www.ieagreen.org.uk
Liaison activities with other organisationsLiaison activities with other organisations(GHG/07/46)(GHG/07/46)
• EPRI
• CCS-CDM working group
• CSLF
• Financing CCS (joint IEA GHG – IEA CCC)
• Det Norske Veritas (DNV)
• EU – CCS Guidelines
www.ieagreen.org.uk
Assessment Criteria – EPRI Assessment Criteria – EPRI • IEA GHG uses standard technical and economic
assessment criteria in its studies on CO2 capture• IEA GHG and EPRI will produce updated criteria
• Taking account of EPRI’s experience from their Technical Assessment Guide (TAG)
• Expanded to include other significant criteria• Provide sets of criteria for plants in other countries
• EPRI has prepared a first draft of the Design and Estimating Basis
• A workshop will be held to discuss this, possibly in early December,
• IEA GHG Members are invited to participate; some members indicated interest already.
www.ieagreen.org.uk
CCS- CDM working groupCCS- CDM working group
• 3 workshops held.• 3rd workshop considered key CCS-CDM issues
raised at last COP-MOP (2).• Group circulated headline conclusions for
consideration by those making submissions to COP-MOP 3 in Bali, in December.
• The submissions received have not yet been posted on the UNFCC website.
• SBSTA 27 will discuss in Bali 3-11th December.
www.ieagreen.org.uk
Carbon Sequestration Leadership ForumCarbon Sequestration Leadership Forum
• Agreement reached between IEA GHG and CSLF Technical Group• Details in Annex 1 of members papers
• Includes representation by CSLF at ExCo• Currently through existing membership
• IEA GHG representation at CSLF• John Gale nominated representative
• Two way process to feed through ideas• Where work is performed jointly, due reference will be given to all
parties
• Action• Members invited to endorse co-operation between CSLF Technical
Group and IEA GHG
www.ieagreen.org.uk
Financing CCS DevelopmentsFinancing CCS Developments
• Joint IEA GHG – IEA CCC activity.
• 1st meeting was in summer of 2007.• Successfully involved the financial community
• 2nd Financing CCS meeting:• New Yorker Hotel, New York, 28-29th May 2008
• 1st agreed Sponsor is World Coal Institute (WCI)
• Other Sponsors Invited
www.ieagreen.org.uk
DNVDNV
• Study on guidelines on site characterisation approved at 31st ExCo
• At time IEA GHG had identified a number of groups working in same area one of which was DNV
• DNV are a non profit organisation in Norway• Accredited verifier under UNFCCC
• Standards body for off shore oil and gas industry
• DNV has proposed a joint venture project supported by Gassnova to develop and qualify sites for geological storage
www.ieagreen.org.uk
DNVDNV
• Sites will include oil and gas fields and deep saline aquifers
• Methodology will be included in a Recommended Practise document• Incorporate; site selection, monitoring, risk
assessment, remediation etc.• Aimed at project developers, regulators and
planners
• a Phase 1 project to develop a preliminary version of the RP will end in December 2007
www.ieagreen.org.uk
DNVDNV
• IEA GHG propose to join Phase 2 of the project that will start in January 2007• Develop a full RP
• Draft available before SBSTA meeting in May
• DNV work plan is compatible with IEA GHG aims for study• Slightly broader
• IEA GHG believes it is more credible to work with an organisation like DNV than to develop guidelines on its own
• Avoids duplication of effort• Work closely with a member organisation i.e. Gassnova• Get financial leverage by contributing to a larger project.
www.ieagreen.org.uk
European Union – CCS GuidelinesEuropean Union – CCS Guidelines
• EU established (2005) European Technology Platform for Zero Emission Power Plants (ZEP)
• 10 to 12 demonstrations to be put in operation (target by 2015)
• EU recognises state aid will be necessary• New guidelines for State Aid for Environmental
Protection must provide a clear long-term framework for how state aid to CCS projects can be approved.