xpc status report veto status report glass rpc r&d

22
C.Gustavino, june 4th 2004, Hamburg •XPC Status report •VETO status report •Glass RPC R&D Outline:

Upload: johnda

Post on 19-Mar-2016

62 views

Category:

Documents


6 download

DESCRIPTION

Outline:. XPC Status report VETO status report Glass RPC R&D. XPC Planes. XPC1 prototype realized and tested (october 2003) XPC mechanical structure: final firm choice (27-3-2004) (INFN approval still in progress) Mounting (structure): XPC1/2 SM1 september 2004 (20 d) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

•XPC Status report•VETO status report•Glass RPC R&D

Outline:

Page 2: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

XPC1 prototype realized and tested (october 2003)XPC mechanical structure: final firm choice (27-3-2004)(INFN approval still in progress)Mounting (structure):XPC1/2 SM1 september 2004 (20 d) XPC2-SM2 may 2005 (7 d) XPC1-SM2 june 2005 (10 d) RPC commissionedStrip commissionedInterconnecting card designed and commissionedMounting (RPC+strips):Details of layout under study Tendering for RPC mounting in progress

XPC Planes

Page 3: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

“Floating” XPC Plane technical design

Page 4: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

Page 5: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

Page 6: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

VETO mechanical structure: final firm choice (may 2004)(INFN approval still in progress)Mounting (structure):februray 2005 or begin of 2006Large Glass RPC under test Details of final layout under study

VETO system

Page 7: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

A CB

A: Poor covering, no fake events from the iron structure, interference with the BMS mounting*, interference with BMS operation?B: good covering, fake events from the pillars no BMS interference.C: good covering, no fake events from the pillars, interference with the BMS mounting*, interference with BMS operation?

*No interference if the mounting is in 2006.

Page 8: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

B solution layout

Page 9: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

moveable structurefor RPC mountingwith footbridge

A 110 mm shiftis mandatory formounting with the footbridge…

Page 10: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

Glass RPC: activity overview

Page 11: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

The 128 glass RPC’s of the Trigger walls of the LNGS test facilityrepresent a real test scale (20% of VETO surface, 80% of equivalent underground life)

Page 12: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

Radiation damaging test (~100 years of OPERA operation)has been performed at the Gamma Irradiation Facility @ CERNBy using a 137Cs source

Page 13: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

Water vapor aging test: after the water damaging a full recovering of the efficiency has been achieved by ammonia flushing,

Page 14: XPC Status report VETO status report Glass RPC R&D

New coating (about 300 k

Glass RPC: technical details

Concave profile to prevent discharges

New frame

glueglass

Page 15: XPC Status report VETO status report Glass RPC R&D

Glass RPC: technical details

10 cm spacing leads to 253 buttons20 cm spacing leads to 60 buttons25 cm spacing leads to 24 buttons!!less manpower, higher efficiencyConstraint: tolerance < 20 microns

Gap uniformity

Page 16: XPC Status report VETO status report Glass RPC R&D

C.Gustavino, june 4th 2004, Hamburg

General Tecnica

G&A

ICRA

Page 17: XPC Status report VETO status report Glass RPC R&D

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

3500 3700 3900 4100 4300 4500

Veff [V]

Efficienza

EFFsecondogiornoEFFnonogiorno

General Tecnica•3 mm electrodes•1m x 0.50m

Efficiency after 2 days

Efficienza after 9 days

0

500

1000

1500

2000

2500

3400 3600 3800 4000 4200 4400

Veff [V]

RATE [Hz/m2]

day1day2day3Day9

Page 18: XPC Status report VETO status report Glass RPC R&D

ICRA•3 mm electrodes•0.60m x 0.60m

0.00

0.20

0.40

0.60

0.80

1.00

3600 3800 4000 4200 4400 4600Veff [V]

Efficienza

0

50

100

150

200

250

300

350

400

450

3600 3800 4000 4200 4400 4600

kV per piatto [V]

rate /m^2 [Hz]

rate primo giorno

rate secondo giorno

rate terzo giorno

rate quarto giornoday1day2day3day4

day1

Page 19: XPC Status report VETO status report Glass RPC R&D

ICRA VS GT

0

100

200

300

400

500

600

700

800

900

3600 3800 4000 4200 4400 4600

kV per piatto [V]

rate /m^2 [Hz]

Rivelatore GTICRA

0.000.100.200.300.400.500.600.700.800.901.00

3600 3800 4000 4200 4400 4600

Veff [V]

Efficienza

GTIcraICRAGT

Page 20: XPC Status report VETO status report Glass RPC R&D

1136 mm

2600 mm

200 mm

Page 21: XPC Status report VETO status report Glass RPC R&D
Page 22: XPC Status report VETO status report Glass RPC R&D

Glass RPC prototype(raw data, no conditioning, low statistic) First class bakelite RPC

Preliminary!