wurster hall sub-metering (2) - 2010 tgif project
DESCRIPTION
Project PosterTRANSCRIPT
400 kwh
350 kW
300 kW
250 kW
200 kW
150 kW
100 kW
50 kW
4 ft /min
3.5 ft /min
3 ft /min
2.5 ft /min
2 ft /min
1.5 ft /min
1 ft /min
.5 ft /min
0
January February March April May June July August September October November December January
Spring 2011 Fall 2011 Spring2012
WinterRecessThanks-
giving
SpringBreak
Summer 2011
thanks-giving
reading/review/
recitationweek
finalexams
administrativeholiday
last
day
of i
nstru
ctio
n (f
all 2
011)
first
day
of i
nstru
ctio
n (s
pring
201
2)
final studioreviews
DecemberNovember JanuaryDecemberNovember January
50 kW
100 kW
150 kW
200 kW
250 kW
300 kW
350 kW
0
studio plug loadselevators
ramona’s cafekilns
heatingventilation
10.6 kW
0 kW
3.9 kW
4.0 kW
25.7
0.8 kW1.0 kW
2.1 kW2.5 kW
6.0 kW1.7kW
24.2 ̀kW
9.4 kW
10.9 kW
7.7 kW
46.4 kW
3.9 kW11.7 kW
5.8 kW7.6 kW
9.5 kW
5.2 kW
0.5 ̀kW
0 kW
2.8 kW
2.7 kW
16.8 kW180.0 kW 372.4 kW126.7 kW
0.7 kW
0.8 kW
1.9 kW1.8 kW
3.9 kW
1.4 kW
whole building
ventilation
heating
kilns
ramona’s
elevators
9th floor studio
8th floor studio
7th floor studio
6th floor studio
5th floor studio
4th floor studio
minimum median maximum Breakdown: Electric Usage Data from November 21, 2011 - January 22, 2012
Whole Building Water & Electric Usage Data from January 22, 2011 to January 22, 2012
Wurster Hall Submetering ProjectHow low can we go?low Eliahu PerszykFacilities Manager
Gita KhandagleData Analysis & Layout
University of California, BerkeleyThe G een Initiative Fund