YOUR REF: 3656EDA004 OUR REF: DA-2011-188/B 26 October 2016 Torres Hire Pty Ltd C/- Whitsunday Design & Drafting Pty Ltd 31 Gregory St MACKAY QLD 4740 Dear Sir/Madam CHANGE TO DEVELOPMENT APPROVAL Applicant’s Name: Torres Hire Pty Ltd Proposal: Change to Development Approval - Plan of Development - General Industry Application Number: DA-2011-188/B Address: 24 Lester Hansen Street, SLADE POINT QLD 4740 Property Description: Lot 7 on CP895316 Your request for a Change of Condition, lodged on 6 September 2016 to amend DA-2011- 188 approved on 15 September 2009, was considered by Council’s Manager Development Assessment under section 369 of the Sustainable Planning Act 2009. Acting under delegated authority on the 21 October 2016 your request was approved as follows: 1. Condition 1 has been amended as follows. Plan of Development The approved General Industry - Extension development must be completed and maintained generally in accordance with the Plan of Development (identified in the Table below) and supporting documentation which forms part of this application, except as otherwise specified by any condition of this approval. Job Number Drawing Number Title Rev Prepared by Date 11/3656 OP-01 Cover Sheet 0 Whitsunday Designs and Drafting Pty Ltd 22.09.2016 11/3656 OP-02 Site plan and BCA Analysis 0 Whitsunday Designs and Drafting Pty Ltd 22.09.2016 11/3656 OP-03 Overall Floor Plan 0 Whitsunday Designs and Drafting Pty Ltd 22.09.2016 11/3656 OP-04 Proposed Office Floor Plan 0 Whitsunday Designs and Drafting Pty Ltd 22.09.2016 11/3656 OP-05 Building Elevations 0 Whitsunday Designs and Drafting Pty Ltd 22.09.2016 This is a Mackay Regional Council digitally signed document

Upload: vanhanh

Post on 27-Apr-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

YOUR REF: 3656EDA004 OUR REF: DA-2011-188/B

26 October 2016 Torres Hire Pty Ltd C/- Whitsunday Design & Drafting Pty Ltd 31 Gregory St MACKAY QLD 4740 Dear Sir/Madam CHANGE TO DEVELOPMENT APPROVAL Applicant’s Name: Torres Hire Pty Ltd Proposal: Change to Development Approval - Plan of Development -

General Industry Application Number: DA-2011-188/B Address: 24 Lester Hansen Street, SLADE POINT QLD 4740 Property Description: Lot 7 on CP895316

Your request for a Change of Condition, lodged on 6 September 2016 to amend DA-2011-188 approved on 15 September 2009, was considered by Council’s Manager Development Assessment under section 369 of the Sustainable Planning Act 2009. Acting under delegated authority on the 21 October 2016 your request was approved as follows: 1. Condition 1 has been amended as follows.

Plan of Development The approved General Industry - Extension development must be completed and maintained generally in accordance with the Plan of Development (identified in the Table below) and supporting documentation which forms part of this application, except as otherwise specified by any condition of this approval.

Job

Number Drawing Number

Title Rev Prepared by Date

11/3656 OP-01 Cover Sheet 0 Whitsunday Designs and Drafting Pty Ltd

22.09.2016

11/3656 OP-02 Site plan and BCA Analysis

0 Whitsunday Designs and Drafting Pty Ltd

22.09.2016

11/3656 OP-03 Overall Floor Plan 0 Whitsunday Designs and Drafting Pty Ltd

22.09.2016

11/3656 OP-04 Proposed Office Floor Plan

0 Whitsunday Designs and Drafting Pty Ltd

22.09.2016

11/3656 OP-05 Building Elevations 0 Whitsunday Designs and Drafting Pty Ltd

22.09.2016

This is a Mackay Regional Council digitally signed document

The works are in stages as follows: Stage 1 – Workshop, Wash bay extension and hardstand area Stage 2 – Office Extension

2. Condition 10 has been amended as follows.

Stormwater Quality Improvement Device

The proposed Stormwater Quality Improvement Device (Bioretention Basin with filter area of 121m2) shown in the WDD drawings TP07 to TP 11 must be amended as part of the Operational Works according to the following: a) Deleted b) The proposed couch grass in the bioretention basin must be replaced with plants

according Appendix A of WSUD Technical Design Guidelines

3. Condition 11 has been amended as follows.

Drainage Easement

The 5.0m proposed drainage easement shown on Drawing WDD OP-02 must in accordance with Council’s Engineering Design Guidelines and be included in the sealing of Survey Plan application

4. Condition 16 has been deleted. 5. Condition 17 has been amended as follows.

Uncovered Working Area

The uncovered working area including the driveway and carparking must be designed and constructed as part of the Operational Works. All uncovered working area must be sealed, linemarked and drained generally in accordance with WDD drawing OP-02, OP-03 and OP-04. The portion of the site (655.6m2) shown as hardstand on WDD Drawing OP-03 can be constructed as compacted gravel hardstand to provide an area to load and unload track vehicles only.

6. All other conditions remain unchanged. 7. The relevant period for this application remains unchanged as per the original

Decision Notice and will lapse on the 19 September 2019. If you require further information, please contact Darryl Bibay at [email protected]. Yours faithfully Brogan Jones Acting Principal Planner Enc. Appeal Provisions

This is a Mackay Regional Council digitally signed document

WHITSUNDAY DESIGN & DRAFTING PTY LTD

ABN 23 139 539 843Licence No: 1180150

31 Gregory Street Mackay Qld 4740Ph: 07 4953 1040Email: [email protected]. Date Revision By

PROJECT -

TITLE -

CHECKED BY -

FULL SIZE

DRAWN BY -

A3 SCALE - A1 SCALE

PROJECT NO. REVISION

ISSUE DATE

STATUS

DRAWING NO.

A1CLIENT- PROPOSED INDUSTRIAL BUILDING EXTENSIONAT 24 LESTER HANSEN STREET

COVER SHEET DL

RP

FOR CONSTRUCTION

11/3656 OP-01 0

22.09.2016

0 22.09.2016 FOR CONSTRUCTION

OPERATIONAL WORKS DRAWING LISTDRAWING NO. DRAWING NAME REVISION ISSUE DATE STATUS

OP-01 COVER SHEET 0 22.09.2016 FOR CONSTRUCTIONOP-02 SITE PLAN 0 22.09.2016 FOR CONSTRUCTIONOP-03 DEVELOPMENT CATCHMENT PLAN 0 22.09.2016 FOR CONSTRUCTIONOP-04 STORMWATER DRAINAGE PLAN 0 22.09.2016 FOR CONSTRUCTIONOP-05 BIO-FILTRATION BASIN LAYOUT 0 22.09.2016 FOR CONSTRUCTIONOP-06 BIO-FILTRATION BASIN - SECTIONS 0 22.09.2016 FOR CONSTRUCTIONOP-07 STORMWATER DRAINAGE DETAILS 0 22.09.2016 FOR CONSTRUCTION

OPERATIONAL WORKS DRAWINGSPROPOSED INDUSTRIAL BUILDING EXTENSION AT

24 LESTER HANSEN STREET, SLADE POINT

DL

This is a Mackay Regional Council digitally signed document

darrylb
Manual DA & Date

5.00

5.00

4.80

5.20

5.20

4.80

4.604.80

4.60

4.60

4.80

4.40

4.60

4.80

4.60

123.13889° 58' 30"

38.400180° 00' 50"

201°

40' 0

0"

6.760

92° 09' 35"123.915

270° 25' 00"121.480

359° 58' 30"8.500

1.5805° 23' 50"

359° 58' 30"30.675

3.084

13° 1

9' 00

"

PROPOSED INDUSTRIAL BUILDING EXTENSIONEXISTING INDUSTRIAL BUILDING PROPOSED WASHDOWN AREA

EXISTING OFFICE BUILDING

LEST

ER

HANS

EN

STRE

ET

EXISTING CONCRETE PAVEMENT

EXISTING TURF

EXISTING LANDSCAPING

EXISTING LANDSCAPING

EXISTING CONCRETE DRIVEWAY

PROPOSEDBIO-RETENTION

AREA

(EXISTING BUILDING) (EXISTING BUILDING)

EXISTING TURF

4 5 6 7 8 9 10 11 12 134 5 6 7 8 9 10 11 12 134

PROPOSED CONCRETE PAVEMENT

Proposed Industrial Building Setback32.595

14 15 16 17

54.995Proposed Industrial Building Extension

36.000 0.897Proposed Washdown Area

9.600 1.0000.300BIO RETENTION

11.100 0.300 9.399

Existing Office Setback11.505

Existing Office9.000 10.041

HEAVY RIGID VEHICLE TURNING PATH

PROVIDE 100mm WHITE LINE MARKING FOR CARPARKING(TYPICAL).

1

2 3

B

B

Was

hdow

n Setb

ack

0.597

1.0m PROPOSED TURFED SWALE

5.000

PROPOSED EASEMENT

B B

PP

PP 0.886

BIO

RET E

NTIO

N11

.100

PROPOSED GRAVEL

HARDSTAND

1.556 3.444

EXISTING STORMWATER PIPE

Powered by AutoTURN

Powered by AutoTURN

Powered by AutoTURN

Powered by AutoTURN

897wash bay

6000 3600

LEGEND

- EXISTING CONCRETE PAVEMENT

- EXISTING TUFED AREAS

- 1.8m HIGH EXISTING TIMBER PALING FENCE

- EXISTING SEWER MANHOLE

- EXISTING ELECTRICAL PILLAR

- EXISTING WATER METER

- EXISTING POWER POLE

- CONCRETE BOLLARDB

- BIO-RETENTION SYSTEM FH - PROPOSED ON-SITE FIRE HYDRANT

- EXISTING BUILDINGS

- PROPOSED BUILDINGS - FIRE WATER BOOSTER ASSEMBLYFB

- REINFORCED CONCRETE PAVEMENT

- EXISTING LANDCAPED AREAS

- EXISTING LANDCAPED AREASPP

- EXISTING OVERHEAD POWER LINES

WHITSUNDAY DESIGN & DRAFTING PTY LTD

ABN 23 139 539 843Licence No: 1180150

31 Gregory Street Mackay Qld 4740Ph: 07 4953 1040Email: [email protected]. Date Revision By

PROJECT -

TITLE -

CHECKED BY -

FULL SIZE

DRAWN BY -

A3 SCALE - A1 SCALE

PROJECT NO. REVISION

ISSUE DATE

STATUS

DRAWING NO.

A1CLIENT-

1 : 200

PROPOSED INDUSTRIAL BUILDING EXTENSIONAT 24 LESTER HANSEN STREET

SITE PLAN1 : 400

DL

RP

FOR CONSTRUCTION

11/3656 OP-02 0

22.09.2016

0 22.09.2016 FOR CONSTRUCTION

LOTPARISH OFCOUNTY OFLOCALITY -

PROPERTY DESCRIPTIONon

AREA -

7HOWARDCARLISLE

SLADE POINT

CP 895316

4462 m²

DL

This is a Mackay Regional Council digitally signed document

darrylb
Manual DA & Date

5.00

5.00

4.80

5.20

5.20

4.80

4.604.80

4.60

4.60

4.80

4.40

4.60

4.80

4.60

201°

40' 0

0"

6.760

LEST

ER

HANS

EN

STRE

ET

5.32 5.3

75.2

9

5.395.3

05.2

7

5.26

5.225.215.08

5.07

5.07

5.06

5.24

5.195.1

65.13

5.205.1

4

5.164.86

5.18

5.20

5.09

4.994.84

4.75

4.73

4.74

4.75 4.7

5

4.82 4.72

4.914.964.784.81

5.00

4.83

4.78

4.67 4.6

5

4.71 4.8

9

4.65

4.93

4.50

4.59

4.65

4.75

4.63

4.63

5.03

5.324.97

4.91

4.55

5.35

5.36

4.73

4.64

4.64

5.02

5.04

4.69

4.66

4.65

4.68

4.54

4.75

4.55

5.54

4.64

4.46

4.49

4.65

4.46

4.48

4.46

4.60

4.59

4.86

4.27

4.63

4.49

4.65

4.73

4.77

4.74

4.72

4.70

4.94

4.71

4.66

4.934.9

9

5.08

5.20

5.31

5.29

5.20

5.135.0

0

4.99

4.895.01

4.94

4.86

4.79

4.75

4.76

4.57 4.68 4.8

3

4.53

4.54

4.65

4.65

4.60

4.60 4.69

4.70

4.704.79

4.83 4.92

5.22

5.22

5.28

5.25

5.25

5.27

5.23

5.17

5.21

5.25

5.27

5.22

5.21

5.18

5.23

5.335.35

5.24

5.28 5.2

0 5.12

5.335.35

5.30 5.28

5.21 5.1

9

5.14 5.1

35.2

1

5.17

5.14

5.14 5.03

5.07

5.19

5.19

5.21 5.19

5.17

5.12

5.07

4.91

4.96

4.90

5.23

5.295.29

5.315.31

5.32 5.35

5.24 5.24

5.355.34

5.22 5.23

5.35

5.34 5.32

5.11

5.23 4.91

4.84

4.80

4.80

4.78

4.63

4.70 4.6

54.7

3

4.87

4.81

4.81

4.88

4.93

5.03

4.95

4.88

4.78

4.72

5.21

5.24

5.20 5.24

5.33

5.33

5.29

5.20

5.25

5.26

5.33

m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

4.35.77.6

76.0

DP DP DP DP

DPDPDP

DP

m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

3.95.16.8

68.0 m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

3.95.16.8

68.0 m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

3.95.16.8

68.0 m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

3.95.16.8

68.0

DPDP

m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

3.95.16.8

68.0 m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

3.95.16.8

68.0 m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

3.95.16.8

68.0 m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

3.95.16.8

68.0

m²l/sl/s

Q5 -Q100 -

PAVEMENT

6.110.7

119.0

m²l/sl/s

Q5 -Q100 -

PAVEMENT

29.752.2

580.0

m²l/sl/s

Q5 -Q100 -

LANDSCAPING

5.810.3

136.9EXISTING INDUSTRIAL BUILDING EXISTING OFFICE

BUILDINGm²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

21.127.837.1

371.0m²l/sl/sl/sQ100 -

Q5 -Q20 -

ROOF

7.710.213.6

136.0

m²l/sl/s

Q5 -Q100 -

PAVEMENT

42.274.2

824.0

EXISTING

m²l/sl/s

Q5 -Q100 -

LANDSCAPING

5.710.0

132.8

EXISTING

m²l/sl/s

Q5 -Q100 -

LANDSCAPING

4.47.7

102.0

EXISTING

5.10

EG EG EG EG

EG EG EG EG

EG

EXISITNG INVERT

INVERT

INVERT

COP-07

EDP

EDP EDP

EDP

m²l/sl/s

Q5 -Q100 -

PAVEMENT

38.868.2

757.9

m²l/sl/s

Q5 -Q100 -

PAVEMENT

33.659.0

655.6

m²l/sl/s

Q5 -Q100 -

LANDSCAPING

1.11.9

26.0

HARDSTAND

STORMWATER DRAINAGE DESIGN DETAILS5 min TIME OF CONCENTRATIONUNDERGROUND DRAINAGE - 5 YEAR STORM INTENSITY - 205mm/hSURFACE DRAINAGE - 100 YEAR STORM INTENSITY - 360mm/hEAVES GUTTERS - 20 YEAR STORM INTENSITY - 270mm/hBOX GUTTERS - 100 YEAR STORM INTENSITY - 360mm/hRUNOFF 100% - ROOF AREASRUNOFF 90% - PAVED AREASRUNOFF 75% - LANDSCAPED AREAS

LEGEND

- 90Ø PVC DOWNPIPEDP

- ROOF PITCHP-7.5°

- SURFACE FLOW PATH.SHAPE FINAL SURFACE TO SUIT.

- EXISTING SEWER MAIN

- 175 QUAD GUTTEREG

- EXISTING DOWNPIPEEDP

WHITSUNDAY DESIGN & DRAFTING PTY LTD

ABN 23 139 539 843Licence No: 1180150

31 Gregory Street Mackay Qld 4740Ph: 07 4953 1040Email: [email protected]. Date Revision By

PROJECT -

TITLE -

CHECKED BY -

FULL SIZE

DRAWN BY -

A3 SCALE - A1 SCALE

PROJECT NO. REVISION

ISSUE DATE

STATUS

DRAWING NO.

A1CLIENT-

1 : 200

PROPOSED INDUSTRIAL BUILDING EXTENSIONAT 24 LESTER HANSEN STREET

DEVELOPMENT CATCHMENT PLAN1 : 400

DL

RP

FOR CONSTRUCTION

11/3656 OP-03 0

22.09.2016

0 22.09.2016 FOR CONSTRUCTION

A1 SCALE:A3 SCALE:

1 : 200DEVELOPMENT CATCHMENT PLAN

1 : 400

This is a Mackay Regional Council digitally signed document

darrylb
Manual DA & Date

5.00

5.00

4.80

5.20

5.20

4.80

4.604.80

4.60

4.60

4.80

4.40

4.60

4.80

4.60

123.13889° 58' 30"

201°

40' 0

0"

6.760

92° 09' 35"123.915

LEST

ER

HANS

EN

STRE

ET

LOTPLAN

on525CI 3887

5.32 5.3

75.2

9

5.395.30

5.27

5.265.225.215.08

5.07

5.07

5.06

5.24

5.195.1

65.13

5.20

5.14

5.164.86

5.18

5.20

5.09

4.994.84

4.75

4.73

4.74

4.75 4.7

5

4.82 4.72

4.914.964.784.81

5.00

4.83

4.78

4.67 4.6

5

4.71 4.8

9

4.65

4.93

4.50

4.59

4.65

4.75

4.63

4.63

5.03

5.324.9

7

4.91

4.55

5.35

5.36

4.73

4.64

4.64

5.02

5.04

4.69

4.66

4.65

4.54

4.75

4.55

5.54

4.64

4.46

4.49

4.65

4.46

4.48

4.46

4.60

4.59

4.86

4.27

4.63

4.49

4.65

4.73

4.77

4.74

4.94

4.71

4.66

4.934.9

9

5.08

5.20

5.31

5.29

5.20

5.135.0

0

4.99

4.895.01

4.94

4.86

4.79

4.75

4.76

4.57 4.68 4.8

3

4.53

4.54

4.65

4.65

4.60

4.60 4.69

4.70

4.704.79

4.83 4.92

5.22

5.22

5.28

5.25

5.25

5.27

5.23

5.17

5.21

5.25

5.27

5.22

5.21

5.18

5.23

5.335.35

5.24

5.28 5.2

0 5.12

5.335.35

5.30 5.28

5.21 5.1

9

5.14 5.1

35.2

1

5.17

5.14

5.14 5.03

5.07

5.19

5.19

5.21 5.19

5.17

5.12

5.07

4.96

5.23

5.295.29

5.315.31

5.32 5.35

5.24 5.24

5.355.34

5.22 5.23

5.35

5.34 5.32

5.11

5.23 4.91

4.84

4.63

4.70

4.65

4.73

4.935.03

4.95

4.88

5.21

5.24

5.20 5.24

5.33

5.33

5.29

5.20

5.25

5.26

5.33

DP DP DP DP

DPDPDP

DP

DPDP

EXISTING INDUSTRIAL BUILDING EXISTING OFFICE BUILDING

5.10

FFL - 5.36

5.30

5.30

5.30

5.30

5.25p

5.25p

4.80

Ø2251 on 15054.4l/sIL- 4.47

OL- 4

.20

4.91 5.15k

5.00p

5.08k

4.93p

5.00k

4.85p

4.95k

4.80p

4.75p4.90k

5.40k

4.68

COP-07

EXISTING 600Ø RCP STORMWATER PIPE

EXISTING 3/900Ø RCP STORMWATER PIPE

EXISTING 2/900Ø RCP STORMWATER PIPE

STORMWATER DRAINAGE ALLOTMENT POINT FOR LOT 6SL - 4.47OL - 3.57

EXISTING 450Ø RCP STORMWATER PIPE

EXISTING STORMWATER GULLY PITSL - 4.54OL - 3.04

EXISTING 2/900Ø RCP STORMWATER PIPE

EXISTING STREET STORMWATER GRATESL - 4.50OL - 3.28

EXISTING STREET STORMWATER GRATESL - 4.57OL - 3.71

EXISTING STREET STORMWATER GRATESL - 4.85

EXISTING BUILDING STORMWATER DRAINAGE

EXISTING STORMWATER MANHOLESL - 4.51OL - 2.69

EXISTING BUILDING STORMWATER DRAINAGE

Ø300

146.1l/s

Ø3751 on 13146.1l/s

IL- 3.20OL- 3.04

EDP

EDP EDP

EDP

4.78p

LAY FLAT- 3.20

EXISTING PAVEMENT

OL- 4.30 Ø2251 on 13554.4l/s

4.90gGPT-1

IL- 4.304.81

4.50g

BIO

4.50gBIO

4.45p

4.45p

4.78g

GPT-1

4.65p

4.65k

WEIR

STORMWATER DRAINS

• INSTALL THE STORMWATER DRAINAGE SYSTEM TO COMPLY WITH AS 3500.3-2003.• PROVIDE STORMWATER DRAINS TO CONNECT DOWNPIPES, SURFACE DRAINS,

SUBSOIL DRAINS AND DRAINAGE PITS TO THE OUTLET POINT. (CONTRACTOR TO CONFIRM OUTLET LEVELS AND LOCATIONS BEFORE COMMENCING WORK)

• ALL UPVC UNDERGROUND STORMWATER PIPES SHALL BE CLASS '2'.• UPVC PIPES SHALL BE SOLVENT JOINTED. • AFTER LAYING AND JOINTING OF A PIPELINE HAS BEEN COMPLETED THE

CONTRACTOR SHALL ARRANGE FOR INSPECTION BY THE SUPERINTENDENT • TURN UP STORMWATER DRAINS WITH BENDS TO MEET THE DOWNPIPES, FINISHING

50mm ABOVE FINISHED GROUND OR PAVEMENT LEVEL. SEAL JOINTS BETWEEN DOWNPIPES AND DRAINS.

• BED PIPING ON A CONTINUOUS UNDERLAY OF SANDY LOAM MATERIAL, AT LEAST 75mm THICK AFTER COMPACTION. GRADE THE UNDERLAY EVENLY TO THE GRADIENT OF THE PIPELINE.

• PLACE THE SANDY LOAM MATERIAL IN THE PIPE SURROUND IN LAYERS < OR EQUAL TO 200mm LOOSE THICKNESS, AND COMPACT TO 95% OF THE STANDARD MAXIMUM DRY DENSITY OF THE MATERIAL USED WHEN DETERMINED IN ACCORDANCE WITH AS 1289.5.7.1-2006

• PROVIDE SUBSOIL DRAINS TO INTERCEPT GROUNDWATER SEEPAGE AND PREVENT WATER BUILD-UP BEHIND WALLS AND UNDER FLOORS AND PAVEMENTS. CONNECT SUBSOIL DRAINS TO THE STORMWATER DRAINAGE SYSTEM.

- FINISHED LEVEL - p-pavmentg-gratek - top of kerbf - finished surface

6.45k

LEGEND

- EXISTING SEWER MAIN

- INSPECTION OPENING TO SURFACEIOS

- 600SQ. EVERHARD STORMWATER PIT WITH 150 CONCRETE SURROUND (GALVANISED STEEL GRATE AND V-BASKET TRASH

SCREEN)

BIO

DP - 90Ø PVC DOWN PIPE

- 600SQ. CONCRETE STORMWATER PIT WITH GALVANISED STEEL GRATE AND V-BASKET TRASH SCREEN)

GPT-1

- NEW UNDERGROUND STORMWATER PIPES

6.59

- EXISTING SURFACE LEVEL

- CONCRETE BOLLARDB

- EXISTING UNDERGROUND STORMWATER PIPES

EDP - EXISTING DOWN PIPE

WHITSUNDAY DESIGN & DRAFTING PTY LTD

ABN 23 139 539 843Licence No: 1180150

31 Gregory Street Mackay Qld 4740Ph: 07 4953 1040Email: [email protected]. Date Revision By

PROJECT -

TITLE -

CHECKED BY -

FULL SIZE

DRAWN BY -

A3 SCALE - A1 SCALE

PROJECT NO. REVISION

ISSUE DATE

STATUS

DRAWING NO.

A1CLIENT-

1 : 200

PROPOSED INDUSTRIAL BUILDING EXTENSIONAT 24 LESTER HANSEN STREET

STORMWATER DRAINAGE PLAN1 : 400

DL

RP

FOR CONSTRUCTION

11/3656 OP-04 0

22.09.2016

0 22.09.2016 FOR CONSTRUCTION

A1 SCALE:A3 SCALE:

1 : 200STORMWATER DRAINAGE PLAN

1 : 400

This is a Mackay Regional Council digitally signed document

darrylb
Manual DA & Date

OL- 4

.20

4.90k

4.65k

WEIR

OL-

4.20

4.50g

BIO

Ø300

146.1l/s

4.75p

4.50g

BIO

AOP-06

4.20p

BED

BOP-06

EXISTING 450Ø STORMWATER PIPE

UNDERDRAIN PIPES -SLOTTED 100Ø RIDIG POLYETHYLENE PIPE -FALL 100

RIVER STONE & REEDS100 HIGH AT PIPE OUTLETSSIZE 50Ø min.-100Ø maxTO LANDSCAPING PLAN

600SQ. EVERHARD STORMWATER PIT, GALVANISED STEEL GRATE AND V-BASKET TRASH SCREEN COMPLETE WITH 280H x 150 CONCRETE SURROUND.

PROVIDE REMOVABLE SCREW CAPS FOR MAINTENANCE

TIMBER EDGE - 200x100 F17 UNSEASONED HWD. SET 150 INTO SURFACE

PROPERTY BOUNDARY

UNDE

R DR

AINS

FAL

L 100

mm

PR OPE RTY BOUNDARY

UNDERDRAIN PIPE -SLOTTED 150Ø RIDIG POLYETHYLENE PIPE -LAY FLAT

EXISTING 600Ø RCP STORMWATER PIPE

EXISTING 3/900Ø RCP STORMWATER PIPE

EXISTING 2/900Ø RCP STORMWATER PIPE

EXISTING STORMWATER MANHOLESL - 4.51OL - 2.69

Ø1501 on 125

21l/s

LAY FLAT- 3.20

4.90k

4.75p

4.90k

4.65p

4.90k

4.45p4.45p

1170

0

Ø3751 on 13146.1l/s

IL-3.2

0OL

- 3.04

Ø2251 on 13554.4l/s

IOS

FILTRATION DETAILS

GENERALALL FILTER MATERIAL SHALL BE TESTED AND A CERTIFICATE PROVIDED FOR CONDUCTIVITY AND STRUCTURE BY A GEOTECHNICAL ENGINEER.

FILTER LAYERTHE FILTER MEDIA SHOULD BE BASED ON NATURAL OR AMENDED NATURAL SOILS OR IT CAN BE ENTIRELY ENGINEERED; IN EITHER CASE, IT CAN BE OF SILICEOUS OR CALCAREOUS ORIGIN. THE MEDIA SHALL HAVE HIGH PERMEABILITY UNDER COMPACTION AND SHALL BE FREE OF RUBBISH, DELETERIOUS MATERIAL, TOXICANTS, DECLARED PLANTS, WEEDS AND SHOULD NOT BE HYDROPHOBIC. THE FILTER MEDIA SHOULD CONTAIN SOME ORGANIC MATTER FOR INCREASED WATER HOLDING CAPACITY BUT BE LOW IN NUTRIENT CONTENT.IN THE CASE OF NATURAL OR AMENDED NATURAL SOILS, THE MEDIA SHOULD BE LOAMY SAND.

THE HYDRAULIC CONDUCTIVITY OF POTENTIAL FILTER MEDIA SHOULD BE MEASURED USING THE ASTM F1815-06 METHOD FOR A TROPICAL ZONE WITH FILTRATION RATE RANGING BETWEEN 100 TO 300mm/hr.

PARTICLE SIZE DISTRIBUTION (PSD) IS OF SECONDARY IMPORTANCE COMPARED WITH HYDRAULIC CONDUCTIVITY. THE FOLLOWING COMPOSITION RANGE (PERCENTAGE W/W) PROVIDES A GUIDE FOR SELECTING AN APPROPRIATE MATERIAL:-

● CLAY SILT <3% (<0.05mm)● VERY FINE 5-30% (0.05 - 0.15mm)● FINE SAND 10-30% (0.15 - 0.25mm)● MEDIUM TO COARSE SAND 40-60% (0.25 - 1.00mm)● COARSE SAND 7-10% (1.00 - 2.00mm)

43-

15 85

15

85th

th

15 85

15

85

th

th

15

15

THE FILTER MEDIA SHOULD BE WELL-GRADED WITH ALL PARTICLE SIZE RANGES PRESENT FROM THE 0.075mm TO THE 4.75mm SIEVE (AS DEFINED BY AS1289.3.6.1 - 1995). THERE SHOULD BE NO GAP IN THE PARTICLE SIZE GRADING, AND THE COMPOSITION SHOULD NOT BE DOMINATED BY A SMALL PARTICLE SIZE RANGE. THIS IS IMPORTANT FOR PREVENTING STRUCTURAL COLLAPSE DUE TO PARTICLE MIGRATION.FILTER MEDIA MUST BE TESTED AND MEET THE FOLLOWING CRITERIA:-

● TOTAL NITROGEN (TN) CONTENT - <1000mg/kg● ORTHOPHOSPHATE (PO ) CONTENT- <80mg/kg● ORGANIC MATTER CONTENT - 3% (w/w)● pH - 5.5-7.5 (pH 1:5 IN WATER)● ELECTRICAL CONDUCTIVITY (EC) <1.2dS/m

FOR INSTALLATION THE FILTER MEDIA SHALL BE LAID IN 250mm LAYER AND BE LIGHTLY COMPACTED DURING INSTALLATION TO PREVENT MIGRATION OF FINE PARTICLES. A SINGLE PASS WITH A VIBRATING PLACE SHOULD BE USED TO COMPACT THE FILTER MEDIA. UNDER NO CIRCUMSTANCE SHALL THE MEDIA BE HEAVILY COMPACTED OR MULTIPLE-PASSES BE MADE.

TOP TRANSITION LAYERTHE TOP 100mm TRANSITION LAYER SHALL CONSIST OF FILTER MEDIA USED IN THE FILTER LAYER AMELIORATED WITH THE FOLLOWING ORGANIC MATTER, FERTILIZER AND TRACE ELEMENTS AS FOLLOWS:-

CONSTITUENT QUANTITY (kg/100m² FILTER AREA)

GRANULATED POULTRY MANURE FINES 50SUPERPHOSPHATE 2MAGNESIUM SULPHATE 3POTASSIUM SULPHATE 2TRACE ELEMENT MIX 1FERTILIZER NPK (16.4.14) 4

TRANSITION LAYERTHE TRANSITION LAYER PREVENTS FILTER MEDIA FROM WASHING INTO THE DRAINAGE LAYER. TRANSITION LAYER MATERIAL SHALL BE A CLEAN, WELL-GRADED SAND MATERIAL CONTAINING <2% FINES.TO AVOID MIGRATION OF THE FILTER MEDIA INTO THE TRANSITION LAYER, THE PARTICLE SIZE DISTRIBUTION OF THE SAND SHOULD BE ASSESSED TO ENSURE IT MEETS 'BRIDGING CRITERIA', THAT IS, THE SMALLEST 15% OF THE SAND PARTICLES BRIDGE WITH THE LARGEST 15% OF THE FILTER MEDIA PARTICLES.

D (TRANSITION LAYER) < 5 x D (FILTER MEDIA)

WHERE: D (TRANSITION LAYER) IS THE 15 PERCENTILE PARTICLE SIZE IN THE TRANSITION LAYER MATERIAL.(ie. 15% OF THE GRAVEL IS SMALLER THAN D mm), AND

D (FILTER MEDIA) IS THE 85 PERCENTILE PARTICLE SIZE IN THE FILTER MEDIA.

DRAINAGE LAYERTHE DRAINAGE LAYER COLLECTS TREATED WATER AT THE BOTTOM OF THE SYSTEM AND CONVEYS IT TO THE UNDER DRAIN PIPES. DRAINAGE LAYER MATERIAL IS TO BE CLEAN, FINE GRAVEL CONSISTING OF 2-5mm WASHED SCREENINGS. BRIDGING CRITERIA SHOULD BE APPLIED TO AVOID MIGRATION OF THE TRANSITION LAYER INTO THE DRAINAGE LAYER.

D (DRAINAGE LAYER) < 5 x D (TRANSITION LAYER)

WHERE: D (DRAINAGE LAYER) IS THE 15 PERCENTILE PARTICLE SIZE IN THE DRAINAGE LAYER MATERIAL.(ie. 15% OF THE GRAVEL IS SMALLER THAN D mm), AND

D (TRANSITION LAYER) IS THE 85 PERCENTILE PARTICLE SIZE IN THE TRANSITION LAYER MATERIAL.

UNDER DRAIN PIPESTHE PERFORATIONS IN THE UNDER DRAIN PIPES SHALL BE SMALL ENOUGH THAT THE DRAINAGE LAYER CANNOT FALL INTO THE PIPES. THE D (DRAINAGE LAYER) IS GREATER THAT THE PIPE PERFORATION DIAMETER.

GEO-TEXTILE FABRICSGEO-TEXTILE FABRICS ARE NOT RECOMMENDED FOR USE BETWEEN LAYERS IN THE BIO-FILTRATION SYSTEM DUE TO THE RISK OF CLOGGING. AN OPEN-WEAVE SHADE CLOTH SHALL BE PLACED BETWEEN THE TRANSITION LAYER AND THE DRAINAGE LAYER TO HELP REDUCE THE DOWNWARD MIGRATION OF SMALLER PARTICLES. THE BASE AND SIDES SHALL BE LINED WITH A GEO-TEXTILE FILTER FABRIC TO PREVENT CONTAMINATION OF THE FILTRATION SYSTEM.

WHITSUNDAY DESIGN & DRAFTING PTY LTD

ABN 23 139 539 843Licence No: 1180150

31 Gregory Street Mackay Qld 4740Ph: 07 4953 1040Email: [email protected]. Date Revision By

PROJECT -

TITLE -

CHECKED BY -

FULL SIZE

DRAWN BY -

A3 SCALE - A1 SCALE

PROJECT NO. REVISION

ISSUE DATE

STATUS

DRAWING NO.

A1CLIENT-

1 : 50

PROPOSED INDUSTRIAL BUILDING EXTENSIONAT 24 LESTER HANSEN STREET

BIO-FILTRATION BASIN LAYOUT1 : 100

DL

RP

FOR CONSTRUCTION

11/3656 OP-05 0

22.09.2016

0 22.09.2016 FOR CONSTRUCTION

A1 SCALE:A3 SCALE:

1 : 50BIO-RETENTION BASIN

1 : 100

DL

This is a Mackay Regional Council digitally signed document

darrylb
Manual DA & Date

Decision Notice Sustainable Planning Act

Sustainable Planning Act Appeals Chapter 7 Part 1 Planning and Environment Court:

465 Appeals about decisions relating to extensions for approvals

(1) For a development approval given for a development application, a person to whom a

notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice.

(2) The appeal must be started within 20 business days after the day the notice of the

decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court

against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the

decision on the matter should have been made.

466 Appeals about decisions relating to permissible changes

(1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval—

(a) if the responsible entity for making the change is the assessment manager for the

application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response

notice about the request;

(b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request.

(2) The appeal must be started within 20 business days after the day the person is given

notice of the decision on the request under section 376.

(3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request.

(4) An appeal under subsection (3) may be started at any time after the last day the

decision on the matter should have been made.

467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency

(1) A person to whom a notice under section 378(9)(b) giving a decision to change or

cancel a condition of a development approval has been given may appeal to the court against the decision in the notice.

(2) The appeal must be started within 20 business days after the day the notice of the

decision is given to the person.

This is a Mackay Regional Council digitally signed document