Page 1: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874

Installation Instructions

Zurn

Trench Drain System

Page 2: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Accessories Trench Drain System

2

Below are the components of the Z874-X trench drain typicalto an installation. Check your order to verify you have allcomponents particular to your job before beginning yourinstallation. Contact customer service at 877-ZURN-NOW(877-987-6669) should additional material be required.

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Four-CornerLockdown (Bag 937)

-RC Rebar Clip(Bag 832)

P874-(X)-ENo-Hub End Outlet

for Channel

P874-(X)-DGCDuctile IronClass C Grate

P874-(X)-E1Closed End Cap

Z874-(X) Black End Cover(-12" - Bag 933; -18" - Bag 955;-21" - Bag 934)

P874-(X)-UNo-Hub BottomOutlet for Channel

Page 3: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

3

Z874 Tools Required

Tape Measure Phillips Head Screwdriver

Hammer Utility Knife Marker

Cordless Drill Reciprocating Saw Ear Protection Safety Glasses

Gloves Hole Saw Caulk Gun

Page 4: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

4

Four-inch new concrete encasement is minimum. Guidelinesfor reinforcing and encasement is recommended to use thesame thick ness and reinforcing used in the surroundingconcrete slab. Concrete must be vibrated to remove air voids in encasement, especially under the frame rails.

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Encasement

ExcavationTrench excavation must include a minimum of 4"concrete encasement or specifying engineer’srequirement on both sides and underneathsurrounding the trench. Soft and/or shifting soilsubstrates may cause cracking of the concreteand consequent movement of the trench. It iscritical that the concrete be poured on an adequatefoundation. Verifying the depth of trench excavationallows for the same thickness of concrete underand beside the trench.

Specifying engineer is responsible for concrete encasementand reinforcing based upon application and local codes.

Overall Width Grate Width Throat WidthDim. (A) Dim. (B) Dim. (C)

System In./[mm] In./[mm] In./[mm]

Z874-12 20 [508] 17 [432] 12 [305]

Z874-18 26 [660] 23 [584] 18 [457]

Z874-21 29-1/4 [743] 26-1/4 [667] 21-1/4 [540]

Page 5: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

5

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 LayoutUpon completion of the excavation, the channel should beplaced in numeric order alongside the excavation accordingto the job layout. Each trench section has a trench identifi ca -tion number and flow direction indicating its sequence withinthe system. It is best to work from the deep or outlet end tothe shallow. Grates are not installed at this time.

Page 6: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

6

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 End Outlet Connection Option

Step 3Attach end outlet or end cap to the channel with hardwareprovided. Attach frame end piece to end with hardwareprovided.

Step 1When installing end cap or end outlet, remove by cuttingwith saw the 1-1/4" male overlap connection as shown.

Step 2Once overlap is removed, trim end cap/end outlet to desired height.

Page 7: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

7

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Bottom Outlet Connection OptionStep 1Score both sides of the rib with the utility knife.

Step 2Tap rib with a hammer to remove rib when necessary.

Step 3Attach bottom outlet to channel with hardware provided.

Step 4Cut out hole with hole saw that matches inside diameter of outlet.

Page 8: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

8

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Channel OptionsMale - MaleUsed for connections at high point transition.

Female - FemaleUsed for connections at low point transition.

Standard

Page 9: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

9

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Channel ConnectionStep 1Attach rebar clip with hardware provided.

Step 2Place in trench and set rebar firm in subsoil, working from deep to shallow.

Step 3Slide male end of channel in grooves offemale end of set channel.

Step 4Position so frames are flush and in linewith each other.

Step 5Attach frame tab to frame tab withhardware provided.

Step 6Using thumbscrew on rebar clip, set thetrench to the finished height.

Note: Channel should be set so it is 1/8" below finished floor.

Page 10: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

10

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Catch Basin ConnectionStep 1Slide male end of channel in grooves of female end of set channel.

Step 2Attach frame tab to frame tab with hardware provided.

Z874-1B

Page 11: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

11

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Retrofit InstallationStep 1Attach 2x4 to span proposed trenchopening using wire ties or 3/8-16 boltsthreaded into the lockdown holes on the frame. Channel should be held 1/8"below 2x4 so trench is 1/8" belowfinished floor.

Step 2Place in trench working from deep toshallow.

Step 3Slide male end of channel in grooves offemale end of set channel.

Step 4Position so frames are flush and in linewith each other.

Step 5Attach frame tab to frame tab withhardware provided.

Page 12: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

12

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Internal BracingInternal sidewall bracing is recommended approximatelyevery 20" for any 874 channel with an invert deeper than 16".Bracing shall be made from standard 2x4 and shall be providedand constructed on site by others. Internal bracing shall be (A)wide (see chart) and the height will be determined to match theinvert depth, and horizontal braces shall be placed every 10".

System Dim. (A)

Z874-12 12 [305]

Z874-18 18 [457]

Z874-21 21-1/4 [540]

Page 13: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

13

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Pour the concrete around the three sides of the trench drain.Be certain to adequately vibrate the concrete as it is beingplaced. Proper vibration will eliminate any unwanted voidswithin the concrete pour. If sidewalls are used, a first andsecond pour are recommended. Care shall be taken not toallow concrete into the grate lockdowns.

Z874 Concrete Pour and Finish

Step 1Verify layout is correct prior to pouring concrete.

Step 3Finish troweling should be done to set the top edge of the trench drain 1/8" below the floor grade. Remember tocompensate for the concrete shrink that may occur duringcure so that the edge of the trench drain does not protrudeabove the finished floor grade.

Step 2Slurry pour to lock rebar into place.

Placing Concrete• Check that the trench drain is in the location required perthe layout drawings prior to pouring concrete.

• Standard concrete practices with expansion and crackinduction joints shall be followed based upon local codesand standards.

• The trench drain shall not be used as an expansion joint.

Step 4Remove internal bracing.

Page 14: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

14

Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Z874 Installing GratesStep 1Start bolts by hand 1 to 2 completerevolutions on opposite corners. Do nottighten completely.

Step 2Start bolts on remaining corners 1 to 2complete revolutions. Do not tightencompletely.

Step 3Once all 4 bolts are started, tighten all 4 bolts with a socket in a crisscrossmethod.

Page 15: Zurn Z874 - Cherokee Nation > Home-12" -Bag 933; -18" -Bag 955;-21" -Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel Zurn Flo-Thru Trench Drain Systems Z874 Installation Instructions

Form No. FT754, Rev. 6/11

ZURN INDUSTRIES, LLC FLO-THRU OPERATION1801 PITTSBURGH AVENUE, ERIE, PA, U.S.A. 16502 PHONE: 814/455-0921 FAX: 814/875-1402 www.zurn.com

In Canada:ZURN INDUSTRIES LIMITED3544 NASHUA DRIVE, MISSISSAUGA, ONTARIO LV4 1L2 PHONE: 905/405-8272 FAX: 905/405-1292