© 2007 Farnsworth Group, Inc. Commissioning LEED Commissioning LEED ® ® Projects Projects Presented by: Presented by: Lance Stewart, PE, CxA, LEED Lance Stewart, PE, CxA, LEED ® AP AP Roger Johnson, CMC, CMGB, SCA Roger Johnson, CMC, CMGB, SCA Understanding the Commissioning Process for Building Owners & Design Professionals October 14, 2008

Upload: andrew-hensley

Post on 17-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

© 2007 Farnsworth Group, Inc.

Commissioning LEEDCommissioning LEED®® Projects Projects

Presented by:Presented by:

Lance Stewart, PE, CxA, LEEDLance Stewart, PE, CxA, LEED®® AP AP

Roger Johnson, CMC, CMGB, SCARoger Johnson, CMC, CMGB, SCA

Understanding the Commissioning Process for Building Owners & Design Professionals

October 14, 2008

© 2007 Farnsworth Group, Inc.

What is Commissioning?

Commissioning Team

What is LEED®?

Commissioning for LEED®

Successful LEED® Projects

Wall of Shame

Cost of Commissioning

AGENDA

© 2007 Farnsworth Group, Inc.

What is Commissioning?What is Commissioning?

Simple DefinitionSimple Definition::An Owner’s An Owner’s quality-based processquality-based processdeveloped from developed from industry bestindustry bestpracticepractice to verify the owner receives to verify the owner receivesat the END OF A PROJECT at the END OF A PROJECT what they stated they wanted in thewhat they stated they wanted in theBEGINNING OF THE PROJECTBEGINNING OF THE PROJECT

© 2007 Farnsworth Group, Inc.

History & Development of Cx:History & Development of Cx:The Naval Commissioning ProcessThe Naval Commissioning Process

USS Alabama (BB-60)USS Alabama (BB-60)

Launched: February 16, 1942

Commissioned: August 16, 1942

Note 6 months to commission!

© 2007 Farnsworth Group, Inc.

Keys to Success: Starting EarlyKeys to Success: Starting EarlyProject Schedule vs. Potential SavingsProject Schedule vs. Potential Savings

Design Construction O &M

Potential Savings

Cost to Fix

Non-Commissioned Project Timeline

Concept

© 2007 Farnsworth Group, Inc.

Commissioning Team MembersCommissioning Team Members

OwnerOwner

Owner’s O & M StaffOwner’s O & M Staff

End User / Building OccupantEnd User / Building Occupant

Commissioning AgentCommissioning Agent

Design TeamDesign Team

Construction TeamConstruction Team

Medical Center of the Rockies, Loveland, Colorado

© 2007 Farnsworth Group, Inc.

Cx Team - DesignCx Team - Design

ArchitectArchitect

Civil (site) EngineerCivil (site) Engineer

Mechanical EngineerMechanical Engineer

Plumbing EngineerPlumbing Engineer

Electrical EngineerElectrical Engineer

Communications (tele/com) EngineerCommunications (tele/com) Engineer

© 2007 Farnsworth Group, Inc.

Cx Team - ConstructionCx Team - Construction

General Contractor/Construction ManagerGeneral Contractor/Construction Manager– Site/Civil Site/Civil – HVACHVAC– PlumbingPlumbing– Fire ProtectionFire Protection– ElectricalElectrical– Tel/ComTel/Com– TAB AgencyTAB Agency– Controls ContractorControls Contractor

WYARNG Army Aviation Support Facility

© 2007 Farnsworth Group, Inc.

Brief LEED Overview Brief LEED Overview

LEEDLEED®® (Leadership in Energy and Environmental (Leadership in Energy and Environmental Design) Green Building Rating System developed Design) Green Building Rating System developed by the US Green Building Council (USGBC)by the US Green Building Council (USGBC)

Point-based system with four award levels:Point-based system with four award levels:Platinum (52 or more of 69 total)Platinum (52 or more of 69 total)Gold (39 to 51 of 69 total)Gold (39 to 51 of 69 total)Silver (33 to 38 of 69 total)Silver (33 to 38 of 69 total)Certified (26 to 32 of 69 total)Certified (26 to 32 of 69 total)

Five Focus Areas:Five Focus Areas:Sustainable SitesSustainable SitesWater EfficiencyWater EfficiencyEnergy & Atmosphere (Energy & Atmosphere (Fundamental Cx or Enhanced CxFundamental Cx or Enhanced Cx))Materials & ResourcesMaterials & ResourcesIndoor Environmental QualityIndoor Environmental Quality

© 2007 Farnsworth Group, Inc.

Key Commissioning TasksKey Commissioning TasksLEEDLEED®® Fundamental Commissioning Fundamental Commissioning

– Owner’s Project Requirements (OPR) Owner’s Project Requirements (OPR) – Basis of Design (BoD) or Design Intent Document (DID)Basis of Design (BoD) or Design Intent Document (DID)– Design Documents Cx RequirementsDesign Documents Cx Requirements– Commissioning Plan (CxPlan)Commissioning Plan (CxPlan)– Construction ChecklistsConstruction Checklists– Site Visit ReviewsSite Visit Reviews– Cx Issues LogsCx Issues Logs– Cx Functional Performance TestingCx Functional Performance Testing

LEEDLEED®® Enhanced Commissioning Enhanced Commissioning– Design ReviewsDesign Reviews– Submittal ReviewsSubmittal Reviews– Cx Training ProgramsCx Training Programs– Systems ManualSystems Manual– Warranty ReviewWarranty Review UCSF 17C, San Francisco, CA

© 2007 Farnsworth Group, Inc.

Pros/Cons of Fundamental CxPros/Cons of Fundamental Cx

PRO: Lower up-front investmentPRO: Lower up-front investment

PRO: Improved system performance, PRO: Improved system performance, documentation, trainingdocumentation, training

CON: Minimum benefits from CxCON: Minimum benefits from Cx

CON(?): May identify costly reworkCON(?): May identify costly rework

© 2007 Farnsworth Group, Inc.

Pros/Cons of Enhanced CxPros/Cons of Enhanced Cx

PRO: Improved system performance, PRO: Improved system performance, documentation, trainingdocumentation, training

PRO: Maximum benefits from CxPRO: Maximum benefits from Cx

PRO: May prevent costly rework PRO: May prevent costly rework (design & submittal reviews)(design & submittal reviews)

CON: Higher up-front costCON: Higher up-front cost

© 2007 Farnsworth Group, Inc.

Owner’s Project Requirements (OPR)Owner’s Project Requirements (OPR)

© 2007 Farnsworth Group, Inc.

Basis of Design (BoD)Basis of Design (BoD)

© 2007 Farnsworth Group, Inc.

Commissioning PlanCommissioning Plan

© 2007 Farnsworth Group, Inc.

Design ReviewsDesign Reviews

© 2007 Farnsworth Group, Inc.

Submittal ReviewsSubmittal Reviews

© 2007 Farnsworth Group, Inc.

Construction ChecklistsConstruction Checklists

© 2007 Farnsworth Group, Inc.

Site Visit ReviewsSite Visit Reviews

© 2007 Farnsworth Group, Inc.

Integrated Systems Shutdown FPTIntegrated Systems Shutdown FPTItem Responsibility Functional test Elapsed

Time Accepted? If No, Explain

Main Circuit Breakers

E1 KE/ Russelectric

Verify operation of accessories such as the engine heaters, battery chargers, remote annunciator, etc that normally function during standby mode.

0:00 YES

E2 Siemens/HPE Verify the radiator room damper shall open on low temp signal from the wall mounted sensor.

0:10 YES

E3 MHN/Siemens/HPE

Adjust the low temperature set point and verify the radiator room damper opens.

0:12 YES

E4 KE/MHN ANNOUNCE THAT POWER WILL BE INTERRUPTED. MHN will de-energize main service entrance switchgear by opening main circuit breakers P-MDC and HB-MDC. Verify generator sequence begins.

0:15 YES

E5 KE Record generator start-up time. 0:16 YES 4 seconds Generator failed to start properly. PLC1 failed and PLC2 during start up. Battery for PLCS could not carry load. Generator batteries did not have adequate capacity to carry load and start generators.

E6 KE Verify the time for the first ATS (Life Safety and Critical) to switch to the hot bus. (10 seconds)

0:16

YES 7-8 seconds

E61 KE/ Russelectric

Disconnect battery chargers and verify alarm to the SCADA.

5:50 NO Currently not monitored. Working with Cummins to correct.

© 2007 Farnsworth Group, Inc.

Cx Issues Log Cx Issues Log

© 2007 Farnsworth Group, Inc.

Cx Training ProgramCx Training Program

© 2007 Farnsworth Group, Inc.

LEED ScorecardLEED Scorecard

© 2007 Farnsworth Group, Inc.

LEEDLEED®® Online Online

© 2007 Farnsworth Group, Inc.

LEEDLEED®® Online Online

© 2007 Farnsworth Group, Inc.

LEEDLEED®® Online Online

© 2007 Farnsworth Group, Inc.

Sample TemplateSample Template

© 2007 Farnsworth Group, Inc.

Sample TemplateSample Template

© 2007 Farnsworth Group, Inc.

Boulder Community Foothills HospitalBoulder Community Foothills Hospital

First LEEDFirst LEED®® certified certified Hospital in the USHospital in the USLEEDLEED®® Silver SilverOperable windows allow Operable windows allow patients control of their patients control of their environmentsenvironmentsUse of low-VOC Use of low-VOC productsproductsEnergy efficient central Energy efficient central plantplantBuilding energy Building energy systems commissioningsystems commissioning

Location: Boulder, Colorado

© 2007 Farnsworth Group, Inc.

Citizenship & Immigration Services (CIS)Citizenship & Immigration Services (CIS)

LEEDLEED®® Silver Silver

More than 30% water More than 30% water conservedconserved

Recycled 86% of Recycled 86% of construction wasteconstruction waste

Over 40% local, regional materials

Views for over 90% of spaces

Location: Lincoln, Nebraska

© 2007 Farnsworth Group, Inc.

Children’s Discovery MuseumChildren’s Discovery Museum

LEEDLEED®® Silver Silver

First project completed First project completed under Town of Normal under Town of Normal LEEDLEED®® initiative initiative

New building designed New building designed to blend into old to blend into old downtowndowntown

Large percentage of Large percentage of recycled materialrecycled material

Building energy Building energy systems commissioningsystems commissioning

Location: Normal, Illinois

© 2007 Farnsworth Group, Inc.

Wisconsin Department of Natural ResourcesWisconsin Department of Natural Resources

LEEDLEED®® Gold Gold

Rapidly renewable materials & FSC certified woodRapidly renewable materials & FSC certified wood

60% below ASHRAE 90.160% below ASHRAE 90.1

Building energy systems commissioningBuilding energy systems commissioning

Recycled 85% construction wasteRecycled 85% construction waste

Location: Green Bay, Wisconsin

© 2007 Farnsworth Group, Inc.

Student Recreation Center, UCCSStudent Recreation Center, UCCS

Pilot LEEDPilot LEED®® project for UCCS project for UCCS

Focus on local and recycled materialsFocus on local and recycled materials

Pool system designed for later retrofit for solar hot waterPool system designed for later retrofit for solar hot water

Public education to be incorporatedPublic education to be incorporated

Daylighting controls & views of Front Range from workout Daylighting controls & views of Front Range from workout areasareas

Location: Colorado Springs, Colorado

© 2007 Farnsworth Group, Inc.

45 Eureka Street, Tenant Improvements45 Eureka Street, Tenant Improvements

LEEDLEED®® Gold Gold

Water fountain powered Water fountain powered by solar powerby solar power

Extensive daylighting Extensive daylighting and controlsand controls

PV panels supply on-PV panels supply on-site renewably site renewably generated powergenerated power

Building energy Building energy systems commissioningsystems commissioning

Location: Pasadena, California

© 2007 Farnsworth Group, Inc.

Aquarium of the PacificAquarium of the Pacific

LEEDLEED®® Platinum Platinum

Exemplary performance Exemplary performance on energy savings & on-on energy savings & on-site renewable energy site renewable energy through the use of PV through the use of PV panelspanels

Green roof with grey Green roof with grey water irrigation systemwater irrigation system

Building energy Building energy systems commissioningsystems commissioning

Location: Long Beach, California

© 2007 Farnsworth Group, Inc.

Chicago Police Station, 22Chicago Police Station, 22ndnd District District

LEEDLEED®® Silver Silver

No potable water use for No potable water use for irrigationirrigation

Numerous options for Numerous options for alternative transportationalternative transportation

Low VOC interior finishesLow VOC interior finishes

Green housekeeping Green housekeeping programprogram

Exemplary performance Exemplary performance in local and recycled in local and recycled materialsmaterials

Location: Chicago, Illinois

© 2007 Farnsworth Group, Inc.

CSU Water Treatment LaboratoryCSU Water Treatment Laboratory

LEEDLEED®® Silver Silver

First laboratory in First laboratory in Colorado to achieve Colorado to achieve LEEDLEED®® certification certification

30% energy savings 30% energy savings over ASHRAE 90.1over ASHRAE 90.1

Fume hood Fume hood commissioningcommissioning

Adhered to Labs 21 Adhered to Labs 21 criteriacriteria

Location: Colorado Springs, Colorado

© 2007 Farnsworth Group, Inc.

Argonne National LaboratoryArgonne National Laboratory

LEEDLEED®® Silver Silver

First Department of First Department of Energy LEEDEnergy LEED®® certified certified buildingbuilding

Heat island reductionHeat island reduction

Daylighting and controlsDaylighting and controls

Recycled materialsRecycled materials

Low VOC interior Low VOC interior finishesfinishes

Building energy Building energy systems commissioningsystems commissioningLocation: Argonne, Illinois

© 2007 Farnsworth Group, Inc.

Newport News Federal CourthouseNewport News Federal Courthouse

Pursuing LEEDPursuing LEED®® CertificationCertification

Improved IAQ through Improved IAQ through low VOC products and low VOC products and proper ventilationproper ventilation

Focus on recycled and Focus on recycled and local productslocal products

Building energy Building energy systems commissioningsystems commissioning

IAQ management IAQ management during constructionduring construction

Location: Newport News, Virginia

© 2007 Farnsworth Group, Inc.

CIS Denver District OfficeCIS Denver District Office

Hybrid geothermal Hybrid geothermal system to provide system to provide redundancyredundancyEntirely pre-cast Entirely pre-cast structurestructureViews for 90% of Views for 90% of spacesspacesDaylighting controlsDaylighting controlsEmployee recreation Employee recreation area to promote health area to promote health & productivity& productivityFocus on local, regional Focus on local, regional materialmaterialBuilding energy Building energy systems commissioningsystems commissioning

Location: Centennial, Colorado

© 2007 Farnsworth Group, Inc.

WYARNG, AASFWYARNG, AASF

Ground Source Heat Pump Ground Source Heat Pump Geo-Exchange SystemGeo-Exchange System

Total Building CxTotal Building Cx

98,000 sf Helicopter 98,000 sf Helicopter Maintenance FacilityMaintenance Facility

First LEEDFirst LEED®® Project for Project for WYARNGWYARNG

Full-Time On Site CxFull-Time On Site Cx

Location: F.E. Warren AFB, Cheyenne, WY

© 2007 Farnsworth Group, Inc.

WYARNG, JFRCWYARNG, JFRC

Horizontal Ground Horizontal Ground Source Heat Pump Geo-Source Heat Pump Geo-Exchange SystemExchange System

Total Building CxTotal Building Cx

145,000 sf. Joint Forces 145,000 sf. Joint Forces Readiness Center, Readiness Center, Headquarters BuildingHeadquarters Building

Full-Time On Site CxFull-Time On Site Cx

Location: F.E. Warren AFB, Cheyenne, WY

© 2007 Farnsworth Group, Inc.

Fort Macon Visitor’s CenterFort Macon Visitor’s Center

Educates visitors on Educates visitors on conserving coastal conserving coastal environmentenvironmentNative plants needing Native plants needing no irrigation systemno irrigation systemMinimizing impact of Minimizing impact of construction on construction on surrounding areasurrounding areaUse of local and Use of local and recycled materialsrecycled materialsEnergy-efficient Energy-efficient mechanical and lighting mechanical and lighting systemssystems

Location: Atlantic Beach, North Carolina

© 2007 Farnsworth Group, Inc.

Hall of Shame GalleryHall of Shame Gallery

© 2007 Farnsworth Group, Inc.

Duct “Break”Duct “Break”

© 2007 Farnsworth Group, Inc.

Maintainable & Accessible?Maintainable & Accessible?

© 2007 Farnsworth Group, Inc.

Right vs. WrongRight vs. Wrong

Missing Valves

Missing Unions

Missing Insulation

© 2007 Farnsworth Group, Inc.

Duct not connected to unitDuct not connected to unit

© 2007 Farnsworth Group, Inc.

Code compliance?Code compliance?

© 2007 Farnsworth Group, Inc.

Where’s the Return Air?Where’s the Return Air?

© 2007 Farnsworth Group, Inc.

Safe?Safe?

© 2007 Farnsworth Group, Inc.

Cost of CommissioningCost of Commissioning

Commissioned Systems Approximate Cx Cost

HVAC and Control Systems 2.0 - 3.0% of mechanical

Electrical Systems 1.0 – 2.0% of electrical

HVAC, Control & Light Electrical 0.5 – 1.5% of construction

Factors Affecting Cx Costs:• Size of Project• Type of Project• Complexity of Project• Level of Service Owner Wants or Needs• Systems to be Commissioned• Duration of Commissioning Engagement• LEED® Fundamental and Enhanced

© 2007 Farnsworth Group, Inc.

Questions & AnswersQuestions & AnswersLance A. Stewart, PE, CxA, LEED® AP8055 E. Tufts Ave, Suite 850, Denver, CO 80237

Phone: 303-692-8838Fax: 303-692-0470