00 26,819.86 Contracted

- - - - - - - - - - - - - 3,493.94 2,700.00 2,349.00 - - - 3,493.94 2,700.00 2,349.00 - - - 3,493.94 2,700.00 2,349.00

- - - - - - - - - - - - - 2,199.89 1,700.00 1,479.00 2,158.66 1,700.00 1,455.84 4,358.55 3,400.00 2,934.84 - - - 4,358.55 3,400.00 2,934.84

- - - - - - - - - - - - - - - - 2,143.42 1,688.00 1,445.56 2,143.42 1,688.00 1,445.56 32,506.88 25,600.00 21,923.25 34,650.30 27,288.00 23,368.82

- - - - - - - - - - - - - - -

- - - - - - - - - - - - - 49,060.15 37,000.00 31,964.97 - - - 49,060.15 37,000.00 31,964.97 - - 49,060.15 37,000.00 31,964.97 Contracted

- - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - 8,644.25 6,680.00 5,811.60 - - - - - - - - 8,644.25 6,680.00 5,811.60 - - - 8,644.25 6,680.00 5,811.60 - - - 8,644.25 6,680.00 5,811.60

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 249 of 255 10/17/2012 1:05 AM

Page 250: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Financial Management

This is PP was updated on April 20, 2010

- - - - - - - - - - - - - 93,134.09 70,239.52 60,681.19 0.61 0.48 0.41 93,134.70 70,240.00 60,681.60 - - 93,134.70 70,240.00 60,681.60 Contracted

- - - - - - - - - - - - - - - - - - - - - - 25,396.00 20,000.00 17,127.54 25,396.00 20,000.00 17,127.54

- - - - - - - - - - - - - 42,660.95 32,967.00 28,681.29 - - - 42,660.95 32,967.00 28,681.29 - - 42,660.95 32,967.00 28,681.29 Contracted

- - - - - - - - - - - - - - - - 47,145.13 37,128.00 31,795.57 47,145.13 37,128.00 31,795.57 - - 47,145.13 37,128.00 31,795.57

- - - - - - - - - - - - - - - - 26,749.61 21,066.00 18,040.44 26,749.61 21,066.00 18,040.44 - - 26,749.61 21,066.00 18,040.44

- - - - - - - - - - - - - 36,155.76 27,940.00 24,307.80 - - - 36,155.76 27,940.00 24,307.80 - - 36,155.76 27,940.00 24,307.80 Contracted

- - - 53,107.81 41,040.00 35,704.80 - - - - - - - - 175,730.31 135,000.00 117,252.95 - - - 175,730.31 135,000.00 117,252.95 - - 175,730.31 135,000.00 117,252.95

- - - - - - - - - - - - - 11,581.75 8,950.00 7,786.50 - - - 11,581.75 8,950.00 7,786.50 - - - 11,581.75 8,950.00 7,786.50

- - - 11,452.34 8,850.00 7,699.50 - - - - - - - - 11,452.34 8,850.00 7,699.50 - - - 11,452.34 8,850.00 7,699.50 - - - 11,452.34 8,850.00 7,699.50

- - - - - - - - - - - - - 8,963.97 6,088.00 5,651.44 - - - 8,963.97 6,088.00 5,651.44 - - 8,963.97 6,088.00 5,651.44 Completed

- - - - - - - - - - - - - 24,457.12 16,610.38 15,419.27 - - - 24,457.12 16,610.38 15,419.27 - - 24,457.12 16,610.38 15,419.27 Contracted

- - - - - - - - - - - - - 4,556.89 3,521.42 3,063.64 - - - 4,556.89 3,521.42 3,063.64 - - 4,556.89 3,521.42 3,063.64 Contracted+C3.2

- - - - - - - - - - - - - 1,405.64 996.80 908.01 - - - 996.80 996.80

- - - - - - - - - - - - - - -

23,488.26 - - - - - - - - - - - - 34,936.76 26,998.00 23,488.26 - - - 34,936.76 26,998.00 23,488.26 - - - 34,936.76 26,998.00 23,488.26

- 2,285.47 1,766.14 1,536.54 - - - - - - - - - - 12,848.18 10,230.84 8,677.72 (2,242.64) (1,766.14) (1,512.48) 10,605.53 8,464.70 7,165.23 - - - 10,605.53 8,464.70 7,165.23

- - - - - - - - - - - - - - - - 866.00 682.00 584.05 866.00 682.00 584.05 2,943.40 2,318.00 1,985.08 3,809.40 3,000.00 2,569.13

- - - - - - - - - - - - - 2,544.01 1,727.80 1,603.90 - 2,544.01 1,727.80 1,603.90 - - - 1,727.80

- - - - - - - - - - - - - - - - 1,680.00 1,680.00 - 10,564.74 8,320.00 7,125.06 10,000.00

631.92 663.46 512.70 446.05 - - - - - - - - - - 1,603.39 1,239.05 1,077.97 (455.92) (359.05) (307.48) 1,147.47 880.00 770.49 3,961.78 3,120.00 2,671.90 5,109.25 4,000.00 3,442.39

- 476.08 367.90 320.07 - - - - - - - - - - 476.08 367.90 320.07 650.26 512.10 438.55 1,126.35 880.00 758.62 2,844.35 2,240.00 1,918.28 3,970.70 3,120.00 2,676.91

211.50 - - - - - - - - - - - - 12,513.24 9,669.83 8,412.75 (308.73) (243.13) (208.21) 12,204.52 9,426.70 8,204.54 - - 12,204.52 9,426.70 8,204.54

- - - - - - - - - - - - - - - - - - - - - - 12,698.00 10,000.00 8,563.77 12,698.00 10,000.00 8,563.77

6,024.23 31,871.98 25,100.00 21,495.06

3,160.97 - - - - - - - - - - - - 4,701.67 3,633.30 3,160.97 2,536.68 1,997.70 1,710.78 7,238.35 5,631.00 4,871.76 - - - 7,238.35 5,631.00 4,871.76

- - - - - - - - - - - - - - - - 10,133.00 7,980.00 6,833.89 10,133.00 7,980.00 6,833.89 - - 10,133.00 7,980.00 6,833.89

- - - - - - - - - - - - - 7,214.68 5,426.50 4,770.26 - - - 7,214.68 5,426.50 4,770.26 - - 7,214.68 5,426.50 4,770.26

404.00 312.20 271.61

- - - 567.31 438.40 381.41 - - - - - - - - 567.31 438.40 381.41 (556.68) (438.40) (375.44) 10.63 - 5.97 - - 10.63 - 5.97

- - - - - - - - - - - - - 4,281.96 3,220.89 2,839.42 0.14 0.11 0.09 4,282.10 3,221.00 2,839.52 - - - 4,282.10 3,221.00 2,839.52

- - - - - - - - - - - - - - - - - - - - - - 11,428.20 9,000.00 7,707.39 11,428.20 9,000.00 7,707.39

945.96 731.01 635.98 2,183.10 1,687.03 1,467.72 (664.14) (523.03) (447.91) 1,518.96 1,164.00 1,019.81 - - - 1,518.96 1,164.00 1,019.81

- - - - - - - - - - - - - - -

1,039.23 772.88 597.26 519.62 1,780.47 1,375.89 1,197.02 - - - - - - - - 15,425.05 11,734.56 10,286.25 (7,074.64) (5,571.46) (4,771.27) 8,350.41 6,163.10 5,514.98 - - - 8,350.41 6,163.10 5,514.98

- - - - - - - - - - - - - - - - - - - - - - 10,400.93 8,191.00 7,014.58 10,400.93 8,191.00 7,014.58

5,224.30 - - - - - - - - - - - - 56,487.66 43,212.43 37,813.75 (9,973.85) (7,854.66) (6,726.55) 46,513.81 35,357.77 31,087.20 - - - 46,513.81 35,357.77 31,087.20

- - - - - - - - - - - - - - - - - - - - - - 52,061.80 41,000.00 35,111.46 52,061.80 41,000.00 35,111.46

602.35 870.07 672.36 584.95 853.34 659.43 573.70 - - - - - - - - 11,760.38 8,960.85 7,846.62 (5,131.68) (4,041.33) (3,460.90) 6,628.70 4,919.52 4,385.72 - - - 6,628.70 4,919.52 4,385.72

- - - - - - - - - - - - - - - - - - - - - - 7,301.35 5,750.00 4,924.17 7,301.35 5,750.00 4,924.17

- - - - - - - - - - - - - 1,423.68 1,108.98 958.81 - - - 1,423.68 1,108.98 958.81 - - - 1,423.68 1,108.98 958.81

8.70 - - - - - - - - - - - - 499.08 385.67 335.53 (489.72) (385.67) (330.28) 9.35 - 5.25 5,714.10 4,500.00 3,853.70 5,723.45 4,500.00 3,858.95

- - 2,107.40 1,628.53 1,416.82 - - - 2,107.40 1,628.53 1,416.82 - - 2,107.40 1,628.53 1,416.82

- - 351.99 4,569.86 4,623.96 3,005.77 (446.96) (351.99) (301.44) 4,122.90 4,271.97 2,704.33 - - - 4,122.90 4,271.97 2,704.33

529.86 409.46 356.23 529.86 409.46 356.23 (519.93) (409.46) (350.65) 9.93 - 5.58 863.46 680.00 582.34 873.39 680.00 587.91

343.56 - - - - - - - - - - - - 3,534.19 2,728.06 2,378.09 (2,223.18) (1,750.81) (1,499.35) 1,311.01 977.25 878.74 - - - 1,311.01 977.25 878.74

451.35 - - - - - - - - - - - - 671.34 518.79 451.35 (658.76) (518.79) (444.28) 12.58 - 7.07 3,441.16 2,710.00 2,320.78 3,453.74 2,710.00 2,327.85

2,325.85 389.25 300.80 261.70 - - - - - - - - - - 9,783.94 8,028.25 6,578.33 (5,690.86) (4,481.70) (3,838.02) 4,093.08 3,546.55 2,740.30 - - - 4,093.08 3,546.55 2,740.30

- - - - - - - - - - - - - - - - - - - - - - 4,769.37 3,756.00 3,216.55 4,769.37 3,756.00 3,216.55

116,622.83 64,106.58 49,539.49 43,099.36 213,425.65 165,280.43 143,487.74 - - - - - - - - - - - - 1,717,664.07 1,310,802.25 1,144,547.54 144,966.89 278,521.80 237,080.95 1,861,225.33 1,589,324.05 1,380,720.48 294,955.49 232,285.00 198,923.53 2,111,200.09 1,796,509.05 1,549,419.99 (79,419.99)

- -

- -

-

- - - - - - - - - - - - - - - - 3,150,300.75 2,480,942.47 2,124,622.07 3,150,300.75 2,480,942.47 2,124,622.07 1,904,700.00 1,500,000.00 1,284,565.50 5,055,000.75 3,980,942.47 3,409,187.57

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - 155,982.23 122,840.00 105,197.35 155,982.23 122,840.00 105,197.35

- - - - - - - - - - - - - - - - - - - - - - 76,822.90 60,500.00 51,810.81 76,822.90 60,500.00 51,810.81

- - - - - - - - - - - - - 5,164.55 3,991.00 3,472.17 - - - 5,164.55 3,991.00 3,472.17 - - 5,164.55 3,991.00 3,472.17

- - - - - - - - - - - - - 9,683.65 7,483.21 6,510.39 - - - 9,683.65 7,483.21 6,510.39 - - 9,683.65 7,483.21 6,510.39

- - - - - - - - - - - - - - - - 2,869.75 2,260.00 1,935.41 2,869.75 2,260.00 1,935.41 2,869.75 2,260.00 1,935.41 5,739.50 4,520.00 3,870.82

- - - - - - - - - - - - - - - - 2,322.46 1,829.00 1,566.31 2,322.46 1,829.00 1,566.31 2,539.60 2,000.00 1,712.75 4,862.06 3,829.00 3,279.07

- - - - - - - - - - - - - -

- - - - - - - - - - - - - 175,828.12 129,580.00 115,505.77 - - - 175,828.12 129,580.00 115,505.77 - - 175,828.12 129,580.00 115,505.77 Completed

- - - - - - - - - - - - - 261,724.02 202,280.00 174,980.43 - - - 261,724.02 202,280.00 174,980.43 - - 261,724.02 202,280.00 174,980.43 Contracted

- - - 6,832.58 5,280.00 4,593.60 - - - - - - - - 36,481.48 27,936.01 24,379.00 (14,247.17) (11,220.01) (9,608.56) 22,234.31 16,716.00 14,770.44 - - 22,234.31 16,716.00 14,770.44 Contracted

- - - - - - - - - - - - - 1,098.11 835.80 730.88 (1,061.30) (835.80) (715.76) 36.81 - 15.12 - - 36.81 - 15.12

- - - - - - - - - - - - - 34,776.98 27,194.23 23,422.93 (0.29) (0.23) (0.20) 34,776.69 27,194.00 23,422.73 - - 34,776.69 27,194.00 23,422.73 Contracted

- - - - - - - - - - - - - - - - 48,049.23 37,840.00 32,405.31 48,049.23 37,840.00 32,405.31 - - 48,049.23 37,840.00 32,405.31 Contracted

- - - 46,659.56 36,057.00 31,369.59 - - - - - - - - 97,864.78 74,859.00 64,937.91 132,137.93 104,062.00 89,116.30 230,002.71 178,921.00 154,054.22 - - 230,002.71 178,921.00 154,054.22

- - - - - - - - - - - - - 75,751.72 60,322.30 51,163.33 12.32 9.70 8.31 75,764.04 60,332.00 51,171.64 - - 75,764.04 60,332.00 51,171.64 Completed

42,248.10 35,992.45 27,816.88 (0.57) (0.45) (0.39) 42,247.53 35,992.00 27,816.49 - - 42,247.53 35,992.00 27,816.49

- - - - - - - - - - - - - 13,665.17 10,560.00 9,187.20 7,542.61 5,940.00 5,086.88 21,207.78 16,500.00 14,274.08 - - - 21,207.78 16,500.00 14,274.08

6,507.60 - - - - - - - - - - - - 9,679.49 7,480.00 6,507.60 17,320.07 13,640.00 11,680.98 26,999.57 21,120.00 18,188.58 - - - 26,999.57 21,120.00 18,188.58

- - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - 30,671.29 22,564.00 20,088.88 - - - 30,671.29 22,564.00 20,088.88 - - 30,671.29 22,564.00 20,088.88

- - - - - - - - - - - - - 3,845.64 3,034.90 2,593.76 - - - 3,845.64 3,034.90 2,593.76 - - 3,845.64 3,034.90 2,593.76

- - - - - - - - - - - - - 2,058.06 1,590.40 1,383.65 - - - 2,058.06 1,590.40 1,383.65 - - 2,058.06 1,590.40 1,383.65

- - - - - - - - - - - - - 3,202.77 2,475.00 2,153.25 - - - 3,202.77 2,475.00 2,153.25 - - - 3,202.77 2,475.00 2,153.25 Under EME?

- - - - - - - - - - - - - 28,680.35 22,163.25 19,282.03 (12,633.56) (9,949.25) (8,520.31) 16,046.80 12,214.00 10,761.72 - - 16,046.80 12,214.00 10,761.72 Under EME?

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

(31,563.17) (31,630.00) (21,220.17)

6,507.60 - - - 53,492.14 41,337.00 35,963.19 - - - - - - - - - - - - 800,861.12 608,711.55 532,895.91 3,332,612.23 2,624,517.43 2,247,576.36 4,165,036.52 3,264,858.98 2,801,692.44 2,142,914.48 1,687,600.00 1,445,221.83 6,307,951.00 4,952,458.98 4,246,914.27 (2,846,914.27)

- - - - - - - - - - - - - 2,588.10 2,000.00 1,740.00 - - - 2,588.10 2,000.00 1,740.00 - - - 2,588.10 2,000.00 1,740.00

- - - - - - - - - - - - - - - -

- - - - - - - - - - - - - 72,743.63 54,327.94 47,417.98 (1.19) (0.94) (0.80) 72,742.44 54,327.00 47,417.18 - - - 72,742.44 54,327.00 47,417.18 Contracted

- - - - - - - - - - - - - - - - 29,129.21 22,940.00 19,645.29 29,129.21 22,940.00 19,645.29 38,094.00 30,000.00 25,691.31 67,223.21 52,940.00 45,336.60

- - - - - - - - - - - - - 3,105.72 2,400.00 2,088.00 - - - 3,105.72 2,400.00 2,088.00 - - 3,105.72 2,400.00 2,088.00 Completed

- - - - - - - - - - - - - 15,874.05 12,266.95 10,672.25 (12,275.09) (9,666.95) (8,278.55) 3,598.95 2,600.00 2,393.69 - - 3,598.95 2,600.00 2,393.69 Completed

- - - - - - - - - - - - - 64,548.81 51,898.87 43,662.31 12,274.05 9,666.13 8,277.85 76,822.86 61,565.00 51,940.16 - - 76,822.86 61,565.00 51,940.16 Contracted

- - - - - - - - - - - - - 14,942.88 12,164.01 10,127.40 (0.01) (0.01) (0.01) 12,164.00 12,164.00 Completed

- - - - - - - - - - - - - - -

- - - - - - - - - - - - - 2,431.13 1,878.70 1,634.47 (246.34) (194.00) (166.14) 2,184.79 1,684.70 1,468.33 - - 2,184.79 1,684.70 1,468.33

- - - - - - - - - - - - - - - - - - - - - - 6,349.00 5,000.00 4,281.89 6,349.00 5,000.00 4,281.89

- - - - - - - - - - - - - 1,772.72 1,369.90 1,191.81 - - - 1,772.72 1,369.90 1,191.81 - - - 1,772.72 1,369.90 1,191.81

- - - - - - - - - - - - - - - - - - - - - - 2,539.60 2,000.00 1,712.75 2,539.60 2,000.00 1,712.75

- - - - - - - - - - - - - - - - - - - 178,007.03 138,306.37 118,534.22 28,880.62 22,744.23 19,477.64 191,944.79 161,050.60 127,884.47 46,982.60 37,000.00 31,685.95 238,927.39 198,050.60 159,570.42 180,429.58

- - - - - - - - - - - - - 640,000.00

362,348.11 269,670.81 208,392.88 181,301.81 733,930.68 631,166.29 493,427.37 - - - - - - - - - - - - 4,708,721.20 3,625,663.50 3,145,288.18 4,381,987.15 3,615,283.70 3,094,607.10 9,105,923.02 7,164,859.04 6,250,080.05 2,582,173.28 2,009,385.00 1,720,791.10 11,629,442.62 9,242,440.80 7,931,244.32 (1,531,244.32)

Exchange Rates used: 1 XDR = 1.58914 USD

Appraisal 1 EUR = 1.468148 USD USD XDR

1 USD = 0.6292711 XDR 10,000,000 6,292,711

1 EUR = 0.9272653 XDR According to Dec 14 2007 Archives

Current as of: 1 XDR = 1.46926 USD

18-May-10 1 EUR = 1.3315 USD USD XDR

1 USD = 0.6622516 XDR 10,000,000 6,622,516

1 EUR = 0.8443022 XDR

This is the figure obtained in XDR if the rate of 0.6292711 is used. However, the XDR

Grant was 6,400,000

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 250 of 255 10/17/2012 1:05 AM

Page 251: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Allocations XDR EUR USD

This is PP was updated on April 20, 2010

1COMPONENT 1. STRENGTHENING ORGANIZATION &

FINANCING OF EDUCATION SYSTEM2,310,000 1,975,340 334,660 2,500,370 2,295,422 204,948 3,670,913 2,971,364 699,549

2

COMPONENT 2. BUILDING INSTITUTIONS &

MANAGEMENT CAPACITY IN PRIMARY & SECONDARY

EDUCATION

1,382,000 1,549,420 -167,420 1,495,892 1,796,509 -300,617 2,196,191 2,111,200 84,991

3COMPONENT 3. CREATING CONDITION TO INTRODUCE

EFFICIENT DESIGNS IN KOSOVO'S SCHOOLS2,258,000 4,246,914 -1,988,914 2,444,085 4,952,459 -2,508,374 3,588,278 6,307,951 -2,719,673

4COMPONENT 4. FINANCING MECHANISMS FOR HIGHER

EDUCATION156,000 159,570 -3,570 168,856 198,051 -29,194 247,906 238,927 8,978

5 UNALLOCATED 294,000 0 294,000 318,229 0 318,229 467,207 0 467,207

TOTALS 6,400,000 7,931,244 -1,531,244 6,927,432 9,242,441 -2,315,008 10,170,496 11,629,443 -1,458,947

Exchange Rates used: 1 XDR = 1.58914 USD

Appraisal 1 EUR = 1.468148 USD USD XDR

1 USD = 0.6292711 XDR 10,000,000 6,292,711

1 EUR = 0.9272653 XDR According to Dec 14 2007 Archives

Current as of: 1 XDR = 1.46926 USD

18-May-10 1 EUR = 1.3315 USD USD XDR

1 USD = 0.6622516 XDR 10,000,000 6,622,516

1 EUR = 0.8443022 XDR

This is the figure obtained in XDR if the rated of 0.6292711

is used. However, the XDR Grant was 6,400,000

Cat Revised

Require-

ments

Diff.

Plus or

Minus

XDR EUR USD

Amounts

Allocated

Revised

Require-

ments

Description Diff.

Plus or

Minus

Diff.

Plus or

Minus

Amounts

Allocated

Revised

Require-

ments

Amounts

Allocated

Filename: 732500PROP0P1000PP0August010002012.xlsx Page 251 of 255 10/17/2012 1:05 AM

Page 252: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Allocations XDR (+ or -)

Sl #

Category

Current

Allocation

s

XDR

Amounts

Disbursed

XDR

April 30 2010

% Disb.

/Curr.

Alloc.

Revised

Requirements

XDR

Surplus/

Deficit

XDR

Remarks

A B C D E F G H

1 Component 1 2,550,000 156,720 6% 1,975,340 574,660

2 Component 2 1,470,000 211,839 14% 1,549,420 (79,420)

3 Component 3 1,400,000 152,698 11% 4,246,914 (2,846,914)

4 Component 4 340,000 20,304 6% 159,570 180,430

5 Unallocated 640,000 640,000

Total Expenditures 6,400,000 541,560 8% 7,931,244 (1,531,244)

Notes:

Red text are formulae, please do not override

Filename: 732500PROP0P1000PP0August010002012.xlsx

Page 253: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

KOSOVO

Institutional Development for Education Project (IDEP)

Procurement Plan - Procurement Steps

Selection Methods for Consulting Services

Selection Methods

QCBS CQS IC

1 Preparation of TOR l l l Depending on complexity 1-2 weeks

2 WB "No Objection" l l l Within 2 weeks

3 EOI/Advertizing l l l 1-2 weeks

4 Submission of EOI l l l Normally within a week

5 Evaluation of EOI l l l 1-2 weeks

6 WB "No Objection" l Within 2 weeks

7 Preparation of RFP l Depending on complexity 1-2 weeks

8 WB "No Objection" l Within 2 weeks

9 Issue of RFP/Invitation l l Depending on WB comments 1-2 weeks

10 Submission of Proposals l l Depending on complexity 1-4 weeks

11 Technical Evaluation l Depending on complexity 1-2 weeks

12 WB "No Objection" l Within 2 weeks

13 Open. and Eval. Fin. Proposals l 1-2 weeks

14 Invitation to Negotiate Contract l l l 1-2 weeks

15 Negotiations/Draft Contract l l l 1-2 weeks

16 WB "No Objection" l l l Within 2 weeks

17 Contract Signing l l l 1 week

18 Start of Assignment l l l Within a week of signing

19 Completion of Assignment l l l As per TOR of the assignment

Note:

Procurement Plan has used the same steps

Procurement Methods for Goods and Works

Selection Methods

ICB NCB Shop-

ping

1 Preparation of Documents l l l Depending on complexity 3-5 months

2 WB "No Objection" l l l Within 2 weeks

3 Advertizing l l 2 weeks but could be more

4 Issue of Documents l l l Within a week

5 Submission of Bids l l l Depending on complexity 1-4 or 6 weeks

6 Evaluation of Bids l l l Within 2 weeks (but could be less)

7 WB "No Objection" l l l Within 2 weeks

8 Contract Award l l l Within 2 weeks (but could be less)

9 Contract Signing l l l 1 week

10 Start l l l Depending on complexity 1-2 weeks

11 Completion l l lDepending on complexity 90 days for goods

9-15 months for works

Note:

Procurement Plan has used the same steps

Step Description Estimated Timing

Step Description Estimated Timing

Page 254: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

Works 3.1

1 Design and Layout of the Guideline on School Facilities Design- Norms and Standards

2 Printing of the Guideline on School Facilities Design- Norms and Standards

CONSULTNATS

1 Roslaind Levacic 5,440.00 Eu

2 Pakize Isufaj 10,350.00 eu

3 Vjollca Selimi 8,469.00 Eu

4 Besim Kokollari 10,800.00 Eu

5 Nicol Saginor 43,950.00 Eu

TRAINING

2.3 Test Item development 900.00 Eu

2.3 Workshop for Assessment unit 1,144.00 Eu

2.3 Training for Matura test Administrators 25,700.00 Eu pako e re

GRANTS

Te gjitha shkollat e rundit te III (38 fillore dhe 4 te mesme)

Page 255: World Bank Document - Documents & Reports · publication of test models ... 41 R/A Abellardo 37,128 13-Apr-12 27-Apr-12 30-Apr-12 42 P C2.3/GD-SH/12-02 2.3 Hardware Support for Item

1000

2000