ZMARTBUILDWALLPANEL• Lightweight and Easy to Work
• East Installation and Clean Site
• Thermal, Sound and Fire Resistance
• Environmentally-Friendly and Energy Saving
General installers can install ZMARTBUILD WALLPANEL of more than 30 sq.m. with 3 Labour team per day
Non-combustible : up to four hour fireratingOutstanding thermal and acousticinsulation qualities increase levels ofcomfort and save on energy coolingcosts
Steel reinforcing is specially coated toprevent corrosion and provides maximumdurability
Up to 180
33
550 - 650
Up to 4.00
ZMARTBUILD WALL PANELZMARTBUILD WALL PANEL are lightweight, steel reinforced,groove & tongue panels that can be easily installed by your normal on-site installers. They are suitable to be used as both external and internal walls.
ZMARTBUILD WALL PANEL Hand Book2 ZMARTBUILD WALL PANEL Hand Book 3
75 x 600 x 3000
100 x 600 x 3000
ZmartBuild Wall Panel are steel reinforced (start from) 75 mmthick and are available in lengths of 1.50 m to 4.0 m ofwidth of 600 mm.
ZMARTBUILD WALL PANEL
10
7
53
70
10. Steel plug (Expansion Bolt)
4 5ZMARTBUILD WALL PANEL Hand Book ZMARTBUILD WALL PANEL Hand Book
6 7ZMARTBUILD WALL PANEL Hand Book ZMARTBUILD WALL PANEL Hand Book
Lift the wall paneland push it toattach the column.
Check sizes and quantitiesof ZMARTBUILD WALL PANEL.
Clean ZMARTBUILD WALL PANEL and move tothe marked point.
Check wall layout to installin construction drawing.
Clean and mark the wall alignmentby using a chalk tape.
Mix thin-bed mortarand apply it onstructure column.
Insert a foam sheet between floorand top of the panel.
Check tools andequipment.
8 9ZMARTBUILD WALL PANEL Hand Book ZMARTBUILD WALL PANEL Hand Book
Continue install wall panels until the gap can beclosed by the end panel.
Use lever to lift ZMARTBUILD WALL PANEL until top of the panel reach the upper floor then insert a wood wedge under the panel.
Use steel angle to fasten the panel with floors on both upper and lower side ofthe panel by using steel plugs and screws.
Apply thin-bed mortar on side of the first panel then lift the next wall panel toattach and do the same as the previous steps.
Measure the gap and cutthe last panel to fit in theninstall it in place.
Fill the gap under the panels withsand-cement mortar.
Fill all gaps between each panel withthin-bed mortar, wait until the mortardry then rub with sandpaper #400.
How to moveZMARTBUILD WALL PANEL
There is no obstructionbesides of the truck.
Check the conditions of thepackaging to make surethat it will not fail whilebeing lifted in the air.
Insert soft belts underpallets at the designedpositions.
Lift wall panel to the loadingarea and then use hand lift tomove wall panel into thebuilding.
ZMARTBUILD WALL PANEL are designed and instructed to use for wall partition only.
Use for installating wall panel only. Please follow the steps in installation guide.Do not use wall panel as load bearing structure.Do not eat or breathe dust from cutting the product.
Finish ZMARTBUILD WALL PANEL Installation
Finishing all gaps again with skim coat then rubwith sandpaper #200.
10 11ZMARTBUILD WALL PANEL Hand Book ZMARTBUILD WALL PANEL Hand Book
Various Application ofZMARTBUILD WALL PANEL
13ZMARTBUILD WALL PANEL Hand Book
• Cladding for heat protection• Horizontal Installation• Till Mount Installation
ZMARTBUILD WALL PANEL
Web : www.zmartbuild.com
SCG International India Pvt. LtdUnit No. 609, 6th Floor, The Palm Spring Plaza, Golf Course Road, Gurugram, Haryana, India, 122001
ZMARTBUILD Call Center : Tel (IN) : +91 124 400 6413