XMM, 10 Years in Orbit
How we built it
Uwe Minne, 20.01.2010
![Page 2: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/2.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
We had to face several challenges
to build three times 58 gold-coated nested mirrors including baffles to suppress visible and x-ray stray light
solved by an outstanding ESA-Prime contractor cooperation and a company (MediaLario).
Mayor steps to build the mirrors
- manufacturing of 58 mandrels- lay down a gold reflecting surface on the mandrels- back it with Nickel-layer- ease off the mandrel
![Page 3: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/3.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
reached by an AOCS, specially designed for XMM and by the selection of suitable materials
- AOCS was the only Subsystem in XMM
- in today’s projects these AOCS-Performances are state of the art
Narrow pointing accuracy and stability requirements
![Page 4: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/4.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
The size of 10,8 m
Consequence of the Focal length of 7,5m
The clean room in Friedrichshafen had to be modified.
Transport to Kourou was by ship.
![Page 5: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/5.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
The scheduleThe critical path analysis revealed:LLI procurement & Manufacturing of FMs are on the critical path>> ITTs for those Units were released 1 month after KO
Subcontractor Selection Process
XMM-Newton was our first project which follows “ESA Best Practice Approach”.
![Page 6: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/6.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
XMM essential dates
05. Oct. 1994 Kick-off in Immenstaad for Phase B
Beg. Nov. 1994 First ITTs submitted to potential Subs
21. March 1996 C/D Contract signed in Paris
27. March 1996 C/D Kick off in Überlingen
09.-23.Sept. 1999 Ship-Transport to Kourou
05. Oct. 1999 FAR Presentation in Überlingen
10. Dec. 1999 Launch with Ariane V (V119)
31. March 2000 End of Commissioning-Phase
![Page 7: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/7.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
C/D Contract signed in Paris
![Page 8: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/8.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
XMM Phase C/D Kick-off
![Page 9: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/9.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
Flight Acceptance Review
![Page 10: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/10.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
Flight Acceptance Review
![Page 11: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/11.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
XMM on top of Ariane
![Page 12: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/12.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
The price
linked to the schedule: if the schedule is met, the price-target is met as well
underspent for in house target underspent for subcontractor envelope
“No Games!”
This Project-Philosophy was highly appreciated by the Prime!
![Page 13: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/13.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
Conclusion
Why was XMM so successful?
- excellent cooperation of all parties involved
- concentration of the important issues
![Page 14: XMM 10 Years in Orbit - How we built it](https://reader035.vdocument.in/reader035/viewer/2022081400/54bd09054a7959da268b45bb/html5/thumbnails/14.jpg)
This
doc
umen
t is
the
prop
erty
of A
striu
m. I
t sha
ll no
t be
com
mun
icat
ed to
third
par
ties
with
out p
rior w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
20.01.2010
Launch at
15:32 MEZ
Thanks to ESOC that our Baby was treated so carefully over ten Years