world’s jewish museumworldsjewishmuseum.com/wp-content/uploads/2017/11/... · the mission of the...

79
WORLD’S JEWISH MUSEUM

Upload: others

Post on 27-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

  • WORLD’S JEWISH MUSEUM

  • I grew up as a child in the 30’s in Canada and it was just the beginning of the founding of the State of Israel. It was a major topic of discussion, and a positive beacon of hope for our families. At that time in Canada, we were experiencing a lot of anti-Semitism. We were all looking for a place of freedom and safety, and the talk of the creation of the State of Israel was an exciting story. So it gives me a great sense of pride that today I can share with you my Concept Design for the World’s Jewish Museum in this country and Tel Aviv in particular. If you look around at the skyline of Tel Aviv and what’s been built in just the last 10 – 15 years, and what is continuing to be built, it’s staggering. And, there is a need for the kind of museum that’s being proposed here, and by nature, it can’t be static – it’s going to have to be continually moving, changing, growing, within its space and adapting. The site has got a lot of potential; being at the mouth of the river signifies a story, that this is a meeting between the international; the sea, the world – and this community, which is the river. And they meet at this point where we’re going to build this museum. It’s a symbolic confluence and we are fortunate to have this site. I think it is a miracle!

    There’s so much history that we have to talk about, and it keeps going on. I think that the important thing is to get the world to understand the Jewish community. The Jewish community should be proud of its contributions and of its relationships, and the rest of the world should understand that we are partners. I think the most important thing architecture can do is to set the stage for the life of the building, to create an emotional and positive response and make it a place where people feel comfortable and elevated. There’s more to it – that there’s a lot of feeling in the architecture that comes from our hearts. And we’re going to portray that in this building that you see unfold in this book here.

    Frank Gehry

    FRANK GEHRY ON THE WORLD’S JEWISH MUSEUM CONCEPT DESIGN

  • DATE: July 2016LOCATION: WJM Museum Site, Tel Aviv, IsraelLEFT TO RIGHT: Frank Gehry, Architect, Gehry Partners LLP Gail Asper, Director & Volunteer, World’s Jewish Museum Moe Levy, Director & Volunteer, World’s Jewish Museum

    DATE: July 2016LOCATION: Mayor of Tel Aviv’s Office, Tel Aviv, IsraelLEFT TO RIGHT: Frank Gehry, Architect, Gehry Partners LLP Mayor Ron Huldai, Mayor of Tel Aviv, Israel

  • ARCHITECT: Gehry Partners, LLPFrank Gehry David NamGavin LangleyMeaghan Lloyd

    PROJECT TEAM: Liron Elkan Elizabeth LorenzDanielle DuryeaNicholas TedescoSimon Alvarez Igor KitsenSam Gehry Jack GaumerJarod Poenisch

    - Design Partner- Project Designer- Project Architect / Manager- Chief of Staff

    DATE: September 2016LOCATION: Gehry Partners LLP Office, Los Angeles, CALEFT TO RIGHT: David Nam, Partner, Gehry Partners LLP Moe Levy, Director & Volunteer, World’s Jewish Museum Frank Gehry, Architect, Gehry Partners LLP

    DATE: February 2017LOCATION: Gehry Partners LLP Office, Los Angeles, CALEFT TO RIGHT: David Nam, Partner, Gehry Partners LLP Frank Gehry, Architect, Gehry Partners LLP

  • PROJECT SUMMARY.......................................................

    PROGRAM......................................................................

    SITE................................................................................

    SKETCHES .....................................................................

    MODEL PHOTOS AND RENDERINGS ...............................

    DRAWINGS ....................................................................

    PROCESS.......................................................................

    9

    11

    13

    21

    29

    45

    67

    TABLE OF CONTENTSTABLE OF CONTENTS

  • PROJECT SUMMARY

  • PAGE 9PROJECT SUMMARY

    The mission of the World’s Jewish Museum is to create a world-scale museum, cultural and entertainment centre by 2023, the 75th anniversary of Israel’s independence. One that will attest to the significance of outstanding Jewish values and how they have inspired contributions that have shaped the path of humankind. This institution will surpass the traditional role of a museum, operating extended hours and become a significant cultural hub for Tel Aviv, Israel and the world.

    THE EXPERIENCE

    The objective is to create a distinctive experience unlike any other. The museum’s exhibit design will be developed by world renowned Ralph Appelbaum & Associates. By blending the museum’s unique content to iconic architecture, it will become a leading global institution for education and dialogue. It would borrow from the rich inventory of artifacts available in the country but also bridge to future technologies of virtual reality and artificial intelligence. The three pillars of the project will be 1) the museum and cultural experience; 2) education and outreach focused both in Israel and the Diaspora and; 3) research using its international platform to disseminate information (through satellite facilities) to communities throughout the world.

    AN UNPARALLELED SITE

    Tel Aviv is one of the leading cities of the world with three million people living in its greater metropolitan area.

    FOR FURTHER INFORMATION OR TO DONATE CONTACT:

    Moses (Moe) Levy, Director & Volunteer Tower Building, 16th FloorTechnology Park, MalhaPO Box 2319Jerusalem, Israel

    Working with the Tel Aviv-Yafo Foundation, The Asper Foundation has identified a prime site for the museum. In August 2015, the City of Tel Aviv unanimously (16-0) approved the conditional donation of land of approximately 22 dunams (5.5 acres). With easy vehicular access from Sderot Rokah and Ibn Gabirol, the site is at the northwestern edge of Hayarkon Park, with easy walking distance of the popular Tel Aviv Port and boardwalk. Work is now underway with city engineers and planners to obtain all necessary access, infrastructure, and building permissions.

    THE ARCHITECTURE

    Frank Gehry, widely recognized as the greatest modern architect of our time, has been commissioned for the project. His architecture has given rise to the term ‘The Bilbao Effect’, whereby an iconic architectural statement has a significant impact on tourism and economic development. That is, ‘if you build it, they will come’. His design will ‘bring the outside in’ to create an unmistakable and beautiful new symbol of the Jewish people.

    An international fundraising campaign is currently underway with interest expressed by donors globally.

    Email: [email protected]: 204-290-6257 (Canada)Office: 204-989-5538 (Canada)

  • PROGRAM

  • CATEGORY SUB CATEGORY DEPARTMENT / ROOM NAME GP PROGRAM (NSM) % TOTAL INDOOR AREA

    SUMMARY OF AREAS

    1.00 PUBLIC AMENITIES 2,577 21.3%

    1.10 RECEPTION 7101.20 RESTROOMS 3431.30 RETAIL AND FOOD SERVICE 8931.40 EDUCATION 631

    2.00 THEATERS 917 7.6%2.10 INTRO THEATER 2472.20 MAIN AUDITORIUM 670

    3.00 GALLERIES 5,692 47.1%3.10 GALLERIES 5,692

    4.00 BACK OF HOUSE COLLECTIONS 695 5.7%4.10 COLLECTIONS ART STORAGE 4014.20 COLLECTIONS NON ART STORAGE 1364.30 COLLECTIONS WORKSHOPS 158

    5.00 BACK OF HOUSE OPERATIONS 1,917 15.9%5.10 STAFF 6815.20 5.30 STAFF SUPPORT 1555.40 FOOD SERVICE 1585.50 5.60 EXHIBIT SUPPORT 2255.70 IT 1025.80 5.90 SECURITY 1296.00 OPERATIONS OTHER 467

    6.50 ADDED PROGRAM 294 2.4%6.50 COMMERICAL 294

    TOTAL NET AREA 12,092 100%

    GROSSING FACTOR ASSUMPTION 1.6

    TARGET7.00 MECHANICAL 3,023 0.25

    8.00 CIRCULATION 2,418 0.20

    9.00 GROSS AREAS (WALLS, STRUCTURE, SHAFTS ETC) 1,814 0.15

    TOTAL GROSS AREA 18,983

    10.00 OUTDOOR AREAS 2,300

    20.00 PARKING 11,000

    PAGE 11PROGRAM

  • SITE

  • OR YEHUDA

    AZOR

    HOLONBAT YAM

    YEHUD

    QIRYAT ONO

    RAMAT GAN

    PETA TIKVABENE BERAQ

    TEL AVIV - YAFO

    SITE

    BEN GURION AIRPORT

    PAGE 13SITE

  • SITE

    PAGE 14 SITE

  • SITE

    PAGE 15SITE

  • PAGE 16 SITE

    SITE

  • SITE

    PAGE 17SITE

  • 1

    2

    3

    4

    SCALE 1:1000

    PAGE 18 SITE

    SITE

  • PAGE 19SITE

    1

    2

    3

    4

  • SKETCHES

  • PAGE 21SKETCHES

  • SKETCHESPAGE 22

  • PAGE 23SKETCHES

  • SKETCHESPAGE 24

  • PAGE 25SKETCHES

  • SKETCHESPAGE 26

  • PAGE 27SKETCHES

  • MODEL PHOTOSFINAL CONCEPT DESIGNSCHEME 25

  • PAGE 29MODEL PHOTOS

  • MODEL PHOTOSPAGE 30

  • PAGE 31MODEL PHOTOS

  • MODEL PHOTOSPAGE 32

  • PAGE 33MODEL PHOTOS

  • MODEL PHOTOSPAGE 34

  • PAGE 35MODEL PHOTOS

  • MODEL PHOTOSPAGE 36

  • PAGE 37MODEL PHOTOS

  • MODEL PHOTOSPAGE 38

  • RENDERINGS

  • RENDERINGSPAGE 40

  • PAGE 41RENDERINGS

  • RENDERINGSPAGE 42

  • PAGE 43RENDERINGS

  • DRAWINGS

  • PAGE 45DRAWINGS

    SITE PLAN

  • LEVEL B1 +3.505M FLOOR TO FLOOR

    GROSS AREA = 221 GSM

    SP

    P

    P

    P

    P

    AUDITORIUMLOBBY30 NSM

    ADMINLOBBY11 NSM

    PARKINGLEVEL B1

    334 SPACES

    TO GENESISGARDEN

    BUILDING 1115 GSM

    BUILDING 495 GSM

    BUILDING 311 GSM

    GROSS AREA = 9224 GSM INCLUDING PARKING

    WITHOUT PARKING

    UNEXCAVATED

    UNEXCAVATED

    UNEXCAVATED

    RAMP UP

    CONNECTION TOFUTURE PARKING

    TO THE NORTHCONNECTION TOFUTURE PARKING

    TO THE NORTH

    EXIT TO STREET

    MECHANICAL23 NSM

    MECHANICAL23 NSM

    MECHANICAL23 NSM LEVEL B1

    DRAWINGSPAGE 46

    LEVEL B1

  • PRO

    PERTY LIN

    E

    SETBACK LIN

    EBUILDING 4411 GSM

    BUILDING 1543 GSM

    BUILDING 31540 GSM

    LEVEL 0 +0.005M FLOOR TO FLOOR

    GROSS AREA = 2828 GSM

    PARKING103 SPACES

    LOBBY49 NSM

    TO GENESISGARDEN

    DROPOFF

    FILL

    FILL

    FILLFILL

    GROSS AREA = 7044 GSM INCLUDING PARKING

    WITHOUT PARKING

    MECHANICAL76 NSM

    2.22AUDITORIUM

    SUPPORT125 NSM

    P

    P

    P

    P

    ART

    SERV

    S

    P

    P

    P

    P

    S P

    SCHOOLSDROPOFF

    BUILDING ABOVE

    RAMP DOWN

    LOADINGAREA

    6.01 BLDG.

    MAINTENANCEAREA

    52 NSM

    6.02GROUNDSSTORAGE

    72 NSM

    6.03 BLDG.MAINTENANCE

    STORAGE122 NSM

    5.26OPERATIONSBREAK ROOM

    & KITCHEN24 NSM

    5.72IT OFFICE

    15 NSM

    5.71IT OFFICEMANAGER

    16 NSM

    5.73IT

    WORKSHOP19 NSM

    5.77IT

    EQUIPMENTSTORAGE

    25 NSM

    5.74INFO.

    SERVERROOM15 NSM

    5.90SECURITY BREAKROOM / KITCHEN

    29 NSM

    6.04GARBAGE &RECYCLING

    AREA21 NSM

    MECH26 NSM

    6.09 SERVICESHIPPING AND

    RECEIVINGSECURE ROOM

    31 NSM

    4.25COLLECTION

    PACKING& UNPACKING

    56 NSM

    4.21CRATE

    STORAGE32 NSM

    4.14COLLECTIONS

    SHIPPING &RECEIVING

    39 NSM

    4.12COLLECTIONS

    IN TRANSIT45 NSM

    4.16COLLECTIONSPROCESSING

    31 NSM

    4.13ISOLATION

    AREA16 NSM

    5.855.84

    5.30BOH

    CORRIDOR201 NSM

    5.87

    4.24

    4.23

    4.27

    5.31

    BOH ARTCORRIDOR

    106 NSM

    ADMIN.ELEVATOR

    LOBBY11 NSM

    1.31-1.32MUSEUM RETAIL

    191 NSM

    COMMERCIAL188 NSM

    1.13SCHOOLS & GROUPS

    ENTRANCE & SECURITY1.14

    SCHOOLS ASSEMBLY103 NSM

    SCHOOLS & GROUPSENTRANCE

    COMMERCIAL106 NSM

    1.24FIRST AID

    OFFICE9 NSM

    1.25CHILDREN'SASSEMBLYRESTROOM

    21 NSM

    1.15SCHOOLSSTORAGE

    19 NSM

    BUILDING 2334 GSM

    BOHELEVATOR

    LOBBY27 NSM

    MECH.13 NSM

    5.76

    ART LOADING

    OPEN

    WC26 NSM

    5.27 & 5.28

    5.86SECURITY

    MEETING RM.14 NSM

    5.83CCTV

    MONITORINGROOM22 NSM

    5.75

    5.92

    5.91

    5.88

    5.81

    5.82

    RESTAURANT /EVENT

    ELEVATORLOBBY49 NSM

    MECH.8 NSM

    STAGE

    EXIT

    6.08 SERVICESHIPPING AND

    RECEIVING AREA84 NSM

    BUILDING ABOVE

    NON-ARTLOADING63 NSM

    LEVEL 0

    PAGE 47DRAWINGS

    LEVEL 0

  • S

    P

    P

    P

    P

    P

    ART

    SERV

    P

    P

    P

    P

    S

    BUILDING 4767 GSM

    BUILDING 2360 GSM

    BUILDING 32945 GSM

    LEVEL 1 +5.005M FLOOR TO

    FLOORGROSS AREA = 5097 GSM

    BUILDING 1551 GSM

    1.11-1.12 &1.16LOBBY &

    TICKETING552 NSM

    CIRCULATION63 NSM

    EDUCATIONADMINISTRATION

    ENTRY

    BOHCIRCULATION

    184 NSM

    MUSEUMENTRY

    3.19CHILDREN'S

    GALLERY225 NSM

    H:7M

    1.14SCHOOLSASSEMBLY

    36 NSM

    4.15EXHIBITSTAGING26 NSM

    3.11TEMPORARY

    GALLERY565 NSM

    H:7M

    2.11INTRO THEATER

    247 NSMH: 7M

    3.13LAND OF ISRAEL

    GALLERY558 NSM

    H:7M

    4.11COLLECTIONS

    STORAGE244 NSM

    H:7M

    STAIRS ANDELEVATORS

    FROMPARKING

    SLOPINGLANDSCAPE

    OUTDOORSEATING AREA

    OPERABLEWALL

    2.21LARGE

    AUDITORIUM383 NSM

    STAGE

    WC21 NSM

    LOBBY157 NSM

    MUSEUMENTRY

    5.54TECH WORKSHOP

    11 NSM

    5.55TECH STORAGE

    11 NSM

    5.59EXHIBIT SUPPORT

    STORAGE29 NSM

    5.60EXHIBITSCONTROL

    ROOM19 NSM

    5.61MICRO-

    CLIMATECONTROL

    ROOM23 NSM

    5.24

    5.41CAFE

    PANTRY18 NSM

    1.34 CAFE

    136 NSM

    CIRCULATION70 NSM

    1.32MUSEUMRETAIL

    165 NSM

    OPEN TOCOMMERCIAL

    BELOW SCHOOLS DROPOFF

    OPEN TORETAILBELOW

    5.22 STAFF BREAK

    ROOM/ KITCHEN23 NSM

    5.23STAFF

    WC10 NSM

    MECH36 NSM

    ATRIUM474 GSM

    OPEN TOBELOW

    SLOPINGLANDSCAPE

    SLOPINGLANDSCAPE

    SLOPINGLANDSCAPE

    SLOPINGLANDSCAPE

    312 SEATS

    4.31PHOTO /

    DIGITIZATIONSTUDIO56 NSM

    5.52CARPENTRYWORKSHOP

    54 NSM

    4.34MOUNT-MAKINGSHOP

    19 NSM

    5.57

    5.58 5.56SUPPLIES

    STOR.11 NSM

    4.32WEB OFFICE

    23 NSM

    4.33COLLECTIONS

    RESEARCHOFFICE30 NSM

    4.35CLEAN EXHIBIT

    PREP ROOM30 NSM

    4.26

    MECH.64 NSM

    1.21WOMEN WC

    13 NSM

    1.22MEN'S WC

    13 NSM

    SKYLIGHT ABOVE

    1.21WOMEN

    WC13 NSM

    1.22MEN'S WC

    14 NSM

    1.46VOLUNTEER

    AREAS58 NSM

    LEVEL 1

    DRAWINGSPAGE 48

    LEVEL 1

  • LEVEL 1M +11.006M FLOOR TO FLOOR

    GROSS AREA = 729 GSM

    BUILDING 1729 GSM

    P

    P

    CIRCULATION45 NSM

    1.45CLASSROOMS

    161 NSM

    1.42MUSIC

    PERFORMANCEREHEARSAL

    103 NSM

    1.44ADULT LIBRARYAND READING

    ROOM148 NSM

    1.43CHILDREN'S

    LIBRARY101 NSM

    5.21STAFF

    INFIRMARYOFFICE28 NSM

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TOBELOW

    OPEN TOBELOW

    1.21WOMEN WC

    15 NSM

    1.22MEN'S WC

    14 NSM

    LEVEL 1M

    PAGE 49DRAWINGS

    LEVEL 1M

  • CIRCULATION295 NSM

    BUILDING 4113 GSM

    BUILDING 1342 GSM

    BUILDING 32318 GSM

    LEVEL 2 +14.00 (MUSEUM) +17.00 (ADMIN)

    9M FLOOR TO FLOOR (MAIN BLDG)5M FLOOR TO FLOOR (ADMIN)

    GROSS AREA = 3335 GSM

    3.14PHILOSOPHY

    GALLERY558 NSM

    H:6M

    3.16SCIENCEGALLERY504 NSM

    H:6M

    3.15CREATIVITY

    GALLERY880 NSM

    H:6M

    P

    P

    P

    P

    ART

    SERV

    P

    P

    BOH CIRC.33 NSM

    BUILDING 2430 GSM

    AUDITORIUMSUPPORT

    71 GSM

    5.10-5.11EDUCATION OFFICES& SUPPORT SPACES

    5.25EDUCATION STAFF

    BREAK ROOM5.53

    GRAPHIC DESIGN/WEB STUDIO

    5.51EDUCATION PREP

    ROOM236 NSM

    TERRACE375 SM

    ELEVATORLOBBY12 NSM

    OPEN TOBELOWOPEN TO BELOW

    ATRIUM133 GSM

    MECH32 NSM

    OPEN TO BELOW

    H:11.5M

    TERRACE252 NSM

    SKYLIGHT

    1.21WOMEN WC

    15 NSM

    1.22MEN'S WC

    14 NSM

    1.21WOMEN WC

    19 NSM

    1.22MEN'S WC

    19 NSM

    OPEN TO BELOW

    LEVEL 2

    DRAWINGSPAGE 50

    LEVEL 2

  • CIRCULATION119 NSM

    OPEN TOBELOW

    LEVEL 3 +22.008M FLOOR TO FLOOR (MAIN BLDG)

    5M FLOOR TO FLOOR (ADMIN)GROSS AREA = 2473 GSM

    3.17ENTERPRISE

    GALLERY538 NSM

    H:6M

    3.16SCIENCEGALLERY396 NSM

    H:6M

    BUILDING 2336 GSM

    BUILDING 31775 GSM

    BOH CIRC.35 NSM

    BUILDING 1362 GSM

    5.09, 5.12-5.19, 5.22ADMINISTRATION

    OFFICES ANDSUPPORT SPACES

    256 NSM

    ELEVATORLOBBY12 NSM

    ROOF

    OPEN TO BELOWP

    P

    ART

    SERV

    P

    P

    JAN. CL.10 NSM

    OPEN TOBELOW

    MECHANICAL226 NSM

    MECHANICAL248 NSM

    OPEN TOBELOW

    OPEN TOSKYLIGHT

    BELOW

    1.21WOMEN WC

    19 NSM

    1.22MEN'S WC

    19 NSM

    1.21WOMEN WC

    15 NSM

    1.22MEN'S WC

    14 NSM

    LEVEL 3

    PAGE 51DRAWINGS

    LEVEL 3

  • BUILDING 1376 GSM

    LEVEL 3M +27.005M FLOOR TO FLOOR (ADMIN)

    GROSS AREA = 376 GSM

    P

    P5.01 - 5.08

    EXEC. DEPT OFFICES& SUPPORT SPACES

    267 NSM

    ELEVATORLOBBY12 NSM

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TO BELOW

    OPEN TOBELOW

    OPEN TOSKYLIGHT BELOW

    1.21WOMEN WC

    15 NSM

    1.22MEN'S WC

    14 NSM

    LEVEL 3M

    DRAWINGSPAGE 52

    LEVEL 3M

  • P

    P

    ART

    SERV

    P

    P

    BUILDING 1380 GSM

    BUILDING 3938 GSM

    LEVEL 4 +30.00 (MUSEUM) +32.00 (ADMIN)

    8M FLOOR TO FLOOR (MAIN BLDG)5M FLOOR TO FLOOR (ADMIN)

    GROSS AREA = 1318 GSM

    3.18TZEDAKAHGALLERY567 NSM

    H:7M

    BOH CIRC.42 NSM

    1.47ORAL HISTORY

    STUDIO60 NSM

    MECHANICAL307 NSM

    CIRCULATION12 NSM

    LOBBY58 NSM

    ARTICULATEDROOF

    ROOF

    ARTICULATEDROOF

    OPEN TO BELOW

    1.21WOMEN WC

    12 NSM

    1.22MEN'S WC

    10 NSM

    LEVEL 4

    PAGE 53DRAWINGS

    LEVEL 4

  • SERV

    BUILDING 3483 GSM

    LEVEL 4M +38.00 (MUSEUM)5.5M FLOOR TO FLOOR

    GROSS AREA = 483 GSM

    MECHANICAL278 NSMH:3.5M

    OPEN TOTZEDAKAH

    BELOW

    ATRIUMARTICULATED

    ROOF

    LEVEL 4M

    DRAWINGSPAGE 54

    LEVEL 4M

  • BUILDING 3766 GSM

    LEVEL 5 +43.508.5M FLOOR TO FLOOR

    GROSS AREA = 766 GSM

    P

    P

    ART

    SERV

    3.18TZEDAKAHGALLERY333 NSMH:6.5M

    LOBBY79 NSM

    BOH LOBBY30 NSM

    5.43RENTAL

    STORAGE66 NSM

    MECHANICAL21 NSMH:6.5M

    OPEN TO BELOW

    1.21WOMEN WC

    11 NSM

    1.22MEN'S WC

    11 NSM

    LEVEL 5

    PAGE 55DRAWINGS

    LEVEL 5

  • LOBBY39 NSM

    LEVEL 6 +52.006.5M FLOOR TO FLOOR

    GROSS AREA = 1354 GSM

    BUILDING 31354 GSM

    P

    P

    ART

    SERV

    3.12 GRAND OBSERVATORY

    RENTAL VENUE568 NSM

    H:5M

    1.35RESTAURANT & BAR

    393 NSMH:5M

    5.29KITCHEN STAFF SUPPORT

    1.37 FOOD SERVICE OFFICES

    24 NSM

    BOHCIRCULATION

    67 NSM

    5.42RESTAURANT

    KITCHEN74 NSM

    6.05JANITORSCLOSET8 NSM

    TERRACE120 NSM

    TERRACE70 NSM

    1.21WOMEN WC

    16 NSM

    1.22MEN'S WC

    16 NSM

    LEVEL 6

    DRAWINGSPAGE 56

    LEVEL 6

  • 4.12COLLECTIONS

    IN TRANSIT

    4.21CRATE

    STORAGEBOH

    CORRIDORBOH ART

    CORR.PARKINGENTRY

    1.11-1.12 &1.16LOBBY &

    BOHCIRC.

    5.57TOOLS

    STORAGE WOMENWC

    MEN'SWC

    WCLOBBY/

    CIRCULATION

    WC CIRC.

    3.17ENTERPRISE

    GALLERY

    1.35RESTAURANT & BAR

    3.12GRAND OBSERVATORY

    RENTAL VENUE

    L0

    L1

    L2

    L3

    L4

    L5

    L6

    T.O.B.

    L4M

    3.18TZEDAKAHGALLERY

    MECH

    5.43RENTAL

    STORAGE

    DRAWINGSPAGE 58

    SECTION

  • L0

    L1

    L2

    L3

    T.O.B.

    3.19CHILDREN'S

    GALLERY

    COMMERCIAL

    MECHANICAL

    3.13LAND OF ISRAEL

    GALLERY

    3.15CREATIVITY

    GALLERY

    MECHANICAL

    MECH

    MECH2.11

    INTRO THEATER

    4.11COLLECTIONS

    STORAGE

    3.16SCIENCEGALLERY

    PARKINGL0

    L1

    L2

    L3

    L4

    L5

    L6

    T.O.B.

    L4M

    PAGE 59DRAWINGS

    SECTION

  • DRAWINGSPAGE 60

    SECTION

  • PARKING

    PARKINGMECHANICAL

    2.21LARGE

    AUDITORIUM

    AUD.SUPPORT

    3.15CREATIVITY

    GALLERY

    3.13LAND OF ISRAEL

    GALLERY

    L0

    L1

    TOP OF ROOF

    B1

    MEZZANINE

    L0

    L1

    L2

    T.O.B.

    SECTION 4PAGE 61DRAWINGS

    SECTION

  • DRAWINGSPAGE 62

    SECTION

  • L0

    L1

    L2

    L3

    L4

    L5

    L6

    T.O.B.

    LB1

    3.15CREATIVITY

    GALLERY

    3.13LAND OF ISRAEL

    GALLERY

    L4M

    S C OPAGE 63DRAWINGS

    SECTION

  • L0

    L1

    L2

    L3

    L4

    L5

    L6

    ROOF

    T.O.B.

    LB1LB1

    RESIDENTIAL WORLD'S JEWISH MUSEUMIBN GABIROL STREET

    DRAWINGSPAGE 64

  • YARKON RIVERFUEL TANKS PORT SEA

    PAGE 65DRAWINGS

    SITE SECTION

  • PROCESS

  • PAGE 67PROCESS

    MASSING PROCESS MODELSSEPTEMBER - DECEMBER 2016

  • PROCESSPAGE 68

    OCTOBER 09, 2016 OCTOBER 12, 2016

    OCTOBER 21, 2016 NOVEMBER 14, 2016

  • PAGE 69PROCESS

    NOVEMBER 15, 2016 DECEMBER 1, 2016

    DECEMBER 06, 2016 DECEMBER 08, 2016

  • PROCESSPAGE 70

    DECEMBER 19, 2016 DECEMBER 22, 2016

    JANUARY 05, 2017 JANUARY 20, 2017

  • SCHEME 22FEBRUARY 1, 2017

  • PROCESSPAGE 72

  • PAGE 73PROCESS

  • PROCESSPAGE 74

  • SCHEME 23FEBRUARY 13, 2017

  • PROCESSPAGE 76

  • PAGE 77PROCESS

  • THE ASPER FOUNDATION GEHRY PARTNERS, LLP.APRIL 2017