wp6 stakeholder involvement at aquatnet annual event 2014

12
Annual Event 2013 Malta 2627 June 2014 Navigating Change: The Aquatnet Voyage

Upload: jean-dhont

Post on 08-Jul-2015

88 views

Category:

Education


2 download

DESCRIPTION

Workpackage 'Stakeholder involvement' at Aquatnet Anual Event 2014, Malta. Aquatnet is the European Thematic Network on higher education in aquaculture and aquatic resource management. This network is funded by the European Commission LIfelong Learning Programme.

TRANSCRIPT

Page 1: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

Annual Event 2013Malta

26‐27 June 2014

Navigating Change: The Aqua‐tnet Voyage

Page 2: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

Annual Event 2014Malta

26 – 27 June 2014Navigating Change:The Aqua‐tnet Voyage

Page 3: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

slide 2 of 15

WP6: Stakeholder involvement

Presented by Jean DhontLaboratory for Aquaculture & Artemia Reference CenterGhent University, Belgium

Aqua‐tnet Annual Event 2014

Workpackage presentations

Page 4: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

slide 3 of 15

WP6 – Stakeholder involvement

Rationale & objectives

Main objectives:• Structured communication channels between education (learners and learning providers), industry, research

• Structured partnership with Technology Platforms• Reinforce link between Higher Education Institutes and research institutes• Reinforce link between Higher Education Institutes and students

Rationale: to promote synergies between all stakeholders involved andreinforce the link between education and society, bringingtogether educational, scientific and professional players,thereby contributing to Europe’s innovation capacity.

Page 5: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

slide 4 of 15

Implementation workpackages Backoffice

Stakeholders

Maximalisation

WP6 – Stakeholder involvement

Interactions within Aqua∙tnet

Page 6: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

slide 5 of 15

N° Title Month Type1 Stakeholder start‐up meeting M2 E2/9/14 Student Forum at EAS conference 2011, 2012, 2014 M2,14,26 E3 Industry think tank M34 Research think tank M45/11/17 Annual Event Year 1, 2, 3 M12,24,36 E6 Sector‐wide review of student associations and organizations M12 R7/12/18 Fine‐tuning of student dissemination networks M12,24,368 Identification and databasing of stakeholder representations M14 R10 Industry work placements M18 W15 Facilitating lifelong learning in industry M35 W16 Research opportunities for students M18 W19 Final stakeholder report M36 R

WP6 – Stakeholder involvement

Expected deliverables

Page 7: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

slide 6 of 15

WP6 – Stakeholder involvement

Expected output

1 Stakeholder start‐up meeting M2 E2/9/14 Student Forum at EAS conference 2012, 2013, 2014 M2,14,26 E3 Industry think tank M34 Research think tank M45/11/17 Annual Event Year 1, 2, 3 M12,24,36 E

6 Sector‐wide review of student associations and organizations M12 R

7/12/18 Fine‐tuning of student dissemination networks M12,24,36

8 Identification and databasing of stakeholder representations M14 R

10 Industry work placements M18 W

15 Facilitating lifelong learning in industry M35 W

16 Research opportunities for students M18 W

19 Final stakeholder report M36 R

by EAS‐Student Group

• Only 25 students attended the entire 2013 conference against >80 workshop participants in 2012

• What about student forum at EAS‐AE in Oct 2014?  !

Page 8: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

slide 7 of 15

WP6 – Stakeholder involvement

Expected output

1 Stakeholder start‐up meeting M2 E2/9/14 Student Forum at EAS conference 2011, 2012, 2014 M2,14,26 E3 Industry think tank M34 Research think tank M45/11/17 Annual Event Year 1, 2, 3 M12,24,36 E

6 Sector‐wide review of student associations and organizations M12 R

7/12/18 Fine‐tuning of student dissemination networks M12,24,36

8 Identification and databasing of stakeholder representations M14 R

10 Industry work placements M18 W

15 Facilitating lifelong learning in industry M35 W

16 Research opportunities for students M18 W

19 Final stakeholder report M36 R

Objective: guidelines for ‘good practice’ in organisinga work placement; inventorise placement opportunities & candidates

Illustrate guidelines and promote internships by featuring experience of enthousiastic host companies & candidates

Interviews recorded at Aquaculture Europe (Trondheim 2013)

To be edited & disseminated via website !

Page 9: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

slide 8 of 15

WP6 – Stakeholder involvement

Expected output

1 Stakeholder start‐up meeting M2 E2/9/14 Student Forum at EAS conference 2011, 2012, 2014 M2,14,26 E3 Industry think tank M34 Research think tank M45/11/17 Annual Event Year 1, 2, 3 M12,24,36 E

6 Sector‐wide review of student associations and organizations M12 R

7/12/18 Fine‐tuning of student dissemination networks M12,24,36

8 Identification and databasing of stakeholder representations M14 R

10 Industry work placements M18 W

15 Facilitating lifelong learning in industry M35 W

16 Research opportunities for students M18 W

19 Final stakeholder report M36 R

Objective: ‘promote the concepts and benefits of LLL to employers & employees’

Upgrade selected deliverable(s) to ‘flagship deliverable’  (stakeholder centered output)‐ Selected D1.3 AquaCases (= Common learning activities for learning resources)

‐ involved WP1 (Mike) & WP5 (Bernd)‐ contracted Post‐doc from GMA‐ assistance of external coach

Page 10: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

slide 9 of 15

WP6 – Stakeholder involvement

Expected output

1 Stakeholder start‐up meeting M2 E2/9/14 Student Forum at EAS conference 2011, 2012, 2014 M2,14,26 E3 Industry think tank M34 Research think tank M45/11/17 Annual Event Year 1, 2, 3 M12,24,36 E

6 Sector‐wide review of student associations and organizations M12 R

7/12/18 Fine‐tuning of student dissemination networks M12,24,36

8 Identification and databasing of stakeholder representations M14 R

10 Industry work placements M18 W

15 Facilitating lifelong learning in industry M35 W

16 Research opportunities for students M18 W

19 Final stakeholder report M36 R

Objective: online database on potential research opportunities for students 

web‐based query among research institutes

Page 11: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

slide 10 of 15

WP6 – Stakeholder involvement

Expected output

1 Stakeholder start‐up meeting M2 E2/9/14 Student Forum at EAS conference 2011, 2012, 2014 M2,14,26 E3 Industry think tank M34 Research think tank M45/11/17 Annual Event Year 1, 2, 3 M12,24,36 E

6 Sector‐wide review of student associations and organizations M12 R

7/12/18 Fine‐tuning of student dissemination networks M12,24,36

8 Identification and databasing of stakeholder representations M14 R

10 Industry work placements M18 W

15 Facilitating lifelong learning in industry M35 W

16 Research opportunities for students M18 W

19 Final stakeholder report M36 R

Objective: online database on potential research opportunities for students 

web‐based query among research institutes

Europe Asia Africa

Europe Asia Africa

Page 12: WP6 Stakeholder involvement at Aquatnet Annual Event 2014

Contact us

Thank you for your attention

Email: [email protected]: www.aquatnet.com