www.material-change.com ed bastow, managing director project star/symonds farm ad
TRANSCRIPT
www.material-change.com
Ed Bastow, Managing Director
Project Star/Symonds Farm AD
Summary
• Material Change Ltd• AD development and risks• Symonds Farm Power Limited
Symonds Farm AD March 2011
Material Change Limited
• Established 2002• Composting contract
equipment• Own operating sites• Local Authority
contracts• Depackaging equipment• PAS100 compost
certification
Heathpatch Group
AD Development
• Economic advantage needed – heat user, gas to grid, private wire
• Mixed feedstocks – farm and waste based
• Symonds Farm in construction
• Pipeline but more needed, range JV to technology sale
Lots of froth and not much action among competitors
Project risks
• Development – security/project funding
• Electricity subsidy - FIT (REFIT)/ROC
• Waste streams• Grown crop failure• Wheat prices• Technology
agraferm technology
‘Agraferm Group provides turnkey and best quality systems in accordance with industrial standards, as well as full service from a professional partner for effective solutions to biogas production.’
First phase fermentation
Feed hopper
Gas storage
Secondary fermentationGas engine
Gas flare
Schematic plant layout
Symonds Farm summary
• MCL/Symonds Farm Joint Venture
• £5m Capex• £1.4m equity, BDO non
recourse funding• £0.75m diversification grant• Equity IRR 18%• Whole project IRR 12%• 1.4MW electricity• Private wire sales
JV structure
Material Change Ltd
•Planning
•Technology
•Project
management
•Technical support
•Operating contract
•Waste
Symonds Farm Power
Ltd
Symonds Farm
•Lease
•Feedstock
•Daily operations
•Solid & Liquid
digestate use
Heat sales
Electricity sales
ROC sales
Embedded benefits
Tank base preparation
Tank construction
Symonds Farm timetable
• Silage clamp and civils groundworks 50% complete
• Tank construction starts 30th May
• Commissioning starts November 2011
• Full production February 2012