مــيـحرـلا نـمـحرـلا هـلـلا مسـب · mohammad j. ghazal waleed q....

23
ـن الـرحـيــمـه الـرحـمـل بـسم الAn-Najah National University Faculty Of Engineering Civil Engineering Department “Design of Wastewater Collection System for Sabastia Town” Prepared By: Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen 2012 2013

Upload: dinhnguyet

Post on 19-Apr-2018

220 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

بـسم الـلـه الـرحـمـن الـرحـيــم

An-Najah National University Faculty Of Engineering

Civil Engineering Department

“Design of Wastewater Collection System for Sabastia Town”

Prepared By: Mohammad J. Ghazal

Waleed Q. Ghazal Ghaith N. Sultan

Supervisor: Dr. Hafez Shaheen

2012 – 2013

Page 2: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

Objectives

Study Area

Problem Definition

Available Data

WWCS Design

Results

Quantity Surveying and Project Cost

Page 3: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

The main objectives of this project are:

i. Design a wastewater collection system; to

serve Sabastia Town.

ii. Design a main trunk line; to transport the

wastewater to Wadi Zemar “Wadi Al-Tofah”

conveyance system.

Page 4: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

- Sabastia is a small town located12 Km north –

west of Nablus city.

- The maximum elevation about 463 meter

above mean see level.

- Population was about 3,000 capita in 2012 and

growth rate is 3%.

- Total area is 6,000 donums, populated area is

about 2,000 donums.

- The WWTP is located 4.3Km to the west of

Sabastia.

Page 5: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1
Page 6: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

There is no wastewater collection system in

Sabastia.

The cesspits is the main way to dispose

wastewater.

The wastewater collection system is necessary;

to protect the environment and complete the

Western Nablus WWTP project.

Page 7: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1
Page 8: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1
Page 9: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

Growth rate is 3%.

Design period is 35 years.

Population in 2012 was 3,000, and about 8,440

in 2047.

Return flow percent is 80%.

Infiltration is 20%.

Peak hourly factor is 3.

Page 10: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

Criterion Unit Value

Velocity m/s 0.6 – 3.0

Max. Length m 60

Slope % 0.5 – 14

Cover m 0.5 – 5.0

Pipe’s Material - PVC (n=0.01)

Full Flow Percentage % 50

Page 11: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

Network layout

Page 12: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

Manholes loads

Unit sanitary load per capita is 307 L/D.

MH Houses Person Total Pop. Futer Pop. Design Flow

# # Per/H Capita Capita CMH

MH-1 3 6 18 59 0.75

MH-2 1 6 6 20 0.25

Page 13: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

Design using SewerCAD.

Page 14: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

0

0.5

1

1.5

2

2.5

3

3.5

0 200 400 600 800

Ve

loc

ity

-

(m

/s

)

Conduit No.

Velocity

m/s

Page 15: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

0

2

4

6

8

10

12

14

16

0 100 200 300 400 500 600 700 800

Slo

pe

- %

Conduit No.

Slope %

Page 16: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0 100 200 300 400 500 600 700 800

Co

ve

r -

m

Conduit No.

Page 17: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1
Page 18: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1
Page 19: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1
Page 20: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

Material Unit Quantity

Excavation Cubic Meter 28,521

Back Filling Cubic Meter 13,653

Manholes Unit 706

Conduits Meter Run 21,309

Sand Cubic Meter 12,183

Page 21: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

Bill of Quantities and Costs

Material Type Unit Quantity Material Unit Cost Total Cost

Euro Euro

Excavation CM 28,521 10 285,210

Back Filling CM 13,653 6 81,918

Manholes - 1.5m No. 537 500 268,500

Manholes - 3m No. 101 600 60,600

Manholes - 4m No. 30 700 21,000

Manholes - 5m No. 23 800 18,400

Manholes - 6m No. 5 900 4,500

Conduit - 8in MR 13,538 32 433,216

Conduit - 10in MR 4,718 44 207,592

Conduit - 12in MR 3,053 68 207,604

Total Cost - (Euro) 1,588,540

Total Cost After Waste Factor - (Euro) 1,636,196

Page 22: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

The total project cost is 1,636,000 Euro.

Unit Total Cost Per Unit

Cost Per KM 21.309 KM 77,000 Euro

Cost Per Capita 3,000 Capita 545 Euro

Trunk Line sewer 7.5 KM 610,000 Euro

Page 23: مــيـحرـلا نـمـحرـلا هـلـلا مسـب · Mohammad J. Ghazal Waleed Q. Ghazal Ghaith N. Sultan Supervisor: Dr. Hafez Shaheen ... MH-1 3 6 18 59 0.75 MH-2 1

Thank You For Your Attention

Thank You For Your Attention