yowani country club€¦  · web viewnew 2 2014 tree maintenance (m) to remove dead pine lhs of...

55
Grounds & Greens Committee July 2014 Golf Course Audit & Report

Upload: others

Post on 24-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Grounds & Greens Committee

July 2014 Golf Course Audit & Report

Page 2: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Background

During the year the Grounds and Greens Committee continued reviewing the golf course having regard to Yowani’s Golf Course Maintenance Standards and 2013 Golf Course Audit & Report. The G&G’s report for 2014 follows.

Assessment

The G&G found that, given the prevailing weather conditions, less than ideal staffing levels and problems with the availability of serviceable and appropriate equipment, the course has continued to be maintained, on average, to a reasonable level (albeit below expectations during the fairway seeding and top dressing), and was generally in line with the Yowani Golf Course and Bowls Maintenance Standards.

While there have been a large number of improvements made to the golf course since July 2013, there remain significant matters that require further attention by the Course Superintendent during the next twelve months – particularly the standard of bunker care and the establishment of the turf nursery. Moreover, there are a number of matters that are outside the day-to-day maintenance activities which require attention by the Board and G&G.

Besides the normal operational outcomes since the last audit, G&G has been very active and instrumental in achieving successful outcomes for many initiatives. Attachment 1 details the work completed during 2013/14 as a result of positive and collaborative efforts by the Course Superintendent and G&G.

Many of the improvements made in the past twelve months are directly attributable to the efforts of the Yowani volunteers. For example, the volunteers have constructed a path between the 17 th green and 18th tee and planted trees to provide a vista; mounds have been constructed and grassed on the LHS of the 11th fairway; commenced an unwanted grass eradication programme; and commenced the installation of the new tee signs. Without the contributions of the volunteers, this number of positive outcomes would never have been achieved with the current staffing levels.

Moreover, volunteers regularly carried out routine maintenance work, such as clearing course debris, the maintenance of ball washers, whipper snipping and mowing of the water hazard surrounds so as to allow ground staff more time to pursue higher maintenance priorities. G&G believes that, by using volunteers to attend to the maintenance of the water hazards, ground staff should be able to spend additional time on improving the standard and presentation of Yowani’s bunkers. Unfortunately, bunker maintenance is still not up to G&G expectations. This outcome is contrary to the intent of the additional assistance given by volunteers.

The hours contributed by the volunteers reinforces the position that, for Yowani to be well presented and maintained, the current Yowani staffing level of 6 staff (including the course superintendent) is below an appropriate staffing level. In 2009, Mr Farrell used the Yowani Maintenance Standards as a basis for hours worked calculations and estimated that Yowani’s effective staff level should be 9 (plus the course superintendent). These staffing calculations were made prior to the establishment of the 3rd bowling green, but recognised that volunteer support could have a reductive influence on actual staff numbers required. The course maintenance program is also adversely affected by the unavailability of staff through leave, sickness and training and, the down-time caused by ageing equipment. The recent Board decision not to employ a groundsman to replace the recent resignation of a qualified greenkeeper further accentuates the problems.

Page 3: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Observations

Drainage at the 4th Fairway

The drainage at the 4th fairway seems to have been partially resolved. The removal of debris collected from the four drainage sumps connected to the drainage system appears to have been partially successful in reducing the amount of surface water.

Work to clear blockages at the well has allowed the water pooled at the 150 metre marker to be discharged into the top lake. The well requires regular inspection to ensure that there is no repeat of the blockage. It is possible that work will be needed to improve the discharge rate by enlarging or supplementing the discharge pipe between the well and the connecting 900mm pipe.

Previously it was reported that jet rodding might be necessary to clear the 300mm pipe. This now does not appear to be the case but the drainage in this area continues to be monitored.

Drainage at the 7th Fairway

The 7th fairway between the treed high ground and the lake edge has become increasingly boggy in wet conditions. Action is needed to alleviate the amount of surface water and improve drainage by replacing the existing inadequate and failing subsoil draining system. The 7th fairway is nearly always in shadow and without an effective means to divert vehicles away from the boggy ground a good drive invariably will result in a poor lie and detract from a pleasant golf experience.

Drainage at the 13th Fairway

The drain on the LHS of the 13th fairway requires excavation work to permit water to flow to the culvert and discharge into the top lake. Furthermore, a small crossing should be put in place to facilitate easy access by players to the area between the drain and the 2nd fairway.

Drainage at the 15th Fairway

The LHS 15th fairway opposite the bunkers retains water. To reduce this water retention and improve drainage, excavation work is required to construct a spoon drain to connect with the LHS 14 th fairway drainage which discharges across the 15th fairway.

Drainage at the 17th Fairway

Since the completion of the water harvesting project, there have been a number of partially successful efforts to improve drainage near the 17th green adjacent to the 18th tee path. Further work is required.

Page 4: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Lake Walls

The lake walls present Yowani with a problem that, despite repeated reporting, has largely been ignored. G&G will continue to monitor the deterioration and implement minor repairs in an effort to provide a modicum of safety, but the Board needs to consider the lake walls as a priority.

In the 2011/12 audit report, G&G recommended to the Board that consideration be given to developing an operational plan to replace the existing lake walls. It was considered that such a plan would consist of identification of potential long term solutions (with estimated costs). The plan would provide the Board with the necessary information to develop a considered implementation plan consistent with a forward budgetary strategy. In 2013, the Course Superintendent provided G&G with his concept on how the lake walls might be replaced incrementally. This concept has been with the Board for over twelve months without a response.

Of Immediate Concern

The soil at the lake edges along the 11th fairway and in front of the 16th and 17th greens is subsiding into the lakes. Some remedial work has been undertaken to fill the cavities along the wall in front of the greens, but the work has failed to achieve a positive result. The interim measure taken some years back to repair the wall at the 16 th green still only serves to delay the inevitable with the slope at front of the green (towards the lake) becoming increasingly noticeable.

The unstable lake edging is also very noticeable at the 16th tee. In most places along the length of the tee less than half the width of the tee is reasonably level. The right hand side of the tee severely slopes towards the lake forcing most players to tee up on the left hand side of the tee.

Bridges

For two years the suitability of the Sullivans Creek bridge surfaces in icy conditions has been raised as an OH&S matter, requiring attention. G&G understands that preliminary work may have been undertaken in 2012 to identify a suitable surface replacement, but this matter remains unresolved. It is a little disconcerting that action on this safety matter has not occurred.

The safety concern with the surface of these bridges has somewhat been overtaken by additional concerns with the structural integrity of the bridges. The bridges, particularly the 10th fairway Bridge crossing Sullivans Creek, have been found to have serious levels of water influenced deterioration in the load bearing beams making full replacement necessary. A structural fix underpinning the LH span to the 10th bridge has been undertaken this year. G&G understands there is an engineering caveat indicating this temporary fix will suffice for twelve months.

Of Immediate Concern

The 10th bridge urgently needs to be replaced – preferably within twelve months.

The 1st Fairway Bridge should be considered for replacement in the following year.

When the 7th fairway is wet, vehicle and player traffic moving around the lake towards the green turns the fairway into a boggy mush. It takes a good period of dry conditions for the fairway to recover to a condition that is suitable for play. Consideration needs to be given to reducing the vehicle and pedestrian traffic in this area by re-establishing appropriate load-bearing bridges to and from the island.

Page 5: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Invasive Grasses

Kikuyu, Paspalum and Parramatta grasses continue to invade the playing areas and will in time present a serious problem for Yowani. During 2013/14 the volunteers have commenced, under the direction and guidance of the Course Superintendent, a structured and targetted programme to remove Paspalum, kikuyu and Parramatta grasses.

To date the eradication effort has concentrated on the Paspalum and Parramatta grasses.

Of Concern

There is a significant infestation of kikuyu along the rear edge of the 9th green which is starting to encroach into the putting surface. There is a similar situation at the front of the 17 th

green. Urgent control measures are warranted to eradicate the kikuyu at these greens.

Tee Signage

It is now a case of securing donors to source funds for this project to be realised. Besides the installation of the 1st and 10th tee plinths, work has commenced with a number of plinth bases constructed at the 3rd, 4th (men), 5th (men), 9th, 11th (men), 12th, 13th and 14th tees. The majority of the installation work will be carried out by volunteers.

Root Barrier and Tree Roots

The root barrier programme has brought about significant improvement in condition of the fairways and should be continued until completed. This programme is assessed as having 2-3 years to completion.

Although funding for 2013/14 had been approved by the Board, due to financial constraints no work was undertaken in this period.

Bunkers

Bunkers continue to be a source of concern to the members. This audit found there were a few bunkers requiring further attention to remove noticeable grass and weeds. The bunkers generally have been presented in a fair condition despite the occasional weeds and poorly levelled surfaces in some bunkers

The major causes for bunker complaint are weeds, sand levels and sloped bases. G&G believe there is insufficient attention given by ground staff to move accumulated sand (brought about by golfers poor raking practices) at the bunker edge to the centre of the base before raking level. There also appears to be an unhelpful practice by ground staff of brushing sand up the bunker face. G&G would prefer greater attention was given to ensuring the base of the bunker is covered with 50mm of sand and the base raked level (flat).

Yowani uses two types of sand for its bunkers. The recently re-profiled bunkers contain the preferred Newcastle (like) sand while the older bunkers contain sand sourced from Canberra. G&G consider that the annual bunker re-profiling should continue and that any (interim) topping-up of sand should be on a like for like basis.

Of Concern

It has been three years since funds were allocated for bunker re-profiling.

Page 6: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Tees

Two Yowani tees have emerged as a concern to the membership. G&G restates the priority to widen, level and reshape the 6th tee. This work was first identified as the priority following the work completed on the 5th tee. It has been approximately four years since funds were allocated for tee improvement.

The RHS of 16th tee is subsiding into the lake. This is particularly noticeable adjacent to the white and gold course plates and does introduce a degree of difficulty with tee placements. To fix this tee would require a similar approach to the lake wall work needed at the 16th and 17th greens.

The women’s 13th tee is too small and requires lengthening by 5m and widening by 3m to facilitate teeing ground rotation and to meet GA standards. Both the 6th and the 4th women’s tees have become quite uneven and levelling should be given priority treatment.

Of Concern

It has been approximately four years since funds were allocated for tee improvements.

Practice Facilities

The current practice facilities provided at Yowani are limited and inadequate for our members. G&G believes the existing space, without significant adjustment, could provide Yowani with facilities commensurate with comparable golf clubs. The majority of the local clubs provide their membership with vastly better practice facilities than those offered by Yowani.

For Yowani to be a golf course of choice to prospective members, Yowani needs to develop its practice facilities to make the golf course a complete package. This means that in the first instance, Yowani needs to identify current deficiencies and then determine the change path forward. This will not happen overnight but in future years it will allow Yowani to market to prospective members, practice facilities that are at least comparable to alternative golf clubs and provide better teaching facilities for the Club Professional.

The Board has approved a G&G chaired working group to review the facilities against current and future needs, identify any low cost options to advance development, and determine longer term goals with priorities for the Board to consider.

Turf Nurseries

The recent difficulties cause by damage to our greens has highlighted the deficiency of available and appropriate turf to repair greens. At some stage in the past Yowani had a turf nursery, but this infrastructure capability, for some unknown reason, was decommissioned or allowed to decline into disuse. Yowani’s Course superintendent should have turf available to make timely repairs to damaged greens, greens’ surrounds and tees.

G&G has recommended that the former greens turf nursery near the maintenance shed should be re-established, and also, that a further turf nursery should be established at the Southwell park end of the driving range.

Page 7: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

On-Course Toilets

It is evident that with Yowani's ageing membership, many of our senior members have a medical condition which necessitates more frequent access to toilet facilities.  During a golf round, the location of the existing on-course toilet facility does not fully meet the needs of golf members.

Other clubs have recognised the need to improve toilet facilities for their golf members and have positioned additional toilets on the course.  Such examples are: Royal Canberra, Gungahlin Lakes, Yarrawonga, The Australian, Murray Downs and Tocumwal.

The temporary facility is a poor substitute for a fully functioning toilet. There are regular complaints about the condition of the toilet and the maintenance is, at best, ad hoc. The toilet is a blight on the golf course landscape as it detracts from the golf course.

It is understood that funds are not available to site proper fully functioning toilets at a halfway point for both 9s, but a single fully functioning toilet at the intersection of the 4th and 13th tees should be possible. Until facilities are installed, it should be reasonable for a robust screen to be erected around the temporary toilet and to ensure that the toilet is properly maintained at all times.

Maintenance and Projects

The Green course tees are essentially completed, although a number of tees require some further work. This course has been rated for both men and women.

During 2013/14, in addition to numerous support tasks carried out by the volunteers, the path areas near the 17th green / 18th tee, 17th tee, 13th green / 14th tee, and 11th tee have been completed.

Those matters identified as green, irrigation and fairway maintenance in Attachment 2 should be prioritised by the Course Superintendent and included in his 2014/15 work schedule.

Other maintenance and project work identified in Attachment 2 will be considered by G&G during 2014/15 and, if significant, will be presented to the Board when Yowani’s financial position improves.

Maintenance Equipment

Some maintenance equipment that was acquired at the time of the in-sourcing is now beyond economical repair and needs to be replaced. Also, at the time of initial acquisition compromises were made as to the numbers and types of equipment. Consequently, general purpose equipment such as the rough cutter and slasher, which perform well enough, are not necessarily the most appropriate for mowing the intermediate rough and greens surrounds. Furthermore, there is no tipper truck to move soil and material around the course, no pallet lifting for heavy items, no post hole capacity, no backhoe capacity for drainage and irrigation work, and no chipper to chip collected tree felling.

G&G considers that there are equipment deficiencies and replacements that require attention. G&G believes there should be a review of the management of golf course equipment to identify capability gaps and inhibitors, serviceability constraints and replacement criteria.

Of Concern

The second fairway unit is at the end of its economical life as it spends nearly more time in the workshop than it does mowing.

Page 8: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

General

G&G is the appropriate forum to handle green keeping concerns. Unfortunately, there are those who prefer to speak directly to the CEO or Board members and bypass the forum chartered to represent the membership on green keeping matters. All G&G matters should be referred to the Chair G&G.

G&G believe the existing arrangements for tasking the Course Superintendent on course matters are ineffective. The Course Superintendent is invited to attend G&G meetings because it is both practical and the most effective means to coordinate G&G golf course maintenance activities and requirements. However, there is no obligation or compulsion on the Course Superintendent to comply with the Committee’s requests, or address issues at timings set or expected by the Committee.

The current procedure for G&G to request the CEO to instruct the Course Superintendent essentially causes delays, miscommunication, disempowerment of the G&G, and can create undue angst between the Course Superintendent and G&G. It would be more appropriate if the Board were to empower the Chair G&G to direct the Course Superintendent on those matters that are the bailiwick of G&G. Matters such as personnel, course superintendent’s budget, asset management and OH&S would remain the responsibility of the CEO.

Recommendations

It is recommended that the Board:

Review the status and priority to be given to:

the lake walls, the Sullivans Creek bridges, reinstitute the bunker reprofiling programme, reinstitute the tee levelling programme, kikuyu infestation at the 9th and 17th greens, on-course toilets, equipment management, and the tasking of grounds and greens matters;

Note the status on:

practice facilities, drainage, course signage, and the commencement of the undesirable grasses programme;

Note the requirement for the Course Superintendent to:

establish turf nurseries (greens nursery 2014/15), and take action, within existing budgets, to address identified maintenance issues.

Attachments:

1. Work Completed or Cancelled in 2013/14.2. Summary of Work or Maintenance either identified or Outstanding by Category.

Page 9: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Attachment 1

Work Completed or Cancelled in 2013/14

Tees

Hole Year Noted

Work Status

3 2012 Project work (P) to construct a Jade course tee. Completed4 2012 Project work (P) to construct a Jade course tee. Completed5 2014 Requires maintenance (M) to repair the stone wall. Completed6 2012 Project work (P) to construct a Jade course tee. Completed

8 2011 Maintenance (M) to fill the depression around the edge of the Blue/White/Gold tee wall.

Completed

8 2014 Requires maintenance (M) to repair the stone wall. Completed9 2011 Maintenance (M) to fill the depression along the edge of the tee wall. Completed9 2014 Requires maintenance (M) to repair the stone wall. Completed10 2014 Maintenance (M) to repair the tee step. Completed11 2011 Maintenance (M) to fill the depression along the edge of the tee wall. Completed

11 2013 Maintenance (M) required to repair the holes forward of the red tee area.

Completed

11 2014 Requires maintenance (M) to repair dislodged stone on the stone wall adjacent to the spillway.

Completed

11 2014 Requires maintenance (M) to repair dislodged stones on the stone wall.

Completed

11 2014 Maintenance (M) required repairing loose stone in the stone wall at the rear garden.

Completed

11 2013 Maintenance (M) is required to level the drop area between the tee and the lake.

Completed

12 2012 Project work (P) to construct a Jade course tee. Completed

12 2011 Maintenance (M) to fill the depression along the edge of the tee wall. Completed

13 2012 Project work (P) to construct a Jade course tee. Completed

14 2011 Maintenance required (M) to fill, level and grass the ground at the rear of the tee immediately prior to the edge of the stone wall.

Completed

14 2012 Project work (P) to construct a Jade course tee. Completed

14 2014 Maintenance (M) required filling, level and grassing the ground between the tee wall and the centre of the tee.

Completed

14 2014 Maintenance (M) required repairing loose stone on middle tee step. Completed

15 2012 Project work (P) to construct a Jade course tee. Completed

16 2012 Project work (P) to construct a Jade course tee. Completed

17 2012 Project work (P) to construct a Jade course tee. Completed

18 2012 Project work (P) to construct a Jade course tee. Completed

Page 10: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Fairways

Hole Year Noted

Work Status

11 2014 Project work (P) to construct mounds LHS fairway from the green tee to 150 metres marker Completed

17 2013 Requires maintenance (M) to fill several depressions between the fairway and the lake RHS about 170m from the green. Completed

18 2014 Project work (P) to uncover the ACTEW sewerage manhole adjacent to the front of the Red tee Completed

Bunkers

Hole Year Noted

Work Status

2 2013 Requires maintenance (M) at the fairway bunker to remove the root from the bunker face.

Completed

5 2013 Maintenance (M) required to the bunker to reduce the grass overhang.

Completed

11 2013Maintenance (M) to replenish the sand LHS front bunker. In places the sand is estimated to be between 5-10mm above the clay base. Bunker to be re-profiled.

Cancelled

12 2011Project work (P) has been identified to realign (slightly) the LHS bunker so the bunker face is aligned with the green. Bunker to be re-profiled.

Cancelled

16 2013 Requires maintenance (M) at the rear bunker to bring the bunker sand up to standard. (50mm bed of loose sand)

Completed

16 2014 Requires maintenance (M) to repair damage to rear edge of LH Bunker.

Completed

18 2013Maintenance (M) to replenish the sand LHS of LH bunker. In places the sand is estimated to be between 5-10mm above the clay base. To be re-profiled.

Cancelled

Greens

Hole Year Noted

Work Status

2 2013 Requires maintenance (M) to revitalize the thin and patchy grassed area at the RHS front of the green.

Completed

3 2011 Maintenance (M) is needed at the rear to grass the bare ground between the green and the 13th tee path.

Completed

4 2014 Maintenance (M) required repairing boggy ground behind the bunker adjacent to the green.

Completed

7 2013 Requires maintenance (M) to repair the front LHS section of the green.

Completed

11 2013 Requires maintenance (M) to revitalize the thin and patchy grass area LHS of green between the green and the path.

Completed

11 2013 Requires maintenance (M) to repair the rear section of the green. Completed

13 2011 Requires maintenance (M) to fill, shape, top-dress and grass the bare ground between the green RHS and the service track.

Completed

14 2013 Project work (P) to relocate the material located behind the green and tidy up this area to allow normal rough maintenance.

Completed

17 2013 Requires maintenance (M) to fill the small depressions between the rear of the green and the harvesting pond mounds.

Completed

Putting 2011 Project work (P) to repair the stone edging adjacent to putting green.

Completed

Page 11: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

GreensIrrigation

Hole Year Noted

Work Status

2 2014 Requires maintenance (M) to repair faulty sprinkler RHS Green. Not Required

4 2014 Requires maintenance (M) to repair faulty sprinkler RHS Fairway adjacent to 100 metre marker. Completed

6 2013 Requires maintenance (M) to repair the leaky sprinkler 45 metres to the green. Completed

7 2014 Requires maintenance (M) to relocate and replace the bubbler at the tee. Completed

7 2014 Requires maintenance (M) to decommission the garden tap. Completed

11 2014 Maintenance (M) to repair sprinkler LHS fairway 200 metres from green. Competed

11 2013 Maintenance (M) required to the sprinkler RHS white tee. Completed

13 2014 Requires maintenance (M) to repair leaky sprinkler RHS fairway 180 metres to the green. Completed

14 2014 Requires maintenance (M) to raise the tee sprinklers to the height of the stepped wall. Completed

14 2014 Requires maintenance (M) to install an irrigation tap outlet at the tee. Completed

15 2014 Requires maintenance (M) to repair leaky sprinkler centre of fairway 380 metres to the green. Completed

17 2014 Requires maintenance (M) to repair faulty sprinkler RHS Green. Completed

Grasses

Hole Year Noted

Work Status

6 2014 Maintenance (M) to eradicate Kikuyu in front and behind LHS bunker and at the rear of the LHS grass bunker.

Completed

Root Barrier

Hole Year Noted

Work Status

Nil

Course Chattels

Hole Year Noted

Work Status

16 2014 Requires maintenance (M) to locate in bench seat adjacent to the 16th White Tee.

Completed

18 2014 Requires maintenance (M) to relocate in bench seat adjacent to the 18th green.

Completed

Signage

Hole Year Noted

Work Status

1 2011 Require main composite tee sign. Completed10 2011 Require main composite tee sign. Completed

Page 12: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Trees, Gardens & Surrounds

Hole Year Noted

Work Status

1 2014 Tree maintenance (M) to trim the dead pine branches along the LHS fairway.

Completed

2 2013 Tree maintenance (M) to trim the lower hanging branches RHS fairway.

Competed

2 2014 Tree maintenance (M) to trim branch overhanging the path adjacent to the entrance to the Tee.

Completed

2 2014 Tree maintenance (M) to trim branch overhanging LHS tee batter. Completed

2/13 2014 Ground maintenance (M) to remove disused pickets between the 2nd

Fairway and the 13th Fairway.Completed

4 2013 Maintenance (M) to remove suckering tree adjacent to the rear tee. Completed

5 2013 Tree maintenance (M) to remove dead tree LHS fairway 60 metres from the green Completed

5 2013 Tree Maintenance (M) to trim the branch overhanging the fence adjacent to the 5th green. Completed

5 2014 Tree maintenance (M) to trim the branches overhanging the fence adjacent to the LHS Tee. Completed

5 2014 Remove broken willow lime adjacent to 150 metre marker. Completed

6 2013 Tree maintenance (M) to remove the dead gum RHS green between the green and 7th tee. Completed

6 2014 Tree maintenance (M) required to trim the branch overhanging the RHS Green Surrounds. Completed

6/7 2014 Ground maintenance (M) to remove disused fence pickets between the 6th Blue Tee and the 7th Fairway stone wall Completed

7 2013Maintenance (M) to remove the garden between the 6th green and 7th

tee. The garden is not maintained and does impede the speed of play. Substantial trees would remain.

Completed

7 2014 Maintenance (M) to trim LHS branches of the Casuarinas at the RHS corner of the lake.

Completed

7 2013 Maintenance (M) to remove gardens adjacent to tee steps. Completed

7 2014 Maintenance (M) to trim lower branches of the gum trees in the garden adjacent to the tee.

Completed

7 2013 Tree maintenance (M) to trim trees adjacent to the tee. Cancelled

8 2014 Tree maintenance (M) to trim the branches overhanging the LHS Rear Tee. Completed

8 2014 Maintenance (M) to remove garden area directly in front of the red tee. Completed

9 2012 Tree maintenance to trim and/or remove the trees with broken dangly branches to rear of 9th green. Completed

9 2014 Tree maintenance (M) to remove the dead dangerous limbs overhanging the rear of the green. Completed

9 2014 Tree maintenance (M) to remove a dangerous mature gum tree LHS fairway 130 metres to the green. Completed

9 2014 Tree maintenance (M) to remove dead pine RHS fairway 170 metres to the green. Completed

9 2014 Tree maintenance (M) to remove small dead pine RHS fairway 210 metres to the green. Completed

10 2013 Tree maintenance (M) to remove the limb overhanging the RHS of tee. Completed

10 2014 Tree maintenance (M) to remove 2 dead pines between the LHS 10th

Green and 11th tee. Completed

10 2014 Tree maintenance (M) to remove the dead branch from the forked pine between the LHS 10 green and 11th tee. Completed

10 2014 Tree maintenance (M) to remove small dead pine RHS fairway 370 Completed

Page 13: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

metres to the green.11 2013 Tree maintenance (M) to trim the overhanging branches along the

LHS of the fairway from the 150m marker to the green. Completed

13/14 2014 Tree maintenance (M) to grind the old poplar stump adjacent to the 14th RHS Bunker. Completed

13/14 2014 Tree maintenance (M) to remove the diseased pine adjacent to the track 100 metres to the 13th green. Completed

13/14 2014 Tree maintenance (M) to remove the dead branch from the forked pine between the 13th and 14th Fairways Completed

13/14 2014 Tree maintenance (M) required trimming the branches overhanging the hazard crossing between the 13th green and 14th tee.

Completed

14 2013Project work (P) to create a drought tolerant low maintenance garden in the area surrounded by the paths to the 14th tee from the 13th green bridge

Completed

14 2014Project work (P) to create a drought tolerant low maintenance garden in the area forward of the tee between the junction and the pine trees.

Completed

14 2013Project work (P) to create a drought tolerant low maintenance garden in the area between the diverging paths forward of the 14 th

tee.Completed

14 2014 Tree maintenance (M) to remove the dead pine tree at the RHS of RH greenside bunker.

Completed

14 2013 Tree maintenance (M) to trim branch from elm tree RHS tee. Completed14 2014 Tree maintenance (M) to trim lower branches LHS tee. Completed

14 2014 Remove broken elm limb situated LHS prior to the 15 th tee/14th

fairway exit path.Completed

14 2013 Tree maintenance (M) to trim two trees LHS green adjacent to the bunker.

Completed

15 2014 Trim branches forward & RHS Red tee to improve tee line. Completed

15 2014 Maintenance (M) to trim lower branches of the gum trees adjacent to the fairway bunker.

Completed

16 2014 Tree maintenance (M) to trim branches overhanging the path adjacent to the entrance to the 16th Tee.

Completed

17 2013 Tree maintenance (M) to trim the overhanging branches along the LHS of the fairway from the 100m marker towards the 18th tee.

Completed

17 2014 Tree maintenance (M) to remove the dead gum tree rear of 17th tee. Completed

17 2013 Tree maintenance (M) to trim overhanging branches at the LHS rear 17th tee.

Completed

17 2013 Tree maintenance (M) to remove dead tree RHS between the Green Tee and lake edge.

Completed

17 2014 Tree maintenance (M) to trim cypress trees LHS 17th tee. Completed

17 2014 Tree maintenance (M) to trim dead branch from the gum tee LHS 17th tee.

Completed

17/18 2013Tree maintenance (M) to plant trees behind the 17th green along the path between the 17th green and 18th tee, and along the eastern side of the pond.

Completed

18 2013 Tree maintenance (M) to trim the overhanging branches along the LHS of the fairway from the tee to the 150 marker. Completed

18 2013 Tree maintenance (M) to remove 4 diseased catalpa trees from the garden behind the 18th green. Completed

18 2014 Tree maintenance (M) required trimming the branch overhanging the Oak RHS Fairway. Completed

Island 2013 Maintenance required (M) to eradicate sucker growth. CompetedCorporate

Area 2014 Maintenance (M) to repair wall stone work halfway adjacent to the path separating the corporate area from the bowls 3rd green. Completed

Boundary 2014 Requires maintenance (M) to repair fence area used as access for the construction of the harvesting facility adjacent to the 17th green. Completed

Car Park 2014 Tree maintenance (M) to remove the car park plane trees. CompletedPutting 2014 Maintenance (M) required removing four overhanging branches Completed

Page 14: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Green from the two trees behind the practice putting green.Paths & Tracks

Hole Year Noted

Work Status

2/11 2014 Project work (P) to connect the 11th tee path and the 2nd Red tee path with a service track/path. Completed

6 2014 Maintenance work (M) is required clearing the drains at the 6th path. Completed

6 2014 Maintenance work (M) is required to repair pot holes in the 6th tee path Completed

6 2014 Maintenance work (M) to repair the wash away areas of the path at the Red tee Completed

11 2011Project work (P) is required to widen the concrete path immediately in front of the women’s tee and to extend through the carry-way to reduce traffic though the uneven ground.

Completed

11 2013 Extend the concrete path to connect with the Jade tee. Project work (P).

Completed

11 2011 The cart path adjacent to the green requires re-alignment to better connection with the fairway. Project work (P).

Completed

14 2014 Maintenance (M) to clean the road base from the path drains. Completed

16 2014Project work (W) to construct a service track parallel with the LHS 2nd Tee between and joining the 2nd tee/13th Green and 16th Green tracks.

Completed

17 2011 Project work (P) is required to construct a path from the 17 th green to connect with the men’s and women’s 18th tees. Completed

18 2011 Project work (P) is required to construct a path along the 18th tee. Completed

BBQ Area 2014 Project work (P) to repair the stone edging between the BBQ Area and the path. Completed

Hazards & Drainage

Hole Year Noted

Work Status

4 2014 Maintenance work (M) to clean the rushes from the hazard LHS fairway.

Completed

4 2014 Maintenance work (M) to remove tree suckers and poison the residual stumps from the hazard LHS fairway/green.

Completed

6 2014 Maintenance work (M) to clean the creek between the 6 th path bridge and the headwall at the 7th fairway.

Completed

6 2014 Maintenance work (M) to clean the creek to reduce the height of the rushes between the women’s tee and the green.

Completed

7 2013 Maintenance work (M) to clean out the water hazard LHS fairway between the 6th crossing and the 7th headwall.

Completed

11 2014 Maintenance (M) work to re-affix four dislodged horizontal wall supports

Completed

18 2012 Project work (P) is required to construct a culvert for a future green to tee path adjacent to the men’s tee

Completed

18 2014 Maintenance (M) to clear tree felling between fairway and Sullivan’s Creek.

Completed

Island 2014 Maintenance work (M) to remove the sucker and other growth from the Island.

Completed

Sullivan’s Creek 2014 Maintenance work (M) to clean the edges of creek to facilitate easier

maintenance.Completed

Sullivan’s Creek 2013 Project work to trim and clear the water hazard of grass and weedy

growthCompleted

Harvesting Pond 2014 Maintenance work (M) to clear the grass behind the Harvesting

Pond.Completed

10th 2014 Install additional support for the rotting supporting beam to extend Completed

Page 15: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Hazards & DrainageBridge the bridge life by 12 months

Page 16: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Attachment 2

Summary of Work or Maintenance either Identified or Outstanding by Category

Tees

Hole Year Noted

Work Status

1 2011 A 3 metre forward extension to conform to GA tee size requirements. It does mean a length reduction to this hole of 2 metres. Project work (P)

No Progress

1 2014 Maintenance (M) required repairing the paving edging at the rear of the tee separating the tee from the garden.

New

2 2011 The men’s tee to be scheduled for future leveling and widening. Project work (P)

No Progress

2 2011 The safety screen wire mesh to be replaced with black wire mesh. The post frame is reusable if painted. Project work (P)

No Progress

2 2011 The sleeper edging to be replaced at the Blue/White/Gold tees with the access point enlarged to spread the wear and tear. Project work (P)

No Progress

3 2011 The tee to be rebuilt in accordance with Yowani Tee Standards to improve grass coverage and drainage. Project work (P).

No Progress

3 2011 Maintenance (M) to fill the depression around the edge of the tee and wall.

No Progress

4 2011 The women’s tee requires maintenance (M) to improve the condition of the tee and encourage grass growth.

No progress

4 2013 Project work (P) to level the Blue/White tees No Progress

6 2011 Project work (P) to level and widen the Blue/White tee to give improved conditions and conform to GA size requirements.

No Progress

6 2011 Project work (P) to establish, enlarge and align the Gold tee area to conform to GA size requirements.

No Progress

6 2012 Project work (P) to relocate the Red tee below the Blue/White tee No Progress

7 2011Project work (P) to level (removing or re-positioning the batters and aligning the tee according to GA tee specifications and Yowani Tee Standards.

No Progress

7 2011 The steps need replacing – project work (P). No Progress

8 2011 Maintenance (M) to level and top-dress the Red tee area 5 metres behind the tee plates.

No Progress

8 2014 Project Work (P) at the red tee to replace the sleeper retaining wall with a stone.. New

10 2011A 3 metre forward extension to the Red tee to conform to GA tee size requirements. It does mean a length reduction to this hole of 2 metres. Project work (P).

No Progress

11 2011 The bare ground adjacent to the rear of the tee requires the installation of drainage, top-dressing and seeding. Project work (P).

No Progress

13 2011Project work (P) to lengthen the Red tee by 5 metres to comply with GA size requirements. This tee should be widened by 3 metres (excluding batter) to improve teeing ground rotation.

No Progress

13 2011Future project work (P) to the Blue/White/Gold tee has been identified to widen the tee and improve the tee surface. The tee edging is deteriorating and within the next three years will require replacing.

No Progress

13 2013 Project work (P) to erect a safety screen at the rear of the red tee. No Progress

14 2011 The grass between the rear and middle is very sparse and requires further maintenance (M)

No Progress

17 2011 Require maintenance (M) to cover the exposed roots adjacent to the LHS of the tee.

No Progress

18 2011 Future project work to lower, level and widen the tee. No Progress

Practice 2011 The front half RHS of the tee should be extended 5 metres towards Sullivan’s Creek to increase the teeing ground.

No Progress

Page 17: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Tees

Hole Year Noted

Work Status

Practice 2013Project work to remove the existing pitching green and realign the practice tee away from the units and extent the driving range distance to around 280 metres.

No Progress

Practice Nets

2012 Maintenance (M) to the base ground within the net area requires filling to prevent water pooling.

No Progress

Practice Nets

2013 Project work (P) to renew and relocate the practice nets to permit the widening of the practice fairway

No Progress

Page 18: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Fairways

Hole Year Noted

Work Status

1 2011

Project work (P) was identified to cover the exposed roots LHS 254-244m, 232-20m (from green) and RHS 294-233m; to trim the root barrier adjacent to the fairway bunker #2 and RHS 150m marker and to fill parts of the root barrier trench from the 150m marker to the green.

No Progress

1 2013 Maintenance (M) to fill a trench crossing the fairway 160 metres from the green centre.

No Progress

1 2013 Maintenance (M) to fill a trench crossing the fairway 200 metres from the green centre.

No Progress

1 2013Requires maintenance (M) to dress and re-vitalize the bare and sparsely grassed area on the LHS #1 fairway bunker. Previous repair work has proven to be unsuccessful.

No Progress

1 2013Requires maintenance (M) to top dress RHS fairway intermediate rough area adjacent between 80 metres to the green and the RH greenside bunker.

No Progress

2 2013 Requires maintenance (M) to top dress the RHS fairway area that is thin and sparsely grassed 150 to 80 metres to the green.

No Progress

2 2013 Requires maintenance (M) to top dress centre fairway area that is thin and sparsely grassed from 90 to 60 metres to the green.

No Progress

2 2013Requires maintenance (M) to top dress the thin and spares grass area LHS fairway area adjacent to mounds behind the 3rd tee 80 metres from green.

No Progress

2 2013 Maintenance (M) to fill a trench crossing the fairway 64 metres from the green centre.

No Progress

5 2013 Project work (P) to fill the RHS fairway root barrier trench. No Progress

5 2013 Maintenance (M) required revitalizing the grassed area between the paths adjacent to the Red Tee.

No Progress

5 2013 Project work (P) to introduce low mounding between the tree line and the root barrier area from 160 to 130 metres from the green.

No Progress

7 2011 Project work (P) to cover the exposed roots at the LHS 193m, 170-155m, 50-40m, 20m and RHS 20m from the green.

No Progress

9 2011 Project work (P) is needed to cover the tree roots along the LHS between 175 – 165m; and the RHS between 270 - 136m and between 117-80m.

No Progress

9 2013 Maintenance (M) to fill the RHS fairway root barrier trench. No Progress

9 2013 Maintenance (M) to repair and grass the ground LHS fairway between fairway and bridge entry/exit path.

No Progress

10 2011Project work (P) was identified to cover the exposed roots LHS 280-264m (from green), 55-50m, 10-0m, and the RHS 385-355m, 325-160m, 145-70m, 55-50m and 35m to the bunker.

No Progress

10 2011 Top-dress the rough adjacent to the LHS fairway at 140m from the green. Maintenance (M).

No Progress

10 2013 Maintenance (M) to fill two trenches crossing the fairway 240m from the green centre.

No Progress

11 2011Project work (P) was identified to cover the exposed roots LHS 36-30m (from green), and parts of the root barrier trench from about 200m to the green requires filling.

No Progress

11 2013 Project work (P) to grass the bare ground (disused track) between the 11th and 2nd fairways.

No Progress

12 2011 Maintenance (M) is required top-dress the bare ground on the top of the RHS #1 mound.

No Progress

13 2011 Project Work (P) is required to cover the exposed roots RHS 260 – 184m and 160-100m from the green.

No Progress

14 2011 Requires maintenance (M) to top-dress and seed the sparse ground adjacent to the LHS mounds 150m from the green.

No Progress

14 2011 Project work (P) to cover the exposed roots LHS 251m, 238-230m, 130- No progress

Page 19: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Fairways

Hole Year Noted

Work Status

50m; and RHS 304m – 70m.

14/15 2014 Project Work (P) to cover exposed roots in the area between the mounds 14th fairway and 15th fairway 170 metres from 14th green.

New

15 2011 Requires maintenance (M) to top-dress and seed the carry-way immediately in front of the women’s tee.

No Progress

15 2013 Requires maintenance (M) to top dress RHS fairway area adjacent to mounds from about 150 to 80 metres to the green.

No Progress

15 2013 Requires maintenance (M) to top dress LHS fairway area adjacent to mounds around 170 metres to the green.

No Progress

17 2011 Project work (P) to cover the exposed roots LHS 336-285m, 257-252m and 196-176m from the green.

No Progress

18 2011 Project work (P) to cover the exposed roots LHS 255-235m, 170-155m; and RHS 115-100m from the green.

No Progress

Practice 2011 Requires maintenance (M) to remove the green rubbish on the LHS adjacent to the old sheds and the fallen tree branch at fence.

No Progress

Practice 2012 Requires maintenance (M) fill old disused bunker at the 200 metre distance.

No Progress

Practice 2013 Requires maintenance (M) to paint the replaced 200 metre distance marker.

No Progress

Page 20: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Bunkers

Hole Year Noted

Work Status

1 2011Both fairway bunkers and the RH greenside bunker require maintenance (M) to improve drainage and reduce water retention. No Progress

2 2011 The LHS bunker requires maintenance (M) to improve drainage. No Progress

3 2011 Maintenance (M) is required to improve bunker drainage to reduce water pooling.

No Progress

3 2013 Requires maintenance (M) at the RHS bunker to bring the bunker sand up to standard. (50mm bed of loose sand)

No Progress

3 2013 Project work (P) to re-align the machinery entry/exit point on the LHS bunker from the existing position to the rear of the bunker.

No Progress

4 2011 Maintenance (M) is required to improve bunker drainage to reduce water pooling.

No Progress

6 2011 The RHS #2 bunker needs reprofiling to bring consistency to the three bunkers. Project work (P) Medium Priority

No Progress

7 2014Project work (P) to reprofile bunker to improve drainage, maintenance access and sand consistency. Consideration to be given to shaping the bunker to exclude the tree. Medium Priority

New

9 2013 Project work (P) to construct a fairway bunker on the LHS between 150 and 100 metres from the green.

No Progress

10 2013Maintenance (M) to replenish the bunker sand level to 50mm of aerated sand. In places the sand is estimated to be about 10mm above the compacted layer.

No Progress

10 2013 Project work (P) to construct a fairway bunker on the LHS 230 to 250 metres to the tee.

No Progress

11 2014 Project work (P) to reprofile the #1 bunker to improve shape, drainage, maintenance access and sand consistency. High Priority New

12 2012Project work (P) has been identified to reprofile the bunker to improve alignment with the green, drainage, maintenance access and sand consistency. High Priority

New

13 2013 Project work (P) to construct a fairway bunker on the RHS 60 to 80 metres from the green.

No Progress

14 2014 Project work (P) to reprofile LHS bunker to improve drainage, maintenance access and sand consistency. Medium Priority

New

14 2014 Project work (P) to reprofile RHS bunker to improve drainage, maintenance access and sand consistency. Medium Priority

New

15 2014 Project work (P) to reprofile #1 LHS bunker to improve drainage, maintenance access and sand consistency. Low Priority

New

15 2014 Project work (P) to reprofile #2 LHS bunker to improve drainage, maintenance access and sand consistency. Medium Priority

New

16 2013 Requires maintenance (M) at the rear bunker to remove the roots from the rear section of the bunker wall.

No Progress

18 2014Project work (P) to reprofile LHS bunker to improve drainage, maintenance access and sand consistency. Consideration to be given to shaping the bunker to exclude the tree. Medium Priority

New

18 2014Project work (P) to reprofile #1 RHS bunker to improve drainage, maintenance access and sand consistency. Consideration to be given to shaping the bunker to exclude the tree. Medium Priority

New

18 2014Project work (P) to reprofile #2 RHS bunker to improve drainage, maintenance access and sand consistency. Consideration to be given to shaping the bunker to exclude the tree. Low Priority

New

Practice 2011 Requires maintenance (M) to repair the drainage, remove the grass and weeds, and to trim the edge.

No Progress

Practice 2013 Project Work (P) to construct 2-3 practice bunkers to the existing pitching green.

No Progress

Page 21: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Greens

Hole Year Noted

Work Status

1 2013Maintenance (M) to remove the gravel and top dress and revitalize the area between the RHS green and the path.

Partial Progress

2 2013Requires maintenance (M) to revitalize barely grassed area before and behind the RH bunker. No Progress

2 2013 Requires maintenance (M) to revitalize the thin and patchy grassed area between the green and the 3rd Tee path.

No Progress

3 2011 Maintenance (M) to improve the grass coverage the RHS between the path and green.

No Progress

3 2011 Maintenance (M) to improve the grass coverage at the RHS rear between the mounds and the path.

No Progress

3 2013 Maintenance (M) is needed to grass the bare ground between the bunker and the path.

No Progress

3 2014 Requires maintenance (M) to repair a patchy area on the green LH Front. No Progress

4 2011

Project Work (P) to build a replacement green to the left of the existing green incorporating the adjacent pond. The current green is constructed on a mass of decaying material which is not conducive grass growth. An increase in separation between the 4th green and 5th tee is highly desirable.

No Progress

5 2013 Requires maintenance (M) to revitalize the thin and patchy grassed area at the RHS front of the RH greenside bunker.

No Progress

5 2013Requires maintenance (M) to revitalize the thin and patchy grassed area at the LHS of the green. No Progress

5 2014 Project work (P) to raise the LH Centre to LH Rear third section of the green to reduce slope and develop playable pin positions. New

7 2011 Requires maintenance (M), once the path has been constructed, to top-dress and grass the bare ground adjacent to the LHS of the green.

No Progress

7 2013 Requires maintenance (M) to revitalize the thin and patchy grassed on the mound at the RHS before the green.

No Progress

7 2013 Requires maintenance (M) to revitalize the thin and patchy grassed area between the green and the 8rd Tee path.

No Progress

9 2013Requires maintenance (M) to revitalize the thin and patchy grassed area between the greenside bunker and tree line. Vehicle traffic in the area should happen only when no other option is available.

No Progress

9 2014 Maintenance (M) required to repair damaged area RHS green New

10 2011 Requires maintenance (M) to top-dress and repair the ground at the LHS front of the green. The tree roots need to be covered.

No Progress

10 2014 Maintenance (M) required repairing the oil spill green RHS green. New

10 2013 Maintenance (M) to repair to ground surround immediately in front of the green.

No Progress

10 2013 Maintenance (M) to repair to ground surround between the green and the RHS bunker in of the green.

No Progress

10 2014 Maintenance (M) to repair to grounds surrounds immediately behind the green.

No Progress

12 2011 Maintenance (M) is needed at the LH rear to grass the bare ground between the mounding and the path.

No Progress

12 2011Project Work (P) to raise the green LHR to a fairer level and create an adjacent grass bunker which connects the LH bunker and the LH Rear mounds.

No Progress

12 2011 Maintenance (M) is needed to top dress the ground immediately in front of the path on the LHS of the green.

No Progress

12 2013 Maintenance (M) to fill and seed the surrounds area at the rear of the green between the green and the path.

No Progress

12 2014 Maintenance (M) required repairing the greens surround RHS New

Page 22: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Greens

Hole Year Noted

Work Status

green.12 2014 Maintenance (M) required to repair damaged area RHS rear green New

13 2014 Maintenance (M) is needed to fill and seed the bare ground RHS of green adjacent to the path.

New

14 2013 Requires maintenance (M) to repair the greens surrounds in front of the L&R bunkers.

No Progress

14 2013 Requires maintenance (M) to repair the greens surrounds on the RHS immediately rear of the RH bunker.

No Progress

15 2011Requires maintenance (M) to top-dress the rear and the RHS of the green. The 2012 audit noted that this area had further deteriorated. The RHS was progressed in 2012/13

Partial Progress

15 2013 Requires maintenance (M) to revitalize the thin and patchy grassed area in front of the green.

No Progress

16 2013 Requires maintenance (M) to top dress and revitalize the thin and patchy grass area on the RH Front of the green.

No Progress

16 2013 Requires maintenance to fill the depressions between the lake wall and the green. Previous work has been unsuccessful.

No Progress

16 2014Project work (P) to raise the Centre Left to the Centre Right front third section of the green to reduce slope and develop additional playable pin positions.

New

17 2013 Requires maintenance to fill the depressions between the lake wall and the green. Previous work has been unsuccessful.

No Progress

17 2013 Requires maintenance (M) to dress and re-vitalize the bare and sparsely grassed area in front of the green.

No Progress

17 2014 Maintenance (M) is needed to fill and seed the bare ground LH Rear of green.

New

18 2013Requires maintenance (M) to top dress and revitalize the bare and sparsely grassed area from the RHS bunker between the bunker and the path to the mounds behinds the green.

No Progress

Putting 2013 Project work (P) to create a new, or extend exiting, putting green between the existing chipping green and the path.

No Progress

Page 23: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Irrigation

Hole Year Noted

Work Status

2 2011 Requires maintenance (M) to enhance the irrigation LHS fairway adjacent to the fairway bunker.

No Progress

2 2013 Requires maintenance (M) to install a controller to irrigate the 2nd tee garden.

No Progress

3 2013 Requires maintenance (M) to improve the irrigation RHS green. No Progress

3 2013 Requires maintenance (M) to install a controller to irrigate the 3 rd tee garden.

No Progress

3 2014 Requires maintenance (M) to repair faulty sprinkler RHS Front of tee.

New

6 2014 Requires maintenance (M) to repair the irrigation to the 6 th tee garden.

New

8 2014 Requires maintenance (M) to install a controller to irrigate the 8 th

tee gardens.New

9 2013 Requires maintenance (M) to install a tap in the garden between the 9 th

green and 10th tee.No Progress

11 2012 Requires maintenance (M) to improve the irrigation at the LHR of the green.

No Progress

12 2013 Maintenance (M) required repairing the faulty sprinkler RH Rear of green.

No Progress

13 2012 Requires maintenance (M) to improve the irrigation at the RHS green surrounds.

No Progress

14 2014 Requires maintenance (M) to provide additional irrigation to the LHS mounds (between the green and the bubbler).

New

14 2014 Requires maintenance (M) to install irrigation (with controller) to the 14th tee gardens.

New

15 2012Require maintenance (M) to enhance the irrigation on the RHS and the RHS Rear of the green to ensure there is adequate watering of the green surrounds.

No Progress

16 2013 Requires maintenance (M) to provide additional irrigation to the LHF mounds (adjacent to the path).

No Progress

16 2013 Requires maintenance (M) to install a controller to irrigate the 16 th tee garden.

No Progress

18 2013 Requires maintenance (M) to enhance the irrigation RHR of green. No Progress

18 2013 Requires maintenance (M) to install a controller to irrigate the 18 th green garden.

No Progress

Pond 2011 The lake wall continues to erode and work is needed to arrest the erosion along the 11th fairway pond walls. Project work (P)

No Progress

Pond 2011 Project work (P) to replace/repair retaining pond wall adjacent to the 11 th

fairwayNo Progress

Lagoon 2011 Project work (P) to replace/repair retraining walls adjacent to 16 th Tee, 16th Green & 17th Green

No Progress

Water Storage

2013Project work (P) to establish a permanent and improved water transfer capability between Yowani Pond (top lake) and Yowani Lagoon (bottom lake).

No Progress

Pump 2013Requires maintenance (M) to replace or repair the inlet valves in the wet well. This was first identified in the Course Superintendent’s 2008 report to the Board.

No Progress

Pump 2013 Project work (P) to install a fertigation unit to permit the distribution of liquid fertilizer.

No progress

Water Reserve

2014 Project work (P) to connect (with a backflow valve) the mains town water supply to the course irrigation system as a backup supply. New

Page 24: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Grasses

Hole Year Noted

Work Status

1 2011 The area between the women’s tee and Sullivan’s creek requires maintenance (M) to eradicate the kikuyu.

No Progress

1 2011 Eradicate the kikuyu on fairway forward of Sullivan’s creek. Maintenance (M).

No Progress

1 2011 The area between the women’s tee and Sullivan’s creek requires maintenance (M) to eradicate the kikuyu.

No Progress

1 2014 Eradicate the kikuyu at the LHS 260 metres to the green. New1 2014 Eradicate the Parramatta grass at the LHS 280 metres to the green. New1 2014 Eradicate the kikuyu at the LHS 15 metres forward of Green Tee. New

2 2011Project work is needed to eradicate the Parramatta grasses on the RHS between the 2nd & 11th fairways.

Partial Progress

2 2012Project work is needed to eradicate the Parramatta grasses on the fairway LHS adjacent to fairway bunker.

Partial Progress

2 2011Project work to eradicate the Parramatta grass on the RHS of the fairway adjacent to the RHS bunker.

Partial Progress

6 2014 Requires maintenance (M) to eradicate the kikuyu at the surround of the 6th green.

Partial Progress

7 2011 Maintenance to eradicate the kikuyu at the tee surrounds. No Progress

7 2011 Eradicate the kikuyu on the RHS adjacent to the casuarinas and on the mound behind the 11th green. Maintenance (M).

No Progress

7 2014Maintenance (M) to eradicate the kikuyu on the fairway centre 200 & 170 metres to the green..

Partial Progress

7 2013 Required maintenance (M) to eradicate paspalum on the RHS adjacent to the lake edge.

Partial Progress

8 2011 Eradicate the kikuyu on the RHS adjacent to the casuarinas, mounds and 9th tee. Maintenance (M).

No Progress

9 2011 Eradicate the kikuyu behind and to the RHS of the green. Maintenance (M).

No Progress

9 2011 Eradicate the kikuyu at the LHS and rear of the tee. No Progress9 2014 Eradicate the kikuyu at the LHS fairway 200 metres to the green. New

10 2011 The area adjacent to the women’s tee requires maintenance (M) to eradicate the kikuyu.

No Progress

10 2012 Work is necessary to eradicate the Parramatta grass on the LHS of the fairway between Sullivan’s Creek and the 1st fairway bunkers.

No Progress

10 2014 Eradicate the Parramatta grass at the front LHS 10th green. New

11 2011Work is necessary to eradicate the Parramatta grass on the LHS of the fairway. Maintenance (M).

Partial Progress

11 2011Project work (P) to eradicate the Parramatta grass on the RHS of the carry way adjacent to the lake.

Partial Progress

11 2011Requires maintenance (M) to eradicate the kikuyu on the RHS of the fairway adjacent to the lake wall 140-120m from the green.

Partial Progress

11 2013 Required maintenance (M) to eradicate paspalum on the RHS from the tee to green adjacent to the lake edge.

Partial Progress

11 2013Requires maintenance to eradicate the Parramatta Grass on the LHS Rear of the Green.

Partial Progress

12 2014 Eradicate the paspalum grass at the front LHS fairway 60 metres to the 12th green.

New

13 2011 Requires maintenance (M) to eradicate the kikuyu at the RHS front mound forward of the green.

Partial Progress

13 2014 Requires maintenance to eradicate the Parramatta Grass on the RHS of fairway.

New

Page 25: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Grasses

Hole Year Noted

Work Status

14 2011Requires maintenance (M) to eradicate the kikuyu at the LHS rear, RHS rear and the rear of the green.

Partial Progress

16 2013 Requires maintenance (M) to eradicate the kikuyu adjacent to the path at the LHS rear of the green.

No Progress

16 2013 Requires maintenance (M) to eradicate the Parramatta grass between the path and 2nd tee safety fence at the rear of the 16th green.

No Progress

16 2013 Required maintenance (M) to eradicate paspalum on the RHS from the tee to the green adjacent to the lake edge.

No Progress

16 2014Required maintenance (M) to eradicate the paspalum at the rear of the 16th blue tee.

Partial progress

17 2011 Requires maintenance (M) to eradicate the kikuyu at the front and RHS of the green.

No Progress

17 2011Requires maintenance (M) to eradicate the kikuyu on the RHS 50 metres from the green.

Partial Progress

17 2013 Required maintenance (M) to eradicate paspalum at the tee and tee surrounds.

Partial Progress

17 2013Required maintenance (M) to eradicate paspalum on the RHS from the tee to the green adjacent to the lake edge.

Partial Progress

18 2011 Requires maintenance (M) to eradicate the Parramatta grass along the RHS fairway between the 100m marker and the green.

No Progress

Putting Green

2014Requires maintenance (M) to eradicate the grass surrounding the practice putting green.

Partial Progress

Course 2011No assessment could be made as to the extent of kikuyu, paspalum or summer grass on the course. Nevertheless, annual effort is mandatory if these grasses at to be eradicated.

Partial Progress

Page 26: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Root Barrier

Hole Year Noted

Work Status

1 2013 Project (P) work to install root barrier on the LHS of the Jade tee. No Progress

2 2012 Root barrier is required from the fairway bunker to meet the existing barrier at a point near the elm adjacent to the 3rd tee.

No Progress

2 2013 Project (P) work to install root barrier on the LHS of the Jade tee. No Progress

3 2011 Require the installation of root barrier behind the tee to reduce the impact that the elms have on the tee. Project work (P).

No Progress

3 2011 Install root barrier to connect with that installed behind the green to extending to the LHS of the green. Project work (P).

No Progress

3 2013 Project (P) work to install root barrier on the LHS of the Jade tee. No Progress

4 2013 Project (P) work to install root barrier on the surrounds of the Jade tee. No Progress

5 2013 Project (P) work to install root barrier on the LHS of the Jade tee. No Progress

6 2013 Project (P) work to install root barrier on the LHS of the Red tee. No Progress

6 2013 Project (P) work to install root barrier on the LHS of the Jade tee. No Progress

7 2013 Project (P) work to install root barrier on the RHS of the Jade tee. No Progress

8 2013 Project work (P) to extend root barrier on the RHS fairway from the gums to the willows near the green.

No Progress

9 2011 Requires root barrier to be installed along the full length of LH side. Project work (P).

No Progress

9 2014 Project work (P) to install a seat in a defined seat area 9th green. New10 2011 Project work (P) to install root barrier behind the men’s tee. No Progress

11 2011 Project work (P) is required to extend the root barrier on the LHS from the gum to the existing root barrier.

No progress

11 2013 Project (P) work to install root barrier on the surrounds of the Jade tee. No Progress

14 2013 Project (P) work to install root barrier from the LHS of the Jade tee to the mounds

No Progress

15 2012 Project work (P) to install root barrier along the LHS of the fairway from the 200m marker to the LHS 15th green

No Progress

15 2013 Project (P) work to install root barrier on the RHS of the Jade tee. No Progress

17 2011 Require root barrier along the LHS of the tee to connect with the existing root barrier along the LHS. Project work (P).

No Progress

17 2013 Project (P) work to install root barrier on the RHS of the Jade tee. No Progress

18 2012 Require root barrier along the fairway LHS from the 17 th fairway to the LHS of the 18th green adjacent to the LHS bunker.

No Progress

18 2012 Require root barrier along the fairway RHS from the 18th tee to the pine trees at the corner.

No Progress

18 2013 Project (P) work to install root barrier on the LHS of the Jade tee. No Progress

Page 27: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Course Chattels

Hole Year Noted

Work Status

2 2013 Project work (P) to install a chain fence at the rear to the red tee to divert traffic around the tee.

No Progress

2 2013 Requires maintenance (M) to repair and paint the bench seat at the red tee.

No Progress

3 2013 Requires maintenance (M) to position a barrier along the path adjacent to the 3rd green.

No Progress

3 2013 Requires maintenance (M) to repair and paint the bench seat No Progress4 2011 Red tee requires new bin. No Progress4 2011 Red tee requires ball washer. No Progress4 2013 Requires maintenance (M) to install a seat. No Progress

5 2013 Requires maintenance (M) to replace the plastic chain at the rear of the tee with a metal chain.

No Progress

5 2013 Requires maintenance (M) to repair and paint the bench seat at the blue tee.

No Progress

6 2013 Requires maintenance (M) to repair and paint the bench seat at the red tee.

No Progress

7 2012 The men’s tee requires a ball washer. No Progress7 2012 The tee requires a new bin. No Progress

7 2013 Requires maintenance (M) to repair and paint the bench seat at the red tee.

No Progress

8 2013 Requires maintenance (M) to repair and paint the bench seat No Progress

10 2013 Requires maintenance (M) to replace the plastic chain at the RHS of the tee with a metal chain.

No Progress

12 2013 Requires maintenance (M) to install a seat. No Progress

13 2013 Requires maintenance (M) to repair and paint the bench seat at the red tea.

No Progress

13 2014 Red tee requires new bin. New13 2014 Red tee requires ball washer. New

13 2014 Sand bin adjacent to the path forward of the tee needs to be raise to for drainage. New

15 2011 Requires a replacement bin. No Progress

15 2013 Requires maintenance (M) to repair and paint the bench seat at the red tee.

No Progress

16 2011 Require replacement bins for the men’s and women’s tee. No Progress

16 2013 Requires maintenance (M) to repair and paint the bench seat at the red tee.

No Progress

18 2011 Require the installation of a ball washer. No Progress18 2014 Require the installation of a bin. New18 2014 Project work (P) to create a seat area at the 18th tee. New

18 2013 Requires maintenance (M) to repair and paint the bench seat at the 18 th

green.No Progress

Practice 2011 Relocate the practice nets to facilitate better use of the practice area. Project work (P).

No Progress

Page 28: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Signage

Hole Year Noted

Work Status

1 2014 Require tee sign women’s tee New2 2011 Tee sign for men’s tee. In Progress2 2011 Tee sign for women’s tee. In Progress3 2011 Require main composite tee sign. In Progress

4/13 2014 Directional map adjacent to the bubbler green indicating the 4th & 13th tees. Consistent with tee signs.

New

4 2011 There is a requirement for a men tee sign. In Progress4 2011 There is a requirement for a women tee sign. In Progress4 2011 There is a requirement for a men tee sign. In Progress5 2011 There is a requirement for a women tee sign. In Progress5 2011 Tee sign for women’s tee. In Progress6 2011 There is a requirement for a men tee sign. In Progress6 2011 There is a requirement for a women tee sign. In Progress7 2011 There is a requirement for a men tee sign. In Progress8 2011 There is a requirement for a women tee sign. In Progress

8 2014 Directional sign adjacent to the 8th green indicating the 9th tee. Consistent with tee signs.

New

9 2011 Require main composite tee sign. In Progress10 2014 Require tee sign women’s tee New11 2011 There is a requirement for a men tee sign. In Progress11 2011 There is a requirement for a women tee sign. In Progress13 2011 Tee sign for men’s tee. In Progress13 2011 Tee sign for women’s tee. In Progress

13 2014 Directional sign adjacent to the 13th green indicating the 14th tee. Consistent with tee signs.

New

15 2011 Tee sign for men’s tee. In Progress15 2011 Tee sign for women’s tee. In Progress16 2011 Tee sign for men’s tee. In Progress16 2011 Tee sign for women’s tee. In Progress

16 2011A directional sign is needed before the 16 th headwall to guide traffic to the path and away from the area between the green and the lake. Consistent with tee signs.

No Progress

17 2011 Directional sign adjacent to the 17th green indicating the 18th tee. In Progress17 2011 Tee sign for men’s tee. In Progress17 2011 Tee sign for women’s tee. In Progress18 2011 Tee sign for men’s tee. In Progress18 2011 Tee sign for women’s tee. In Progress

18 2011Directional (promotional) sign to the club house. Consistent with tee signs. No Progress

Page 29: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Trees, Gardens & Surrounds

Hole Year Noted

Work Status

1 2014 Tree maintenance (M) to remove the dead/dying pine first tree on the LHS fairway, New

2 2011 Tree maintenance (M) to remove the two poplars on the LHS of the fairway as their roots impact on the fairway.

No progress

2 2012 The gardens at the 2nd blue/white/gold tees require adoption. No Progress

2 2012 Tree maintenance (M) to thin the pines LHS 2nd green to permit improved sunlight to 3rd tee.

No Progress

2 2013 Tree maintenance (M) to trim elm & oak sucker growth LHS fairway. No Progress

2 2014 Tree maintenance (M) to trim the Oak and Elm trees RHS 140 metres to green. New

2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New

3 2013 Tree maintenance (M) to trim the branches from the elms behind the 3 rd

tee.No Progress

3 2014 Tree maintenance (M) to trim branch overhanging RHS greenside bunker. New

4 2014 Tree maintenance (M) to remove dying/dead pine tree behind green. New

5 2014 Tree maintenance (M) to remove dead pine LHS fairway 120 from the green. New

5 2014 Tree maintenance (M) to trim the branches overhanging the fence adjacent to the LHS green. New

5 2014 Tree maintenance (M) to trim the branches LHS fairway from 100 metres to green. New

6 2014 Tree maintenance (M) to remove dead pine LHS Blue Tee adjacent to the boundary fence. New

6 2014 Tree maintenance (M) to remove 2 dead/dying poplars LHS forward of the Blue/White Tee. New

6 2014 Tree maintenance to remove 2 dead/dying pines adjacent to the LHS blue tee. New

7 2011 Tree maintenance (M) to remove the poplar on the LHS of the fairway as its roots impact on the fairway.

No progress

7 2013 Tree maintenance (M) to trim the overhanging elm branch green surrounds RHS mounds.

No Progress

7 2013 Tree maintenance (M) to reduce the number of pine trees shading the fairway adjacent to the lake.

No Progress

7 2013 Tree maintenance (M) to trim overhanging branches RHS fairway adjacent to 12th tee.

No Progress

7 2013 Garden at the RHS 7th fairway requires adoption No Progress7 2014 Tree maintenance (M) to remove one of the elm trees RHS of green. No Progress8 2012 Gardens at the 8th tee require adoption. No Progress

8 2013 Maintenance (M) required to trim the overhanging branches LHS green adjacent to the bunker.

No Progress

8 2014 Tree maintenance (M) required trimming the overhanging branches RHS red tee path. New

9 2011 Tree maintenance to remove the poplar on the LHS of the fairway as its roots impact on the fairway.

No Progress

9 2014 Tree maintenance (M) to remove dead pine RHS fairway 240 metres to the green. New

9 2014 Tree maintenance (M) to remove dead/dying pine RHS fairway 280 metres to the green. New

9 2014 Tree maintenance (M) to remove dead gum rear of green. New

10 2012 Tree maintenance to remove the native pines from behind the 10th green. Progress to date - the trees have been trimmed.

No Progress

Page 30: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Trees, Gardens & Surrounds

Hole Year Noted

Work Status

10 2013 Tree maintenance (M) to remove the second limb overhanging the RHS of tee. New

11 2014 Tree maintenance (M) to remove the second limb overhanging the RHS of tee. New

11 2014 Tree maintenance (M) to remove the limb overhanging the fairway LHS between green tee and mounds. New

11 2013 Tree maintenance (M) required trimming gum RHS fairway adjacent to 100 metre marker. New

13 2014 The plants at the fairway RHS require more protection. Partial Progress

14 2014 Tree maintenance (M) to trim lower branches of two pine trees LHS tee.

New

15 2014 Tree maintenance (M) to remove dead/dying callistemon LHS fairway 70m from green

New

16 2014 Tree maintenance (M) to trim branch overhanging the rear greenside bunker.

New

16 2014 Tree maintenance (M) to trim branch overhanging the path leading from the Red Tee.

New

18 2014 Maintenance (M) required planting five trees at the rear of the tee for future shading.

New

Boundary 2014 Requires maintenance (M) to remove tree felling outside the boundary fence adjacent to the 5th green. Felling cut ready for removal.

No Progress

Boundary 2014 Requires maintenance (M) to repair the damaged fence section in the north corner adjacent to the LHS of the 4th green. Quote sought

No Progress

Practice 2013 Tree maintenance (M) to remove the line of pine trees adjacent to the existing practice nets.

No Progress

Practice 2014 Tree Maintenance to remove dead pine RHS practice fairway. NewGreen Waste

2014 Maintenance (M) to mulch collected course felling & debris. New

Car Park 2014 Tree maintenance (M) to plant replacement car part trees. New

Page 31: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Paths & Tracks

Hole Year Noted

Work Status

1 2013 Extend the concrete path from the bridge to connect with the Jade tee. Project work (P).

No Progress

2 2014 Maintenance work (M) is required to repair pot holes in the 2th tee path

New

4 2012 Project work (P) to construct a all-weather path around the LHS hazard and the LHS of the 5th green along the fence line connecting to the 5th tee

No Progress

4 2013 Project work (P) to formalize the track into a path between the Gold and Red tees.

No Progress

5 2011Project work (P) to establish a path at the LHS of the green connecting with the 6th Blue tee in advance of repairing the bare area between the fence and the green.

No Progress

5 2014 Maintenance work (M) is required to repair pot holes in the 5th tee path No Progress

6 2011Project work (P) to establish a path along the rear of the men’s white/yellow tee connecting with the paths at the 5th green and 6th men’s blue/white tee has been identified

No Progress

6 2011 Project work (P) to establish an all weather path to the LHS of the green and connecting with the path at the 7th tee.

No Progress

6 2013 Install an additional two drains across the 6th path to assist with the reduction of further path erosion. Project work (P).

No Progress

7 2011 Project work (P) to extend the 7th tee path to the fairway. No Progress

7 2013 Extend the path to connect with the Jade tee. Project work (P). No Progress

7 2011 Project work (P) to establish an all weather path from the LHS bunker along the fence and connecting with the path at the 8th tee.

No Progress

7 2011 Project work (P) to construct a short cart path connecting the concrete path behind the 8th tee with the service track.

No Progress

7 2012 Project work (P) to construct a heavy duty service bridge to cross the hazard at the 7th.

No Progress

7 2012 Project work (P) to edge the service track on the green RHS No Progress

7 2014Project work (P) to construct of path from the LHS of the 7 th

fairway culvert through the trees, along the retaining wall and ending at the up slope approximately 60 metres from the 7th green

New

8 2011 Project work (P) to extend the existing concrete path adjacent to the men’s tee to the 8th fairway to reduce traffic through the uneven ground.

No Progress

8 2011 Project work (P) to refurbish the existing gravel path adjacent to the women’s tee to the 8th fairway.

No Progress

8 2011 Project work (P) to construct a path adjacent to the green to the service track.

No Progress

8 2013 Extend the path to connect with the Jade tee. Project work (P). No Progress

9 2011Project work (P) to widen the concrete path adjacent to the tee by 500mm to reduce the pot holing along the edge of the path. Road base had been used in the interim.

No Progress

9 2011 Project work (P) to extend by 15-20m the existing concrete path adjacent to the green towards the creek with road base.

No progress

9 2011 Project work (P) to formalize the path between the LHS of the fairway and the maintenance bridge.

No Progress

9 2012 Project work (P) to construct a service bridge to across Sullivan’s Creek between the 10th and 9th Fairways.

No Progress

9 2012 Project work (P) to repair the path exiting from the maintenance bridge to the fairway/apron

No Progress

10 2011 Project work (P) to extend the concrete path exiting the bridge to connect with the fairway.

No Progress

10 2011 Project work (P) to formalize path with parking needs to be constructed No Progress

Page 32: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Paths & Tracks

Hole Year Noted

Work Status

adjacent with the green connecting the three steps at the 11th tee.

10 2013 Requires maintenance (M) to extend the concrete path to connect with the Jade tee.

No Progress

10 2013 Requires maintenance (M) to repair the path intersection at the RHS Rear of the green with additional road base.

No Progress

11 2012 The existing cart path behind the 12th tee to be widened. No Progress

12 2011 Extend the concrete path diagonally forward to spread the exit traffic to the fairway. Project work (P).

No Progress

12 2013 Extend the concrete path to connect with the Jade tee. Project work (P). No Progress

12 2013 Project work (P) to formalize a path on the green RHS from adjacent to the RHS bunker to connect with the 4th tee path.

No Progress

13 2011 Extend the path adjacent to the 13th men’s tee to the women’s 13th tee. Project Work (P).

No Progress

13 2013 Project work (P) to repair the path between the hazard and the 13 th tee path.

No Progress

13 2013 Project work (P) to formalize a track/path from the 4 th men’s tee to the 15th tee.

No Progress

13 2014 Maintenance work (M) is required to repair pot holes in the 14th tee path In Progress

14 2011

Project work (P) is required to re-align the path exiting the LHS fairway adjacent to the LHS bunker. This path should be extended to the 15 th

tee. Also, the service road behind the tee should connect to a path at the 15th tee.

No Progress

14 2012 Project work (P) to formalize the service track from the rear of the 13 th

tee along the rear of the 14th green to the 15th tee.No Progress

14 2014 Maintenance work (M) is required to repair pot holes in the 14th tee path In Progress

15 2011Project work (P) is required to construct a path from the 15 th tee to the fairway to reduce traffic through the uneven grounds and connects with 14th green paths.

No Progress

15 2011Project work (P) is required to construct a path exiting the RHS of the fairway near the greenside mounds and extending around the rear of the green to connect with the 16th tee.

No Progress

15 2011 Project work (P) to construct a path on the LHS of the 15th fairway along the tree-line to divert traffic from the mounds.

No Progress

16 2013 Extend the fairway access path to connect with the Jade tee. Project work (P).

No Progress

17 2014Maintenance work (M) is required to repair pot holes in the 17th tee path New

Page 33: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Hazards & Drainage

Hole Year Noted

Work Status

1 2011

Requires maintenance (M). The existing carpet covering the bridge is not safe when frost is present. The carpet should be removed and the bridge covered with a material that does not retain moisture and is non-skid.

No Progress

1 2013 The slope of the Sullivan Creek banks needs to be reduced to minimise the risk of injury. Project Work (P).

No Progress

1 2014 Project Work (P) to replace the bridge as the supporting beams have deteriorated making the bridge potentially unsafe

New

3 2011 Project work (P) was identified to improve the drainage from the front of the tee and the front of the green.

No Progress

3 2012 Project work (P) has been identified to improve the drainage for the ground on the RHS of the tee behind the garden

No Progress

3 2011 Project work to fill the LHS drain from the 3rd green to the front of the women’s 13th tee.

No Progress

4 2011Project Work (P) was identified to improve the drainage on the LHS adjacent to the 150m marker to reduce the amount of water pooled between this point and the green.

Partial Progress

4 2011 Project work (P) is required to improve drainage at the LHS of the green to give drier ground conditions.

No Progress

4 2013 Maintenance (M) is required to eradicate the boggy ground RHS green front at rear of bunker.

No Progress

4 2013 Project work (P) to clean out the water hazard LHS fairway 0 metres from the green.

No Progress

4 2013 Requires maintenance (M) to clear out the swamp grass near the 150 metre marker and denote the wet area as a water hazard.

No Progress

7 2011 Requires maintenance (M) to reduce water pooling adjacent to LHS drain culvert.

No Progress

7 2013 Project work (P) required improving fairway condition by replacing/repairing the subsoil drainage.

No Progress

7 2013 Project work (P) to construct/install a spoon drain between the fairway and the 6th hazard bridge.

No Progress

9 2011 Requires maintenance (M) to install sub-soil drainage at the LHS near the 150m marker to eliminate water pooling.

No Progress

9 2011 The slope of the Sullivan Creek banks needs to be reduced to minimise the risk of injury. Project Work (P).

No Progress

9 2011

The drain section immediately in front of the green requires a concrete apron to ease the exit from the creek up the bank. It would be ideal if at some future stage a bridge could be constructed to cross at the RHS of the fairway. Project work (P)

No Progress

9 2011 Project Work (P) to construct a bridge to cross Sullivan’s Creek at the RHS of the fairway.

No Progress

10 2011

Requires maintenance (M). The existing carpet covering the bridge is not safe when frost is present. The carpet should be removed and the bridge covered with a material that does not retain moisture and is non-skid.

No Progress

10 2013 The slope of the Sullivan Creek banks needs to be reduced to minimise the risk of injury. Project Work (P).

No Progress

10 2014 Project Work (P) to replace the bridge as the supporting beams have deteriorated making the bridge potentially unsafe New

11 2014 Requires Maintenance (M) to address the boggy area (water seepage?) LHS Rear green New

13 2012 Project Work (P) to install a crossing point in the drain forward of the women’s tee for player access to the waste area.

No Progress

13 2012 Requires maintenance (P) to paint the bridge crossing rails. No Progress

Page 34: Yowani Country Club€¦  · Web viewNew 2 2014 Tree maintenance (M) to remove dead pine LHS of green behind LHS bunker. New 3 2013 Tree maintenance (M) to trim the branches from

Hazards & Drainage

Hole Year Noted

Work Status

13 2014 Drain requires maintenance (M) to allow water to freely flow to the culvert

New

15 2011 Requires maintenance (M) to drain the boggy ground on the LHS 200m from the tee.

No Progress

16 2011Requires maintenance (M) to fill the subsidence in front of the green. It should be noted that the lake wall is gravitating towards the lake. See Lagoon Project work.

No Progress

17 2011 Requires maintenance (M) to fill the subsidence at the RHS 50 metres from the green. See Lagoon Project work.

No Progress

17 2012Requires maintenance (M) to fill the subsidence in front of the green. It should be noted that the lake wall is gravitating towards the lake. See Lagoon Project work.

No Progress

17 2014 Requires maintenance (M) to level the boggy ground LHS green to direct water towards the water spillway.

In Progress

18 2012

Project work (P) is required to re-commission the bridge adjacent to the practice greens to provide players with safe access to the Northbourne Avenue side of Sullivan’s Creek. As the creek is a lateral water hazard, players find it necessary to cross the creek in the search of their ball, or choose to play from that side.

No Progress

18 2013Sullivan Creek spoon drain needs to be cleared of the accumulated (high grade) alluvial soil that currently reduces the creek width and the creek side returned to their original slope. Project Work (P).

No Progress

Practice 2013 Project (P) work to extend the existing drain behind the chipping green to Sullivan’s Creek.