® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion Date: 3/31/2015 Industry Leader Jody Berenblatt, Continuity Shippers Association, MTAC Association Executive USPS Leaders John Nabor, Business Systems Analyst/Martha Forrest. Program Manager, Service Performance Measurement, Engineering Issue Statement Synopsis: To identify, recommend, and assist in testing solutions to get more mail pieces into service performance measurement. This includes: • Lack of or inconsistent mail visibility data • Discrepancy in eDoc Preparation • Discrepancy in Mail Preparation

Upload: katherine-clark

Post on 22-Dec-2015

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: ® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion

®New MTAC

User Groups/Work Groups/Task Teams

Work Group #167: Solutions for Pieces Excluded from Service MeasurementStart date: 1/21/2015 Target Completion Date: 3/31/2015

Industry Leader – Jody Berenblatt, Continuity Shippers Association, MTAC Association Executive

USPS Leaders – John Nabor, Business Systems Analyst/Martha Forrest. Program Manager, Service Performance Measurement, Engineering

Issue Statement Synopsis: To identify, recommend, and assist in testing solutions to get more mail pieces into service performance measurement. This includes:

• Lack of or inconsistent mail visibility data• Discrepancy in eDoc Preparation• Discrepancy in Mail Preparation

Page 2: ® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion

®New MTAC

User Groups/Work Groups/Task Teams

Work Group #168: FSS Multi-scheme PalletsStart date: 11/4/2014 Target Completion Date: 1/31/2015

Industry Leader – Susan Pinter, Direct Gardening Association, MTAC Representative

USPS Leaders – Cathy Moon, Manager Operations Integration & Support/Paul Mitchell, Operations Specialist

Issue Statement Synopsis– The Joint USPS and Industry Flats Strategy group and a Lean Six Sigma effort with industry Mail Service Providers identified an opportunity to reduce the quantity of low volume scheme pallets resulting from the 250lb minimum under FSS preparation rules. Modifications to the FSS Stand Alone Mail Prep (SAMP) are being tested by USPS Engineering which would facilitate sorting and prepping multiple schemes from a single pallet. This appears promising; therefore, impacts and opportunities must be evaluated from all perspectives to ensure successful implementation.

Page 3: ® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion

®New MTAC

User Groups/Work Groups/Task Teams

Work Group #169: Refining Package Machinability Standards Start date: 2/5/2015 Target Completion Date: 1/31/2017

Industry Leader – Richard Porras, Continuity Shippers Association, MTAC Representative

USPS Leader – Cathy Moon, Manager Operations Integration & Support/Christian Rivera, Operations Industrial Engineer

Issue Statement Synopsis– Some mail currently qualifying as machinable is not compatible with processing on USPS automated equipment. The lack of compatibility results in manual handlings which drive up costs attributed to these products. The requirements for machinability will be refined to reflect only mail which can be successfully processed on USPS automation. Efforts will be made to identify options that would allow the piece to continue to qualify as machinable.

Page 4: ® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion

®New MTAC

User Groups/Work Groups/Task Teams

Task Team #23: Readiness for Trend Based VerificationStart date: 01/21/2015 Target Completion Date: 3/31/15

Industry Leader – Todd Black, American Catalog Mailers Association, MTAC Representative

USPS Leader -Pritha Mehra, VP, Mail Entry & Payment Technology

Issue Statement Synopsis– The USPS will transition from sample-based verification at acceptance to a trend-based verification that will take place post mail acceptance leveraging data and reports to assess quality of mail. A Task team is proposed to provide recommendation on readiness of Reports and Systems to ensure smooth transition to this new approach.

Validate Data Quality across Key Reports and Invoices Validate Stability of Systems Validate data attribution Communicate thresholds and approach

Page 5: ® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion

®

Desired Results:

1. USPS will share the approach for establishing thresholds for each program

2. Validate attribution of data to the correct parties3. Validate stability of systems via published metrics to

consistently meet established SLAs for eDoc processing, report availability, data availability, and mailer feedback

4. Validate data quality across key reports and invoices

Task Team #23: Readiness for Trend Based

Verification

Page 6: ® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion

®Task Team #23:

Readiness for Trend Based Verification

Page 7: ® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion

®Task Team #23:

Readiness for Trend Based Verification

1. USPS will share the approach for establishing thresholds for each program

• USPS Developed and Shared Threshold document that describes approach for Threshold establishment

• Group Provided Feedback and Requested Updates• Threshold document will be posted externally on RIBBS

shortly

2. Validate Attribution of Data to the Correct Parties

• Reviewed MTAC 163 recommendations and USPS compromise position

• Reviewed changes proposed in April• Reviewed Guide to Postage Assessment• Provided Feedback• Guide to Postage Assessment will be posted externally on

RIBBS

Page 8: ® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion

®

3. Validate stability of systems via published metrics to consistently meet established SLAs for eDoc processing

• Reviewed Initial Set of Metrics• Working to finalize a comprehensive set of metrics and

distribute across workgroups for comment

4. Validate data quality across key reports and invoices

• Next Steps: Review Test Plan and approach for validating key reports and invoices and work through usergroups / workgroups to test

Task Team #23: Readiness for Trend Based

Verification

Page 9: ® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion

®Task Team #23:

Readiness for Trend Based Verification

Desired Results from Task Team Issue StatementArtifacts Related to

Desired Result

DateShared with Task Team

Date finalConcurrence by

Task Team

 Validate Data Quality Across key reports and invoices Validate the Full Service, Move Update metrics included in the Electronic Verification scorecard, eInduction metrics included in the eInduction scorecard and seamless metrics included in the seamless scorecard for accuracy.Validate the Full Service, Move Update, eInduction and Seamless Postage Assessments for accuracy. 

Report card for Mailer Scorecard and Postage Assessment 

 

Test Plan for Mailer Scorecard and Assessments 

   

Guide to Mailer Scorecard 

   

 Validate Stability of systems via published metrics to consistently meet established SLAs for eDoc processing, report availability, data availability, and mailer feedback

Critical Metrics  02/11/2015  

 Validate data distributionUSPS will provide the needed information to identify the responsible parties contributing to errorsProvide notice to Permit Holders whose Permits are being charged for assessments due to errors. 

Guide to Postage Assessment

2/4/2015  

 USPS will share approach to how thresholds for each program were initially set and any plans to update the threshholds using more recent mailing results. 

Threshold Document 

1/28/2015  02/11/2015