Z. Papandreou, GlueX Collaboration Meeting, May 1 1, 2009 1 BCAL Construction First Article work has begun: crew in place

Upload: shannon-palmer

Post on 13-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1

BCAL Construction

First Article work has begun: crew in place

Page 2: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 2

Teams• JLab

Eugene Chudakov, Elton Smith, Tim Whitlach, …

• Regina George Lolos, Zisis

Papandreou, Dan Kolybaba, Keith Wolbaum, Andrei Semenov, students

• Alberta James Pinfold, Jan Soukup,

Gilbert Lachat, Richard Soluk

• Ross Machine Shop Kevin Lorenz

At a glance…

• Contracts• Vendors• Fibers: Quality Assurance• Mechanical issues• Construction preparations• Logistics• Crew• Looking ahead

Overview

Page 3: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 3

• Construction MOU is done• First Article - PO (49th module)• Full Contruction - RFP (48 modules)

Contracts

“The mother of all prototypes”

Page 4: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 4

Timetable

• First Article Delivery: Oct 2, 2009• First Four Modules: Feb 10, 2010

Page 5: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 5

Fiber Test Preparations

• Kuraray Contract SCSF-78MJ; (410cm -0/+4)cm 780,590 fibers; maybe too few?

• First article tests: A. Semenov’s talk (next)

• New Fibers QA protocol Attenuation length: (a few % of fibers)

• use photodiode/PMT, measure current• use spectrophotometer for select cases• setup upgrades: parts; manual scan, eventually automatic

Photoelectrons: 90Sr; SiPM/PMT, manual scan, auto in future Anchor back to Kuraray’s results on attenuation length

Fiber track

Page 6: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 6

Detector Lab

p.e.

Module

DAQ

UV LED

fiber coffinSiPM

Page 7: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 7

Construction Preparations

• Facilities Construction 1300 ft2 ; Fiber & Sensor QA 1100 ft2

Press/Fiber Sorting area: ready Swaging area: blueprints+safety done, complete on June 1 Detector lab: ready Underground lab: ready

• Personnel Construction Manager: Dan Kolybaba Undergraduates: Brent Giesbrecht, Shaun Krueger, Lee Sichello (UofR -

CoOp), Aimee Heinrichs (UofC), Alana Watson (UofR) Trainers: Kathryn Janzen, George, Zisis Fall 2009: CoOp/Engineering Interships - Interviews May 20

• Materials Incidentals: ready Fibers, Lead, Epoxy: timetables in progress

Page 8: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 8

Construction Space Layout

Main Machine Shop

Group Office

Swaging

Pre

ss

Pre

ss

Fib

ers

Dan

Opti

mal A

rrang

em

ent!

Machine Shop

Shop storage

Load

ing

Dock,

Scie

nce S

tore

s

Page 9: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 9

Swaging

• Roller gap adjustments Short & Long lead strips swaged Built test matrix samples

• Lead Precut to width Rolled or in sheets Purity, uniformity,cleanliness Drop shipped First Article: using surplus lead; major

effort: 2 weeks to just clean & cut

• Safety HEPA vacuum for lead clean up; time

consuming and disposal Ventilation, electrical, escape routes

wedge

gap

Page 10: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 10

Cal Babies

• Small samples: Test roller gap Stack tolerances Unpopulated

grooves

• Clamp-press Fiber pitch

Page 11: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 11

Press Frame

• Located in Edmonton: Disassembly, strapping Crating, shipping Space is ready in Regina

• Commissioning: Orientation, leveling,

retrofitting (gauges), reactivation

Target date: June 1

• Second press will be built after full contract has been signed

Page 12: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 12

Ross Machine Shop

• “Big Machine” Levelling-indexing Polish ends Taper sides 4 modules at a time

• “Small machine”• Mechanical Liaison

Dan Kolybaba at UofR and Kevin Lorenz at Ross

Cost Quotes 49th Al plates: this week;

machine end of May

• Fac. of Science Shop

Page 13: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 13

Mechanical Issues

• Regular teleconferences (UofR, JLab, Ross)• Engineering drawings that are complete:

Aluminum Base and Inner plate BCAL wedge drawings Press frame

• Other tasks: Module leveling: done Lead storage: in progress Lift-off/Installation? Transport crates construction

2 t

on “

Cherr

y P

icke

r”

Page 14: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 14

Logistics & Paperwork

• Transportation Fibers & Lead will be drop shipped to Regina Regina-Newport News

Quotes received from two companies Return crates & support beams from NN to Canada?

• Customs Vendors are responsible for import to Canada Regina is responsible export to USA

HST Number 8544.70.90.00 ! (48 times the first module)

• Paperwork Drawings are complete Construction MOU is done Contract for First Article module has been awarded RFP: Budget for 48 module construction is in progress Regina is a DOE ‘approved non-domestic sole source’ QA Plan - in progress Safety documentation - in progress (Dan & Safety Officer) Student Job ads - ongoing

Page 15: Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 15

Summary

• Lead cutting is underway• Swaging starts week of May 19• Awaiting fibers and precut lead• Fiber First Article checks and report• Awaiting Full Construction Contract• We’re rock-and-rolling!