˘ˇˇ ˆ ˙ ˇˇ ˝˘ˇ˛ ˆˇ˘ · 2015. 12. 18. · 3. coat gauge and elbow pipe threads with...

6
3^Rd\T]c° 8]bcadRcX^]bU^aATca^UXc :Xc:HBB??A) 8]bcP[[X]VcWT?aTUX[[ EP[eT?aTbbdaT ATVd[Pc^a

Upload: others

Post on 27-Jul-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ˘ˇˇ ˆ ˙ ˇˇ ˝˘ˇ˛ ˆˇ˘ · 2015. 12. 18. · 3. Coat gauge and elbow pipe threads with hydraulic sealant (Loctite 569 or similar). 4. Assemble the gauge and elbow then install

?dQ[XbWTS 3^Rd\T]c =d\QTa) 18?? A�

� B_TRXUXTS 3PcT) !��! !�

� 0b�^U 3PcT) !��! !�

� 0RRTbb 3PcT) !��! !�

� 3T_cW) STcPX[

� 0__[XRPQX[Xch) ??

� ;P]VdPVT 2^ST) 4=6� � ?da_^bT) _dQ[XRPcX^]� 5^a\Pc) R^[0

��������

������� �������������� �� ������������������� ����������� �������������������������

?4;;4A8= <8;=>A 2>A?>A0C8>= @?CD ?66935 2?H $ � ;5>>5B� <?E9C91>1 ' &# � $ � E�C�1�

Page 2: ˘ˇˇ ˆ ˙ ˇˇ ˝˘ˇ˛ ˆˇ˘ · 2015. 12. 18. · 3. Coat gauge and elbow pipe threads with hydraulic sealant (Loctite 569 or similar). 4. Assemble the gauge and elbow then install
Page 3: ˘ˇˇ ˆ ˙ ˇˇ ˝˘ˇ˛ ˆˇ˘ · 2015. 12. 18. · 3. Coat gauge and elbow pipe threads with hydraulic sealant (Loctite 569 or similar). 4. Assemble the gauge and elbow then install

@5<<5B9> =9<>?B 3?B@?B1D9?>

29@@!B ! �@eR\YcXUT� 2__[ c`USc� 4QdUc* " "!!" � " "!!" � " "!!" <Q^W* 5>7 ! 1``\YS* @@!

������� �������������� ��� �������������������� ����������� ��������������������������These instructions cover installing and setting a pressure regulator block between the cast ironprefill valve and the prefill pilot valve. The regulator protects the prefill valve from damagingsystem pressure spikes.

30=64A ) 2adbW P]S BTeTa 7PiPaS—Moving can and ram will crush or sever bodyparts caught between closing gaps. Raised can and/or ram can drift down even with power off.• Do not service machine unless qualified and authorized.• Before reaching into any of these gaps, lock out and tag out power to the machine.• Before working under a raised can, install factory-supplied safety stands.• Know how to use factory-supplied emergency stop switches and where they are located.• Ensure personnel are clear of the press before operating it in manual or automatic mode.

The can and/or ram may move automatically when certain controls are used, such as when� is pressed or cake data is entered.

F0A=8=6 ! ) ?d]RcdaT F^d]S P]S ?^Xb^] 7PiPaSb—Oil leaking out under highpressure can easily puncture skin causing serious injury,• Observe gauges to verify hydraulic system is not pressurized before working on

hydraulics.• If injured, seek emergency medical help. Immediate surgery is required to remove oil.

20DC8>= " ) 1da] 7PiPaS—Hot oil can cause serious burns• Allow oil to cool before working on hydraulic system.

Before starting procedure, understand the crush and sever hazards associated with the can andram. During movement of these components, gaps can form, then close between the followingcomponents:

• The ram and press bed (ram descending).

• The can and press bed (can descending).

• The raised can and lowered ram (can descending and/or ram ascending).

• The raised ram and lowered can (ram descending and/or can ascending).

• The can and press top plate (can ascending).

� ������� ����� ������� ����������������This procedure requires two qualified service technicians who fully understand the safetyprecautions described in this section and know how to actuate manual functions from the keypad.See “MANUALLY OPERATING THE SINGLE STAGE PRESS” in the reference manual.

Page 4: ˘ˇˇ ˆ ˙ ˇˇ ˝˘ˇ˛ ˆˇ˘ · 2015. 12. 18. · 3. Coat gauge and elbow pipe threads with hydraulic sealant (Loctite 569 or similar). 4. Assemble the gauge and elbow then install

9^cdbeSdY_^c V_b BUdb_VYd ;Yd ;ICC@@B !* 9^cdQ\\Y^W dXU @bUVY\\ FQ\fU @bUccebU BUWe\Qd_b

@5<<5B9> =9<>?B 3?B@?B1D9?>

Figure 1: Retrofit Kit KYSSPPR001

Kit contents Legend

1

2 3 4

5

6

7

1. Pressure regulator block2. Elbow3. 3-3/4" (95 mm) Fasteners4. Pressure gauge5. Spacer (note notch)6. O-rings7. Regulator pressure

adjustment

Figure 2: Assembled Regulator Block

=^cT ) See system schematics BMP970014 (MP1601 and MP1602 machines) or BMP010007 (MP1603and MP1604 machines) to locate hydraulic components.

1. Lock off and tag off power to the machine at the wall disconnect.

2. Verify kit contains all the items shown in Figure 1.

3. Coat gauge and elbow pipe threads with hydraulic sealant (Loctite 569 or similar).

4. Assemble the gauge and elbow then install in regulator block as shown in Figure 2.

5. Locate the prefill pilot valve at base of the prefill pipe on top of machine.

6. Remove and discard the four fasteners holding the prefill pilot to the prefill valve.

7. Remove prefill pilot.

Page 5: ˘ˇˇ ˆ ˙ ˇˇ ˝˘ˇ˛ ˆˇ˘ · 2015. 12. 18. · 3. Coat gauge and elbow pipe threads with hydraulic sealant (Loctite 569 or similar). 4. Assemble the gauge and elbow then install

@5<<5B9> =9<>?B 3?B@?B1D9?>

Figure 3: Spacer and Regulator Mounting Details

Spacer mounted to regulator Legend

2

1

1. Spacer notch aligned witharrow

2. Spacer3. "Notch" stamped on block

and notch on spacer4. Adjustment locknut5. Adjustment screw

Completed assembly

4

3

5

8. Verify new fasteners are 3-3/4" (95 mm) long. Shorten fasteners if needed.

9. Insert the four new fasteners through the prefill pilot and through the regulator block.

10. Install O-rings in spacer.

11. Carefully install the spacer on the regulator block (Figure 3). Note notch in the spacer. Alignthis notch with the arrow stamped on regulator block.

12. Carefully mount the prefill pilot and regulator block on prefill valve (Figure 3). Take care notto dislodge spacer O-rings during assembly. Tighten fasteners to 6.5 foot-pounds (29 N-n).

13. Turn power on and look for oil leaks around pilot and regulator.

Page 6: ˘ˇˇ ˆ ˙ ˇˇ ˝˘ˇ˛ ˆˇ˘ · 2015. 12. 18. · 3. Coat gauge and elbow pipe threads with hydraulic sealant (Loctite 569 or similar). 4. Assemble the gauge and elbow then install

9^cdbeSdY_^c V_b BUdb_VYd ;Yd ;ICC@@B !* 9^cdQ\\Y^W dXU @bUVY\\ FQ\fU @bUccebU BUWe\Qd_b

@5<<5B9> =9<>?B 3?B@?B1D9?>

!� ���� ���������������������1. Using manual functions, raise the ram and lower the can.

2. Lock out and tag out power.

3. Open a side door and load approximately 130 pounds (60 Kg.) of goods into can.

4. Wet down the sides of the diaphragm and the inside of the can to reduce friction.

5. Close and lock door then restore power.

6. Station one technician at the keyboard and the other on top of machine at the regulatoradjustment.

7. Have the technician at the keypad use manual function � to lower the ram under pressure,while the other technician loosens the adjustment locknut and adjusts the regulatoradjustment screw (Figure 3) until the pressure gauge reads 2000 psi (138 bar). Turn the screwin (CW) to raise the pressure or out (CCW) to lower the pressure.

— End of BIPP1R01 —