Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping PART L01 LANDSCAPE GENERAL Unless specified below, all works must be undertaken in accordance with Master Specification Part L01 Landscape General Edition Dec 2017. Headin g Title Details 1 General Applies Applies (Exceeds with spec information) Does Not Apply 2 Non-Conforming or Defective Work 3 Reviewing of Pre-Qualification Status 4 Repair or Replacement 5 Co-ordination 6 Contractor’s Site Representative 7 Site Meetings 8 Working Days and Hours of Work 9 Rates and Lump Sums 10 License Requirements 11 Materials Select which materials are provided by the Principal. 12 Manufacturer’s Instructions 13 Proprietary Names Not to Be Displayed 14 Approvals and Notices 15 Advice of Attendance at Site 16 Notification of Property Occupiers 17 Clearances from Landholders 18 Restrictions Applying at the Site 19 Control of Fences and Gates

Upload: vudang

Post on 30-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

PART L01 LANDSCAPE GENERAL

Unless specified below, all works must be undertaken in accordance with Master Specification Part L01 Landscape General Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Non-Conforming or Defective Work

3 Reviewing of Pre-Qualification Status

4 Repair or Replacement

5 Co-ordination

6 Contractor’s Site Representative

7 Site Meetings

8 Working Days and Hours of Work

9 Rates and Lump Sums

10 License Requirements

11 Materials Select which materials are provided by the Principal.

12 Manufacturer’s Instructions

13 Proprietary Names Not to Be Displayed

14 Approvals and Notices

15 Advice of Attendance at Site

16 Notification of Property Occupiers

17 Clearances from Landholders

18 Restrictions Applying at the Site

19 Control of Fences and Gates

20 Condition of Site

21 Hold Points

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

PART L02 EARTHWORKS AND TOPSOILING

Unless specified below, all works must be undertaken in accordance with Master Specification Part L02 Earthworks and Topsoiling Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Extent of Works

3 Clearing and Grubbing

4 Soil Preparation Select which Topsoil Stripping(s) applies

4.1.a Topsoil Stripping

4.1.b Minor Trimming or Levelling of Subgrade

4.1.c Excavation and Removal of Unsuitable Materials

4.1.d Deep Ripping

4.1.e Cultivation and Amelioration

4.1.f Final Levelling

5 Soil Testing

6 Soil for Landscape Areas Select which Soil(s) applies

6.3.a General Landscape Soil 60/40

6.3.b General Landscape Soil 80/20

6.3.c Soil from Off Site

6.3.d Topsoil from Off Site

6.3.e Topsoil from On Site

7 Spreading of Soil

8 Soil Additives Select which Soil Additive(s) applies

8.1.a Gypsum

8.1.b Organic Compost

9 Hold Points

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

PART L03 EROSION CONTROL MATTING

Unless specified below, all works must be undertaken in accordance with Master Specification Part L03 Erosion Control Matting Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Selection and Supply of Matting Types Select who will supply the Matting

2.1.a Supply of Matting by the Principal

2.1.b Supply of Matting by the Contractor

3 Matting Types Select which Matting Type(s) applies

3.1.a Light Jute

3.1.b Jute Based Mesh

3.1.c Jute Based

3.1.d Recycled

3.1.e Heavy Jute Mesh

3.1.f Coir Matting

3.1.g Polypropylene

3.1.h Polypropylene Nets

3.1.i Short Term

3.1.j Long Term

4 Additional Matting Requirements

4.1.a Fire Retardant

4.1.b Mat Slitting

5 Site Preparation

6 Installation

6.4.a Anchoring

6.4.a Top of Batter

6.4.b Bottom of Batter

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

6.4.c Side of Batter

6.4.d Pinning

7 Maintenance

7.1.a Repair of Damaged Matting

7.1.b Reinstatement of Eroded Soil

7.1.c Reseeding and Replanting

8 Hold Points

PART L05 SUPPLY OF PLANT MATERIAL

Unless specified below, all works must be undertaken in accordance with Master Specification Part L05 Supply of Plant Material Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Local Provenance

3 Permits

4 Supply of Plant Material by the Principal Select who will supply the plant material

5 Supply of Plan Material by the Contractor

5.2.a Tubestock and Nursery Stock

5.2.b Advanced Trees

5.2.c Growing Media

5.4 Tubestock and General Nursery Stock Containers and Plant Size

5.2.a Tubestock and Nursery Stock

5.2.b Advanced Trees

5.2.c Growing Media

5.2.d Tubestock and General Nursery Stock Containers and Plant Size

5.2.e Advanced Tree Containers and Sizes

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

5.2.f.1 Containers

5.2.f.2 Ball and Burlapped

5.2.f.3 Root Control Bags

6 Hold Points

PART L10 PLANTING

Unless specified below, all works must be undertaken in accordance with Master Specification Part L10 Planting Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Weed Control

3 Setting Out

4 Preparation of Planting Holes Select which preparation method(s) apply

4.7.a Spade Dug

4.7.b Hamilton Tree Planters

4.7.c Hand Operated Auger

4.7.d Machine Mounted Auger

4.7.e Riplines

4.7.f Hand Plugging

4.7.g Mini Excavator/Backhoe/Skid Steer Loader

5 Planting Method

5.7.a Planting into Holes

5.7.b Planting into Riplines

5.7.c For Advanced Trees

6 Fertiliser

7 Root Control

7.2.a Woodchuck Equipment RS 500 – 500 mm Select which Barrier Types apply and

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

wide; Director Types apply.

7.2.b Woodchuck Equipment RS 1000 – 1000 mm wide;

7.2.c Woodchuck Equipment RS 1500 – 1500 mm wide;

7.2.d Geofabrics Australasia RCM 03030 – 300 mm wide;

7.2.e Geofabrics Australasia RCM 06030 – 600 mm wide

7.2.f Geofabrics Australasia RCM 09030 – 900 mm wide

7.2.g Geofabrics Australasia RCM 12030 – 1200 mm wide

7.2.h Woodchuck Equipment RD 640

7.2.i Woodchuck Equipment RD 1050

8 Tree Stakes for Advanced Trees

8.1.a Hardwood Stakes Select which Tree Stake(s) apply

8.1.b Treated Pine Posts

8.1.c Star Droppers

9 Marker Stakes

9.2.a Bamboo Stakes Select which Marker Stake(s) apply

9.2.b Hardwood Stakes

9.2.c Recycled Plastic Stakes

10 Tree Ties Select which Tree Tie(s) apply

10.2.a Hessian Tree Tie Woodchuck Equipment HTT - 30 mm wide

10.2.b Hessian Tree Tie Woodchuck Equipment HTT - 50 mm wide

10.2.c Polyethylyne Tree Tie - Woodchuck Equipment PTT - 50 mm wide

10.2.d Maxilock Tree Tie - Woodchuck Equipment ML 10 - 10 mm wide

10.2.e Maxilock Tree Tie - Woodchuck Equipment ML 25 - 25 mm wide

11 Tree Guards Select which Tree Guard(s) apply

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

11.2.a Rigid Polypropylene Fluteboard

11.2.b Polyethylene Plastic Sleeve

11.2.c Recycled Polypropolyne Mesh

11.2.d Mesh Guard

12 Weed Mats Select which Weed Mat(s) apply

12.2.a Jutemat Biodegradable (750-800 sqm) - 370 mm x 370 mm

12.2.b Jutemat Biodegradable (750-800 sqm) - 600 mm x 600 mm

12.2.c ReCover 100% recycled fibre (285 sqm) - 370 mm x 370 mm

12.2.d ReCover 100% recycled fibre (285 sqm) - 600 mm x 600 mm

13 Mulch

13.4.a Shredded Pine Mulch Select which Mulch(s) apply

13.4.b Pine Chip

13.4.c Red Gum Chip

13.4.d Forest Mulch

13.5.e Eco-Mulch

14 Native Revegetation Area Signage

15 Hold Points

PART L15 LAWN ESTABLISHMENT

Unless specified below, all works must be undertaken in accordance with Master Specification Part L15 Lawn Establishment Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Weed Control

3 Ground and Soil Preparation

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

4 Soil Testing

5 Supply of Soil Select which Soil(s) apply

5.3.a DPTI Premium Soil Mix

5.3.b General Landscape Soil 60/40

5.3.c General Landscape Soil 80/20

5.3.d Soil from Off Site

5.3.e Topsoil from Off Site

5.3.f Topsoil from On Site

6 Spreading of Soil

7 Soil Additives Select which Soil Additive(s) apply

7.1.a Gypsum

7.1.b Organic Compost

7.1.c Lime

8 Fertiliser Select which Fertiliser(s) apply

8.1.a Pre-Planting Fertiliser

8.1.b Soil Additives

9 Supply of Seed and Turf Select which Supply(s) apply

9.1.a Supply of Seed and Turf by the Principal

9.1.b Supply of the Seed and Turf by the Contractor

9.1.c Supply of Instant Turf by the Contractor

9.1.d Supply of Synthetic Turf by the Contractor

9.1.e ‘Male Sterile’ Kikuyu - Pennisetum clandestinum spp

9.1.f ‘Sir Walter’ Buffalo - Stenotaphrum secundatum sp

9.1.g ‘Wintergreen’ Couch - Cynodon dactylon spp

9.1.h ‘Santa Anna’ Couch - Cynodon dactylon spp

9.1.i Synthetic Turf

10 Seed and Turf Installation Select which installation(s) apply

10.2.a Broadcast Seeded (by hand)

10.2.b Hydroseeding

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

10.2.c Instant Turf

10.2.d Synthetic Turf (used for median strips and roundabouts)

11 Watering

12 Establishment Define the Establishment Period

13 Hold Points

PART L18 PALM TRANSPLANTING

Unless specified below, all works must be undertaken in accordance with Master Specification Part L18 Palm Transplanting Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Soil Testing

3 Palm Preparation Select which preparation(s) apply

3.1 General

3.2 Frond Preparation Method

3.2.a 45° Frond Removal

3.2.b 1/3 Front Removal

3.2.c No Frond Removal and Controlled Watering

3.3.a Root Preparation Method Specified by the Principal

Select which preparation requirement(s) apply

3.3.b Root Preparation Method Specified by the Contractor

3.4.a Root Pruning and Soaking Select which preparation method(s) apply

3.4.b Berm and Soaking

4 Root Excavation Method

4.2.a Hand Spade Excavated Select which method(s) apply

4.2.b Mechanically Excavated

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

4.2.c High Pressure Water Blasting

5 Transport

5.4.a Palm Support

5.4.b Burlap Root Ball

5.3 Transport Vehicle

6 Planting Procedure

6.5.a Hand Spade Excavated Planting Hole Select which preparation method(s) apply

6.5.b Mechanically Excavated Planting Hole

6.12.a TerraCottem Select which fertiliser(s) and/or additive(s) apply

6.12.b Gypsum

6.12.c Sugar

6.12.d N-Fix

6.12.e Rooting Hormone

7 Palm Support

7.2.a Root Ball Anchors Select which type(s) apply

7.2.b Anchors and Above Ground Cables -Arrowhead Land Anchors

7.2.c Anchors and Above Ground Cables -Arrowhead Steel Stakes

7.2.d Anchors and Above Ground Cables -Arrowhead Deadmen

7.3.a Clamping Device

7.3.b Polypropylene Webbing

8 Mulch

8.4.a Recycled Arborist Waste Select which mulch type(s) apply

8.4.b Eco Mulch

8.4.c Red Gum Chip

9 Watering

9.4.a Hand Watering Select which method(s) apply

9.4.b Irrigation System

10 Antitranspirants

10.2.a Anti-Stress

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

10.2.b Stressguard

10.2.c PVA Glue Mix

11 Reinstatement of Site

12 Maintenance Specify the maintenance period

13 Practical Completion

14 Hold Points

PART L19 TREE TRANSPLANTING AND RELOCATING

Unless specified below, all works must be undertaken in accordance with Master Specification Part L19 Tree Transplanting and Relocating Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Soil Testing

3 Tree Preparation Select which preparation(s) apply

3.4.a Root Preparation Method Specified by the Principal

3.4.b Root Preparation Method Specified by the Contractor

3.5.a Root Pruning and Soaking Select which preparation method(s) apply

3.5.b Berm and Soaking

4 Root Excavation Method

4.2.a Hand Spade Excavated

4.2.b Mechanically Excavated

4.2.c High Pressure Water Blasting

5 Transport

6 Planting Procedure

6.5.a Hand Spade Excavated Planting Hole Select which preparation method(s) apply

6.5.b Mechanically Excavated Planting Hole

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

6.12.a TerraCottem Select which fertiliser(s) and/or additive(s) apply

6.12.b Gypsum

6.12.c Sugar

6.12.d N-Fix

6.12.e Rooting Hormone

7 Tree Support

7.2.a Root Ball Anchors Select which type(s) apply

7.2.b Anchors and Above Ground Cables -Arrowhead Land Anchors

7.2.c Anchors and Above Ground Cables -Arrowhead Steel Stakes

7.2.d Anchors and Above Ground Cables -Arrowhead Deadmen

7.3.a Clamping Device Select which type(s) apply

7.3.b Polypropylene Webbing

8 Mulch

8.4.a Recycled Arborist Waste Select which mulch type(s) apply

8.4.b Eco Mulch

8.4.c Red Gum Chip

9 Watering

9.4.a Hand Watering Select which method(s) apply

9.4.b Irrigation System

10 Antitranspirants

10.2.a Anti-Stress

10.2.b Stressguard

10.2.c PVA Glue Mix

11 Reinstatement of Site

12 Maintenance Specify the maintenance period

13 Practical Completion

14 Hold Points

PART L20 HYDROSEEDING

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

Unless specified below, all works must be undertaken in accordance with Master Specification Part L20 Hydroseeding Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Supply of Seed Select which seed(s) apply

2.1.a Non-Native Seed

2.1.b Native Seed

3 Weed Control

4 Setting Out

5 Hydroseeding Mixture

6 Method of Seedbed Preparation and Seed Sowing

6.1.a Method Specified by Principal Select which method(s) apply

6.1.b Method Recommended by the Contractor

7 Practical Completion

8 Native Revegetation Area Sign

9 Hold Points

PART L21 DIRECT SEEDING

Unless specified below, all works must be undertaken in accordance with Master Specification Part L21 Direct Seeding Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

2 Supply of Seed

2.1.a Non-Native Seed Select which seed(s) apply

2.1.b Native Seed

3 Weed Control

4 Setting Out

5 Method of Seedbed Preparation and Seed Sowing

Select which method(s) apply

5.4.a Machine Direct Seeding

5.4.b Hand Direct Seeding

6 Fertiliser

7 Practical Completion

8 Native Revegetation Area Sign

9 Hold Points

PART L23 PLANT RESCUE AND MAINTENANCE

Unless specified below, all works must be undertaken in accordance with Master Specification Part L23 Plant Rescue and Maintenance Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Plant Rescue

2.2.a Plant Relocation Select which plant rescue method(s) apply

2.2.b Seed Collection

2.2.c Vegetative Cuttings

3 Plant Relocation Procedures

3.10.a Spade Dug Select which preparation method(s) apply

3.10.b Mini Excavator/Backhoe/Skid Steer Loader

3.10.c Hand-Operated Auger

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

3.10.d Machine-Mounted Auger

3.13.a Spade Dug Select which technique(s) apply

3.13.b Mini Excavator/Backhoe/Skid Steer Loader Excavated

3.22.a Water Retention Agents

3.22.b Terrcottem

3.28.a Anti-Stress Select which apply

3.28.b Stressguard

3.31.a Bamboo Stakes 750 mm long, 10-12 mm diameter

Select which stake(s) apply

3.31.b Recycled Plastic Stakes 750 mm long, 25 x 25 mm

3.31.c Hardwood Stakes - Small 750 mm long, 25 x 25 mm

3.31.d Hardwood Stakes - Large 1 m long, 25 x 25 mm

3.32.a Rigid Polypropylene Fluteboard Select which tree guard(s) apply

3.32.b Polyethylene Plastic Sleeve

3.32.c Mesh

3.35.a Jutemat Biodegradable (750 - 800 gsm) 370 x 370 mm

Select which weed mat(s) apply

3.35.b Jutemat Biodegradable (750 - 800 gsm) 600 x 600 mm

3.35.c ReCover 100% recycled fibre 370 x 370 mm

3.35.d ReCover 100% recycled fibre 600 x 600 mm

3.40.a Forest Mulch Select which mulch(s) apply

3.40.b Eco-Mulch

3.40.c Red Gum Chip

4 Maintenance

4.8.a Pest/Disease Control Method Specified by the Principal

Select which method(s) apply

4.8.b Pest/Disease Control Method Specified by the Contractor

5 Hold Points

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

PART L25 IRRIGATION

Unless specified below, all works must be undertaken in accordance with Master Specification Part L25 Irrigation Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Referenced Documents

3 Abbreviations and Irrigation Terms

4 Design

5 Water Supply

6 Salvaged Materials

7 Setting Out and Checking of Work

8 Backflow Prevention

9 Trenching and Boring

10 Laying and Jointing of Pipes

11 Pipes and Fittings

12 Joints and Jointing Materials

13 Valves

14 Valve Boxes

15 Filters

16 Sprinklers

17 Drip Irrigation System

18 Thrust Blocks

19 Electrical

20 Control System

21 As Constructed Drawings

22 Manuals and Documentation

23 Inspection and Testing

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

24 Maintenance (Defect Liability)

25 Hold Points

PART L27 WATER SENSITIVE URBAN DESIGN TREATMENTS

Unless specified below, all works must be undertaken in accordance with Master Specification Part L27 Water Sensitive Urban Design Environments Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Extent of Works

3 Clearing and Grubbing

4 Soil Testing

5 Earthworks

6 Bioretention Systems Media Layers

7 Moisture Control

8 Mulch

9 Drainage

10 Maintenance Specify Maintenance Frequency

11 Hold Points

PART L30 TREE HOLLOW RELOCATION

Unless specified below, all works must be undertaken in accordance with Master Specification Part L30 Tree Hollow Relocation Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

Does Not Apply

2 Fauna Habitat

3 Inspecting for Tree Hollows

3.1.a Inspection by the Contractor Select who will inspect the Tree Hollow

3.1.b Inspection by Others

3.1.c Identification of Hollows

4 Habitat Creation

5 Tree Hollow Harvesting and Relocation

5.1.a End of a Natural Tree Hollow Select which type(s) apply

5.1.b Section of a Natural Tree Hollow

5.1.c Natural Hollows

5.1.d Entire Trees with Hollows

5.1.e Manufactured Hollows and Nesting Boxes

5.2.a Arboreal Specify if other persons must select the site

5.2.b Terrestrial

5.2.c Hollow Orientation

5.3.a Chain Attachment Specify which attachment(s) apply

5.3.b Rod Attachment

6 Equipment for Installation of Hollows

6.1.a Use of Climbers Select which requirement(s) apply

6.1.b Elevated Platform

6.1.c Equipment Recommended by Contractor

6.2 Whole Trees

7 Removal of Material from Site Specify if any other material may be removed from site.

8 Maintenance

9 Hold Points

PART L40 TREE PRUNING AND REMOVAL

Unless specified below, all works must be undertaken in accordance with Master Specification Part L40 Tree Pruning and Removal Edition Dec 2017.

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Tree Pruning and Removal

3 Clearance Envelope Pruning and Removal

4 Fauna Protection and Habitat

5 Disposal of Cut Material Select which material(s) apply

6 Prevention of Suckering and Regrowth

7 Stump Removal

PART L45 BUSHCARE

Unless specified below, all works must be undertaken in accordance with Master Specification Part L45 Bushcare Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2.1.a High Quality and Sensitive Sites Specify which site(s) apply

2.1.b Moderate Quality Sites

2.1.c Sites with Weedy Areas

3 Weed Control Requirements

3.1 Methods of Weed Control Specified by the Principal

Specify which requirement(s) apply and which weed type(s)

3.2 Methods of Weed Control Specified by the Contractor

4 Methods of Weed Control Select which method(s) apply

4.2.a Cut and Swab, Cut and Frill

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

4.2.b Cut Only

4.2.c Hand-pull

4.2.d Spot Spray

4.2.e Wiping

4.2.f Frilling Only

4.2.g Ringbarking

5 Disposal of Cut Material

5.5.a Stockpile On-Site Select which method(s) apply

5.5.b Spread On-Site

5.5.c Remove from Site

5.5.d Burning

5.5.e Phytophthora (Dieback) Areas

6 Records

7 Native Revegetation Area Sign

8 Hold Points

PART L48 HERBACEOUS WOODY WEED CONTROL

Unless specified below, all works must be undertaken in accordance with Master Specification Part L48 Herbaceous Woody Weed Control Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Weed and Vegetation Control

2.7.a Slash Only Select which herbaceous method(s) apply

2.7.b Slash and Spray

2.7.c Boom Spray

2.7.d Spot Spray

2.7.e Hand Pull

2.8.a Cut Only Select which woody weed method(s) apply

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

2.8.b Cut and Swab

2.8.c Spot Spray

2.8.d Stem Injection

2.8.e Basal Bark Spray

2.8.f Hand Pull

3 Fauna Protection

4 Disposal of Cut Material Select which Material(s) apply

4.1 Phytophthora

4.2 Material Containing Woody Weeds

4.3 Other Materials

5 Prevention of Suckering and Regrowth

6 Stump Removal

7 Damage and Nuisance

8 Records and Reporting

9 Hold Points

PART L50 PERMEABLE PAVING

Unless specified below, all works must be undertaken in accordance with Master Specification Part L50 Permeable Paving Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Permeable Paving Requirements

2.1.a Installation of Permeable Paving for Future Tree Planting

2.1.b Installation of Permeable Paving around Existing Trees

2.1.c Replacement of Existing Pavement with

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

Permeable Paving for Future Tree Planning

2.1.d Replacement of Existing Pavement with Permeable Paving Around Existing Trees

3 Site Preparation

3.5.a Excavation Method Specified by the Principal

Select which method(s) apply

3.5.b Excavation Method Recommended by the Contractor

3.9.a Air Excavation within Tree Root Zone Select which method(s) apply

3.9.b Hand Spade Excavation within Tree Root Zone

4 Tree Root Care

5 Load Support

5.1 General Select with method(s) apply

5.2.a Structural Soil Specify if analysis is required and finish levels.

5.2.b Ecocell Specify spacing required

6.1.a Porous Concrete Select which paving type(s) apply

6.1.b Aggregate Bonded with Terrabond

6.1.c Boral Hydrapave

6.1.d Standard Paving Specify which types

PART L60 MAINTENANCE OF PLANTS

Unless specified below, all works must be undertaken in accordance with Master Specification Part L60 Maintenance of Plants Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Replacement of Defective, Damaged or Dead Plants

3.4.a Hand Watering Select which method(s) apply

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

3.4.b Irrigation System

4 Weed Control

5 Pest/Disease Control Select which method(s) apply

5.3.a Pest/Disease Control Specified by the Principal

Specify which chemicals and rates to use

5.3.b Pest/Disease Control Method Recommended by Contractor

6 Maintenance of Marker Stakes, Tree Guards, Tree Stakes, Tree Ties and Weed Mats

7 Maintenance of Mulch

8 Formative Pruning Only Apply for Advanced Trees

9 Follow Up Fertiliser Select which fertiliser(s) apply

9.1.a Slow Release Tablets

9.1.b Slow Release Granule

9.1.c Complete Organic

9.1.d Complete Mineral

9.1.e Soluble Mineral

9.1.f Liquid

10 Removal of Marker Stakes and Tree Guards

11 Hold Points

PART L65 MAINTENANCE OF HYDROSEEDED AND DIRECT SEEDED AREAS

Unless specified below, all works must be undertaken in accordance with Master Specification Part L65 Maintenance of Hydroseeded and Direct Seeded Areas Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Weed Control

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

2.1.a Spot Spray Select which method(s) apply

2.1.b Boom Spray

3 Pest/Disease Control

3.1.a Pest/Disease Control Specified by the Principal

Specify which chemicals and rates to use

3.1.b Pest/Disease Control Method Recommended by Contractor

4 Grass Slashing

5 Repairs

6 Hold Points

PART L70 MAINTENANCE OF SEEDED AREAS AND LAWNS

Unless specified below, all works must be undertaken in accordance with Master Specification Part L70 Maintenance of Seeded Areas and Lawns Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Weed Control

2.2.a Spot Spray Select which apply

2.2.b Boom Spray

3 Pest/Disease Control

3.3.a Pest/Disease Control Specified by the Principal

Specify which chemicals and rates to use

3.3.b Pest/Disease Control Method Recommended by Contractor

4 Cutting of Lawn and Seeded Areas

5 Follow Up Fertiliser Select which fertiliser(s) apply

5.2.a Complete Organic

5.2.b Greenup Lawn Fertiliser

5.2.c Liquid Mix

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

5.2.d Complete D

6 Repairs to Lawn and Seeded Areas

7 Lawn Renovation Select which method(s) apply

7.1.a Vertical Mowing Specify mowing depth

7.1.b Coring Specify cavity depth

7.1.c Slicing Specify slicing depth

7.1.d Topdressing

8 Hold Points

PART L80 MAINTENANCE OF MAINTENANCE OF NATIVE GRASSES

Unless specified below, all works must be undertaken in accordance with Master Specification Part L80 Maintenance of Native Grasses Edition Dec 2017.

Heading

Title Details

1 General Applies

Applies (Exceeds with spec information)

Does Not Apply

2 Replacement of Defective, Damaged or Dead Plants

3 Watering of Plants Select which method(s) apply

3.2.a Hand Watering

3.2.b Irrigation System

4 Weed Control Select which control(s) apply

4.2.a Knockdown Herbicide

4.2.b Pre-Emergent Herbicide

5 Slashing Specify if the native seeds need to be collected

5.3.a Group 1: Summer Active Grasses (C4 Species)

Select which maintenance(s) apply

5.3.b Group 2: Winter Active Grasses (C3 Species)

6 Pest/Disease Control

Project: XXXXXX Specification: Contract Specific Technical Requirements Division L Landscaping

6.1 General

6.3.a Pest/Disease Control Specified by the Principal

Specify which chemicals and rates to use

6.3.b Pest/Disease Control Method Recommended by Contractor

7 Maintenance of Marker Stakes

8 Maintenance of Tree Guards

9 Maintenance of Weed Mats

10 Maintenance of Mulch

11 Follow Up Fertiliser

11.1 General

11.3.a Pelleted Organic Fertiliser Select which fertiliser(s) apply

11.3.b Slow Release Granule

12 Removal of Marker Stakes and Tree Guards

13 Hold Points