TRU Waste Processing Center OperationsPre-Solicitation ConferenceDraft Request for Proposal

DE-SOL-0006331

July 8, 2014

Page 2: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 2

Welcome and Purpose

Pre-Solicitation Conference for the U.S. Department of Energy (DOE) Draft Request for Proposal (RFP) DE-SOL-0006331 for TRU Waste Processing Facility Operation at Oak Ridge, Tennessee.

Purpose of the Pre-Solicitation Conference and Site Tour:•Provide information to potential Offerors.•Emphasize certain important aspects of the Draft RFP.•Visualize physical descriptions included in the Performance Work Statement (PWS).•Allow Offerors to gain a better understanding of the TWPC Operation Draft RFP.

Page 3: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 3

Logistics and Ground Rules

• No cell phones, audio, or video recording are permitted.

• DOE will not answer any questions during the pre-solicitation conference or site tour. However, interested parties are encouraged to submit their comments pertaining to the Draft RFP on the 3 x 5 inch cards provided today or via the e-mail address at [email protected].

• Briefing slides and attendee list will be posted on the website.

• The Final RFP, once released, will govern over any information presented today. Information provided today is at a summary level and subject to change.

Page 4: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 4

Agenda

Site History, Project Background – Karen Deacon, Senior Project Manager

Performance Work Statement – Chelsea Hubbard, Facility Representative

Acquisition Specifics – Nina Akgunduz, Contracting Officer

• Overview of the Acquisition Process • Overview of the Draft RFP

Page 5: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 5

Site History and Project Background

Karen Deacon, Senior Project Manager

Page 6: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 6

Performance Work Statement

Chelsea Hubbard, DOE

Performance Work Statement

Page 7: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 7

Performance Work Statement

Performance Objectives:• Project Management and Facility Maintenance• Operations Project Management• Cyber Security • CCP Support• Interfaces • Facility Maintenance

Page 8: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 8

Performance Work Statement

Performance Objectives:• Waste Processing Operations and Disposition

• Completion of processing and certification of the Oak Ridge Office of Environmental Management (OREM) legacy remote handled (RH) transuranic (TRU) wastes.

• Assumes processing completion of contact handled (CH) transuranic (TRU) wastes. May be impacted by inability to make Waste Isolation Pilot Plant (WIPP) shipments.

• Management and dispositioning of all low-level waste (LLW) and mixed low-level waste (MLLW).

• Processing, certification, and disposal of Oak Ridge National Laboratory (ORNL) newly generated RH/CH-TRU waste. Nuclear Fuel Services (NFS) CH-TRU soil waste, and the certification and disposal of Solid Waste Storage Area number 5 (SWSA-5) fissile waste.

Page 9: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 9

Performance Work Statement

Performance Objectives:

• Container Management, Tracking, and Loading

• NFS Soils Not To Exceed 2,100 Drums (Option)

• Operational “Warm” Standby (Option)

• Facility Decontamination and Downgrade (Option)

• S&M “Cold” Standby (Option)

Page 10: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 10

Acquisition Specifics

Nina Akgunduz, Contracting Officer

Page 11: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 11

Acquisition Process

• This procurement for TWPC Operation will be conducted as a small businesses set-aside under North American Industry Classification System (NAICS) Code 562211, Hazardous Waste Treatment and Disposal. The size standard for NAICS Code 562211 is $35.5M.

• DOE will only accept proposals from small businesses that do not exceed the small business size standard of $35.5M under NAICS code 562211, Hazardous Waste Treatment and Disposal, at the time proposals are due.

• Evaluation and award of the contract will be conducted in accordance with source selection procedures in FAR Part 15.3.

Page 12: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 12

Acquisition Process

• Draft RFP issued on June 30, 2014.• Industry is encouraged to comment on the Draft RFP.

Comments are due by 5:00 PM EST on July 14, 2014.

• DOE will not respond to any verbal or written questions or comments to the Draft RFP. However, comments received may be considered in preparation of the Final RFP.

• However, DOE will respond and post Q&A’s on the Final RFP after its release.

Page 13: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 13

Acquisition Process

• The Final RFP will be issued in September 2014.• Interested parties are encouraged to submit questions

and comments on the Final RFP in writing for DOE response to email address:

[email protected]

• DOE will provide official responses to questions on the procurement website at:

HTTP://TWPC.ORO.DOE.GOV

Page 14: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 14

Procurement Website

Page 15: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 15

Acquisition Process

• Proposal Preparation: Approximately 30 to 45 days from the date the Final RFP is released.

• Three physically separate volumes:• Volume I – Offer and Other Documents • Volume II – Technical Proposal • Volume III – Price Proposal

• Minimum Proposal Acceptance Period: 360 days after proposals receipt date.

• Government intends to award a contract without discussions.

• Award based on the best value to the Government

Page 16: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 16

Draft RFP Overview

• Sections A – J of the Final RFP will become the resultant contract.• Section A consists of Standard Form 33 which must be

signed by an authorized representative of the Contractor as part of the proposal.

• Becomes a fully-executed contract when the SF 33 is signed by the Government within the Minimum Proposal Acceptance Period (360 days).

• Section K will be incorporated by reference into the contract.• Sections L and M contain the proposal preparation instructions

and the basis for evaluation and award.

Page 17: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 17

Section B – Supplies or Services/Prices

• This is a Hybrid Contract with Firm Fixed Price (FFP and Cost Plus Award Fee (CPAF) Contract Line Items:• FFP CLINs may be incrementally funded.

• Contract Objectives:• Primary

• Manage and operate the TRU Waste Processing Center (TWPC) • Perform surveillance and maintenance (S&M) activities• Provide support to the Central Characterization Project (CCP)

Page 18: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 18

Section B – Supplies or Services/Prices (Cont’d)

• Secondary• Nuclear Fuel Services (NFS) soils will be certified by CCP on-

site • Process, certify, and disposition ORNL newly generated RH/CH

TRU waste

Page 19: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 19

Section B – Supplies or Services/Prices (Cont’d)

Contract has 3 year base period and 2- one year option periods with Optional Requirements.

Base Period: 36 months

CLIN 1 (FFP): Transition – 45 days

CLIN 2 (FFP): Project Management and Facility Maintenance Base Period

CLIN 3 (CPAF): Waste Processing Operations

CLIN 4 (FFP): Container Management & Loading

Optional Requirements :

CLIN 5 (FFP) : NFS Soils CH (NTE 2100 drums)

Option Periods: 2-12 Months

CLIN 6 (FFP): S&M (Warm Standby)

CLIN 7 (FFP): Facility Decontamination & Downgrading

CLIN 8 (FFP): S&M (Cold Standby)

Page 20: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 20

Section F – Deliveries or Performance

Place of Performance:TRU Waste Processing Center100 WIPP RoadLenoir City, TN 37771

Period of Performance:

Transition – Up to 45 days

Based Period – 34.5 Months

Option Periods – two -12 Months

Page 21: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 21

Section G – Contract Administration Data

• Billing Instructions

https://vipers.oro.doe.gov

• Correspondence Procedures

• Contact Information for Defective or Improper Invoices

Page 22: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 22

Section H – Special Contract Requirements

• Workforce Transition and Hiring Preferences:• FAR 52.222-17 Nondisplacement of Qualified Workers (JAN 2013), is

applicable

• Nuclear Facilities Operations• Performance Evaluation and Measurement Plan – CLIN3• Key Personnel

Page 23: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 23

Section H – Special Contract Requirements

• Performance Guarantee Agreement• Work Stoppage and Shutdown Authorization• Security Qualifications• Quality Assurance for Work Affecting Nuclear Safety• Cost Reporting for the Environmental Cost Analysis System –

CLIN3• Integrated Work Control Systems and Reporting Requirements

Page 24: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 24

Section K – Reps, Certs, and Other Statements

Representations, Certifications, and Other Statements of Offerors:

• Offerors shall complete and submit all of the fill-in information provided in Section K.

• Failure to provide the requested information may make the offer unacceptable for award.

Page 25: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 25

Section L – Instructions, Conditions, and Notices to Bidders

Overview of Volume I – Offer and Other Documents• Signed Standard Form (SF) 33• Cover Letter (No Cost/Price Information)• Representation, Certification, and Other Statement of Offer• Foreign Ownership Control, or Influence (FOCI) – Section K.6 • Completed Section B.2 Price Schedule• Organizational Conflict of Interest Disclosure – Section K.4• Joint Ventures and/or LLC or other Teaming Arrangements• Contractor Compliance with Limitations on Subcontracting• Completed Performance Guarantee and Corporate Governance• Amendments to the RFP

Page 26: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 26

Section L – Instructions, Conditions, and Notices to Bidders (Cont’d)

Overview of Volume II – Technical Proposal (40 page limit)

No cost/price information shall be included in Volume II

Criterion 1: Past Performance• Forwarded Attachment L-2, Past Performance Letter and

Questionnaire for contracts that are not with DOE -EM• Completed Attachment L-3, Past Performance and Relevant

Experience Information Form• Completed Attachment L-4, ESH&Q Past Performance

Information Form

Page 27: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 27

Section L – Instructions, Conditions, and Notices to Bidders (Cont’d)

Overview of Volume II – Technical Proposal

Criterion 2: Technical Understanding and Approach• Approach to performing each element of the PWS• Approach to managing the fixed-price and cost-reimbursable

elements of the PWS.• A detailed staffing plan and the rationale for the FTEs for each

element of the PWS• Approach to transition• Three most significant risks to the successful performance of

the PWS

Page 28: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 28

Overview of Volume II – Technical Proposal

Criterion 3: Key Personnel and Organizational Structure• Program Manager and up to 4 additional positions• Explanation for the designations of Key Personnel positions

relative to the proposed management approach• Resumes – No more than 4 pages for the Program Manager and

3 pages for all other Key Personnel• Letter of Commitment for a minimum of two years.

Section L – Instructions, Conditions, and Notices to Bidders (Cont’d)

Page 29: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 29

Section L – Instructions, Conditions, and Notices to Bidders (Cont’d)

Overview of Volume II – Technical Proposal

Criterion 4: Relevant Experience• Relevant experience in performing work similar in size, scope,

and complexity to that described in the PWS.• Size - dollar value and contract duration; • Scope - type of work;• Complexity - performance challenges and risk (e.g., types of

waste, nuclear environment, regulatory environment).• Relevant Experience for Teaming Partner or Subcontractor with

a value above $5 Million.

Page 30: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 30

Section L – Instructions, Conditions, and Notices to Bidders

Overview of Volume III – Cost, Price, and Fee Proposal

General Instructions:• Volume III should be sufficiently complete as a stand alone document. • Offerors shall provide proposed cost and fee by providing a completed

Cost/Price Schedule in Section B. • Offerors shall submit all proposed Accounting System support information.• The Offeror shall use the organization of work set forth in the Performance Work

Statement (PWS) as the Work Breakdown Structure (WBS) for its cost proposal.• DOE reserves the right to request an audit on any information provided in this

volume or additional information provided by the Offeror. • The Offeror shall complete Exhibits A through L of the Excel spreadsheets for

cost/price details.

Page 31: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 31

Section L – Instructions, Conditions, and Notices to Bidders

Overview of Volume III – Cost, Price, and Fee Proposal

Applicable Firm Fixed Price Instructions• Offerors shall provide a Firm Fixed Price for all CLIN’s except CLIN 3.

Offerors shall use the Excel spreadsheets for cost detail.• The offeror shall propose price for each year and in total corresponding to the

price for performing the Performance of Work (PWS).• The offeror’s proposed price for the transition period must be on a firm fixed

price basis not to exceed 45 days.• The Work Breakdown Structure (WBS) structure shall be at the same level as

the WBS in the PWS.

Page 32: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 32

Section L – Instructions, Conditions, and Notices to Bidders

Overview of Volume III – Cost, Price, and Fee Proposal

Applicable Cost Reimbursement Instructions• FAR Part 31, Contract Clause Principles and Procedures, must be the guide to

the definition of cost elements. • Offerors shall provide a Cost Reimbursement price for CLIN 3 only. Offerors

shall use the Excel spreadsheets for cost detail.• Offerors shall provide cost element detail for: Direct Labor Hours; Direct

Labor Rates; Indirect Rates; On-Site Overhead; Materials, Equipment and Supplies; Travel; Consultants; Other Direct Costs; Escalation; and Tax.

• Offerors shall provide a Basis of Estimate (BOE) documenting all estimates are consistent with the technical and management proposal. The BOE shall be a standalone document within the Volume III.

• Offerors shall provide an explanation of Executive Compensation.

Page 33: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 33

Section M – Evaluation Factors

Overall Relative Importance of Technical Evaluation Criteria

Criterion 1 – Past Performance

Criterion 2 – Technical Understanding and Approach

Criterion 3 – Key Personnel and Organizational Structure

Criterion 4 – Relevant Experience

Criterion 1 and Criterion 2 are significantly more important than Criteria 3 and 4.

Page 34: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 34

Section M – Evaluation Factors (Cont’d)

Basis for Award

• The Government intends to award one contract to a single responsible Offeror whose proposal is responsive to the solicitation and is determined to be the best value to the Government.

• Selection of the best value to the Government will be achieved through a process of evaluating the strengths, weaknesses, and deficiencies, of each Offeror’s technical proposal against the Evaluation Factors/Criteria

• The Government is more concerned with obtaining a superior technical proposal and past performance than making an award at the lowest total evaluated price.

• The Government will not make an award at a price premium that it considers disproportionate to the benefits associated with the evaluated superiority of one proposal over another.

Page 35: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 35

Section M – Evaluation Factors (Cont’d)

Cost and Price Evaluation• The Offeror’s cost and price proposal will not be point scored or

adjectivally rated, but will be evaluated for completeness, reasonableness; and (with respect to CLIN 3) realism.

• The price analysis will be utilized to determine if the proposed firm-fixed prices are reasonable.

• For CLIN 3, DOE will determine whether the proposed cost elements are realistic for the work to be performed, reflect a clear understanding of the work requirements, and are consistent with the methods of performance and materials described in the Offeror’s Technical Proposal for CLIN 3.

Page 36: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 36

Site Tour Information

Tour Participants:• Must have registered for the Tour prior to today.• No smoking, no chewing (gum or tobacco products).• The DOE will not be responsible for securing any items during

the tour so it is recommended they be locked in your vehicle.• Please leave personal belongings in your vehicle or on the bus.• At 12:50 PM EST, participants are to reconvene at the DOE

Information Center. It is important to be on time, as instructions will be provided for the site tour.

• Group assignments will be made for the bus transportation and tour. There will be 2 groups for transportation and 4 groups for the tour. Please stay with your assigned group.

Page 37: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 37

• Each tour guide will be guiding you to points of interest. The tour guide will provide written information at each point of interest.

• You will be allowed 5 minutes at each point of interest to read the written information and write down any questions.

• Tour escorts are instructed not to engage in conversation and will not be answering any questions.

• Please do not engage in conversation with or ask any questions of any workers.

• Please return written point of interest information to your tour guide at the conclusion of the site tour.

• Submit all questions on Index Cards or via the Procurement email.• Responses to all questions submitted during the site tour and the

site tour scripts will be posted on the Procurement website.

Page 38: Www.energy.gov/EM 1 TRU Waste Processing Center Operations Pre-Solicitation Conference Draft Request for Proposal DE-SOL-0006331 July 8, 2014

www.energy.gov/EM 38

Closing

Thank you for Attending today.

Questions or comments may be submitted today via the Index Cards provided or via the Procurement Website e-mail Address:

[email protected]