wynn everett boston impact analysismassgaming.com/wp-content/uploads/wynn-everett... · 23.07.2014...

55
7/23/2014 1 Wynn Everett Boston Impact Analysis July 23 rd , 2014

Upload: others

Post on 14-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

1

Wynn EverettBoston Impact Analysis

July 23rd, 2014

Page 2: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

2

Agenda

• Project Overview

• Impact Methodology

• Overview of Impacts

• Conclusions

Page 3: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

3

ProjectO verview

Page 4: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

4

ProjectSite

4

Page 5: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

5

Neighborhood - Context

W ellington

SullivanSquare

Assem blySquare

5

Page 6: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

6

Property

6

Page 7: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

7

Developm entSite Today

7

Page 8: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

8

Developm entSite Today

8

Page 9: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

9

A BitofHistory

Bridge over the Mystic River, 1790

Page 10: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

10

W ynn Everett

10

Page 11: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

11

ConceptualSite Plan

11

Page 12: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

12

PublicRealm ConceptPlan

DEVELO PMENT SITE

12

Page 13: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

13

Rem ediation

Page 14: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

14

Living Shoreline

14

Page 15: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

15

Shellfish Restoration

• Historic value- Union Oyster House• Control nitrogen and other bacteria• Improves water quality and habitat for other species (30 gal/day)• Offset impacts from pollutants• Provides educational opportunities/raise awareness• MOP has shown that oysters can survive and grow in Boston Harbor

15

Page 16: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

16

Im pactAnalysis Methodology

Page 17: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

17

MEPAMA Environmental Policy Act

• Requires that state agencies and major projects involving state agenciesstudy the environmental consequences of their actions.

• “Use all practicable means and measures to minimize damage to theenvironment," by studying alternatives to the proposed project, anddeveloping enforceable mitigation commitments, which will becomeconditions for the project if and when they are permitted.

• It is NOT a permitting process

• It DOES include significant public participation, seeking comment fromcitizens, state, regional and local agencies.

• MEPA review occurs before permitting agencies act, to ensure that theyare fully cognizant of environmental consequences of their actions, and toensure that all possible courses of action have been examined.

Page 18: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

18

Jurisdiction ofMEPA forthis Project

Page 19: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

19

SubjectAreas ofthe FEIR

1 Introduction2 Project Description3 Wetlands and Waterways4 Transportation5 Air Quality6 Greenhouse Gas and Sustainable Development7 Stormwater8 Water Supply9 Wastewater10 Solid and Hazardous Wastes11 Historic and Archaeological Resources12 Construction Management13 Mitigation Measures14 Draft Section 61 Findings

Page 20: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

20

MEPA Tim eLine

• Expanded Environmental Notification Form(EENF), filed May 31, 2013

• Secretary’s Certificate on EENF and scope of DEIR,issued on July 26, 2013

• Draft Environmental Impact Report (DEIR),filed December 16, 2013

• Secretary’s Certificate on DEIR and scope of FEIR,issued on February 21, 2014

• FEIR filing June 30th—Secretary’s Certificateanticipated by August 15, 2014

EENF DEIR Certificate FEIRCertificate Certificate

20

Page 21: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

21

Look-Back and Reopening Provisions

• We anticipate that EOEEA’s Secretary Certificate onFEIR will include a five year look-back requirement formonitoring, reporting, and mitigating

• Gaming Commission language on reopening

Page 22: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

22

DistributionofW ynnEverettC a sinoTa xRevenue,FirstFullYea r

Fund/Progra mPercent

Dedica tedDolla rVa lue

MA Cultural Council 2.0% $4.02 M

MA Tourism Fund 1.0% $2.01 M

Community Mitigation Fund 6.5% $13.07 M

Local Capital Projects Fund 4.5% $9.05 M

Gaming Local Aid Fund 20.0% $40.20 M

Commonwealth Stabilization Fund 10.0% $20.10 M

Education Fund 14.0% $28.14 M

Gaming Economic Development Fund 9.5% $19.10 M

Debt Reduction Program 10.0% $20.10 M

Transportation Infrastructure & Development Fund 15.0% $30.15 M

Public Health Trust Fund 5.0% $10.05 M

Race Horse Development Fund 2.5% $5.03 M

TO TA L 100% $201.01 M

Source: Chapter 194 of the Acts of 2011: An Act Establishing Expanded Gaming in the Commonwealth;TMG Consulting Analysis

Gam ing TaxAllocation

Page 23: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

23

Gam ing Legislation Methodology

205 CMR 125.01(2)(b):

1. Proximity

2. Transportation infrastructure will be “significantly andadversely” affected

3. Community will be “significantly and adversely” affectedby the development of the gaming establishment

4. Community will be “significantly and adversely” affectedby the operation of the gaming establishment

5. Community will “significantly and adversely” affected byother relevant potential impacts

Page 24: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

24

Agreem ents = MEPA +

Page 25: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

25

Com m unity Agreem ents

• Malden- Surrounding Agreement Reached• Medford- Surrounding Agreement Reached• Cambridge – Surrounding Agreement Reached• Chelsea – Surrounding Agreement Arbitrated• Somerville – Surrounding Agreement Arbitrated• Lynn – Neighboring Agreement Reached• Melrose – Neighboring Agreement Reached

• Boston – Ongoing Discussions

Page 26: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

26

O verview ofIm pacts – Proxim ity Chart

CityApproxim ate Length of

Com m on Border( m iles)

Approxim ate Distancefrom W ynn Site to Border

( m iles)

Malden 1.80 1.33

Medford 1.04 0.38

Boston 0.66 0.00

Chelsea 3.00 0.76

Somerville 0.27 0.01

Cambridge 0 1.14

Page 27: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

27

Transportation Im pacts( ex. Trip Distribution ofPatrons)

Page 28: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

28

Im pacts During Developm ent( i.e. Construction Im pacts)

• Potential Impacts

–Noise

–Dust

–Erosion

–Vibration

–Traffic

Page 29: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

29

Construction Noise Im pact

Page 30: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

30

Noise LevelIndex

Source: Galen Carol Audio

Page 31: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

31

Boston Noise Regulations

Page 32: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

32

Im pacts During O peration

• Economic Studies

• Crime Studies

Page 33: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

33

Statew ide Econom ic Im pactProjection

• 5,1 4 4 New Jobs

–3,287 Direct On-Site FTEs (approximately 4,000 Jobs)

–1,858 Indirect & Induced FTEs throughoutCommonwealth

• $2 7 0.55Million in New Earnings

–$136.13 million Direct On-Site Earnings

–$134.42 million Indirect & Induced Earningsthroughout the Commonwealth

Page 34: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

34

Im pacts ofCasinos on ResidentialProperty Values

• We have not found that the presence of a casino hasnegative effects on the value of residential property inthe area

–Often, communities with casinos experiencestronger growth or a more stable housing valuethan their state average

Page 35: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

35

Im pacts ofCasinos on ResidentialProperty Values

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

$350,000

$400,000

$450,000

1990 2000 2010 2012

Median Housing Value: Newport County v. State of Rhode Island

Newport Rhode Island Rhode Island

Newport Grand opens1992

Page 36: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

36

Boston Analysis

Page 37: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

37

RelevantSection ofthe FEIR

1 Introduction2 Project Description3 Wetlands and Waterways4 Transportation5 Air Quality6 Greenhouse Gas and Sustainable Development7 Stormwater8 Water Supply9 Wastewater10 Solid and Hazardous Wastes11 Historic and Archaeological Resources12 Construction Management13 Mitigation Measures14 Draft Section 61 Findings

Page 38: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

38

AirQ uality

• Parking Garage Emissions

– CO Monitoring System

• Vehicle Emissions

– Mesoscale Air Quality Analysis– Assessed VOC and NOx future no-build and build– VOC emissions increase from no build to build, slightly higher than today– NOx emissions increase from no build to build, but will be significantly better

than today– Sources: Natural Ozone, locally generated ozone and transported ozone– Local emissions have almost no effect due to small contribution and reaction

times– County wide emissions increase less than 0.001%– Massachusetts in compliance with NAAQS for ozone

Page 39: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

39

W astew ater

• Charlestown (Cambridge and Somerville) sewageflows through Everett

• DeLauri Pump Station has reduced capacity

• Diversion of Everett flows will increase capacity

• Fewer Combined Sewer Overflow events in MysticRiver

Page 40: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

40

Solid andHazardous W aste

Rem ediation

• Remediation underMassachusetts Contingency Planwill stop contamination migrationto River.

• Significant additional remediationwill be accomplished due todevelopment.

Page 41: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

41

Rem ediation w illbeperform ed in

com pliance w ith allregulatory

requirem ents and in am annerto controloff-

property im pacts:

• Massachusetts Contingency Plan -310 CMR 40.0000

• Dust measurement and control(310 CMR 40.0018)

• Properly stockpiled (310 CMR40.0036)

• Impacted soil shipped in amanner to minimize fugitive dust(310 CMR 40.0036(5))

Page 42: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

42

Construction Managem ent-Charlestow n Construction Im pacts

• Noise – None

• Dust – None

• Erosion - None

• Vibration – None

• Traffic – None

Page 43: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

43

Econom ic Im pacts

Estim a ted Im pa cts fromW ynnEverettonB oston

Popula tiona nd Dista nceM ethod

Earnings Impact $37,438,678

Source: U.S. Census; U.S. Department of Commerce; TMG Consulting analysis

Page 44: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

44

Transportation

Page 45: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

45

Boston Im pactSum m ary and BAFO

Page 46: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

46

4 6

Methodology

1. Proximity

2. Transportation infrastructure will be “significantly and adversely”affected

3. Community will be “significantly and adversely” affected by thedevelopment of the gaming establishment

4. Community will be “significantly and adversely” affected by theoperation of the gaming establishment

5. Community will “significantly and adversely” affected by otherrelevant potential impacts

205 CMR 125.01(2)(b):

Page 47: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

47

4 7

Proxim ity

Page 48: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

48

Proxim ity

City

Approxim ate Length ofCom m on Border

( m iles)

Approxim ate Distancefrom W ynn Site to Border

( m iles)

Malden 1.80 1.33

Medford 1.04 0.38

Boston 0.66 0.00

Chelsea 3.00 0.76

Somerville 0.27 0.01

Cambridge 0 1.14

Page 49: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

49

Transportation

• Exhaustive traffic analysis

• Through the MEPA process, Wynn will be responsible forapproximately $50 M in traffic mitigation:

– Everett (host community)

– Medford (surrounding community)

– Boston (surrounding community)

– Chelsea (surrounding community)

– Revere (did not request surrounding status)

• Boston mitigation estimated to be approximately $5 million

• FEIR is pending and Wynn will implement any required trafficmitigation

Page 50: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

50

Developm entIm pact

NOISE DUST EROSION VIBRATION TRAFFIC

Boston WhisperQuiet Library

None None None Minor

Cambridge None None None None None

Chelsea WhisperQuiet Library

None None None None

Malden None None None None None

Medford WhisperQuiet Library

None None None Minor

Somerville WhisperQuiet Library

None None None None

Page 51: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

51

O perations Im pactDirect/Indirect New Jobs (5,144 throughout the Commonwealth)

New Household Earnings

Increase in Residential and Retail Property Values

ESTIMATED EARNINGS IMPACT TOLOCATION

Boston $37.44 million

Cambridge $11.68 million

Chelsea $4.92 million

Malden $7.87 million

Medford $6.58 million

Somerville $8.29 million

TOTAL $86.1 million

Page 52: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

52

PublicSafety

• Three level of enforcement:

– Wynn Internal Security

– Everett Police

– State Police

• No increase in crime rate

• Increase of incidents in the im m ediate area in instance of certain types ofcrime associated with additional population

• $1,000,000 to cover any public safety needs resulting from increased visitation

Page 53: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

53

5 3

Boston BAFO

1. Vendor Purchase - At least $15 million of goods and services

2. Traffic Improvements - Estimated at approximately $5 million

Pre-Opening Payments -• $250,000 for impacts to local roadways in Charlestown and/or for design and

construction of an agreed upon long-term infrastructure solution for SullivanSquare

• $750,000.00 for staffing and public safety initiatives related to increased pedestrianand vehicular traffic in Boston during the construction phase

Post-Opening Payments -• $1 million/year for impacts to local roadways in Charlestown and/or for design and

construction of an agreed upon long-term infrastructure solution for SullivanSquare

• $1 million/year for need for increased police, fire, traffic, EMS, mutual aidassistance and public works personnel to maintain roadway safety

• $250,000/year for water transportation• $350,000/year to support Charlestown’s non-profits

Page 54: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

54

5 4

Wynn Surrounding Community Agreements*

M a lde n M e dford Som e rville C he lse a C a m bridge B oston

B usine ss D e ve lopm e ntFund $1 0 0 ,0 0 0 $1 0 0 ,0 0 0 $1 5 0 ,0 0 0 $75 ,0 0 0 $2 5 ,0 0 0 $0

Tra nsporta tionH ub Pa ym e nt $3 2 5 ,0 0 0 $3 2 5 ,0 0 0 $0 $0 $0 $0

Tra nsporta tionPa ym e nt $2 2 5 ,0 0 0 $0 $0 $2 2 5 ,0 0 0 $0 $1 ,0 0 0 ,0 0 0

Public Sa fe ty (re la te d toincre a se d tra ffic) $2 5 0 ,0 0 0 $2 5 0 ,0 0 0 $2 5 0 ,0 0 0 $2 5 0 ,0 0 0 $0 $1 ,0 0 0 ,0 0 0

N on-ProfitC ontribution $1 0 0 ,0 0 0 $2 2 5 ,0 0 0 $1 0 0 ,0 0 0 $1 0 0 ,0 0 0 $2 5 ,0 0 0 $3 5 0 ,0 0 0

W a te rTra nsporta tion(including public sa fe ty) $0 $1 0 0 ,0 0 0 $1 5 0 ,0 0 0 $0 $5 0 ,0 0 0 $2 5 0 ,0 0 0

$1 ,0 0 0 ,0 0 0 $1 ,0 0 0 ,0 0 0 $65 0 ,0 0 0 $65 0 ,0 0 0 $1 0 0 ,0 0 0 $2 ,60 0 ,0 0 0

• In addition to upfront payments

Page 55: Wynn Everett Boston Impact Analysismassgaming.com/wp-content/uploads/Wynn-Everett... · 23.07.2014  · • MEPA review occurs before permitting agencies act, to ensure that they

7/23/2014

55

Q &A