NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater flooding in Chalk and produce predictive models for Somme and Brighton Somme valley at Abbeville, April 2001 (Ministère de l’Ecologie et du Développement Durable) Flooding of the Patcham area, Brighton November-December 2000 ( John Ellis, EA) www.flood1.info

Upload: henry-lynch

Post on 19-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Groundwater floodingFLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.)Aim to understand processes leading to groundwater flooding in Chalk and

produce predictive models for Somme and Brighton

Somme valley at Abbeville, April 2001(Ministère de l’Ecologie et du Développement Durable)

Flooding of the Patcham area, Brighton November-December 2000

( John Ellis, EA)

www.flood1.info

Page 2: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Outline

• What specific questions are we trying to answer using models?

• How do we represent the processes of interest?

• With current commonly applied techniques, what can we do well, and where is there room for improvement?

Page 3: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Groundwater flooding

• Definition:

”A groundwater flood event results from a rise in groundwater level sufficient for the water table to intersect the ground surface and inundate low lying areas”

Flooding from other sources (HA4a), 2006, jba Consulting

Page 4: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

What do we want models to do?

• Explain – why and how

• Predict – where and when

Constraint – need a methodology that can be applied in other regions

Page 5: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Processes of interest

• Response of water table to rainfall

• Effect of “micro” geology on water table

Page 6: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

What have we tried

• Using DTM and water table contours

• Distributed recharge model

• Regional groundwater model with simplified geology

• Unsaturated zone model

Page 7: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

What have we tried

• Using DTM and water table contours

• Distributed recharge model

• Regional groundwater model with simplified geology

• Unsaturated zone model

Page 8: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Page 9: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Page 10: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

What have we tried

• Using DTM and water table contours

• Distributed recharge model

• Regional groundwater model with simplified geology

• Unsaturated zone model

Page 11: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Average recharge (1990-2003)

Page 12: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved#

#

#

##

#

#

#

##

#

#

#

#

#

##

#

#

#

# ##

#

#

#

Page 13: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

65

70

75

80

85

1990

1991

1992

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

Gro

un

dw

ater

lev

el (

m a

OD

)

0

5

10

15

20

Mean

mo

nth

ly recharg

e (mm

/day)

Pyecombe Old Rec Mean monthly recharge (mm/day)

Page 14: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

What have we tried

• Using DTM and water table contours

• Distributed recharge model

• Regional groundwater model with simplified geology

• Unsaturated zone model

Page 15: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Average groundwater levels

Page 16: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Transmissivity distribution

Page 17: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Modelled water levels

Page 18: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Difference between model and observed water levels

Page 19: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

-5

0

5

10

15

20

25

30

35

Ja

n-7

6

De

c-8

0

De

c-8

5

De

c-9

0

De

c-9

5

De

c-0

0

De

c-0

5

BRIGHTON PRESTON PARK

Model

Page 20: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

-15

-10

-5

0

5

10

15

Ja

n-7

6

De

c-8

0

De

c-8

5

De

c-9

0

De

c-9

5

De

c-0

0

De

c-0

5

BRIGHTON ST PETERS CHURCH

Model

Page 21: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

35

45

55

65

75

85

95

Ja

n-7

6

De

c-8

0

De

c-8

5

De

c-9

0

De

c-9

5

De

c-0

0

De

c-0

5

LOWER STANDEAN Model

Page 22: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

35

45

55

65

75

85

95

105

115

125

Ja

n-7

6

De

c-8

0

De

c-8

5

De

c-9

0

De

c-9

5

De

c-0

0

De

c-0

5

NORTH BOTTOM Model

Page 23: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

95

105

115

125

135

145

155

Ja

n-7

6

De

c-8

0

De

c-8

5

De

c-9

0

De

c-9

5

De

c-0

0

De

c-0

5

FAULKNERS BOTTOM Model

Page 24: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

What have we tried

• Using DTM and water table contours

• Distributed recharge model

• Regional groundwater model with simplified geology

• Unsaturated zone model

Data

Page 25: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Envirosmart Probe

0

5

10

15

20

25

30

30-Jul 11-Aug 23-Aug 04-Sep 16-Sep 28-Sep 10-Oct 22-Oct 03-Nov 15-Nov 27-Nov 09-Dec 21-Dec 02-Jan 14-Jan 26-Jan

Date

Wat

er c

on

ten

t

0

1

2

3

4

5

6

Rai

nfa

ll (m

m)

0.1 m

0.3 m

0.4 m

0.6 m

0.8 m

1.0 m

1.2 m

1.5 m

Rainfall

Page 26: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

What have we tried

• Using DTM and water table contours

• Distributed recharge model

• Regional groundwater model with simplified geology

• Unsaturated zone model

Data

Boundary conditions

Page 27: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

The way forward for prediction

• Analysis of hydrographs

Page 28: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

The way forward for prediction

• Analysis of hydrographs

Interested in GWL maxima

Water level related to rainfall

Want to predict how high water level may rise during next recharge season

Page 29: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Predicting groundwater floods1. Calibrate and validate model using historic GWL dataMultiple linear regression model where annual maximum groundwater level (m OD) is a function of previous annual minimum and winter rainfall (mm)

Page 30: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

Predicting groundwater floods1. Calibrate and validate model using historic GWL dataMultiple linear regression model where annual maximum groundwater level (m OD) is a function of previous annual minimum and winter rainfall (mm)

Page 31: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

2. Predictive modelUse Monte Carlo simulation to predict a range of annual maximum groundwater levels, based on a range of possible winter rainfall scenarios, up to nine months ahead

1. Calibrate and validate model using historic GWL dataMultiple linear regression model where annual maximum groundwater level (m OD) is a function of previous annual minimum and winter rainfall (mm)

Predicting groundwater floods

Page 32: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved

1. Calibrate and validate model using historic GWL dataMultiple linear regression model where annual maximum groundwater level (m OD) is a function of previous annual minimum and winter rainfall (mm)

Predicting groundwater floods

2. Predictive modelUse Monte Carlo simulation to predict a range of annual maximum groundwater levels, based on a range of possible winter rainfall scenarios, up to nine months ahead

Frequency Chart

(m OD)

.000

.006

.011

.017

.022

0

138.2

276.5

414.7

553

9.30 10.33 11.37 12.40 13.43

25,000 Trials 24,733 Displayed

Forecast: Predicted Max (m OD)

Page 33: © NERC All rights reserved Groundwater flooding FLOOD1 – Interreg IIIA project (BGS, BGRM, Brighton Uni.) Aim to understand processes leading to groundwater

© NERC All rights reserved