zd/&/ d k& wzk h d ke&kzd/dz } v w } µ ] } v v o ] À Ç ... · certificate issued to:...

5
CERTIFICATE OF PRODUCT CONFORMITY Concrete Production and Delivery Facilities Dubai Central Laboratory Department (DCLD) of Dubai Municipality hereby attests that: has been assessed and found in conformity with the requirements of Dubai Municipality Standard Specifications DMS 026 "Technical Requirements for the Operation of Ready Mixed Concrete Plants" and the relevant Specific Rules. Accordingly, DCLD hereby authorizes the above company to use the DCL Conformity Mark to indicate conformance with the requirements of the certification scheme. for / ENGR. AMIN AHMED AMIN Director, Dubai Central Laboratory Department Dubai Municipality Certificate No: Valid Until: Current Issue Date: Original Issue Date: The attached Scope of Certification bearing the same Certificate Number forms an integral part of this Certificate. This Certificate is an electronic document subject to the Terms and Conditions of the Product Certification System and shall not be reproduced except in full. CL16020335 27/03/2020 28/03/2019 28/03/2016 AL NABOODAH CONTRACTING CO. (L.L.C.) - Plant #C-07 and #C-09 P. O. Box: 889, Jebel Ali Industrial Area, Plot No. 5990892, Dubai, UAE (with production and delivery facilities as given in the attached Scope of Certification) DM-DCLD-F-IC-2050 Rev 9

Upload: others

Post on 20-Apr-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

CERTIFICATE OF PRODUCT CONFORMITYConcrete Production and Delivery Facilities

Dubai Central Laboratory Department (DCLD) of Dubai Municipalityhereby attests that:

has been assessed and found in conformity with the requirements of Dubai Municipality Standard SpecificationsDMS 026 "Technical Requirements for the Operation of Ready Mixed Concrete Plants" and the relevant Specific Rules.

Accordingly, DCLD hereby authorizes the above company to use the DCL Conformity Markto indicate conformance with the requirements of the certification scheme.

for / ENGR. AMIN AHMED AMINDirector, Dubai Central Laboratory Department

Dubai Municipality

Certificate No:Valid Until:

Current Issue Date:Original Issue Date:

The attached Scope of Certification bearing the same Certificate Number forms an integral part of this Certificate.This Certificate is an electronic document subject to the Terms and Conditions of the Product Certification System and shall not be reproduced except in full.

CL1602033527/03/2020

28/03/201928/03/2016

AL NABOODAH CONTRACTING CO. (L.L.C.) - Plant #C-07 and #C-09P. O. Box: 889, Jebel Ali Industrial Area, Plot No. 5990892, Dubai, UAE

(with production and delivery facilities as given in the attached Scope of Certification)

DM-DCLD-F-IC-2050 Rev 9

Page 1 of 4 DM-DCLD-F-IC-2051 R8 P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE

DUBAI CENTRAL LABORATORY DEPARTMENT CONCRETE PRODUCTION AND DELIVERY CERTIFICATION SCHEME

SCOPE OF CERTIFICATION

FOR CERTIFICATE NO. CL16020335

Certificate Issued To: AL NABOODAH CONTRACTING CO. (L.L.C.) –

Plant #C-07 and #C-09 P. O. Box: 889, Jebel Ali Industrial Area, Plot No. 5990892, Dubai, UAE

Applicable Standard Specification: DMS 026 – Technical Requirements for the Operation of Ready Mix Concrete Plants

Applicable Specific Rules: RD-DP21-2177 (IC) - Specific Rules for Certification of Ready-Mixed Concrete Plants in Accordance with Administrative Decision (316) 2012 and DMS 026.

RD-DP21-2086 (IC) – Factory Production Control System for Ready-Mixed Concrete Plants and CBUs

SCOPE: This Certificate indicates that the plant implements a quality management system and has the appropriate production and delivery facilities (as mentioned below) capable of producing concrete according to the required specifications. Conformance of the final product with the agreed concrete specifications shall be verified according to the usual inspection methods and as agreed between the plant and its customer.

CERTIFIED BATCHING PLANTS As required by the certification scheme, the plants listed below are central mixing with automatic batching of concrete components including cementitious materials, aggregates, water and admixtures:

S/N Plant Identification Plant Details

1 Ready Mix Concrete Batching Plant # C-07

Manufacturer: ELBA Plant Model. : EBCB 130 VAC 7 Serial No. 418 – 69 – 1007 - 0

2 Ready Mix Concrete Batching Plant # C-09

Manufacturer: ELBA Plant Model. : EBCB 130 VAC 7

Serial No. 418 – 69 -1017-0

Page 2 of 4 DM-DCLD-F-IC-2051 R8 P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE

CERTIFIED CONCRETE TRUCKS

S.N. Truck No. Plate No. MANUFACTURER

1 TG 72 M 23026 GORICA

2* TG 73 V 10377 GORICA

3 TG 74 E 54907 GORICA

4 TG 76 E 55402 GORICA

5* TG 77 E 54315 GORICA

6 TG 78 H 19756 GORICA

7 TG 79 J 43833 GORICA

8* TG 81 V 12380 GORICA

9 TG 82 F 55239 GORICA

10* TG 83 V 12381 GORICA

11 TG 86 G 80267 STETTER

12 TG 87 G 81052 STETTER

13 TG 88 N 85479 STETTER

14 TG 89 F 85645 STETTER

15 TG 90 G 85645 STETTER

16 TG 91 G 83302 STETTER

17* TG 92 G 81517 GORICA

18* TG 94 N 65331 GORICA

19* TG 95 C 26795 GORICA

20 TG 97 S 32129 GORICA

21* TG 98 J 98317 GORICA

22* TG 99 I 68419 GORICA

23 TG 102 G 61397 BARUVAL

24 TG 103 S 33143 BARUVAL

25* TG 104 V 60491 GORICA

Page 3 of 4 DM-DCLD-F-IC-2051 R8 P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE

26* TG 105 U 96221 GORICA

27 TG 106 O 97602 BARUVAL

28 TG 107 L 99705 BARUVAL

29* TG 108 E 51668 GORICA

30* TG 109 I 83703 GORICA

31* TG 111 F 27486 GORICA

32* TG 113 I 83705 GORICA

33* TG 114 L 99810 GORICA

34* TG 115 I 85545 GORICA

35* TG 118 D 73189 GORICA

36* TG 134 E 92725 GORICA

37* TG 135 E 93717 GORICA

38* TG 136 E 88943 GORICA

39* TG 137 N 85401 GORICA

40* TG 138 E 88937 GORICA

41* TG 139 J 96375 GORICA

42 TG 140 J 98355 GORICA

43 TG 141 J 98354 GORICA

44 TG 142 J 98350 GORICA

45 TG 143 J 96365 GORICA

46 TG 144 N 83406 GORICA

47* TG 145 K 21050 GORICA

48* TG 146 K 21049 GORICA

49* TG 147 K 21051 GORICA

50 TG 148 K 21052 GORICA

51* TG 149 T 45930 GORICA

52* TG 150 T 87174 GORICA

53* TG 151 T 87170 GORICA

Page 4 of 4 DM-DCLD-F-IC-2051 R8 P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE

54* TG 152 T 87169 GORICA

55* TG 153 T 87164 GORICA

56* TG 154 T 84955 GORICA

- NOTHING FOLLOWS - *New added trucks NOTE 1:This document forms part of the Certificate of Conformity bearing the same certificate number. NOTE 2: The above certified batching plants and delivery trucks shall be identified by the DCL Conformity

Mark. Original Issue Date : 28 March 2016 Current Issue Date : 28 March 2019 Valid Until : 27 March 2020

ARIF HUSAIN AL MARZOOQI Products Conformity Assessment Section Manager

Dubai Central Laboratory Department