Page 1: I NTRODUCTION TO CPC BLEND ASSAY Teacher: Dr Nemati Student: Mohammad Noruzi Oct - 2012

WW

W.IC

MSTU

DY.IR

Page 2: I NTRODUCTION TO CPC BLEND ASSAY Teacher: Dr Nemati Student: Mohammad Noruzi Oct - 2012

WW

W.IC

MSTU

DY.IR

INTRODUCTION TOCPC BLEND ASSAY

Teacher: Dr Nemati

Student: Mohammad Noruzi

Oct - 2012

Page 3: I NTRODUCTION TO CPC BLEND ASSAY Teacher: Dr Nemati Student: Mohammad Noruzi Oct - 2012

WW

W.IC

MSTU

DY.IR

WHAT IS CPC BLEND? … CPC Blend is a light crude oil which was first

introduced to the market at the end of 2001 with the commissioning of a 1,580km pipeline by the Caspian Pipeline Consortium Oil Pipeline (CPC).

The CPC pipeline links major oil fields in Western Kazakhstan to a Black Sea export terminal opened in 2001 at Yuzhnaya Ozereevka, located 40km North-West of Novorossiysk (Russia).

Source: http://crudemarketing.chevron.com/crude/central_asian/cpc_blend_tengiz.aspx

Page 4: I NTRODUCTION TO CPC BLEND ASSAY Teacher: Dr Nemati Student: Mohammad Noruzi Oct - 2012

WW

W.IC

MSTU

DY.IR

… WHAT IS CPC BLEND? …

At the end of 2004, CPC Blend consisted of seven crude oil streams: Tengiz Aktobe Kumkol Martyshi Arman Karachaganak Siberian Light

Despite new streams being injected to the pipeline, Tengiz remains the single largest component of CPC Blend.

Page 5: I NTRODUCTION TO CPC BLEND ASSAY Teacher: Dr Nemati Student: Mohammad Noruzi Oct - 2012

WW

W.IC

MSTU

DY.IR

… WHAT IS CPC BLEND?

The CPC Pipeline runs from Tengiz to a purpose built terminal at Yuzhnaya Ozerreyevka near Novorossiysk.

There are injection points at Atyrau, Kazakhstan and also Kropotkin in Russia where other crude oil grades are added to the blend.

The terminal has two Single Point Moorings (SPMs), where vessels are loaded at a water depth of 54-56 metres.

Crude oil is pumped to the SPMs from a tank farm located 238m above sea level and 9km inland. CPC Blend is loaded onto Suezmax (120,000-145,000 DWT) and Aframax (80,000-90,000 DWT) vessels.

Implementation of strict vessel vetting procedures, use of double hull tankers, and deep water loading set high safety standards.

Page 6: I NTRODUCTION TO CPC BLEND ASSAY Teacher: Dr Nemati Student: Mohammad Noruzi Oct - 2012

WW

W.IC

MSTU

DY.IR

INSPECTION OF CPC BLENDFIRST HALF OF 2005

Page 7: I NTRODUCTION TO CPC BLEND ASSAY Teacher: Dr Nemati Student: Mohammad Noruzi Oct - 2012

WW

W.IC

MSTU

DY.IR

CPC BLEND – TENGIZ (2007)  CPC blend TengizGravity, API° 45.30 46.42Gravity SG 0.80 0.80Sulfur, wt% 0.56 0.51Total Nitrogen, ppm 332.20 145.18Acid Number, mg KOH/g 0.06 0.04Pour Point, °C -15.00 -15.97Charact. Factor (K-FACTOR) 12.14 12.05Viscosity, cSt at 40°C (104°F) 1.84 1.52Viscosity, cSt at 50°C (122°F) 1.57 1.32Vanadium, ppm 1.33 0.12Nickel, ppm 1.56 0.07MCR, wt% 0.70 0.39Ramsbottom Carbon, wt% 0.61 0.33Asphaltenes, (H.C7) wt% 0.07 0.05

Page 8: I NTRODUCTION TO CPC BLEND ASSAY Teacher: Dr Nemati Student: Mohammad Noruzi Oct - 2012

WW

W.IC

MSTU

DY.IR

FULL ASSAY

CPC BLEND – FULL ASSAY TENGIZ – FULL ASSAY

Page 9: I NTRODUCTION TO CPC BLEND ASSAY Teacher: Dr Nemati Student: Mohammad Noruzi Oct - 2012

WW

W.IC

MSTU

DY.IR

Thank youThe End