zcap meeting presentation for 5-21-12.pptx [read-only]
TRANSCRIPT
![Page 1: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/1.jpg)
N OLUTIONSOIZ S LLCAn EnergySolutions Company
ZCAP UpdateMay 21 2012May 21, 2012
![Page 2: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/2.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCAgenda
• Status update of the project• Overview of Reactor Vessel Internals Segmentationg• Environmental update
2
![Page 3: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/3.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC2012 Safety Statistics
• 2012 Statistics• 6 OSHA Recordable Injuries (all
categorized as Strain/Sprain/Pain)- Focus is being placed on Human Performance tools and
training.
Injury Body Location9 Back/Shoulder – 3 OSHA
7 Knee/Leg – 2 OSHA10 Hand/Finger – 1 OSHA
![Page 4: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/4.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCSafety
• Focus 2012 on Sprains/Strains/Pains– Outside of RCA for mgmt attention– Added senior mgmt team observation program modeled
after Ford Motor Co. This is in addition to formal daily mgmt observations.observations.
– Stretching, limbering, getting mechanical advantage for work– Proper equipment, proper use of equipment– Human Performance tools; attention span, work planning
involvement of craft (weekly safety meetings focus)– Murphy’s Alley Trainingu p y s ey a g
4
![Page 5: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/5.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCRad/ALARA
2012 Dose and RWP Breakdown
Year Total (mR) Month Dose (mR)
2917, 17%1545, 9%
7420
General RWPs
Unit 1 RWPs
U it 2 RWP
1629
3511
4842
7420
12940, 74%
Unit 2 RWPs
5
1629 5140 9982 17402
January February March April
![Page 6: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/6.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCRegulatory, NRC
• Actions– License amendment for fuel building crane upgrade and
heavy loads in the fuel building to support cask handling.– ISFSI Security Plan review and approval– Post-Fuel Tech Spec changes to support staff reductions– Post-Fuel Tech Spec changes to support staff reductions
• Region III inspections: No cited violations• NRC Public Meetingg
6
![Page 7: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/7.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCDisbursements and Balances
ZionSolutionsNuclear Decommissioning Balance Roll ForwardNuclear Decommissioning Balance Roll Forward
As of March 31, 2012
($ millions)Beginning Balance $ 801.4
Earnings - Net of Taxes & Fees 59.9
Disbursements (189 2)Disbursements (189.2)
Ending Balance $ 672.1
![Page 8: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/8.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCMajor Expense Categories
ZionSolutionsMajority of Expense Incurredj y p
As of March 31, 2012
P j MProject ManagementProcurement of Casks and Canisters for Dry Fuel
StorageStoragePlanning & Preparation for Spent Fuel StorageAsbestos RemediationUnit 1 & 2 Containment Preparation & SupportPlant Maintenance & Security
![Page 9: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/9.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCMajor Expense Categories
ZionSolutionsMajority of Expense Incurredj y p
As of March 31, 2012
Unit 1 & 2 Reactor VesselUnit 2 Reactor Internals Segmentation PreparationUnit 2 Containment Large ComponentsWaste DisposalRail ImprovementsRail ImprovementsEstablish Temporary UtilitiesISFSI Pad Design
![Page 10: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/10.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCSite Infrastructure Modifications
Service Water
RailModifications
34kv electrical upgradeU-1 heavy lift system
![Page 11: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/11.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC
Unit One Cavity Preparations
– Welding half pipe and dbsandbox covers
– Clearing the RV headCutting cavity– Cutting cavity interferences
Rx head CRDM removal
Seal weld Rx Vsl to cavity
![Page 12: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/12.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC
Unit One Large Component Removal Preparations
• Mirror insulation removal• Electrical interference removal• Piping removal
Rx coolant leg
![Page 13: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/13.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCSpent Fuel Milestones
• 2012 Fuel modifications and fuel inspections – complete• 2012 ISFSI and Monitoring Station construction• 2013 Transfer of spent nuclear fuel to dry storage begins• Continued safe operation and maintenance of the spent fuel pool
![Page 14: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/14.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCMajor Fuel Tasks – Schedule
• Fuel Modifications and InspectionsComplete for all 2 226 fuel assemblies– Complete for all 2,226 fuel assemblies
• Dry Cask Storage Canisters– First canisters set to arrive – summer 2012
• ISFSI– Engineering complete– Construction begins – summer 2012 Visual Inspectiong
• Fuel Crane Upgrade– New trolley assembly complete– Installation begins – summer 2012
Visual Inspection
Installation begins summer 2012
• Fuel Transfer Operations– Scheduled to begin – spring 2013
Damaged Fuel
![Page 15: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/15.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC2012 Major Work Remaining
• ISFSI construction• Heavy haul path constructiony p• U-1 reactor vessel prep work• U-1 SGs removal• Complete U-2 reactor internals segmentation• Complete Asbestos remediation in the Aux building
VCC t ti• VCC construction• Fuel building crane upgrade• Continue MARSAME characterization of the turbine• Continue MARSAME characterization of the turbine
building
15
![Page 16: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/16.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCReactor Segmentation
• The major components of the reactors are:– The reactor vessel (RV); and
Th t i t l (RVI)– The reactor internals (RVI)• RV and RVI now require remote cutting because of the levels of radioactivity
• All segmentation performed in reactor cavity– Internals under water– Vessel dry (after cavity draining)– All cuts performed mechanically (currently)
![Page 17: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/17.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCReactor Segmentation
Upper and Lower Internals Assemblies
C tti• Cutting– Reactor Internals– Reactor VesselReactor Vessel
• Reactor Internals– 2 pieces2 pieces
• Upper and Lower Internals
• Cut under water
17Assembled Reactor
• Cut under water
![Page 18: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/18.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCTooling (1)
• Volume Reduction Station– Located in Upper Refueling Cavity– Used for size reduction of ring sections
18VRS in Mock-Up Test Facility
![Page 19: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/19.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCTooling (2)
• Circumferential Hydraulically Operated Cutting Equipment– Used for segmenting cylindrical components prior to size
reduction on the VRS– Supported from the internal surface of the core barrel
19CHORCE
![Page 20: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/20.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCTooling (3)
• Bolt Milling Tool– Used to remove the core baffle plates (GTCC) by
milling off the bolt heads– Located in the position via pegs in lower core plate
holesholes
20BMTBMT installed in lower internals
![Page 21: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/21.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCTooling (4)
21
![Page 22: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/22.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCMock Up Testing (1)
22
![Page 23: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/23.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCMock Up Testing (2)
23
![Page 24: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/24.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCMobilization (1)
24
![Page 25: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/25.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCMobilization (2)
25
![Page 26: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/26.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCVRS Installed
26
![Page 27: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/27.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCRV Upper Internals lift
27
![Page 28: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/28.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCCHORCE cutting of RV Lower Internals
28
![Page 29: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/29.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCCHORCE plunge cut
29
![Page 30: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/30.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCUpper Internals on VRS
30
![Page 31: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/31.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCUpper Internals guide tube segmenting
31
![Page 32: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/32.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCWaste basket loaded with guide tubes
32
![Page 33: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/33.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCUpper Internals with guide tubes removed
33
![Page 34: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/34.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCSegmentation Schedule
34
![Page 35: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/35.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCEnvironmental Department
ZionSolutions EnvironmentalZionSolutions Environmental Department
– Compliance– Risk Management– Stewardshipp
35
![Page 36: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/36.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC
Compliance- National Pollutant Discharge Elimination System
NPDEST l i h h• To comply with the Clean Water Act
Primary Inputs– Primary Inputs• Storm Water• Roof Drains• WWTP• Oil/Water Separators • Turbine BuildingTurbine Building
Sump
36
![Page 37: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/37.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCRisk Management
• Protecting Lake Michigan– Implement Best Management
Practices (BMPs) for stormwaterdrains
– Oil/Water Separators• 2 x 42,000 gal liquid capacity
– SWPPP for construction activities related to:
• Railroad Refurbishment • VCC Pad• ISFSI Pad
37
![Page 38: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/38.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCStewardship
Biodiversity Protection• Illinois Beach State Park located on• Illinois Beach State Park located on
the North and South side of the property.p p y
• Examples of Wildlife Protection– Canada Goose and Goslingsg– Blanding’s Turtle
• Inspections and Notifications – Snakes
• Fox SnakeG t S k• Garter Snakes
38
![Page 39: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/39.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCCanada Goose and Gosling Rescue
• A pair of Canada Geese nested on a roof top • IDNR inspected the nest site and advised• Six Goslings were rescued from the roof top and
relocated to the lake front• After several minutes the mother goose flew from the• After several minutes the mother goose flew from the
roof top to the lake front. The gander stood a protective watch from a distance. 39
![Page 40: ZCAP Meeting Presentation for 5-21-12.pptx [Read-Only]](https://reader031.vdocument.in/reader031/viewer/2022012205/61de577a03cf07305148badf/html5/thumbnails/40.jpg)
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCSnake Rescue and Release
• Snakes rescued from railroad tracks scheduled to be repaired as part of the decommissioning work.
• Environmental coordinated efforts with: – IDNR– Lake Forest Wildlife Discover CenterLake Forest Wildlife Discover Center– College of Lake County Biology Professor– High School Teacher/Local Resident
• During the Spring, the rescued snakes were returned to an artificial den. The den is located at the Illinois Beach State Park, north of the original snake den location. , g
40