yof city clerk's department vancouver · geotech report and inspection reports in regards to...

54
�YOF VANCOUVER File No.: 04-1000-20-2019-609 November 1, 2019 ·s.22i Dea CITY CLERK'S DEPARTMENT Access to Information & Privacy Re: Request r Access to Records under the Freedom of Inrmation and Protection of Privacy Act (the "Act") I am responding to your request of September 30, 2019 for: Geotech report and inspection repos in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. All responsive records are attached. Some information in the records has been severed, (blacked out), under s.22(1) of the Act. You can read or download this section here: http://. bclaws. ca/EPLibraries/bclaws new/documenI D/eeside/96165 00. Under section 52 of the Act you may ask the Information & Privacy Commissioner to review any matter related to the City's response to your request. The Act allows you 30 business days from the date you receive this notice to request a review by writing to: Office of the Information & Privacy Commissioner, info@oipc.bc.ca or by phoning 250-387-5629. If you request a review, please provide the Commissioner's office with: 1) the request number assigned to your request (#04-1000-20-2019-609); 2) a copy of this letter; 3) a copy of your original request for inrmation sent to the City of Vancouver; and 4) detailed reasons or gunds _ on which you are seeking the review. Please do not hesitate to contact the Freedom of Information Office at foi@vancouver.ca if you have any questions. City Hall 453 West 12th Avenue Vancouver BC V5Y 1V4 vancouver.ca City Clerk's Department tel: 604.873.7276 fax: 604.873.7419

Upload: others

Post on 05-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

�YOF VANCOUVER

File No.: 04-1000-20-2019-609

November 1, 2019

·s.22i

Dea

CITY CLERK'S DEPARTMENT Access to Information & Privacy

Re: Request for Access to Records under the Freedom of Information and Protection of Privacy Act (the "Act")

I am responding to your request of September 30, 2019 for:

Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019.

All responsive records are attached. Some information in the records has been severed, (blacked out), under s.22(1) of the Act. You can read or download this section here: http://www. bclaws. ca/EPLibraries/bclaws new/document/I D/freeside/96165 00.

Under section 52 of the Act you may ask the Information & Privacy Commissioner to review any matter related to the City's response to your request. The Act allows you 30 business days from the date you receive this notice to request a review by writing to: Office of the Information & Privacy Commissioner, [email protected] or by phoning 250-387-5629.

If you request a review, please provide the Commissioner's office with: 1) the request number assigned to your request (#04-1000-20-2019-609); 2) a copy of this letter; 3) a copy of your original request for information sent to the City of Vancouver; and 4) detailed reasons or grounds

_ on which you are seeking the review.

Please do not hesitate to contact the Freedom of Information Office at [email protected] if you have any questions.

City Hall 453 West 12th Avenue Vancouver BC V5Y 1V4 vancouver.ca City Clerk's Department tel: 604.873.7276 fax: 604.873.7419

Page 2: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

Yours truly,

Bar ara J. Van Fraassen, BA Director, Access to Information & Privacy [email protected] 453 W. 12th Avenue Vancouver BC VSY 1V4

*If you have any questions, please email us at [email protected] and we will respond to you as soon as possible. Or you can call the FOi Case Manager at 604.871.6584.

Encl.

:kt

Page 2 of 2

Page 3: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

~ Phillips Engineering Ltd. 3641 Blenheim Street Vancouver, BC, V6L 2Y1 Phone (604) 716-8881 / Fax (604) 739-6782 i nfo@phlll ipsengi neerl ng. ca

c/o Diamond Architectural Group Inc. 410 - 119 West Pender Street Vancouver, BC V6B 1S5

Attention: Craig Meres,

~----::;---::;--;:--:--~ M'.!!ar~cb 10, 2017 (!; is U W lfc -om File: 1253

ITY OF" VA~couvrn .J

I . re 21 2017

Re: Proposal for Geotechnical Engineering Services for roposed New Single.-Fam.ilyJl>welling Located at 550 East 20th Avenue, Vancouver, BC

1.0 INTRODUCTION

We understand tbat it is proposed to re-develop the property located at 550 East 20th Avenue in Vancouver. It is proposed to construct a residential building on this lot which we understand will be up to two or three levels of wood framed construction founded near existing grades.

This report describes the general subsurface conditions at the time of our investigation and makes recommendations for the design and construction of tbe proposed development. This report was prepared exclusively fors .2"2T1) and for tbe use of others on their design and construct ion team, although it remains the property orPbillips "Engineering Ltd.

2.0 SITE DESCRIPTION

The site is located on the south side of East 20th Avenue in Vancouver, BC. The site is bounded by private property to the west, east and south.

At the time of our investigation a house existed on the site.

The property is r ectangular in shape and of maximum dimensions of 49 feet in the east-west direction and 122 feet in the north-south direction. The site is essentially level.

3.0 INVESTIGATION

Phillips Engineering Ltd. was present on site February 9, 2017 to conduct a drill-based site investigation using the subcontracted services ofUniwide Drilling Co. Ltd. ofBurnaby, BC. At that time one solid stem auger test hole was drilled to depths of up to 50 feet and one Dynamic Cone Penetration Test (DPCT) near the proposed building were conducted on areas of the property that were accessible for the truck mounted drill rig. The DCPTs were terminated at depths of up to 41 feet below existing grades. An engineer from our office logged the soils and collected samples for further laboratory analysis. All test holes were backfilled and compacted with excavated soil upon completion oflogging. The test hole locations are shown

File: 1253 · Proposed Residential Oevelopmtnl, 550 East 22od Avenue, Va.ncouver, BC page I

City of Vancouver. FOi 2019-609 . Page 1 of 52

Page 4: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 2 of 52

on our drawing number Sketch-I located following the text of this report and the detailed test hole logs are attached in Appendix A.

4.0 DISCUSSION

4.1 Soil Conditions

The published geological information of the region under investigation is described as SAb = bog, swamp and shallow lake deposits, lowland peat up to 8 m thick overlaying Fb, c, according to the Geological Survey of Canada map 1484A. Please refer to the individual test bole logs in Appendix A for specific soil descriptions. A general description of the soils encountered at the test hole locations is given below:

FILL

Up to 6 inches of asphalt on fill below grades has been identified near the ground surface at all of our test hole location.

PEAT

Very soft, amorphous, peat with high moisture content, was identified from near the ground surface at all of our test hole locations down to about 29 feet below current grades. It is expected to underlie the entire property.

SILT

Silt to organic silt was identified underlying the peat. The silt is more plastic near the top and becomes less plastic with depth and with moderate moisture contents and very soft to soft consistency. The silt extends to depths between 29 feet to 37 feet below existing site grades. The silt is considered compressible under any new area loading.

GLACIAL Till Deposit (Sand and Silt)

The materials described above were noted to be underlain by dense glacial till, comprised of mostly fine sand, some silt, and trace sub-angular gravel. The glacial till was identified at depths ranging from 37 feet below existing site grades and was found to extend to depths beyond those of our investigation.

4.2 Groundwater Conditions

The water table was encountered at around 6 feet below existing site grades at our test hole locations at the time of our investigation. We expect that groundwater level may fluctuate at different times of the year and possibly following periods of heavy rainfall. Excavations below the static groundwater table are expected to encounter significant groundwater.

5.0 GENERAL DISCUSSION

We have not been provided with any design drawings yet however we expect that construction on these lots

File: 1253 - Proposed Residential Development, 550 East 22nd Avenue, Vancouver, BC page 2

Page 5: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 3 of 52

will be limited to three levels of wood framed construction founded near existing site grades

The site was noted to be underlain by up to I 7 feet of peat over about 12 feet of very soft to soft silt at our test hole location and therefore we do not recommend founding the proposed structures at grade as large and differential settlements would be likely. We recommend supporting the house and any accessory buildings on heljcal piles set within the compact to medium dense sand identified at a depth of about 40 feet below eltisting site grades.

The concrete grade beams and floor slabs will be poured using the ground surface as the base form. We note that peat soils are identified at or near the existing ground surface and that any pressure applied to the peat will likely result in compressive settlements. For example, under an 8 inch concrete slab we would expect settlements in the range of 1 to 2 inches. These settlements may result in weakening and/or bowing of the concrete wrule it is curing lending to possible cracking. Therefore we recommend a small pre-load equjval nt in weight to the expected foundation and floor slab concretes be placed over the building areas.

6.0 DESIGN RECOMMENDATIONS

6.1 Site Preparation

6.1.l Stripping Recommendations

Prior to construction the existing structures and infrastructure should be decommissioned, demolished and all debris removed.

6.1 .2 Pre-Loading Recommendations

As discussed above, the peat is expected to be subject to compressive settlements under the weight of the concrete grade beams and floor slabs lending to bowing and/or weakening of the concrete while it is curing. We expect that a 1 metre (3.3 foot) pre-load placed over the building areas and extending at least 0.6 metres (2 feet) outside of the building envelopes would be sufficient to reduce these potential settlements and to not impact the concrete pours. We expect that sufficient compressive settlement under the pre-loads will be complete after about 3 weeks.

6.2 Foundation Recommendations

6.2.1 Piled Foundation

We understand that an alternative option would be to have the proposed structure founded on piles set in the dense glacial till material located below depths of 38 feet below existing site grades. The site is underlain by soft soils and the eltisting homes to the north and south are located relatively close to the property line. To Jim.it vibration and potential damage to the adjacent structures we suggest the use of drilled (helical) piles for the site.

One potential drilled pile would be TerraCana helical micropiles. TerraCana helical micropiles, equipped with a triple (250 mm/300 mm/350 mm diameter) helix lead with a steel pipe, six inch diameter column, can be expected to achieve the working compressive capacities required at a depth. Under lateral loading the Terra Cana helical micro-pile would undergo significant movements. The use of the TerraCana helical rrucro-

File: 1253 - Proposed Residential Developmen 550 East 22°"' Avenue, Vancouver, BC page 3

Page 6: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 4 of 52

pile will require the incorporation ofa grade beam system around the foundations to support the lateral loads from earthquakes or other sources rather than the piles.

AJlowable pile capacities of about 20 kips to 40 kips can be anticipated provided pile lengths are about 42 feet allowing for sufficient embedment of at least 5 feet within the dense glacial till material at depth.

Pile foundations require continuous inspection during installation.

6.2.2 Seismic Design of Foundations

The subsurface soils are not considered prone to ground liquefaction or other forms of ground softening caused by earthquake induced ground motions.

Review of our available geotecbnical data indicates that the proposed development site qualifies as Site Class :gas defined in Table 4.1.8.4.A of the BCBC20 12. We recommend that the structural designer utilize the Class E design spectrum.

All other aspects of construction should meet the requirements of the Vancouver Building By-law 2014 and the details in our report are still relevant.

6.3 Grade Supported Beams, Pile Caps and/or Structural Slabs

Following the recommended site preparation, including pre-loading, specified in Section 6.2 of this report we expect that all concrete beams, pile caps and structural slabs will be structurally designed and poured using the improved ground surface as the base form

7.0 UNDERGROUND SERVICES AND BUILDING TO GROUND TRANSITIONS

The ground around and beneath and around the pile supported building will settle after construction. The amount of settlement depends long term settlement characteristics of the silts. However, a flexible connection system allowing for about 300 mm of settlement should be made for all services connecting to the fixed building from the surrounding ground.

Any pipes or ducts entering the building crawlspace should enter beneath the building foundations or a block out in the foundation should be sufficiently large to allow for the ground settlement. Connections to the building should be flexible or telescopic to allow for settlement.

Building steps, porches and patios should be connected to the building or pile supported. Where the steps meet the ground there should be a transition slab connected to the fixed stairs or building and resting on the ground so that should settlement occur there will be a smooth transition from the ground to the base of the stairs.

Provided that the building floors are above the surrounding grade and constructed in accordance with the recommendations presented above, then perimeter drains should not be necessary.

8.0 SERVICES

Site servicing will consist of the installation of storm, water and sanitary services along with gas and likely

File:1253 • Proposed Residential Development, 550 East 22nc1 Avenue, Vancouver, BC pagc 4

Page 7: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 5 of 52

underground electrical. All of these services are likely to be relatively shallow and therefore within the peat. As discussed above long term settlement of the underlying soils will occur. Services should be designed to account for potential changes of grade ofup to 300 mm.

Normal pipe bedding and backfilling procedures should be used for all services.

9.0 NATURAL GAS GENERATION

The native soil at this site consists of peat. Decomposition of organic soil in anaerobic conditions results in the production of natural gases such as methane. Methane is a light gas and tends to rise and will normally dissipate into the atmosphere without harm. Where the natural gas is able to accumulate beneath buildings, there is a potential hazard.

Ventilation can normally be accomplished by the installation of perforated pipe at about 10 foot spacing which vents through the perimeter wall and up to the atmosphere. Since natural gas is lighter than air, pa sive ventilation normally occurs. However we understand that the current building code requires active ventilation to the roof of the building.

The placement of a vapour barrier above the ventilation system and beneath the floor will also serve to prevent discharge of gas into the building. Care must be taken during construction to prevent the tearing of the vapour barrier.

10.0 FIELD REVIEWS

As required for Municipal "Letters of Assurance", Phillips Engineering Ltd. will carry out sufficient field reviews during construction to ensure that the Geotechnical Design recommendations contained within this report have been adequately communicated to the design team and to the contractors implementing the design. These field reviews are not carried out for the benefit of the contractors and therefore do not in any way effect the contractors obligations to perform under the terms of bis/her contract.

It is the contractors ' responsibility to advise Phillips Engineering Ltd. (a minimum of 24 hours in advance) that a field review is required. Geotechnical field reviews are normally required at the time of the following:

I. Stripping 2. Pre-Load - Review of subgrade and placement of pre-load 3. Deep foundations - Review of pile installation

It is critical that these reviews are carried out to ensure that our intentions have been adequately communicated. It is also critical that contractors working on the site view this document in advance of any work being carried out so that they become familiarised with the sensitive aspects of the works proposed. lt is the responsibility of the developer to notify Phillips Engineering Ltd. when conditions or situations not outlined within this document are encountered.

11.0 CLOSURE

This report is prepared solely for used by our client's Design Team for this project as described to the general standards of similar work for similar projects in this area and no other warranty of any kind is expressed or implied. Phillips Engineering Ltd. accepts no responsibi lity for any other use of this report.

File: 1253 - Proposed Residential Development, 550 East 22..i Avenue, Vancouver, BC page 5

Page 8: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

We are pleased to be of assistance to you on this project and we trust that our comments and recommendations are both helpful and sufficient for your current purpoBes. If you would like further details or would like clarification of any of the above, please do not hesitate to call.

For:

File:1253 - Proposed Residential Development, 550 East 22nd Avenue, Vancouver, BC pagc6

City, of Vancouver - FOi 2019-609 - Page 6 of 52

Page 9: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

Test Hole Log: TH-1 File: 1253 Project: . 2( Residence Client: .22(1) Location: 550 East 20th Avenue, Vancouver, BC

.c a. Q) 0

-o-~o ft ... m

... ... - 1 ... ...

5-... --2 -... -...

10-'-3 ... -,-... - 4 -...

15-... -._5

-20- - 6 -

-7 -

25----8

----

30- - 9

... - 10

35-- 11

0 Q)

.D a. E E ::,... m en en

Soil Description

Asphalt on 6 inches of poor fill overlying PEAT

Very Soft clayey Silt

cnanging 1TOrn very son 10 son to nrm gray "

Sandy Silt compact/firm. moist.grey, trace of gravel

PHILLIPS ENGINEERING LTD.

3641 Blenheim Street Vancouver, BC V6L 2Y1 Tel: 604 716-8881

C:

fox: 604 739-6782 =It Q) a. E

8 DCPT ro en

~ (blows per foot) ~ 102030405000708,C

1 4 o P O P O p O P O P O P O P o P o p O P u p O P o p O P O P O P o p O P o p O P o p o p O P O P ., I 1 • 1 •1 e s

• • 17

• 8 e 13 • 12 • 1?

Remarks

Water Table @abou 6 ft Below Grade

Fine sand sloughed off auger stem .

Equipment: Truck Mounted Drill Rig Sampling Method: Lump Sample

Hammer Type: DCPT

Datum: Existing Grade Surface Elevation: SEE PLAN

Water Depth: 6 ft Below Grade

Logged By: WP Drilling Date; February, 2017

Dwg No.: TH-1 Page: 1 of 2

r ih, n f • i:-n 1 'Jn10. 1::nO • P<>no 7 o f <;')

Page 10: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

Test Hole Log: TH-3 File: 1253 PHILLIPS ENGINEERING LTD. Project: s.22( Residence Client: s.:,tl(1) ---,.-_-Location: 550 East 2oth Avenue, Vancouver, BC 3641 Blenheim Street

Vancouver, BC V6L 2Y1 Tel : 604 716-8,881

0 Q) ;C Cl a.

c 0

(.)

Fox: 60+ 739-6782

DCPT a. E E Q.l >, ro 0 Cl)

Soil Description

Q) a. E m

CJ)

-!Y {blows per f oat) ~ 10203040 5060708(

Remarks

-rc=-m I-

.... , 2 ,_

40- : ,_ - 13 ,_

_,_ I-

,_

45--14

I-

---I-

-15 I--50-,-,_ -1 6 ,_ ,_ ,_ ,_

55- -17 I--,_ I-

-18 ,_ ,_

60----,_ -- 19

I-

---21

70-,_ I-

- 22

-

Cl)

Hard Sandy Silt and Silt Commences at about 37.5 fl Below Grade

End of Test Hole@ 50'

Equipment: Truck Mounted Drill Rig Sampling Method: Lump Sample

Hammer Type: DCPT

Datum: Existing Grade Surface Elevation: SEE PLAN

Water Depth: 6 ft Below Gracie

t 130 IDCPT mel refusal @ 50 ft below grade

Logged By: WP Drilling Date: February 2017

Owg No.: TH-1 Page: 2 of 2

rih, of \In~~~ .... ~ ._ ~ru ?01 Q. ROO _ Pano A of<;?

Page 11: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

RmRENCI:

• NlfH/lCIS Pf/OJ. NO.: /WE: '

PHILLIPS [NCINffRINC LTD. JG'1/WIIIWSl/lfFT VII/CbMR, 11.C f&'.tfl

Pio. (/DI) lll.a881 f4' (11/1) IJl-6l8l

1/1]/ /0SCAll.

DAlt /IN/af 6, 2011

llllH. BY: WP

AH-2 -$- -AUGER DRILL HOLE (AH)

8.

PROPOSED R[SIO[NTIAL 0[V[LOPMENT FU ~O: 1253 ~ 'cf$51cififf.6Miftf[, ~..009 - Page o-..1~ - ----1

AUGER Hot.[ lOCAT/ON PIAN SKETCH-I

Page 12: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

REr ERENCC•

I I I ~------1 I I ~ · PtC l'IJIT1W I PK. !II «x • I I

,.._ (111/)}I..., Ft:r(~)7Jl-ml

I I s I

I I I I I _______ .,_ __ I I I I I I I I I -----19-1--1

/'HlDIOf~ -----Gil~---' I I I I I I ------~--- ---- -1---

' 1

TERMINATION Of VENT RISER: -10' min. /\W/\Y FROM MY ELECmcAJ. DEVICES -ARCHITECT A~O MECHANICAL ENGINEER TO .PLACE PLACARO SIGl'IATVENT LOCAl lONS ON Tl-IE ROOF.

PlJ.CARO SIGN TO READ:

CAUTIOfl METHANloGAS IN PIPE

DRN, IY•

SCJ\Lu

SlPIDBfl 10, 20/l t.P. APP''D,

REVIEW MIITliANE VENfllATION SYSTEM TO ENSURE THAT AliAPPl.lCA!!LE CODES ANO PERMITREOUIREMENTS ARE MEl,

PROPOSED f-22(1) H£S«NCE 550 fAST 20TH AVfMJE, ~~ 8.C. Jl£TIWE ~ TIOI( SrSTEJI PW(

rJLE >ill, 1253 D\JG. N01 G-111

INTERIOR W/>I..L ORCOI.UMN

Pl

WINO OPEAATEO ROfARY VENTILATOO

• ' DIA. $OLIO PVC \/ENT Plr-£ (tOCA.TE TO SUIT ARCHITEC'I\JRAL I.AYOU1)

SLA6-0fi-GRAOf

4"PERFORATIDPVC PIPE IN 1' x r CLEAR CRUSN GRAVEL TRfNCH

1lllLL IIIBlH fWllMll /ff I llfjl1i TD llXTIETJl

HOODED CAP. OR GOOSE NECA< INTAKE (VANDALISM PROOf}

EXTERIOR GRADES 4' DIA. SOI.ID PVC VENT PIPE

TI-WALL

STAJlll.ESS Sim HAl!GER@8' 0/C

C.

STAINLESS STEB. HANGERS AT 8' 0/C 10 SUPPORT PiPE AS SOI. SETll.ES

_j_ PUNG MIN. 12'

f PERfORA18J l'VCPIPE ~

er - FOi 2019-609 - Page 1 of 52

Page 13: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 11 of 52

~TYOF VANCOUVER

Building Permit (BP) Inspection I Enforcement

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: BP-2017-06677-01 Inspection Date: 25 Jul 2018

Inspector: Name: Ed Loney, District Building Inspector Address: 550 E 20TH AVENUE Vancouver, BC V5V 1 M8 Office Hours: 8:30AM - 9:30AM

Phone: (604) 873-7074 Contractor:

Inspection Result: Issues Need Resolution

Comments: GC John 778.896.7887

have contacted GC re noise.

Page 14: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 12 of 52

r-~~ ~irCITYOF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Building Permit (BP) Inspection I Demo - Tree barrier and or demo.assessment

Inspection Number: BP-2017-06677-02 Inspection Date: 10 Sep 2018

Inspector: Name: Ed Loney, District Building Inspector Address: 550 E 20TH AVENUE Office Hours: 8:30AM - 9:30AM Vancouver, BC V5V 1 M8

Phone: (604) 873-7074

Inspection Result: Approved

Comments:

Inspection Checklist Details • D. Predemolition Assessment

Deficiency: Code Section: Comments:

• C. Compliance with Approved Plan

Deficiency: Code Section: Comments:

• B. Safety

Deficiency:. Code Section: Comments:

• A. Inspection General

Deficiency: Code Section: Comments:

Contractor:

Status: Pass

Resolution Date:

Status: Pass

Resolution Date:

Status: N/A

Resolution Date:

Status: Pass

Resolution Date:

Page 15: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 13 of 52

['~~ ~~YCITYOF

VANCOUVER Building Permit (BP) Inspection I Enforcement

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: BP-2017-06677-03 Inspection Date: 15 Oct 2018

Inspector: Name: Ed Loney, District Building Inspector Address: 550 E 20TH AVENUE Office Hours: 8:30AM - 9:30AM Vancouver, BC V5V 1 MB

Phone: (604) 873-7074 Contractor: Wecan Excavating & Demolition Ltd

15031 94 Avenue Surrey, BC V3R 7L9 Office: (778) 241-9295

Inspection Result: Passed

Comments: attempted to contact complainant several times, no response

Page 16: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 14 of 52

~YOF VANCOUVER

Community Services Group Licenses and Inspections

Certificate of Inspection

Building Permit (BP) Inspection I Demo -Demo notification

Inspection Number: BP-2017-06677-04 Inspection Date: 16 Oct 2018

Inspector: Name: Ed Loney, District Building Inspector Address: 550 E 20TH AVENUE Office Hours: 8:30AM - 9:30AM Vancouver, BC V5V 1 M8

Phone: (604) 873-7074

Inspection Result: Failed

Comments: demo done w/ notification

Inspection Checklist Details • C. Compliance with Demolition Contractor Declaration

Deficiency: Code Section: Comments:

• B. Safety

Deficiency: Code Section: Comments:

• A. Inspection General

Deficiency: Code Section: Comments:

Contractor: Wecan Excavating & Demolition Ltd 15031 94 Avenue Surrey, BC V3R 7L9 Office: (778) 241-9295

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: NIA

Resolution Date:

Page 17: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 15 of 52

~Q(~ ~~rCITYOF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Building Permit (BP) Inspection I Demo -Demo notification

Inspection Number: BP-2017-06677-05 Inspection Date: 18 Oct 2018

Inspector: Name: Ed Loney, District Building Inspector Address: 550 E 20TH AVENUE Office Hours: 8:30AM - 9:30AM Vancouver, BC V5V 1 M8

Phone: (604) 873-7074

Inspection Result: Passed

Comments:

Inspection Checklist Details • C. Compliance with Demolition Contractor Declaration

Deficiency:

Code Section:

Comm,ents:

• 8. Safety

Deficiency:

Code Section:

Comments:

• A. Inspection General

Deficiency:

Code Section:

Comments:

Contractor: Wecan Excavating & Demolition Ltd 15031 94 Avenue Surrey, BC V3R 7L9 Office: (778) 241-9295

Status: N/A

Resolution Date:

Status: NIA

Resolution Date:

Status: N/A

Resolution Date:

Page 18: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 16 of 52

~fl~ ~" 'c1TY OF

VANCOUVER

Community Services Group Licenses and Inspections

Certificate of Inspection

Building Permit (BP) Inspection I Demo -Final

Inspection Number: BP-2017-06677-06 Inspection Date: 18 Oct 2018

Inspector: Name: Ed Loney, District Building Inspector Address: 550 E 20TH AVENUE Office Hours: 8:30AM - 9:30AM Vancouver, BC V5V 1 MB

Phone: (604) 873-7074

Inspection Result: Final Inspection Performed

Comments:

Inspection Checklist Details • C. Demolition Complete

Deficiency: Code Section: Comments:

• 8. Safety

Deficiency: Code Section: Comments:

• A. Inspection General

Deficiency: Code Section: Comments:

Contractor: Wecan Excavating & Demolition Ltd 15031 94 Avenue Surrey, BC V3R 7L9 Office: (778) 241-9295

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Page 19: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 17 of 52

r-Q\~ ~rCITYOF

VANCOUVER Plumbing Inspection I Underground

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: PP-2019-01509-01 Inspection Date: 12Apr2019

Inspector: Name: Ed Baumann, Plumbing/Gas and Sprin Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 318-7309

Inspection Result: Passed

Contractor: Christopher K Alexander 11550 2368 Maple Ridge, BC V4R 2C5 Office: (604) 307-5711

Comments: Underground drainage waste venting excepted slab protected by pump all Supported by rods and hangers to rebar structural slab bog area

Inspection Checklist Details • Other Status: N/A

Deficiency: Resolution Date:

Code Section: Comments:

• Permit Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

• Drainage Status: Pass

Deficiency: Resolution Date: Code Section: Comments:

• Sumps/Interceptors Status: N/A

Deficiency: Resolution Date:

Code Section: Comments:

Page 20: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 18 of 52

• Water Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

• Waterservice Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

Page 21: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 19 of 52

r-9'~ ~~rCITYOF

VANCOUVER Electrical Inspection I Underground

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: EP-2018-04452-01 Inspection Date: 24 Apr 2019

Inspector: Name: Andrew Thornley, District Electrical Ins Address: 558 E 20TH AVENUE Vancouver, BC V5V 1 M8 Office Hours:

Phone: (604) 873-7843

Inspection Result: Passed

Comments:

Inspection Checklist Details • 12. Energy Compliance

Deficiency: Code Section: Comments:

• 05. Raceways, Boxes

Deficiency: Code Section: Comments:

• 06. Fixtures, Fittings, Equip

Deficiency: Code Section: Comments:

• 07. Mtr, Gen, Xfmr, Captr

Deficiency: Code Section: Comments:

Contractor: Clear Energy Solutions Inc 5220 Keith Rd West Vancouver, BC V7W 2N 1 Office: (604) 970-9717

Status: N/A

Resolution Date:

Status: Pass

Resolution Date:

Status: N/A

Resolution Date:

Status: NIA

Resolution Date:

Page 22: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 20 of 52

• 09. Life Safety Systems

Deficiency: Code Section: Comments:

• 08. Heating

Deficiency: Code Section: Comments:

• 04. Br Ccts, Cndtrs, Cables, Cords Cable in house foundation

Deficiency: Code Section:

Comments:

• 03. Grounding & Bonding

Deficiency:

Code Section: Comments:

• 01. Service

Deficiency: Code Section: Comments:

• 02. Dist, Protect'n, Control

Deficiency:

Code Section: Comments:

• 13. Other

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: Pass

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Page 23: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 21 of 52

Deficiency: Resolution Date:

Code Section:

Comments:

• 10. Class 1/Class 2/Comm Status: N/A

Deficiency: Resolution Date:

Code Section: Comments:

• 11. EV,PV, Renewable Status: N/A

Deficiency: Resolution Date:

Code Section:

Comments:

Page 24: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 22 of 52

r--Ql,--~, ,.CITY OF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Development and Building Permit (DB) Inspection I 1 and 2 FD - Slab

Inspection Number: DB-2017-06676-02 Inspection Date: 03 May 2019

Inspector: Name: Richard Allen, -District Building lnspecto Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 123-4567

Inspection Result: Passed

Contractor: Rain City Renovations Ltd 4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Comments: Vapour barrier/ insulation is installed and matches plan. P. Eng letter received and accepted for slab reinforcement. Ok to pour.

Inspection Checklist Details • A. Inspection General Status:

Deficiency: Code Section: Comments:

• B. Safety Status:

Deficiency:

Code Section:

Comments:

• C. Compliance with Approved Plans Status:

Deficiency: Code Section:

Comments:

• D. Structural Aspects Status:

Deficiency: Code Section: Comments:

N/A

Resolution Date:

N/A

Resolution Date:

N/A

Resolution Date:

N/A

Resolution Date:

Page 25: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 23 of 52

• E. Environmental Separation Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

• F. In-floor Hydronic Heating Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

Page 26: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 24 of 52

~fl~ ~

1 rCITY OF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Development and Building Permit (DB) Inspection I 1 and 2 FD - Forms/Foundation

Inspection Number: DB-2017-06676-01 Inspection Date: 03 May 2019

Inspector: Name: Richard Allen, District Building lnspecto Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 MB

Phone: (604) 123-4567

Inspection Result: Failed

Comments: Please cleanup tree barrier.

Contractor: Rain City Renovations Ltd 4515 GOTHARD ST Vancouver, BC V5R 3KB Office: (778) 896-7887

P. Eng letter received and accepted for formwork/slab/structural reinforcement Formwork matches plan WCB Geotech required. recall before pour.

Inspection Checklist Details • A. Inspection General

Deficiency: Code Section: Comments:

• B. Safety

Deficiency: Code Section: Comments:

• C. Excavation

Deficiency: Code Section: Comments:

• D. Footings

Deficiency: Code Section:

Status:

Status:

Status:

Status:

N/A·

Resolution Date:

N/A

Resolution Date:

N/A

Resolution Date:

N/A

Resolution Date:

Page 27: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 25 of 52

Comments:

• E. Foundation Walls Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

• F. Concrete Stairs Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

Page 28: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 26 of 52

r-fl,--~'f f'CITY OF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Development and Building Permit (DB) Inspection I 1 and 2 FD - Forms/Foundation

Inspection Number: DB-2017-06676-03 Inspection Date: 08 May 2019

Inspector: Name: Richard Allen, District Building lnspecto Address: 558 E 20TH AVENUE Vancouver, BC V5V 1 M8 Office Hours:

Phone: (604) 829-9768

Inspection Result: Passed

Contractor: Rain City Renovations Ltd 4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Comments: Geotech WCB letter received and accepted valid until June 6, 2019 Geotech methane system letter received and accepted OK to pour footings and slab call for inspection for wall forms

Inspection Checklist Details • A. Inspection General Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

• B. Safety Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

• C. Excavation Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

• D. Footings Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

Page 29: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 27 of 52

• E. Foundation Walls Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

• F. Concrete Stairs Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

Page 30: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 28 of 52

~Q(,--~~ rCITY OF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Development and Building Permit (DB) Inspection I 1 and 2 FD - Forms/Foundation

Inspector: Name: Eli Zienty, District Building Inspector Office Hours: 8:30-9:30 AM Phone: (604) 673-8469

Inspection Result: Passed

Comments: Inspection for foundation walls Some planters and wells to be filled in later P eng let~er for reinforcing received

Inspection Checklist Details • A. Inspection General

Deficiency: Code Section:

Comments:

• 8. Safety

Deficiency: Code Section: Comments:

• C. Excavation

Deficiency: Code Section: Comments:

• D. Footings

Deficiency: Code Section: Comments:

Inspection Number: DB-2017-06676-04 Inspection Date: 28 May 2019

Address: 558 E 20TH AVENUE Vancouver, BC V5V 1 M8

Contractor: Rain City Renovations Ltd 4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Status: Pass

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Page 31: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 29 of 52

• E. Foundation Walls Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

• F. Concrete Stairs Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

Page 32: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 30 of 52

·r-9'~ ~~rCITYOF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Development and Building Permit {DB) Inspection I Draintile

Inspector: . Name: Anthony Leung Office Hours: gav79 Phone: (604) 506-4119

Inspection Result: Passed

Comments: Damp proofing inspection. Asphalt liquid Emulsion damp proofing ok. Draintile and RWL piping to see. Passed.

Inspection Number: DB-2017-06676-05 Inspection Date: 04Jun2019

Address: 558 E 20TH AVENUE Vancouver, BC V5V 1 M8

Contractor: Rain City Renovations Ltd 4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Page 33: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 31 of 52

~YOF VANCOUVER

Community Services Group Licenses and Inspections

Certificate of Inspection

Development and Building Permit (DB) Inspection I Non-encroachment/Plan Check

Inspection Number: DB-2017-06676-06 Inspection Date: 07 Jun 2019

Inspector: Name: Eli Zienty, District Building Inspector Address: 558 E 20TH AVENUE Office Hours: 8:30-9:30 AM Vancouver, BC V5V 1 M8

Phone: (604) 673-8469

Inspection Result: Passed

Comments: TOC 157.2 northeast corner

Inspection Checklist Details • A. Inspection General

Deficiency: Code Section:

Comments:

• B. Safety

Deficiency: Code Section:

Comments:

• C. Compare NEC

Deficiency: Code Section:

Comments:

• D. Field Plan Check

Deficiency: Code Section: Comments:

Contractor: Rain City Renovations Ltd 4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Status: Pass

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Page 34: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 32 of 52

~Ql~ ~"rclTYOF

VANCOUVER Building Permit (BP) Inspection I Enforcement

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: BP-2017-06677-01 Inspection Date: 25 Jul 2018

Inspector: Name: Ed Loney, District Building Inspector Address: 550 E 20TH AVENUE Office Hours: 8:30AM - 9:30AM Vancouver, BC V5V 1 M8

Phone: (604) 873-7074 Contractor:

Inspection Result: Issues Need Resolution

Comments: GC John 778.896.7887

have contacted GC re noise.

Page 35: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 33 of 52

f'~~ ~"frCITYOF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Development and Building Permit (DB) Inspection I 1 and 2 FD - Sheathing

Inspection Number: DB-2017-06676-11 Inspection Date: 10 Sep 2019

Inspector: Name: Ed Loney, District Building Inspector Address: 558 E 20TH AVENUE Office Hours: 8:30AM - 9:30AM Vancouver, BC V5V 1M8

Phone: (604) 873-7074

Inspection Result: Passed

Comments: ok to paper, D-1 in place. ridge survey req'd

Inspection Checklist Details • A. Inspection General

Deficiency: Code Section: Comments:

• B. Safety

Deficiency: Code Section: Comments:

• C. Sheathing Installation

Deficiency: Code Section: Comments:

• D. Wall Penetrations

Deficiency: Code Section: Comments:

Contractor: Rain City Renovations Ltd 4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Status: N/A

Resolution Date:

· Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: NIA

Resolution Date:

Page 36: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 34 of 52

• E. Window Mock-up Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

• F. Flashings Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

• G. Roof Status: N/A

Deficiency: Resolution Date:

Code Section: Comments:

• H. Windows, Doors, and Skylights Status: N/A

Deficiency: Resolution Date:

Code Section: Comments:

• I. Compliance with Approved Plans Status: N/A

Deficiency: Resolution Date:

Code Section:

Comments:

• J. Paths Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

Page 37: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 35 of 52

~~~ ~irCITYOF

VANCOUVER Plumbing Inspection I Rough In

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: PP-2019-01509-03 Inspection Date: 20 Sep 2019

Inspector: Name: Steve Donnery, Plumbing/Gas and Spri Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 418-0926

Inspection Result: Passed

Comments: Venting accepted Waterpipe to see

· inspection Checklist Details • Other

Vent terminations to see

Deficiency: Other

Code Section: Comments: Vent terminations to see

Contractor: Christopher K Alexander 11550 2368 Maple Ridge, BC V4R 2C5 Office: (604) 307-5711

Status: Pass

Resolution Date: Sep 20, 2019

Page 38: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 36 of 52

\'~~ ~"f rCITY OF

VANCOUVER Electrical Inspection I Underground

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: EP-2018-04452-02 Inspection Date: 17 Jun 2019

Inspector: Name: Ronald Macneil, District Electrical lnspe Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 873-7847

Inspection Result: Passed

Comments: Ok to cover cable and conduit

Inspection Checklist Details • Other

Deficiency:

Code Section: Comments:

Contractor: Clear Energy Solutions Inc 5220 Keith Rd West Vancouver, BC V7W 2N1 Office: (604) 970-9717

Status: N/A

Resolution Date:

Page 39: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 37 of 52

~ff~ ~, ,.CITY OF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Development and Building Permit (DB) Inspection I Enforcement

Inspection Number: DB-2017-06676-10 Inspection Date: 21 Jun 2019

Inspector: Name: Siobhan O'Toole, District Building lnspe Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: -(604) 873-7691 Contractor: Rain City Renovations Ltd

4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Inspection Result: Passed

Comments: Spoke to John @ 778-896-7887 He denies it is his crew as they are aware of the By-Laws and do not start working until 7:30am

Page 40: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 38 of 52

~Ql,--~'t ,.CITY OF

Community Services Group Licenses and Inspections

Certificate of Inspection

VANCOUVER Electrical Inspection I Expiration Followup Inspection

Inspection Number: EP-2018-04398-02 Inspection Date: 12 Jul 2019

Inspector: Name: Andrew Thornley, Technical Training In Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 873-7843

Inspection Result: No Action Required

Comments: Main Service to be ready by July 2oth

Inspection Checklist Details • Other

Deficiency: Code Section:

Comments:

Contractor: Clear Energy Solutions Inc 5220 Keith Rd West Vancouver, BC V7W 2N1 Office: (604) 970-9717

Status: NIA

Resolution Date:

Page 41: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 39 of 52

~TYOF VANCOUVER

Plumbing Inspection I Rough In

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: PP-2019-01807-02 Inspection Date: 28 Aug 2019

Inspector: Name: Ed Baumann, Plumbing/Gas and Sprin Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 318-7309

Inspection Result: Passed

Contractor: Nathan Pulice 3522 HURST PLACE Vancouver, BC V5S 4C8 Office: (778) 227-8219

Comments: Add deck drains to permit, deck drains and tests OK

Inspection Checklist Details • Other Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

Page 42: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 40 of 52

~9'~ ~~rCITYOF

VANCOUVER Plumbing Inspection I Rough In

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: PP-2019-01807-03 Inspection Date: 28 Aug 2019

Inspector: Name: Ed Baumann, Plumbing/Gas and Sprin Address: 558 E 20TH AVENUE Vancouver, BC V5V 1 M8 Office Hours:

Phone: (604) 318-7309

Inspection Result: Failed

Comments: Add deck drains to permit

Inspection Checklist Details • Other

Add deck drains to permit

Deficiency: Other Code Section: Comments: Add deck drains to permit

Contractor: Nathan Pulice 3522 HURST PLACE Vancouver, BC V5S 4C8 Office: (778) 2.27-8219

Status: Fail

Resolution Date:

Page 43: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 41 of 52

. ~If~ ~~ rCITY OF

VANCOUVER Plumbing Inspection I Rough In

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: PP-2019-01509-02 Inspection Date: 09 Sep 2019

Inspector: Name: Ed Baumann, Plumbing/Gas and Sprin Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 318-7309

Inspection Result: Not Ready

Contractor: Christopher K Alexander 11550 236B Maple Ridge, BC V4R 2C5 Office: (604) 307-5711

Comments: Partial drainage waste venting excepted vent terminations to see test excepted Reebok

Inspection Checklist Details • Other Status: Fail

Vent terminations to see

Deficiency: Other Resolution Date: Code Section: Comments: Vent terminations to see

Page 44: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 42 of 52

~({l,-~'{ ,.CITY OF

VANCOUVER

Community Services Group Licenses and Inspections

Certificate of Inspection

Development and Building Permit (DB) Inspection I Draintile

Inspection Number: DB-2017-06676-08 Inspection Date: 11 Jun 2019

Inspector: Name: Ed -Baumann, Plumbing/Gas and Sprin Address: 558 E 20TH AVENUE Office Hours: Phone: (604) 318-7309

Inspection Result: Passed

Vancouver, BC V5V 1 M8

Contractor: Rain City Renovations Ltd 4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Comments: Dt rwl ok support to foundations ok to sumps to see

Page 45: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 43 of 52

r-Q(,_ ~~'clTYOF

VANCOUVER

Community Services Group Licenses and Inspections

Certificate of Inspection

Development and Building Permit (DB) Inspection I Draintile

Inspection Number: DB-2017-06676-07 Inspection Date: 11Jun2019

Inspector: Name: Ed Baumann, Plumbing/Gas and Sprin Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 318-7309 Contractor: Rain City Renovations Ltd

4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Inspection Result: Passed

Comments: Drain tile rain water litre supported to Concrete foundation excepted connections to Sumter to see

Page 46: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 44 of 52

r-fl,-~, rCITYOF

VANCOUVER Plumbing Inspection I Sumps

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: PP-2019-01807-01 Inspection Date: 14 Jun 2019

Inspector: Name: Ed Baumann, Plumbing/Gas and Sprin Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 318-7309

Inspection Result: Passed

Contractor: Nathan Pulice 3522 HURST PLACE Vancouver, BC V5S 4C8 Office: (778) 227-8219

Comments: Sumps sewers ok to pl capped subject to depth and location

Inspection Checklist Details • Other Status: N/A

Deficiency: Resolution Date: Code Section: Comments:

Page 47: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 45 of 52

. r-fX,,_-~1 ,.CITY OF

VANCOUVER

Community Services Group Licenses and Inspections

Certificate of Inspection

Development and Building Permit (DB) Inspection I Draintile

Inspection Number: DB-2017-06676-09 Inspection Date: 14 Jun 2019

Inspector: Name: Ed Baumann, Plumbing/Gas and Sprin Address: 558 E 20TH AVENUE Office Hours: Vancouver, BC V5V 1 M8

Phone: (604) 318-7309

Inspection Result: Passed

Comments: Dt. Nd rwl to sumps okay

Contractor: Rain City Renovations Ltd 4515 GOTHARD ST Vancouver, BC V5R 3K8 Office: (778) 896-7887

Page 48: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 46 of 52

~Q\~ ~~ 'c1TY OF

VANCOUVER Electrical Inspection I Service

Inspector: Name: Victor Lippucci Office Hours: 2:30-3:30

Phone: (604) 673-8342

Inspection Result: Passed

Community Services Group Licenses and Inspections

Certificate of Inspection

Inspection Number: EP-2018-04398-01 Inspection Date: 04 Jun 2018

Address: 558 E 20TH AVENUE Vancouver, BC V1 V 1 V1

Contractor:. Clear Energy Solutions Inc 5220 Keith Rd West Vancouver, BC V7W 2N1 Office: (604) 970-9717

Comments: 100 A .120/240V 1 phase 3W ok to cover.

Inspection Checklist Details • 13. Other

Deficiency:

Code Section: Comments:

• 11. EV, PV, Renewable

Deficiency: Code Section: Comments:

• 10. Class 1 /Class 2/Comm

Deficiency: Code Section: ·comments:

• 09. Life Safety Systems

Deficiency: Code Section:

Comments:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Status: N/A

Resolution Date:

Page 49: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 47 of 52

• 08. Heating Status: NIA

Deficiency: Resolution Date: Code Section: Comments:

• 07. Mtr, Gen, Xfmr, Captr Status: NIA

Deficiency: Resolution Date: Code Section: Comments:

• 06. Fixtures, Fittings, Equip Status: NIA

Deficiency: Resolution Date: Code Section:

Comments:

• 01. Service Status: NIA

Deficiency: Resolution Date: Code Section: Comments:

• 05. Raceways, Boxes Status: Pass

Deficiency: Resolution Date: Code Section:

Comments:

• 04. Br Ccts, Cndtrs, Cables, Cords Status: Pass

Deficiency: Resolution Date: Code Section:

Comments:

• 03. Grounding & Bonding Status: Pass

Page 50: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 48 of 52

Deficiency: Resolution Date: Code Section:

Comments:

• 02. Dist, Protect'n, Control Status: Pass

Deficiency: Resolution Date: Code Section:

Comments:

• 12. Energy Compliance Status: N/A

Deficiency: Resolution Date: Code Section:

Comments:

Page 51: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 49 of 52

~TYOF VANCOUVER

G 1505976 PLANNING & DEVELOPMENT Licences and Inspections

CERi\F\CATE OF • l~~PECTIOdNth BC Safety Standards Act: the Piping, Venting and Appliances in these f v uver Gas Ftttlng By-Law an e Pursuant to the City o anco

Pre~been ins~ed as Noted Hereunder. ADDRESS 6 s8 e ~ Jpit~,'i SPECIFICS

Same as permit lJO INSPECTOR ~]) ($v1{1~ Item YES

/ 1 ROUGH - IN COMPLETE OK TO COVER OFFICE HOURS: 8:30 • 9:30 am I 3!00 · ~:00' ~ii"i

2 CERTIFICATE OF COMPLETION RECEIVED V PHONE /I: «M 813 . 3 ('i -1:3 0/ ,

3 PERMIT CLEARED FOR OCCUPANCY / EMAIL:

o/~L:' 4 OTHER / INSPECTOR -) / SIGNATURE

5 FINAL ACCEPTED ~ EJ ITTM -7 ACC REJ ITEM ACy

V 6 GAS PIPING / 16 ROUGH IN ONLY /

7 AIR TEST / 17 UNVENTED HEATER / 8 GAS VENTING / 18 FAN ASSISTED DRAFT /' - AIR SUPPLY Sl~OM BUSTI ON 19 SGTAG / 9

10 VENTILA T19'( 20 GAS REGUALTOY

11 WATE~EATER 21 DIRECT VE~

12 F~ACE 22 VENT ~TOPPING

13 lJ'OILER 23 Vo/'°1lATlON AIR

141 FIREPLACE 24 l)'PECIAL GAS VENTING

'5 APPLIANCES 25/ BARBECUE

The following deficiencies shall be corrected and be left accessible for inspection OTHER INSPECTOR'S PRESENT:

ITEM # DEFICIENCrES / REMARKS CODE / REG. fl

I

3~/~ --p {IL C/Jf'I'~ ,t--

5vl/Vl'5 tzs::. o~ _ :3 t6:,Zi"z:;.r- TO c::>t#frf -r L£J~DrJ ...

( I WHITE COPY TO FIL£

Page 52: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 50 of 52

C

~TYOF G 1505940 VANCOUVER PLANNING & DEVELOPMENT

P l Licences and Inspections

PER>IIT PP-U)(9-0 I 9 0

OAlt R va!} -2-'fJ oo

l.t ~&, ~ CERTIFICATE OF· I INSPECTION

remlses have been Inspected as Noted Hereunder. Pursuant to the City of Vancouver Gas Fitting By-Law and the BC Safety Standards Act: the Piping, Venting and Appliances in these p

CONTRACTOR I OWNER ADDRESS 6bt3 ~"20· Same as oermit 0 SPECIFICS Item YES NO~l t;&> i~~ / INSPECTOR 1 ROUGH -IN COMPLETE OK TO COVER

/" OFFICE HOURS: 8:30 - 9:30 am /~89 4·00 !"'" 2 CERTIFICATE OF COMPLETION RECEIVED ~ 3<'i-"r309 ,,v PHONE#:

3 PERMIT CLEARED FOR OCCUPANCY EMAIL: 4 OTHER / qt~ INSPECTOR .C __,,,)

/ 5 FINAL ACCEPTED SIGNATURE ) ITEM / ACC REJ ITEM

/ i..{cc

6 GAS PIPING / 16 ROUGH IN ONLY / 7 AIR TEST / 17 UNVENTED HEATER / 8 GAS VENTING / 18 FAN ASSISTED DRAFT /

9 AIR SUPPLY SIZE 91MBUSTION 19 SGTAG / 10 VENTILATION / 20 GAS REGUALT9,R"' , 11 WATERHE/fER 21 DIRECTVEy{

12 FURNA9' n VENT _?{ESTOPPING

13 eo1ir 23 V?1'1LATION AIR

14 F~PLACE 24 ~ECIAL GAS VENTING

15 fPPUANCES 2s/ BARBECUE

The 1 ollowin g deficiencies shall be corrected and be left accessible for inspection OTHER INSPECTOR'S PRESENT:

ITEM I DEFICIENCIES / REMARKS

D

WHITE COPY · TO FILE Pie:. _ _ ____ _

-,-

YELLOW WOY 0l'flCER

Referred: DO HOT RfNOYE:n.;:;~0R;..;DDi;::;imQl\;;;:'t;"i1Hl5iii CEiil'iC.At'!

CODE / REG.#

PINK SITE COPY

~ ------

REJ

Page 53: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 51 of 52

t'~ ~., 'orY OF

VANCOUVER

ITEM

6 GAS PIPING

7 AIR TEST

8

9

10

11

12

APPLIANCES

G 1505360 PLANNING &. DEVELOPMENT Licences and Inspections

SPECIFICS

ACC REJ ITEM

16 ROUGH IN ONLY

17 UNVENTED HEATER

18 FAN ASSISTED DRAFT

19 SGTAG

20 GAS REG UAL TOR 21

22

23

24

25

e following def iciencies shall be corrected and e left accessible for inspection OTHER INSPECTOR'S PRESEtrr:

ITEM ti DEFICIENCIES/ REMARKS CODE/REG. I

YELLOW · WETY OFFICER

Refem!d:,=~=---DO HOT REMOVE OR.

J

Page 54: YOF CITY CLERK'S DEPARTMENT VANCOUVER · Geotech report and inspection reports in regards to 558 East 20th Avenue, from January 1, 2017 to October 1, 2019. ... auger test hole was

City of Vancouver - FOI 2019-609 - Page 52 of 52

~TYOF G 120554 7

VANCOUVER COMMUNITY SERVICES GROUP t {)c.,LIM!>/~ Licences and Inspections

CERTIFICATE OF 4i)ig INSPECTION INSPECTION SCHEDULE PHONE LINES 604.873.7601 OR 604.873.7061 (24 hr)

PURSUANT TO THE CITY OF VAJIICOUVER GAS FITTING BY-LAW AND THE BC SAFETY STANDARDS ACT THE PIPING, VENTING AJ-10 APPLIANCES lN THESE PREMJSES HAVE BEEN INSPECTED AS NOTED HEREUNDER.

CONTRACTORJ OWNER

SPECIFICS 5 PO (/ , .,,r.

I 5. I WATER HEATER ITEM N I 6. FURNACE 11.

I 1. BOILER 2 1 .

15.

THE FOUOWING DEFICIENCIES SHALL BE CORRECTED AND BE LEFT ACCESS!

I OTHER GAS SAFETY OFFICERS PRESENT· I ITEM, , DATE -

I I CODE/REG.#

arm COPY· TO FILE ~ le: YEU.ow -~SAFETY

Referrect: 0FFlcERs COPY PINK - SITE COPY

DO NOT IIEMOVEOR DEsTloy ~ ------11tls CER'nAcAtt