www.ieagreen.org.uk liaison activities with other organisations (ghg/07/46) epri ccs-cdm working...

9
www.ieagreen.org.u k Liaison activities with other Liaison activities with other organisations organisations (GHG/07/46) (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det Norske Veritas (DNV) EU – CCS Guidelines

Upload: cori-brooks

Post on 27-Dec-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Www.ieagreen.org.uk Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det

www.ieagreen.org.uk

Liaison activities with other organisationsLiaison activities with other organisations(GHG/07/46)(GHG/07/46)

• EPRI

• CCS-CDM working group

• CSLF

• Financing CCS (joint IEA GHG – IEA CCC)

• Det Norske Veritas (DNV)

• EU – CCS Guidelines

Page 2: Www.ieagreen.org.uk Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det

www.ieagreen.org.uk

Assessment Criteria – EPRI Assessment Criteria – EPRI • IEA GHG uses standard technical and economic

assessment criteria in its studies on CO2 capture• IEA GHG and EPRI will produce updated criteria

• Taking account of EPRI’s experience from their Technical Assessment Guide (TAG)

• Expanded to include other significant criteria• Provide sets of criteria for plants in other countries

• EPRI has prepared a first draft of the Design and Estimating Basis

• A workshop will be held to discuss this, possibly in early December,

• IEA GHG Members are invited to participate; some members indicated interest already.

Page 3: Www.ieagreen.org.uk Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det

www.ieagreen.org.uk

CCS- CDM working groupCCS- CDM working group

• 3 workshops held.• 3rd workshop considered key CCS-CDM issues

raised at last COP-MOP (2).• Group circulated headline conclusions for

consideration by those making submissions to COP-MOP 3 in Bali, in December.

• The submissions received have not yet been posted on the UNFCC website.

• SBSTA 27 will discuss in Bali 3-11th December.

Page 4: Www.ieagreen.org.uk Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det

www.ieagreen.org.uk

Carbon Sequestration Leadership ForumCarbon Sequestration Leadership Forum

• Agreement reached between IEA GHG and CSLF Technical Group• Details in Annex 1 of members papers

• Includes representation by CSLF at ExCo• Currently through existing membership

• IEA GHG representation at CSLF• John Gale nominated representative

• Two way process to feed through ideas• Where work is performed jointly, due reference will be given to all

parties

• Action• Members invited to endorse co-operation between CSLF Technical

Group and IEA GHG

Page 5: Www.ieagreen.org.uk Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det

www.ieagreen.org.uk

Financing CCS DevelopmentsFinancing CCS Developments

• Joint IEA GHG – IEA CCC activity.

• 1st meeting was in summer of 2007.• Successfully involved the financial community

• 2nd Financing CCS meeting:• New Yorker Hotel, New York, 28-29th May 2008

• 1st agreed Sponsor is World Coal Institute (WCI)

• Other Sponsors Invited

Page 6: Www.ieagreen.org.uk Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det

www.ieagreen.org.uk

DNVDNV

• Study on guidelines on site characterisation approved at 31st ExCo

• At time IEA GHG had identified a number of groups working in same area one of which was DNV

• DNV are a non profit organisation in Norway• Accredited verifier under UNFCCC

• Standards body for off shore oil and gas industry

• DNV has proposed a joint venture project supported by Gassnova to develop and qualify sites for geological storage

Page 7: Www.ieagreen.org.uk Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det

www.ieagreen.org.uk

DNVDNV

• Sites will include oil and gas fields and deep saline aquifers

• Methodology will be included in a Recommended Practise document• Incorporate; site selection, monitoring, risk

assessment, remediation etc.• Aimed at project developers, regulators and

planners

• a Phase 1 project to develop a preliminary version of the RP will end in December 2007

Page 8: Www.ieagreen.org.uk Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det

www.ieagreen.org.uk

DNVDNV

• IEA GHG propose to join Phase 2 of the project that will start in January 2007• Develop a full RP

• Draft available before SBSTA meeting in May

• DNV work plan is compatible with IEA GHG aims for study• Slightly broader

• IEA GHG believes it is more credible to work with an organisation like DNV than to develop guidelines on its own

• Avoids duplication of effort• Work closely with a member organisation i.e. Gassnova• Get financial leverage by contributing to a larger project.

Page 9: Www.ieagreen.org.uk Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det

www.ieagreen.org.uk

European Union – CCS GuidelinesEuropean Union – CCS Guidelines

• EU established (2005) European Technology Platform for Zero Emission Power Plants (ZEP)

• 10 to 12 demonstrations to be put in operation (target by 2015)

• EU recognises state aid will be necessary• New guidelines for State Aid for Environmental

Protection must provide a clear long-term framework for how state aid to CCS projects can be approved.