6/25/15 1 BUILDING CONTRACT ADMINISTRATION In reference to PAM Building Contract 2006 by Wan Sofiah Wan Ishak May 2014 ADMINSTRATION Architects are engaged as CONSULTANTS on building projects for his/her professional skills and experience. 2 separate funcDons; translaDng client’s brief into design with drawings, specificaDons, etc supervising the work of the actual construcDon to ensure it complies with the intenDons, standards of workmanship and quality, not forgeOng [complying to] the building byelaws and regulaDons BUILDING CONTRACT an overview

Upload: lamhanh

Post on 25-Jul-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

6/25/15  

1  

       

BUILDING  CONTRACT  ADMINISTRATION  In  reference  to  PAM  Building  Contract  2006  

by    Wan  Sofiah  Wan  Ishak  

May  2014  

ADMINSTRATION  

     Architects  are  engaged  as  CONSULTANTS  on  building  projects  for  his/her  professional  skills  and  experience.    2  separate  funcDons;  

-­‐  translaDng  client’s  brief  into  design  with  drawings,  specificaDons,  etc  -­‐  supervising  the  work  of  the  actual  construcDon  to  ensure  it  complies  with  

the  intenDons,  standards  of  workmanship  and  quality,  not  forgeOng  [complying  to]  the  building  bye-­‐laws  and  regulaDons    

 

   

BUILDING  CONTRACT  

an  overview  

6/25/15  

2  

Architect’s  main  funcCons  in  the  building  contract  include  :    Firstly,  he  carries  out  duDes  as  agent  of  the  Employer  in  that  he  is  bound  to  act  on  his  Employer’s  instrucDons.    

•  provide  informaDon,  drawings,    •  issue  variaDon  orders  on  nature  or  quanDty  of  the  works,  suspending  the  

works,    •  nominate  sub-­‐contractor  and  suppliers  and    •  inspecDng  and  approving  the  works  

 Secondly,  he  carries  out  certain  decision  making  funcCons  which  require  him  to  act  fairly  between  the  Employer  and  Contractor  and  exercise  independent  professional  judgment.    

•   role  as  an  independent  cerDfier    

   

ADMINSTRATION  BUILDING  CONTRACT  

an  overview  

Architects  Rules  [  Scale  of  Minimum  Fees]  2010  recognised  the  roles  and  responsibiliDes  of  the  architect  as  employer’s  agent  in  the  building  contract.  Part  II    –  Architectural  Consultancy  Services  

Rule  10  :  Basic  Services  under  Contract  ImplementaDon  &  Management  Phase  CondiDons  of  Engagement  :    -­‐  paragraph  8  [instrucDons  /variaDon  orders],      -­‐  paragraph  9  [inspecDon  of  works]  and      -­‐  paragraph  13  [client  not  to  issue  instrucDon  to  contractors]  

 LAM’s  Code  of  Professional  Conduct  -­‐   Faithful  discharge  of  responsibiliDes  :  to  act  competently,  responsibly  and  to  be  imparDal..    PAM’s  Code  of  professional  Conduct  -­‐   Fairness  between  parDes  

In  addiDon,  Architects  are  also  bound  to;  •   Federal  &  State  consDtuDons  •   Contract  Act  1950  •   Street,  Drainage  And  Building  Act  1974  [incl  UBBL]    

   

ADMINSTRATION  BUILDING  CONTRACT  

an  overview  

6/25/15  

3  

roles  and  responsibiliDes  of  the  architect  as  employer’s  agent  in  the  building  contract.  -­‐   Is  a  relaDonship  created  by  an  Agreement,  expressed  or  implied  -­‐   the  extent  of  roles  &  responsibiliDes  are  limited  to  that  prescribed  in  the  contract  

An  agent  in  the  building  contract;  -­‐  Is  expected  to  work  with  a  level  of  skill  normally  associated  with  his  profession  or  occupaDon,  and  be  concerned  not  to  allow  a  conflict  to  arise  between  his  own  interests  and  those  of  his  principal.  

 The  power  of  the  architect  [as  a  client’s  agent  in  building  contract]  

-­‐   is  limited  to  the  terms  of  the  appointment,  and  has  no  authority    e.g.to  vary  the  contract  between  the  contractor  and  employer  unless  express  powers  are  granted  for  such  a  purpose    

Note:  An  architect  is  appointed  under  Architects  Rules  [2010]  as  a  consultant  providing  ‘consultancy  services’  not  as  an  ‘agent’  giving  ‘agency’  services.  

 

   

ADMINSTRATION  BUILDING  CONTRACT  

an  overview  

…architect  as  employer’s  agent  in  the  building  contract  and  independent  cerDfier    

VariaCons  :    Where  an  architect  acts  without  the  authority  or  approval,  the  Employer  is  not  bound  by  what  is  done,  except  for  ;  statutory  requirements  or  safety.      Note    on  the  provisions  under  paragraph  8  of  CondiDons  of  Engagement  [what  would  the  contractor’s  recourse  if  client  disagree  with  variaDons  instructed  by  architect  without  his  prior  approval?]  

 Suspension  of  work:  

Generally  ,  the  employer  and  the  Architect  have  no  right  to  instruct  the  contractor  to  suspend  work.    

DelegaCon  of  authority:  Generally,  an  Architect  is  expected  to  act  personally  for  the  employer,  unless  expressly  stated  in  the  contract  such  as  delegaDon  to  the  engineer  [stated  in  ArDcle  4],  QuanDty  Surveyor[  stated  in  ArDcle  5]  or  specialist  consultant  [stated  in  ArDcle  6]    

InstrucCons  to  contactor:  Architect  has  no  general  right  to  issue  instrucDons  except  those  within  express  provisions  in  the  building  contract    

ADMINSTRATION  BUILDING  CONTRACT  

an  overview  

6/25/15  

4  

…architect  as  employer’s  agent  in  the  building  contract  and  independent  cerDfier    InformaCon  to  the  contractor;  The  architect  is  to  provide  relevant  informaDon  to  the  contractor.  [Cl  3]    -­‐  2  signed  original  copies  of  the  contract  document    -­‐  2  further  copies  of  contract  drawings    -­‐  2  copies  of  unpriced  bills  -­‐  And  when  necessary,  to  provide  further  drawings,  details,  levels  and  any  other  informaDon  as  reasonably  necessary.  [Cl  3]  -­‐ Architect  to  determine  all  levels  and  provide  drawings  &  informaDon  to  enable  the  contractor  to  set  out  the  works.  [Cl  5]  -­‐   Architect  to  determine  levels  and  provide  drawings,  informaDon  to  enable  contractor  to  do  seOng  out    InspecCons    Terms  of  Engagement  of  an  architect  contain  the  architect’s  duty  to  inspect  at  periodic  intervals.  The  need  for  a  constant  inspecDons  to  ensure  that  the  works  are  executed  in  accordance  to  the  contract  is  supplemented  by  a  resident  architect  or  clerk  of  works  as  inspectors.  [note  Cl  6  on  the  power  by  architect  to  open  up  works  or  arrange  test  on  materials  incorporated  in  the  works…]  

  ADMINSTRATION  BUILDING  CONTRACT  

an  overview  

NOTE  :  para  9  has  been  updated  in  ARCHITECTS  RULES  2010  

6/25/15  

5  

ADMINSTRATION  BUILDING  CONTRACT  

an  overview  

…architect  as  employer’s  agent  in  the  building  contract  and  an  independent  cerCfier  

 The    Architect  must  act  as  an  independent  professional  

-­‐   in  exercising  judgment  and  reaching  decisions  on  various  makers  under  the  contract.    

Note:  -­‐  The  terms;  instruct  /  direct,  approve,  cerDfy,  to  determine,  to  the  saDsfacDon,  at  the  discreDon,  in  the  opinion  of  

 Examples;  

-­‐   cerDficaDon  of  payments,    -­‐   acceptance  of  completed  works  at  specified  standard  and  Dme  

 

   

…architect  as  employer’s  agent  in  the  building  contract  and  an  independent  cerCfier  

   Guiding  rules;  

-­‐  should  act  honestly  and  without  any  preserve  conduct  or  refusal  to  deal  with  the  maker  at  all    

-­‐  apply  the  contract  as  strictly  and  imparDally  as  possible    -­‐  not  an  arbitrator  but  to  decide  based  on  evidence  and  quanDtaDve  

assessment    

 Failing  which  can  lead  to    -­‐  Breach  of  Contract  enDtling  claims  from  Contractor    on  damages,  direct  loss  

and  expense,  Dme  extension  and  determinaDon  if  found  to  be  mala  fide  -­‐  claim  as  negligence  

 

   

mala  fide  :  undertaken  in  bad  faith  

ADMINSTRATION  BUILDING  CONTRACT  

an  overview  

6/25/15  

6  

Architect’s  main  funcDons  in  the  administering  the  building  contract  can  be  summarised  to  include  the  following:    1.  To  verify  whether  the  Contractor  discharges  his  contractual  obligaDon  that  the  works  

are  completed  saDsfactorily  as  specified  in  the  contract  documents  in  terms  of  quanDty,  quality  and  Dme;  

 2.  To  provide  the  Contractor  with  any  addiDonal  or  supplementary  informaDon  not  

contained  in  the  contract  documents  which  he  might  require  to  complete  the  works;    3.  To  assess  any  claim  for  extensions  of  Dme  to  complete  the  contract,  loss  and  /  or  

expense  from  the  variaDons,  addiDons  which  the  Contractor  had  not  allowed  for  and  be  enDtled  to  recover;  

 4.  To  issue  pracDcal  compleDon  and  making  good  defects  cerDficates  upon  compleDon  of  

the  works  and  expiry  of  the  defect  liability,  to  issue  cerDficate  of  non-­‐compleDon  if  necessary;  

 5.  To  be  the  first  point  of  adjudicaDon  of  any  dispute  between  the  Employer  and  the  

Contractor.    

   

ADMINSTRATION  BUILDING  CONTRACT  

an  overview  

WHAT,  WHO,  WHEN    together  with  required  acDons  

RecommendaDons  on  the  best  way  to  read  and  understand  the  document;  

6/25/15  

7  

A  contract  has  been  defined  as:        “Legally  binding  agreement  between  two  or  more  parCes,  by  which  rights  are  acquired  by  one  or  more  to  acts  or  forbearances  on  the  part  of  the  other  or  others”  

   

Sir  William  Anson    

Rule  of  Law  ..states    

-­‐  …must  be  ad  idem  (  of  one  mind-­‐intenDon  the  same  thing)  before  the  existent  of  the  contract.  -­‐  Intended  project  is  lawful,    -­‐  both  partner  is  of  age  (mature)  and  mentally  capable  (sane).    -­‐  No  element  of  fraud.  

 

   

ADMINSTRATION  BUILDING  CONTRACT  

Building  contract   WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

Building  Contract  is  -­‐  A  private  agreement  -­‐  Enforceable  by  Law      

in  essence,  to  set  out  the  terms    •   for  the  architect  to  govern  the  Dmely  delivery  of  the  specified  product  by  the  

contractor  to  the  employer  within  the  sDpulated  cost,    in  return    •   for  the  appropriate  disbursement  of  money  from  the  employer  to  the  

contractor      

Note  that,  Architects  are  advised  to  use  the  PAM  Standard  Form  of  Contract  without  amendments.    Any  alteraDons  made  which  lead  to  ambiguity  or  inconsistency  of  the  document  may  compromise  the  Employer’s  rights  to  the  contract  or  construed  to  be  against  the  Employer    

Building  contract  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

8  

Contracts may be -  VALID -  VOID, without any legal effect -  VOIDABLE i.e. valid until one of the parties repudiates

-  UNENFORCEABLE in the courts    

ADMINSTRATION  BUILDING  CONTRACT  

Building  contract   WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

Hierarchy  of  documents  

Act  of  Parliament  

MINISTRY    

PARLIAMENT  

REGULATORY  BODY  

Acts  

Rules  /  RegulaDons  /    bye  law  /    

code  of  conduct  

ADMINSTRATION  BUILDING  CONTRACT  

Building  contract  

Building  contract  [private  agreement]  

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

6/25/15  

9  

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

Architect  to  funcDon  as  the  client’s  agent  &  an  independent  cerDfier  as  prescribed  and  implied;    An  agent  in  the  building  contract;  

-­‐  Is  expected  to  work  with  a  level  of  skill  normally  associated  with  his  profession  or  occupaDon,  and  be  concerned  not  to  allow  a  conflict  to  arise  between  his  own  interests  and  those  of  his  principal.  

 The  power  of  the  architect  [as  a  client’s  agent  in  building  contract]  

-­‐   is  limited  to  the  terms  of  the  appointment,  and  has  no  authority    e.g..to  vary  the  contract  between  the  contractor  and  employer  unless  express  powers  are  granted  for  such  a  purpose    

Note:  -­‐  An  architect  is  appointed  under  Architects  Rules  [2010]  as  a  consultant  providing  ‘consultancy  services’  not  as  an  ‘agent’  giving  ‘agency’  services  -­‐  name  of  the  architect  &  pracDce  are  stated  in  ArDcle  3  and  defined  under  arDcle  7  of  the  building  contract  

   

administraCon  

ADMINSTRATION  BUILDING  CONTRACT  

•  Contract  documents  [defined  under  arDcle  7]  •  Work  programme    •  OrganisaCon  chart  •  SeOng  out  drawings  •  Site  report  ,  site  diaries  •  Architect’s  InstrucDons  •  NoDces  •  CerDficates  •  Asbuilt  drawings  •  Maintenance  &  operaDon  Manual  •  Final  Account    

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

•  Performance  bond  •  insurance    

6/25/15  

10  

Contract  documents  [defined  under  arDcle  7]  i.  The  leker  of  award  [defined]  ii.  The  ArDcles  of  Agreement  iii.   The  condiDons  of  the  contract  [defined]  iv.   the  contract  drawings  [stated  in  arDcle  of  agreement]  v.   the  contract  bills  [defined]  vi.  Other  documents  incorporated  in  the  contract  documents  

In  the  event  of  any  conflict  or  inconsistencies…  The  priority  shall  be  the  order…  as  listed  above  [  Cl  3.1]  

   

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

Contract  Bills  [defined  in  ArDcle  7]    comprise  the  following  documents  (as  may  be  applicable):  •  InstrucDon  to  Tenders  •  CondiDons  of  Tendering    •  Form  of  Tender  •  Preliminaries    •  Preambles  and  SpecificaDons  •  Bills  of  QuanDDes  and    •  Any  other  documents  specifically  menDoned  in  any  of  the  above  documents;  

   

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

11  

Work  programme  [defined  in  ArDcle  7  and  described  in  Cl  3.5-­‐3.7]  is      -­‐   an  obligaDon  by  the  contractor  to  the  architect  for  informaCon.  -­‐   is  not  part  of  the  contract    -­‐   is  a  responsibility  &  duty  of  the  contractor  even  if  the  architect  accept  the  work  programme  

-­‐   may  be  used  by  the  architect  to  monitor  progress,  use  as  a  basis  to  assess  EOT,  delay  and  /or  disturbance  to  work  progress    

Work  programme  ;  -­‐   To  be  submiked  to  the  architect  within  21  days  from  the  receipt  of  LA  or  as  stated  by  the  architect  [but  not  sooner]  

-­‐   To  be  submiked    6  copies  unless  otherwise  stated  in  the  contract  documents  [but  no  less]  

-­‐  To  indicate  the  order  of  works  to  be  carried  out  -­‐  must  comply  to  requirements  specified  in  the  contract  documents  -­‐   must  be  revised  if  the  works  or  any  part  of  is  delayed  [architect  may  issue  instrucDon  for  a  revised  WP  ]  

   

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

SeOng  out  [Cl  5]  drawings  Note  the  difference  between  the  acDon  required  for  seOng  out  and  the  responsibility  to  provide  informaDon  &  drawings  to  enable  seOng  out.    SeWng  out  -­‐   Is  a  duty  and  responsibility  of  the  contractor    -­‐   is  a  liability  of  the  contractor  on  any  errors  arising  from  any  inaccurate  seOng  out    InformaCon,  drawings  &  levels  to  enable  seOng  out  -­‐ to  be  provided  by  the  architect    In  the  event  of  errors;  -­‐   The  contractor  to  recDfy  at  his  own  cost  -­‐   The  architect  may  accept  the  errors  with  prior  approval  from  the  Employer,  and  subject  to  appropriate  deducDon  to  be  set  off  by  the  employer    

Note:  It  is  recommended  to  include  in  the  contract  document  on  the  requirement  for  the  contractor  to  appoint  a  license  surveyor  Q  :  How  /  when  does  the  architect  observe  that  the  seOng  out  is  correct?  Q  :  What  is  an  acceptable  tolerance  to  be  considered  as  ‘error’    

   

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

12  

Architect’s  InstrucCons  -­‐  AI  [arDcle  7  &  Cl  2]    

-­‐   Issued  by  the  architect  within  the  condiDons  expressly  stated  in  the  contract  -­‐   must  be  in  wriDng  and  expressly  stated  “AI”  -­‐   obliged  to  specify  in  wriDng  on  which  provision  that  empowers  to  the  architect  to  issue  such  AI  -­‐   contractor  to  comply  with  the  instrucDon  within  the  period  stated  by  the  architect  [not  less  than  7  days  from  receipt  of  AI]  

In  the  event  that  the  contractor  fails  to  comply  with  AI  within  the  stated  period;    

-­‐   The  employer  may  employ  and  pay  another  party  to  execute  the  work  to  comply  with  AI.    The  cost  to  be  set  off  by  the  employer  

   

   

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

NoCces  [Cl  36]    

-­‐ Must  be  sent  by  hand,  ordinary  mail  or  registered  post  or  fax  

Deemed  received  -­‐   By  hand  [at  Dme  delivery]  with  signed  acknowledgement  of  receipt    -­‐   ordinary  mail  or  registered  post  [3  days  arer  posDng]  with  receipt  of  posDng  -­‐   fax  [at  Dme  of  transmission]  with  report  on  successful  transmission  

Sent  to  the  addresses  as  stated  in  ArDcle  3      Note;  -­‐ NoDce  sent  by  email  is  not  an  acceptable  form  of  delivery  unless  otherwise  stated  in  the  contract  document.    -­‐   ArDcle  3  only  state  addresses  but  not  fax  no.  

     

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

13  

As  built  drawings  [arCcle  7,  Cl  3.10]    Means  as-­‐built  drawings  for  works  designed  [including  alternaDve  design]  by  the  contractor  and  /  or  NSC  And  Any  other  as  required  as  specified  in  the  contract  documents      

-­‐   Contractor  to  submit  before  the  CompleDon  Date  or  within  the  Dme  specified  in  the  contract  -­‐   Contractor  to  obtain  the  same  from  NSC  and  submit  in  the  same  manner  

   Q  Can  this  include  [if  specified  in  the  contract  documents]  key  plans/  drawings  incorporaDng  all  changes  made  during  construcDon?      

   

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

CerCficates  Final  Account    [covered  under  other  Module]      

   

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

14  

OrganisaDon  chart  Not  stated  in  the  contract  

     

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

Site  report  ,  site  diaries  Not  stated  in  the  contract  

   

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

15  

Performance  Bond  [PB]    Defined  as    ‘the  bond  required  to  be  provided  by  the  Contractor  as  a  security  for  the  due  performance  of  the  contract  under  Clause  37.1;  ‘    Stated  in  -­‐      -­‐  Stated  in  under  Apendix  

 Amount  of  PB  is  5%  of  Contract  Sum  unless  otherwise  stated.  -­‐  cl  27.13  [  under  NSC]  and  PAM  2006  NCS  contract  cl  32.1  

Contractor  may  recoveraddiDonal  expenses  from  NSC’s  PB  in  the  event  that  Architect  gives  consent  to  determine  NSC’s  employment.  

-­‐  Cl  30.4  [set-­‐off  by  employer]  Employer  can  recover  from  contractor’s  PB  on  any  ‘set-­‐off’  as  outlined  in  the  contract  

-­‐  Cl  37  [PB]  

   

   

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

……PB  ConCnue    

ConCnue  ……  Performance  Bond  [PB]    Cl  37  [PB]  -­‐  To  submit  before  the  Date  of  Commencement  -­‐  FuncDon  as  a  security  for  the  due  performance  up  to  PracDcal  CompleDon  of  the  Works.  -­‐  To  be  prepared  by  the  Contractor  during  site  mobilisaDon  -­‐  However,  in  the  event  the  contractor  failed  to  submit,  the  client  cannot  prevent  the  Contractor  

from  commencing  works  unless  expressly  stated  in  the  contract.  -­‐  The  amount  is  a  fixed  sum  as  stated  in  the  appendix  -­‐  Format  of  PB  is  specified  in  the  contract  or  to  the  client’s  approval.    It  is  recommended  to  include  

specimen  of  PB  in  the  tender  documents  to  avoid  disagreement  on  the  content  &  format  -­‐  Validity  is  unDl  3  months  arer  CompleDon  Date  and  to  be  extended  by  the  Contractor  in  the  event  

of  delay,  following  the  same  requirements.  -­‐  If  the  Contractor  fails  to  provide  or  maintain  PF,  the  Employer  has  the  right  to  withhold  or  deduct  

the  same  amount  of  PB,  from  any  payment  due  to  the  contractor  PB  shall  be  uDlised  by  Employer  :  -­‐  Contractor’s  employment  is  determined  by  the  Employer  [cl37.5].    Employer  to  refund  to  the  

Contractor,  the  balance  of  amount  uDlised  arer  deducDons  in  recovering  all  expenses,  losses  suffered  by  the  Employer  

-­‐  To  recover  from  any  Set-­‐off  as  stated  under  the  contract    [cl  30.4]  PB  to  be  returned  to  the  Contractor:  -­‐  Contractor’s  own  determinaDon  of  the  contract.    Employer  to  return  within  28  days  of  noDficaDon  from  the  contractor      

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

16  

maintenance  manuals  [cl  3.10]    -­‐  To  be  supplied  by  the  Contractor  &  NSC  in  4  copies  before  the  CompleDon  Date  

unless  specified  otherwise.  -­‐  The  content  and  details  of  OM  is  not  specified  in  the  Contract.  -­‐  It  is  recommended  to  provide  specimen  in  the  tender  document  on  the  minimum  

requirement  of  OM      

WHAT    •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

documents  

ADMINSTRATION  BUILDING  CONTRACT  

WHO  contractual  parDes  /  line  of  communicaDon  

•  Architect  •  Engineers  •  QS  •  Specialists  

consultant  •  site  staff    

•  contractor  •  site  agent  •  nominated  subcontractor  •  nominated  supplier  •  domesDc  sub-­‐contractor  

•  employer  

•  ArDsts  /  tradesmen  •  License  surveyor  

ADMINSTRATION  BUILDING  CONTRACT  

WHO  

6/25/15  

17  

Employer  [stated  in  ArDcle  of  Agreement  and  defined  in  ArDcle  7]  •   Include  the  legal  successors  or  personal  representaDves  •  Can  be  transferred  with  the  agreement  from  the  contractor  

the client or employer undertakes to:

•  give the contractor possession of site in order to carry out the work

•  ensure all necessary information is made available to the contractor

•  appoint a contract administrator [architect, engineer, QS, etc]

•  pay all amounts properly certified

     

   

WHO  •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

who  

ADMINSTRATION  BUILDING  CONTRACT  

Architect    [stated  in  ArDcle  of  Agreement  and  defined  in  ArDcle  7]  •  Can  be    a  person  registered  as  a  Professional  Architect  •  Or  a  pracDce    registered  by  LAM  

Architect undertakes to:

•  issues necessary information to the contractor

•  issues instructions empowered or required by the contract;

•  issues certificates as required by the contract

•  does not exceed the authority given by the contract

•  act in a fair and reasonable manner where impartial judgment is required by the contract

     

   

WHO  •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

who  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

18  

Engineer      [stated  in  ArDcle  4  of  Agreement  and  defined  in  ArDcle  7]  •  Can  be  a  person  registered  as  a  Professional  Engineer  •  Or  a  pracDce    registered  with  Board  of  Engineers,  Malaysia    

QuanCty  Surveyor      [stated  in  ArDcle  5  of  Agreement  and  defined  in  ArDcle  7]  •  Can  be  a  person  registered  as  a  registered  QS  •  Or  a  pracDce    registered  with  Board  of  QS,  Malaysia  •  To  keep  copies  of  documents  [cl  3.3]  •  To  do  measurement  &  valuaDon  of  variaDon  works,  to  determine  rates  if  

variaDon  involves  works  not  similar  to  that  stated  in  the  contract  •  Has  access  to  contractor’s  books  and  documents  [cl11.8]  •  Evaluate  loss  and/or  expense  Note  :  in  all  situaCons,  the  term    ‘QuanCty  Surveyor’  appears  together  with  ‘architect’  

 Specialist  Consultant  [stated  in  ArDcle  6  of  Agreement]  

     

   

WHO  •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

who  

ADMINSTRATION  BUILDING  CONTRACT  

Contractor    [stated  in  ArDcle  of  Agreement  and  defined  in  ArDcle  7]  

•  Include  the  legal  successors  or  personal  representaDves  •  Can  be  transferred  with  the  agreement  by  the  Employer  

Contractor undertakes to:

•  carry out and complete the works in accordance with the contract;

•  proceed regularly and diligently;

•  complete by the agreed Date for Completion;

•  comply with instructions empowered by the contract

     

   

WHO  •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

who  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

19  

Site  Staff  [defined  in  ArDcle  7  &  described  duty  under  cl  10]  -­‐ To  be  appointed  by  the  Employer  -­‐ Act  as  an  inspector  under  the  direcDon  of  the  architect  -­‐ Contractor  to  provide  faciliDes  [Note  :  refer  to  CondiDons  of  Engagement  para  9]    

scope  of  services    In  simple  terms…  to  look,  and  report  to  the  architect  what  they  see.  

 Site  Staff  has  no  power  to;  

-­‐issue  instrucDons  to  the  contractor  unless  expressly  authorised  in  wriDng  by  the  architect  -­‐Approve  any  of  the  work  -­‐issue  any  of  the  cerDficates  -­‐ Carry  out  any  of  the  other  administraDve  duDes  that  fall  to  the  architect  

 Note  the  difference  terms:  site  agent,  Clerk  of  Works          and  delegate,  authorise    

     

   

WHO  •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

who  

ADMINSTRATION  BUILDING  CONTRACT  

Site  Agent    [defined  in  ArDcle  7  &  described  duty  under  cl  8.0]  -­‐   A  competent  Site  Agent  to  be  appointed  by  the  Contractor  and  to  be  full  Dme  at  Site  -­‐   Act  as  Contractor’s  representaDve  at  site  to  receive  any  direcDons  &  instrucDons.  -­‐   Architect  has  the  right  to  remove  Site  Agent,  but  not  unreasonably  or  vexaDously.  -­‐   to  sign  off  vouchers  specifying  Dme,  materials,  workers’  names,  construcDon  plan  of  variaDon  works.    The  Contract  does  not  state:  -­‐  The  number  of  Site  staff  required  &  their  qualificaDons  -­‐  It  is  recommended  to  state  the  minimum  qualificaDon  in  Contract  Bills    Note:  -­‐  cl  8.3  also  states  that  the  Architect  has  the  right  remove  any  Person  employed  or  controlled  by  the  Contractor  .    This  definiDon  extends  to  any  sub-­‐contractor  under  the  control  of  the  Contractor.      

 

     

   

WHO  •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

who  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

20  

NSC  Under  separate  note  

 Crabsmen,  Tradesmen,  Other  Contractors  employed  /  engaged  by  the  Employer  [cl29.0]    -­‐  The  Contractor  to  allow  access  and  permit  execuDon  of  works  by  other  parDes  engaged  

by  Employer  -­‐  Employer  to  take  full  responsibility  -­‐  The  Contractor  shall  be  enDtled  for  EOT  in  the  event  of  delay  caused  by  3rd  party  

engaged  by  Employer          

   

WHO  •  Meaning  

•   Significance  /  importance  

•  Hierarchy  

who  

ADMINSTRATION  BUILDING  CONTRACT  

Employer  

Architect  Engineers  

QS  others  

Local  AuthoriDes  

Main  Contractor  

Nominated    supplier  

DomesDc    sub-­‐contractor  

suppliers  

Crarsmen  &  tradesmen  

Nominated    sub-­‐contractor  

Contractual  &  communicaCon  link  

ADMINSTRATION  BUILDING  CONTRACT  

Note  :  communicaDon  between  contractors,  suppliers  with  local  authoriDes  is  limited  to  their  respecDve  works  

communicaCon  link  

contractual  link  

6/25/15  

21  

WHEN  /  EVENTS  

Perfect  situaCons…  •  site  possession  •  commencement  of  works  •  works  in  progress  •  compleDon  •  defect  liability  period  •  Final  Account  

ADMINSTRATION  BUILDING  CONTRACT  

Not  so  perfect…  •  postponement  of  site  possession  •  Works  not  in  accordance  •  Discrepancies  /  divergence  •  variaDons  •  non-­‐compliance  •  delay  •  Disputes  &  resoluDons  •  determinaDon  

ADMINSTRATION  BUILDING  CONTRACT  

WHEN  /  EVENTS  

6/25/15  

22  

Site  Possession  [Cl  21.0]  -­‐  Client’s  obligaDon  to  give  site  possession  on  the  Date  of  Commencement  [defined  

in  ArDcle  7,  stated    in  the  Appendix  [including  SecDonal  Commencement  Dates]    In  the  event  of  delay  in  site  possession  within  the  Period  of  Delay;  -­‐  Architect  to  grant  EOT  -­‐  The  contractor  is  enDtled  to  loss  and/or  expense    In  the  event  of  delay  in  site  possession  aber  the  Period  of  Delay;  -­‐  The  client  is  in  breach  of  the  contract  -­‐  The  contractor  is  enDtled  to  determine  the  contract  [with  due  noDce]    Period  of  Delay  is  stated  in  the  Appendix,  if  none  stated  it  is    ‘conDnuous’  period  of  3  months      

     

   

WHEN  •  Meaning  

•   Significance  /  importance  

 

events  

ADMINSTRATION  BUILDING  CONTRACT  

SecDonal  Commencement  Dates  [cl  21.2]    -­‐  The  contract  allows  for  the  site  possession  to  take  place  in  secDons  whereby  it  

must  be  stated  in  the  Appendix  [&  Contract  Bills]  so  that  the  contractor  can  price  accordingly.  

 -­‐  Giving  site  possession  in  secDons  when  it  is  not  stated  in  Contract  Bills  [ArDcle  7],  is  

a  breach  of  contract  by  the  Employer        

     

   

WHEN  •  Meaning  

•   Significance  /  importance  

 

events  

ADMINSTRATION  BUILDING  CONTRACT  

6/25/15  

23  

…Works  not  in  accordance…[cl  6.5-­‐6.7]  -­‐   Referring  to  work,  materials,  good  and  workmanship  

 Architect  to  instruct  the  contractor  in  wriDng;  

-­‐   To  remove  or  not  to  bring  to  the  site  -­‐     to  demolish  and  reconstruct  -­‐   to  recCfy  with  no  effect  to  the  contact  sum  -­‐   to  submit  method  statement  within  7  days  [  or  any  other  specified  by  the  architect]  from  the  receipt  of  AI…  Architect  may  accept  or  reject  the  proposal  for  recDficaDon.  -­‐   accept  the  works,  materials,  goods  or  workmanship  with  Employer’s  consent  and  subject  appropriate  set-­‐off  by  the  Employer.    In  this  case,  the  contractor  is  sDll  liable  for  the  works  -­‐   no  compensaDon  on  Dme  &  cost  to  the  contractor  [cl  6.6]  

 

At  the  same  Dme,  the  architect  must  inform  QS  to  make  adjustment  in  payment  valuaDons  on  the  related  works,…      

     

   

WHEN  •  Meaning  

•   Significance  /  importance  

 

events  

ADMINSTRATION  BUILDING  CONTRACT  

not  perfect  situaCon  

 

Works  not  in  accordance…[cl  6.5-­‐6.7]    If  the  contractor  fail  to  comply  with  wriken  instrucDon  by  the  architect  [cl  6.7]  

-­‐ Employer  may  employ  and  pay  other  Person  to  carry  out  such  works….,  all  cost  including  loss  &  expense  to  be  set-­‐off  by  the  Employer  -­‐   Employer  may  determine  the  contract  provided  that  the  contractor    has  persistently  fail  to  comply  with  the  architect’s  instrucDons.  

 

     

   

WHEN  •  Meaning  

•   Significance  /  importance  

 

events  

ADMINSTRATION  BUILDING  CONTRACT  

not  perfect  situaCon  

 

6/25/15  

24  

Discrepancy  or  divergence  between  documents  [cl  1.4]  -­‐   Referring  to  work,  materials,  good  and  workmanship  

 Contractor  to  plan  the  works  prior  to  execuCon,  using  the  Contract  Documents  and  any  other  subsequent  documents  to.    Upon  discovery  of  any  discrepancy  or  divergence,  

-­‐ Contractor  to  give  wrifen  noCce  to  the  architect  in  sufficient  Dme,  before  commencement  of  the  affected  works.  -­‐   architect  to  respond  with  wriken  instrucDon  within  a  ‘fair’  period  and  not  to  delay  the  affected  works.  

NOTE  The  Dme  duraDon  for  the  architect  to  respond  is  not  specifically  stated.        Q:  In  the  event  that  the  contractor  claim  for  EOT  due  to  delay  in  response  by  the  architect,  what  would  be  the  basis  for  assessment?    

     

   

WHEN  •  Meaning  

•   Significance  /  importance  

 

events  

ADMINSTRATION  BUILDING  CONTRACT  

ACTIONS  •  Instruct  /  Direct  •  Approve  •  CerDfy  /  grant  •  Comply    •  non-­‐compliance/  not  in  accordance  

•  Issue  /  provide  /  furnish  •  Due  diligence  •  Fail  /  refuse  /  neglect  •  Pay,  offset  payment  

building  contract                                        administraDon    

•  to  determine  •  to  the  saDsfacDon..  

•  at  the  discreDon  •  In  the  opinion  of  •  VexaDously  •  conDnuously  •  shall  • may  

6/25/15  

25  

WHAT,  WHO,  WHEN    together  with  required  acDons  

•  client    

•  Architect  

•  engineer  

•  site  staff  

•  contractor  

•  site  agent  

•  nominated  subcontractor  

•  nominated  supplier  

•  domesCc  sub-­‐contractor  

•  ArCsts  /  tradesmen  

building  contract                                        administraDon    

•  pre  site  possession  

•  site  possession  

•  commencement  of  works  

•  works  in  progress  

•  compleCon  

•  defect  liability  period  

•  postponement  of  site  possession  

•  Discrepancies  /  divergence  

•  variaCons  

•  non-­‐compliance  

•  delay  

•  Disputes  &  resoluCons  

•  determinaCon  

•  Contract  documents  

•  Performance  bond  

•  Work  programme    

•  OrganisaCon  chart  

•  SeWng  out  drawings  

•  Site  report  

•  Architect’s  InstrucCons  

•  NoCces  

•  CerCficates  

•  Asbuilt  drawings  

Glossary of Common Legal terms  •  Per  se  –  by  itself  •  Prima  facie  –  on  first  view  •  Ultra vires – beyond one’s powers •  Non  –  grata  –  not  welcome  •  mala  fide  :  undertaken  in  bad  faith    

6/25/15  

26  

TradiDonal  procurement  The  basic  hierarchy  

CLIENT

ARCHITECT

PRINCIPAL CONTRACTOR

DOMESTIC SUB CONTRACTORS

NOMINATED SUB CONTRACTORS

SPECIALIST CONSULTANTS

TENDERING STAGE: SELECTION OF PRINCIPAL CONTRACTOR