.. _ H NERGY -5 igC Ref. No: SHIGA ENERGY PRIVATE LIMITED 2f.id Floor, Rabdenling, Annex II To, Adjoining Royal Plaza The Joint Director, Upper Shyari, Gangtok North-Eastern Regional office, EastSikkim - 737101 Tel. : +91 3592-280703 Ministry of Environment & Forest, Government of India Dated: 23/5/2016 Subject: Six Monthly compliance Report on status of Environmental Safeguards of 97MWTashiding Hydro Electric Project in West Sikkim. Dear Sir,' . This has reference to Environmental Clearance of 97MW Tashiding hydro Hydro Electric Project vide MoEF letter No.J-1201l/66/2006-IA-I dated 29.07.2010 following are clarified for your kind perusal. . 1. As per the Stage I Clearance the following amount is deposited to the Forest Env. & Wildlife management Deptt. Government of Sikkim, Gangtok. i) Compensatory afforestation: Rs, 28,43,900=00 ii) Net Present Value: Rs, 32,18,774=00 iii) CAT Plan: Rs 63,48,000=00 iv) Biodiversity Conservation & Management Plan: Rs,88,40,000=00 2. Public Notification Published as per the Para 12 of the Environmental Clearance. We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela" in Nepali and "Sikkim Express" in English and Sikkim Herald classified the Government of Sikkim paper dated, 11th August 2010 and 12 th August 2010, informing that Project has been accorded environmental clearance. 3. Six Monthly compliance on the status of the 97 MW Tashiding Hydro Electric Project to the stipulated environmental conditions is enclosed as Annexure-A, Environmental activities and Corporate Social Reoponaibilitics as Auue s: ure -R and Monthly I'rogress report of the prnjPr.t as Annexure- C. This is for your kind information. Thanking You. iKri" shna Gurung) Sr.ACHvl Shiga Energy Pvt. Ltd. EmAil.io:[email protected] Copy to: 1) Additional Director, MoEF New Delhi, for kind information. 2) Central Pollution Control Board, Govt. of India, for kind information, 3) CCF-cum -Nodal Officer (FCA) Gangtok, for kind information, 4) Member Secretary, State pollution Control Board Gangtok, for kind info Site Office Yangtey, Near Tashigang Resort, Gyezing, West Sikkim - 737111

Upload: dinhdien

Post on 30-Jan-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

.._ H NERGY

- 5 igCRef. No: SEPLlF-5/15-16/S.;2.~ SHIGA ENERGY PRIVATE LIMITED

2f.id Floor, Rabdenling, Annex II To, Adjoining Royal Plaza The Joint Director, Upper Shyari, Gangtok North-Eastern Regional office, EastSikkim - 737101

Tel. : +91 3592-280703 Ministry of Environment & Forest, Government of India Dated: 23/5/2016

Subject: Six Monthly compliance Report on status ofEnvironmental Safeguards of 97MWTashiding Hydro Electric Project in West Sikkim.

Dear Sir,' . This has reference to Environmental Clearance of 97MW Tashiding hydro Hydro Electric Project vide MoEF letter No.J-1201l/66/2006-IA-I dated 29.07.2010 following are clarified for your kind perusal. .

1. As per the Stage I Clearance the following amount is deposited to the Forest Env. & Wildlife management Deptt. Government of Sikkim, Gangtok.

i) Compensatory afforestation: Rs, 28,43,900=00 ii) Net Present Value: Rs, 32,18,774=00 iii) CAT Plan: Rs 63,48,000=00 iv) Biodiversity Conservation & Management Plan: Rs,88,40,000=00

2. Public Notification Published as per the Para 12 of the Environmental Clearance. We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela" in Nepali and "Sikkim Express" in English and Sikkim Herald classified the Government of Sikkim paper dated, 11th August 2010 and 12th August 2010, informing that Project has been accorded environmental clearance.

3. Six Monthly compliance on the status of the 97 MW Tashiding Hydro Electric Project to the stipulated environmental conditions is enclosed as Annexure-A, Environmental activities and Corporate Social Reoponaibilitics as Auue s: ure -R and Monthly I'rogress report of the prnjPr.t as Annexure- C.

This is for your kind information.

Thanking You.

You~~,f~fully,

~---iKri"shna Gurung)

Sr.ACHvl Shiga Energy Pvt. Ltd. EmAil.io:[email protected]

Copy to: 1) Additional Director, MoEF New Delhi, for kind information. 2) Central Pollution Control Board, Govt. of India, for kind information, 3) CCF-cum -Nodal Officer (FCA) Gangtok, for kind information, 4) Member Secretary, State pollution Control Board Gangtok, for kind info

Site Office Yangtey, Near Tashigang Resort, Gyezing, West Sikkim - 737111

Page 2: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

97MW TASHIDING HYDRO ELECTRIC PROJECT DATA SHEET

SI.No. Particulars Details l. Project Type

Name of the Project Clearance Letter

i) Environmental Clearance ii) Forest Clearance.

Run- of- River Scheme 97MW Tashiding Hydro Electric Project

NoJ-12011166/2006-IA-I dated 29.7.2010 MoEF GO! vide letter No.3-SKB 00712010-SHI/1693-94 dated 16th Sypt.2011. Forest Env.& wildlife Management Deptt GOS vide Letter No.1368/FCAIFEWMD 955-57.Dated 24/9/2011

2. 3.

4. LOCATION: District

State

Latitude

Longitude

Address for Correspondence a) Address of concerned Project

Head(with pin code, Telephone/Fax)

b) Address of Project Incharge site office (With Pin code, Telephone/Fax)

Break up of the Project Area

a) Forest Land Total

Break-up of the Project affected Population. Financial Details

a) Project cost as originally planned.

Forest Land requirement

a.The Status of approval for diversion of forest land for non forestry use,

West District

Sikkim

2T20'28"N 88°13'59"E

Shri. P.B.Praveen Kumar, Director Shiga Energy Pvt.Ltd. Rabdenling, Annex-II, Adjoining Hotel Royal Plaza Upper Shyari, Gangtok, East Sikkim. e-mail:[email protected] Telephone:03592-280709 Fax:03592-280703 Mr. C.L.Thakur Sr.Vice-President, Shiga Energy Pvt.Ltd. Yangtey, Gyalshing, West Sikkim, Contact no;8348691932 e-mail :[email protected]

4.3492Ha(Surface 2.7 840Ha+Underground :l.5652Ha) in West Sikkim,

Project affected families:30 Landless affected families: Nil

494.44Crores.

The Ministry of Environment & Forest Government of India vides its letter No.3-SKB 007/2010-SHI/1693-94 dated 20d May 2008 Forest Env.& wildlife Management Deptt GOS vide Letter No. 1368/FCAIFEWMD 955-57 Dated 24/9/2011

5.

6.

7.

8.

9.

Page 3: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Annexure-A Compliance Status on Environmental Clearance.

Sl.No. Stipulated Conditions

Part -A: Specific Conditions (i) Catchment area treatment plans as has been

proposed should be completed in 3 years.

(ii) Five dumping site have been identified for dumping 380858m3 of excavated material. For retaining the dumped /unused material for subsequent stabilization along the hill slopes and along the stretch of the road sausage-cum­retaining walls shall be developed. These need to be built prior to the dumping of muck at these sites . These walls would range from 70 to 290m length at the proposed dumping site.

(iii) It should be ensured that the dumping yards blend with the natural landseape by developlng the sites with gentle slopes, bunds, terraced and water ponds, patches of greenery in and around them.

(iv) For maintaining environmental flow in the river two cumec water should be released during lean season.

(v) The scheme of disposal of solid waste should cover the integrated project area including from labour colony during construction Phase. Solid waste from the labour camps shall be collected in beans/Masonry Vats and the same shall be dumped or disposed to nearby municipal landfills/authorized dump sites. No dumping of solid waste is allowed near any water body or a stream to exclude any health hazard problems to the society.

Compliance Status

We have already deposited the CAT amount of Rs. 63, 48, 000=00 in the CAMPA fund and work will be carried out by the State Forest Department.

Muck dumping is being carried out in approved muck dumping sites. Sausage cum retaining walls has been developed as proposed to ensure that the unused material does not spillover. Further, the excavated muck is being used for preparation of aggregate and boulder is being used for constructing of sausage wall.

After the completion of the construction work we will convert the dumping sites into natural vegetation by consulting experts in this field.

We will comply as per the MoEF norms.

The solid waste is collected in bins and then dumped into Municipal approved dumping area. This condition is being complied strictly so as La prevent any health hazards to staffs and labourers.

Page 4: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

(vi)

(vii)

(viii)

(ix)

Jobs should be provided to atleast 1 member of all the 30 .affected families as per their skills.

We have already provided jobs to atleast one member of all the affected families as per their skills and also contract works are being allocated to the affected families and we are further encouraging them to produce organic vegetables and developed poultry/ dairy farming to be supplied to the Company.

Fishery Management Plan as proposed in the We will implement the Fishery Management EMP should be implemented in totality. plan as proposed in the EMP together with

the Fisheries Department, Govt. of Sikkim.

The Proposed site is about 5Km away from the Not applicable as per Gazette Notification buffer Zone of Khangchendzonga Biosphere issued by MoEF vide: 1688 dated 27 th August Reserve as per Supreme Court order clearance 2014. from NBWL may be obtained ( If required) The Proponent should carry out a study on Construction of the project is in progress. post construction period during O&M stage in After the commissioning of the project we between 3 to 5 years after commissioning of will comply with the said condition. the project to examine the actual environmental impact of the project on its surrounding compare to what was planned initially. The study should be conducted by a reputed institute/consultant.

Part-B: General Conditions

Sl.No . (I)

(11)

(iii)

Stipulated Conditions Adequate free fuel arrangement shonlrt hf\ made for the labour force engaged in the construction work at project cost so that indiscriminate felling of trees is prevented.

Fuel depot may be opened at the site to provide the fuel (kerosene/wood/LPG).Medical facilities as well as recreational facilities should also be provided to the labourers.

All the labourers to be engaged for construction works should be thoroughly examined by health personal and adequately treated before issuing them work permit.

Compliance status Sllttw.1Ant tn"p' nlPl (on Iy I Pl.]) hili been provided by the company for labourers engaged in the project, As such food is provided to the most employees at the Company's mess where LPG is used as fuel.

The fuel Depot (LPG) has been established at site. We have employed three nurses (one female & two male) and two ambulances have been provided to meet the emergency needs for project employees and also the public residing within the project site. Routine health checkup is conducted at project 3itC3. We arc also taking help from State Health Department. We have provided Table Tennis, Carom Board, chess, Volley ball Television, Screening Films etc. for recreation of labourers and employees. Labourers engaged at construction work are examined by MBBS Doctor. Regular health checkup is carried out at Project sites.

Page 5: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

(iv)

(v)

(vi)

5.

6.

7.

8.

9.

10.

11.

Restoration of Construction area including dumping site of excavated materials should be ensured by leveling, filling up of burrow pits, landscaping etc.The area should he properly treated with suitable plantation . Financial provision should be made in the total budget of the project for implernentatinn (If the above suggested sateguard measures.

Six monthly monitoring reports should be submitted to the Ministry and its Regional Office, shillong for review. Officials from Regional Office MoEF, Shillong who would be monitoring the implementation of environmental safeguards should be given full co-operation, facilities and documents/data by project proponents during their inspection.

The responsibility of implementation of environmental safeguards rests fully with the Mis Shiga Energy Pvt.Ltd. & Govt. of Sikkim.

The total amount of Rs.466.76 lakhs kept in the budgetary provision for implementation of environmental management plan should be strictly adhered am! Hot lo be diverted for any other purpose.

In case of change in the scope of the project, project would require a fresh appraisal.

The Ministry reserves the right to add additional safeguard measures subsequently, if found necessary and take action including revoking of the clearance under the provision of the Environment (protection) Act,1986 to ensure effective implementation of the safeguard measures In a time bound and satifisfactory manner.

This clearance letter is valid for a period of 10 year S rn 1111 the date of issue of this tor commencement of cunstruction work

A copy of the clearance letter will be marked to concerned Panchayat I local NGO, if any .from whom any suggestion / representation has been received while processing the proposal. The Clearance letter shall also be put on the website of the Company by the proponent.

As and when the construction is complete the guidelines laid down will be followed. We have already started the plantation around the dumping areas .

Yes, the financial provision for implementation of environmental ocfegunrdn hnn hoon kept.

Proposal for constituting monitoring committee is already submitted to Additional Director, MoEF, New Delhi for confirmation. We have been providing full co-operation, facilities and documents/ data by project proponents during the inspection of the officials from MoEF, Shillong.

We are strictly complying with all the conditions set for the safeguards of environment with the cooperation of Forest Env. & Wildlife management Department, Government of Sikkim. We are committed to implement of the said budget for Environmental Management programme.

There is no change in scope of the project. However, in case of any changes we will inform the concern department and take the fresh appraisal. Agreed.

The construction work began since December, 2011.

Till date we had not received the suggestion /representation while processing the proposal. The Clearance letter is available on the company's website.

Page 6: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

12. The proponent should advertise in atleast two local newspaper widely circulated in the region around the project, one of which shall be in the vernacular language of the locality concerned informing that the project has been accorded environmental clearance and copies of the clearance letter are available with the State Pollution Control Board/ Committee and may also be seen in the Website of the ministery of environment and Forests at http://www.envfor.nic.in.

We have advertised in Two local Newspaper widely circulated in the region around the project "Himali Bela" in Nepali and "Sikkim Express" in English and Sikkim Herald Classified the Government of Sikkim Paper dated: 11th August 2010 and 12th August 2010, informing that project has been accorded environmental clearance. The clearance letter is available with SPCB and at MoEF website.

13. The project proponent shall also submit Six monthly reports on the status of compliance of the stipulated EC conditions including result of monitored data ( both in Hard copies as well as bye-mail) to the representative Regional office of MoEF, the respective Office of CPCB and the SPCB.

We are submitting six monthly compliance reports as stipulated ill Hard and soft copy to the concerned officials.

14. Any appeal against this environmental clearance shall lie with the National Environment Appellate Authority, if preferred within a period of 30 days as prescribed under Section 11 of the National Environment Appellate Authority Act. 1997.

Agreed

Page 7: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

MESSATKABERTHANG

LPG Fuel Depot

Page 8: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

DUMPING AREA Muck dumping is being carried out III UWWVl:U muck duping sites. Sausages cum retaining walls have been developed as proposed.

DUMPING AREA NEAR POWER HOUSE

Page 9: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

ANNEXURE-B ENVIRONMENTAL ACTIVITIES AND CORPORATE SOCIAL RESPONSIBILITY

Plantation Drive along Road Side - SEPL carried out plantation drive on project approach roads. Some patches of the approach road from Sakyong to Project site are steep and without trees. In this regard SEPL chose those spots and .planted trees with the help of rings of Hume pipe. In this technique firstly steep side of the road is dug for an 8-10 inches and ring of Hume pipe is placed and filled it with soil. Till date SEPL has planted around 100 trees and found approx. 90% viable ratio.

Plantation Drive: Mis Shiga Energy Pvt. Ltd carried out plantation drive on project approach road. The planted trees with the help of rings of hume Pipe (Coller) and to protect lrorn animals the plant has been sorroundcd .by barnbooas sticks with qraan painted. More than 300 varities of sapling were planted

Page 10: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

I

,I !

HSE Training.

Training on Ladder Safety.

Training on Use of Lockout/Tagout (LOTO)_, _~ t!

Page 11: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Educational Tour to Affected Area School Kabirthang The Shiga Energy Pvt. Ltd sponsored the educational Excursion to Rabongla, Chamchay and Namchi for Kabirthang Primary School on 5th December 2015, for 50 Nos of School Student of prima level.

,. - ~:..". ')

mUCATlONAl fltUR)IOM KABIRTHAN6PRY.SUlOOl

WEST SIK KIM Sf""""aI-t-s: SHIGA

ENERGY PVT. ~~ .

Educational Tour to Affected Area School Upper Bhaluthang The Shiga Energy Pvt. Ltd sponsored the Educational Excursion tour from Upper Bhaluthang to Rabongala and Namchi for upper Bhaluthang Primary School on 8th December 2015 for 30 Nos of School Student ofprimary level.

Jour programme Scouts & Guide for Sakyong Secondary School ShigaEnergy Pvt. Ltd organize tour program for Scouts & Guides from Sakyoung Secondary School to Namchi Char Dham & Rabongla Buddha Park south Sikkim on 9th December 2015.

S pU n • ...,..cI bv ·

S t l l g h a COlTlpany .-enod b" c

S h l g h a Company

Page 12: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Cash Prize Contribution for Open Marathon Competition Chumbong School MIS Shiga Energy Pvt. Ltd. sponsored l ", 2nd & 3rd cash prize for open marathon competition on 10th December 2015 at Chumbung Junior Secondary School. The event was organized by the SMC Chumbung School and Guardians.

Laptop & Projector to Self Reliable Youths, Yangtey GPU (Sakyong) Shiga Energy Pvt. Ltd. provided one set projector & Laptop for the Self Reliable Youths Sakyong under CSR, in order to conduct Winter Multi Camp to the Youths of affected area, with awareness of education and nanitntion.

Page 13: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Active Participation on Winter Tourism Festival, Pelling West Sikkim. The Shiga Energy Pvt Ltd. participated actively on s" Winter Tourism festival, the festival was held at Pelling Tourism Hub falls under project affected area of Yangthang Constituency in presence of Area MLA, in order to promote tourism in area. A felicitation to Shiga Energy Pvt. Ltd by the "Hamro Samuha" was held on the evening of inaugural session of the festival, regarding the help provided to the Homeless Children of West Sikkim by the Company.

~----'-------'"

Republic Day 2016 at Company Site Office

There are many nationa.l and local cultural programs focusing on the history and culture of India. India's Republic Day marks the anniversary of the adoption of the Indian constitution. It is an annual gazetted holiday in India on January 26. In order to Mark a Day the Shiga Energy Pvt. Ltd also celebrates the kepubuc Day With Employee at site ottice hosting National Flag, and with color fur proqrammee.

Page 14: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Republic Day in association with District Administration

The Shiga Energy Pvt. Ltd, also celebrated Republic Day participating with District Administration West Sikkim at Community Hall Geyzing, the company provided contribution towards prizes distributed for dancing and singing competition.

FREE COMPUTER LEARNING CENTRE.

Under the Corporate Social Responsibility the Shiga Energy Private Limited had inaugurated the Free Computer Learning Centre at Lower Bhaluthang, Geyzing West Sikkim. The Free Computer Learning started with winter Crash Courses, around 40 students were joined. This centre aims to provide local children and youth with practical computer education free of charge. We believe that it will help to promote skills needed for self development, while also equipping youth with computer literacy that has become essential for employment in today's world .

Page 15: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Felicitation to company by NGO of Labing- Gerethang Gram Panchayat Unit (Project Affected Area) MiS, Shiga Energy Pvt. Ltd was felicitated by the NGO "PHURCHA CHU SEWA SAMITI" of Labing-Gerethang Gram Panchayat Unit under Yuksom - Tashiding Constituency, to gratitude for Company active involvement in village development social works taken during the construction period since 2011 .

Provided Sheet for Monastery Roofing

Page 16: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Felicitation by Kaberthang Primary School Management Committee. On 23rd February 2016, Kabirthang New Primary School Building inauguration in Presence of Hon'ble Area MLA Ms Chandra Maya Subba. On this inauguration Programme the School Management Committee (SMC) had felicitated Mis SHIGA ENERGY PVT.LTD in presence for our active coo eration towards the school.

Construction of Nirmal Toilet to affected Villagers at Project area

To generate awareness on sanitation Bring about an improvement in the general quality of life in the rural areas, by promoting cleanliness, hygiene and eliminating open defecation. Shiga Energy Pvt. Ltd provides 10 Nos. of Nirmal toilet to the villagers of project effected area under CSR Activities. The main objectives to distribute toilet are as under:­

a) Bring about an improvement in the general quality of life in the rural areas, by

promoting cleanliness, hygiene and eliminating open defecation. b) Accelerate sanitation coverage in rural areas to achieve the vision of' Swachh Bharat" . c) Motivate Cornm 11 n iti es adopt sn sta i n a h 1e san itat i on practices and facilities through

awareness creation and health education.

d) Encourage cost eflective and appropriate technologies tor ecologically safe and

sustainable sanitation. e) Develop where required, Community managed sanitation systems focusing on

scientific

Solid & Liquid Waste Management systems for overall cleanliness in the rural areas. The name of the beneficiaries from Lower Labing, Lower Gerathang (Tamatam).I) Mr. Chung Chung Lepcha, 2) Mr. Abi Chandra Chettri, 3) Mr. Harka Dhan Limboo,4) Mr. Shiva Lall Thapa 5) Mr. Buddhi Man Limboo 6) Mrs. Amrita Sharma 7) Mrs. Bina Tamang 8) Club House Lower Bhaluthang 9) Mr. Santa Bir Subba, 10) Mrs.Bishnu Lall Sharma

Page 17: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Before

Before After I!'J:-'I/}'E!

Before After

Page 18: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Before After

After

Before After r

Page 19: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

Before

Sponsoring & organizing Inter-School competition

To generate awareness on hydro-electric projects among school children, an Inter-school competition titled "Towards Clean Energy-Towards Future" was organized by the Company. Around 80 students from 8 schools from the Project area participated in the competition. The competition comprised 2 phases. In first phase, a project site visit was organized on 10th Apr'16 to give the students the actual view of a hydro-electric project. The students actively participated in the site visit and showed enthusiasm by posing a lot of questions to better understand the working of a hydro project. In second phase, a model making competition was organized on 19th Apr'16 and student teams were asked to make and present working models of Dams based on their learnings from site visit. Student team from "Tamatam Junior High School" won the competition. The top 3 teams were felicitated with Prizes and certificates.

Da t e of Si t e Vi s ' t : April 2016 Da t e o f Display: 9 th April 2016

Venu e : Com~un;ty Hall, Geyzlng / Geyzing Bazar, West Sikkim.

Page 20: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 21: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"

ANNEXURE-C

APRIL 2016

Page 22: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 23: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 24: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 25: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 26: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 27: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 28: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 29: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 30: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 31: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 32: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 33: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 34: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 35: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 36: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 37: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 38: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 39: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 40: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"
Page 41: - 5 igCdansenergy.com/pdf/THEP-Environment-Compliance-Report-May-2016.… · We have advertised in two Local Newspaper widely circulated in the region around the Project "Himali Bela"