    PROCESS ADOPTED FORPROCESS ADOPTED FOR

    FINALISATION OF DOCUMENTSFINALISATION OF DOCUMENTS

    WPP of NTPC was beingWPP of NTPC was being

    followedfollowed

    Need felt for updating to suitNeed felt for updating to suitTransmission SectorTransmission Sector

    requirements, based onrequirements, based on

    experience gained over theexperience gained over the

    yearsyears

    POWERGRID WPPP finalisedPOWERGRID WPPP finalised

    PROCESS ADOPTED FORPROCESS ADOPTED FOR

    FINALISATION OF DOCUMENTSFINALISATION OF DOCUMENTS

    WPP of NTPC was beingWPP of NTPC was being

    followedfollowed

    Need felt for updating to suitNeed felt for updating to suitTransmission SectorTransmission Sector

    requirements, based onrequirements, based on

    experience gained over theexperience gained over theyearsyears

    POWERGRID WPPP finalisedPOWERGRID WPPP finalised

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    3/46

    04/22/1204/22/12

    33

    Process For DocumentProcess For Document

    Finalisation.Finalisation.

    Services of ConsultantServices of Consultanttakentaken

    Wide consultations wereWide consultations wereunder-taken withinunder-taken withinPOWERGRIDPOWERGRID

    A no. of drafts wereA no. of drafts wereprepared and commentsprepared and commentswere sought from allwere sought from allconcernedconcerned

    Final draft was laced onFinal draft was laced on

    Process For DocumentProcess For Document

    Finalisation.Finalisation.

    Services of ConsultantServices of Consultanttakentaken

    Wide consultations wereWide consultations wereunder-taken withinunder-taken withinPOWERGRIDPOWERGRID

    A no. of drafts wereA no. of drafts wereprepared and commentsprepared and commentswere sought from allwere sought from allconcernedconcerned

    Final draft was laced onFinal draft was placed on

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    4/46

    04/22/1204/22/12

    44

    Process For DocumentProcess For Document

    Finalisation.Finalisation.

    Copy of documentCopy of document

    circulated to fundingcirculated to funding

    agencies (World Bank,agencies (World Bank,ADB etc) , Ministry, CVC,ADB etc) , Ministry, CVC,

    CAG etcCAG etc

    Comments received wereComments received weredeliberated and suitablydeliberated and suitably

    incorporatedincorporated

    Process For DocumentProcess For Document

    Finalisation.Finalisation.

    Copy of documentCopy of document

    circulated to fundingcirculated to funding

    agencies (World Bank,agencies (World Bank,ADB etc) , Ministry, CVC,ADB etc) , Ministry, CVC,

    CAG etcCAG etc

    Comments received wereComments received weredeliberated and suitablydeliberated and suitably

    incorporatedincorporated

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    5/46

    04/22/1204/22/12

    55

    The WPPP is organised intoThe WPPP is organised intotwo Volstwo Vols

    Volume I (PreVolume I (Pre

    award)award)

    Volume- II(PostVolume- II(Post

    AwardAward))

    The WPPP is organised intoThe WPPP is organised intotwo Volstwo Vols

    Volume I (PreVolume I (Pre

    award)award)

    Volume- II(PostVolume- II(Post

    AwardAward))

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    6/46

    04/22/1204/22/12

    66

    WPPP is aimed at :WPPP is aimed at :WPPP is aimed at :WPPP is aimed at :

    1 Transparency and consistency indecision making

    2 Mapping of roles & responsibilities ofdifferent departments.

    3 Benchmarking of time schedules forvarious activities.

    4 Providing Methodology/ Guidelines to

    deal with real issues/ situations.Covering entire gamut of Activities fromconception of the Project to C

    ompletion

    1 Transparency and consistency indecision making

    2 Mapping of roles & responsibilities ofdifferent departments.

    3 Benchmarking of time schedules forvarious activities.

    4 Providing Methodology/ Guidelines to

    deal with real issues/ situations.Covering entire gamut of Activities fromconcep

    tion of the Project to Completion

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    7/46

    04/22/1204/22/12

    77

    Review of WPPPReview of WPPP

    envisaged after oneenvisaged after oneyear ofyear of

    implementationimplementation

    Review of WPPPReview of WPPP

    envisaged after oneenvisaged after oneyear ofyear of

    implementationimplementation Further, the procedure for

    modification/ addition inWPPP, which may benecessissated based onexperience or other reasons,

    has been given in thedocument itself.

    Further, the procedure for

    modification/ addition inWPPP, which may benecessissated based onexperience or other reasons,has been given in thedocument itself.

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    8/46

    04/22/1204/22/12

    88

    Vol I (Pre-Award) CoversVol I (Pre-Award) CoversVol I (Pre-Award) CoversVol I (Pre-Award) Covers

    Project Conception and approval

    Internal Zero Date

    Package list -Corporate / Site

    MNW

    Finalisation of Cost Estimate

    Qualification Requirement of Bidders

    Selection of Bidding Process

    Finalisation of Bidding Documents

    Calling of Tenders

    Project Conception and approval

    Internal Zero Date

    Package list -Corporate / Site

    MNW

    Finalisation of Cost Estimate

    Qualification Requirement of Bidders

    Selection of Bidding Process

    Finalisation of Bidding Documents

    Calling of Tenders

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    9/46

    04/22/1204/22/12

    99

    Vol I CoversVol I CoversVol I CoversVol I Covers

    Contd..

    10 Bid Receipt and Opening

    11 Evaluation of Bids

    12 Post Bid Discussions

    13 Award of Contract

    AND

    Various Pre-award Issues

    Contd..

    10 Bid Receipt and Opening

    11 Evaluation of Bids

    12 Post Bid Discussions

    13 Award of Contract

    AND

    Various Pre-award Issues

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    10/46

    04/22/1204/22/12

    1010

    Salient Points of Vol ISalient Points of Vol ISalient Points of Vol ISalient Points of Vol I

    Standardisation of : Package list

    Qualification requirement

    Bidding Documents

    -

    Approvals at higher levelrequired only in case ofdeviation from standard

    Standardisation of : Package list

    Qualification requirement

    Bidding Documents

    -

    Approvals at higher levelrequired only in case ofdeviation from standard

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    11/46

    04/22/1204/22/12

    1111

    Salient Points of Vol I .Salient Points of Vol I .Salient Points of Vol I .Salient Points of Vol I .Specifies decision methodology for

    selecting Bidding Process and modeof calling tenders.

    eg Two Stage Bidding for Packageswhich are: Technically Complex;specialised in nature; POWERGRIDhas limited experience; Specs fastchanging

    (Price bids from Bidders conformingto an acceptable common technicalstandards & other conditions/ QR)

    Specifies decision methodology for

    selecting Bidding Process and modeof calling tenders.

    eg Two Stage Bidding for Packageswhich are: Technically Complex;specialised in nature; POWERGRIDhas limited experience; Specs fastchanging

    (Price bids from Bidders conformingto an acceptable common technicalstandards & other conditions/ QR)

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    12/46

    04/22/1204/22/12

    1212

    Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I .. Spells out evaluation methodology

    in details including that for

    Arithmetic corrections

    Cost compensation forcommercial/ technical deviations

    Seeking post bid clarifications

    When to carry out negotiations

    Spells out evaluation methodology

    in details including that for

    Arithmetic corrections

    Cost compensation forcommercial/ technical deviations

    Seeking post bid clarifications

    When to carry out negotiations

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    13/46

    04/22/1204/22/12

    1313

    Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I ..

    Specifies Methodology to dealwith change in sub-vendors, ifrequested by recommendedbidder during post biddiscussions, taking care offinancial implications

    Specifies Methodology to dealwith change in sub-vendors, ifrequested by recommendedbidder during post biddiscussions, taking care offinancial implications

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    14/46

    04/22/1204/22/12

    1414

    Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I .. Defines Applicability of WPPP - not

    applicable in case of Restoration Works

    All activities to commence from InternalZero Date, monitored through MNW

    Pre-Award actions and advanceExpenditure on New Projects prior to

    approval - to avoid delay

    Late Bid, after bid opening, to besummarily rejected

    Defines Applicability of WPPP - not

    applicable in case of Restoration Works

    All activities to commence from InternalZero Date, monitored through MNW

    Pre-Award actions and advanceExpenditure on New Projects prior to

    approval - to avoid delay

    Late Bid, after bid opening, to besummarily rejected

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    15/46

    04/22/1204/22/12

    1515

    Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I .. Single response against Open Tender

    to be treated as Open Tender

    Change in BOQ, during bidding methodology to deal with is spelt out

    Bid Evaluation Comparison withestimate on overall basis; No negotiationupto a variation of (+ve) 10%

    Single response against Open Tender

    to be treated as Open Tender

    Change in BOQ, during bidding methodology to deal with is spelt out

    Bid Evaluation Comparison withestimate on overall basis; No negotiationupto a variation of (+ve) 10%

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    16/46

    04/22/1204/22/12

    1616

    Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I ..Salient Points of Vol I ..

    Owner supplied materials in case ofsite packages - BG done away with

    CPG / Security Deposit for sitepackages

    - deduction from RA bill allowed

    Works Contract Tax - to be included

    in bid price

    Octroi / Entry Tax reimbursable onbought-out items also

    Separate procedure for procurement of

    software solutions

    Owner supplied materials in case ofsite packages - BG done away with

    CPG / Security Deposit for sitepackages

    - deduction from RA bill allowed

    Works Contract Tax - to be included

    in bid price

    Octroi / Entry Tax reimbursable onbought-out items also

    Separate procedure for procurement of

    software solutions

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    17/46

    04/22/1204/22/12

    1717

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    AREAS COVEREDContract SigningArranging CPGRelease of Initial Advance(Supply)Finalisation of L2 NetworkDetailed Engineering, Drawingapproval and Type TestingSub-vendor/Sub-ContractorsapprovalInspection and DespatchClearance

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    AREAS COVEREDContract SigningArranging CPG

    Release of Initial Advance(Supply)Finalisation of L2 NetworkDetailed Engineering, Drawingapproval and Type TestingSub-vendor/Sub-ContractorsapprovalInspection and DespatchClearance

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    18/46

    04/22/1204/22/12

    1818

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    AREAS COVERED..contdProject MonitoringOpening of LC, Processing ofBills and Release of Payment

    Technical Approval forvariationsAdministrative approval forissue of amendment

    Time Extension and LiquidatedDamagesCommissioning and TakingOver

    Revised Cost EstimateDis ute Resolution and

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    AREAS COVERED..contdProject MonitoringOpening of LC, Processing ofBills and Release of Payment

    Technical Approval forvariationsAdministrative approval forissue of amendment

    Time Extension and LiquidatedDamagesCommissioning and TakingOver

    Revised Cost EstimateDis ute Resolution and

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    19/46

    04/22/1204/22/12

    1919

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    (IMPORTANT AREAS)(IMPORTANT AREAS)

    Time Extension And LiquidatedDamage

    Guidelines for decision

    making No LD to be imposed if net delay

    is not attributable to the

    Contractor Token LD to be levied if net delay

    is attributable to Contractor &Loss not suffered by POWERGRID

    Methodology for calculating

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    (IMPORTANT AREAS)(IMPORTANT AREAS)

    Time Extension And LiquidatedDamage

    Guidelines for decision

    making No LD to be imposed if net delay

    is not attributable to the

    Contractor Token LD to be levied if net delay

    is attributable to Contractor &Loss not suffered by POWERGRID

    Methodology for calculating

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    20/46

    04/22/1204/22/12

    2020

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    LD(Contd)

    Methodology to find out delayattributable to the Contractor

    Total Delay= ADelay due to force majeure =BDelay attributable toPOWERGRID =CConcurrent period in B & C = XNet period of delay on accountof Force Majeure andPOWERGRID= B+C-XNet period of dela on account

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    LD(Contd)

    Methodology to find out delayattributable to the Contractor

    Total Delay= ADelay due to force majeure =BDelay attributable toPOWERGRID =CConcurrent period in B & C = XNet period of delay on accountof Force Majeure andPOWERGRID= B+C-XNet period of delay on account

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    21/46

    04/22/1204/22/12

    2121

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    LD(Contd)Loss, if any, suffered by

    POWERGRID viz.

    Extra payment to other contractor

    Extra payment to other agencies

    Compensation to generatingcompany towards deemed

    generation Delay in return on investment

    Exchange rate fluctuation in a

    foreign currency contract,wherever a licable

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    LD(Contd)Loss, if any, suffered byPOWERGRID viz.

    Extra payment to other contractor

    Extra payment to other agencies

    Compensation to generatingcompany towards deemed

    generation Delay in return on investment

    Exchange rate fluctuation in a

    foreign currency contract,wherever a licable

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    22/46

    04/22/1204/22/12

    2222

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    LD(Contd)

    Methodology to work out LDAmount if the delay is

    attributable to contractor andloss suffered by POWERGRIDLoss > Full LD Amount as percontract

    Leviable LD= Full LDLoss < Full LD Amount as percontract

    Leviable LD= Loss+

    Token LD subject to

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    LD(Contd)

    Methodology to work out LDAmount if the delay is

    attributable to contractor andloss suffered by POWERGRIDLoss > Full LD Amount as percontract

    Leviable LD= Full LDLoss < Full LD Amount as percontract

    Leviable LD= Loss+

    Token LD subject to

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    23/46

    04/22/1204/22/12

    2323

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    LD(Contd)Pending finalisation of LD,payment to the contractor shall

    continue in case of Corporatepackages without deduction onthis account on theconsideration that theretention amount and BGs(against retention etc) areavailable. However deductionstowards LD from progressivepayment can be made only

    after approval of ED(Region), if

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    LD(Contd)Pending finalisation of LD,payment to the contractor shall

    continue in case of Corporatepackages without deduction onthis account on theconsideration that theretention amount and BGs(against retention etc) areavailable. However deductionstowards LD from progressivepayment can be made only

    after approval of ED(Region), if

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    24/46

    04/22/1204/22/12

    2424

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    CONTRACT CLOSINGMonitoring for Contract closing to

    commence on completion of 80-90% of scopeContract Closing Certificates 13 innumber, To be issued by not lessthan Manager

    A Contract to be treated as closedon Release of CPG/SD onsuccessful completion of warrantyperiod and on Issuance of CCP-13Closing of a Contract to be

    formally declared by theconcerned Contracts Deptt.,acting as co-ordinator, afterascertaining receipt of allcertificates

    All activities except release ofCPG/SD of Contract closing to be

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    CONTRACT CLOSINGMonitoring for Contract closing to

    commence on completion of 80-90% of scopeContract Closing Certificates 13 innumber, To be issued by not lessthan Manager

    A Contract to be treated as closedon Release of CPG/SD onsuccessful completion of warrantyperiod and on Issuance of CCP-13Closing of a Contract to be

    formally declared by theconcerned Contracts Deptt.,acting as co-ordinator, afterascertaining receipt of allcertificates

    All activities except release ofCPG/SD of Contract closing to be

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    25/46

    04/22/1204/22/12

    2525

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    CUSTODY AND RELEASE OF BGs

    Finance to be custodianStreamlined procedure for

    monitoring all BGsAdvance BG will bereleased on adjustment offull advance.CPG to be reduced to 50%on taking overQuarterly review of statusby ED(region) in respect ofall critical BGs on the basisof MIS prepared by PESM

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    CUSTODY AND RELEASE OF BGs

    Finance to be custodianStreamlined procedure for

    monitoring all BGsAdvance BG will bereleased on adjustment offull advance.CPG to be reduced to 50%on taking overQuarterly review of statusby ED(region) in respect ofall critical BGs on the basisof MIS prepared by PESM

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    26/46

    04/22/1204/22/12

    2626

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    ADVANCEMENT OF SUPPLIESAdvancement of supplies maybe on account of the following

    - Requirement fromPOWERGRID

    - For timely completion ofPOWERGRIDs projectAdvancement to be normallyallowed except for fund/storage

    constraints as it is positive stepNo approval required foradvancement upto 30 days.Once advancement allowed, PV

    as per actuals

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    ADVANCEMENT OF SUPPLIESAdvancement of supplies maybe on account of the following

    - Requirement fromPOWERGRID

    - For timely completion ofPOWERGRIDs projectAdvancement to be normallyallowed except for fund/storage

    constraints as it is positive stepNo approval required foradvancement upto 30 days.Once advancement allowed, PV

    as per actuals

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    27/46

    04/22/1204/22/12

    2727

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    QUANTITY VARIATION PROVISIONS(CONTD)Revised ProcedureUniform Quantity Variation Provisionsin all types of contract

    Overall limit of +/- 15% of contractpriceNo limit for individual itemsIf overall contract price exceed 15%. Payment at unit rates upto

    quantities originally provided in thecontract .unit rate for thequantities executed beyond (+15%)to be negotiated and finalisedA token compensation @ 0.01% of

    Contract price for every 1% reduction

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    QUANTITY VARIATION PROVISIONS(CONTD)Revised ProcedureUniform Quantity Variation Provisionsin all types of contract

    Overall limit of +/- 15% of contractpriceNo limit for individual itemsIf overall contract price exceed 15%. Payment at unit rates upto

    quantities originally provided in thecontract .unit rate for thequantities executed beyond (+15%)to be negotiated and finalisedA token compensation @ 0.01% of

    Contract price for every 1% reduction

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    28/46

    04/22/1204/22/12

    2828

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Reference Contract PriceFor different purposes suchas Quantity Variation, LDamount, CPG value, Advance

    amount. Contract price asoriginally awarded

    Amendment to

    Contract Price willnot affect LD amount,CPG Value, advanceamount resulting in

    simplified contract

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Reference Contract PriceFor different purposes suchas Quantity Variation, LDamount, CPG value, Advance

    amount. Contract price asoriginally awarded

    Amendment to

    Contract Price willnot affect LD amount,CPG Value, advanceamount resulting in

    simplified contract

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    29/46

    04/22/1204/22/12

    2929

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    TURNKEY CONTRACT ANDLUMPSUM PRICE

    Lumpsum price ofitems to remainunchangedirrespective of

    quantities actuallyexecuted Unlessscope change iseffected by

    POWERGRID.

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    TURNKEY CONTRACT ANDLUMPSUM PRICE

    Lumpsum price ofitems to remainunchangedirrespective of

    quantities actuallyexecuted Unlessscope change iseffected by

    POWERGRID.

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    30/46

    04/22/1204/22/12

    3030

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Change of sub-vendor asper WP policy(volume I) to

    be followed during postaward stage.

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Change of sub-vendor asper WP policy(volume I) to

    be followed during postaward stage.

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    31/46

    04/22/1204/22/12

    3131

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Acceptance of BG from a Bank otherthan specified in contract

    To be accepted in exceptionalcircumstances with theapproval of ED (finance)

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Acceptance of BG from a Bank otherthan specified in contract

    To be accepted in exceptionalcircumstances with theapproval of ED (finance)

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    32/46

    04/22/1204/22/12

    3232

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Procedure for taking up new work /quantum of work exceeding the

    contract item pending ContractAmendment

    Any new work / quantum of workexceeding the contract item shallbe taken up only after technicalclearance / technical approval.

    On receipt of technical clearance /technical approval communicationto be sent to contractor and allconcerned with the quantum ofwork to be taken up by thecontractor so that progress of

    work continues pending issue of

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Procedure for taking up new work /quantum of work exceeding the

    contract item pending ContractAmendment

    Any new work / quantum of workexceeding the contract item shallbe taken up only after technicalclearance / technical approval.

    On receipt of technical clearance /technical approval communicationto be sent to contractor and allconcerned with the quantum ofwork to be taken up by thecontractor so that progress of

    work continues pending issue of

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    33/46

    04/22/1204/22/12

    3333

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    PROJECT MANAGERFor a more coordinatedapproach in major/important/specialized projects

    Normally at a level of AGM &above

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    PROJECT MANAGERFor a more coordinatedapproach in major/important/specialized projects

    Normally at a level of AGM &above

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    34/46

    04/22/1204/22/12

    3434

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    ARBITRATION / DRP

    Normally Arbitration / DRP shallbe avoided to the extentpossiblePrior to reference of a disputeby contractor to Arbitration /DRP, at least one attempt shallbe made for amicable settlementby a standing committee asfollows.

    for Corporate awardedpackages : ED(Fin),ED(CS),ED(Engg/LD&C/Telecom),

    ED(Region) headed by

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    ARBITRATION / DRP

    Normally Arbitration / DRP shallbe avoided to the extentpossiblePrior to reference of a disputeby contractor to Arbitration /DRP, at least one attempt shallbe made for amicable settlementby a standing committee asfollows.

    for Corporate awardedpackages : ED(Fin),ED(CS),ED(Engg/LD&C/Telecom),

    ED(Region) headed by

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    35/46

    04/22/1204/22/12

    3535

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Retention of documentsAll documents pertaining toaward and implementationagainst a contract shall be

    retained for a period of eightfinancial years after the closingof the contract.Thereafter the same can be

    destroyed if not underexamination / scrutiny by anyinvestigating authorities)

    VOLUME II- POST AWARDVOLUME II- POST AWARD

    Retention of documentsAll documents pertaining toaward and implementationagainst a contract shall be

    retained for a period of eightfinancial years after the closingof the contract.Thereafter the same can be

    destroyed if not underexamination / scrutiny by anyinvestigating authorities)

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    36/46

    04/22/1204/22/12

    3636

    Thus the WPP

    formalises and consolidatesthe policies, procedures

    hitherto followed for contractadministration and re-engineers the processess,

    using the experience gainedover the years and, providesbenchmark time schedules fordifferent activities

    Thus the WPP

    formalises and consolidatesthe policies, procedures

    hitherto followed for contractadministration and re-engineers the processess,

    using the experience gainedover the years and, providesbenchmark time schedules fordifferent activities

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    37/46

    04/22/1204/22/12

    3737

    Delegation of PowersDelegation of Powers

    Contents :Contents :

    - Delegation by Board to CMDDelegation by Board to CMD

    -

    DOP for construction stage of approvedDOP for construction stage of approvedprojectsprojects

    - DOP for O&MDOP for O&M

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    38/46

    04/22/1204/22/12

    3838

    Delegation of PowersDelegation of Powers

    Contents (Contd):Contents (Contd):

    - DOP for Personnel Powers in CCDOP for Personnel Powers in CC

    - DOP for Admin Powers in CCDOP for Admin Powers in CC

    - DOP for P&A powers in RegionsDOP for P&A powers in Regions

    - DOP for ConsultancyDOP for Consultancy

    - DOP for Bond CellDOP for Bond Cell

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    39/46

    04/22/1204/22/12

    3939

    Delegation of PowersDelegation of Powers

    Salient PointsSalient Points

    - Concurrence by Finance necessary unlessConcurrence by Finance necessary unlessotherwise specifiedotherwise specified

    - Subject to observance of relevant policySubject to observance of relevant policyguidelines, rules and regulations and instructionsguidelines, rules and regulations and instructionson system and procedureon system and procedure

    - Full Powers not to exceed powers of CMDFull Powers not to exceed powers of CMD

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    40/46

    04/22/1204/22/12

    4040

    Delegation of PowersDelegation of Powers

    Powers of CMDPowers of CMD

    - By Exception i.e., authorised to exerciseBy Exception i.e., authorised to exerciseall or any power rested in Board except asall or any power rested in Board except as

    in Annexure-A of DOPin Annexure-A of DOP- Award of Contracts upto Rs. 10 Cr; 10 toAward of Contracts upto Rs. 10 Cr; 10 to

    20 Cr. By Sub-committee; beyond 20 Cr.20 Cr. By Sub-committee; beyond 20 Cr.

    By BoardBy Board

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    41/46

    04/22/1204/22/12

    4141

    Delegation of PowersDelegation of Powers

    Powers excluded from Delegation to CMDPowers excluded from Delegation to CMD

    - Feasibility Reports, Projects Reports andFeasibility Reports, Projects Reports andEstimates etc. costing more than 5 Cr.Estimates etc. costing more than 5 Cr.

    - Any deviation in estimate approved byAny deviation in estimate approved byBoard/ GoI, which is more than 10% forBoard/ GoI, which is more than 10% forany component part of project.any component part of project.

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    42/46

    04/22/1204/22/12

    4242

    Delegation of PowersDelegation of Powers

    Powers excluded from Delegation to CMDPowers excluded from Delegation to CMD(contd..)(contd..)

    - Consultancy Contracts beyond 50 lakh asConsultancy Contracts beyond 50 lakh as

    against 10 Cr. For othersagainst 10 Cr. For others- Write off of stores, plant and machineryWrite off of stores, plant and machinery

    more resulting in net loss of more thanmore resulting in net loss of more than

    10 lakhs10 lakhs

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    43/46

    04/22/1204/22/12

    4343

    Delegation of PowersDelegation of Powers

    Canons of Financial ProprietyCanons of Financial Propriety

    - Expenditure should not be prima facieExpenditure should not be prima faciemore than occasion Demandsmore than occasion Demands

    - Same vigilance to be exercised as of ownSame vigilance to be exercised as of ownmoneymoney

    - Allowances not to be source of profitAllowances not to be source of profit

    - Subject to approved budgetSubject to approved budget

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    44/46

    04/22/1204/22/12

    4444

    Delegation of PowersDelegation of Powers

    Powers of Executives (some examples)Powers of Executives (some examples)

    (Construction Stage)(Construction Stage)

    - Technical & Administrative approval ofTechnical & Administrative approval of

    Cost EstimatesCost Estimates

    ED upto 500 lakhsED upto 500 lakhs

    Manager upto 10 lakhsManager upto 10 lakhs

  • 8/3/2019 WPPP for ETs Including Delegation of Power

    45/46

    04/22/1204/22/12

    4545

    Delegation of PowersDelegation of Powers

    Approval of Award of Contracts (openApproval of Award of Contracts (open

    tender)tender)

    ED upto 500 lakhsED upto 500 lakhs

    GM upto 150 lakhsGM upto 150 lakhs

    Dy Manager upto 5 lakhsDy Manager upto 5 lakhs