© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
![Page 2: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/2.jpg)
Presented by:
Session ID: MAN-01
Global Specification Management Drives Digital Transformation in Quality Management
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Timothy B Billman, Manager Business Solutions, Ai2S
Ronnie J Massey, Principal Quality Engineer, Tech-Quality Assurance
Mark McElroy, Manufacturing Solutions Architect, Ai2SNovember 12, 2019
![Page 3: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/3.jpg)
Agenda
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Identifying the Problem
Plan of Attack
Challenges in Execution
The Look of Success
Improvement and Sustainability
Q&A
![Page 4: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/4.jpg)
Roadmap to Issues
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Malcomb Baldridge Quality Award - 1997
Standardized to Single System
Platform Difficult to Maintain
Therefore Specifications not Maintained
Information Eroded to Inaccuracy
Disparate Homegrown Systems at Plants
Lost Visibility to Information
Demand on People’s Time Increased
Key Business Systems Slow Down
![Page 5: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/5.jpg)
Poor Data Led to Poor Quality
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
• Bad Product Going Out the Door
• Climbing Claim Rates
• Constant Firefighting Issues
• Time Consuming Remote Support
• Lack of Standardization
• Difficult Data Accessibility
• Ability to Drive Operational Excellence Challenged
![Page 6: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/6.jpg)
Key Initial Steps
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
• Senior Management Alignment
• Project Valuation Streamlined Approval Process
• Right Project Lead
• Understood Operations
• Translated Operational Needs into IT Requirements
• Organized for Success
• Global Product Specifications
• Quality Data Collection
• Next Phase of TBD Needs
![Page 7: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/7.jpg)
Resourcing for Success – Armstrong & AVEVA
• Armstrong Management Team
• Structured to Eliminate Hurdles
• Core Team Makeup
• Corporate Quality Engineer
• Corporate Process Engineer
• Corporate IT Project Manager
• Corporate IT Business Relationship Manager
• Corporate IT Solutions Architect
• Extended Team
• Key Process Engineer from Each Plant
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
• Aveva Management Team
• Provided Continuity and Escalation Path
• Core Team Makeup
• System Architect
• Project Manager
• Lead Developer
• Extended Team
• Development Team
• Unit Testing Team
![Page 8: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/8.jpg)
Implementation Rollout Plan
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
• Principles
• Quality of Product Over Schedule
• Positive Implementation Experience
• Business Priorities Trumps Rollout Schedule
• Global Specification Management (GSM)
• 12 Plants Over 6 Months
• Plan Adjusted for Plant Resource Availability
• Quality Data Collection (QDC)
• Core Team Plus Extended Team Resourcing
• Supported by Previous and Next Plant Resources
![Page 9: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/9.jpg)
Execution Challenges
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
• Standardization Across Plants
• Common Understanding of Requirements
• Development Team vs. Business Process Expectations
• Assuming Understanding Between Developers and Customers
• Knowledge Continuity
• Armstrong Resource Model Realignment
• Implementation Scheduling
• Plant Schedule Changes
• Unforeseen Business Challenges
![Page 10: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/10.jpg)
IT System ArchitectureGlobal Specification Management & Quality Data Collection
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
![Page 11: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/11.jpg)
Results – Improved IT Support
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
• Global Specification System (GSM)
• Available via Citrix
• One Instance Centrally Maintained with Standard Data Model
• Data Collection System (QDC)
• Web-based – Eliminates Fat Client Installation
• Site Based Server Deployments
• Integration with Other Systems
• Standard Reporting Model
![Page 12: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/12.jpg)
Results – Improved Business Support
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
• Remote Support
• Resource Mobility
• Sales Opportunities
• Equipment Design Engineering
![Page 13: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/13.jpg)
Results – Specification Creation/Revision Improvements
• Common Look Across Plants
• Clone Specifications for Quick Starting Points
• View Multiple Specifications Simultaneously
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
![Page 14: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/14.jpg)
Results –Data Collection Improvements
• Operator Experience
• Tailored to Specific Operator Responsibilities
• Eliminated Manual Data Entries
• Linked to Specification System with Change History
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
![Page 15: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/15.jpg)
Results – Information Accessibility
• Information Availability from Days to Minutes
• Transparency Across Sites to Compare Specifications
• Dashboards for Quick Daily Review of Production Runs
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
![Page 16: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/16.jpg)
Next Steps
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
• Ongoing Evolution Driven by Plants
• Further Digitalization Efforts Driving Higher Efficiency
• Sustainability
• Part of Quality Audits – Plant Maintenance Awareness
• Provides IT Ability to Maintain System Going Forward
![Page 17: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/17.jpg)
What Kept Us Moving Forward
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
• Armstrong & Aveva Alignment
• Continuity of Core Team Resources
• Armstrong’s Internal Support
• Senior Leadership
• IT Leadership
• Operations
• Technical
![Page 18: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/18.jpg)
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Q&A
![Page 19: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/19.jpg)
Survey
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Review this session in the AVEVA World Conference APP
![Page 20: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/20.jpg)
Haven’t downloaded the app yet?
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Get the app
1 Go the right store. Access the App Store on
iOS devices and the Play Store on Android.
If you’re using a Blackberry or Windows phone,
skip these steps. You’ll need to use the web
version of the app found here:
https://event.crowdcompass.com/2019awc.
2 Install the app. Search for AVEVA World.
Once you’ve found the app, tap either Get or
Install.
3 View the session in the app and the survey
will appear after the session concludes.
![Page 21: © 2019 AVEVA Group plc and its subsidiaries. All rights ... NA 2019 Day 1 Content/MAN-01 A… · •Principles • Quality of Product Over Schedule ... •Ongoing Evolution Driven](https://reader035.vdocument.in/reader035/viewer/2022071105/5fdfd70780888b4f356cf40f/html5/thumbnails/21.jpg)
linkedin.com/company/aveva
@avevagroup
ABOUT AVEVA
AVEVA is a global leader in engineering and industrial software driving digital transformation across the entire asset and operational l ife cycle of capital -intensive industries.
The company’s engineering, planning and operations, asset performance, and monitoring and control solutions deliver proven results to over 16,000 customers across the globe. Its customers are supported by the largest industrial software ecosystem, including 4,200 partners and 5,700 certified developers. AVEVA is headquartered in Cambridge, UK, with over 4,400 employees at 80 locations in over 40 countries.
aveva.com
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.