wra rodney complex presentation - newark, de
TRANSCRIPT
![Page 1: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/1.jpg)
April 10, 2017
Rodney Complex
![Page 2: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/2.jpg)
Key staff – all local!
• Jeff Riegner, WRA• Andrea Trabelsi, WRA• Gregg Crystall, BrightFields• Mike Campbell, WRA• Hans Benford, WRA• Todd Oliver, WRA• Rod Grier, WRA
![Page 3: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/3.jpg)
Four key challenges
• Public outreach and acceptance
• Negotiating the Delaware Brownfields Program
• Balancing stormwater and recreation needs on a limited site
• Delivering a complex, multidisciplinary project on a compressed schedule
![Page 4: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/4.jpg)
Public outreach
• An effective outreach process enables the City to deliver the project more efficiently and effectively.
• Good outreach reduces the number of surprises in the project development process, controlling the project schedule and budget.
![Page 5: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/5.jpg)
Public outreachEn
gage
men
t Opp
ortu
nity
Timeline
Initiation Planning Design PS&E
Opportunity curvefor meaningful
stakeholderengagement
![Page 6: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/6.jpg)
Stakeholders are happier and feel empowered when they are meaningfully involved in project development (and referenda are more likely to pass).
Public outreach
![Page 7: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/7.jpg)
Public outreach
• Stakeholder committee• Key person interviews• Three public meetings
1. Obtain initial input from the community at a public workshop with interactive activities
2. Present three conceptual alternatives for consideration by the public at an open house
3. Present the preferred alternative prior to - and during - a City Council meeting
![Page 8: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/8.jpg)
Delaware Brownfields Program
• Brownfield Certification/Grant/Brownfield Development Agreement
• Project scoping (CSM/SAP)• Sample collection• GPR/EM survey (utilities, buried objects, tanks)
– Soil and groundwater sampling• Analysis and data evaluation• Report preparation, remedy recommendation• DNREC’s Proposed Plan of Remedial Action,
public comment period, Final Plan– Soil, groundwater, PCB oil, asbestos, hazardous
materials, environmental covenant
![Page 9: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/9.jpg)
Balancing SWM/recreation needs
• Urban parks and open space analysis
• SWM analysis• Public input/City goals
![Page 10: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/10.jpg)
Balancing SWM/recreation needs
• Hydrologic Model Development – Drainage area confirmation (68 acres)– Hydrologic soil and land use/land cover– Model calibrated to match the previous study
• Hydraulic Assessment and Assumptions– Inflow can be intercepted and daylighted– Available hydraulic head (storage)– Pond grading within site (14 ft grade difference)
• Downstream Analysis– Potentially reduce frequency of localized flooding– Benefits to the Silver Brook watershed to be
determined– Remain realistic about downstream
consequences
![Page 11: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/11.jpg)
Balancing SWM/recreation needs
• Alternative 1 –Maximize SWM Detention– Recreational approach
• Full site dedicated to stormwaterdetention facility
• Perimeter trails with limited site access for safety
– SWM approach• Should meet the 90% reduction goal
of the draft MS4 permit• 5.3 acre pond footprint• Provides 20 acre-feet of storage• 32 cfs peak flow• Dependent on geotechnical analysis
(ground water depth)
![Page 12: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/12.jpg)
Balancing SWM/recreation needs
• Alternative 2 – Maximize Recreational Opportunities– Recreational use approach
• Maximize active recreation• Additional ball fields/play
surfaces/network of trails– SWM approach
• Manage runoff on-site• Water quality focused BMPs• Minimal volume reduction• Minimal footprint required
![Page 13: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/13.jpg)
Balancing SWM/recreation needs
• Alternative 3 –SWM Facility with Public Space– Recreational approach
• Existing public facilities could remain• Trail network• Environmental education
– SWM approach• Dormitory area only available for SWM• 3.2 acre pond footprint
– Provides 14 acre-feet of storage– Peak flow reduced to 79 cfs (75%
reduction)• Constructed wetlands
– Meandering channel and spill pools– Diverse habitat creation and opportunity
for education
![Page 14: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/14.jpg)
Balancing SWM/recreation needs
![Page 15: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/15.jpg)
Balancing SWM/recreation needs
![Page 16: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/16.jpg)
Delivering complex projects
• All disciplines in-house• Constant communication with client and project
team• Direct involvement in stakeholder outreach• Effective project management skills and tools
– Kickoff meeting– Action item lists– Documentation– File sharing– Reporting– Interagency coordination– Quality assurance
![Page 17: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/17.jpg)
MANAYUNK BRIDGE TRAIL
Delivering complex projects
![Page 18: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/18.jpg)
MANAYUNK BRIDGE TRAIL
Delivering complex projects
![Page 19: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/19.jpg)
MANAYUNK BRIDGE TRAIL
Delivering complex projects
![Page 20: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/20.jpg)
NEW CASTLE INDUSTRIAL TRACK TRAIL
Delivering complex projects
![Page 21: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/21.jpg)
NEWARK REGIONAL TRANSPORTATION CENTER
Delivering complex projects
![Page 22: WRA Rodney Complex Presentation - Newark, DE](https://reader031.vdocument.in/reader031/viewer/2022011923/61d8bb658bacb124f921e09b/html5/thumbnails/22.jpg)
Questions?